CN110133338A - A kind of twin-core electric energy meter and display methods - Google Patents

A kind of twin-core electric energy meter and display methods Download PDF

Info

Publication number
CN110133338A
CN110133338A CN201910409908.0A CN201910409908A CN110133338A CN 110133338 A CN110133338 A CN 110133338A CN 201910409908 A CN201910409908 A CN 201910409908A CN 110133338 A CN110133338 A CN 110133338A
Authority
CN
China
Prior art keywords
core
video memory
metering
display
management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910409908.0A
Other languages
Chinese (zh)
Other versions
CN110133338B (en
Inventor
刘型志
周全
郑可
田娟
侯兴哲
谢永明
吴彬
宫林
籍勇亮
陈文礼
杨芾藜
彭鹏
刘畅
黄可
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
State Grid Corp of China SGCC
State Grid Chongqing Electric Power Co Ltd
Holley Technology Co Ltd
Original Assignee
Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
State Grid Corp of China SGCC
State Grid Chongqing Electric Power Co Ltd
Holley Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd, State Grid Corp of China SGCC, State Grid Chongqing Electric Power Co Ltd, Holley Technology Co Ltd filed Critical Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
Priority to CN201910409908.0A priority Critical patent/CN110133338B/en
Publication of CN110133338A publication Critical patent/CN110133338A/en
Application granted granted Critical
Publication of CN110133338B publication Critical patent/CN110133338B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • G01R11/02Constructional details
    • G01R11/16Adaptations of counters to electricity meters
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R35/00Testing or calibrating of apparatus covered by the other groups of this subclass
    • G01R35/04Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Controls And Circuits For Display Device (AREA)

Abstract

The invention discloses a kind of twin-core electric energy meters, belong to electric energy meter technical field, and the electric energy meter includes metering module and management module, and the management module is connected to the metering module by SPI communication interface;The metering module includes metering core, display and display button, and the management module includes management core;The metering core is internally provided with video memory, for caching all video memory frames for being output to the display;The metering core is connected to the display by the video memory, and the video memory is made of multiple metering video memory frames and multiple management video memory frames;The display button is connected to the display pin of the metering core, for switching the current video memory frame of the video memory.Electric energy meter of the present invention and display methods do not change twin-core electric energy meter server-client communication model, realize that management module data are flexibly shown in metering module, solve the problems, such as that installing pipe reason module is not unable to satisfy vertification regulation requirement.

Description

A kind of twin-core electric energy meter and display methods
Technical field
The present invention relates to electric energy meter technical field, especially a kind of twin-core electric energy meter and display methods.
Background technique
JJG596 is regulation of the State Bureau of Quality Supervision by national standard calibrating electric energy meter.Including following 7 calibratings project: appearance Inspection, AC voltage test, false actuation test, starting test, elementary error, instrument constant test, clock error of time of day.It is existing Scheme is not able to satisfy vertification regulation requirement when lacking management module.It is specific as follows:
" visual examination " project needs to check that electricity is shown in regulation, removes after management module without display, is unsatisfactory for regulation It is required that;
" instrument constant test " is also required to read display data in regulation, for recording the calibrating project beginning and end moment Energy value.Remove after management module without display, is unsatisfactory for regulatory requirements;Existing design can only be by measuring RS485 port Energy data is read, it is also infeasible that modification vertification regulation, which reads electric energy using communication, because electric energy meter communication protocol has very It is a variety of, and always in evolution, vertification regulation can not determine specific communication protocol.
" clock error of time of day " is tested in regulation, and it will be " more that existing scheme, which is to send commands to metering core by managing core, After function mouth output " is switched to second signal output, aptitude tests.It will be unable to calibrating " clock day timing mistake after removing management module Difference ".
For existing scheme not display design in metering core, technical difficult points are will to show that design after metering core, is managed Reason core related data will be unable to show.Although " Multifunctional mouth output " function is readily devised metering core, due to can not By display design in metering core, even if " Multifunctional mouth output " Functional Design is become nonsensical to metering core.
Metering core and management core have many data to need to show, the traffic model of server-client between twin-core, certainly Determine only to manage core actively from metering core access evidence, then data have been shown in management core.It can not achieve metering core actively It is shown to management core access evidence, then data in metering core.And kilowatt meter reading-out system is by managing core to metering core number of request According to so server, client role cannot be exchanged.In addition, the firmware of management core needs often to upgrade, management core is new The data and final display bitmap data for increasing display are unpredictable for metering core.It needs while rising when updating and management core Grade metering core, could correctly show.But metering core program cannot be upgraded by IR46 requirement.
Existing scheme, in order to keep display data real-time synchronous with metering core, management core needs inquiry metering in real time Core data.Real-time query mode occupies too many management core resource and SPI communication bandwidth.Reduce management core obtain metering core its The efficiency of his data and the efficiency for managing core itself.
Summary of the invention
In view of the above drawbacks of the prior art, it is an object of the invention to provide a kind of twin-core electric energy meters, realize management Module data is flexibly shown in metering module;Realize that the electric energy meter of not installing pipe reason module can correctly measure electricity and display;It is real After the electric energy meter management core program upgrading for now installing management module, even if management display data change, upgrading metering is not needed yet Core program.Solve the problems, such as that installing pipe reason module is not unable to satisfy vertification regulation requirement.Solves management core program upgrading simultaneously It is needed when needing to change display while upgrading metering core program and asking for requirement cannot be upgraded by being unsatisfactory for IR46 metering core program Topic.
First embodiment of the invention provides a kind of twin-core electric energy meter, and the electric energy meter includes metering module and management module, The metering module is connected to the management module by SPI communication interface;
The metering module includes metering core, display and display button, and the management module includes management core;
The metering core is internally provided with video memory, for caching all video memory frames for being output to the display;
The metering core is connected to the display by the video memory;
The video memory is made of multiple metering video memory frames and multiple management video memory frames;
The metering video memory frame is used to cache each framing bit figure of metering core internal data;
The management video memory frame is used for each framing bit figure of cache management core forward data;
The display button is connected to the display pin of the metering core, for switching the current video memory frame of the video memory.
Optionally, quantity of the metering video memory frame in the video memory is fixed, and the video memory frame in the metering video memory It is total corresponding with most display screen number demands.
Optionally, the video memory frame in the video memory is provided with number.
Second embodiment of the invention proposes a kind of display methods of twin-core electric energy meter, and this method includes:
The video memory frame of video memory inside metering core is respectively allocated to metering module and management module;
Determine that management core will need the data for updating display to be converted to display bitmap simultaneously when needing to update display managing core Metering core is issued by SPI communication mouth;
Determine that metering core will need the data for updating display to be converted to display bitmap simultaneously when needing to update display in metering core The corresponding video memory of deposit metering display frame;
Metering core has detected whether to receive management core SPI communication write request, is receiving display bitmap that management core is sent In the case of, the display bitmap deposit management that core is sent will be managed and show the corresponding video memory of frame.
Optionally, the data that update will be needed to be converted to display bitmap in metering core and to be stored in metering video memory frame corresponding aobvious After depositing, or;
After managing the corresponding video memory of bitmap deposit management display frame that core is sent, this method also includes, in the aobvious of deposit When to deposit frame be the video memory frame currently shown, metering core label display updates mark.
Optionally, this method also includes, and the aobvious time is taken turns in metering core setting, reach it is described take turns the aobvious time when, metering core will The video memory frame of next number is set as current video memory frame in video memory, and juxtaposition display updates request flag.
Optionally, this method also includes to show key by pinch roller, the video memory frame of number next in video memory is arranged metering core For current video memory frame, juxtaposition display updates request flag.
Optionally, before current video memory frame feeding display being shown, this method also includes described in metering core checks Display updates request flag.
By adopting the above-described technical solution, the present invention has the advantage that:
1, do not change twin-core server-client communication model, do not change role of the twin-core in traffic model yet, realize Management core data are flexibly shown in metering core;
2, meet the not upgradeable requirement of IR46 metering core program, after management core program upgrading, changing display not It needs to upgrade metering core.
3, display and the same amount of data of existing scheme, SPI bandwidth occupancy reduce.
Other advantages, target and feature of the invention will be illustrated in the following description to a certain extent, and And to a certain extent, based on will be apparent to those skilled in the art to investigating hereafter, Huo Zheke To be instructed from the practice of the present invention.
Detailed description of the invention
Detailed description of the invention of the invention is as follows:
Fig. 1 is the structural block diagram of electric energy meter of the invention;
Fig. 2 is the electric energy meter display methods flow chart of the embodiment of the present invention;
Fig. 3 is the video memory data structure diagram of the embodiment of the present invention.
Specific embodiment
Present invention will be further explained below with reference to the attached drawings and examples.
As described in Figure 1, a kind of twin-core electric energy meter of the invention, the electric energy meter include metering module and management module, institute It states metering module and the management module is connected to by SPI communication interface;
The metering module includes metering core, display and display button, and the management module includes management core;
The metering core is internally provided with video memory, for caching all video memory frames for being output to the display;
The metering core is connected to the display by the video memory;
The video memory is made of multiple metering video memory frames and multiple management video memory frames;
The metering video memory frame is used to cache each framing bit figure of metering core internal data;
The management video memory frame is used for each framing bit figure of cache management core forward data;
The display button is connected to the display pin of the metering core, for switching the current video memory frame of the video memory.
As shown in Figure 1, twin-core table includes metering core and management core two subsystems, SPI mouthfuls are used between two subsystems Connection.It is communicated with client-server model, wherein metering core is server, and Xiang Guanli core provides reading data and sets The service of setting.Management core is client, initiates to request from management core to metering core, and metering core is responded, and metering core cannot be actively Request is initiated to management core.
Metering bobbin subsystem includes metering chip, metering single-chip microcontroller, metering memory, metering RS485 port, clock core Piece, Clock battery, super capacitor, multi-functional output, display, display button, infrared communication mouth etc..
Managing bobbin subsystem includes management single-chip microcontroller, management memory, safety chip, management RS485 port, load control System.
Optionally, quantity of the metering video memory frame in the video memory is fixed, and the video memory frame in the metering video memory It is total corresponding with most display screen number demands.
Optionally, the video memory frame in the video memory is provided with number.
As shown in Fig. 2, metering core inner part meets the video memory array of demand maximum display screen number in future, front face with one Divide video memory fixed allocation to show to metering core data to use, since metering core program is not upgradeable, which is solid Change.Aft section video memory is distributed to management core and is used, when management core shows that data screen is less, video memory tail portion null data. Current screen serial number is the position indicator pointer that a current display uses that video memory, when key wheel is aobvious or self-timing wheel is aobvious, when Preceding screen serial number adds 1, moves down, switching display content, when current screen serial number reaches the last one management core video memory, is circulated back to 1st screen display is deposited.
On the basis of previous embodiment, twin-core electric energy meter system power supply uses the transformer of electrical isolation in the present embodiment The mode of multiple-channel output winding provides the power supply being mutually isolated to metering module and management module, management module power supply damage respectively The bad normal work for not interfering with metering module.
As shown in Figure 1, metering module includes voltage sample, current sample, metering chip, metering core, metering memory, meter Measure RS485 port, clock chip, Clock battery, super capacitor, multi-functional output, display, display button, infrared communication Mouthful etc..
Voltage sampling circuit connects the AD sampling pin of metering chip with current sampling circuit, and metering chip passes through the pin The analog quantitys such as sampled voltage, electric current, frequency;
Metering chip is connect with metering core by UART, and FM33G045 metering core is used in the present embodiment, and metering chip will Sampling analog quantity is filtered, amplifies, AD conversion, after digital operation, by the voltage being calculated, electric current, frequency, power, function The electric parameters such as rate factor and electric energy data send metering core to by the UART port.
Metering core is connect with metering memory using I2C and spi bus, and metering core adds up electric flux, calculates school Metering memory is stored in after testing.
Clock battery and super capacitor are powered to clock chip jointly using 2 diode unilateral conduction characteristics, system electricity It is charged by diode unilateral conduction characteristic to super capacitor in source.
When twin-core electric energy meter system power supply normal power supply, twin-core electric energy meter system power supply charges to super capacitor, super electricity Hold voltage and be higher than cell voltage, so being powered by super capacitor to clock chip.
When having a power failure, when battery has electricity, the first stage is powered by diode to clock chip by super capacitor, the Two-stage when super-capacitor voltage is equal to cell voltage, is powered to clock chip jointly by super capacitor and battery.
When sending power failure, when dead battery, first stage second stage is powered by super capacitor, can maintain clock 2 More than it.
Metering core is connect with clock chip by I2C bus, and metering core reads the clock number of clock chip by I2C bus According to.
Metering core is connect with display by I2C bus, and metering core needs electric parameter, electric flux, clock etc. to be shown Data are converted to and are stored in corresponding video memory as video memory frame after bitmap, and by video memory data by I2C bus be sent to display into Row display.
Display button is connected to the input pin of metering core, and metering core detects the decline that the input pin is generated due to key Display for switching video memory frame number, and is refreshed in edge.
Infrared communication mouth is connected to management core by UART;
Multi-functional delivery outlet is by the multi-functional open-drain delivery outlet of metering core and clock chip second signal open-drain output mouth line with after Connection;
Management core is connect by spi bus with metering core, and core is managed in the present embodiment using FM33A048 and manages core, management Core reads the data such as electric parameter, electric flux and the clock that metering core generates by the spi bus.It simultaneously will by the spi bus Management core needs data display bitmap to be shown to be sent to metering core.
Manage bobbin subsystem include management core, management memory, safety chip, management RS485 port, load control system, Uplink module, downstream module and bluetooth module.
Management memory is connect by I2C and spi bus with management core;
Safety chip passes through ISO7816 mouthfuls of connection management cores;RS485 port is managed by passing through after light-coupled isolation UART connection management core;
Load control system by operate a switch, two pins that close a floodgate are connected to management core;
Uplink module, downstream module, bluetooth module pass through UART respectively and are connected to management core;
The second object of the present invention is to provide a kind of display methods of twin-core electric energy meter, twin-core server-client is not changed Machine traffic model does not change role of the twin-core in traffic model yet, realizes that management core data are flexibly shown in metering core, this hair Bright method includes:
This method includes:
The video memory frame of video memory inside metering core is respectively allocated to metering module and management module;
Determine that management core will need the data for updating display to be converted to display bitmap simultaneously when needing to update display managing core Metering core is issued by SPI communication mouth;
Determine that metering core will need the data for updating display to be converted to display bitmap simultaneously when needing to update display in metering core The corresponding video memory of deposit metering display frame;
Metering core has detected whether to receive management core SPI communication write request, is receiving display bitmap that management core is sent In the case of, the display bitmap deposit management that core is sent will be managed and show the corresponding video memory of frame.
Optionally, the data that update will be needed to be converted to display bitmap in metering core and to be stored in metering video memory frame corresponding aobvious After depositing, or;
After managing the corresponding video memory of bitmap deposit management display frame that core is sent, this method also includes, in the aobvious of deposit When to deposit frame be the video memory frame currently shown, metering core label display updates mark.
Optionally, this method also includes, and the aobvious time is taken turns in metering core setting, reach it is described take turns the aobvious time when, metering core will The video memory frame of next number is set as current video memory frame in video memory, and juxtaposition display updates request flag.
Optionally, this method also includes to show key by pinch roller, the video memory frame of number next in video memory is arranged metering core For current video memory frame, juxtaposition display updates request flag.
Optionally, before current video memory frame feeding display being shown, this method also includes described in metering core checks Display updates request flag.
As shown in figure 3, for the invention shows method flow diagram,
Manage core process:
1, client's machine testing display updates, to determine the need for sending data to metering core;
2, the data of core update are managed after last time being sent display bitmap data and state all collects;
3, the data being collected into and state are converted to the bitmap data that can directly issue display;
4, bitmap data is issued into metering core;
Metering core process:
1, last time is updated into the metering core data updated after metering video memory and state collection;
2, the metering core data and state that are collected into are converted into bitmap data, are stored in metering core correlation video memory, and mark The video memory updates mark.
3, it checks whether and receives the management new bitmap data of core, if there is new data, be stored in management core correlation video memory, and mark Remember that the video memory updates mark.
4, it handles display button message and timing wheel shows the time, if desired switching display, then be switched to next screen serial number.
5, it checks that preceding step generates current video memory more new logo or is switched to next screen, then send corresponding video memory content Enter display to show.
It should be understood by those skilled in the art that, embodiments herein can provide as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the application Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the application, which can be used in one or more, The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces The form of product.
The application is referring to method, the process of equipment (system) and computer program product according to the embodiment of the present application Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
Finally it should be noted that: the above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof, to the greatest extent Invention is explained in detail referring to above-described embodiment for pipe, it should be understood by those ordinary skilled in the art that: still It can be with modifications or equivalent substitutions are made to specific embodiments of the invention, and without departing from any of spirit and scope of the invention Modification or equivalent replacement, should all cover within the scope of the claims of the present invention.

Claims (8)

1. a kind of twin-core electric energy meter, which is characterized in that the electric energy meter includes metering module and management module, the metering module The management module is connected to by SPI communication interface;
The metering module includes metering core, display and display button, and the management module includes management core;
The metering core is internally provided with video memory, for caching all video memory frames for being output to the display;
The metering core is connected to the display by the video memory;
The video memory is made of multiple metering video memory frames and multiple management video memory frames;
The metering video memory frame is used to cache each framing bit figure of metering core internal data;
The management video memory frame is used for each framing bit figure of cache management core forward data;
The display button is connected to the display pin of the metering core, for switching the current video memory frame of the video memory.
2. a kind of twin-core electric energy meter according to claim 1, it is characterised in that: the metering video memory frame is in the video memory Quantity fix, and it is described metering video memory in video memory frame sum it is corresponding with most display screen number demands.
3. a kind of twin-core electric energy meter according to claim 2, it is characterised in that: the video memory frame in the video memory is provided with volume Number.
4. a kind of display methods of twin-core electric energy meter, which is characterized in that this method includes:
The video memory frame of video memory inside metering core is respectively allocated to metering module and management module;
Determine that management core will need the data for updating display to be converted to display bitmap and pass through when needing to update display managing core SPI communication mouth issues metering core;
Determine that metering core will need the data for updating display to be converted to display bitmap and be stored in when needing to update display in metering core The corresponding video memory of metering display frame;
Metering core has detected whether to receive management core SPI communication write request, the case where receiving the display bitmap that management core is sent Under, the display bitmap deposit management that core is sent will be managed and show the corresponding video memory of frame.
5. a kind of display methods of twin-core electric energy meter according to claim 4, which is characterized in that will be needed more in metering core After new data are converted to display bitmap and are stored in the corresponding video memory of metering video memory frame, or;
After managing the corresponding video memory of bitmap deposit management display frame that core is sent, this method also includes, in the video memory frame of deposit For currently show video memory frame when, metering core label display update mark.
6. a kind of display methods of twin-core electric energy meter according to claim 5, which is characterized in that this method also includes to count Measure core setting and take turns the aobvious time, reach it is described take turns the aobvious time when, metering core sets the video memory frame of number next in video memory to Current video memory frame, juxtaposition display update request flag.
7. a kind of display methods of twin-core electric energy meter according to claim 6, which is characterized in that this method also includes to press Pinch roller shows key, and the video memory frame of number next in video memory is set current video memory frame by metering core, and juxtaposition display updates request Mark.
8. a kind of display methods of twin-core electric energy meter according to claim 6 or 7, which is characterized in that by current video memory frame Before feeding display is shown, this method also includes that metering core checks that the display updates request flag.
CN201910409908.0A 2019-05-16 2019-05-16 Double-core electric energy meter and display method Active CN110133338B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910409908.0A CN110133338B (en) 2019-05-16 2019-05-16 Double-core electric energy meter and display method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910409908.0A CN110133338B (en) 2019-05-16 2019-05-16 Double-core electric energy meter and display method

Publications (2)

Publication Number Publication Date
CN110133338A true CN110133338A (en) 2019-08-16
CN110133338B CN110133338B (en) 2021-03-30

Family

ID=67574671

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910409908.0A Active CN110133338B (en) 2019-05-16 2019-05-16 Double-core electric energy meter and display method

Country Status (1)

Country Link
CN (1) CN110133338B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112098924A (en) * 2020-11-04 2020-12-18 南方电网数字电网研究院有限公司 Interactive function testing method and device based on double-core intelligent electric meter
CN112305305A (en) * 2020-02-21 2021-02-02 贵州电网有限责任公司 Isolation processing system between two cores of modular electric energy meter
CN112698068A (en) * 2020-12-08 2021-04-23 烟台科大正信电气有限公司 Internet of things modular electric energy meter capable of monitoring temperature of terminal block
CN112858993A (en) * 2021-02-20 2021-05-28 南方电网数字电网研究院有限公司 Double-core electric energy meter test system
CN114764959A (en) * 2021-01-13 2022-07-19 辽宁思凯科技股份有限公司 Double-core intelligent water meter

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102062814A (en) * 2009-11-16 2011-05-18 上海安科瑞电气股份有限公司 ZIGBEE technology-based three-phase guide rail-type installed electric energy meter
KR101166329B1 (en) * 2012-01-10 2012-07-18 송원순 Data concentrator unit using a power line communication remote meter reading
CN104330619A (en) * 2014-09-16 2015-02-04 杭州西力电能表制造有限公司 Transformer electric energy meter and thermal equilibrium calculating alarm method thereof
CN104391173A (en) * 2014-12-08 2015-03-04 国网宁夏电力公司固原供电公司 Jump-out type expenditure-controlled intelligent electric energy meter system and jump-out type expenditure-controlled intelligent electric energy meter
CN205176133U (en) * 2015-12-14 2016-04-20 威胜集团有限公司 Electric energy meter based on SOC measures chip
CN108414830A (en) * 2018-02-05 2018-08-17 国网江苏省电力有限公司苏州供电分公司 Twin-core intelligent electric meter with non-invasive powerline road breakdown judge function
CN108761160A (en) * 2018-08-20 2018-11-06 贵州电网有限责任公司 A kind of electric energy meter legality measurement and non-legal system functional hardware separated structure
CN109739863A (en) * 2019-01-22 2019-05-10 威胜集团有限公司 Electric energy meter data managing method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102062814A (en) * 2009-11-16 2011-05-18 上海安科瑞电气股份有限公司 ZIGBEE technology-based three-phase guide rail-type installed electric energy meter
KR101166329B1 (en) * 2012-01-10 2012-07-18 송원순 Data concentrator unit using a power line communication remote meter reading
CN104330619A (en) * 2014-09-16 2015-02-04 杭州西力电能表制造有限公司 Transformer electric energy meter and thermal equilibrium calculating alarm method thereof
CN104391173A (en) * 2014-12-08 2015-03-04 国网宁夏电力公司固原供电公司 Jump-out type expenditure-controlled intelligent electric energy meter system and jump-out type expenditure-controlled intelligent electric energy meter
CN205176133U (en) * 2015-12-14 2016-04-20 威胜集团有限公司 Electric energy meter based on SOC measures chip
CN108414830A (en) * 2018-02-05 2018-08-17 国网江苏省电力有限公司苏州供电分公司 Twin-core intelligent electric meter with non-invasive powerline road breakdown judge function
CN108761160A (en) * 2018-08-20 2018-11-06 贵州电网有限责任公司 A kind of electric energy meter legality measurement and non-legal system functional hardware separated structure
CN109739863A (en) * 2019-01-22 2019-05-10 威胜集团有限公司 Electric energy meter data managing method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王立州 等: "基于IR46 标准的新型智能双芯电表设计", 《自动化仪表》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112305305A (en) * 2020-02-21 2021-02-02 贵州电网有限责任公司 Isolation processing system between two cores of modular electric energy meter
CN112098924A (en) * 2020-11-04 2020-12-18 南方电网数字电网研究院有限公司 Interactive function testing method and device based on double-core intelligent electric meter
CN112698068A (en) * 2020-12-08 2021-04-23 烟台科大正信电气有限公司 Internet of things modular electric energy meter capable of monitoring temperature of terminal block
CN114764959A (en) * 2021-01-13 2022-07-19 辽宁思凯科技股份有限公司 Double-core intelligent water meter
CN112858993A (en) * 2021-02-20 2021-05-28 南方电网数字电网研究院有限公司 Double-core electric energy meter test system

Also Published As

Publication number Publication date
CN110133338B (en) 2021-03-30

Similar Documents

Publication Publication Date Title
CN110133338A (en) A kind of twin-core electric energy meter and display methods
CN109410454B (en) Management control method and system for water electric meter
CN113064083A (en) BTS client battery test method
CN104201780A (en) Load data collecting, transmitting and analyzing device used for rural power distribution area
CN202661620U (en) Verification system for electronic-type mutual inductor and for merging unit
CN210804735U (en) Intelligent electric meter
CN103383791A (en) Parking lot management method and device
CN103177565A (en) Bus scheduling information adjusting system based on actual bus taking requests
CN102148535A (en) Intelligent instrument for managing household power utilization
CN113053090A (en) Distributed data set reading system and method for intelligent electric meter
CN106896710A (en) Scene configurable time synchronization test system and implementation method
CN112305487A (en) Laboratory error calibration system and method for digital direct current electric energy meter
US20200357107A1 (en) Automated inspection system and automated inspection method
CN205983837U (en) Traffic management and control system with space orientation technique
WO2021258719A1 (en) Billing method and system for container platform
CN114966521A (en) Metering device analysis system based on simulation cloud ammeter
CN212723082U (en) Smart electric meter with 4G communication function
CN103632030B (en) Method and system for intelligently extracting lighting loads
CN103063256A (en) Railway signal measurement intelligent terminal
CN209044355U (en) A kind of composite type processing unit
CN206224588U (en) A kind of self-service business deduction management system
CN111724055A (en) Metering monitoring system for ground service system and operation method thereof
CN108710319A (en) A kind of acquiring and processing method and system of electric power data
CN111461693B (en) Container type data center electric quantity charging method and system
CN214125432U (en) Camera direct-reading remote meter reading collector

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant