CN110132376A - Construction of hydro project level alarm for water - Google Patents
Construction of hydro project level alarm for water Download PDFInfo
- Publication number
- CN110132376A CN110132376A CN201910471432.3A CN201910471432A CN110132376A CN 110132376 A CN110132376 A CN 110132376A CN 201910471432 A CN201910471432 A CN 201910471432A CN 110132376 A CN110132376 A CN 110132376A
- Authority
- CN
- China
- Prior art keywords
- construction
- fixedly connected
- hydro project
- water
- level alarm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01F—MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
- G01F23/00—Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm
- G01F23/30—Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm by floats
Landscapes
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- General Physics & Mathematics (AREA)
- Level Indicators Using A Float (AREA)
Abstract
The invention discloses a kind of construction of hydro project level alarm for water, it is intended to solve the technical issues of prior art can not be monitored some region of water level in construction of hydro project.Construction of hydro project level alarm for water includes fixed seat at bottom, buoyance module, track frame and adjusts power supply module;Present invention can be implemented in monitoring when construction of hydro project to a certain area's water level, and can drain immediately, achieve the purpose that control area water level.
Description
Technical field
The present invention relates to hydraulic engineering technical fields, and in particular to a kind of construction of hydro project level alarm for water.
Background technique
Water is human being's production and essential precious resources of living, but the state of its naturally occurring not fully meets people
The needs of class.Hydraulic engineering is only built, just can control water flow, prevents flood, and carries out the adjusting and distribution of water, with
Meet people's lives and production to the needs of water resource.
Hydraulic engineering is the surface water and groundwater for controlling and deploying nature, reaches and removes the evil emerging sharp purpose and build
Engineering, also referred to as Hydraulic Projects.Hydraulic engineering need to build dam, dike, spillway, sluice, water inlet, channel, cross mortise, log chute,
The different types of hydraulic structure such as fish pass, to realize its target.
The prior art is mostly to be suitable for Groundwater level monitoring, river water level monitoring, reservoir level monitoring, water level in water pool prison
The large-scale level monitoring equipment of survey etc., and in construction of hydro project, it generally requires to control some region of water level, make
The wasting of resources is often resulted in the equipment of large-scale level monitoring.
Therefore, continue to research and develop a kind of method that some region of water level is controlled suitable for construction of hydro project or
Equipment, to which the purpose of monitoring water level can be completed with low cost.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of construction of hydro project level alarm for water, solve existing
The problem of technology can not be monitored some region of water level in construction of hydro project.
In order to solve the above technical problems, the present invention adopts the following technical scheme:
Design a kind of construction of hydro project level alarm for water, including fixed seat at bottom, buoyance module, track frame and adjusting electricity
Source component;The fixed seat at bottom includes bottom plate, footstock plate, and the bottom plate top is fixedly connected there are two vertical support plate,
The support plate upper end is respectively fixedly connected with the both ends of the footstock plate, and the footstock plate is equipped with rectangular straight slot;
The buoyance module includes hollow kickboard;The both ends of the hollow kickboard lower part have been respectively fixedly connected with sliding riser;Institute
It states sliding riser and is slidably connected to the rectangular straight slot;The hollow kickboard top is equipped with positive and negative anodes and is connected with metal by conducting wire
The warning lamp of piece;
The track frame includes perpendicular rail rods, and the perpendicular rail rods lower end is fixedly connected with the bottom plate top;
The adjusting power supply module includes sliding sleeve;The sliding sleeve is slidably connected in the perpendicular rail rods;The sliding sleeve
Front side is threaded with the fastening screw that can be withstood in the perpendicular rail rods;It is equipped with and sheet metal position phase on the left of the sliding sleeve
Corresponding metal column;The power supply seat board with power supply is fixedly connected on the right side of the sliding sleeve;The positive and negative anodes and gold of the power supply
Belong to column to connect by conducting wire.
Preferably, the fixed seat at bottom top is fixedly connected with rectangle frame.
Preferably, plug pin is plugged on the bottom plate.
Preferably, the sliding riser lower end is equipped with limited post.
Preferably, the sheet metal is fixedly connected on the hollow kickboard upper edge.
Preferably, the perpendicular rail rods upper end is fixedly connected with crossbearer;The free-end of the crossbearer, which is fixedly connected with, to draw water
Pipe.
Preferably, the warning lamp can issue red alarm signal.
Compared with prior art, the beneficial technical effect of the present invention lies in:
1. present invention can be implemented in monitoring when construction of hydro project to a certain area's water level, and can drain immediately, reach control zone
The purpose of domain water level.
2. the present invention can save a large amount of artificial monitoring water level time, and reduce the working strength of technical staff, simultaneously
Solve the problems, such as that more ground monitoring water level needs a large amount of manpowers.
Detailed description of the invention
One of Fig. 1 is the structural diagram of the present invention.
Fig. 2 is second structural representation of the invention.
Fig. 3 is one of the structural schematic diagram of fixed seat at bottom of the present invention.
Fig. 4 is the second structural representation of fixed seat at bottom of the present invention.
Fig. 5 is one of the structural schematic diagram of buoyance module of the present invention.
Fig. 6 is the second structural representation of buoyance module of the present invention.
Fig. 7 is the structural schematic diagram of track frame of the present invention.
Fig. 8 is the structural schematic diagram that the present invention adjusts power supply module.
In the above figure, 1 is fixed seat at bottom, 1-1 is bottom plate, 1-2 is support plate, 1-3 is rectangle frame, 1-4 is plug pin, 1-
5 be footstock plate, 1-6 is rectangular straight slot;2 be buoyance module, 2-1 is hollow kickboard, 2-2 is warning lamp, 2-3 is sheet metal, 2-4
It is sliding riser for limited post, 2-5;3 be track frame, 3-1 is perpendicular rail rods, 3-2 is crossbearer, 3-3 is drinking-water pipe;4 be adjusting
Power supply module, 4-1 are sliding sleeve, 4-2 is metal column, 4-3 is fastening screw, 4-4 is power supply seat board, 4-5 is power supply.
Specific embodiment
Illustrate a specific embodiment of the invention with reference to the accompanying drawings and examples, but following embodiment is used only in detail
It describes the bright present invention in detail, does not limit the scope of the invention in any way.
Components and structure involved in following embodiment or unit module are then unless otherwise instructed conventional city
Sell product.
Embodiment: construction of hydro project level alarm for water
Referring to Fig. 1 and Fig. 2, in construction of hydro project, the drainage arrangement can be used in small-sized tunnel, which uses
Level alarm for water includes fixed seat at bottom 1, buoyance module 2, track frame 3 and adjusts power supply module 4.
Referring to Fig. 3 and Fig. 4, fixed seat at bottom 1 includes bottom plate 1-1, support plate 1-2, plug pin 1-4, footstock plate 1-5 and rectangle
Through slot 1-6;The top of bottom plate 1-1 is fixedly connected there are two vertical gripper shoe 1-2, and the upper end of two support plate 1-2 is fixed respectively
The both ends of footstock plate 1-5 are connected, footstock plate 1-5 is equipped with rectangular straight slot 1-6;Multiple plug pin 1-4 are plugged on bottom plate 1-1, it can
The construction of hydro project level alarm for water is fixed in the small-sized tunnel of construction.
1 top of fixed seat at bottom is fixedly connected with rectangle frame 1-3, and can be packed into the weights such as stone cooperation plug pin further makes this
Construction of hydro project is stablized with level alarm for water.
Referring to figs. 5 and 6, buoyance module 2 includes hollow kickboard 2-1, warning lamp 2-2, the sheet metal 2-3 for being coated with antirust paint
With sliding riser 2-5;The both ends of the lower part hollow kickboard 2-1 are respectively fixedly connected with two sliding riser 2-5;It slides under riser 2-5
End is fixedly connected to limited post 2-4;Two sliding riser 2-5 are slidably connected in rectangular straight slot 1-6, hollow kickboard 2-1's
Top is equipped with red warning lamp 2-2, and the positive and negative anodes of warning lamp 2-2 connect sheet metal 2-3, two sheet metal 2- by conducting wire respectively
3 are fixedly connected on the upper edge of hollow kickboard 2-1.
Referring to Fig. 7, track frame 3 includes perpendicular rail rods 3-1, and the lower end of perpendicular rail rods 3-1 is fixedly connected on the upper of bottom plate 1-1
Portion;The upper end of perpendicular rail rods 3-1 is fixedly connected by crossbearer 3-2;The free-end of crossbearer is fixedly connected with drinking-water pipe 3-3.Drinking-water pipe
External water plug.
Referring to Fig. 8, adjusting power supply module 4 includes sliding sleeve 4-1, metal column 4-2, fastening screw 4-3, power supply seat board 4-4
With power supply 4-5;Sliding sleeve 4-1 is slidably connected at perpendicular rail rods 3-1;Fastening screw 4- is connected through a screw thread on front side of sliding sleeve 4-1
3, fastening screw 4-3 are withstood on perpendicular rail rods 3-1;Metal column 4-2 there are two being set on the left of sliding sleeve 4-1;The right side of sliding sleeve 4-1
Side is fixedly connected with power supply seat board 4-4;The top of power supply seat board 4-4 is fixedly connected with power supply 4-5;Hollow kickboard 2-1 floats up and down+
When, two metal column 4-2 can be in contact with two sheet metal 2-3 respectively;Two metal column 4-2 pass through conducting wire respectively and are connected to institute
On the positive and negative anodes for stating power supply seat board 4-4.
The operate with method of above-mentioned construction of hydro project level alarm for water is as follows:
When construction of hydro project, bottom plate 1-1 is placed in the tunnel for needing to control water level region in hydraulic engineering, is inserted multiple
Nail 1-4 hammers into underground and fixes bottom plate 1-1.
Two sliding riser 2-5 can on rectangular straight slot 1-6 vertical sliding, when region water level rises, hollow kickboard
2-1 can float to drive to be slided on two sliding riser 2-5;When regional water potential drop is low, hollow kickboard 2-1, which can be moved down, drives two cunnings
Dynamic riser 2-5 is moved down.
Sliding sleeve 4-1 can be slided on perpendicular rail rods 3-1, adjusted the height of sliding sleeve 4-1 to warning line, adjusted
Sliding sleeve 4-1 is fixed on perpendicular rail rods 3-1 using fastening screw 4-3 at rear.
It is used to place the weights such as rock in rectangle frame 1-3, prevents bottom plate 1-1 from floating with plug pin 1-4 cooperation, make bottom plate 1-1
It is more stable.Limited post 2-4 can prevent two sliding riser 2-5 from completely disengaging footstock plate 1-5 and cause footstock plate 1-5 loss.
When hollow kickboard 2-1 floats, two sheet metal 2-3 can be in contact with two metal column 4-2 respectively, at this moment will warn
Show that lamp 2-2 is lighted, at this moment water level can be warned, power supply 4-5 provides electric power for warning lamp 2-2.The height of sliding sleeve 4-1
Determine the height of water level caution.
When warning lamp 2-2 lights warning, the upper end of drinking-water pipe 3-3 is connected into water pump, extracts the water in region out one
Point, with control area water level.
The present invention is described in detail above in conjunction with drawings and examples, still, those of skill in the art
Member is it is understood that without departing from the purpose of the present invention, can also carry out each design parameter in above-described embodiment
Change, forms multiple specific embodiments, is common variation range of the invention, is no longer described in detail one by one herein.
Claims (7)
1. a kind of construction of hydro project level alarm for water, which is characterized in that including fixed seat at bottom, buoyance module, track
Frame and adjusting power supply module;The fixed seat at bottom includes bottom plate, footstock plate, and the bottom plate top is fixedly connected with that there are two vertical
Support plate, the support plate upper end is respectively fixedly connected with the both ends of the footstock plate, and the footstock plate is equipped with rectangular straight slot;
The buoyance module includes hollow kickboard;The both ends of the hollow kickboard lower part have been respectively fixedly connected with sliding riser;Institute
It states sliding riser and is slidably connected to the rectangular straight slot;The hollow kickboard top is equipped with positive and negative anodes and is connected with metal by conducting wire
The warning lamp of piece;
The track frame includes perpendicular rail rods, and the perpendicular rail rods lower end is fixedly connected with the bottom plate top;
The adjusting power supply module includes sliding sleeve;The sliding sleeve is slidably connected in the perpendicular rail rods;The sliding sleeve
Front side is threaded with the fastening screw that can be withstood in the perpendicular rail rods;It is equipped with and sheet metal position phase on the left of the sliding sleeve
Corresponding metal column;The power supply seat board with power supply is fixedly connected on the right side of the sliding sleeve;The positive and negative anodes and gold of the power supply
Belong to column to connect by conducting wire.
2. construction of hydro project level alarm for water according to claim 1, which is characterized in that the fixed seat at bottom
Top is fixedly connected with rectangle frame.
3. construction of hydro project level alarm for water according to claim 1, which is characterized in that grafting on the bottom plate
There is plug pin.
4. construction of hydro project level alarm for water according to claim 1, which is characterized in that under the sliding riser
End is equipped with limited post.
5. construction of hydro project level alarm for water according to claim 1, which is characterized in that the sheet metal is fixed
It is connected to the hollow kickboard upper edge.
6. construction of hydro project level alarm for water according to claim 1, which is characterized in that in the perpendicular rail rods
End is fixedly connected with crossbearer;The free-end of the crossbearer is fixedly connected with drinking-water pipe.
7. construction of hydro project level alarm for water according to claim 1, which is characterized in that the warning lamp can
Issue red alarm signal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910471432.3A CN110132376B (en) | 2019-05-31 | 2019-05-31 | Water level alarm device for hydraulic engineering construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910471432.3A CN110132376B (en) | 2019-05-31 | 2019-05-31 | Water level alarm device for hydraulic engineering construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110132376A true CN110132376A (en) | 2019-08-16 |
CN110132376B CN110132376B (en) | 2021-01-08 |
Family
ID=67583504
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910471432.3A Active CN110132376B (en) | 2019-05-31 | 2019-05-31 | Water level alarm device for hydraulic engineering construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110132376B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113047213A (en) * | 2021-02-07 | 2021-06-29 | 姚瑶 | Water level monitoring device for hydraulic engineering |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1994029679A1 (en) * | 1993-06-07 | 1994-12-22 | Fluid Level Sensors, Inc. | Apparatus for monitoring liquid level, method and systems incorporating same |
CN207529237U (en) * | 2017-11-29 | 2018-06-22 | 中博建设工程集团有限公司 | A kind of foundation pit structure with drain function |
CN108981862A (en) * | 2018-06-14 | 2018-12-11 | 李风花 | A kind of pond water level monitoring device used for aquiculture |
CN109518652A (en) * | 2018-11-20 | 2019-03-26 | 浙江水利水电学院 | A kind of river flood prevention device and its construction method |
CN110044443A (en) * | 2019-04-24 | 2019-07-23 | 王秀兰 | A kind of hydraulic engineering reservoir level monitoring device |
-
2019
- 2019-05-31 CN CN201910471432.3A patent/CN110132376B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1994029679A1 (en) * | 1993-06-07 | 1994-12-22 | Fluid Level Sensors, Inc. | Apparatus for monitoring liquid level, method and systems incorporating same |
CN207529237U (en) * | 2017-11-29 | 2018-06-22 | 中博建设工程集团有限公司 | A kind of foundation pit structure with drain function |
CN108981862A (en) * | 2018-06-14 | 2018-12-11 | 李风花 | A kind of pond water level monitoring device used for aquiculture |
CN109518652A (en) * | 2018-11-20 | 2019-03-26 | 浙江水利水电学院 | A kind of river flood prevention device and its construction method |
CN110044443A (en) * | 2019-04-24 | 2019-07-23 | 王秀兰 | A kind of hydraulic engineering reservoir level monitoring device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113047213A (en) * | 2021-02-07 | 2021-06-29 | 姚瑶 | Water level monitoring device for hydraulic engineering |
Also Published As
Publication number | Publication date |
---|---|
CN110132376B (en) | 2021-01-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203569537U (en) | Novel lever type automatic diversion sluice | |
CN203011668U (en) | Slope-adjustable rectangular sink device for simulating bottom bud corrosion and transmission characteristics | |
CN110044443A (en) | A kind of hydraulic engineering reservoir level monitoring device | |
CN104674784B (en) | Side slope tidal level regulation device when hypergravity | |
CN206470618U (en) | Dewatering well water level control, alarming device | |
CN205382469U (en) | Formula water conservancy regulation and control gate sways | |
CN110132376A (en) | Construction of hydro project level alarm for water | |
CN211121503U (en) | Water level monitoring device for hydraulic engineering | |
CN203755229U (en) | Water flow circulating multifunctional experimental system | |
KR20120015903A (en) | Pumping device using wave energy | |
CN203530944U (en) | Gate capable of automatically controlling irrigation water lever | |
CN203373809U (en) | Vertical well type laminated water taking structure | |
CN204350727U (en) | Ball float submerged plant planting bed | |
CN206174004U (en) | Sewer well lid | |
CN208963284U (en) | Floating on water surface photovoltaic module support system | |
CN104074174A (en) | Method for relieving low-temperature water environment influence of reservoir project and dam structure | |
CN204356744U (en) | A kind of reservoir anti-icing equipment of extremely frigid zones pumped storage power plant | |
CN206828959U (en) | A kind of municipal bridge guardrail | |
CN107451334B (en) | Dam gate bottom plate downstream connecting section body and setting method thereof | |
CN205296102U (en) | Unpowered flotation pontoon that floats certainly blocks dirty device that floats | |
CN205707200U (en) | A kind of comprehensive electric generating platform of the serially connected adaptation rivers water surface | |
CN206071564U (en) | A kind of oil exploitation oily-water seperating equipment | |
CN205000683U (en) | Water hole formula morning and evening tides generating device | |
CN205314073U (en) | Imitative nature fishway of tunnel style combines arranging of lifting means | |
CN204385693U (en) | Can the channel of approach of automatic desilting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |