CN110131902A - The control method of more water heaters and the linkage of other electric appliances - Google Patents
The control method of more water heaters and the linkage of other electric appliances Download PDFInfo
- Publication number
- CN110131902A CN110131902A CN201910314269.XA CN201910314269A CN110131902A CN 110131902 A CN110131902 A CN 110131902A CN 201910314269 A CN201910314269 A CN 201910314269A CN 110131902 A CN110131902 A CN 110131902A
- Authority
- CN
- China
- Prior art keywords
- power
- water heater
- run
- heating
- electric appliances
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
- F24H9/00—Details
- F24H9/20—Arrangement or mounting of control or safety devices
- F24H9/2007—Arrangement or mounting of control or safety devices for water heaters
- F24H9/2014—Arrangement or mounting of control or safety devices for water heaters using electrical energy supply
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Heat-Pump Type And Storage Water Heaters (AREA)
Abstract
The invention belongs to water heater control fields, disclose the control method of a kind of more water heaters and the linkage of other electric appliances, comprising: the maximum load power of route where obtaining the current power of water heater, the current power for other electric appliances that the water heater had been run on the line and the water heater run;Current power, the current power difference of the other electric appliances run of the maximum load power and the water heater run are calculated, difference power is obtained;Judge whether the heating power of water heater to be heated is less than the difference power, when the heating power is less than the difference power, runs the heating function of water heater to be heated.The present invention is by calculating difference power; power headroom namely on the route; and then judge whether water heater to be heated can run heating function by difference power, and then avoid that the water heater power run on route is excessive to be caused to be spaced apart protection, improve user experience.
Description
Technical field
The present invention relates to field of water heaters, more particularly to the control method of a kind of more water heaters and the linkage of other electric appliances.
Background technique
With the continuous improvement of economic development and living standard, the big-room and luxury housing project house of more toilets is more and more, mostly hygienic
Between generally require each toilet and fill a water heater, and water heater is powerful device, many to defend the different health of house type more
Between using with air switch all the way, when more water heaters are worked at the same time and (especially heated), often power is excessive causes to be spaced apart
Protection (i.e. air switch trips, and power circuit where multiple water heaters is disconnected by air switch), causes water heater not to be available.
And the power of water heater becomes greatly now, so that there is a phenomenon where more frequent for the above problem.
In addition, on same route other than having more water heaters, also have other electric appliances (such as warm-air drier, exhaust fan,
Washing machine etc.), these electric appliances can also generate power at runtime, and when working at the same time with more water heaters, work generation
General power is easier to cause to be spaced apart protection, influences user experience.
Summary of the invention
The purpose of the present invention is to provide the control methods of a kind of more water heaters and the linkage of other electric appliances, can be avoided line
The water heater power of road operation is excessive to be caused to be spaced apart protection, improves user experience.
To achieve this purpose, the present invention adopts the following technical scheme:
A kind of control method of more water heaters and the linkage of other electric appliances, comprising:
Obtain working as the current power of water heater, other electric appliances that the water heater had been run on the line run
The maximum load power of route where preceding power and the water heater;
By the maximum load power and the current power of the water heater run, the current function of the other electric appliances run
Rate difference calculates, and obtains difference power;
Judge whether the heating power of water heater to be heated is less than the difference power, is less than institute in the heating power
When stating difference power, the heating function of water heater to be heated is run.
Preferably, when the heating power is not less than the difference power, issue the user with whether run it is described to
The request instruction of the heating function of the water heater of heating;
When user selects to run the heating function of the water heater to be heated, at least hot water run is controlled
Device reduces current power, and when the heating power is less than the difference power calculated in real time, runs the hot water to be heated
The heating function of device.
Preferably, the water heater reduction current power that control at least one has been run includes:
Water heater adjustment operational mode, reduction gear or the directly closing that control at least one has been run.
Preferably, needing control to be lowered current function according to user at the end of the water heater to be heated heats
The water heater of rate restores to initial operating state.
Preferably, before restoring to initial operating state further include:
Determine that the water heater for being lowered current power restores to power needed for initial operating state to be less than to calculate in real time
Difference power.
Preferably, the recovery condition of the initial operating state are as follows:
The current operating conditions for stopping the water heater of heating are unsatisfactory for the initial sets requirement of user;
Alternatively, receiving user restores to stop the water heater of heating to the instruction of initial operating state.
Preferably, cloud platform receives the current power that the water heater that has run uploads, air switch uploads it is described most
The current power of big load power and the other electric appliances run, and difference calculating is carried out to three, to obtain the difference function
Rate.
Preferably, cloud platform receives the current power that the water heater that has run uploads, air switch uploads it is described most
The current power that big load power and the other electric appliances run upload, and difference calculating is carried out to three, described in obtaining
Difference power.
Preferably, whether the heating power for judging water heater to be heated is less than the difference power includes:
The cloud platform receives the heating power of water heater to be heated, and judges whether the heating power is less than the difference
It is worth power.
Preferably, passing through mobile terminal, other electricity of operation when the heating power is not less than the difference power
Device or the water heater of operation issue the user with the prompt that power transfinites.
Beneficial effects of the present invention:
According to maximum on the current power of the water heater run, the current power of the other electric appliances run and route
Load power (the namely Upper Bound Power of air switch), can calculate more than the power in difference power, that is, the route
Amount, and then judge whether water heater to be heated can run heating function by difference power, and then avoid on route
The water heater power of operation is excessive to be caused to be spaced apart protection, improves user experience.
Further, the present embodiment heating power be more than or equal to difference power when, if user still adhere to operation to
The heating function of the water heater of heating then controls at least one reduction current power in the water heater run, and to be added
When the heating power of the water heater of heat is less than the difference power calculated in real time, the heating function of water heater to be heated is run.It is logical
Which is crossed, can further ensure that on route to be not in the case where being spaced apart protection, so that more hot water on entire route
Device and other electric appliances being capable of normal uses.
Detailed description of the invention
Fig. 1 is the flow chart of the control method of more water heaters described in the embodiment of the present invention one and the linkage of other electric appliances;
Fig. 2 is the flow chart of the control method of more water heaters described in the embodiment of the present invention two and the linkage of other electric appliances;
Fig. 3 is the flow chart of the control method of more water heaters described in the embodiment of the present invention three and the linkage of other electric appliances;
Fig. 4 is the flow chart of the control method of more water heaters described in the embodiment of the present invention four and the linkage of other electric appliances;
Fig. 5 is the flow chart of the control method of more water heaters described in the embodiment of the present invention five and the linkage of other electric appliances.
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings and examples.It is understood that this place is retouched
The specific embodiment stated is used only for explaining the present invention rather than limiting the invention.It also should be noted that in order to just
Only the parts related to the present invention are shown in description, attached drawing rather than entire infrastructure.
In the description of the present invention unless specifically defined or limited otherwise, term " connected ", " connection ", " fixation " are answered
It is interpreted broadly, for example, it may be being fixedly connected, may be a detachable connection, or is integral;It can be mechanical connection,
It can be electrical connection;It can be directly connected, the company inside two elements can also be can be indirectly connected through an intermediary
Logical or two elements interaction relationship.For the ordinary skill in the art, can be understood with concrete condition above-mentioned
The concrete meaning of term in the present invention.
In the present invention unless specifically defined or limited otherwise, fisrt feature second feature "upper" or "lower"
It may include that the first and second features directly contact, also may include that the first and second features are not direct contacts but pass through it
Between other characterisation contact.Moreover, fisrt feature includes the first spy above the second feature " above ", " above " and " above "
Sign is right above second feature and oblique upper, or is merely representative of first feature horizontal height higher than second feature.Fisrt feature exists
Second feature " under ", " lower section " and " following " include that fisrt feature is directly below and diagonally below the second feature, or is merely representative of
First feature horizontal height is less than second feature.
In the description of the present embodiment, term " on ", "lower", " right side ", etc. orientation or positional relationships be based on shown in attached drawing
Orientation or positional relationship, be merely for convenience of description and simplification operation, rather than the device or element of indication or suggestion meaning
It must have a particular orientation, be constructed and operated in a specific orientation, therefore be not considered as limiting the invention.In addition,
Term " first ", " second " are only used to distinguish between description, and have no special meaning.
In the present invention, in the control method of more water heaters provided by the invention and the linkage of other electric appliances, it is related to
More water heaters, other electric appliances, air switch and mobile terminal all have long-distance on-line function, above-mentioned water heater, Qi Ta electricity
Device, air switch and and mobile terminal can long-distance on-line to cloud platform, and corresponding information is transferred to the cloud platform (it can
To be that communication module is arranged on water heater, other electric appliances, air switch and mobile terminal, communication module is the prior art,
Information remote can be transferred to cloud platform).Between different water heaters also have correlation function, can by cloud platform come
It realizes association, association can also be realized by the way of local area network, some water heater is enabled to receive other water heaters
Corresponding data.Above-mentioned water heater, other electric appliances can also be interrelated with air switch, again may be by cloud platform to realize
Association, association can also be realized by the way of local area network, water heater is enabled to receive the corresponding data of other electric appliances,
Enable air switch to receive the corresponding data of other electric appliances, and cloud platform can be delivered the data to.
The information that above-mentioned cloud platform can be transmitted according to water heater, other electric appliances, air switch and mobile terminal carries out phase
Processing operation is answered, and the operating status of water heater can be controlled.In the present invention, above-mentioned cloud platform is also referred to as remote service
Device, with the information processing function and instruction sending function, i.e., it is opened in addition to that can receive water heater, other electric appliances, air
The information with mobile terminal transmitting is closed, instruction can also be automatically generated and be sent to water heater, other electric appliances and mobile terminal.
Embodiment one
Fig. 1 is the flow chart of the more water heaters of the present embodiment and the control method of other electric appliances linkage, as shown in Figure 1,
The control method the following steps are included:
The current power of water heater that S100, acquisition have been run, other electric appliances that water heater had been run on the line
The maximum load power of route where current power and water heater.
In this step, the current power of the above-mentioned water heater run, that water heater had been run on the line was other
The current power and maximum load power of electric appliance are obtained by cloud platform, on the route have more water heaters and
Other electric appliances, when certain water heater is run, can by after self-operating heated condition and the information such as current power upload
To cloud platform, while in this step, also maximum load power (the namely Upper Bound Power of air switch) can be uploaded to cloud
Platform, specifically, its water heater that can be on same route stores the maximum load power of water heater place route, when certain
When platform water heater is run, it can synchronize and maximum load power is uploaded to cloud platform.The air being also possible on the route is opened
It closes and directly uploads maximum load power to cloud platform.
It, can be directly by the current function of itself meanwhile if other electric appliances on same route are in operating status
Rate information is uploaded to cloud platform, the current power information of itself can also be passed to water heater or air switch, then by heat
Its current power information is uploaded to cloud platform by hydrophone or air switch.
It should be pointed out that the water heater of every operation is by the current of itself when the water heater run is more
Power is uploaded to cloud platform, and cloud platform can sum the current power of the water heater of all operations, the water heater run
Current power;Correspondingly, when the electric appliance of operation is multiple, and can working as other electric appliances of all operations by cloud platform
Preceding power summation, the current power of the other electric appliances run.
S101, working as according to maximum load power, the current power of the other electric appliances run and the water heater that has run
Preceding power obtains difference power.
The maximum load power of water heater upload, the current power and of the other electric appliances run are received in cloud platform
After the current power of the water heater of operation, difference calculating can be carried out to three, specifically maximum load power, which subtracts, has run
The current power of the current power of other electric appliances and the water heater run, calculated difference are difference power.This step
In rapid, realize that difference is calculated by cloud platform, on the one hand can reduce the operation of this body controller of water heater, can also reduce
The cost of water heater;On the other hand, the operational capability of cloud platform is stronger, can more quickly calculate difference power, with
Achieve the effect that fast reaction.
S102, judge whether the heating power of water heater to be heated is less than difference power.
In the present embodiment, the above-mentioned water heater run and water heater to be heated are in and power on
State, difference are that the water heater run may start to carry out the operation (such as heating schedule) of a certain program, and to be heated
Water heater is only to power on, and does not carry out the operation operation for the program such as heating also.
Specifically, cloud platform can receive the heating power information that water heater to be heated uploads, and by the heating power with
Difference power is made comparisons, to judge whether heating power is less than difference power.
S103, heating power be less than difference power when, run the heating function of the water heater to be heated;In heating function
When rate is more than or equal to difference power, the heating function of the water heater to be heated is not run.
It is whole even if running the heating function of water heater to be heated at this time when above-mentioned heating power is less than difference power
Again smaller than the Upper Bound Power of air switch, cloud platform can directly control water heater operation heating to be heated for power on a route
Function.
When heating power is more than or equal to difference power, at this time if directly running the heating function of water heater to be heated
Can, air switch will disconnect entire route, be protected.Therefore, in order to avoid air switch disconnect entire route cause it is other
It has run electric appliance not being available, cloud platform will not control the water heater operation heating function to be heated.
Above-mentioned water heater to be heated can be one, and the heating power of the water heater to be heated is to calculate institute at this time
The heating power needed.Above-mentioned water heater to be heated can also be more, i.e., runs more electric appliances simultaneously, at this time above-mentioned heating function
Rate is total heating power that the summation of the heating power of all water heaters to be heated obtains, when total heating power is less than difference
When power, cloud platform directly controls more water heater operation heating functions.When total heating power is more than or equal to difference power,
Cloud platform will not control the heating function of more acting water heater operations to be added.
In addition, cloud platform control has run electric appliance and (can be wherein one when heating power is more than or equal to difference power
The water heater run is also possible to all water heaters run, can also be the other electric appliances run on the route)
Issue the user with the prompt that power transfinites;It is also possible to cloud platform and sends information to mobile terminal, by mobile terminal to user
Issue the prompt that power transfinites.It is also possible to the electric appliance run and mobile terminal while issues the user with the prompt that power transfinites.
The mode of above-mentioned prompt can be text importing, buzz or voice broadcast.
By above-mentioned control method, the present embodiment can effectively avoid the appliance power run on route is excessive from causing to be spaced apart
Protection, improves user experience.
Embodiment two
The difference between this embodiment and the first embodiment lies in: it is not transport when heating power is more than or equal to difference power
The heating function of row water heater to be heated, but the state of water heater that adjustment has been run come so that difference power becomes larger, and
Final difference power is greater than heating power, and water heater to be heated is enabled to run heating function.
Specifically, can refer to the flow chart of the control method of more water heaters shown in Fig. 2 and the linkage of other electric appliances, this reality
Apply example more water heaters and other electric appliances linkage control method the following steps are included:
The current power of water heater that S200, acquisition have been run, other electric appliances that water heater had been run on the line
The maximum load power of route where current power and water heater.
S201, working as according to maximum load power, the current power of the other electric appliances run and the water heater that has run
Preceding power obtains difference power.
S202, judge whether the heating power of water heater to be heated is less than difference power.
Above-mentioned steps S200-S202 is identical as the step S100-S102 of embodiment one, repeats no more.
S203, heating power be more than or equal to difference power when, issue the user with and whether run the water heater to be heated
Heating function request instruction.
In this step, when above-mentioned heating power is more than or equal to difference power, cloud platform can equally issue the user with function
The prompt that rate transfinites.And at the same time the request instruction for whether running the heating function of water heater to be heated can be issued the user with.
Specifically, being cloud platform control electric appliance and/or the mode for sending information to mobile terminal, this is shown by electric appliance or mobile terminal
Request instruction, the request instruction can be by the way of selection key and inquire user, if run the hot water to be heated
The heating function of device.In this step, if user selects the instruction not run, the command information that can not run this is uploaded to cloud
Platform after cloud platform receives the instruction not run, controls water heater to be heated and does not run heating function.
S204, when user selects to run the heating function of the water heater to be heated, control at least one has been run
Water heater adjusts operational mode to reduce current power, and when the heating power is less than the difference power calculated in real time, fortune
The heating function of the row water heater to be heated.
When cloud platform receive user sending operating instruction when, hot water device, operation other electric appliances or mobile terminal
The operating instruction information, can be uploaded to cloud platform, cloud platform receives the operation and refers to by the operating instruction for receiving user's selection
After order, the water heater adjustment operational mode that control at least one has been run, to reduce current power.In the present embodiment, above-mentioned tune
Whole operational mode generally refers to the adjustment to operation program, can be slow heat pattern by the speed heat mode adjustment of water heater,
Or the heating of full gallbladder is adjusted to the heating of half gallbladder, the current power of water heater can be reduced at this time.
Subsequent cloud platform is according to the real-time calculating difference power of mode of step S101, since the water heater run has been adjusted
Whole operational mode, the difference power calculated at this time will increase, and subsequent cloud platform continues the heating function of water heater to be heated
Rate is made comparisons with difference power, until heating power is less than difference power, can run the heating function of water heater to be heated.
The present embodiment water heater to be heated heating power be greater than calculate difference power when, not directly control to
The water heater of heating is not run, but the operational mode by adjusting the water heater run, to reduce its current power, in turn
So that the heating power of water heater to be heated can finally be less than the difference power calculated in real time, so that water heater to be heated
It is able to its heating function of trouble-free operation.And this kind of mode can effectively ensure that the appliance power run on route is not too big,
Also would not cause to be spaced apart protection.
Embodiment three
The present embodiment is more similar to embodiment two, and difference is only that the present embodiment reduces working as the water heater run
The mode of preceding power is different, specifically, as shown in figure 3, the control of the more water heaters of the present embodiment and the linkage of other electric appliances
Method processed includes:
The current power of water heater that S300, acquisition have been run, other electric appliances that water heater had been run on the line
The maximum load power of route where current power and water heater.
S301, working as according to maximum load power, the current power of the other electric appliances run and the water heater that has run
Preceding power obtains difference power.
S302, judge whether the heating power of water heater to be heated is less than difference power.
S303, heating power be more than or equal to difference power when, issue the user with and whether run the water heater to be heated
Heating function request instruction.
Above-mentioned steps S300-S303 is identical as the step S200-S203 of embodiment two, repeats no more.
S304, when user selects to run the heating function of the water heater to be heated, control at least one has been run
It is to be added to run this to reduce current power, and when the heating power is less than the difference power calculated in real time for water heater downshift
The heating function of the water heater of heat.
When cloud platform receive user sending operating instruction when, hot water device, operation other electric appliances or mobile terminal
The operating instruction information, can be uploaded to cloud platform, cloud platform receives the operation and refers to by the operating instruction for receiving user's selection
After order, the water heater downshift run is controlled, reduces current power by way of downshift.In the present embodiment, need to have transported
Capable water heater has multiple gears, and then realizes downshift.
Subsequent cloud platform is according to the real-time calculating difference power of mode of step S301, since the water heater run has dropped
Shelves, the difference power calculated at this time will increase, and cloud platform continues the difference of the heating power of water heater to be heated and the increase
Value power is made comparisons, until heating power is less than the difference power calculated in real time, can run the heating of water heater to be heated
Function.
Example IV
The present embodiment is more similar to embodiment two, and difference is only that the present embodiment reduces working as the water heater run
The mode of preceding power is different, specifically, as shown in figure 4, the control of the more water heaters of the present embodiment and the linkage of other electric appliances
Method processed includes:
The current power of water heater that S400, acquisition have been run, other electric appliances that water heater had been run on the line
The maximum load power of route where current power and water heater.
S401, working as according to maximum load power, the current power of the other electric appliances run and the water heater that has run
Preceding power obtains difference power.
S402, judge whether the heating power of water heater to be heated is less than difference power.
S403, heating power be more than or equal to difference power when, issue the user with and whether run the water heater to be heated
Heating function request instruction.
Above-mentioned steps S400-S403 is identical as the step S200-S203 of embodiment two, repeats no more.
S404, when user selects to run the heating function of the water heater to be heated, control at least one has been run
Water heater is directly closed, and when the heating power is less than the difference power calculated in real time, runs the water heater to be heated
Heating function.
When cloud platform receive user sending operating instruction when, hot water device, operation other electric appliances or mobile terminal
The operating instruction information, can be uploaded to cloud platform, cloud platform receives the operation and refers to by the operating instruction for receiving user's selection
After order, controls the water heater run and directly close, to reduce current power.It should be noted that in the present embodiment, closing is
The water heater run the not rerun procedure referred to, but the water heater run still powers on.
Subsequent cloud platform is according to the real-time calculating difference power of mode of step S401, since the water heater run at least closes
One is closed, the difference power calculated at this time will increase, and cloud platform continues the heating power of water heater to be heated and the increasing
Big difference power is made comparisons, until heating power is less than the difference power calculated in real time, can run water heater to be heated
Heating function.
Embodiment five
On the basis of the present embodiment is any one into example IV in embodiment two, rate-determining steps are increased, are had
Body, as shown in figure 5, the more water heaters of the present embodiment and other electric appliances linkage control method the following steps are included:
The current power of water heater that S500, acquisition have been run, other electric appliances that water heater had been run on the line
The maximum load power of route where current power and water heater.
S501, working as according to maximum load power, the current power of the other electric appliances run and the water heater that has run
Preceding power obtains difference power.
S502, judge whether the heating power of water heater to be heated is less than difference power.
S503, heating power be more than or equal to difference power when, issue the user with and whether run the water heater to be heated
Heating function request instruction.
Above-mentioned steps S500-S503 is identical as the step S200-S203 of embodiment two, repeats no more.
S504, when user selects to run the heating function of the water heater to be heated, control at least one has been run
Water heater reduces current power, and when the heating power is less than the difference power calculated in real time, runs the heat to be heated
The heating function of hydrophone.
When cloud platform receive user sending operating instruction when, hot water device, operation other electric appliances or mobile terminal
The operating instruction information, can be uploaded to cloud platform, cloud platform receives the operation and refers to by the operating instruction for receiving user's selection
After order, the water heater run is controlled using the adjustment operational mode of embodiment two, the downshift of embodiment three or example IV
The mode directly closed reduces the current power of the water heater run
Subsequent cloud platform is according to the real-time calculating difference power of mode of step S501, since the water heater run at least closes
One is closed, the difference power calculated at this time will increase, and cloud platform continues the heating power of water heater to be heated and the increasing
Big difference power is made comparisons, until heating power is less than the difference power calculated in real time, can run water heater to be heated
Heating function.
S505, at the end of water heater heating to be heated, need to control the electric appliance for being lowered current power according to user
Restore to initial operating state.
In this step, it is preferable that when water heater it is to be heated water heater heating at the end of, can also select as needed be
The no water heater for restoring to be lowered current power is to initial operating state, specifically, being that cloud platform acquisition is lowered current power
Water heater current state (such as temperature, mode), and judge whether the current state meets the initial sets requirement of user, such as
Fruit is unsatisfactory for, then the water heater that control is lowered current power restores to initial operating state (such as to carry out with initial heating power
Heating etc.) so that the water heater finally can satisfy the sets requirement of user.It is initially set if current state meets user
It is required that then illustrating that not needing the water heater restores to initial operating state, can also reach the requirement of user, at this point, being not required to
The water heater is controlled to restore to initial operating state.
It is understood that choosing whether the water heater for restoring to be lowered current power as needed to initial operating state
It can also realize in the following ways, i.e., cloud platform judges whether that having received user restores the water heater for being lowered current power
To the instruction of initial operating state, i.e., user can water heater, operation other electric appliances or mobile terminal on select to restore
The water heater of current power is lowered to initial operating state, water heater, other electric appliances of operation or mobile terminal can be by users
The instruction be uploaded to cloud platform, cloud platform when receiving the instruction, then control be lowered the water heater of current power according to
Initial operating state operation, so that the water heater finally can satisfy the sets requirement of user.If cloud platform does not receive
To the instruction, then illustrate that user does not need the water heater at present and restores to initial operating state, at this point, at this time not to the water heater
It is controlled.
In the present embodiment, it is preferable that before carrying out restoring to be lowered the water heater to initial operating state of current power,
It can also further determine that the water heater for being lowered current power restores whether to be less than reality to power needed for initial operating state
When the difference power that calculates, if it is less, being restored;If it is not, then explanation is lowered the water heater of current power
Once restoring to initial operating state, air switch can be caused to protect, therefore, the heat for being lowered current power will not be restored at this time
Hydrophone is to initial operating state.
In the present embodiment, by above-mentioned control method, it on the one hand can ensure to run the heating function of water heater to be heated
Can when be not under the premise of air switch will disconnect entire route protection so that more water heaters on entire route and
Other electric appliances can normal use, the water heater for being lowered current power can also be controlled, further on the other hand to be dropped
The water heater of low current power can satisfy user's requirement.
Obviously, the above embodiment of the present invention is just for the sake of clearly illustrating examples made by the present invention, and being not is pair
The restriction of embodiments of the present invention.For those of ordinary skill in the art, be able to carry out it is various it is apparent variation,
It readjusts and substitutes without departing from protection scope of the present invention.There is no need and unable to give thoroughly all embodiments
It lifts.Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the present invention
Within scope of protection of the claims.
Claims (10)
1. the control method of a kind of more water heaters and the linkage of other electric appliances characterized by comprising
Obtain the current power of the water heater run, the current function for other electric appliances that the water heater had been run on the line
The maximum load power of route where rate and the water heater;
Current power, the current power of the other electric appliances run of the maximum load power and the water heater run is poor
Value calculates, and obtains difference power;
Judge whether the heating power of water heater to be heated is less than the difference power, is less than the difference in the heating power
When being worth power, the heating function of water heater to be heated is run.
2. the control method of more water heaters according to claim 1 and the linkage of other electric appliances, which is characterized in that
When the heating power is not less than the difference power, issues the user with and whether run the water heater to be heated
The request instruction of heating function;
When user selects to run the heating function of the water heater to be heated, the water heater that control at least one has been run drops
Low current power, and when the heating power is less than the difference power calculated in real time, run the water heater to be heated
Heating function.
3. the control method of more water heaters according to claim 2 and the linkage of other electric appliances, which is characterized in that control is extremely
Few one water heater run reduces current power and includes:
Water heater adjustment operational mode, reduction gear or the directly closing that control at least one has been run.
4. the control method of more water heaters according to claim 3 and the linkage of other electric appliances, which is characterized in that described
At the end of water heater heating to be heated, restored according to the water heater that user needs control to be lowered current power to initial launch
State.
5. the control method of more water heaters according to claim 4 and the linkage of other electric appliances, which is characterized in that restoring
To before initial operating state further include:
Determine that the water heater for being lowered current power restores to be less than the difference calculated in real time to power needed for initial operating state
Power.
6. the control method of more water heaters according to claim 4 and the linkage of other electric appliances, which is characterized in that described first
The recovery condition of beginning operating status are as follows:
The current operating conditions for stopping the water heater of heating are unsatisfactory for the initial sets requirement of user;
Alternatively, receiving user restores to stop the water heater of heating to the instruction of initial operating state.
7. the control method of more water heaters according to claim 1 and the linkage of other electric appliances, which is characterized in that cloud platform
It receives the current power of the water heater upload run, the maximum load power that air switch uploads and has run other
The current power of electric appliance, and difference calculating is carried out to three, to obtain the difference power.
8. the control method of more water heaters according to claim 1 and the linkage of other electric appliances, which is characterized in that cloud platform
Receive current power, the maximum load power that air switch uploads and its run that the water heater run uploads
The current power that its electric appliance uploads, and difference calculating is carried out to three, to obtain the difference power.
9. the control method of more water heaters according to claim 7 or 8 and the linkage of other electric appliances, which is characterized in that institute
It states and judges whether the heating power of water heater to be heated is less than the difference power and includes:
The cloud platform receives the heating power of water heater to be heated, and judges whether the heating power is less than the difference function
Rate.
10. the control method of more water heaters according to claim 1 and the linkage of other electric appliances, which is characterized in that in institute
When stating heating power not less than the difference power, by the water heater of mobile terminal, other electric appliances of operation or operation to
Family issues the prompt that power transfinites.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910314269.XA CN110131902A (en) | 2019-04-18 | 2019-04-18 | The control method of more water heaters and the linkage of other electric appliances |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910314269.XA CN110131902A (en) | 2019-04-18 | 2019-04-18 | The control method of more water heaters and the linkage of other electric appliances |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110131902A true CN110131902A (en) | 2019-08-16 |
Family
ID=67570310
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910314269.XA Pending CN110131902A (en) | 2019-04-18 | 2019-04-18 | The control method of more water heaters and the linkage of other electric appliances |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110131902A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112443955A (en) * | 2020-11-30 | 2021-03-05 | 佛山市顺德区美的电子科技有限公司 | Air conditioner control method, air conditioner and computer readable storage medium |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103970089A (en) * | 2014-03-11 | 2014-08-06 | 杭州天丽科技有限公司 | Intelligent management system and method for domestic electrical load |
CN104197502A (en) * | 2014-09-05 | 2014-12-10 | 成都前锋电子有限责任公司 | Heat source machine formed by connecting gas water heaters in parallel and control method |
CN104216307A (en) * | 2013-05-31 | 2014-12-17 | 沁园集团股份有限公司 | Home electricity distribution control system and method |
CN104536508A (en) * | 2014-10-30 | 2015-04-22 | 深圳市国创新能源研究院 | Electrical equipment power control method and device |
US20170147060A1 (en) * | 2015-11-19 | 2017-05-25 | Inventec (Pudong) Technology Corporation | Method and system for managing power supplies |
BR102017003668A2 (en) * | 2016-03-01 | 2017-09-05 | Siemens Aktiengesellschaft | METHOD AND SYSTEM FOR OPERATING AN AUTOMATIC ENERGY SUPPLY NETWORK. |
CN107516902A (en) * | 2017-07-28 | 2017-12-26 | 广西大学 | A variety of interruptible load real time coordination control methods of meter and market promotion rule |
CN107906761A (en) * | 2017-11-06 | 2018-04-13 | 广东美的暖通设备有限公司 | Air-source water heater and its energy-saving control method, control device |
CN108631310A (en) * | 2018-05-28 | 2018-10-09 | 天津平高智能电气有限公司 | A kind of orderly charging management method in residential area, apparatus and system |
-
2019
- 2019-04-18 CN CN201910314269.XA patent/CN110131902A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104216307A (en) * | 2013-05-31 | 2014-12-17 | 沁园集团股份有限公司 | Home electricity distribution control system and method |
CN103970089A (en) * | 2014-03-11 | 2014-08-06 | 杭州天丽科技有限公司 | Intelligent management system and method for domestic electrical load |
CN104197502A (en) * | 2014-09-05 | 2014-12-10 | 成都前锋电子有限责任公司 | Heat source machine formed by connecting gas water heaters in parallel and control method |
CN104536508A (en) * | 2014-10-30 | 2015-04-22 | 深圳市国创新能源研究院 | Electrical equipment power control method and device |
US20170147060A1 (en) * | 2015-11-19 | 2017-05-25 | Inventec (Pudong) Technology Corporation | Method and system for managing power supplies |
BR102017003668A2 (en) * | 2016-03-01 | 2017-09-05 | Siemens Aktiengesellschaft | METHOD AND SYSTEM FOR OPERATING AN AUTOMATIC ENERGY SUPPLY NETWORK. |
CN107516902A (en) * | 2017-07-28 | 2017-12-26 | 广西大学 | A variety of interruptible load real time coordination control methods of meter and market promotion rule |
CN107906761A (en) * | 2017-11-06 | 2018-04-13 | 广东美的暖通设备有限公司 | Air-source water heater and its energy-saving control method, control device |
CN108631310A (en) * | 2018-05-28 | 2018-10-09 | 天津平高智能电气有限公司 | A kind of orderly charging management method in residential area, apparatus and system |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112443955A (en) * | 2020-11-30 | 2021-03-05 | 佛山市顺德区美的电子科技有限公司 | Air conditioner control method, air conditioner and computer readable storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8989878B2 (en) | Methods, circuits, and computer program products for generation following load management | |
CN102461331B (en) | Cooking device, control method and programme for same | |
US20100125376A1 (en) | Methods, systems, circuits, and computer program products for reducing peak electrical demand by shifting activation of electrical appliances | |
US10574053B2 (en) | Power management transfer system and method | |
CN104881014A (en) | Control method and intelligent household control device | |
CA2710508C (en) | Adjusting distributed storage of solar electrical power responsive to changes in supply and demand | |
JP2014166114A (en) | Power generation system with hot water storage function | |
CN110131902A (en) | The control method of more water heaters and the linkage of other electric appliances | |
JP2007053866A (en) | Method of operating distributed power supply system and distributed power supply system | |
JP2012235615A (en) | Outlet device, power feeding state monitor, and energization control system | |
CN110045647A (en) | A kind of electric control method | |
EP2587163A1 (en) | Combined control system for the power consumed in an oven and a glass ceramic hob | |
CN207926267U (en) | a kind of UPS system | |
CN107466117B (en) | Controller, method for controlling heater body by controller and electric heater | |
WO2019184609A1 (en) | Flexible domestic power supply system based on renewable energy and mains power supply | |
CN111492558A (en) | Power supply arbitration device, power supply device, power consumption device, power supply remote control device, power supply arbitration method, and power system | |
JP2005312210A (en) | Apparatus and method for controlling current on indoor electric light line in apartment | |
JPH1198688A (en) | Electrical apparatus system using demand control | |
CN106233558B (en) | Electric control appliance, electrical control method and electric control system | |
JP2010161849A (en) | Power control system | |
WO2018066037A1 (en) | Storage type hot water supplying device, hot water supplying method, and program | |
CN107314549A (en) | Water heater and its control method and server | |
JP3886101B2 (en) | Selector | |
EP4012287A1 (en) | Load control system, power conversion system, distributed power supply system, load control method, and program | |
CN106247643B (en) | A kind of power control system of solar water heater |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |