CN110130472A - Dredging device for water conservancy projects - Google Patents
Dredging device for water conservancy projects Download PDFInfo
- Publication number
- CN110130472A CN110130472A CN201910269023.5A CN201910269023A CN110130472A CN 110130472 A CN110130472 A CN 110130472A CN 201910269023 A CN201910269023 A CN 201910269023A CN 110130472 A CN110130472 A CN 110130472A
- Authority
- CN
- China
- Prior art keywords
- blocking component
- supervisor
- connection
- dredging
- water conservancy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F7/00—Other installations or implements for operating sewer systems, e.g. for preventing or indicating stoppage; Emptying cesspools
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F9/00—Arrangements or fixed installations methods or devices for cleaning or clearing sewer pipes, e.g. by flushing
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F9/00—Arrangements or fixed installations methods or devices for cleaning or clearing sewer pipes, e.g. by flushing
- E03F9/007—Devices providing a flushing surge
Abstract
The present invention discloses a kind of dredging device for water conservancy projects, belongs to pipe technology field, comprising: the first blocking component, the first blocking component and hydraulic engineering pipeline gap are adjustable;Connection supervisor, connection supervisor's one end connects the first blocking component end face, the other end connects water pump, be cooperatively connected spray module on connection supervisor, and second blocking component, second blocking component be connected to that supervisor is cooperatively connected and the second blocking component and hydraulic engineering pipeline gap are adjustable, the connection of the second blocking component and the first blocking component is responsible for and connects spray module;Wherein, there is a tracheae, tracheae is for being inflated/deflating to the seal cavity formed between the first blocking component and the second blocking component and hydraulic engineering pipeline on the second blocking component.Accrete clearing device of the invention carries out dredging work to urban duct using segmented, can be crushed curing sludge, and mud disengaging rate is high on pipe wall, and pipeline is not likely to produce rupture, and desilting efficiency data is high and reduces dredging labor intensity.
Description
Technical field
The invention belongs to pipe technology fields, and in particular to a kind of dredging device for water conservancy projects.
Background technique
Urban discharging pipeline has more long construction history in China, there is special pipe duct very early, for excluding city
Sewage and rainwater, each dynasty capital also all built many drainage systems, these systems construction is more complete.In urban duct reality
There is also some not perfect places, such as pipeline product silt problem in the use process of border.
The siltation problem of drainage pipeline is due to caused by the deposition of solids of silt and suspension in pipe-line system mostly
, this phenomenon does not occur only in drain header, can also betide in branch drain line.Sewage is in drainage pipeline
Since the drag losses of pipeline reduce flow velocity, the silt and solid suspension carried in sewage is likely to sink wherein for movement
It accumulates, so that drainage pipeline product be caused to become silted up.In addition, interflow tubing giving sufficient strength is in the flow and pipeline that rainy season and dry season receive sewage
The difference of effluent flow rate is very big, this will lead to the larger particles that rainy season originally can be pulled away or bulky grain suspended matter because dry season manages
The reduction of flow and flow rate in road and deposit, can also cause drainage pipeline to deposit, at the same partial particulate object have it is certain viscous
Attached property further increases pipe dredging difficulty in inner wall of the pipe bonding, such as dredging not in time after pipeline product is become silted up, may make
At line clogging, this is unfavorable for urban duct blowdown, also provides compared with multi-method or equipment solve pipeline product silt in the prior art
Problem, for example, by using chemical reagent, but chemical reagent often will cause pollution to water body, for another example use pipe dredging machine
People, but this kind of high equipment cost, complicated for operation, unsuitable realization is a wide range of to promote the use of.
Summary of the invention
The purpose of the present invention is to provide a kind of dredging device for water conservancy projects, carry out dredging to urban duct using segmented
Work, can be crushed curing sludge, and mud disengaging rate is high on pipe wall, and pipeline is not likely to produce rupture, and desilting efficiency data is high and reduces
Dredging labor intensity.
The technical solution that the present invention is taken to achieve the above object are as follows: dredging device for water conservancy projects, comprising:
First blocking component, the first blocking component and hydraulic engineering pipeline gap are adjustable;
Connection supervisor, connection supervisor's one end connect the first blocking component end face, and the other end connects water pump, matches on connection supervisor
Connection spray module is closed, and
Second blocking component, the second blocking component be connected to supervisor and be cooperatively connected and the second blocking component and hydraulic engineering pipeline enclosure
Gap is adjustable, connects spray module on the connection supervisor of the second blocking component and the first blocking component;
Wherein, there is a tracheae, tracheae is used for the first blocking component and the second blocking component and water conservancy on the second blocking component
The seal cavity formed between engineering pipeline is inflated/deflates.
The present invention carries out segmented closure to the pipeline of required dredging by the first blocking component and the second blocking component, right
Pipeline between first blocking component and the second blocking component carries out dredging work, compared with the prior art to longer pipeline into
For row monoblock type dredging work, the segmented dredging means that the present invention uses can guarantee that dredging efficient work carries out, effectively broken
With the curing sludge of adhesiveness on bad tube wall, while guaranteeing that breakage does not occur in pipeline, specifically, utilizing the during dredging
One blocking component and the second blocking component carry out segmented closure to the pipeline of required dredging, after the completion of closure by air pump and
Tracheae extracts the gas between the first blocking component and the second blocking component after closure in pipeline out, bears its internal formed
Then pressure is then turned on air pump by tracheae to being inflated in pipeline between the first blocking component and the second blocking component, so
Water body is inputted after connection supervisor by spray module to spraying water body in tube wall by water pump under negative pressure state after operation repeatedly,
The frictional resistance of the adsorption effect of viscosity particle and particle and water body on tube wall is destroyed using the switching repeatedly of positive/negative-pressure,
It specifically reaches approximately the motion state of viscosity particle and the motion state of non-viscosity particle and destroys curing sludge effect, together
When viscosity particle and non-viscosity particle and pipeline in the water flow sprayed when interacting, the friction between particulate matter and water body
Resistance reduces, and flow resistance of the particulate matter in water body is small, realizes that the Particle flow speed in water body increases, first and second
Mud is quickly detached from from tube wall and is discharged with water flow when blocking component cancels the closure to pipeline, realizes that desilting efficiency data is high and drops
Low dredging labor intensity, and the segmented dredging means used are strong to dredging situation controllability, effectively avoid managing during dredging
The situation of road breakage occurs.
Further, connection supervisor's axial line and hydraulic engineering pipeline axis parallel make the water inputted in connection supervisor
Body flow direction is consistent with hydraulic engineering pipeline, and then it is impacted after the water body in connection supervisor is discharged by spray module
Effect is able to guarantee that resistance to water-flow can't be generated, reduces the energy consumption of water pump, be connected to the ring flange that supervisor is equipped with by its end
It is connect with water pump, for guaranteeing the connection between connection supervisor and water pump.
Further, the second blocking component can be moved along connection supervisor's direction of axis line, it can be achieved that by the second envelope of regulation
Blocking component adjusts the distance of segmented closure in the position of connection supervisor's axis direction, on connection supervisor there are at least two groups to use
In the limit assembly limited to the second blocking component, pass through when determining the position of the opposite connection supervisor of the second blocking component
The second blocking component upper and lower ends be separately connected limit assembly come to the second blocking component limit, realize the second blocking component with
Fixation between connection supervisor, sealing effect and device overall stability during guarantee segmented dredging.
Further, limit assembly include with the clip that is connected to supervisor's connection, clip be connected between supervisor with section
For I-shaped sealing ring.Second blocking component upper and lower side is separately connected for limiting the mobile limit group of the second blocking component
Part, clip are fixed using fastener, and fastener is bolt, and nut corresponding with bolt specification also can be selected.Clip width with it is close
I-shaped the distance between the casting lug thereon up and down of seal is equal, makes clip by tight by designing the cross sectional shape of sealing ring
Firmware be connected to supervisor it is fixed when, extruding when sealing ring is tightened by clip is responsible for contact portion with being connected on the inside of sealing ring
Two casting lug thereons of semi-shaped structure extend to the outside to be formed "-" type make its flexible deformation expand come shape to clip tightening process
Reaction force, avoid clip tightening oversized commutation supervisor generate deformation, while expand sealing ring be connected to be responsible between it is close
Contact area is sealed, realizes the sealing between clip and the second blocking component.
Further, spray module includes and is connected to the terminal pad be responsible for and be fixedly connected, spiral surrounding arrangement in terminal pad
The hole for water spraying of sparge pipe, sparge pipe is connected with connection supervisor, and sparge pipe injection water flow velocity is 120 ~ 150m/s.By sparge pipe
Cloth is set as surrounded spiral shape formula and is conducive to sparge pipe during water spray to the tube wall progress wound water spray of helical ring, and injection water body can
Useful effect is after tube wall makes it be that water body contacts everywhere and with mud contacts by the wound injection influence on water body mud of helical ring
The flowing velocity of water is increased, and sets the mud that injection water flow velocity comes out in 120 ~ 150m/s further expansion dredging
The flow velocity of water, mud are quickly detached from from tube wall and are discharged with water flow.
Further, the first blocking component includes two the first sealing plates connected by connecting column, is equipped between two sealing plates
Can deformation outward the first rubber ring, the first rubber ring inner wall direction is equipped with magnetic substance, tool in the first sealing plate below magnetic substance
There is the electromagnet group for driving magnetic substance mobile.Electromagnet group is by multi-turn around the electromagnetic block group being laid in the first sealing plate
At, electromagnetic block from the edge of the first sealing plate to its axle center at lay.The present invention using peripheral control unit to electromagnet group into
Row control system of switching on or off electricity makes magnetic substance to deformable first rubber ring to control the moving distance of magnetic substance opposed electromagnets group
It pushes out to make to be formed between its outside deformation and the tube wall of dredging pipeline and contacts and generate avoiding for corresponding inner wall of the pipe injustice
Carry out deformation and adjusting, solve existing seal assembly and pressure that when seal for pipe joints generates be excessive leads to piping failure or dress
Set damaged problem.The device of the invention realizes the sealing to different tube diameters inner wall of the pipe, is capable of the pipeline wide scope of dredging.
Further, the second blocking component includes two the second sealing plates connected by connecting column, is equipped between two sealing plates
Can deformation outward the second rubber ring, the second rubber ring inner wall direction is equipped with magnetic substance, tool in the second sealing plate below magnetic substance
There is the electromagnet group for driving magnetic substance mobile.Electromagnet group is by multi-turn around the electromagnetic block group being laid in the second sealing plate
At, electromagnetic block from the edge of the second sealing plate to its axle center at lay.Pass through variant electromagnet in control electromagnet group
Power on/off controls the position of magnetic substance opposed electromagnets group, specific: outside by axle center by continuous the second sealing plate of power on/off
The energization of the electromagnetic block in diameter direction adsorbs electromagnet to the movement of the second sealing plate outer diameter direction, to make the second rubber ring deformation, the original
Reason is suitable for the deformation process of the first rubber ring of the first blanking plate component.
Further, there is pressure sensor and air pressure sensing on the second blocking component one side of the first blocking component direction
Device monitors pressure sensor and baroceptor by peripheral control unit, realizes to the first blocking component and the second closure group
The intracorporal air pressure of the seal chamber formed between part and hydraulic engineering pipeline and existing pressure are monitored, and are realized to dredging feelings
The case where condition controllability is promoted, and effectively avoids piping failure during dredging appearance.
Further, the connection supervisor between the second blocking component and ring flange is equipped with parallel with supervisor's axis is connected to
Rack gear, rack gear are correspondingly provided with gear, and gear has motor driven.Motor is displaced in the axial direction for realizing connection supervisor, is utilized
Motor-driven gear keeps rack gear mobile to realize movement of the device in pipeline when not carrying out closure dredging to pipeline, expands
Pipe dredging range reduces labor intensity.
Dredging device for water conservancy projects includes:
First blocking component, the first blocking component and hydraulic engineering pipeline gap are adjustable;
Connection supervisor, connection supervisor's one end connect the first blocking component end face, and the other end connects water pump, matches on connection supervisor
Connection spray module is closed, and
Second blocking component, the second blocking component be connected to supervisor and be cooperatively connected and the second blocking component and hydraulic engineering pipeline enclosure
Gap is adjustable, connects spray module on the connection supervisor of the second blocking component and the first blocking component;
Wherein, there is a tracheae, tracheae is used for the first blocking component and the second blocking component and water conservancy on the second blocking component
The seal cavity formed between engineering pipeline is inflated/deflates, and inflatable and deflatable number is no less than 3 times.
The present invention carries out segmented closure to the pipeline of required dredging by the first blocking component and the second blocking component, right
Pipeline between first blocking component and the second blocking component carries out dredging work, compared with the prior art to longer pipeline into
For row monoblock type dredging work, the segmented dredging means that the present invention uses can guarantee that dredging efficient work carries out, effectively broken
With the curing sludge of adhesiveness on bad tube wall, while guaranteeing that breakage does not occur in pipeline, specifically, utilizing the during dredging
One blocking component and the second blocking component carry out segmented closure to the pipeline of required dredging, after the completion of closure by air pump and
Tracheae extracts the gas between the first blocking component and the second blocking component after closure in pipeline out, bears its internal formed
Then pressure is then turned on air pump by tracheae to being inflated in pipeline between the first blocking component and the second blocking component, so
Water body is inputted after connection supervisor by spray module to spraying water body in tube wall by water pump under negative pressure state after operation repeatedly,
The frictional resistance of the adsorption effect of viscosity particle and particle and water body on tube wall is destroyed using the switching repeatedly of positive/negative-pressure,
Select inflatable and deflatable number be no less than 3 times this for guaranteeing positive/negative pressure viscosity knot on tube wall under 3 times or more conversions
Structure is changed and upsets original characteristic, specifically makes the motion state of viscosity particle close with the motion state of non-viscosity particle
Seemingly reach and destroy curing sludge effect, while the water flow sprayed in viscosity particle and non-viscosity particle and pipeline interacts
When, the frictional resistance between particulate matter and water body reduces, and flow resistance of the particulate matter in water body is small, realizes the particle in water body
Object flowing velocity increases, and when the first and second blocking component is cancelled to the closure of pipeline, mud is quickly detached from from tube wall and with water
Stream discharge realizes that desilting efficiency data is high and reduces dredging labor intensity, and the segmented dredging means used are controllable to dredging situation
The case where property is strong, effectively avoids piping failure during dredging appearance.
Further, connection supervisor's axial line and hydraulic engineering pipeline axis parallel, connection supervisor are set by its end
Some ring flanges are connect with water pump.
Further, spray module includes and is connected to the terminal pad be responsible for and be fixedly connected, spiral surrounding arrangement in terminal pad
The hole for water spraying of sparge pipe, sparge pipe is connected with connection supervisor, and sparge pipe injection water flow velocity is 120 ~ 150m/s.
Further, the first blocking component includes two the first sealing plates connected by connecting column, is equipped between two sealing plates
Can deformation outward the first rubber ring, the first rubber ring inner wall direction is equipped with magnetic substance, tool in the first sealing plate below magnetic substance
There is the electromagnet group for driving magnetic substance mobile.
Further, there is pressure sensor and air pressure sensing on the second blocking component one side of the first blocking component direction
Device.
Further, the connection supervisor between the second blocking component and ring flange is equipped with parallel with supervisor's axis is connected to
Rack gear, rack gear are correspondingly provided with gear, and gear has motor driven.
Further, the second blocking component can be moved along connection supervisor's direction of axis line, have at least two on connection supervisor
Limit assembly of the group for limiting to the second blocking component, limit assembly include and are connected to the clip for being responsible for connection, clip and company
Having section between logical supervisor is I-shaped sealing ring.
Compared with prior art, the invention has the benefit that the present invention passes through the first blocking component and the second closure group
Part carries out segmented closure to the pipeline of required dredging, carries out to the pipeline between the first blocking component and the second blocking component clear
Silt work, compared with the prior art for longer pipeline carries out monoblock type dredging work, the segmented that the present invention uses is clear
Silt means can guarantee that dredging efficient work carries out, and effectively destroy the curing sludge on tube wall with adhesiveness, while guaranteeing pipeline
There is not breakage.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of dredging device for water conservancy projects of the present invention;
Fig. 2 is dredging device for water conservancy projects front view of the present invention;
Fig. 3 is the structural schematic diagram of the first blocking component of the invention;
Fig. 4 is the structural schematic diagram of the second blocking component of the invention;
Fig. 5 is the cross-sectional view of the first blocking component of the invention;
Fig. 6 is sectional view along A-A in Fig. 5;
Fig. 7 is spray module structural schematic diagram of the invention;
Fig. 8 is limit assembly structural schematic diagram of the invention;
Fig. 9 is the fractionation schematic diagram of limit assembly of the present invention;
Figure 10 is sealing ring cross-sectional view of the invention;
Figure 11 is the second spray module structural schematic diagram in the embodiment of the present invention 3.
Description of symbols: the first blocking component of 10-;The first sealing plate of 11-;The first rubber ring of 12-;13- connecting column;14-
Magnetic substance;15- electromagnet group;20- pressure sensor;30- baroceptor;40- connection supervisor;41- rack gear;42- ring flange;
50- spray module;51- terminal pad;52- sparge pipe;The second blocking component of 60-;61- tracheae;62- intercommunicating pore;The second envelope of 63-
Plate;The second rubber ring of 64-;70- limit assembly;71- sealing ring;72- clip;73- fastener;80- motor;90- second sprays water
Component.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Embodiment 1:
Referring to shown in Fig. 1-10, dredging device for water conservancy projects includes:
First blocking component, the first blocking component and hydraulic engineering pipeline gap are adjustable;
Connection supervisor, connection supervisor's one end connect the first blocking component end face, and the other end connects water pump, matches on connection supervisor
Connection spray module is closed, and
Second blocking component, the second blocking component be connected to supervisor and be cooperatively connected and the second blocking component and hydraulic engineering pipeline enclosure
Gap is adjustable, connects spray module on the connection supervisor of the second blocking component and the first blocking component;
Wherein, there is a tracheae, tracheae is used for the first blocking component and the second blocking component and water conservancy on the second blocking component
The seal cavity formed between engineering pipeline is inflated/deflates, and inflatable and deflatable number is no less than 3 times.
The present invention carries out segmented closure to the pipeline of required dredging by the first blocking component and the second blocking component, right
Pipeline between first blocking component and the second blocking component carries out dredging work, compared with the prior art to longer pipeline into
For row monoblock type dredging work, the segmented dredging means that the present invention uses can guarantee that dredging efficient work carries out, effectively broken
With the curing sludge of adhesiveness on bad tube wall, while guaranteeing that breakage does not occur in pipeline, specifically, utilizing the during dredging
One blocking component and the second blocking component carry out segmented closure to the pipeline of required dredging, after the completion of closure by air pump and
Tracheae extracts the gas between the first blocking component and the second blocking component after closure in pipeline out, bears its internal formed
Then pressure is then turned on air pump by tracheae to being inflated in pipeline between the first blocking component and the second blocking component, so
Water body is inputted after connection supervisor by spray module to spraying water body in tube wall by water pump under negative pressure state after operation repeatedly,
The frictional resistance of the adsorption effect of viscosity particle and particle and water body on tube wall is destroyed using the switching repeatedly of positive/negative-pressure,
Select inflatable and deflatable number be no less than 3 times this for guaranteeing positive/negative pressure viscosity knot on tube wall under 3 times or more conversions
Structure is changed and upsets original characteristic, specifically makes the motion state of viscosity particle close with the motion state of non-viscosity particle
Seemingly reach and destroy curing sludge effect, while the water flow sprayed in viscosity particle and non-viscosity particle and pipeline interacts
When, the frictional resistance between particulate matter and water body reduces, and flow resistance of the particulate matter in water body is small, realizes the particle in water body
Object flowing velocity increases, and when the first and second blocking component is cancelled to the closure of pipeline, mud is quickly detached from from tube wall and with water
Stream discharge realizes that desilting efficiency data is high and reduces dredging labor intensity, and the segmented dredging means used are controllable to dredging situation
The case where property is strong, effectively avoids piping failure during dredging appearance.
Connection supervisor's axial line and hydraulic engineering pipeline axis parallel, the ring flange that connection supervisor is equipped with by its end
It is connect with water pump.
Shown in Figure 7, spray module includes and is connected to the terminal pad be responsible for and be fixedly connected, spiral surrounding row in terminal pad
The hole for water spraying of cloth sparge pipe, sparge pipe is connected with connection supervisor, and sparge pipe injection water flow velocity is 120m/s.
Referring to shown in Fig. 5,6, the first blocking component includes two the first sealing plates connected by connecting column, between two sealing plates
Equipped with can deformation outward the first rubber ring, the first rubber ring inner wall direction is equipped with magnetic substance, the first sealing plate below magnetic substance
The interior electromagnet group having for driving magnetic substance mobile.
It is shown in Figure 1, there is pressure sensor and air pressure on the first blocking component the second blocking component one side of direction
Sensor.
Shown in Figure 1, connection between the second blocking component and ring flange supervisor is equipped with and be connected to supervisor's axis and put down
Capable rack gear, rack gear are correspondingly provided with gear, and gear has motor driven.
Ginseng as shown in Figs. 8 and 9, the second blocking component can along connection supervisor direction of axis line move, connection supervisor on have extremely
Few two groups of limit assemblies for limiting to the second blocking component, limit assembly include and are connected to the clip for being responsible for connection, clip
Have section for I-shaped sealing ring with being connected between supervisor.
Embodiment 2:
Referring to shown in Fig. 1-10, dredging device for water conservancy projects, comprising:
First blocking component, the first blocking component and hydraulic engineering pipeline gap are adjustable;
Connection supervisor, connection supervisor's one end connect the first blocking component end face, and the other end connects water pump, matches on connection supervisor
Connection spray module is closed, and
Second blocking component, the second blocking component be connected to supervisor and be cooperatively connected and the second blocking component and hydraulic engineering pipeline enclosure
Gap is adjustable, connects spray module on the connection supervisor of the second blocking component and the first blocking component;
Wherein, there is a tracheae, tracheae is used for the first blocking component and the second blocking component and water conservancy on the second blocking component
The seal cavity formed between engineering pipeline is inflated/deflates.
The present invention carries out segmented closure to the pipeline of required dredging by the first blocking component and the second blocking component, right
Pipeline between first blocking component and the second blocking component carries out dredging work, compared with the prior art to longer pipeline into
For row monoblock type dredging work, the segmented dredging means that the present invention uses can guarantee that dredging efficient work carries out, effectively broken
With the curing sludge of adhesiveness on bad tube wall, while guaranteeing that breakage does not occur in pipeline, specifically, utilizing the during dredging
One blocking component and the second blocking component carry out segmented closure to the pipeline of required dredging, after the completion of closure by air pump and
Tracheae extracts the gas between the first blocking component and the second blocking component after closure in pipeline out, bears its internal formed
Then pressure is then turned on air pump by tracheae to being inflated in pipeline between the first blocking component and the second blocking component, so
Water body is inputted after connection supervisor by spray module to spraying water body in tube wall by water pump under negative pressure state after operation repeatedly,
The frictional resistance of the adsorption effect of viscosity particle and particle and water body on tube wall is destroyed using the switching repeatedly of positive/negative-pressure,
It specifically reaches approximately the motion state of viscosity particle and the motion state of non-viscosity particle and destroys curing sludge effect, together
When viscosity particle and non-viscosity particle and pipeline in the water flow sprayed when interacting, the friction between particulate matter and water body
Resistance reduces, and flow resistance of the particulate matter in water body is small, realizes that the Particle flow speed in water body increases, first and second
Mud is quickly detached from from tube wall and is discharged with water flow when blocking component cancels the closure to pipeline, realizes that desilting efficiency data is high and drops
Low dredging labor intensity, and the segmented dredging means used are strong to dredging situation controllability, effectively avoid managing during dredging
The situation of road breakage occurs.
Connection supervisor's axial line and hydraulic engineering pipeline axis parallel make the water body flow direction inputted in connection supervisor
It is consistent with hydraulic engineering pipeline, and then its impact effect is protected after the water body in connection supervisor is discharged by spray module
Card can't generate resistance to water-flow, reduce the energy consumption of water pump, and connection supervisor is connect by the ring flange that its end is equipped with water pump,
For guaranteeing the connection between connection supervisor and water pump.
Second blocking component can be moved along connection supervisor's direction of axis line, it can be achieved that by the second blocking component of regulation even
Lead to the position of supervisor's axis direction to adjust the distance of segmented closure, is used for at least two groups to the second envelope on connection supervisor
The limit assembly of blocking component limit, by being blocked second when determining the position of the opposite connection supervisor of the second blocking component
Component upper and lower ends be separately connected limit assembly come to the second blocking component limit, realize the second blocking component be connected to supervisor's
Between fixation, guarantee segmented dredging during sealing effect and device overall stability.
Limit assembly include be connected to supervisor connection clip, clip be connected to supervisor between have section be it is I-shaped
Sealing ring.Second blocking component upper and lower side is separately connected for limiting the mobile limit assembly of the second blocking component, and clip uses
Fastener is fixed, and fastener is bolt, and nut corresponding with bolt specification also can be selected.Clip width and sealing ring are I-shaped
The distance between upper and lower casting lug thereon is equal, is leading clip with being connected to by fastener
When pipe is fixed, extruding when sealing ring is tightened by clip, on the inside of sealing ring be connected to the semi-shaped structure for being responsible for contact portion
Two casting lug thereons extend to the outside to be formed "-" type make its flexible deformation expand come shape to the reaction force of clip tightening process, avoid
Clip tighten oversized commutation supervisor generate deformation, while expand sealing ring be connected to supervisor between area in sealing contact, in fact
Sealing between existing clip and the second blocking component.
Spray module includes and is connected to the terminal pad be responsible for and be fixedly connected, spiral surrounding arrangement sparge pipe, spray in terminal pad
The hole for water spraying of water pipe is connected with connection supervisor, and sparge pipe injection water flow velocity is 130m/s.Sparge pipe cloth is set as helical ring
Around form be conducive to sparge pipe during water spray to tube wall carry out the wound water spray of helical ring, injection water body can useful effect in pipe
Wall is it after water body contacts by the flowing velocity of the wound injection influence on water body slime water of helical ring everywhere and with mud contacts
Increased, and set the flow velocity for the slime water that injection water flow velocity comes out in 130m/s further expansion dredging, mud is fast
Speed is detached from from tube wall and is discharged with water flow.
First blocking component includes two the first sealing plates connected by connecting column, and being equipped between two sealing plates can outside deformation
The first rubber ring, the first rubber ring inner wall direction is equipped with magnetic substance, has in the first sealing plate below magnetic substance for driving
The mobile electromagnet group of magnetic substance.Electromagnet group is made of multi-turn around the electromagnetic block being laid in the first sealing plate, and electromagnetic block is equal
It is laid at from the edge of the first sealing plate to its axle center.The present invention carries out control system of switching on or off electricity to electromagnet group using peripheral control unit
It pushes out magnetic substance to deformable first rubber ring to control the moving distance of magnetic substance opposed electromagnets group and makes it
Formed between outside deformation and the tube wall of dredging pipeline the carry out deformation avoided for contacting and generating corresponding inner wall of the pipe injustice and
It adjusts, solves existing seal assembly and the pressure that generates when seal for pipe joints is excessive leads to asking for piping failure or device breakage
Topic.The device of the invention realizes the sealing to different tube diameters inner wall of the pipe, is capable of the pipeline wide scope of dredging.
Second blocking component includes two the second sealing plates connected by connecting column, and being equipped between two sealing plates can outside deformation
The second rubber ring, the second rubber ring inner wall direction is equipped with magnetic substance, has in the second sealing plate below magnetic substance for driving
The mobile electromagnet group of magnetic substance.Electromagnet group is made of multi-turn around the electromagnetic block being laid in the second sealing plate, and electromagnetic block is equal
It is laid at from the edge of the second sealing plate to its axle center.It is controlled by the power on/off of variant electromagnet in control electromagnet group
The position of magnetic substance opposed electromagnets group, it is specific: the electromagnetism by continuous the second sealing plate of power on/off by axle center to the outer direction
The energization of block adsorbs electromagnet to the movement of the second sealing plate outer diameter direction, and to make the second rubber ring deformation, which is suitable for first
The deformation process of first rubber ring of blanking plate component.
There is pressure sensor and baroceptor on first blocking component the second blocking component one side of direction, by outer
If controller monitors pressure sensor and baroceptor, realize to the first blocking component and the second blocking component and water conservancy work
The intracorporal air pressure of the seal chamber formed between Cheng Guandao and existing pressure are monitored, and realization proposes dredging situation controllability
The case where rising, effectively avoiding piping failure during dredging appearance.
Connection supervisor between second blocking component and ring flange is equipped with the rack gear parallel with supervisor's axis is connected to, rack gear
It is correspondingly provided with gear, gear has motor driven.Motor is displaced in the axial direction for realizing connection supervisor, utilizes motor driven tooth
It takes turns to keep rack gear mobile to realize movement of the device in pipeline when not carrying out closure dredging to pipeline, expands pipe dredging model
It encloses, reduces labor intensity.
Embodiment 3:
The present embodiment is based on the technical solution for proposing another dredging device for water conservancy projects on the basis of embodiment 2, referring to shown in figure,
Spray module is replaced with into the second spray module in the technical solution of embodiment 2, the second spray module includes and is connected to supervisor
The terminal pad being fixedly connected, around arrangement sparge pipe in terminal pad.
Embodiment 4:
Dredging device for water conservancy projects of the invention is in actual use: the device of the invention being put into the pipeline for needing dredging, is passed through
Peripheral control unit-computer makes its control magnetic substance generation displacement that the first rubber ring be pushed to produce outward to control electromagnet group power on/off
Raw deformation contacts with inner wall of the pipe shape and forms sealing, similarly controls the second blocking component and inner wall of the pipe is formed and sealed, realize
First blocking component and the second blocking component carry out segmented closure to the pipeline of required dredging, pass through air pump after the completion of closure
And tracheae extracts the gas between the first blocking component and the second blocking component after closure in pipeline out, bears its internal formed
Then pressure is then turned on air pump by tracheae to being inflated in pipeline between the first blocking component and the second blocking component, so
Water body is inputted after connection supervisor by spray module to spraying water body in tube wall by water pump under negative pressure state after operation 4 times,
And cancelling the first blocking component and the second blocking component by computer-controlled electromagnetic iron group divides inner wall of the pipe the sealing of pipeline
From fixed line mud and dredging generate slime water be quickly discharged from pipeline by spray module injection water, complete dredging
Work, then make by motor-driven gear rack gear mobile device is in pipeline when not carrying out closure dredging to pipeline to realize
Movement, expand pipe dredging range.
Peripheral control unit described herein is computer, power on/off and monitoring pressure for computer-controlled electromagnetic iron group
Force snesor and air pressure sensing belong to existing well-known technique, and those skilled in the art have the ability to realize and understand, not excessive herein
It repeats.First rubber ring and the second rubber ring of the invention is isoprene rubber, the material of the first sealing plate and the second sealing plate be non-ferric,
The substances such as cobalt, nickel.
First rubber ring of the first blocking component and the deformation principle of the second rubber ring of the second blocking component are identical, and first
The pressure that blocking component and the second blocking component solve existing seal assembly and when seal for pipe joints generates is excessive to lead to pipeline
Damaged or device breakage problem.
Sparge pipe injection water flow velocity includes but is not limited to 120 ~ 150m/s, can also be 120 m/s or 121 m/s or
122 m/s or 123 m/s or 124 m/s ... or 149 m/s or 150 m/s.
The above disclosure is only the preferred embodiments of the present invention, cannot limit the right model of the present invention with this certainly
It encloses, therefore equivalent changes made in accordance with the claims of the present invention, is still within the scope of the present invention.
Claims (10)
1. dredging device for water conservancy projects, the dredging device for water conservancy projects include:
First blocking component (10), first blocking component (10) and hydraulic engineering pipeline gap are adjustable;
Connection supervisor (40), connection supervisor (40) one end connect the first blocking component (10) end face, the other end connection
Mating connection spray module (50) on (40) is responsible in water pump, the connection, and
Second blocking component (60), second blocking component (60) be connected to supervisor (40) be cooperatively connected and it is described second block
Component (60) and hydraulic engineering pipeline gap are adjustable, the connection of second blocking component (60) and the first blocking component (10)
It is responsible on (40) and connects spray module (50);
Wherein, there are a tracheae (61) on second blocking component (60), the tracheae (61) is used for the first blocking component
(10) seal cavity formed between the second blocking component (60) and hydraulic engineering pipeline is inflated/deflates.
2. dredging device for water conservancy projects according to claim 1, it is characterised in that: connection supervisor's (40) axial line with
Hydraulic engineering pipeline axis parallel, the ring flange (42) that the connection supervisor (40) is equipped with by its end are connect with water pump.
3. dredging device for water conservancy projects according to claim 1, it is characterised in that: second blocking component (60) can edge
Connection supervisor's (40) direction of axis line is mobile, on the connection supervisor (40) there are at least two groups to be used for the second blocking component
(60) limit assembly (70) limited.
4. dredging device for water conservancy projects according to claim 3, it is characterised in that: the limit assembly (70) includes and connects
The clip (72) of logical supervisor (40) connection, the clip (72) be connected between supervisor (40) with section be I-shaped sealing
It encloses (71).
5. dredging device for water conservancy projects according to claim 1, it is characterised in that: the spray module (50) includes and connects
Lead to the terminal pad (51) that supervisor (40) is fixedly connected, spiral surrounding arrangement sparge pipe (52), the spray on the terminal pad (51)
The hole for water spraying of water pipe (52) is connected with connection supervisor (40), and sparge pipe (52) the injection water flow velocity is 120 ~ 150m/s.
6. dredging device for water conservancy projects according to claim 1, it is characterised in that: first blocking component (10) includes
Two the first sealing plates (11) connected by connecting column (13), be equipped between two sealing plate can deformation outward the first rubber ring
(12), the first rubber ring (12) inner wall direction is equipped with magnetic substance (14), the first sealing plate below the magnetic substance (14)
(11) there is the electromagnet group (15) for driving magnetic substance (14) mobile in.
7. dredging device for water conservancy projects, the dredging device for water conservancy projects include:
First blocking component (10), first blocking component (10) and hydraulic engineering pipeline gap are adjustable;
Connection supervisor (40), connection supervisor (40) one end connect the first blocking component (10) end face, the other end connection
Mating connection spray module (50) on (40) is responsible in water pump, the connection, and
Second blocking component (60), second blocking component (60) be connected to supervisor (40) be cooperatively connected and it is described second block
Component (60) and hydraulic engineering pipeline gap are adjustable, the connection of second blocking component (60) and the first blocking component (10)
It is responsible on (40) and connects spray module (50);
Wherein, there are a tracheae (61) on second blocking component (60), the tracheae (61) is used for the first blocking component
(10) seal cavity formed between the second blocking component (60) and hydraulic engineering pipeline is inflated/deflates, and inflates and puts
Gas number is no less than 3 times.
8. dredging device for water conservancy projects according to claim 7, it is characterised in that:
Preferably, connection supervisor's (40) axial line and hydraulic engineering pipeline axis parallel, the connection supervisor (40) are logical
The ring flange (42) that its end is equipped with is crossed to connect with water pump;
Preferably, the spray module (50) includes and is connected to the terminal pad (51) being responsible for (40) and being fixedly connected, the terminal pad
(51) hole for water spraying of spiral surrounding arrangement sparge pipe (52) on, the sparge pipe (52) is connected with connection supervisor (40), described
Sparge pipe (52) injection water flow velocity is 120 ~ 150m/s;
Preferably, first blocking component (10) includes two the first sealing plates (11) connected by connecting column (13), described
Between two sealing plates be equipped with can outward deformation the first rubber ring (12), the first rubber ring (12) inner wall direction be equipped with magnetic substance
(14), there is the electromagnet group for driving magnetic substance (14) mobile in the first sealing plate (11) below the magnetic substance (14)
(15).
9. dredging device for water conservancy projects according to claim 7, it is characterised in that:
Preferably, there are pressure sensor (20) on described first blocking component (10) direction the second blocking component (60) one side
With baroceptor (30);
Preferably, the connection supervisor (40) between second blocking component (60) and ring flange (42) is equipped with and is connected to supervisor
(41) the parallel rack gear of axis (41), the rack gear are correspondingly provided with gear, and the gear has motor (80) driving.
10. dredging device for water conservancy projects according to claim 7, it is characterised in that: second blocking component (60) can edge
Connection supervisor's (40) direction of axis line is mobile, on the connection supervisor (40) there are at least two groups to be used for the second blocking component
(60) limit assembly (70) limited, the limit assembly (70) includes the clip (72) connecting with connection supervisor (40), described
Clip (72) be connected to supervisor (40) between have section be I-shaped sealing ring (71).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910269023.5A CN110130472A (en) | 2019-04-04 | 2019-04-04 | Dredging device for water conservancy projects |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910269023.5A CN110130472A (en) | 2019-04-04 | 2019-04-04 | Dredging device for water conservancy projects |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110130472A true CN110130472A (en) | 2019-08-16 |
Family
ID=67569249
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910269023.5A Pending CN110130472A (en) | 2019-04-04 | 2019-04-04 | Dredging device for water conservancy projects |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110130472A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111926907A (en) * | 2020-06-28 | 2020-11-13 | 宁波宏川环境科技有限公司 | Pipeline dredging and dredging method |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5771937A (en) * | 1996-12-13 | 1998-06-30 | Mcp Industries, Inc. | Pipe plug and method |
EP1068468A1 (en) * | 1998-04-09 | 2001-01-17 | KA-TE System AG | Sealing element for piping |
CN203008118U (en) * | 2013-01-17 | 2013-06-19 | 杭州远山食品科技有限公司 | Negative pressure dredging device for drain pipe |
CN203131316U (en) * | 2013-02-15 | 2013-08-14 | 周晓东 | Pipeline temporary blocking device |
CN205189083U (en) * | 2015-12-14 | 2016-04-27 | 张雷 | Sewer line dredge |
CN106193271A (en) * | 2016-09-06 | 2016-12-07 | 黄河科技学院 | High-pressure water jet spiral advance and retreat formula pipe-dredging drill bit |
CN207484208U (en) * | 2017-08-23 | 2018-06-12 | 裴看元 | Urban pavement rainwater fast drain system |
CN208280290U (en) * | 2018-05-14 | 2018-12-25 | 广州市合信环保科技有限公司 | A kind of pipeline sludge fast dredging device |
-
2019
- 2019-04-04 CN CN201910269023.5A patent/CN110130472A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5771937A (en) * | 1996-12-13 | 1998-06-30 | Mcp Industries, Inc. | Pipe plug and method |
EP1068468A1 (en) * | 1998-04-09 | 2001-01-17 | KA-TE System AG | Sealing element for piping |
CN203008118U (en) * | 2013-01-17 | 2013-06-19 | 杭州远山食品科技有限公司 | Negative pressure dredging device for drain pipe |
CN203131316U (en) * | 2013-02-15 | 2013-08-14 | 周晓东 | Pipeline temporary blocking device |
CN205189083U (en) * | 2015-12-14 | 2016-04-27 | 张雷 | Sewer line dredge |
CN106193271A (en) * | 2016-09-06 | 2016-12-07 | 黄河科技学院 | High-pressure water jet spiral advance and retreat formula pipe-dredging drill bit |
CN207484208U (en) * | 2017-08-23 | 2018-06-12 | 裴看元 | Urban pavement rainwater fast drain system |
CN208280290U (en) * | 2018-05-14 | 2018-12-25 | 广州市合信环保科技有限公司 | A kind of pipeline sludge fast dredging device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111926907A (en) * | 2020-06-28 | 2020-11-13 | 宁波宏川环境科技有限公司 | Pipeline dredging and dredging method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105275492B (en) | A kind of provisional baffle device for water for being used to quickly handle the prominent mud problem of water burst in tunnel | |
CN101622049A (en) | Continuous pressure letdown system | |
CN106968262B (en) | The channel steel cofferdam system quickly repaired for the slope lining cutting of water channel canal | |
CN110130472A (en) | Dredging device for water conservancy projects | |
CN101869783A (en) | Method for carrying out inflating and flushing on filter | |
CN111186918A (en) | Adjustable turbulence scale inhibitor and scale inhibition method | |
CN203008102U (en) | Blowdown device | |
CN105126505B (en) | A kind of surface mine ultrasonic atomization dust arrester | |
CN106890748A (en) | A kind of film wiper with emergency start system | |
CN104307216B (en) | Efficient swash plate oil removing sand-catching apparatus | |
CN206676618U (en) | A kind of film wiper with emergency start system | |
CN110117062A (en) | A kind of novel biofilter backwash gas distributing pipeline system and biological aerated filter | |
CN207452256U (en) | A kind of zinc-plated passivating solution recycle device | |
CN104929019B (en) | A kind of rubber-tyred roller tire tread injection system | |
CN109371930B (en) | Bulb-shaped dirt blocking structure of sewer pipeline | |
CN101806370A (en) | Multifunctional watermeter connecting valve | |
CN219209439U (en) | Gas lifting cap with enhanced demisting and dedusting capabilities | |
CN201288103Y (en) | Industrial waste water treatment apparatus | |
CN203350725U (en) | Flow regulator | |
CN215842065U (en) | Hydrocyclone separation filter | |
CN217951364U (en) | Pneumatic gate device | |
CN212954399U (en) | Square air supporting pond | |
CN104801444B (en) | A kind of independent increment fluid jet nozzle | |
CN207478781U (en) | A kind of Wet-type permanent magnet drum type magnetic separator unloads mineral water nozzle | |
CN208169582U (en) | One kind prevents adhesion hose valve |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
AD01 | Patent right deemed abandoned |
Effective date of abandoning: 20210528 |
|
AD01 | Patent right deemed abandoned |