CN110130472A - Dredging device for water conservancy projects - Google Patents

Dredging device for water conservancy projects Download PDF

Info

Publication number
CN110130472A
CN110130472A CN201910269023.5A CN201910269023A CN110130472A CN 110130472 A CN110130472 A CN 110130472A CN 201910269023 A CN201910269023 A CN 201910269023A CN 110130472 A CN110130472 A CN 110130472A
Authority
CN
China
Prior art keywords
blocking component
supervisor
connection
dredging
water conservancy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910269023.5A
Other languages
Chinese (zh)
Inventor
陈国君
黄少雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Tianmu Construction And Development Co Ltd
Original Assignee
Zhejiang Tianmu Construction And Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Tianmu Construction And Development Co Ltd filed Critical Zhejiang Tianmu Construction And Development Co Ltd
Priority to CN201910269023.5A priority Critical patent/CN110130472A/en
Publication of CN110130472A publication Critical patent/CN110130472A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F7/00Other installations or implements for operating sewer systems, e.g. for preventing or indicating stoppage; Emptying cesspools
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F9/00Arrangements or fixed installations methods or devices for cleaning or clearing sewer pipes, e.g. by flushing
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F9/00Arrangements or fixed installations methods or devices for cleaning or clearing sewer pipes, e.g. by flushing
    • E03F9/007Devices providing a flushing surge

Abstract

The present invention discloses a kind of dredging device for water conservancy projects, belongs to pipe technology field, comprising: the first blocking component, the first blocking component and hydraulic engineering pipeline gap are adjustable;Connection supervisor, connection supervisor's one end connects the first blocking component end face, the other end connects water pump, be cooperatively connected spray module on connection supervisor, and second blocking component, second blocking component be connected to that supervisor is cooperatively connected and the second blocking component and hydraulic engineering pipeline gap are adjustable, the connection of the second blocking component and the first blocking component is responsible for and connects spray module;Wherein, there is a tracheae, tracheae is for being inflated/deflating to the seal cavity formed between the first blocking component and the second blocking component and hydraulic engineering pipeline on the second blocking component.Accrete clearing device of the invention carries out dredging work to urban duct using segmented, can be crushed curing sludge, and mud disengaging rate is high on pipe wall, and pipeline is not likely to produce rupture, and desilting efficiency data is high and reduces dredging labor intensity.

Description

Dredging device for water conservancy projects
Technical field
The invention belongs to pipe technology fields, and in particular to a kind of dredging device for water conservancy projects.
Background technique
Urban discharging pipeline has more long construction history in China, there is special pipe duct very early, for excluding city Sewage and rainwater, each dynasty capital also all built many drainage systems, these systems construction is more complete.In urban duct reality There is also some not perfect places, such as pipeline product silt problem in the use process of border.
The siltation problem of drainage pipeline is due to caused by the deposition of solids of silt and suspension in pipe-line system mostly , this phenomenon does not occur only in drain header, can also betide in branch drain line.Sewage is in drainage pipeline Since the drag losses of pipeline reduce flow velocity, the silt and solid suspension carried in sewage is likely to sink wherein for movement It accumulates, so that drainage pipeline product be caused to become silted up.In addition, interflow tubing giving sufficient strength is in the flow and pipeline that rainy season and dry season receive sewage The difference of effluent flow rate is very big, this will lead to the larger particles that rainy season originally can be pulled away or bulky grain suspended matter because dry season manages The reduction of flow and flow rate in road and deposit, can also cause drainage pipeline to deposit, at the same partial particulate object have it is certain viscous Attached property further increases pipe dredging difficulty in inner wall of the pipe bonding, such as dredging not in time after pipeline product is become silted up, may make At line clogging, this is unfavorable for urban duct blowdown, also provides compared with multi-method or equipment solve pipeline product silt in the prior art Problem, for example, by using chemical reagent, but chemical reagent often will cause pollution to water body, for another example use pipe dredging machine People, but this kind of high equipment cost, complicated for operation, unsuitable realization is a wide range of to promote the use of.
Summary of the invention
The purpose of the present invention is to provide a kind of dredging device for water conservancy projects, carry out dredging to urban duct using segmented Work, can be crushed curing sludge, and mud disengaging rate is high on pipe wall, and pipeline is not likely to produce rupture, and desilting efficiency data is high and reduces Dredging labor intensity.
The technical solution that the present invention is taken to achieve the above object are as follows: dredging device for water conservancy projects, comprising:
First blocking component, the first blocking component and hydraulic engineering pipeline gap are adjustable;
Connection supervisor, connection supervisor's one end connect the first blocking component end face, and the other end connects water pump, matches on connection supervisor Connection spray module is closed, and
Second blocking component, the second blocking component be connected to supervisor and be cooperatively connected and the second blocking component and hydraulic engineering pipeline enclosure Gap is adjustable, connects spray module on the connection supervisor of the second blocking component and the first blocking component;
Wherein, there is a tracheae, tracheae is used for the first blocking component and the second blocking component and water conservancy on the second blocking component The seal cavity formed between engineering pipeline is inflated/deflates.
The present invention carries out segmented closure to the pipeline of required dredging by the first blocking component and the second blocking component, right Pipeline between first blocking component and the second blocking component carries out dredging work, compared with the prior art to longer pipeline into For row monoblock type dredging work, the segmented dredging means that the present invention uses can guarantee that dredging efficient work carries out, effectively broken With the curing sludge of adhesiveness on bad tube wall, while guaranteeing that breakage does not occur in pipeline, specifically, utilizing the during dredging One blocking component and the second blocking component carry out segmented closure to the pipeline of required dredging, after the completion of closure by air pump and Tracheae extracts the gas between the first blocking component and the second blocking component after closure in pipeline out, bears its internal formed Then pressure is then turned on air pump by tracheae to being inflated in pipeline between the first blocking component and the second blocking component, so Water body is inputted after connection supervisor by spray module to spraying water body in tube wall by water pump under negative pressure state after operation repeatedly, The frictional resistance of the adsorption effect of viscosity particle and particle and water body on tube wall is destroyed using the switching repeatedly of positive/negative-pressure, It specifically reaches approximately the motion state of viscosity particle and the motion state of non-viscosity particle and destroys curing sludge effect, together When viscosity particle and non-viscosity particle and pipeline in the water flow sprayed when interacting, the friction between particulate matter and water body Resistance reduces, and flow resistance of the particulate matter in water body is small, realizes that the Particle flow speed in water body increases, first and second Mud is quickly detached from from tube wall and is discharged with water flow when blocking component cancels the closure to pipeline, realizes that desilting efficiency data is high and drops Low dredging labor intensity, and the segmented dredging means used are strong to dredging situation controllability, effectively avoid managing during dredging The situation of road breakage occurs.
Further, connection supervisor's axial line and hydraulic engineering pipeline axis parallel make the water inputted in connection supervisor Body flow direction is consistent with hydraulic engineering pipeline, and then it is impacted after the water body in connection supervisor is discharged by spray module Effect is able to guarantee that resistance to water-flow can't be generated, reduces the energy consumption of water pump, be connected to the ring flange that supervisor is equipped with by its end It is connect with water pump, for guaranteeing the connection between connection supervisor and water pump.
Further, the second blocking component can be moved along connection supervisor's direction of axis line, it can be achieved that by the second envelope of regulation Blocking component adjusts the distance of segmented closure in the position of connection supervisor's axis direction, on connection supervisor there are at least two groups to use In the limit assembly limited to the second blocking component, pass through when determining the position of the opposite connection supervisor of the second blocking component The second blocking component upper and lower ends be separately connected limit assembly come to the second blocking component limit, realize the second blocking component with Fixation between connection supervisor, sealing effect and device overall stability during guarantee segmented dredging.
Further, limit assembly include with the clip that is connected to supervisor's connection, clip be connected between supervisor with section For I-shaped sealing ring.Second blocking component upper and lower side is separately connected for limiting the mobile limit group of the second blocking component Part, clip are fixed using fastener, and fastener is bolt, and nut corresponding with bolt specification also can be selected.Clip width with it is close I-shaped the distance between the casting lug thereon up and down of seal is equal, makes clip by tight by designing the cross sectional shape of sealing ring Firmware be connected to supervisor it is fixed when, extruding when sealing ring is tightened by clip is responsible for contact portion with being connected on the inside of sealing ring Two casting lug thereons of semi-shaped structure extend to the outside to be formed "-" type make its flexible deformation expand come shape to clip tightening process Reaction force, avoid clip tightening oversized commutation supervisor generate deformation, while expand sealing ring be connected to be responsible between it is close Contact area is sealed, realizes the sealing between clip and the second blocking component.
Further, spray module includes and is connected to the terminal pad be responsible for and be fixedly connected, spiral surrounding arrangement in terminal pad The hole for water spraying of sparge pipe, sparge pipe is connected with connection supervisor, and sparge pipe injection water flow velocity is 120 ~ 150m/s.By sparge pipe Cloth is set as surrounded spiral shape formula and is conducive to sparge pipe during water spray to the tube wall progress wound water spray of helical ring, and injection water body can Useful effect is after tube wall makes it be that water body contacts everywhere and with mud contacts by the wound injection influence on water body mud of helical ring The flowing velocity of water is increased, and sets the mud that injection water flow velocity comes out in 120 ~ 150m/s further expansion dredging The flow velocity of water, mud are quickly detached from from tube wall and are discharged with water flow.
Further, the first blocking component includes two the first sealing plates connected by connecting column, is equipped between two sealing plates Can deformation outward the first rubber ring, the first rubber ring inner wall direction is equipped with magnetic substance, tool in the first sealing plate below magnetic substance There is the electromagnet group for driving magnetic substance mobile.Electromagnet group is by multi-turn around the electromagnetic block group being laid in the first sealing plate At, electromagnetic block from the edge of the first sealing plate to its axle center at lay.The present invention using peripheral control unit to electromagnet group into Row control system of switching on or off electricity makes magnetic substance to deformable first rubber ring to control the moving distance of magnetic substance opposed electromagnets group It pushes out to make to be formed between its outside deformation and the tube wall of dredging pipeline and contacts and generate avoiding for corresponding inner wall of the pipe injustice Carry out deformation and adjusting, solve existing seal assembly and pressure that when seal for pipe joints generates be excessive leads to piping failure or dress Set damaged problem.The device of the invention realizes the sealing to different tube diameters inner wall of the pipe, is capable of the pipeline wide scope of dredging.
Further, the second blocking component includes two the second sealing plates connected by connecting column, is equipped between two sealing plates Can deformation outward the second rubber ring, the second rubber ring inner wall direction is equipped with magnetic substance, tool in the second sealing plate below magnetic substance There is the electromagnet group for driving magnetic substance mobile.Electromagnet group is by multi-turn around the electromagnetic block group being laid in the second sealing plate At, electromagnetic block from the edge of the second sealing plate to its axle center at lay.Pass through variant electromagnet in control electromagnet group Power on/off controls the position of magnetic substance opposed electromagnets group, specific: outside by axle center by continuous the second sealing plate of power on/off The energization of the electromagnetic block in diameter direction adsorbs electromagnet to the movement of the second sealing plate outer diameter direction, to make the second rubber ring deformation, the original Reason is suitable for the deformation process of the first rubber ring of the first blanking plate component.
Further, there is pressure sensor and air pressure sensing on the second blocking component one side of the first blocking component direction Device monitors pressure sensor and baroceptor by peripheral control unit, realizes to the first blocking component and the second closure group The intracorporal air pressure of the seal chamber formed between part and hydraulic engineering pipeline and existing pressure are monitored, and are realized to dredging feelings The case where condition controllability is promoted, and effectively avoids piping failure during dredging appearance.
Further, the connection supervisor between the second blocking component and ring flange is equipped with parallel with supervisor's axis is connected to Rack gear, rack gear are correspondingly provided with gear, and gear has motor driven.Motor is displaced in the axial direction for realizing connection supervisor, is utilized Motor-driven gear keeps rack gear mobile to realize movement of the device in pipeline when not carrying out closure dredging to pipeline, expands Pipe dredging range reduces labor intensity.
Dredging device for water conservancy projects includes:
First blocking component, the first blocking component and hydraulic engineering pipeline gap are adjustable;
Connection supervisor, connection supervisor's one end connect the first blocking component end face, and the other end connects water pump, matches on connection supervisor Connection spray module is closed, and
Second blocking component, the second blocking component be connected to supervisor and be cooperatively connected and the second blocking component and hydraulic engineering pipeline enclosure Gap is adjustable, connects spray module on the connection supervisor of the second blocking component and the first blocking component;
Wherein, there is a tracheae, tracheae is used for the first blocking component and the second blocking component and water conservancy on the second blocking component The seal cavity formed between engineering pipeline is inflated/deflates, and inflatable and deflatable number is no less than 3 times.
The present invention carries out segmented closure to the pipeline of required dredging by the first blocking component and the second blocking component, right Pipeline between first blocking component and the second blocking component carries out dredging work, compared with the prior art to longer pipeline into For row monoblock type dredging work, the segmented dredging means that the present invention uses can guarantee that dredging efficient work carries out, effectively broken With the curing sludge of adhesiveness on bad tube wall, while guaranteeing that breakage does not occur in pipeline, specifically, utilizing the during dredging One blocking component and the second blocking component carry out segmented closure to the pipeline of required dredging, after the completion of closure by air pump and Tracheae extracts the gas between the first blocking component and the second blocking component after closure in pipeline out, bears its internal formed Then pressure is then turned on air pump by tracheae to being inflated in pipeline between the first blocking component and the second blocking component, so Water body is inputted after connection supervisor by spray module to spraying water body in tube wall by water pump under negative pressure state after operation repeatedly, The frictional resistance of the adsorption effect of viscosity particle and particle and water body on tube wall is destroyed using the switching repeatedly of positive/negative-pressure, Select inflatable and deflatable number be no less than 3 times this for guaranteeing positive/negative pressure viscosity knot on tube wall under 3 times or more conversions Structure is changed and upsets original characteristic, specifically makes the motion state of viscosity particle close with the motion state of non-viscosity particle Seemingly reach and destroy curing sludge effect, while the water flow sprayed in viscosity particle and non-viscosity particle and pipeline interacts When, the frictional resistance between particulate matter and water body reduces, and flow resistance of the particulate matter in water body is small, realizes the particle in water body Object flowing velocity increases, and when the first and second blocking component is cancelled to the closure of pipeline, mud is quickly detached from from tube wall and with water Stream discharge realizes that desilting efficiency data is high and reduces dredging labor intensity, and the segmented dredging means used are controllable to dredging situation The case where property is strong, effectively avoids piping failure during dredging appearance.
Further, connection supervisor's axial line and hydraulic engineering pipeline axis parallel, connection supervisor are set by its end Some ring flanges are connect with water pump.
Further, spray module includes and is connected to the terminal pad be responsible for and be fixedly connected, spiral surrounding arrangement in terminal pad The hole for water spraying of sparge pipe, sparge pipe is connected with connection supervisor, and sparge pipe injection water flow velocity is 120 ~ 150m/s.
Further, the first blocking component includes two the first sealing plates connected by connecting column, is equipped between two sealing plates Can deformation outward the first rubber ring, the first rubber ring inner wall direction is equipped with magnetic substance, tool in the first sealing plate below magnetic substance There is the electromagnet group for driving magnetic substance mobile.
Further, there is pressure sensor and air pressure sensing on the second blocking component one side of the first blocking component direction Device.
Further, the connection supervisor between the second blocking component and ring flange is equipped with parallel with supervisor's axis is connected to Rack gear, rack gear are correspondingly provided with gear, and gear has motor driven.
Further, the second blocking component can be moved along connection supervisor's direction of axis line, have at least two on connection supervisor Limit assembly of the group for limiting to the second blocking component, limit assembly include and are connected to the clip for being responsible for connection, clip and company Having section between logical supervisor is I-shaped sealing ring.
Compared with prior art, the invention has the benefit that the present invention passes through the first blocking component and the second closure group Part carries out segmented closure to the pipeline of required dredging, carries out to the pipeline between the first blocking component and the second blocking component clear Silt work, compared with the prior art for longer pipeline carries out monoblock type dredging work, the segmented that the present invention uses is clear Silt means can guarantee that dredging efficient work carries out, and effectively destroy the curing sludge on tube wall with adhesiveness, while guaranteeing pipeline There is not breakage.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of dredging device for water conservancy projects of the present invention;
Fig. 2 is dredging device for water conservancy projects front view of the present invention;
Fig. 3 is the structural schematic diagram of the first blocking component of the invention;
Fig. 4 is the structural schematic diagram of the second blocking component of the invention;
Fig. 5 is the cross-sectional view of the first blocking component of the invention;
Fig. 6 is sectional view along A-A in Fig. 5;
Fig. 7 is spray module structural schematic diagram of the invention;
Fig. 8 is limit assembly structural schematic diagram of the invention;
Fig. 9 is the fractionation schematic diagram of limit assembly of the present invention;
Figure 10 is sealing ring cross-sectional view of the invention;
Figure 11 is the second spray module structural schematic diagram in the embodiment of the present invention 3.
Description of symbols: the first blocking component of 10-;The first sealing plate of 11-;The first rubber ring of 12-;13- connecting column;14- Magnetic substance;15- electromagnet group;20- pressure sensor;30- baroceptor;40- connection supervisor;41- rack gear;42- ring flange; 50- spray module;51- terminal pad;52- sparge pipe;The second blocking component of 60-;61- tracheae;62- intercommunicating pore;The second envelope of 63- Plate;The second rubber ring of 64-;70- limit assembly;71- sealing ring;72- clip;73- fastener;80- motor;90- second sprays water Component.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Embodiment 1:
Referring to shown in Fig. 1-10, dredging device for water conservancy projects includes:
First blocking component, the first blocking component and hydraulic engineering pipeline gap are adjustable;
Connection supervisor, connection supervisor's one end connect the first blocking component end face, and the other end connects water pump, matches on connection supervisor Connection spray module is closed, and
Second blocking component, the second blocking component be connected to supervisor and be cooperatively connected and the second blocking component and hydraulic engineering pipeline enclosure Gap is adjustable, connects spray module on the connection supervisor of the second blocking component and the first blocking component;
Wherein, there is a tracheae, tracheae is used for the first blocking component and the second blocking component and water conservancy on the second blocking component The seal cavity formed between engineering pipeline is inflated/deflates, and inflatable and deflatable number is no less than 3 times.
The present invention carries out segmented closure to the pipeline of required dredging by the first blocking component and the second blocking component, right Pipeline between first blocking component and the second blocking component carries out dredging work, compared with the prior art to longer pipeline into For row monoblock type dredging work, the segmented dredging means that the present invention uses can guarantee that dredging efficient work carries out, effectively broken With the curing sludge of adhesiveness on bad tube wall, while guaranteeing that breakage does not occur in pipeline, specifically, utilizing the during dredging One blocking component and the second blocking component carry out segmented closure to the pipeline of required dredging, after the completion of closure by air pump and Tracheae extracts the gas between the first blocking component and the second blocking component after closure in pipeline out, bears its internal formed Then pressure is then turned on air pump by tracheae to being inflated in pipeline between the first blocking component and the second blocking component, so Water body is inputted after connection supervisor by spray module to spraying water body in tube wall by water pump under negative pressure state after operation repeatedly, The frictional resistance of the adsorption effect of viscosity particle and particle and water body on tube wall is destroyed using the switching repeatedly of positive/negative-pressure, Select inflatable and deflatable number be no less than 3 times this for guaranteeing positive/negative pressure viscosity knot on tube wall under 3 times or more conversions Structure is changed and upsets original characteristic, specifically makes the motion state of viscosity particle close with the motion state of non-viscosity particle Seemingly reach and destroy curing sludge effect, while the water flow sprayed in viscosity particle and non-viscosity particle and pipeline interacts When, the frictional resistance between particulate matter and water body reduces, and flow resistance of the particulate matter in water body is small, realizes the particle in water body Object flowing velocity increases, and when the first and second blocking component is cancelled to the closure of pipeline, mud is quickly detached from from tube wall and with water Stream discharge realizes that desilting efficiency data is high and reduces dredging labor intensity, and the segmented dredging means used are controllable to dredging situation The case where property is strong, effectively avoids piping failure during dredging appearance.
Connection supervisor's axial line and hydraulic engineering pipeline axis parallel, the ring flange that connection supervisor is equipped with by its end It is connect with water pump.
Shown in Figure 7, spray module includes and is connected to the terminal pad be responsible for and be fixedly connected, spiral surrounding row in terminal pad The hole for water spraying of cloth sparge pipe, sparge pipe is connected with connection supervisor, and sparge pipe injection water flow velocity is 120m/s.
Referring to shown in Fig. 5,6, the first blocking component includes two the first sealing plates connected by connecting column, between two sealing plates Equipped with can deformation outward the first rubber ring, the first rubber ring inner wall direction is equipped with magnetic substance, the first sealing plate below magnetic substance The interior electromagnet group having for driving magnetic substance mobile.
It is shown in Figure 1, there is pressure sensor and air pressure on the first blocking component the second blocking component one side of direction Sensor.
Shown in Figure 1, connection between the second blocking component and ring flange supervisor is equipped with and be connected to supervisor's axis and put down Capable rack gear, rack gear are correspondingly provided with gear, and gear has motor driven.
Ginseng as shown in Figs. 8 and 9, the second blocking component can along connection supervisor direction of axis line move, connection supervisor on have extremely Few two groups of limit assemblies for limiting to the second blocking component, limit assembly include and are connected to the clip for being responsible for connection, clip Have section for I-shaped sealing ring with being connected between supervisor.
Embodiment 2:
Referring to shown in Fig. 1-10, dredging device for water conservancy projects, comprising:
First blocking component, the first blocking component and hydraulic engineering pipeline gap are adjustable;
Connection supervisor, connection supervisor's one end connect the first blocking component end face, and the other end connects water pump, matches on connection supervisor Connection spray module is closed, and
Second blocking component, the second blocking component be connected to supervisor and be cooperatively connected and the second blocking component and hydraulic engineering pipeline enclosure Gap is adjustable, connects spray module on the connection supervisor of the second blocking component and the first blocking component;
Wherein, there is a tracheae, tracheae is used for the first blocking component and the second blocking component and water conservancy on the second blocking component The seal cavity formed between engineering pipeline is inflated/deflates.
The present invention carries out segmented closure to the pipeline of required dredging by the first blocking component and the second blocking component, right Pipeline between first blocking component and the second blocking component carries out dredging work, compared with the prior art to longer pipeline into For row monoblock type dredging work, the segmented dredging means that the present invention uses can guarantee that dredging efficient work carries out, effectively broken With the curing sludge of adhesiveness on bad tube wall, while guaranteeing that breakage does not occur in pipeline, specifically, utilizing the during dredging One blocking component and the second blocking component carry out segmented closure to the pipeline of required dredging, after the completion of closure by air pump and Tracheae extracts the gas between the first blocking component and the second blocking component after closure in pipeline out, bears its internal formed Then pressure is then turned on air pump by tracheae to being inflated in pipeline between the first blocking component and the second blocking component, so Water body is inputted after connection supervisor by spray module to spraying water body in tube wall by water pump under negative pressure state after operation repeatedly, The frictional resistance of the adsorption effect of viscosity particle and particle and water body on tube wall is destroyed using the switching repeatedly of positive/negative-pressure, It specifically reaches approximately the motion state of viscosity particle and the motion state of non-viscosity particle and destroys curing sludge effect, together When viscosity particle and non-viscosity particle and pipeline in the water flow sprayed when interacting, the friction between particulate matter and water body Resistance reduces, and flow resistance of the particulate matter in water body is small, realizes that the Particle flow speed in water body increases, first and second Mud is quickly detached from from tube wall and is discharged with water flow when blocking component cancels the closure to pipeline, realizes that desilting efficiency data is high and drops Low dredging labor intensity, and the segmented dredging means used are strong to dredging situation controllability, effectively avoid managing during dredging The situation of road breakage occurs.
Connection supervisor's axial line and hydraulic engineering pipeline axis parallel make the water body flow direction inputted in connection supervisor It is consistent with hydraulic engineering pipeline, and then its impact effect is protected after the water body in connection supervisor is discharged by spray module Card can't generate resistance to water-flow, reduce the energy consumption of water pump, and connection supervisor is connect by the ring flange that its end is equipped with water pump, For guaranteeing the connection between connection supervisor and water pump.
Second blocking component can be moved along connection supervisor's direction of axis line, it can be achieved that by the second blocking component of regulation even Lead to the position of supervisor's axis direction to adjust the distance of segmented closure, is used for at least two groups to the second envelope on connection supervisor The limit assembly of blocking component limit, by being blocked second when determining the position of the opposite connection supervisor of the second blocking component Component upper and lower ends be separately connected limit assembly come to the second blocking component limit, realize the second blocking component be connected to supervisor's Between fixation, guarantee segmented dredging during sealing effect and device overall stability.
Limit assembly include be connected to supervisor connection clip, clip be connected to supervisor between have section be it is I-shaped Sealing ring.Second blocking component upper and lower side is separately connected for limiting the mobile limit assembly of the second blocking component, and clip uses Fastener is fixed, and fastener is bolt, and nut corresponding with bolt specification also can be selected.Clip width and sealing ring are I-shaped The distance between upper and lower casting lug thereon is equal, is leading clip with being connected to by fastener When pipe is fixed, extruding when sealing ring is tightened by clip, on the inside of sealing ring be connected to the semi-shaped structure for being responsible for contact portion Two casting lug thereons extend to the outside to be formed "-" type make its flexible deformation expand come shape to the reaction force of clip tightening process, avoid Clip tighten oversized commutation supervisor generate deformation, while expand sealing ring be connected to supervisor between area in sealing contact, in fact Sealing between existing clip and the second blocking component.
Spray module includes and is connected to the terminal pad be responsible for and be fixedly connected, spiral surrounding arrangement sparge pipe, spray in terminal pad The hole for water spraying of water pipe is connected with connection supervisor, and sparge pipe injection water flow velocity is 130m/s.Sparge pipe cloth is set as helical ring Around form be conducive to sparge pipe during water spray to tube wall carry out the wound water spray of helical ring, injection water body can useful effect in pipe Wall is it after water body contacts by the flowing velocity of the wound injection influence on water body slime water of helical ring everywhere and with mud contacts Increased, and set the flow velocity for the slime water that injection water flow velocity comes out in 130m/s further expansion dredging, mud is fast Speed is detached from from tube wall and is discharged with water flow.
First blocking component includes two the first sealing plates connected by connecting column, and being equipped between two sealing plates can outside deformation The first rubber ring, the first rubber ring inner wall direction is equipped with magnetic substance, has in the first sealing plate below magnetic substance for driving The mobile electromagnet group of magnetic substance.Electromagnet group is made of multi-turn around the electromagnetic block being laid in the first sealing plate, and electromagnetic block is equal It is laid at from the edge of the first sealing plate to its axle center.The present invention carries out control system of switching on or off electricity to electromagnet group using peripheral control unit It pushes out magnetic substance to deformable first rubber ring to control the moving distance of magnetic substance opposed electromagnets group and makes it Formed between outside deformation and the tube wall of dredging pipeline the carry out deformation avoided for contacting and generating corresponding inner wall of the pipe injustice and It adjusts, solves existing seal assembly and the pressure that generates when seal for pipe joints is excessive leads to asking for piping failure or device breakage Topic.The device of the invention realizes the sealing to different tube diameters inner wall of the pipe, is capable of the pipeline wide scope of dredging.
Second blocking component includes two the second sealing plates connected by connecting column, and being equipped between two sealing plates can outside deformation The second rubber ring, the second rubber ring inner wall direction is equipped with magnetic substance, has in the second sealing plate below magnetic substance for driving The mobile electromagnet group of magnetic substance.Electromagnet group is made of multi-turn around the electromagnetic block being laid in the second sealing plate, and electromagnetic block is equal It is laid at from the edge of the second sealing plate to its axle center.It is controlled by the power on/off of variant electromagnet in control electromagnet group The position of magnetic substance opposed electromagnets group, it is specific: the electromagnetism by continuous the second sealing plate of power on/off by axle center to the outer direction The energization of block adsorbs electromagnet to the movement of the second sealing plate outer diameter direction, and to make the second rubber ring deformation, which is suitable for first The deformation process of first rubber ring of blanking plate component.
There is pressure sensor and baroceptor on first blocking component the second blocking component one side of direction, by outer If controller monitors pressure sensor and baroceptor, realize to the first blocking component and the second blocking component and water conservancy work The intracorporal air pressure of the seal chamber formed between Cheng Guandao and existing pressure are monitored, and realization proposes dredging situation controllability The case where rising, effectively avoiding piping failure during dredging appearance.
Connection supervisor between second blocking component and ring flange is equipped with the rack gear parallel with supervisor's axis is connected to, rack gear It is correspondingly provided with gear, gear has motor driven.Motor is displaced in the axial direction for realizing connection supervisor, utilizes motor driven tooth It takes turns to keep rack gear mobile to realize movement of the device in pipeline when not carrying out closure dredging to pipeline, expands pipe dredging model It encloses, reduces labor intensity.
Embodiment 3:
The present embodiment is based on the technical solution for proposing another dredging device for water conservancy projects on the basis of embodiment 2, referring to shown in figure, Spray module is replaced with into the second spray module in the technical solution of embodiment 2, the second spray module includes and is connected to supervisor The terminal pad being fixedly connected, around arrangement sparge pipe in terminal pad.
Embodiment 4:
Dredging device for water conservancy projects of the invention is in actual use: the device of the invention being put into the pipeline for needing dredging, is passed through Peripheral control unit-computer makes its control magnetic substance generation displacement that the first rubber ring be pushed to produce outward to control electromagnet group power on/off Raw deformation contacts with inner wall of the pipe shape and forms sealing, similarly controls the second blocking component and inner wall of the pipe is formed and sealed, realize First blocking component and the second blocking component carry out segmented closure to the pipeline of required dredging, pass through air pump after the completion of closure And tracheae extracts the gas between the first blocking component and the second blocking component after closure in pipeline out, bears its internal formed Then pressure is then turned on air pump by tracheae to being inflated in pipeline between the first blocking component and the second blocking component, so Water body is inputted after connection supervisor by spray module to spraying water body in tube wall by water pump under negative pressure state after operation 4 times, And cancelling the first blocking component and the second blocking component by computer-controlled electromagnetic iron group divides inner wall of the pipe the sealing of pipeline From fixed line mud and dredging generate slime water be quickly discharged from pipeline by spray module injection water, complete dredging Work, then make by motor-driven gear rack gear mobile device is in pipeline when not carrying out closure dredging to pipeline to realize Movement, expand pipe dredging range.
Peripheral control unit described herein is computer, power on/off and monitoring pressure for computer-controlled electromagnetic iron group Force snesor and air pressure sensing belong to existing well-known technique, and those skilled in the art have the ability to realize and understand, not excessive herein It repeats.First rubber ring and the second rubber ring of the invention is isoprene rubber, the material of the first sealing plate and the second sealing plate be non-ferric, The substances such as cobalt, nickel.
First rubber ring of the first blocking component and the deformation principle of the second rubber ring of the second blocking component are identical, and first The pressure that blocking component and the second blocking component solve existing seal assembly and when seal for pipe joints generates is excessive to lead to pipeline Damaged or device breakage problem.
Sparge pipe injection water flow velocity includes but is not limited to 120 ~ 150m/s, can also be 120 m/s or 121 m/s or 122 m/s or 123 m/s or 124 m/s ... or 149 m/s or 150 m/s.
The above disclosure is only the preferred embodiments of the present invention, cannot limit the right model of the present invention with this certainly It encloses, therefore equivalent changes made in accordance with the claims of the present invention, is still within the scope of the present invention.

Claims (10)

1. dredging device for water conservancy projects, the dredging device for water conservancy projects include:
First blocking component (10), first blocking component (10) and hydraulic engineering pipeline gap are adjustable;
Connection supervisor (40), connection supervisor (40) one end connect the first blocking component (10) end face, the other end connection Mating connection spray module (50) on (40) is responsible in water pump, the connection, and
Second blocking component (60), second blocking component (60) be connected to supervisor (40) be cooperatively connected and it is described second block Component (60) and hydraulic engineering pipeline gap are adjustable, the connection of second blocking component (60) and the first blocking component (10) It is responsible on (40) and connects spray module (50);
Wherein, there are a tracheae (61) on second blocking component (60), the tracheae (61) is used for the first blocking component (10) seal cavity formed between the second blocking component (60) and hydraulic engineering pipeline is inflated/deflates.
2. dredging device for water conservancy projects according to claim 1, it is characterised in that: connection supervisor's (40) axial line with Hydraulic engineering pipeline axis parallel, the ring flange (42) that the connection supervisor (40) is equipped with by its end are connect with water pump.
3. dredging device for water conservancy projects according to claim 1, it is characterised in that: second blocking component (60) can edge Connection supervisor's (40) direction of axis line is mobile, on the connection supervisor (40) there are at least two groups to be used for the second blocking component (60) limit assembly (70) limited.
4. dredging device for water conservancy projects according to claim 3, it is characterised in that: the limit assembly (70) includes and connects The clip (72) of logical supervisor (40) connection, the clip (72) be connected between supervisor (40) with section be I-shaped sealing It encloses (71).
5. dredging device for water conservancy projects according to claim 1, it is characterised in that: the spray module (50) includes and connects Lead to the terminal pad (51) that supervisor (40) is fixedly connected, spiral surrounding arrangement sparge pipe (52), the spray on the terminal pad (51) The hole for water spraying of water pipe (52) is connected with connection supervisor (40), and sparge pipe (52) the injection water flow velocity is 120 ~ 150m/s.
6. dredging device for water conservancy projects according to claim 1, it is characterised in that: first blocking component (10) includes Two the first sealing plates (11) connected by connecting column (13), be equipped between two sealing plate can deformation outward the first rubber ring (12), the first rubber ring (12) inner wall direction is equipped with magnetic substance (14), the first sealing plate below the magnetic substance (14) (11) there is the electromagnet group (15) for driving magnetic substance (14) mobile in.
7. dredging device for water conservancy projects, the dredging device for water conservancy projects include:
First blocking component (10), first blocking component (10) and hydraulic engineering pipeline gap are adjustable;
Connection supervisor (40), connection supervisor (40) one end connect the first blocking component (10) end face, the other end connection Mating connection spray module (50) on (40) is responsible in water pump, the connection, and
Second blocking component (60), second blocking component (60) be connected to supervisor (40) be cooperatively connected and it is described second block Component (60) and hydraulic engineering pipeline gap are adjustable, the connection of second blocking component (60) and the first blocking component (10) It is responsible on (40) and connects spray module (50);
Wherein, there are a tracheae (61) on second blocking component (60), the tracheae (61) is used for the first blocking component (10) seal cavity formed between the second blocking component (60) and hydraulic engineering pipeline is inflated/deflates, and inflates and puts Gas number is no less than 3 times.
8. dredging device for water conservancy projects according to claim 7, it is characterised in that:
Preferably, connection supervisor's (40) axial line and hydraulic engineering pipeline axis parallel, the connection supervisor (40) are logical The ring flange (42) that its end is equipped with is crossed to connect with water pump;
Preferably, the spray module (50) includes and is connected to the terminal pad (51) being responsible for (40) and being fixedly connected, the terminal pad (51) hole for water spraying of spiral surrounding arrangement sparge pipe (52) on, the sparge pipe (52) is connected with connection supervisor (40), described Sparge pipe (52) injection water flow velocity is 120 ~ 150m/s;
Preferably, first blocking component (10) includes two the first sealing plates (11) connected by connecting column (13), described Between two sealing plates be equipped with can outward deformation the first rubber ring (12), the first rubber ring (12) inner wall direction be equipped with magnetic substance (14), there is the electromagnet group for driving magnetic substance (14) mobile in the first sealing plate (11) below the magnetic substance (14) (15).
9. dredging device for water conservancy projects according to claim 7, it is characterised in that:
Preferably, there are pressure sensor (20) on described first blocking component (10) direction the second blocking component (60) one side With baroceptor (30);
Preferably, the connection supervisor (40) between second blocking component (60) and ring flange (42) is equipped with and is connected to supervisor (41) the parallel rack gear of axis (41), the rack gear are correspondingly provided with gear, and the gear has motor (80) driving.
10. dredging device for water conservancy projects according to claim 7, it is characterised in that: second blocking component (60) can edge Connection supervisor's (40) direction of axis line is mobile, on the connection supervisor (40) there are at least two groups to be used for the second blocking component (60) limit assembly (70) limited, the limit assembly (70) includes the clip (72) connecting with connection supervisor (40), described Clip (72) be connected to supervisor (40) between have section be I-shaped sealing ring (71).
CN201910269023.5A 2019-04-04 2019-04-04 Dredging device for water conservancy projects Pending CN110130472A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910269023.5A CN110130472A (en) 2019-04-04 2019-04-04 Dredging device for water conservancy projects

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910269023.5A CN110130472A (en) 2019-04-04 2019-04-04 Dredging device for water conservancy projects

Publications (1)

Publication Number Publication Date
CN110130472A true CN110130472A (en) 2019-08-16

Family

ID=67569249

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910269023.5A Pending CN110130472A (en) 2019-04-04 2019-04-04 Dredging device for water conservancy projects

Country Status (1)

Country Link
CN (1) CN110130472A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111926907A (en) * 2020-06-28 2020-11-13 宁波宏川环境科技有限公司 Pipeline dredging and dredging method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5771937A (en) * 1996-12-13 1998-06-30 Mcp Industries, Inc. Pipe plug and method
EP1068468A1 (en) * 1998-04-09 2001-01-17 KA-TE System AG Sealing element for piping
CN203008118U (en) * 2013-01-17 2013-06-19 杭州远山食品科技有限公司 Negative pressure dredging device for drain pipe
CN203131316U (en) * 2013-02-15 2013-08-14 周晓东 Pipeline temporary blocking device
CN205189083U (en) * 2015-12-14 2016-04-27 张雷 Sewer line dredge
CN106193271A (en) * 2016-09-06 2016-12-07 黄河科技学院 High-pressure water jet spiral advance and retreat formula pipe-dredging drill bit
CN207484208U (en) * 2017-08-23 2018-06-12 裴看元 Urban pavement rainwater fast drain system
CN208280290U (en) * 2018-05-14 2018-12-25 广州市合信环保科技有限公司 A kind of pipeline sludge fast dredging device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5771937A (en) * 1996-12-13 1998-06-30 Mcp Industries, Inc. Pipe plug and method
EP1068468A1 (en) * 1998-04-09 2001-01-17 KA-TE System AG Sealing element for piping
CN203008118U (en) * 2013-01-17 2013-06-19 杭州远山食品科技有限公司 Negative pressure dredging device for drain pipe
CN203131316U (en) * 2013-02-15 2013-08-14 周晓东 Pipeline temporary blocking device
CN205189083U (en) * 2015-12-14 2016-04-27 张雷 Sewer line dredge
CN106193271A (en) * 2016-09-06 2016-12-07 黄河科技学院 High-pressure water jet spiral advance and retreat formula pipe-dredging drill bit
CN207484208U (en) * 2017-08-23 2018-06-12 裴看元 Urban pavement rainwater fast drain system
CN208280290U (en) * 2018-05-14 2018-12-25 广州市合信环保科技有限公司 A kind of pipeline sludge fast dredging device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111926907A (en) * 2020-06-28 2020-11-13 宁波宏川环境科技有限公司 Pipeline dredging and dredging method

Similar Documents

Publication Publication Date Title
CN105275492B (en) A kind of provisional baffle device for water for being used to quickly handle the prominent mud problem of water burst in tunnel
CN101622049A (en) Continuous pressure letdown system
CN106968262B (en) The channel steel cofferdam system quickly repaired for the slope lining cutting of water channel canal
CN110130472A (en) Dredging device for water conservancy projects
CN101869783A (en) Method for carrying out inflating and flushing on filter
CN111186918A (en) Adjustable turbulence scale inhibitor and scale inhibition method
CN203008102U (en) Blowdown device
CN105126505B (en) A kind of surface mine ultrasonic atomization dust arrester
CN106890748A (en) A kind of film wiper with emergency start system
CN104307216B (en) Efficient swash plate oil removing sand-catching apparatus
CN206676618U (en) A kind of film wiper with emergency start system
CN110117062A (en) A kind of novel biofilter backwash gas distributing pipeline system and biological aerated filter
CN207452256U (en) A kind of zinc-plated passivating solution recycle device
CN104929019B (en) A kind of rubber-tyred roller tire tread injection system
CN109371930B (en) Bulb-shaped dirt blocking structure of sewer pipeline
CN101806370A (en) Multifunctional watermeter connecting valve
CN219209439U (en) Gas lifting cap with enhanced demisting and dedusting capabilities
CN201288103Y (en) Industrial waste water treatment apparatus
CN203350725U (en) Flow regulator
CN215842065U (en) Hydrocyclone separation filter
CN217951364U (en) Pneumatic gate device
CN212954399U (en) Square air supporting pond
CN104801444B (en) A kind of independent increment fluid jet nozzle
CN207478781U (en) A kind of Wet-type permanent magnet drum type magnetic separator unloads mineral water nozzle
CN208169582U (en) One kind prevents adhesion hose valve

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned

Effective date of abandoning: 20210528

AD01 Patent right deemed abandoned