CN110130280B - Cantilever bracket concrete lower template and support frame dismantling method - Google Patents

Cantilever bracket concrete lower template and support frame dismantling method Download PDF

Info

Publication number
CN110130280B
CN110130280B CN201910413752.3A CN201910413752A CN110130280B CN 110130280 B CN110130280 B CN 110130280B CN 201910413752 A CN201910413752 A CN 201910413752A CN 110130280 B CN110130280 B CN 110130280B
Authority
CN
China
Prior art keywords
concrete
bracket
template
support frame
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910413752.3A
Other languages
Chinese (zh)
Other versions
CN110130280A (en
Inventor
李永山
杨彪
陈猛
周佳骏
马福海
于庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 5 Co Ltd
Original Assignee
Sinohydro Bureau 5 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 5 Co Ltd filed Critical Sinohydro Bureau 5 Co Ltd
Priority to CN201910413752.3A priority Critical patent/CN110130280B/en
Publication of CN110130280A publication Critical patent/CN110130280A/en
Application granted granted Critical
Publication of CN110130280B publication Critical patent/CN110130280B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/20Movable barrages; Lock or dry-dock gates

Abstract

The invention discloses a method for dismantling a lower template and a support frame of cantilever bracket concrete, which comprises the following steps: after pouring the gate pier concrete to a specified elevation, embedding a steel column in advance; after the gate pier is constructed to the bracket elevation, a positioning cone is installed, and a prefabricated operating platform is installed on the positioning cone; installing a template and a steel bar, fixing the template to the steel column through a tie bar, and embedding a vertical steel pipe before pouring the bracket to form a preformed hole; after the strength of the concrete reaches the stripping strength, removing the lower template and the support frame of the cantilever bracket and stacking the lower template and the support frame on the operation platform; a winch is arranged on the top of the cantilever corbel concrete; a steel wire rope of the winch penetrates through the reserved hole, and the winch is used for stably unloading the operating platform to the ground; and (5) plugging the reserved holes to finish the bracket construction. The method of the invention ensures that the construction of the cantilever bracket concrete is safer and faster.

Description

Cantilever bracket concrete lower template and support frame dismantling method
Technical Field
The invention relates to the field of concrete construction of water conservancy and hydropower structures, in particular to a method for dismantling a lower template and a support frame of cantilever corbel concrete.
Background
According to introduction of water conservancy and hydropower construction organization design and other related data, the construction scheme of cantilever corbel concrete pouring in hydropower construction in China includes construction modes such as precast concrete template internal pulling type, internal pulling type templates, tripod support type and the like. After the cantilever bracket concrete construction is finished, due to the overlong cantilever part, the disassembly of the bracket bottom die template and the outer support frame has larger construction difficulty and safety risk, and the lower part of the bracket is difficult to arrange corresponding equipment for template disassembly.
Disclosure of Invention
The invention aims to solve the technical problem of providing a method for removing a lower formwork and a support frame of cantilever corbel concrete, so that the cantilever corbel concrete construction is safer and faster.
In order to solve the technical problems, the invention adopts the technical scheme that:
a method for dismantling a lower template and a support frame of cantilever bracket concrete comprises the following steps:
step 1: after pouring the gate pier concrete to a specified elevation, embedding a steel column in advance;
step 2: after the gate pier is constructed to the bracket elevation, a positioning cone is installed, and a prefabricated operating platform is installed on the positioning cone;
and step 3: installing a template and a steel bar, fixing the template to the steel column through a tie bar, and embedding a vertical steel pipe before pouring the bracket to form a preformed hole;
and 4, step 4: after the strength of the concrete reaches the stripping strength, removing the lower template and the support frame of the cantilever bracket and stacking the lower template and the support frame on the operation platform;
and 5: a winch is arranged on the top of the cantilever corbel concrete;
step 6: a steel wire rope of the winch penetrates through the reserved hole, and the winch is used for stably unloading the operating platform to the ground;
and 7: and (5) plugging the reserved holes to finish the bracket construction.
Further, step 1 still includes, pre-buried anchor bar is in the gate pier concrete to connect the steel column in the anchor bar through the lacing wire, stabilize the steel column.
Further, the steel column is made of I-shaped steel.
Furthermore, a plurality of tie bars for fixing the template and a plurality of tie bars for fixing the steel column are uniformly connected to the steel column.
Compared with the prior art, the invention has the beneficial effects that:
1) adopt prefabricated suspension type operation platform to reduce the risk that operation platform set up, improved the security and dismouting simple and convenient.
2) The reserved holes are adopted for dismantling the bracket template and the operation platform, and the problem of difficulty in equipment arrangement when the large cantilever bracket cantilever part is dismantled is solved.
3) The construction method is suitable for the construction of the large cantilever bracket with higher height, the resource investment is less, the construction progress is fast, and the construction cost and the management cost are reduced.
Drawings
FIG. 1 is a schematic view of a cantilever corbel concrete lower formwork and a support frame dismantling method of the invention.
In the figure: 1-steel column; 2-positioning a cone; 3-operating the platform; 4-template and frame pipe; 5-a steel pipe; 6-a winch; 7-anchor bars; 8-stretching the tendon.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
1. Bracket pouring layering
The bracket construction layering is determined according to a support system. And (3) embedding a positioning cone 2 (selecting a proper positioning cone according to construction load) on the side surface of the concrete, and embedding a steel column 1 when the concrete is poured to the last layer below the bracket.
2. Installation construction platform
After the gate pier is constructed to the bracket elevation, the prefabricated operating platform 3 is installed by using the positioning cone 2. The operating platform 3 is made of channel steel, and a suspension fastener is reserved in the support and can be directly suspended on the positioning cone 2.
3. Formwork and support frame
Installing templates and reinforcing steel bars, installing an operating platform 3 by utilizing the embedded positioning cones 2, erecting template supporting scaffold installing templates, and embedding the templates before pouring corbels
Figure BDA0002063670180000021
The steel pipe 5 is provided with holes, and the bracket inclined section template is constructed by adopting a hanging mould and a steel template. The construction of the bracket template comprises the following steps: in a concrete block with bracket starting point elevation poured in the dam body, a steel column 1 (I20I-steel is generally adopted), the distance between the steel column 1 and the edge of the formwork is 0.5m, the distance between the steel column 1 and the formwork is 1.0m, and the burial depth is 1.5 m. By using
Figure BDA0002063670180000031
The steel bar (tie bar 8) ties the template on the steel column1, the row spacing between the lacing wires 8 is 0.5 m. In order to ensure that the embedded steel column 1 has enough formwork tie strength, the next layer of concrete can be poured 7 days after each layer of concrete is poured, tie bars 8 for fixing the steel column 1 are further arranged and tie on the concrete embedded anchor bars 7 along the opposite direction of the tie bars 8 for fixing the formwork, and the stress safety and stability of the steel column 1 are ensured.
The bracket overhanging part is poured and layered by 1.5m, and the row spacing between the steel pipe back frames is 0.5 m. And 8 tie bars of each pouring layer are arranged in three rows, the height of the embedded steel column 1 is 4.5m (excluding the embedding depth), the embedding depth is 1.5m, the distance is 1m, and the bracket overhanging template is installed and poured in layers at one time.
In order to ensure the overall stability of the formwork system and convenient operation, the simple external support bracket is arranged in the formwork installation process and used for installing and supporting the formwork, and the support is only protected by the operating platform 3 and is not used as a bearing scaffold during concrete pouring.
4. Removal of form and outer bracket
And after the strength of the concrete reaches the form removal strength, dismantling the bracket template and the support frame, manually dismantling the template and the outer support frame, stacking the materials on the prefabricated operation platform 3 after dismantling the template and the support frame by using the installed operation platform 3 as an operation layer, and bundling the materials on the operation platform 3 after dismantling.
And 1, installing a 10t winch 6 at the top of the bracket, penetrating out the steel wire rope through the reserved hole, and stably unloading the construction materials and the operating platform 3 to the ground at one time by adopting the 10t winch 6.
5. Hole sealing
And plugging the reserved holes.

Claims (2)

1. A method for removing a lower template and a support frame of cantilever bracket concrete is characterized by comprising the following steps:
step 1: after pouring the gate pier concrete to a specified elevation, embedding a steel column (1); embedding anchor bars (7) in the gate pier concrete, connecting the steel column (1) to the anchor bars (7) through tie bars (8) to stabilize the steel column (1), wherein a plurality of tie bars (8) used for fixing a template and a plurality of tie bars (8) used for fixing the steel column (1) are uniformly connected to the steel column (1);
step 2: after the gate pier is constructed to the bracket elevation, a positioning cone (2) is installed, and a prefabricated operating platform (3) is installed on the positioning cone (2);
and step 3: installing a template and a steel bar, fixing the template to the steel column (1) through a tie bar (8), and embedding a vertical steel pipe (5) before pouring the bracket to generate a preformed hole;
and 4, step 4: after the strength of the concrete reaches the stripping strength, removing the lower template and the support frame of the cantilever bracket and stacking the template and the support frame on the operation platform (3);
and 5: a winch (6) is arranged at the top of the cantilever corbel concrete;
step 6: a steel wire rope of the winch (6) penetrates through the reserved hole, and the winch (6) is used for stably unloading the operating platform (3) to the ground;
and 7: and (5) plugging the reserved holes to finish the bracket construction.
2. The cantilever corbel concrete lower form and support frame dismantling method according to claim 1, wherein the steel column (1) is made of i-steel.
CN201910413752.3A 2019-05-17 2019-05-17 Cantilever bracket concrete lower template and support frame dismantling method Active CN110130280B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910413752.3A CN110130280B (en) 2019-05-17 2019-05-17 Cantilever bracket concrete lower template and support frame dismantling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910413752.3A CN110130280B (en) 2019-05-17 2019-05-17 Cantilever bracket concrete lower template and support frame dismantling method

Publications (2)

Publication Number Publication Date
CN110130280A CN110130280A (en) 2019-08-16
CN110130280B true CN110130280B (en) 2022-04-01

Family

ID=67575079

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910413752.3A Active CN110130280B (en) 2019-05-17 2019-05-17 Cantilever bracket concrete lower template and support frame dismantling method

Country Status (1)

Country Link
CN (1) CN110130280B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115142424A (en) * 2022-08-18 2022-10-04 中电建十一局工程有限公司 Concrete gravity dam cantilever structure pouring support system and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2220360C (en) * 1995-05-08 2007-07-24 Memduh Ali Tayar Wall-mounted shelving system or similar article
CN101476410A (en) * 2009-01-13 2009-07-08 杭州萧宏建设集团有限公司 Mounting and demounting method roof plate formwork support platform of concrete silo
CN206815542U (en) * 2017-06-15 2017-12-29 上海宝冶集团南京建筑有限公司 A kind of portable bracket pre-embedded bolt fixed structure
CN107859162A (en) * 2017-10-31 2018-03-30 广东水电二局股份有限公司 One kind is encorbelmented bracket structure and its construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2220360C (en) * 1995-05-08 2007-07-24 Memduh Ali Tayar Wall-mounted shelving system or similar article
CN101476410A (en) * 2009-01-13 2009-07-08 杭州萧宏建设集团有限公司 Mounting and demounting method roof plate formwork support platform of concrete silo
CN206815542U (en) * 2017-06-15 2017-12-29 上海宝冶集团南京建筑有限公司 A kind of portable bracket pre-embedded bolt fixed structure
CN107859162A (en) * 2017-10-31 2018-03-30 广东水电二局股份有限公司 One kind is encorbelmented bracket structure and its construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《大型牛腿结构立模方案分析》;刘红岩;《四川水力发电》;20120430;第31卷(第2期);全文 *
浅析悬臂模板在牛腿施工中的应用;周端卫;《陕西水利》;20090920(第05期);第85-88页 *

Also Published As

Publication number Publication date
CN110130280A (en) 2019-08-16

Similar Documents

Publication Publication Date Title
CN102031784A (en) Slope protection pile pouring and cable bolting construction method for deep foundation pit
CN106120568A (en) Cross a river Main Bridge bridge pier secondary locking temporary consolidation structure and construction method
CN101824800A (en) Method for construction of bridge cast-in-situ pre-stressed concrete continuous beam
CN106638313A (en) Large-scale bent cap semi-prefabrication construction technical method
CN114150766B (en) Prefabricated reinforced concrete column connecting node and construction method thereof
CN110965474A (en) Construction method of cable tower cross beam
CN104652417A (en) High-performance concrete corrugated sheet pile, forming die and production method for high-performance concrete corrugated sheet pile
CN110130280B (en) Cantilever bracket concrete lower template and support frame dismantling method
CN111395745A (en) Basement outer wall single-face formwork supporting system and construction method thereof
CN105780922B (en) Large span steel reinforced concrete transfer truss segmental hoisting formwork system construction method
CN111350187A (en) Template system suitable for large-diameter manual hole digging annular foundation pile and construction method
CN206956979U (en) A kind of Linear shear wall with fore-set
CN111877129B (en) Arch ring construction method of continuous arch bridge
CN103911989B (en) A kind of underwater casting base type foundation with retaining wall and construction method thereof
CN212249179U (en) Basement outer wall single face formwork support system
CN210315253U (en) Novel aquatic tie beam bracket device
CN103061334B (en) I-section prestressed reinforced concrete support pile by centrifugal pouring
CN108978699B (en) Land integral prefabricated bearing platform and production and installation method thereof
CN104164882A (en) Construction method for building support structural beam foundation on slope and structure thereof
CN203782691U (en) Underwater pouring type pipe column provided with retaining wall and internal mold system thereof
CN103628684B (en) A kind of construction method of simultaneously watering build floor and shear wall
CN103924595B (en) A kind of hollow pipe column underwater casting self-floating inner formwork system
CN212358366U (en) Fan foundation transformation structure
CN105464128B (en) Prestress anchorage cable assembled pile plate wall protection construction method
CN203129133U (en) Centrifugal poured prestressed steel bar concrete H-shaped section support pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant