CN110126062A - A kind of precast concrete pours vibrating method - Google Patents
A kind of precast concrete pours vibrating method Download PDFInfo
- Publication number
- CN110126062A CN110126062A CN201910428490.8A CN201910428490A CN110126062A CN 110126062 A CN110126062 A CN 110126062A CN 201910428490 A CN201910428490 A CN 201910428490A CN 110126062 A CN110126062 A CN 110126062A
- Authority
- CN
- China
- Prior art keywords
- concrete
- template
- stirred
- added
- cope plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B1/00—Producing shaped prefabricated articles from the material
- B28B1/08—Producing shaped prefabricated articles from the material by vibrating or jolting
- B28B1/093—Producing shaped prefabricated articles from the material by vibrating or jolting by means directly acting on the material, e.g. by cores wholly or partly immersed in the material or elements acting on the upper surface of the material
- B28B1/0935—Producing shaped prefabricated articles from the material by vibrating or jolting by means directly acting on the material, e.g. by cores wholly or partly immersed in the material or elements acting on the upper surface of the material using only elements wholly or partly immersed in the material, e.g. cores
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28C—PREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28C5/00—Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions
- B28C5/003—Methods for mixing
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Vibrating method is poured the invention discloses a kind of precast concrete, the following steps are included: concrete stirs, concreting, external mold is mounted in die station by fixation kit, the mixed mud being stirred is poured into external mold, form concrete floor, lower template is installed on concrete floor, by the concrete being stirred out of, upside is added to that lower template surrounds frame, form concrete lower die, the template in the installation of the upside of lower template, the concrete being stirred is added into middle template, form mould in concrete, cope plate is installed in the upside of middle template, the concrete being stirred is added in cope plate, form concrete upper mold, realization pours mixed mud, vibration compacting, vibration compacting is carried out to concrete using concrete vibrator, solidification, side mode is detached from, structure of the invention is reasonable, pass through above step, it can be fast Speed produces precast concrete, keeps prefabricated component secured, is hardly damaged, practicability with higher.
Description
Technical field
The present invention relates to precast concrete production field, in particular to a kind of precast concrete pours the side of vibrating
Method.
Background technique
In recent years, with the development of building trade, more and more people select PC (concrete prefabricated when building house
Part) component, compared with traditional cast-in-place concrete, the construction environment of PC component is more to pacify in PC factory compared to site operation
Entirely;And installation speed and construction speed can be significantly improved by prefabrication size;Meanwhile being made using the building-site of PC component
Industry amount is obviously reduced less, can be effectively reduced dust pollution and noise pollution.
The demand of precast concrete is gradually increased, however, production precast concrete needs in the conventional mode
Longer time, cannot good meet demand, in view of the above problems, a solution set forth below.
Summary of the invention
Vibrating method is poured the object of the present invention is to provide a kind of precast concrete, having being capable of quick Fabrication coagulation
Native prefabricated component, the advantages of making precast concrete can satisfy use demand.
Above-mentioned technical purpose of the invention has the technical scheme that
A kind of precast concrete pours vibrating method, comprising the following steps:
A: concrete stirring, the plurality of raw materials for making concrete is added in blender, starting blender to plurality of raw materials into
Row stirring, stirs into concrete for raw material;
B: concreting,
External mold: being mounted in die station by b1 by fixation kit, and the mixed mud being stirred is poured in Xiang Suoshu external mold, forms coagulation
Native bottom plate;
B2: installing lower template on the concrete floor, and several first jacks are offered on the side wall of the lower template, several
It is inserted with reinforcing bar in first jack, by the concrete being stirred out of, upside is added to that lower template surrounds frame, is formed mixed
Solidifying soil lower die;
B3: the template in the installation of the upside of lower template is equipped with the first sealing strip, the side wall of middle template between middle template and lower template
If it is inserted with dry plug Short Item on, the concrete being stirred is added into middle template, forms mould in concrete;
B4: cope plate is installed in the upside of middle template, the second sealing strip is equipped between cope plate and middle template, is opened up on cope plate
There are several second jacks, be inserted with reinforcing bar in several second jacks, the concrete being stirred is added in cope plate, is formed mixed
Solidifying soil upper mold, realization pour mixed mud;
C: vibration compacting, carry out vibration compacting to concrete using concrete vibrator makes to mix by the removal of bubbles in concrete
The solidifying closely knit combination of soil;
D: precast concrete placement is solidified in the natural environment, a gear is arranged on precast concrete by solidification
Plate prevents damage of the adverse circumstances to prefabricated component;
E: side mode is detached from, and cope plate, middle template and lower template are successively separated with concrete, and stifled Short Item is separated with prefabricated component.
A kind of precast concrete according to claim 1 pours vibrating method, which is characterized in that concrete stirs
The step of mixing include:
A1: coarse aggregate, cement, fine aggregate are added sequentially in blender, open blender, and aggregate and cement mixing is equal
It is even,
A2: slowly water is added into blender, be persistently stirred, after water all adds, continue stir one end time, will
Raw material stirs evenly,
A3: the stirring thing in blender is poured on working plate, and the stirring of a period of time is manually carried out to stirring thing, and coagulation is made
Soil, concrete obtained can use sub-fraction and laboratory gone to be detected, and another part carries out the production of prefabricated board.
A kind of precast concrete according to claim 1 pours vibrating method, which is characterized in that the lower die
Built-in fitting is equipped in plate or cope plate, when making concrete lower die or concrete upper mold, built-in fitting can be embedded into concrete, real
Now to the placement of built-in fitting.
A kind of precast concrete according to claim 1 pours vibrating method, which is characterized in that often produces
After one layer concrete, vibration compacting is carried out to concrete is changed to, the closely knit step of concrete vibrating includes:
C1: the output shaft of internal vibrator is rapidly inserted into concrete, is opened vibrator and is vibrated to concrete, vibrates
After, slowly vibrator is extracted into concrete,
C2: after vibrating at the one of concrete, continuing to carry out its other some position vibration compacting, repetitive operation,
Vibration compacting is carried out to monolith concrete slab.
A kind of precast concrete according to claim 3 pours vibrating method, which is characterized in that concrete
When the side mode position of plate is vibrated, using wooden mallet gently tapping template, vibrate to the intensive place of reinforcing bar and template edge
When, it is consolidated with the use of crooked chisel.
The present invention is that a kind of precast concrete pours vibrating method, can be with by taking the superposition to template to install
The precast concrete for producing different shapes enables precast concrete to be suitable for different occasions, uses internal vibrator
Concrete can be kept solid intensively, obtained after equal concrete settings later mixed quickly by the removal of bubbles in concrete
Solidifying soil prefabricated component.
Specific embodiment
As described below is only the preferred embodiment of the present invention, and protection scope is not limited merely to the embodiment, all to belong to
Protection scope of the present invention should belong in technical solution under thinking of the present invention.Simultaneously it should be pointed out that for the art
For those of ordinary skill, several improvements and modifications without departing from the principles of the present invention, these improvements and modifications are also answered
It is considered as protection scope of the present invention.
A kind of precast concrete pours vibrating method, comprising the following steps:
A: concrete stirring, the plurality of raw materials for making concrete is added in blender, starting blender to plurality of raw materials into
Row stirring, stirs into concrete for raw material.
Concrete stir the step of include:
A1: coarse aggregate, cement, fine aggregate are added sequentially in blender, open blender, and aggregate and cement mixing is equal
It is even.Coarse aggregate uses stone, and fine aggregate uses fine sand.The total time that all raw materials are added is no more than 2 minutes.
A2: slowly water is added into blender, be persistently stirred, the addition time of water is maintained at 20 minutes or so.
After water all adds, continues stirring 3 minutes, raw material is stirred evenly.
A3: the stirring thing in blender is poured on working plate, and stirring in 3 minutes or so, system are manually carried out to stirring thing
Obtain concrete.
Concrete obtained can use sub-fraction and laboratory gone to be detected, and another part carries out the production of prefabricated board.
B: concreting,
External mold: being mounted in die station by b1 by fixation kit, and the mixed mud being stirred is poured into external mold, forms concrete bottom
Plate.
B2: installing lower template on concrete floor, offers several first jacks on the side wall of lower template, and several first
It is inserted with reinforcing bar in jack, by the concrete being stirred out of, upside is added to that lower template surrounds frame, forms concrete lower die.
When making concrete lower die, the built-in fitting for needing to be put into concrete can be put into lower template, such as
Electrical appliance kit, the object of pipeline etc.When in concreting to lower template, built-in fitting can be fully wrapped around by concrete, when mixed
When solidifying soil solidification, built-in fitting is secured to the inside of precast concrete.
B3: the template in the installation of the upside of lower template is equipped with the first sealing strip between middle template and lower template, middle template
If being inserted with dry plug Short Item on side wall, the concrete being stirred is added into middle template, forms mould in concrete.
B4: cope plate is installed in the upside of middle template, the second sealing strip is equipped between cope plate and middle template, on cope plate
Several second jacks are offered, reinforcing bar is inserted in several second jacks, the concrete being stirred is added in cope plate, shape
At concrete upper mold, realization pours mixed mud.
Built-in fitting can also be put into casting concrete upper mold, the adding manner and coagulation of built-in fitting in concrete upper mold
Adding manner in native lower die is identical, and the built-in fitting of different function can be added in concrete upper mold, make concrete prefabricated board
Applicability it is more extensive.
C: vibration compacting carries out vibration compacting to concrete using concrete vibrator, by the removal of bubbles in concrete,
Combine concrete compaction.After often producing a layer concrete, vibration compacting is carried out to concrete is changed to, concrete vibrating is closely knit
The step of include:
C1: the output shaft of internal vibrator is rapidly inserted into concrete, is opened vibrator and is vibrated to concrete, vibrates
After, slowly vibrator is extracted into concrete.
Vibrating time was controlled at 20 ~ 30 seconds.When concrete no longer significantly sinks, there is not bubble, when starting frost boiling, that is, sentences
Determine concrete vibrating to be completed.
When vibrating to the side mode position of concrete slab, using wooden mallet gently tapping template, to the intensive place of reinforcing bar and mould
When plate edge is vibrated, consolidated with the use of crooked chisel.
When vibrating to concrete lower die, the output shaft of internal vibrator runs through concrete lower die, is inserted into coagulation
5 centimetres to 10 centimetres or so of position in native bottom plate, keeps the connection between concrete lower die and concrete floor stronger.
It when mould and concrete upper mold are vibrated in concrete, also adopts in a like fashion, is inserted into needs and vibrates
Concrete lower layer in, reinforce two layer concretes between connection.
C2: after vibrating at the one of concrete, continue to carry out vibration compacting to its other some position, repeat to grasp
Make, makes monolith concrete slab can vibration compacting.Complete work of vibrating for the first time.
D: solidification.Precast concrete placement is solidified in the natural environment, one is arranged on precast concrete
A baffle prevents damage of the adverse circumstances to prefabricated component.
In concrete in or so initial set previous hour, need to carry out secondary vibration to it.When secondary vibration, internal vibrator
Output shaft from the upper end of concrete upper mold to underthrust, through mould and concrete lower die in concrete, be inserted into concrete floor
It is interior, start to vibrate.
The time of secondary vibration and decision procedure with vibrate for the first time identical, determined according to the actual situation.
Precast concrete is continued to place after secondary vibration and is solidified in the natural environment, is made concrete prefabricated
Part solidifies completely.
E: side mode is detached from.After concrete solidifies substantially, cope plate, middle template and lower template are successively divided with concrete
From stifled Short Item is also extracted from precast concrete, is smoothed to the edge of precast concrete, is made precast concrete
Surface it is more smooth.
Claims (5)
1. a kind of precast concrete pours vibrating method, which comprises the following steps:
A: concrete stirring, the plurality of raw materials for making concrete is added in blender, starting blender to plurality of raw materials into
Row stirring, stirs into concrete for raw material;
B: concreting,
External mold: being mounted in die station by b1 by fixation kit, and the mixed mud being stirred is poured in Xiang Suoshu external mold, forms coagulation
Native bottom plate;
B2: installing lower template on the concrete floor, and several first jacks are offered on the side wall of the lower template, several
It is inserted with reinforcing bar in first jack, by the concrete being stirred out of, upside is added to that lower template surrounds frame, is formed mixed
Solidifying soil lower die;
B3: the template in the installation of the upside of lower template is equipped with the first sealing strip, the side wall of middle template between middle template and lower template
If it is inserted with dry plug Short Item on, the concrete being stirred is added into middle template, forms mould in concrete;
B4: cope plate is installed in the upside of middle template, the second sealing strip is equipped between cope plate and middle template, is opened up on cope plate
There are several second jacks, be inserted with reinforcing bar in several second jacks, the concrete being stirred is added in cope plate, is formed mixed
Solidifying soil upper mold, realization pour mixed mud;
C: vibration compacting, carry out vibration compacting to concrete using concrete vibrator makes to mix by the removal of bubbles in concrete
The solidifying closely knit combination of soil;
D: precast concrete placement is solidified in the natural environment, a gear is arranged on precast concrete by solidification
Plate prevents damage of the adverse circumstances to prefabricated component;
E: side mode is detached from, and cope plate, middle template and lower template are successively separated with concrete, and stifled Short Item is separated with prefabricated component.
2. a kind of precast concrete according to claim 1 pours vibrating method, which is characterized in that concrete stirring
The step of include:
A1: coarse aggregate, cement, fine aggregate are added sequentially in blender, open blender, and aggregate and cement mixing is equal
It is even,
A2: slowly water is added into blender, be persistently stirred, after water all adds, continue stir one end time, will
Raw material stirs evenly,
A3: the stirring thing in blender is poured on working plate, and the stirring of a period of time is manually carried out to stirring thing, and coagulation is made
Soil, concrete obtained can use sub-fraction and laboratory gone to be detected, and another part carries out the production of prefabricated board.
3. a kind of precast concrete according to claim 1 pours vibrating method, which is characterized in that the lower template
Or built-in fitting is equipped in cope plate, when making concrete lower die or concrete upper mold, built-in fitting can be embedded into concrete, realize
Placement to built-in fitting.
4. a kind of precast concrete according to claim 1 pours vibrating method, which is characterized in that often produce one
After layer concrete, vibration compacting is carried out to concrete is changed to, the closely knit step of concrete vibrating includes:
C1: the output shaft of internal vibrator is rapidly inserted into concrete, is opened vibrator and is vibrated to concrete, vibrates
After, slowly vibrator is extracted into concrete,
C2: after vibrating at the one of concrete, continuing to carry out its other some position vibration compacting, repetitive operation,
Vibration compacting is carried out to monolith concrete slab.
5. a kind of precast concrete according to claim 3 pours vibrating method, which is characterized in that concrete slab
Side mode position when being vibrated, using wooden mallet gently tapping template, when vibrating to the intensive place of reinforcing bar and template edge,
It is consolidated with the use of crooked chisel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910428490.8A CN110126062A (en) | 2019-05-22 | 2019-05-22 | A kind of precast concrete pours vibrating method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910428490.8A CN110126062A (en) | 2019-05-22 | 2019-05-22 | A kind of precast concrete pours vibrating method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110126062A true CN110126062A (en) | 2019-08-16 |
Family
ID=67572344
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910428490.8A Pending CN110126062A (en) | 2019-05-22 | 2019-05-22 | A kind of precast concrete pours vibrating method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110126062A (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7510384B2 (en) * | 2006-05-09 | 2009-03-31 | Chiou Chi-Lung | Concrete wall fabrication system |
CN204748888U (en) * | 2015-07-23 | 2015-11-11 | 成都建工成新混凝土工程有限公司 | Prefabricated coincide floor preparation leaking stoppage piece and have mould of this leaking stoppage piece for mould |
CN206048460U (en) * | 2016-08-24 | 2017-03-29 | 北京中铁房山桥梁有限公司 | A kind of nylon sheet wallboard mould and wallboard formwork for placing system |
CN108381753A (en) * | 2018-07-06 | 2018-08-10 | 湖南三快而居住宅工业有限公司 | The production method of precast concrete |
CN208410189U (en) * | 2018-06-29 | 2019-01-22 | 浙江新邦远大绿色建筑产业有限公司 | Production mold for PC component |
CN109262812A (en) * | 2018-11-15 | 2019-01-25 | 长沙英平机械制造有限责任公司 | The production mould of Prefabricated stacking floor |
CN109514710A (en) * | 2018-12-29 | 2019-03-26 | 广东联城住工装备信息科技有限公司 | Muscle Prefabricated part forming die and its application method out |
CN109514725A (en) * | 2018-12-08 | 2019-03-26 | 曙光装配式建筑科技(浙江)有限公司 | A kind of concrete board precast part production technology and its molding die |
-
2019
- 2019-05-22 CN CN201910428490.8A patent/CN110126062A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7510384B2 (en) * | 2006-05-09 | 2009-03-31 | Chiou Chi-Lung | Concrete wall fabrication system |
CN204748888U (en) * | 2015-07-23 | 2015-11-11 | 成都建工成新混凝土工程有限公司 | Prefabricated coincide floor preparation leaking stoppage piece and have mould of this leaking stoppage piece for mould |
CN206048460U (en) * | 2016-08-24 | 2017-03-29 | 北京中铁房山桥梁有限公司 | A kind of nylon sheet wallboard mould and wallboard formwork for placing system |
CN208410189U (en) * | 2018-06-29 | 2019-01-22 | 浙江新邦远大绿色建筑产业有限公司 | Production mold for PC component |
CN108381753A (en) * | 2018-07-06 | 2018-08-10 | 湖南三快而居住宅工业有限公司 | The production method of precast concrete |
CN109262812A (en) * | 2018-11-15 | 2019-01-25 | 长沙英平机械制造有限责任公司 | The production mould of Prefabricated stacking floor |
CN109514725A (en) * | 2018-12-08 | 2019-03-26 | 曙光装配式建筑科技(浙江)有限公司 | A kind of concrete board precast part production technology and its molding die |
CN109514710A (en) * | 2018-12-29 | 2019-03-26 | 广东联城住工装备信息科技有限公司 | Muscle Prefabricated part forming die and its application method out |
Non-Patent Citations (1)
Title |
---|
徐善初: "《土木工程施工》", 31 December 2017 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104499498B (en) | A kind of construction method of mass concrete building | |
CN106564114A (en) | Factorial construction technology for small prefabricated components | |
CN109236033A (en) | A kind of building prefabrication Assembled enclosing wall and its production technology | |
CN108193858A (en) | A kind of production of European high-strength cement base artificial stone moulding of assembled and mounting means | |
CN110509425A (en) | A kind of concrete prefabricated wallboard and its production technology | |
CN101531026A (en) | Method for preparing plaster evacuated mould | |
CN109336533A (en) | The production method of light composite wall panel | |
CN110126059A (en) | A kind of preparation process of precast concrete | |
CN110126062A (en) | A kind of precast concrete pours vibrating method | |
CN101806112B (en) | Preparation method of cast-in-situ concrete hollow slab | |
CN109304796A (en) | A kind of construction technology of concrete steel formwork | |
CN105755979A (en) | Process for constructing cement concrete guardrails | |
CN109113230A (en) | A kind of stone facing concrete partition construction method | |
CN109454745A (en) | A kind of waste heat recycling preparation method of concrete | |
CN207672849U (en) | A kind of sand aerated concrete plank of built-in line box line pipe | |
CN101269520A (en) | Method for producing concrete building block by using pipe pile wastewater slurry | |
JP2005138544A (en) | Manufacturing method of outer wall panel | |
CN101666094B (en) | Method of pouring and constructing side wall of hydraulic building | |
CN110512642A (en) | Soft clay area drainage pipeline concrete pack punching block board construction method | |
CN111074754B (en) | Pier column bare concrete construction method and pier column | |
CN109732771A (en) | A kind of production technology and products thereof of precast bridge plate | |
CN102220791B (en) | Non-bearing wall body and forming method thereof | |
CN113858427B (en) | Preparation method of grouting material for repairing defects of rock-socketed section of cast-in-place pile | |
CN211922683U (en) | Concrete rigid foundation adopting large-particle-size coarse aggregate and free of stirring | |
CN215038903U (en) | Grinding tool for concrete production |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190816 |