CN110119819A - A kind of data predetermined process method, apparatus and its storage medium - Google Patents
A kind of data predetermined process method, apparatus and its storage medium Download PDFInfo
- Publication number
- CN110119819A CN110119819A CN201910370801.XA CN201910370801A CN110119819A CN 110119819 A CN110119819 A CN 110119819A CN 201910370801 A CN201910370801 A CN 201910370801A CN 110119819 A CN110119819 A CN 110119819A
- Authority
- CN
- China
- Prior art keywords
- data
- assignment
- predetermined process
- node
- logical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Information Retrieval, Db Structures And Fs Structures Therefor (AREA)
Abstract
The invention discloses a kind of data predetermined process method, this method includes receiving user's request;The multiple data management modules sequentially divided by Resolving probiems stage etch of creation are requested according to the user, wherein, each data management module have it is multiple can assignment logical data node, and there is scheduled logical relation between multiple logical data nodes, multiple data management modules realize jumping by sequence of steps by the logical relation, receive the assignment of logical data node, assignment is carried out to the logical data node, the data predetermined process for receiving user is instructed and is called to assignment and predetermined process;The experimental data in BIR/TIR can be subjected to assignment to logical data node by application and called, and then carry out predetermined process, solved when BIR/TIR data are extremely numerous and jumbled, data is caused to be difficult to the technical issues of tracking and counting.
Description
Technical field
The present invention relates to computer field, in particular to a kind of data predetermined process method, apparatus and its storage medium.
Background technique
With the continuous development of industrial technology, market competition is increasingly fierce.The trial-production and test of product were needed to its period
Further compressed.By taking automobile industry as an example, trial-production and experimental stage need to make its process trial-production report and test
Report (i.e. BIR/TIR, wherein BIR is Build Issue Report, and TIR is Test Issue Report.), but when examination
When the problem of system and experimental stage reaches certain amount, the experimental data of BIR/TIR is extremely numerous and jumbled, it is difficult to be tracked and unite
Meter.Based on the demand, a kind of data predetermined process method how is provided, in BIR/TIR management process, extremely due to data
Numerous and jumbled to be difficult to track and count, become urgently has technical problem to be solved in the prior art.
Summary of the invention
The present invention provides a kind of data predetermined process methods, this method comprises:
Receive user's request;
The multiple data management modules sequentially divided by Resolving probiems stage etch of creation are requested according to the user,
In, each data management module have it is multiple can assignment logical data node, and multiple logical data nodes it
Between there is scheduled logical relation, realized by the logical relation between multiple data management modules press sequence of steps into
Row jumps;
Receive the assignment data of logical data node, wherein the assignment data is can be into the logical data node
The data of row assignment;
According to the logical relation pair between the sequence of the step of between the data management module and the logical data node
The corresponding logical data node carries out assignment according to the assignment data;
Receive the data predetermined process instruction of user, wherein data predetermined process instruction is to specifying the logic
The assignment of back end is called and carries out the instruction of predetermined process;
The assignment specified in the logical data node is called according to the instruction of the data predetermined process of the user;
Predetermined process is carried out according to the assignment of calling.
Optionally, multiple data management modules are followed successively by the data management module that problem proposes the stage by sequence of steps
With the data management module and the data management module in analysis of causes stage and the number in permanent measure stage in interim measure stage
According to management module, there are also the data management modules and the data management module of problem closed stage of permanent measure verifying.
Optionally, problem proposes the data management module and the data management module in interim measure stage in stage, Yi Jiyuan
Because being provided with whether decision problem weighs in the data management module and the data management module in permanent measure stage of analysis phase
Multiple logical data node stops the subsequent tax to logical data node when logical data node is when being assigned a value of replication problem
It is worth step.
Optionally, it is described according between the data management module the step of sequence the logical data node between
Logical relation carries out assignment and the data for receiving user according to the assignment data to the corresponding logical data node
Predetermined process instruction, wherein the data predetermined process instruction is to be called to the assignment for specifying the logical data node
And it carries out between the instruction step of predetermined process, this method further include:
Record the assignment time for carrying out assignment according to the assignment numerical value to the corresponding logical data node;
It is described that the assignment packet specified in the logical data node is called according to the instruction of the data predetermined process of the user
It includes:
The assignment and tax specified in the logical data node are called according to the tentation data process instruction of the user
The time of value;
It is described to include: according to the assignment of calling progress predetermined process
It is described that predetermined process is carried out according to the assignment of calling and the time of assignment.
Optionally, this method comprises: the predetermined process is to specify the assignment of the logical data node to carry out calling
The processing of statistics and/or display.
Present invention also provides a kind of data predetermined process device, which includes:
Receiving module, for receiving user's request;
Creation module, the data divided for requesting creation multiple according to the user by Resolving probiems stage etch sequence
Management module, wherein each data management module have it is multiple can assignment logical data node, and multiple logics
There is scheduled logical relation between back end, pressed between multiple data management modules by logical relation realization
Sequence of steps is jumped;
The receiving module, for receiving the assignment data of logical data node, wherein the assignment data is to described
Logical data node can carry out the data of assignment;
Assignment module, between the sequence of the step of according between the data management module and the logical data node
Logical relation to the corresponding logical data node according to the assignment data carry out assignment;
The receiving module is also used to receive the data predetermined process instruction of user, wherein the data predetermined process refers to
It enables as to specifying the assignment of the logical data node to be called and carry out the instruction of predetermined process;
Calling module is also used to instruct to call according to the data predetermined process of the user to specify the logical data node
In assignment;
Predetermined process module, for carrying out predetermined process according to the assignment of calling.
Optionally, multiple data management modules of the creation module creation are followed successively by problem by sequence of steps and propose
The data management module and the data management module in interim measure stage and the data management module in analysis of causes stage in stage
With the data management module in permanent measure stage, there are also the data management modules and the number of problem closed stage of permanent measure verifying
According to management module.
Optionally, problem proposes the data management module and the data management module in interim measure stage in stage, Yi Jiyuan
Because being provided with whether decision problem weighs in the data management module and the data management module in permanent measure stage of analysis phase
Multiple logical data node stops the subsequent tax to logical data node when logical data node is when being assigned a value of replication problem
It is worth step.
Optionally, the device further include:
Logging modle, for recording the tax for carrying out assignment according to the assignment data to the corresponding logical data node
It is worth the time;
The assignment module is also used to instruct to call according to the data predetermined process of the user to specify the logical data
The time of assignment and assignment in node;
The predetermined process module is also used to carry out predetermined process according to the assignment of calling and the time of assignment.
Optionally, the predetermined process module is also used to specify the assignment of the logical data node to unite calling
The processing of meter and/or display.
Present invention also provides a kind of data predetermined process device, the processor and memory:
It is stored with the application program that can be executed by the processor in the memory, is used for so that the processor executes
The step of described data predetermined process method.
The application also provides a kind of computer readable storage medium, is stored thereon with computer program, and the program is processed
The step of data predetermined process method is realized when device executes.
Based on the above embodiment, the application can ask the BIR/TIR experimental data in logical data node according to solution
Sequence was called according to the request of user and carried out predetermined process the step of topic, solved when BIR/TIR data are extremely numerous and jumbled,
Cause the technical issues of being difficult to track and counting.
Detailed description of the invention
Only illustratively description and explain the present invention for the following drawings, not delimit the scope of the invention.
Fig. 1 is the schematic diagram of data predetermined process method flow 100 in the application one embodiment;
Fig. 2 is the schematic diagram of data predetermined process method flow 200 in the application one embodiment;
Fig. 3 is the screenshot of data predetermined process method software interface in the application one embodiment;
Fig. 4 is the software interface screenshot that data predetermined process method proposes the stage in the application one embodiment;
Fig. 5 is the logical data node and duty that data predetermined process method problem proposes the stage in the application one embodiment
Appoint relations of distribution schematic diagram;
Fig. 6 is patrolling for the logical data node that data predetermined process method problem proposes the stage in the application one embodiment
Collect relationship frame figure;
Fig. 7 is the software interface screenshot in data predetermined process method interim measure stage in the application one embodiment;
Fig. 8 is the logical data node in data predetermined process method interim measure stage and duty in the application one embodiment
Appoint relations of distribution schematic diagram;
Fig. 9 is that the logical data node in data predetermined process method interim measure stage in the application one embodiment is patrolled
Collect relationship frame figure;
Figure 10 is the software interface screenshot of data predetermined process method cause analysis phase in the application one embodiment;
Figure 11 be the application one embodiment in the data predetermined process method cause analysis phase logical data node with
Responsibility relations of distribution schematic diagram;
Figure 12 is the logical data node of data predetermined process method cause analysis phase in the application one embodiment
Logical relation architecture diagram;
Figure 13 is the software interface screenshot in data predetermined process method permanent measure stage in the application one embodiment;
Figure 14 be the application one embodiment in the data predetermined process method permanent measure stage logical data node with
Responsibility relations of distribution schematic diagram;
Figure 15 is the logical data node in data predetermined process method permanent measure stage in the application one embodiment
Logical relation architecture diagram;
Figure 16 is that the software interface of the permanent measure Qualify Phase of data predetermined process method in the application one embodiment is cut
Figure;
Figure 17 is the logical data section of the permanent measure Qualify Phase of data predetermined process method in the application one embodiment
Point and responsibility relations of distribution schematic diagram;
Figure 18 is the logical data section of the permanent measure Qualify Phase of data predetermined process method in the application one embodiment
The logical relation architecture diagram of point;
Figure 19 is that data predetermined process method always counts result schematic diagram in the application one embodiment;
Figure 20 is the statistical result schematic diagram of data predetermined process method different brackets problem in the application one embodiment;
Figure 21 is the statistics knot that data predetermined process method different type problem closes situation in the application one embodiment
Fruit schematic diagram;
Figure 22 is the statistics knot that data predetermined process method different brackets problem closes situation in the application one embodiment
Fruit schematic diagram;
Figure 23 is the statistics knot that data predetermined process method difference department's problem closes situation in the application one embodiment
Fruit schematic diagram;
Figure 24 is that data predetermined process method difference department's problem is in the Resolving probiems stage in the application one embodiment
Statistical result schematic diagram;
Figure 25 is the system that data predetermined process method difference department's problem is closed about problem in the application one embodiment
Count result schematic diagram;
Figure 26 is that the statistical result that data predetermined process method is monthly closed about problem in the application one embodiment is shown
It is intended to;
Figure 27 is data predetermined process device architecture schematic diagram in the application one embodiment.
Specific embodiment
In order to which the technical features, objects and effects of invention are more clearly understood, the Detailed description of the invention present invention is now compareed
Specific embodiment, identical label indicates identical part in the various figures.
Herein, " schematic " expression " serving as examplea, instances, or illustrations " should not will be described herein as " showing
Any diagram, the embodiment of meaning property " are construed to technical solution that is a kind of preferred or more having advantages.
To make the objectives, technical solutions, and advantages of the present invention more comprehensible, right hereinafter, referring to the drawings and the embodiments,
The present invention is further described.
Fig. 1 is the schematic diagram of data predetermined process method flow 100 in the application one embodiment.As shown in Figure 1, this Shen
A kind of data predetermined process method please be provide, this method comprises:
S101 receives user's request;
User's request in this step is that user needs to carry out during trial-production or test BIR/TIR management creation data
The corresponding requests of management module.
S102 requests the multiple data management moulds sequentially divided by Resolving probiems stage etch of creation according to the user
Block, wherein each data management module have it is multiple can assignment logical data node, and multiple logical data sections
There is scheduled logical relation between point, realized between multiple data management modules by the logical relation suitable by step
Sequence is jumped;
Multiple data management modules are established in this step, data management module was carried out according to the stage of Resolving probiems
It divides, each data management module has multiple logical data nodes and these logical data node framves in the corresponding stage
The logical relation of structure.It is to be noted that logical relation here has been not only to having carried out logical constraint between logical data node,
Logical constraint is carried out also by logical relation between data management module, so that the subsequent assignment of data management module can be with
It is jumped according to scheduled sequence of steps.Specific embodiment can also be introduced in detail below, herein just no longer
It repeats.
S103 receives the assignment data of logical data node, wherein the assignment data is to the logical data node
It can carry out the data of assignment;
Assignment data is received in this step, it is pointed out that the assignment data in this step can be a variety of data class
Type, such as character type, logic judgment etc. can also be explained specifically in subsequent concrete example, and details are not described herein again
?.In addition, each logical data node there is certain rule to require assignment, for example some logical data node only receives word
Symbol type data or logic judgment data, specific rule requirement will be directed to different logical relation and specific BIR or TIR
Situation carries out corresponding configuration.
S104 is closed according to the logic between the sequence of the step of between the data management module and the logical data node
System carries out assignment according to the assignment data to the corresponding logical data node;
Major embodiment sequence of steps and logical relation, sequence of steps embodies the category in Resolving probiems stage in this step
Property.Any problem can be mainly divided into proposition problem, problem analysis in fact, and solve the problems, such as three main stages.Root
Can be to the above-mentioned interim division carried out again according to different application scenarios, the specific division mode of the application is hereinafter
It can also further illustrate, it is pointed out that the description in Resolving probiems stage is intended merely to preferably solve in this step
This step is released, is not the specific restriction to this step.Sequence of steps is then laggard according to the interim division carried out of problem
Row setting, according to the sequence of the step of between data management module and corresponding data management module, wherein logical data node is patrolled
The relationship of collecting carries out assignment.User is according to the stage solved the problems, such as above to data management module logical number therein in this step
Assignment is carried out according to node, essence forms a closed loop multidimensional data constructed by multiple logical data nodes by logical relation
Matrix, assignment data can be understood as the experimental data content of BIR/TIR.
S105 receives the data predetermined process instruction of user, wherein the data predetermined process instruction is to specified described
The assignment of logical data node is called and carries out the instruction of predetermined process;
User is called the assignment of logical data node and predetermined process in this step, needs first to send data pre-
Determine process instruction.In other words, user can be called and carry out subsequent to the experimental data content in multidimensional data matrix
Predetermined process.
S106 calls the assignment specified in the logical data node according to the instruction of the data predetermined process of the user;
In this step it is to be noted that calling at this time can not only call the experimental data of assignment, can also adjust
The related data of corresponding data management module belonging to assignment.
That is, calling the tax specified in the logical data node according to the tentation data process instruction of the user
The attribute of value and the affiliated data management module of data logical node, wherein the attribute of data management module includes data management mould
The block divided Resolving probiems stage.
S107 carries out predetermined process according to the assignment of calling.
Predetermined process is carried out to assignment in this step, predetermined process is the specific processing mode artificially set.It needs
It is to be noted that it is identical as above-mentioned steps in addition to predetermined process can be carried out to the assignment in logical data node, it can also be to institute
Belong to data management module and be divided in which kind of Resolving probiems stage and classifies.
In the present embodiment, the request that user establishes BIR/TIR problem is received first, is then established and is pressed the Resolving probiems stage
The multiple data management modules divided, wherein there is multiple logical data nodes, logical data in each data management module
Framework is carried out by logical relation between node, and between realizing between multiple data management modules also by logical relation
It jumps.The assignment data that user sends is received, assignment is carried out to logical data node according to assignment data, then passes through user again
Data predetermined process instruction the assignment of logical data node is called and subsequent predetermined process.It is to be noted that this
The call by value at place can also include the affiliated data management module attribute of assignment logic back end, such as affiliated data management
Module belongs to the data management module in which kind of Resolving probiems stage.It through this embodiment can be by the experimental data in BIR/TIR
Predetermined process is called and carried out according to the framework of sequence of steps and logical relation according to the request of user, realizes and works as BIR/
TIR data are extremely numerous and jumbled, cause the technical issues of being difficult to track and counting.
In one embodiment, multiple data management modules are followed successively by the data pipe that problem proposes the stage by sequence of steps
Manage module and the data management module in interim measure stage and the data management module in analysis of causes stage and permanent measure rank
The data management module of section, there are also the data management modules and the data management module of problem closed stage of permanent measure verifying.
It present embodiments provides a kind of specifically in such a way that the Resolving probiems stage carries out data management module division, needs
Being pointed out that above-mentioned division mode not only has the attribute in division stage but also is also equipped with sequence of steps.
In one embodiment, problem proposes the data management module and the data management module in interim measure stage in stage,
And decision problem is provided in the data management module and the data management module in permanent measure stage in analysis of causes stage
Whether duplicate logical data node stops to logical data node when logical data node is when being assigned a value of replication problem
Subsequent assignment procedure.
A kind of specific logical data node is provided in the present embodiment.Because in BIR/TIR problem, in order to avoid same
The problem of sample repeatedly, so such logical data node is arranged, so that same BIR/TIR problem, which will not be repeated, to be caused
The waste of resource.
Fig. 2 is the schematic diagram of data predetermined process method flow 200 in the application one embodiment.As shown in Fig. 2, one
In embodiment, it is described according between the data management module the step of sequence the logical data node between logic close
It is that assignment and the data book office for receiving user are carried out according to the assignment data to the corresponding logical data node
Reason instruction, wherein data predetermined process instruction is to specifying the assignment of the logical data node to be called and carry out
Between the instruction step of predetermined process, this method further include:
S201 records the assignment time for carrying out assignment according to the assignment data to the corresponding logical data node;
A kind of embodiment that the assignment time is equally recorded is provided in this step.
It is described that the assignment packet specified in the logical data node is called according to the instruction of the data predetermined process of the user
It includes:
S202, called according to the instruction of the data predetermined process of the user specify assignment in the logical data node with
And the assignment time;
Called is not only assignment in this step, and there are also the assignment times.
S203, it is described to include: according to the assignment of calling progress predetermined process
It is described that predetermined process is carried out according to the assignment of calling and assignment time.
Predetermined process is carried out together to assignment and assignment time in this step, it can be in the result that predetermined process obtains
Obtain the relationship of assignment and time.
In one embodiment, it is that the assignment of the logical data node is specified to calling that this method, which includes the predetermined process,
The processing for being counted and/or being shown.
A kind of specific predetermined process mode is provided in the present embodiment, that is, is counted and/or shown.According to logical data
The assignment of node and the time of assignment, and the data management module and logical relation that divide are summarized, are analyzed.Count
Then processing may be shown.Some situations are relatively simple, it is only necessary to be shown.
Basic principle and the course of work:
Below by taking the BIR/TIR problem of Che Qizhong as an example, the application is described in more detail, it should be noted that
It is the BIR/TIR problem of Che Qizhong just for the sake of better illustrating the application, is not the specific restriction to the application.
Fig. 3 is the screenshot of data predetermined process method software interface in the application one embodiment.As shown in figure 3, one
In embodiment, this method comprises:
Receive user's request;
User needs to solve remote-control key in the car in this step, the self-locking problem of vehicle.Then user, which sends, solves to be somebody's turn to do
The BIR item request of problem receives the step of user requests the creation data management module with triggering following.
The multiple data management modules sequentially divided by Resolving probiems stage etch of creation are requested according to the user,
In, each data management module have it is multiple can assignment logical data node, and multiple logical data nodes it
Between there is scheduled logical relation, realized by the logical relation between multiple data management modules press sequence of steps into
Row jumps;
In this step when receiving BIR item request, establish by the multiple of Resolving probiems stage etch sequence division
Data management module.Multiple data management modules are followed successively by the data pipe that problem proposes stage (i.e. 0/4 stage) by sequence of steps
Manage module and the data management module in interim measure stage (i.e. 1/4 stage) and the number in analysis of causes stage (i.e. 2/4 stage)
According to the data management module of management module and permanent measure stage (i.e. 3/4 stage), there are also permanent measure Qualify Phases (i.e. 4/4
Stage) data management module and the data management module of problem closed stage.
Receive the assignment data of logical data node, wherein the assignment data is can be into the logical data node
The data of row assignment;
Fig. 4 is the software interface screenshot that data predetermined process method proposes the stage in the application one embodiment, and Fig. 5 is this
Apply for that data predetermined process method problem proposes that the logical data node in stage and the responsibility relations of distribution are illustrated in one embodiment
Figure,
Fig. 6 is patrolling for the logical data node that data predetermined process method problem proposes the stage in the application one embodiment
Relationship frame figure is collected, as shown in Fig. 4 and Fig. 5 and Fig. 6, problem proposes that the data management module in stage (i.e. 0/4 stage) includes
Multiple logical data nodes be followed successively by respectively the first start node, establishment node, PPV confirmation node (PPV be BIR in one
Link under a line), problem distribution node, first or logical node, addition node, problem recipient node, the first decision problem is
No duplicate node, 0/4 state node of addition, the first addition state node, second or logical node and the first completion node.
Problem proposes the logical relation of multiple logical data nodes in the data management module in stage are as follows:
The data management for requesting the creation of the first start node of starting to divide by Resolving probiems stage etch sequence according to user
Module and the assignment function of starting establishment node;
The arbitration functions of assignment starting PPV confirmation node whether have been carried out according to starting establishment node;
According to PPV confirm node assignment judge whether PPV link is completed, when PPV confirm node be assigned a value of complete PPV
When link, then the assignment function of starting problem distribution node and by predetermined set carry out assignment, first or logical node carry out or
Logic judgment, meets when problem distribution node assignment or when PPV confirmation node is when being assigned a value of not completing PPV link, starting adds
The assignment function of supernumerary segment point, the assignment function of starting problem recipient node after adding node valuation, when problem recipient node is assigned
Start after value the first decision problem whether the assignment function of duplicate node, when whether duplicate node is assigned a value of for the first decision problem
When replication problem, starting the first addition state node realizes addition closed state (closed state), when the first decision problem is
When being assigned a value of non-duplicate problem of no duplicate node, starting 0/4 state node of addition adds 0/4 stage condition, when the first addition
When state node realizes that addition closed state or 0/4 state node of addition add 0/4 stage condition, the first completion will start
Node makes problem propose that the logical relation of the data management module in stage terminates and jumped to for 1/4 stage.
In fact, above-mentioned logical relation is to realize the process of trial-production responsibility distribution in the problem proposition stage, first starts
Node carries out problem creation for problem raiser, and the first start node will be assigned after receiving user's request, once first opens
The step of beginning node is assigned, performs creation, the assignment for then working out node are used to record live specific trial-production problem,
So the establishment received assignment of node, data type is character type, and assignment carries out assignment by problem raiser.Work out node
It can be understood as problem after being assigned to be defined, and then PPV confirms node according to assignment (the i.e. record scene of establishment node
Specific trial-production problem) judge whether to have been completed PPV link, after being judged as completion PPV link, PPV confirmation node is connect
The assignment for the logic judgment type that one artificially sends is had received, when this is assigned a value of completing PPV link, problem distribution node can be with
Trial-production problem is directly distributed into preset person liable, if logic judgment type is assigned a value of not completing PPV confirmation node, is asked
Trial-production problem directly can be distributed to the responsible person (i.e. chief engineer) with distribution task right by topic distribution node, be first responsible for by this
People carries out the distribution of task owner (i.e. QA Manager), and the person liable of distribution is then sent to problem as assignment and receives section
Point, the two kinds of situations that whether can be completed to above-mentioned PPV link by first or logical node carry out or logic judgment selects it
One, but which kind of either above-mentioned situation, can all there be the responsible person of trial-production problem to pass through the trial-production problem in problem recipient node.When
When thering is responsible person to receive an assignment, responsible person can by the first decision problem whether duplicate node judge this trial-production problem whether be
The problem of repeating, then needs to close trial-production problem if it is replication problem, adds closed state by the first addition state node,
If this trial-production non-repetitive problem of problem adds 0/4 state node and adds 0/4 stage condition and jump next stage
Interim measure phase data management module.Second or logical node then either add closed state or addition 0/4 stage shape
State terminates the step of notebook data management module assignment all from logical relation.
Fig. 7 is the software interface screenshot in data predetermined process method interim measure stage in the application one embodiment, Fig. 8
For the logical data node in data predetermined process method interim measure stage in the application one embodiment and the responsibility relations of distribution
Schematic diagram, Fig. 9 are that the logical data node in data predetermined process method interim measure stage in the application one embodiment is patrolled
Collect relationship frame figure.As shown in Fig. 7 and Fig. 8 and Fig. 9, the data management module in interim measure stage (i.e. 1/4 stage) includes
Multiple logical data nodes be followed successively by the second start node, fill in interim measure node, whether lead and look into approval node, company master
Pipe audit node, department master look into audit node, third or logical node, the second decision problem whether duplicate node, the second addition
State node, 1/4 state node of addition, the 4th or logical node, the first notice node, second completes node.
It proposes that the logical relation concrete configuration of data management module in stage (i.e. 0/4 stage) is different from problem, but configures
Mode is identical, the logical relation of logical data node in the data management module in interim measure stage (i.e. 1/4 stage) are as follows:
By logical data node previous in logical relation sequence whether assignment, open the tax of next logical data node
It is worth function, the second start node is opened according to the first jumping for completion node, wherein the first jumping for completion node is understood that
For the assignment of the second start node.
It fills in that interim measure node is received to be assigned a value of problem responsible person to the interim measure content solved the problems, such as, initiates this
The process in stage (i.e. 1/4 stage), if master looks into approval node and judges that trial-production problem belongs to A class or B class, because inhomogeneous
Trial-production problem auditor is different.Then entering co-director's audit node if it is A class, B class then enters department master and looks into audit node,
It selects above-mentioned inhomogeneity to manufacture experimently a kind of situation of problem by third or logical node, whether repeats to save into the second decision problem
Point, second judges replication problem node, and whether duplicate node effect is identical with the first decision problem, if a determination be made that equally
Repetition manufacture experimently problem, then enter second addition state node add closed state.Conversely, then entering 1/4 state node of addition
The data management module of the reason of adding 1/4 stage condition and jumping next stage analysis phase (i.e. 2/4 stage), equally no matter
It is which kind of above-mentioned situation, the second completion node can all terminate the assignment procedure in this stage.
Figure 10 is the software interface screenshot of data predetermined process method cause analysis phase in the application one embodiment.Figure
11 close for logical data node and the responsibility distribution of data predetermined process method cause analysis phase in the application one embodiment
It is schematic diagram.Figure 12 is the logical data node of data predetermined process method cause analysis phase in the application one embodiment
Logical relation architecture diagram.As shown in Figure 10 and Figure 11 and Figure 12, the data management mould in analysis of causes stage (i.e. 2/4 stage)
Multiple logical data nodes of block be followed successively by third start node, fill in basic reason node, company master looks into (minister) node,
Three decision problems whether duplicate node, third addition state node, addition 2/4 state node, the 5th or logical node, third it is complete
At node.
In the data management module in analysis of causes stage (i.e. 2/4 stage) logical relation of multiple logical data nodes also with
The configuration mode in the first two stage is identical, by logical data node previous in logical relation sequence whether assignment, open it is next
The assignment function of a logical data node opens third start node according to the second jumping for completion node, wherein second completes
Node jumps the assignment that can be understood as third start node.
The basic reason for being assigned a value of filling in trial-production problem for filling in basic reason node, then looks into (minister) by company master
Carry out the audit analysis of causes, third decision problem whether duplicate node, third addition state node, 2/4 state node of addition, the
Five or logical node, third complete node logical relation be same as above, details are not described herein again.Finally jump to permanent measure rank
In the data management module of section (i.e. 3/4 stage).
Figure 13 is the software interface screenshot in data predetermined process method permanent measure stage in the application one embodiment.Figure
14 close for logical data node and the responsibility distribution in data predetermined process method permanent measure stage in the application one embodiment
It is schematic diagram.Figure 15 is the logical data node in data predetermined process method permanent measure stage in the application one embodiment
Logical relation architecture diagram.As shown in Figure 13 and Figure 14 and Figure 15, the data management mould of permanent measure stage (i.e. 3/4 stage)
Whether multiple mathematical logic nodes of block are the 4th start node, fill in permanent measure node, lead and look into audit node, department master and look into
(higher level manager) node, the 6th or logical node, company master look into (minister) and audit node, whether chief engineer ratifies node, chief engineer crowd
Quasi- node, the 7th or logical node, the 4th decision problem whether duplicate node, the 4th addition state node, addition 3/4 state section
Point, the 8th or logical node, the second notice node, the 4th complete node.
Corresponding logical relation be fill in permanent measure node be assigned a value of filling in permanent measure, then whether lead and look into audit
Node judges whether to master and looks into audit, looks into (higher level manager) node if not department master is then entered, either enters department
Main (higher level manager) node either two kinds of situations of trial audit of looking into enter the 6th or logical node, look into subsequently into company master
(minister) examines that node, the corresponding chief engineer's approval node that enters judge whether to be ratified by chief engineer, ratify if yes then enter chief engineer
Node, no matter chief engineer ratifies node and chief engineer and disapproves to enter the 7th or logical node, no matter which kind of above two situation according to
It is secondary enter the 4th decision problem whether replication problem node, the 4th addition state node, 3/4 state node of addition, the 8th or patrol
Collect node, the second notice node, the 4th completion node.The concrete configuration mode of logical relation is identical as earlier stage, final to jump
The data management module for going to permanent measure verifying (i.e. 4/4 stage), just repeats no more herein.
Figure 16 is that the software interface of the permanent measure Qualify Phase of data predetermined process method in the application one embodiment is cut
Figure.
Figure 17 is the logical data section of the permanent measure Qualify Phase of data predetermined process method in the application one embodiment
Point and responsibility relations of distribution schematic diagram.Figure 18 is that rank is verified in the permanent measure of data predetermined process method in the application one embodiment
The logical relation architecture diagram of the logical data node of section.As shown in Figure 16 and Figure 17 and Figure 18, permanent measure verifying (i.e. 4/4
Stage) data management module multiple logical data nodes be followed successively by the 5th start node, fill in verifying conclusion node, problem
Raiser confirmation node, QA Manager's node, company master look into audit node, decision problem category node, chief engineer ratify node, the
Nine or logical node, addition 4/4 state node, third notice node, the 5th complete node.
The data management module of permanent measure verifying (i.e. 4/4 stage) will finally be jumped to as the tax of the 5th start node
Value opens the data management module of permanent measure verifying (i.e. 4/4 stage), fills in verifying conclusion as filling in verifying conclusion node
Assignment, then problem raiser confirm node the above-mentioned verifying conclusion filled in is confirmed, after confirmation enter QA Manager
Node, QA Manager carry out confirmation again for verifying conclusion, look into audit node subsequently into company master, utilize decision problem
Category node judges the AB classification of trial-production problem again, if yes then enter chief engineer ratify node, the 9th or logical node into
Enter chief engineer ratify node the case where and be not AB classification trial-production problem selection first, enter addition 4/4 state node add 4/4
Stage condition, and enter problem responsible person corresponding to third notice node notice, it is all to eventually enter into the 5th completion node completion
Logic step.
According to the logical relation pair between the sequence of the step of between the data management module and the logical data node
The corresponding logical data node carries out assignment according to the assignment;
The step of in this step according between data management module above, is sequentially and logical relation carries out assignment, herein
Assignment needs the corresponding configuration of different data types according to mathematical logic node valuation.
Record the assignment time for carrying out assignment according to the assignment data to the corresponding logical data node;
The above-mentioned assignment time is recorded in this step, for calling and predetermined process later.
Receive the data predetermined process instruction of user, wherein data predetermined process instruction is to specifying the logic
The assignment of back end is called and carries out the instruction of predetermined process;
The assignment of above-mentioned logical data node is called in this step, for example which rank is trial-production problem enter
Section, so that it may call last addition stage condition node.
The assignment and tax specified in the logical data node are called according to the tentation data process instruction of the user
The time of value;
In this step other than the assignment in calling logic back end, the assignment time is also had invoked.
Figure 19 is that data predetermined process method always counts result schematic diagram in the application one embodiment;Figure 20 is the application
The statistical result schematic diagram of data predetermined process method different brackets problem in one embodiment;Figure 21 is the application one implementation
Data predetermined process method different type problem closes the statistical result schematic diagram of situation in example;Figure 22 is the application one implementation
Data predetermined process method different brackets problem closes the statistical result schematic diagram of situation in example;Figure 23 is the application one implementation
Data predetermined process method difference department's problem closes the statistical result schematic diagram of situation in example;Figure 24 is the application one implementation
Data predetermined process method difference department's problem is in the statistical result schematic diagram in Resolving probiems stage in example;Figure 25 is the application
The statistical result schematic diagram that data predetermined process method difference department's problem is closed about problem in one embodiment;
Figure 26 is that the statistical result that data predetermined process method is monthly closed about problem in the application one embodiment is shown
It is intended to, it is described that predetermined process is carried out according to the assignment of calling and the time of assignment as shown in Figure 19 to Figure 26.
Final assignment and assignment time according in calling logic back end above is directly displayed, or is carried out pre-
Fixed statistical disposition, then shown.
Figure 27 is data predetermined process device architecture schematic diagram in the application one embodiment.As shown in figure 27, real one
It applies in example, this application provides a kind of data predetermined process device, which includes:
Receiving module 101, for receiving user's request;
Creation module 102, for requesting creation multiple by the sequence division of Resolving probiems stage etch according to the user
Data management module, wherein each data management module have it is multiple can assignment logical data node, and it is multiple described
There is scheduled logical relation between logical data node, pass through the logical relation reality between multiple data management modules
Now jumped by sequence of steps;
The receiving module 101, for receiving the assignment data of logical data node, wherein the assignment data is pair
The logical data node can carry out the data of assignment;
Assignment module 103, for the sequence of the step of according between the data management module and the logical data node
Between logical relation to the corresponding logical data node according to the assignment data carry out assignment;
The receiving module 101 is also used to receive the data predetermined process instruction of user, wherein the data book office
Reason instruction is to specifying the assignment of the logical data node to be called and carry out the instruction of predetermined process;
Calling module 104 is also used to instruct to call according to the data predetermined process of the user to specify the logical data
Assignment in node;
Predetermined process module 105, for carrying out predetermined process according to the assignment of calling.
In one embodiment, multiple data management modules that the creation module 102 creates press sequence of steps successively
For data management module and the data management module in interim measure stage and the analysis of causes stage for proposing for problem the stage
The data management module of data management module and permanent measure stage, there are also the data management modules and problem of permanent measure verifying
The data management module of closed stage.
In one embodiment, problem proposes the data management module and the data management module in interim measure stage in stage,
And decision problem is provided in the data management module and the data management module in permanent measure stage in analysis of causes stage
Whether duplicate logical data node stops to logical data node when logical data node is when being assigned a value of replication problem
Subsequent assignment procedure.
In one embodiment, the device further include:
Logging modle 106 carries out assignment according to the assignment data to the corresponding logical data node for recording
The assignment time;
The assignment module 103 is also used to instruct to call according to the data predetermined process of the user to specify the logic
Assignment data and assignment time in back end;
The predetermined process module 105 is also used to carry out predetermined process according to the assignment of calling and assignment time.
In one embodiment, the predetermined process module 105 is also used to specify calling the tax of the logical data node
The processing that value is counted and/or shown.
Present invention also provides a kind of data predetermined process device, the processor and memory:
It is stored with the application program that can be executed by the processor in the memory, is used for so that the processor executes
The step of described data predetermined process method.
Present invention also provides a kind of computer readable storage mediums, are stored thereon with computer program, which is located
Manage the step of realizing the data predetermined process method when device executes.
The series of detailed descriptions listed above only for the application feasible embodiment specifically
Protection scope that is bright, and being not intended to limit the invention, it is all without departing from equivalent embodiments made by technical spirit of the present invention or
Change, such as the combination, segmentation or repetition of feature, should all be included in the protection scope of the present invention.
Claims (12)
1. a kind of data predetermined process method, which is characterized in that this method comprises:
Receive user's request;
The multiple data management modules sequentially divided by Resolving probiems stage etch of creation are requested according to the user, wherein every
A data management module have it is multiple can assignment logical data node, and have between multiple logical data nodes
Scheduled logical relation is realized between multiple data management modules by the logical relation and is jumped by sequence of steps
Turn;
Receive the assignment data of logical data node, wherein the assignment data is that can assign to the logical data node
The data of value;
According to the logical relation between the sequence of the step of between the data management module and the logical data node to correspondence
The logical data node according to the assignment data carry out assignment;
Receive the data predetermined process instruction of user, wherein data predetermined process instruction is to specifying the logical data
The assignment of node is called and carries out the instruction of predetermined process;
The assignment specified in the logical data node is called according to the instruction of the data predetermined process of the user;
Predetermined process is carried out according to the assignment of calling.
2. data predetermined process method according to claim 1, which is characterized in that multiple data management modules are by step
The rapid data management module for being sequentially followed successively by the problem proposition stage and the data management module in interim measure stage and reason point
The data management module of the data management module in analysis stage and permanent measure stage, there are also the data management moulds of permanent measure verifying
The data management module of block and problem closed stage.
3. data predetermined process method according to claim 2, which is characterized in that the data management mould in problem proposition stage
Block and the data management module in interim measure stage and the data management module in analysis of causes stage and permanent measure stage
The whether duplicate logical data node of decision problem is provided in data management module, when the assignment of logical data node is attached most importance to
When multiple problem, stop the subsequent assignment procedure to logical data node.
4. data predetermined process method according to claim 1, which is characterized in that described according to the data management module
Between the step of sequence the logical data node between logical relation to the corresponding logical data node according to institute
It states assignment data and carries out assignment and the data predetermined process instruction for receiving user, wherein the data predetermined process instruction
For the assignment for specifying the logical data node is called and is carried out between the instruction step of predetermined process, this method is also wrapped
It includes:
Record the assignment time for carrying out assignment according to the assignment data to the corresponding logical data node;
Described called according to the instruction of the data predetermined process of the user specifies the assignment in the logical data node to include:
When specifying the assignment and assignment in the logical data node according to the data predetermined process of user instruction calling
Between;
It is described to include: according to the assignment of calling progress predetermined process
It is described that predetermined process is carried out according to the assignment of calling and assignment time.
5. according to claim 1 to the data predetermined process method of 4 any one, which is characterized in that this method comprises: institute
Stating predetermined process is the processing for specifying the assignment of the logical data node to be counted and/or shown calling.
6. a kind of data predetermined process device, which is characterized in that the device includes:
Receiving module, for receiving user's request;
Creation module, the data management divided for requesting creation multiple according to the user by Resolving probiems stage etch sequence
Module, wherein each data management module have it is multiple can assignment logical data node, and multiple logical datas
There is scheduled logical relation between node, realized between multiple data management modules by the logical relation and press step
Sequence is jumped;
The receiving module, for receiving the assignment data of logical data node, wherein the assignment data is to the logic
Back end can carry out the data of assignment;
Assignment module, for patrolling between the sequence of the step of according between the data management module and the logical data node
The relationship of collecting carries out assignment according to the assignment data to the corresponding logical data node;
The receiving module is also used to receive the data predetermined process instruction of user, wherein the data predetermined process, which instructs, is
To specifying the assignment of the logical data node to be called and carry out the instruction of predetermined process;
Calling module is also used to instruct to call according to the data predetermined process of the user to specify in the logical data node
Assignment;
Predetermined process module, for carrying out predetermined process according to the assignment of calling.
7. data predetermined process device according to claim 6, which is characterized in that multiple institutes of the creation module creation
It states data management module and is followed successively by the data management module and the data in interim measure stage that problem proposes the stage by sequence of steps
The data management module of management module and the data management module in analysis of causes stage and permanent measure stage, there are also permanent
The data management module and the data management module of problem closed stage of measure verifying.
8. data predetermined process device according to claim 7, which is characterized in that the data management mould in problem proposition stage
Block and the data management module in interim measure stage and the data management module in analysis of causes stage and permanent measure stage
The whether duplicate logical data node of decision problem is provided in data management module, when the assignment of logical data node is attached most importance to
When multiple problem, stop the subsequent assignment procedure to logical data node.
9. data predetermined process device according to claim 6, which is characterized in that the device further include:
Logging modle, when carrying out the assignment of assignment according to the assignment data to the corresponding logical data node for recording
Between;
The assignment module is also used to instruct to call according to the data predetermined process of the user to specify the logical data node
In assignment and assignment time;
The predetermined process module is also used to carry out predetermined process according to the assignment of calling and the time of assignment.
10. according to the described in any item data predetermined process devices of claim 6 to 9, which is characterized in that the predetermined process mould
Block, the processing for being also used to specify the assignment of the logical data node to be counted and/or shown calling.
11. a kind of data predetermined process device, which is characterized in that the processor and memory:
It is stored with the application program that can be executed by the processor in the memory, is used for so that the processor is executed as weighed
Benefit require any one of 1 to 5 described in data predetermined process method the step of.
12. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the program is by processor
The step of claim 1-5 described in any item data predetermined process methods are realized when execution.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910370801.XA CN110119819A (en) | 2019-05-06 | 2019-05-06 | A kind of data predetermined process method, apparatus and its storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910370801.XA CN110119819A (en) | 2019-05-06 | 2019-05-06 | A kind of data predetermined process method, apparatus and its storage medium |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110119819A true CN110119819A (en) | 2019-08-13 |
Family
ID=67521755
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910370801.XA Pending CN110119819A (en) | 2019-05-06 | 2019-05-06 | A kind of data predetermined process method, apparatus and its storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110119819A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102243609A (en) * | 2011-06-15 | 2011-11-16 | 惠州运通信息技术有限公司 | Embedded software-based test analysis method and system |
CN104618502A (en) * | 2015-02-15 | 2015-05-13 | 中国科学院遥感与数字地球研究所 | Joint debugging testing platform used for satellite data ground receiving station net |
CN104866585A (en) * | 2015-05-28 | 2015-08-26 | 华北计算技术研究所 | Comprehensive processing system for experimental flight-test data |
CN107861870A (en) * | 2017-11-02 | 2018-03-30 | 平安科技(深圳)有限公司 | Interface testing and test data generating method, device, terminal and storage medium |
CN108122088A (en) * | 2016-11-30 | 2018-06-05 | 上海驭创信息科技有限公司 | A kind of examination & approval stream automatic control system and method |
CN108153528A (en) * | 2017-12-15 | 2018-06-12 | 东软集团股份有限公司 | Extension processing method, device, storage medium and the electronic equipment of procedural model |
CN109582563A (en) * | 2018-10-26 | 2019-04-05 | 平安科技(深圳)有限公司 | Test method, device, computer equipment and the storage medium of test cases |
-
2019
- 2019-05-06 CN CN201910370801.XA patent/CN110119819A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102243609A (en) * | 2011-06-15 | 2011-11-16 | 惠州运通信息技术有限公司 | Embedded software-based test analysis method and system |
CN104618502A (en) * | 2015-02-15 | 2015-05-13 | 中国科学院遥感与数字地球研究所 | Joint debugging testing platform used for satellite data ground receiving station net |
CN104866585A (en) * | 2015-05-28 | 2015-08-26 | 华北计算技术研究所 | Comprehensive processing system for experimental flight-test data |
CN108122088A (en) * | 2016-11-30 | 2018-06-05 | 上海驭创信息科技有限公司 | A kind of examination & approval stream automatic control system and method |
CN107861870A (en) * | 2017-11-02 | 2018-03-30 | 平安科技(深圳)有限公司 | Interface testing and test data generating method, device, terminal and storage medium |
CN108153528A (en) * | 2017-12-15 | 2018-06-12 | 东软集团股份有限公司 | Extension processing method, device, storage medium and the electronic equipment of procedural model |
CN109582563A (en) * | 2018-10-26 | 2019-04-05 | 平安科技(深圳)有限公司 | Test method, device, computer equipment and the storage medium of test cases |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Banks | Introduction to simulation | |
Williams | Identifying the hard lessons from projects–easily | |
WO2022199179A1 (en) | Remaining life prediction model modeling system and method for equipment, and prediction system | |
CN106100935A (en) | Charging equipment of electric automobile communication protocol consistency test device and method | |
CN109784758A (en) | Construction quality supervision early warning system and method based on BIM model | |
CN110297760A (en) | Building method, device, equipment and the computer readable storage medium of test data | |
CN106502898A (en) | Method of testing and test driver and test platform | |
CN108897695A (en) | A kind of the interconnection test method and system of demand side apparatus | |
CN107679423A (en) | Partition integrity inspection method and device | |
CN110515833A (en) | A kind of method of software test, equipment and readable medium | |
Kehris et al. | Using X-machines to model and test discrete event simulation programs | |
CN205864449U (en) | Charging equipment of electric automobile communication protocol consistency test device | |
CN106708897A (en) | Quality assurance method, device and system for data warehouse | |
CN110119819A (en) | A kind of data predetermined process method, apparatus and its storage medium | |
CN114722789B (en) | Data report integrating method, device, electronic equipment and storage medium | |
Loper | The modeling and simulation life cycle process | |
CN113810379B (en) | Exception handling method and multi-service system | |
CN115952224A (en) | Heterogeneous report integration method, equipment and medium | |
JP6663779B2 (en) | Risk assessment device and risk assessment system | |
CN105787141A (en) | Collaborative simulation method and system for complex weapon system operation process | |
CN115293750A (en) | AI (AI) middle desk-based intelligent auditing system, method and device | |
CN115292072A (en) | Visual business flow arrangement method, device and storage medium | |
CN114285840A (en) | Vehicle data acquisition method, intelligent terminal and storage medium | |
CN114302398A (en) | Reserved fraud number identification method and device based on big data and computing equipment | |
Ramler et al. | Key questions in building defect prediction models in practice |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190813 |