CN110119378A CN201910350738.3A CN201910350738A CN110119378A CN 110119378 A CN110119378 A CN 110119378A CN 201910350738 A CN201910350738 A CN 201910350738A CN 110119378 A CN110119378 A CN 110119378A
Authority
CN
China
Prior art keywords
project
data
cloud platform
institution
engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910350738.3A
Other languages
Chinese (zh)
Inventor
邱海燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910350738.3A priority Critical patent/CN110119378A/en
Publication of CN110119378A publication Critical patent/CN110119378A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/10File systems; File servers
    • G06F16/11File system administration, e.g. details of archiving or snapshots
    • G06F16/113Details of archiving
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Data Mining & Analysis (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of building trade big data analysis system and method, this method comprises: building engineering project cloud platform;Obtain the engineering project data that project institution is uploaded to the cloud platform after receiving uploading instructions;According to the data filing format of the cloud platform, the engineering project data are filed, obtain multiple digital archives libraries and are saved;The data in the multiple digital archives library are handled and analyzed by the default learning algorithm in the cloud platform, obtain project management index.The embodiment of the present invention can effectively manage engineering project progress, quality safety, cost etc., to improve efficiency of China's building trade in project management.

Description

Building trade big data analysis system and correlation technique
Technical field
The present invention relates to project management technical field more particularly to a kind of building trade big data analysis systems and phase Pass method.
Background technique
Dependent on the progress of science and technology, building trade also obtains the development for continuing high speed, and according to statistics, building trade exists Accounting in China's GDP is 30% or so, and industry practitioner is more than 200,000,000, and building trade is in China's economic transition Very important effect is played in development.However, the engineering project information management level of China's building trade is not high, example Such as, in the case where engineering project carries out multistage subpackage, each subpackage mechanism manages the engineering item that subpackage is got off using different technologies Mesh, the data that base's project institution is collected can not provide multiple infrastructure data of reference, same project for decision-making level Circulating, poor, amount of redundant data is big etc. has become industry universal phenomenon, and entire industry is substantially to be divided with big data and internet State, the transition of industry and enterprise has difficulty in walking.As it can be seen that there are efficiency in project management for China's building trade at present Low problem.
Summary of the invention
In view of the above technical problems, the present invention provides one kind can be improved China's building trade in project management Efficiency the project management method, apparatus and electronic equipment based on big data.
To achieve the above object, first aspect of the embodiment of the present invention provides a kind of project management based on big data Method, comprising:
Build engineering project cloud platform;
Obtain the engineering project data that project institution is uploaded to the cloud platform after receiving uploading instructions;
According to the data filing format of the cloud platform, the engineering project data are filed, multiple numbers are obtained File store simultaneously saves;
By the default learning algorithm in the cloud platform to the data in the multiple digital archives library carry out processing and Analysis, obtains project management index.
Optionally, the data filing format according to the cloud platform, files the engineering project data Step includes:
The corresponding schedule data of engineering project, quality monitoring data and cost are obtained from the engineering project data Data;
According to the schedule data, quality monitoring data and cost data read, according to the data of the cloud platform Archive format files the engineering project data.
Optionally, the multiple digital archives library includes schedule database, quality monitoring database and cost data Library;The default learning algorithm by the cloud platform is handled and is divided to the data in the multiple digital archives library Analysis, the step of obtaining project management index include:
The project institution is obtained from the schedule database in the schedule hundred of multiple preset time nodes Divide ratio, the schedule percentage is handled and analyzed by the default learning algorithm in the cloud platform, obtains work Journey item purpose schedule level of control;
The project institution is obtained from the quality monitoring database in the quality testing figure of multiple preset time nodes Text obtains work by the default learning algorithm in the cloud platform by the way that the quality testing picture and text are handled and analyzed Journey item purpose quality monitoring level of control;
The project institution is obtained from the cost database in the cost overhead of multiple preset time nodes, passes through institute The default learning algorithm in cloud platform is stated by the way that the cost overhead is handled and analyzed, obtains the cost pipe of engineering project Manage index.
Optionally, the method also includes:
It is that the project institution distributes the first weight according to the schedule level of control of the engineering project, according to described The quality monitoring level of control of engineering project is that the project institution distributes the second weight and the cost according to the engineering project Level of control is that the project institution distributes third weight;
Project institution described in the first weight, the second weight and third weight computing based on project institution distribution it is comprehensive Scoring is closed, and determines the grade of the project institution according to the comprehensive score.
Optionally, after the grade for determining the project institution according to the comprehensive score the step of, the method Further comprise:
In the case where receiving the inquiry request of the project institution, by the grade of the project institution and the engineering The schedule level of control of project, quality monitoring level of control, cost management index push to the terminal of the project institution Equipment.
Optionally, the engineering project of the cloud platform is uploaded to after receiving uploading instructions in the acquisition project institution Before the step of data, the method also includes:
In the cloud platform, official's account is created for the project institution, and by official's account of the project institution And official's account private key storage is in the preset database;
The step for obtaining project institution and being uploaded to the engineering project data of the cloud platform after receiving uploading instructions Suddenly include:
The project institution is obtained after receiving uploading instructions, the cloud platform is uploaded to by official's account Engineering project data.
Second aspect of the embodiment of the present invention provides a kind of project management device based on big data, comprising:
Platform building module, for building engineering project cloud platform;
Data acquisition module is uploaded to the engineering of the cloud platform for obtaining project institution after receiving uploading instructions Project data;
Data filing module carries out the engineering project data for the data filing format according to the cloud platform Filing, obtains multiple digital archives libraries and saves;
Level of control module, for by the default learning algorithm in the cloud platform in the multiple digital archives library Data handled and analyzed, obtain project management index.
The third aspect of the embodiment of the present invention provides a kind of electronic equipment, comprising: memory, processor and is stored in described On memory and the computer program that can run on the processor, the processor are realized above-mentioned when executing computer program Step in project management method based on big data.
Fourth aspect of the embodiment of the present invention provides a kind of computer readable storage medium, and computer readable storage medium is deposited Computer program is contained, which realizes the above-mentioned project management side based on big data when being executed by processor Step in method.
Above scheme of the invention is include at least the following beneficial effects:
By building engineering project cloud platform, obtains project institution and be uploaded to the cloud platform after receiving uploading instructions Engineering project data the engineering project data are filed, are obtained more according to the data filing format of the cloud platform A number file store simultaneously saves, by the default learning algorithm in the cloud platform to the data in the multiple digital archives library Handled and analyzed, obtain project management index, thus realize to engineering project progress, quality safety, cost etc. into Row effectively control, and then improve efficiency of China's building trade in project management.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is a kind of schematic diagram of network system architecture provided in an embodiment of the present invention;
Fig. 2 is a kind of flow diagram of the project management method based on big data provided in an embodiment of the present invention;
Fig. 3 is the process signal of another project management method based on big data provided in an embodiment of the present invention Figure;
Fig. 4 is a kind of structural schematic diagram of the project management device based on big data provided in an embodiment of the present invention;
Fig. 5 is the structural representation of another project management device based on big data provided in an embodiment of the present invention Figure;
Fig. 6 is the structural representation of another project management device based on big data provided in an embodiment of the present invention Figure;
Fig. 7 is the structural representation of another project management device based on big data provided in an embodiment of the present invention Figure;
Fig. 8 is the structural representation of another project management device based on big data provided in an embodiment of the present invention Figure;
Fig. 9 is the structural representation of another project management device based on big data provided in an embodiment of the present invention Figure;
Figure 10 is the structural schematic diagram of a kind of electronic equipment provided in an embodiment of the present invention.
Specific embodiment
In order to enable those skilled in the art to better understand the solution of the present invention, below in conjunction in the embodiment of the present invention Attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is only The embodiment of a part of the invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people The model that the present invention protects all should belong in member's every other embodiment obtained without making creative work It encloses.
The term " includes " and " having " and their any changes occurred in description of the invention, claims and attached drawing Shape, it is intended that cover and non-exclusive include.Such as contain the process, method of a series of steps or units, system, product or Equipment is not limited to listed step or unit, but optionally further comprising the step of not listing or unit or optional Ground further includes the other step or units intrinsic for these process, methods, product or equipment.In addition, term " first ", " the Two " and " third " etc. are and to be not intended to describe specific sequence for distinguishing different objects.
It illustrates first in conjunction with relevant drawings and introduces the network system frame that the scheme possible application of lower the embodiment of the present application is arrived Structure.
Referring to Figure 1, network system architecture shown in FIG. 1 is related to multiple project institutions, cloud platform and management organization. The project institution can be the branch, company for contracting some engineering project or subsidiary or line construction department, be all data First gatherer, management organization can be corporate HQ or department, corporate decision or middle control center, can be according to cloud platform to item The processing analysis for the engineering project data that mesh mechanism is submitted, carries out the decision in terms of progress, quality safety, cost, to engineering Project is effectively managed, and cloud platform stores and processs center as data, it is intended to by data processing and be analyzed as supervisor Structure obtains significant level of control, and each project institution and management organization can obtain the data needed from the platform, real Existing data sharing.
Fig. 2 is referred to, Fig. 2 is a kind of stream of the project management method based on big data provided in an embodiment of the present invention Journey schematic diagram, as shown in Fig. 2, comprising steps of
S11 builds engineering project cloud platform.
Wherein, in a specific embodiment of the present invention, which is formed using multiple technologies framework architecture, such as: HDFS (Hadoop Distributed File System, distributed file system), cluster Computing Platform Spark etc. are One concentrated-distributed data storage, data cleansing, the platform of machine learning and forecast analysis, can provide progress, matter The overall data analysis report of the modules such as amount, cost and the technological prediction of part business index.
S12 obtains the engineering project data that project institution is uploaded to the cloud platform after receiving uploading instructions.
S13 files the engineering project data, obtains multiple according to the data filing format of the cloud platform Digital archives library simultaneously saves.
S14, by the default learning algorithm in the cloud platform to the data in the multiple digital archives library at Reason and analysis, obtain project management index.
Project management device provided in an embodiment of the present invention based on big data can be realized above-mentioned based on big data Project management embodiment of the method in each embodiment and corresponding beneficial effect, to avoid repeating, here no longer It repeats.
The embodiment of the present invention obtains project institution and uploads after receiving uploading instructions by building engineering project cloud platform To the engineering project data of the cloud platform, according to the data filing format of the cloud platform, to the engineering project data into Row filing, obtains multiple digital archives libraries and saves, by the default learning algorithm in the cloud platform to the multiple number Data in file store are handled and are analyzed, and project management index is obtained, so as to realize to engineering project progress, Quality safety, cost etc. are effectively managed, and then improve efficiency of China's building trade in project management.
Fig. 3 is referred to, Fig. 3 is another project management method based on big data provided in an embodiment of the present invention Flow diagram, as shown in figure 3, comprising steps of
S21 builds engineering project cloud platform.
S22 obtains the engineering project data that project institution is uploaded to the cloud platform after receiving uploading instructions.
S23, obtained from the engineering project data the corresponding schedule data of engineering project, quality monitoring data and Cost data.
S24, according to the schedule data, quality monitoring data and cost data read, according to the cloud platform Data filing format files the engineering project data, obtains multiple digital archives libraries and saves.
S25, by the default learning algorithm in the cloud platform to the data in the multiple digital archives library at Reason and analysis, obtain project management index.
As an alternative embodiment, the multiple digital archives library includes schedule database, quality monitoring Database and cost database;The default learning algorithm by the cloud platform is in the multiple digital archives library The step of data are handled and analyzed, and project management index is obtained include:
The project institution is obtained from the schedule database in the schedule hundred of multiple preset time nodes Divide ratio, the schedule percentage is handled and analyzed by the default learning algorithm in the cloud platform, obtains work Journey item purpose schedule level of control;
The project institution is obtained from the quality monitoring database in the quality testing figure of multiple preset time nodes Text obtains work by the default learning algorithm in the cloud platform by the way that the quality testing picture and text are handled and analyzed Journey item purpose quality monitoring level of control;
The project institution is obtained from the cost database in the cost overhead of multiple preset time nodes, passes through institute The default learning algorithm in cloud platform is stated by the way that the cost overhead is handled and analyzed, obtains the cost pipe of engineering project Manage index.
As an alternative embodiment, the method also includes:
It is that the project institution distributes the first weight according to the schedule level of control of the engineering project, according to described The quality monitoring level of control of engineering project is that the project institution distributes the second weight and the cost according to the engineering project Level of control is that the project institution distributes third weight;
Project institution described in the first weight, the second weight and third weight computing based on project institution distribution it is comprehensive Scoring is closed, and determines the grade of the project institution according to the comprehensive score.
As an alternative embodiment, in the step of the grade for determining the project institution according to the comprehensive score After rapid, the method further includes:
In the case where receiving the inquiry request of the project institution, by the grade of the project institution and the engineering The schedule level of control of project, quality monitoring level of control, cost management index push to the terminal of the project institution Equipment.
As an alternative embodiment, being uploaded to after receiving uploading instructions in the acquisition project institution described Before the step of engineering project data of cloud platform, the method also includes:
In the cloud platform, official's account is created for the project institution, and by official's account of the project institution And official's account private key storage is in the preset database;
The step for obtaining project institution and being uploaded to the engineering project data of the cloud platform after receiving uploading instructions Suddenly include:
The project institution is obtained after receiving uploading instructions, the cloud platform is uploaded to by official's account Engineering project data.
Fig. 4 is referred to, Fig. 4 is a kind of project management device based on big data provided in an embodiment of the present invention, should Device includes:
Platform building module 401, for building engineering project cloud platform;
Data acquisition module 402 is uploaded to the cloud platform for obtaining project institution after receiving uploading instructions Engineering project data;
Data filing module 403, for the data filing format according to the cloud platform, to the engineering project data into Row filing, obtains multiple digital archives libraries and saves;
Level of control module 404, for by the default learning algorithm in the cloud platform to the multiple digital archives Data in library are handled and are analyzed, and project management index is obtained.
Optionally, as shown in figure 5, the data filing module 403, comprising:
First data capture unit 4031, for from the engineering project data obtain engineering project complete accordingly into Degree evidence, quality monitoring data and cost data;
Data filing unit 4032, for according to the schedule data, quality monitoring data and the cost data that read, According to the data filing format of the cloud platform, the engineering project data are filed.
Optionally, as shown in fig. 6, the level of control module 404, comprising:
Progress control unit 4041, for obtaining the project institution from the schedule database multiple default The schedule percentage of timing node, by the default learning algorithm in the cloud platform to the schedule percentage into Row processing and analysis, obtain the schedule level of control of engineering project;
Quality management unit 4042, for obtaining the project institution from the quality monitoring database multiple default The quality testing picture and text of timing node, by the default learning algorithm in the cloud platform by the quality testing picture and text into Row processing and analysis, obtain the quality monitoring level of control of engineering project;
Cost management unit 4043, for obtaining the project institution from the cost database in multiple preset times The cost overhead of node, by the default learning algorithm in the cloud platform by the way that the cost overhead is handled and divided Analysis, obtains the cost management index of engineering project.
Optionally, as shown in fig. 7, described device further include:
Weight distribution module 405, for being the project institution according to the schedule level of control of the engineering project The first weight is distributed, is that the project institution distributes the second weight and root according to the quality monitoring level of control of the engineering project Cost management index according to the engineering project is that the project institution distributes third weight;
Level determination module 406, the first weight, the second weight and third weight for being distributed based on the project institution The comprehensive score of the project institution is calculated, and determines the grade of the project institution according to the comprehensive score.
Optionally, as shown in figure 8, described device further include:
Inquiry request module 407, in the case where receiving the inquiry request of the project institution, by the project The schedule level of control of the grade of mechanism and the engineering project, quality monitoring level of control, the push of cost management index To the terminal device of the project institution.
Optionally, as shown in figure 9, described device further include:
Account creation module 408 creates official's account for the project institution in the cloud platform, and by institute The official's account for stating project institution and official's account private key storage are in the preset database;
The data acquisition module 402, comprising:
Second data capture unit 4021, for obtaining the project institution after receiving uploading instructions, by described Official's account is uploaded to the engineering project data of the cloud platform.
0, Figure 10 is the structural schematic diagram of a kind of electronic equipment provided in an embodiment of the present invention, such as Figure 10 referring to Figure 1 It is shown, comprising: memory 1001, processor 1002 and to be stored on the memory 1001 and can be on the processor 1002 The computer program 1003 of operation, in which:
The computer program 1003 that processor 1002 is used to that memory 1001 to be called to store executes following steps:
Build engineering project cloud platform;
Obtain the engineering project data that project institution is uploaded to the cloud platform after receiving uploading instructions;
According to the data filing format of the cloud platform, the engineering project data are filed, multiple numbers are obtained File store simultaneously saves;
By the default learning algorithm in the cloud platform to the data in the multiple digital archives library carry out processing and Analysis, obtains project management index.
Optionally, processor 1002 is used to execute the data filing format according to the cloud platform, to the engineering The step of project data is filed include:
The corresponding schedule data of engineering project, quality monitoring data and cost are obtained from the engineering project data Data;
According to the schedule data, quality monitoring data and cost data read, according to the data of the cloud platform Archive format files the engineering project data.
Optionally, the multiple digital archives library includes schedule database, quality monitoring database and cost data Library;The processor 1002 execute it is described by the default learning algorithm in the cloud platform in the multiple digital archives library Data the step of being handled and analyzed, obtaining project management index include:
The project institution is obtained from the schedule database in the schedule hundred of multiple preset time nodes Divide ratio, the schedule percentage is handled and analyzed by the default learning algorithm in the cloud platform, obtains work Journey item purpose schedule level of control;
The project institution is obtained from the quality monitoring database in the quality testing figure of multiple preset time nodes Text obtains work by the default learning algorithm in the cloud platform by the way that the quality testing picture and text are handled and analyzed Journey item purpose quality monitoring level of control;
The project institution is obtained from the cost database in the cost overhead of multiple preset time nodes, passes through institute The default learning algorithm in cloud platform is stated by the way that the cost overhead is handled and analyzed, obtains the cost pipe of engineering project Manage index.
Optionally, the processor 1002 is also used to: being described according to the schedule level of control of the engineering project Project institution distributes the first weight, is project institution distribution second according to the quality monitoring level of control of the engineering project Weight and according to the cost management index of the engineering project be the project institution distribute third weight;
Project institution described in the first weight, the second weight and third weight computing based on project institution distribution it is comprehensive Scoring is closed, and determines the grade of the project institution according to the comprehensive score.
Optionally, after the grade for determining the project institution according to the comprehensive score the step of, the processing Device 1002 is further used for:
In the case where receiving the inquiry request of the project institution, by the grade of the project institution and the engineering The schedule level of control of project, quality monitoring level of control, cost management index push to the terminal of the project institution Equipment.
Optionally, the engineering project of the cloud platform is uploaded to after receiving uploading instructions in the acquisition project institution Before the step of data, the processor 1002 is also used to:
In the cloud platform, official's account is created for the project institution, and by official's account of the project institution And official's account private key storage is in the preset database;
The step for obtaining project institution and being uploaded to the engineering project data of the cloud platform after receiving uploading instructions Suddenly include:
The project institution is obtained after receiving uploading instructions, the cloud platform is uploaded to by official's account Engineering project data.
Illustratively, above-mentioned electronic equipment can be mobile phone, computer, laptop, tablet computer, palm PC and Wearable device etc..Electronic equipment may include, but are not limited to processor 1002, memory 1001.Those skilled in the art can be with Understand, the schematic diagram is only the example of electronic equipment, does not constitute the restriction to electronic equipment, may include than illustrating more More or less component perhaps combines certain components or different components.
It should be noted that the processor 1002 due to electronic equipment realizes above-mentioned people when executing computer program 1003 Step in face biopsy method, therefore the embodiment of the above-mentioned project management method based on big data is suitable for The electronic equipment, and can reach the same or similar beneficial effect.
The embodiment of the invention also provides a kind of computer readable storage medium, computer-readable recording medium storage has meter Calculation machine program, the computer program are realized when being executed by processor in the above-mentioned project management method based on big data Step.
Illustratively, the computer program of computer readable storage medium includes computer program code, the computer Program code can be source code form, object identification code form, executable file or certain intermediate forms etc..The computer can Reading medium may include: any entity or device, recording medium, USB flash disk, mobile hard that can carry the computer program code Disk, magnetic disk, CD, computer storage, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium etc..
It should be noted that the computer program due to computer readable storage medium realized when being executed by processor it is above-mentioned The project management method based on big data in step, therefore the above-mentioned project management method based on big data All embodiments are suitable for the computer readable storage medium, and can reach the same or similar beneficial effect.
The embodiment of the present invention has been described in detail above, specific case used herein to the principle of the present invention and Embodiment is expounded, and the above description of the embodiment is only used to help understand the method for the present invention and its core ideas; At the same time, for those skilled in the art can in specific embodiments and applications according to the thought of the present invention There is change place, in conclusion the contents of this specification are not to be construed as limiting the invention.

Claims (10)

1. a kind of building trade big data analysis method, which is characterized in that the described method includes:
Build engineering project cloud platform;
Obtain the engineering project data that project institution is uploaded to the cloud platform after receiving uploading instructions;
According to the data filing format of the cloud platform, the engineering project data are filed, multiple digital archives are obtained Library simultaneously saves;
The data in the multiple digital archives library are handled and are analyzed by the default learning algorithm in the cloud platform, Obtain project management index.
2. the method according to claim 1, wherein the data filing format according to the cloud platform, right The step of engineering project data are filed include:
The corresponding schedule data of engineering project, quality monitoring data and cost number are obtained from the engineering project data According to;
According to the schedule data, quality monitoring data and cost data read, according to the data filing of the cloud platform Format files the engineering project data.
3. the method according to claim 1, wherein the multiple digital archives library includes schedule data Library, quality monitoring database and cost database;The default learning algorithm by the cloud platform is to the multiple number The step of data in word file store are handled and analyzed, and project management index is obtained include:
The project institution is obtained from the schedule database in the schedule percentage of multiple preset time nodes, The schedule percentage is handled and analyzed by the default learning algorithm in the cloud platform, obtains engineering project Schedule level of control;
The project institution is obtained from the quality monitoring database in the quality testing picture and text of multiple preset time nodes, is led to The default learning algorithm crossed in the cloud platform obtains engineering project by the way that the quality testing picture and text are handled and analyzed Quality monitoring level of control;
The project institution is obtained from the cost database in the cost overhead of multiple preset time nodes, passes through the cloud By the way that the cost overhead is handled and analyzed, the cost management for obtaining engineering project refers to default learning algorithm in platform Mark.
4. according to the method described in claim 3, it is characterized in that, the method also includes:
It is that the project institution distributes the first weight according to the schedule level of control of the engineering project, according to the engineering The quality monitoring level of control of project is that the project institution distributes the second weight and the cost management according to the engineering project Index is that the project institution distributes third weight;
The synthesis of project institution described in the first weight, the second weight and third weight computing based on project institution distribution is commented Divide, and determines the grade of the project institution according to the comprehensive score.
5. according to the method described in claim 4, it is characterized in that, determining the project institution according to the comprehensive score described Grade the step of after, the method further includes:
In the case where receiving the inquiry request of the project institution, by the grade of the project institution and the engineering project Schedule level of control, quality monitoring level of control, cost management index push to the terminal device of the project institution.
6. the method according to claim 1, wherein in the acquisition project institution after receiving uploading instructions Before the step of being uploaded to the engineering project data of the cloud platform, the method also includes:
In the cloud platform, official's account is created for the project institution, and by official's account of the project institution and be somebody's turn to do Official's account private key stores in the preset database;
The step of acquisition project institution is uploaded to the engineering project data of the cloud platform after receiving uploading instructions packet It includes:
The project institution is obtained after receiving uploading instructions, the engineering of the cloud platform is uploaded to by official's account Project data.
7. a kind of building trade big data analysis system characterized by comprising
Platform building module, for building engineering project cloud platform;
Data acquisition module is uploaded to the engineering project of the cloud platform for obtaining project institution after receiving uploading instructions Data;
Data filing module files the engineering project data for the data filing format according to the cloud platform, It obtains multiple digital archives libraries and saves;
Level of control module, for by the default learning algorithm in the cloud platform to the number in the multiple digital archives library According to being handled and being analyzed, project management index is obtained.
8. device according to claim 7, which is characterized in that the data filing module includes:
First data capture unit, for obtained from the engineering project data the corresponding schedule data of engineering project, Quality monitoring data and cost data;
Data filing unit, for schedule data, quality monitoring data and cost data that basis is read, according to described The data filing format of cloud platform files the engineering project data.
9. a kind of electronic equipment characterized by comprising memory, processor and be stored on the memory and can be in institute The computer program run on processor is stated, the processor is realized when executing the computer program as in claim 1 to 6 Step in described in any item project management methods based on big data.
10. a kind of computer readable storage medium, which is characterized in that be stored with computer on the computer readable storage medium Program, when the computer program is executed by processor realize as it is described in any one of claims 1 to 6 based on big data Step in project management method.
CN201910350738.3A 2019-04-28 2019-04-28 Building trade big data analysis system and correlation technique Pending CN110119378A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910350738.3A CN110119378A (en) 2019-04-28 2019-04-28 Building trade big data analysis system and correlation technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910350738.3A CN110119378A (en) 2019-04-28 2019-04-28 Building trade big data analysis system and correlation technique

Publications (1)

Publication Number Publication Date
CN110119378A true CN110119378A (en) 2019-08-13

Family

ID=67521603

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910350738.3A Pending CN110119378A (en) 2019-04-28 2019-04-28 Building trade big data analysis system and correlation technique

Country Status (1)

Country Link
CN (1) CN110119378A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110659872A (en) * 2019-08-27 2020-01-07 华润置地控股有限公司 Energy data collection method and system based on edge server

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170053244A1 (en) * 2015-08-22 2017-02-23 Salim B. KHALIL Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods
CN107368967A (en) * 2017-07-20 2017-11-21 北京建工土木工程有限公司 Engineering safety quality inspection intelligent management based on internet
CN108492075A (en) * 2018-01-31 2018-09-04 湖南建工集团有限公司 The enterprise management method of tertiary management system and the application of data cloud based on BIM

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170053244A1 (en) * 2015-08-22 2017-02-23 Salim B. KHALIL Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods
CN107368967A (en) * 2017-07-20 2017-11-21 北京建工土木工程有限公司 Engineering safety quality inspection intelligent management based on internet
CN108492075A (en) * 2018-01-31 2018-09-04 湖南建工集团有限公司 The enterprise management method of tertiary management system and the application of data cloud based on BIM

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110659872A (en) * 2019-08-27 2020-01-07 华润置地控股有限公司 Energy data collection method and system based on edge server

Similar Documents

Publication Publication Date Title
CN105630847B (en) Date storage method, data query method, apparatus and system
CN104750708B (en) A kind of index establishing method of space-time data, querying method, device and equipment
Grabowski et al. Disk-based compression of data from genome sequencing
CN107124394B (en) Power communication network security situation prediction method and system
CN103827899B (en) Data center resource is distributed
CN104123186B (en) Method for distributing business and device
US20150032759A1 (en) System and method for analyzing result of clustering massive data
CN110362544A (en) Log processing system, log processing method, terminal and storage medium
KR20150052540A (en) Method for transcoding mutimedia, and hadoop-based mulimedia transcoding system operating the same
CN102282544A (en) Storage system
CN105930479A (en) Data skew processing method and apparatus
US20170315848A1 (en) Performing automatic map reduce job optimization using a resource supply-demand based approach
US20170353537A1 (en) Predictive load balancing for a digital environment
CN103077254A (en) Webpage acquiring method and device
CN107644081A (en) Data duplicate removal method and device
CN109963167A (en) Audio/video processing method, server, device and storage medium
CN110262775A (en) Business rule generation method and device
CN111935140A (en) Abnormal message identification method and device
Canali et al. Exploiting classes of virtual machines for scalable IaaS cloud management
Heikkinen et al. Distributed multimedia content analysis with MapReduce
CN111445027B (en) Training method and device for machine learning model
CN107818106B (en) Big data offline calculation data quality verification method and device
CN110119378A (en) Building trade big data analysis system and correlation technique
CN110322153A (en) Monitor event processing method and system
CN105468676A (en) Big data processing method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination