CN110118885A - Electrical energy measurement test connecting box, target meter replacing options and electric energy metering device - Google Patents

Electrical energy measurement test connecting box, target meter replacing options and electric energy metering device Download PDF

Info

Publication number
CN110118885A
CN110118885A CN201910568275.8A CN201910568275A CN110118885A CN 110118885 A CN110118885 A CN 110118885A CN 201910568275 A CN201910568275 A CN 201910568275A CN 110118885 A CN110118885 A CN 110118885A
Authority
CN
China
Prior art keywords
meter
current
electrical energy
voltage
flakes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910568275.8A
Other languages
Chinese (zh)
Inventor
赵云
高瀚磊
肖勇
张乐平
钱斌
何恒靖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSG Electric Power Research Institute
China Southern Power Grid Co Ltd
Research Institute of Southern Power Grid Co Ltd
Original Assignee
China Southern Power Grid Co Ltd
Research Institute of Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Southern Power Grid Co Ltd, Research Institute of Southern Power Grid Co Ltd filed Critical China Southern Power Grid Co Ltd
Priority to CN201910568275.8A priority Critical patent/CN110118885A/en
Publication of CN110118885A publication Critical patent/CN110118885A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • G01R11/02Constructional details
    • G01R11/04Housings; Supporting racks; Arrangements of terminals
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R22/00Arrangements for measuring time integral of electric power or current, e.g. electricity meters
    • G01R22/06Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods

Abstract

This application discloses a kind of electrical energy measurement test connecting boxes, it include: box body and box cover, it is equipped with the multiple electric current Wiring modules connecting respectively with the first meter, the second meter and current transformer in box body, is additionally provided with the multiple voltage link modules connecting respectively with the first meter, the second meter and voltage transformer;Each voltage link module include first voltage in flakes with second voltage in flakes, the first meter connect in flakes by first voltage with voltage transformer, and the second meter passes through second voltage and connect in flakes with voltage transformer;Each electric current Wiring module include the first electric current in flakes with multiple auxiliary currents in flakes.It may be implemented using the electrical energy measurement test connecting box of the application in charged for replacement object table timing, other meters do not have electric quantity loss, and accurate measurement.Disclosed herein as well is a kind of target meter replacing options and electric energy metering devices, have above-mentioned beneficial effect.

Description

Electrical energy measurement test connecting box, target meter replacing options and electric energy metering device
Technical field
This application involves electrical energy measurement fields, replace more particularly to a kind of electrical energy measurement test connecting box, target meter Method and electric energy metering device.
Background technique
Electric energy metering device used at present, the mode of connection are: Secondary Circuit of Potential Transformer voltage and current mutual inductance Device secondary loop current pass through respectively electric energy metering wiring box voltage wiring terminal and current wiring terminal access electric energy meter and Load management terminal keeps the voltage circuit of electric energy metering wiring box, electric energy meter and load management terminal in parallel, current loop string Connection.When on-load replaces electric energy meter or load management terminal, it is necessary to first by the voltage yoke plate of electric energy metering wiring box two Secondary voltage circuit open circuit causes replacement electric energy meter by the electric current of electric energy metering wiring box in flakes the short circuit of secondary current circuit When load management terminal cannot normally measure electric energy, electric energy meter can not normally measure electric energy when replacing load management terminal, Exactly replacing either table timing need to all have a power failure progress, until replacement is completed.Meter could be measured normally after energization, lead to electric energy Meter cannot be measured or be replaced to measurement meter decompression therebetween and meter decompression electricity cannot be measured correctly and cause to lose.
Therefore, how to provide a kind of scheme of solution above-mentioned technical problem is that those skilled in the art need to solve at present Problem.
Summary of the invention
The purpose of the application is to provide a kind of electrical energy measurement test connecting box, target meter replacing options and electrical energy measurement dress It sets, may be implemented in charged for replacement object table timing, other meters do not have electric quantity loss, and accurate measurement.
In order to solve the above technical problems, this application provides a kind of electrical energy measurement test connecting boxes, comprising: box body and box Lid, the box body is interior to be equipped with the multiple electric current Wiring modules connecting respectively with the first meter, the second meter and current transformer, also Equipped with the multiple voltage link modules being connect respectively with first meter, second meter and voltage transformer;
Each voltage link module include first voltage in flakes with second voltage in flakes, first meter passes through institute First voltage is stated to connect with the voltage transformer in flakes, second meter by the second voltage in flakes with the voltage Mutual inductor connection;
Each electric current Wiring module include the first electric current in flakes with multiple auxiliary currents in flakes, each auxiliary is electric For stream in flakes for controlling the short circuit of current loop of the target meter in replacement object table timing, the object table is calculated as described the One meter and/or second meter.
Preferably, each electric current Wiring module further includes series current terminal, first meter and described second Meter is connected by the series current terminal.
Preferably, the multiple auxiliary current include in flakes the first auxiliary current in flakes with the second auxiliary current in flakes;
The No.1 current terminal of each electric current Wiring module and No. two current terminals pass through first electric current in flakes The first end of connection, the current transformer passes through the No.1 current terminal and No. two current terminals and first table Meter connection, the second end that second meter passes through No. three current terminals and the current transformer of the electric current Wiring module Connection;
First auxiliary current is set in flakes on the current terminal laterally adjacent with the No.1 current terminal, and described Two auxiliary currents are set in flakes on the current terminal laterally adjacent with No. three current terminals.
Preferably, the series current terminal is set between the No.1 current terminal and No. three current terminals.
Preferably, the electrical energy measurement test connecting box is phase three-wire three electrical energy measurement test connecting box or three-phase and four-line electricity It can metering experiment terminal box;
When the electrical energy measurement test connecting box is the phase three-wire three electrical energy measurement test connecting box, the electrical energy measurement Test connecting box includes two electric current Wiring modules and three voltage link modules;
When the electrical energy measurement test connecting box is the three-phase and four-line electrical energy measurement test connecting box, the electrical energy measurement Test connecting box includes three electric current Wiring modules and four voltage link modules.
In order to solve the above technical problems, being applied to present invention also provides a kind of target meter replacing options as appointed above Electrical energy measurement test connecting box described in meaning one, comprising:
When object table is calculated as the first meter, by the first voltage of each voltage link module in flakes to setting aside, to disconnect Auxiliary current corresponding with first meter in each electric current Wiring module is stirred in the three-phase voltage circuit of first meter In flakes, so that the short circuit of current loop of first meter;
When object table is calculated as the second meter, by the second voltage of each voltage link module in flakes to setting aside, to disconnect Auxiliary current corresponding with second meter in each electric current Wiring module is stirred in the three-phase voltage circuit of second meter In flakes, so that the short circuit of current loop of second meter.
Preferably, the electrical energy measurement test connecting box is phase three-wire three electrical energy measurement test connecting box or three-phase and four-line electricity It can metering experiment terminal box;
When the electrical energy measurement test connecting box is the phase three-wire three electrical energy measurement test connecting box, the electrical energy measurement Test connecting box includes two electric current Wiring modules and three voltage link modules;
When the electrical energy measurement test connecting box is the three-phase and four-line electrical energy measurement test connecting box, the electrical energy measurement Test connecting box includes three electric current Wiring modules and four voltage link modules.
In order to solve the above technical problems, present invention also provides a kind of electric energy metering devices, including such as any one above The electrical energy measurement test connecting box.
This application provides a kind of electrical energy measurement test connecting boxes, comprising: box body and box cover are equipped in box body respectively with the One meter, the second meter and current transformer connection multiple electric current Wiring modules, be additionally provided with respectively with the first meter, the second table Meter and multiple voltage link modules of voltage transformer connection;Each voltage link module includes that first voltage is electric with second in flakes In flakes, the first meter connect with voltage transformer in flakes by first voltage pressure, the second meter pass through second voltage in flakes with electricity Press mutual inductor connection;Each electric current Wiring module include the first electric current in flakes with multiple auxiliary currents in flakes, each auxiliary current In flakes for the short circuit of current loop in replacement object table timing control target meter, object table is calculated as the first meter and/or the Two meters.
In practical applications, using the scheme of the application, in voltage link module, every phase voltage circuit is provided with muti-piece Voltage in flakes, controls the on-off of different circuit respectively, in replacement object table timing, disconnects any voltage in flakes, does not influence other The power supply in meter circuit, in electric current Wiring module, setting auxiliary current in flakes, guarantees only to make mesh in replacement object table timing The short circuit of current loop for marking meter, does not influence the current loop of other meters, thus realize charged for replacement object table timing, other Meter does not have electric quantity loss, and accurate measurement.
Present invention also provides a kind of target meter replacing options and electric energy metering device, has and above-mentioned electrical energy measurement tries Test the identical beneficial effect of terminal box.
Detailed description of the invention
It in order to more clearly explain the technical solutions in the embodiments of the present application, below will be to institute in the prior art and embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the application Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings Obtain other attached drawings.
Fig. 1 is a kind of structural schematic diagram of electric energy test connecting box provided herein;
Fig. 2 is the structural schematic diagram of another electric energy test connecting box provided herein;
Fig. 3 a is the structural schematic diagram of another electric energy test connecting box provided herein;
Fig. 3 b is the structural schematic diagram of another electric energy test connecting box provided herein;
Fig. 3 c is the structural schematic diagram of another electric energy test connecting box provided herein;
Fig. 4 is a kind of step flow chart of target meter replacing options provided herein.
Specific embodiment
The core of the application is to provide a kind of electrical energy measurement test connecting box, target meter replacing options and electrical energy measurement dress It sets, may be implemented in charged for replacement object table timing, other meters do not have electric quantity loss, and accurate measurement.
To keep the purposes, technical schemes and advantages of the embodiment of the present application clearer, below in conjunction with the embodiment of the present application In attached drawing, the technical scheme in the embodiment of the application is clearly and completely described, it is clear that described embodiment is Some embodiments of the present application, instead of all the embodiments.Based on the embodiment in the application, those of ordinary skill in the art Every other embodiment obtained without making creative work, shall fall in the protection scope of this application.
Fig. 1 is please referred to, Fig. 1 is a kind of structural schematic diagram of electrical energy measurement test connecting box provided herein, comprising:
Box body and box cover, box body is interior to be equipped with the multiple electricity connecting respectively with the first meter, the second meter and current transformer Wiring module IX is flowed, the multiple voltage link modules connecting respectively with the first meter, the second meter and voltage transformer are additionally provided with UX, X=A, B, C;
It is understood that electrical energy measurement test connecting box provided herein can be the electric energy of adaptation phase three-wire three Metering experiment terminal box, or the electrical energy measurement test connecting box of three-phase and four-line is adapted to, when adapting to phase three-wire three, the electric energy It should be set in the box body of metering experiment terminal box there are two electric current Wiring module IX and three voltage link module UX, adapt to three-phase four Electric current Wiring module IX and four voltage link modules there are three should being set when line, in the box body of the electrical energy measurement test connecting box UX。
Each voltage link module UX includes that U2, the first meter pass through first to first voltage in flakes for U1 and second voltage in flakes U1 is connect voltage with voltage transformer in flakes, and by second voltage, U2 is connect the second meter with voltage transformer in flakes;
Specifically, the application, which passes through, improves every phase voltage connection terminal structure, in flakes original one piece of every phase voltage circuit It changes into every phase muti-piece in flakes, connects so that every phase voltage circuit is split up into multichannel by the on-off of original one piece control loop in flakes The on-off (installing every phase voltage secondary circuit or three circuits in flakes additional) of piece difference control loop, that is to say, that disconnect any road voltage and connect Piece does not influence other loop voltages and powers in flakes, thus achieve the purpose that every phase voltage circuit, which is split up into multichannel, independently to be exported, It include corresponding with A first in box body by taking the electrical energy measurement test connecting box for adapting to phase three-wire three as an example shown in referring to Fig.1 Voltage link module UA, second voltage Wiring module UB corresponding with B, tertiary voltage Wiring module UC corresponding with C, respectively It include first voltage U1 in flakes in a voltage link module UX, U2, voltage transformer pass through first voltage to second voltage in flakes U1 is connect with the first meter in flakes, and by second voltage, U2 is connect voltage transformer with the second meter in flakes, two in every phase Voltage circuit is independent of each other.
Each electric current Wiring module IX includes that Ifi, each auxiliary are electric in flakes for I1 and multiple auxiliary currents in flakes for the first electric current Stream in flakes Ifi be used for replacement object table timing control target meter short circuit of current loop, object table be calculated as the first meter and/ Or second meter.
Specifically, the application increases multiple auxiliary currents Ifi in flakes in each electric current Wiring module IX, electric current is improved The connection type of circuit connection mode and short-circuit connection sheet, reaching on-load replacement another meter of object table timing can normally measure The purpose of electric energy.Shown in referring to Fig.1, include and A phase by taking the electrical energy measurement test connecting box for adapting to phase three-wire three as an example, in box body Corresponding first electric current Wiring module IA and second electric current Wiring module IC corresponding with C.Correspondingly, being fitted referring to shown in Fig. 2 Should further include in the box body of the electrical energy measurement test connecting box of three-phase and four-line third electric current Wiring module IB corresponding with B and Fourth voltage link module UN corresponding with N.First electric current No. 1 current terminal of I1 connection and No. two current terminals in flakes, If1 is set on the current terminal laterally adjacent with No.1 current terminal one auxiliary current in flakes, and If2 is set the second auxiliary current in flakes In on the current terminal laterally adjacent with No. three current terminals.
Specifically, using be adapted to phase three-wire three electrical energy measurement test connecting box, the first meter as electric energy meter, the second meter To be illustrated for load management terminal to the application, when electric energy meter and load management terminal can work normally, ginseng According to shown in Fig. 3 a, the secondary current of current transformer output passes through in the electric current Wiring module IX of electrical energy measurement test connecting box Current terminal is connected to the current coil of electric energy meter and load management terminal, every phase current time of electric energy meter and load management terminal Road series connection, by taking A phase current as an example, A phase current mutual inductor secondary current is by No. 1 current terminal in the first electric current Wiring module IA Through the first electric current, I1 flows to the electric current end of incoming cables that No. 2 current terminals flow into electric energy meter again in flakes after son, and electric current flows through electric energy meter It is flowed out after current coil from electric energy meter leading-out terminal, then accesses the current-series connecting terminal in the first electric current Wiring module IA A11, series current terminal A11 are set between No.1 current terminal and No. three current terminals, pass through current-series connecting terminal A11 The end of incoming cables for accessing load management terminal, after the current coil for flowing through load management terminal, from the leading-out terminal of load management terminal Then No. 3 current terminal return current mutual inductors are passed through in outflow.It is understood that equal in electric energy meter and load management terminal When can operate normally, If2 does not connect with other current terminals the first auxiliary current in flakes for If1 and the second auxiliary current in flakes It connects.Equally by taking A phase as an example, voltage transformer exports secondary voltage by the voltage terminal of electrical energy measurement test connecting box again through the U1 is connected to the potential winding terminal of electric energy meter to one voltage in flakes, while U2 is connected to load management terminal in flakes through second voltage Potential winding terminal, electric energy meter and load management terminal run well under voltage and current effect at this time, and two meters are just Often metering electric energy.
Specifically, referring to Fig. 3 b, when needing on-load to replace electric energy meter, first by electrical energy measurement test connecting box with A, U1 disconnects electric energy meter three-phase voltage circuit to setting aside to the first voltage in the corresponding voltage link module UX of B, C tri- in flakes, Since U2 is in connection status in flakes for the corresponding second voltage of A, B, C tri- at this time, so load management terminal voltage is normal.Then By the first auxiliary current in each electric current Wiring module IX, If1 is dialled to the left in flakes, is shorted tie point on No. 1 current terminal, this When electric energy meter current loop be in short-circuit condition, but the current loop of load management terminal is unaffected, that is to say, that load pipe Reason terminal still is able to operate normally and measure electric energy, and electric energy meter decompression, defluidization, replaces to electric energy meter.
Correspondingly, when needing on-load to replace load management terminal, electrical energy measurement is tested first referring to shown in Fig. 3 c U2 disconnects load management to setting aside to second voltage in terminal box in voltage link module UX corresponding with A, B, C tri- in flakes Terminal three-phase voltage circuit, since U1 is in connection status in flakes for the corresponding first voltage of A, B, C tri- at this time, so electrical energy meter electricity Positive pressure is normal.Then by the second auxiliary current in each electric current Wiring module IX, If2 is dialled to the right in flakes, is shorted No. 3 current terminals Upper tie point, the current loop of load management terminal is in short-circuit condition at this time, but the current loop of electric energy meter is unaffected, also It is to say that electric energy meter still is able to operate normally and measure electric energy, and load management terminal decompression, defluidization carry out more electric energy meter It changes.
Further, when needing while replacing electric energy meter and load management terminal, in each voltage link module UX First voltage U2 disconnects the three-phase voltage of electric energy meter and load management terminal simultaneously to setting aside in flakes for U1 and second voltage in flakes Circuit, then by the first auxiliary current, If1 is dialled to the left in flakes, and by the second auxiliary current, If2 is dialled to the right in flakes, is made electric energy meter and is born The current loop of lotus management terminal is in short-circuit condition, electric energy meter, load management terminal decompression, defluidization, but does not influence once to set Standby operating status, can be replaced at this time.
This application provides a kind of electrical energy measurement test connecting boxes, comprising: box body and box cover are equipped in box body respectively with the One meter, the second meter and current transformer connection multiple electric current Wiring modules, be additionally provided with respectively with the first meter, the second table Meter and multiple voltage link modules of voltage transformer connection;Each voltage link module includes that first voltage is electric with second in flakes In flakes, the first meter connect with voltage transformer in flakes by first voltage pressure, the second meter pass through second voltage in flakes with electricity Press mutual inductor connection;Each electric current Wiring module include the first electric current in flakes with multiple auxiliary currents in flakes, each auxiliary current In flakes for the short circuit of current loop in replacement object table timing control target meter, object table is calculated as the first meter and/or the Two meters.
In practical applications, using the scheme of the application, in voltage link module, every phase voltage circuit is provided with muti-piece Voltage in flakes, controls the on-off of different circuit respectively, in replacement object table timing, disconnects any voltage in flakes, does not influence other The power supply in meter circuit, in electric current Wiring module, setting auxiliary current in flakes, guarantees only to make mesh in replacement object table timing The short circuit of current loop for marking meter, does not influence the current loop of other meters, thus realize charged for replacement object table timing, other Meter does not have electric quantity loss, and accurate measurement.
Referring to figure 4., Fig. 4 is a kind of step flow chart of target meter replacing options provided herein, comprising:
Step 1: determining target meter;
Step 2: when object table is calculated as the first meter, by the first voltage of each voltage link module in flakes to setting aside, To disconnect the three-phase voltage circuit of the first meter, stirs auxiliary current corresponding with the first meter in each electric current Wiring module and connect Piece, so that the short circuit of current loop of the first meter, executes step 4;
Step: 3: when object table is calculated as the second meter, by the second voltage of each voltage link module in flakes to setting aside, To disconnect the three-phase voltage circuit of the second meter, stirs auxiliary current corresponding with the second meter in each electric current Wiring module and connect Piece, so that the short circuit of current loop of the second meter, executes step 4;
Step 4: replacement target meter.
Embodiment as one preferred, electrical energy measurement test connecting box be phase three-wire three electrical energy measurement test connecting box or Three-phase and four-line electrical energy measurement test connecting box;
When electrical energy measurement test connecting box is phase three-wire three electrical energy measurement test connecting box, the electrical energy measurement test connection Box includes two electric current Wiring modules and three voltage link modules;
When electrical energy measurement test connecting box is three-phase and four-line electrical energy measurement test connecting box, the electrical energy measurement test connection Box includes three electric current Wiring modules and four voltage link modules.
A kind of target meter replacing options provided herein have identical with above-mentioned electric energy metering device beneficial to effect Fruit.
Above-described embodiment is please referred to for a kind of introduction of target meter replacing options provided herein, the application exists This is repeated no more.
Correspondingly, present invention also provides a kind of electric energy metering device, the electrical energy measurement examination including any one such as above Test terminal box.
A kind of electrical energy measurement test connecting box provided herein has identical with above-mentioned electric energy metering device beneficial Effect.
Above-described embodiment, the application are please referred to for a kind of introduction of electrical energy measurement test connecting box provided herein Details are not described herein.
It should also be noted that, in the present specification, relational terms such as first and second and the like be used merely to by One entity or operation are distinguished with another entity or operation, without necessarily requiring or implying these entities or operation Between there are any actual relationship or orders.Moreover, the terms "include", "comprise" or its any other variant meaning Covering non-exclusive inclusion, so that the process, method, article or equipment for including a series of elements not only includes that A little elements, but also including other elements that are not explicitly listed, or further include for this process, method, article or The intrinsic element of equipment.In the absence of more restrictions, the element limited by sentence "including a ...", is not arranged Except there is also other identical elements in the process, method, article or apparatus that includes the element.
The foregoing description of the disclosed embodiments makes professional and technical personnel in the field can be realized or use the application. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the application.Therefore, the application It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (8)

1. a kind of electrical energy measurement test connecting box characterized by comprising box body and box cover, be equipped in the box body respectively with First meter, the second meter and current transformer connection multiple electric current Wiring modules, be additionally provided with respectively with first meter, Second meter and multiple voltage link modules of voltage transformer connection;
Each voltage link module include first voltage in flakes with second voltage in flakes, first meter passes through described the One voltage is connect with the voltage transformer in flakes, second meter by the second voltage in flakes with the mutual induction of voltage Device connection;
Each electric current Wiring module include the first electric current in flakes with multiple auxiliary currents in flakes, each auxiliary current connects Piece is used to control the short circuit of current loop of the target meter in replacement object table timing, and the object table is calculated as first table Meter and/or second meter.
2. electrical energy measurement test connecting box according to claim 1, which is characterized in that each electric current Wiring module is also Including series current terminal, first meter is connected with second meter by the series current terminal.
3. electrical energy measurement test connecting box according to claim 2, which is characterized in that the multiple auxiliary current wraps in flakes Include the first auxiliary current in flakes with the second auxiliary current in flakes;
The No.1 current terminal of each electric current Wiring module and No. two current terminals are connected in flakes by first electric current, The first end of the current transformer is connected by the No.1 current terminal and No. two current terminals and first meter It connects, second meter is connected by No. three current terminals of the electric current Wiring module and the second end of the current transformer It connects;
First auxiliary current is set in flakes on the current terminal laterally adjacent with the No.1 current terminal, and described second is auxiliary Electric current is helped to be set on the current terminal laterally adjacent with No. three current terminals in flakes.
4. electrical energy measurement test connecting box according to claim 3, which is characterized in that the series current terminal is set to institute It states between No.1 current terminal and No. three current terminals.
5. electrical energy measurement test connecting box according to any one of claims 1-4, which is characterized in that the electrical energy measurement Test connecting box is phase three-wire three electrical energy measurement test connecting box or three-phase and four-line electrical energy measurement test connecting box;
When the electrical energy measurement test connecting box is the phase three-wire three electrical energy measurement test connecting box, electrical energy measurement test Terminal box includes two electric current Wiring modules and three voltage link modules;
When the electrical energy measurement test connecting box is the three-phase and four-line electrical energy measurement test connecting box, electrical energy measurement test Terminal box includes three electric current Wiring modules and four voltage link modules.
6. a kind of target meter replacing options, which is characterized in that applied to the electric energy meter as described in claim 1-5 any one Measure test connecting box, comprising:
When object table is calculated as the first meter, by the first voltage of each voltage link module in flakes to setting aside, described in disconnecting The three-phase voltage circuit of first meter is stirred auxiliary current corresponding with first meter in each electric current Wiring module and is connected Piece, so that the short circuit of current loop of first meter;
When object table is calculated as the second meter, by the second voltage of each voltage link module in flakes to setting aside, described in disconnecting The three-phase voltage circuit of second meter is stirred auxiliary current corresponding with second meter in each electric current Wiring module and is connected Piece, so that the short circuit of current loop of second meter.
7. target meter replacing options according to claim 6, which is characterized in that the electrical energy measurement test connecting box is Phase three-wire three electrical energy measurement test connecting box or three-phase and four-line electrical energy measurement test connecting box;
When the electrical energy measurement test connecting box is the phase three-wire three electrical energy measurement test connecting box, electrical energy measurement test Terminal box includes two electric current Wiring modules and three voltage link modules;
When the electrical energy measurement test connecting box is the three-phase and four-line electrical energy measurement test connecting box, electrical energy measurement test Terminal box includes three electric current Wiring modules and four voltage link modules.
8. a kind of electric energy metering device, which is characterized in that including the electrical energy measurement test as described in claim 1-5 any one Terminal box.
CN201910568275.8A 2019-06-27 2019-06-27 Electrical energy measurement test connecting box, target meter replacing options and electric energy metering device Pending CN110118885A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910568275.8A CN110118885A (en) 2019-06-27 2019-06-27 Electrical energy measurement test connecting box, target meter replacing options and electric energy metering device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910568275.8A CN110118885A (en) 2019-06-27 2019-06-27 Electrical energy measurement test connecting box, target meter replacing options and electric energy metering device

Publications (1)

Publication Number Publication Date
CN110118885A true CN110118885A (en) 2019-08-13

Family

ID=67524571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910568275.8A Pending CN110118885A (en) 2019-06-27 2019-06-27 Electrical energy measurement test connecting box, target meter replacing options and electric energy metering device

Country Status (1)

Country Link
CN (1) CN110118885A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110726859A (en) * 2019-10-31 2020-01-24 国网山东省电力公司济宁供电公司 Switching device for continuously metering during live replacement of electric energy meter and electric energy meter replacement method
CN112924732A (en) * 2021-01-29 2021-06-08 广东电网有限责任公司 Metering device external member and metering system
CN113721183A (en) * 2021-08-31 2021-11-30 国网重庆市电力公司营销服务中心 Modular functional plug suitable for plug-in type test junction box and use method
CN114280342A (en) * 2021-12-23 2022-04-05 广东电网有限责任公司 Test junction box and method for replacing electric energy metering device
CN115754397A (en) * 2022-10-31 2023-03-07 云南电网有限责任公司昆明供电局 Multifunctional testing system and method for seamlessly connecting high-precision calculation of electric quantity

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102798743A (en) * 2012-08-29 2012-11-28 重庆市电力公司电力科学研究院 Wiring terminal box for electric energy meter
CN204556692U (en) * 2015-05-06 2015-08-12 广东电网有限责任公司江门供电局 Multiple way electric metering junction box
CN109696573A (en) * 2018-12-10 2019-04-30 云南电网有限责任公司临沧供电局 A kind of Combined Trials terminal box
CN210181109U (en) * 2019-06-27 2020-03-24 南方电网科学研究院有限责任公司 Electric energy metering test junction box and electric energy metering device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102798743A (en) * 2012-08-29 2012-11-28 重庆市电力公司电力科学研究院 Wiring terminal box for electric energy meter
CN204556692U (en) * 2015-05-06 2015-08-12 广东电网有限责任公司江门供电局 Multiple way electric metering junction box
CN109696573A (en) * 2018-12-10 2019-04-30 云南电网有限责任公司临沧供电局 A kind of Combined Trials terminal box
CN210181109U (en) * 2019-06-27 2020-03-24 南方电网科学研究院有限责任公司 Electric energy metering test junction box and electric energy metering device

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110726859A (en) * 2019-10-31 2020-01-24 国网山东省电力公司济宁供电公司 Switching device for continuously metering during live replacement of electric energy meter and electric energy meter replacement method
CN110726859B (en) * 2019-10-31 2022-01-21 国网山东省电力公司济宁供电公司 Switching device for continuously metering during live replacement of electric energy meter and electric energy meter replacement method
CN112924732A (en) * 2021-01-29 2021-06-08 广东电网有限责任公司 Metering device external member and metering system
CN113721183A (en) * 2021-08-31 2021-11-30 国网重庆市电力公司营销服务中心 Modular functional plug suitable for plug-in type test junction box and use method
CN113721183B (en) * 2021-08-31 2023-12-01 国网重庆市电力公司营销服务中心 Modularized functional plug suitable for plug-in test junction box and use method
CN114280342A (en) * 2021-12-23 2022-04-05 广东电网有限责任公司 Test junction box and method for replacing electric energy metering device
CN114280342B (en) * 2021-12-23 2023-08-11 广东电网有限责任公司 Test junction box and method for replacing electric energy metering device
CN115754397A (en) * 2022-10-31 2023-03-07 云南电网有限责任公司昆明供电局 Multifunctional testing system and method for seamlessly connecting high-precision calculation of electric quantity
CN115754397B (en) * 2022-10-31 2023-12-05 云南电网有限责任公司昆明供电局 Multifunctional testing system and method for seamless connection high-precision electric quantity calculation

Similar Documents

Publication Publication Date Title
CN110118885A (en) Electrical energy measurement test connecting box, target meter replacing options and electric energy metering device
CN204556692U (en) Multiple way electric metering junction box
Cividino Power factor, harmonic distortion; causes, effects and considerations
CN109507459A (en) Standard electric signal creating method, device and accuracy checking method of one or two fusion switchgears and system
CN211296072U (en) Junction box for realizing seamless measurement of electric energy meter replacement
EP2733809A2 (en) Power quality control
CN103197259B (en) Photovoltaic DC-to-AC converter testing apparatus
CN106443561B (en) Integral inspection method and device for electric energy metering device with voltage of 35kV or below
US20150270057A1 (en) Iterative Transformers With Complex Triple Windings And Systems For Reducing Electrical Consumption Using The Iterative Transformers
CN111044828A (en) Three-phase transformer winding parameter online monitoring method based on positive and negative sequence equations
CN107912059A (en) The switching device operating method of switching device, test device and transformer measuring device
CN210323153U (en) Take device of three-phase four-wire electric energy measurement
RU2557368C2 (en) Transformer linearisation method and device
CN209014614U (en) A kind of double no-load voltage ratio electric energy metering combined wiring boxes
CN104237835A (en) Wiring detection device for straight-through current transformer
CN104521129B (en) Inverter in parallel on choke
CN210181109U (en) Electric energy metering test junction box and electric energy metering device
CN102624102A (en) Power supplying circuit and power supplying method for chain-type SVG (static var generator) modules
CN115356676A (en) Phase line and zero line synchronous calibration method for single-phase ammeter
CN205898978U (en) Exchange inverter motor test device
US20200295669A1 (en) Rectifier arrangement
CN105229759B (en) For the equipment of the unidirectional flux component in the magnetic core for reducing transformer
CN111239512A (en) Electromagnetic compatibility test system suitable for power equipment
CN206470342U (en) Temperature measurement system and REgulatable reactor
CN204479622U (en) A kind of three-phase three-winding transformer three side cooperation temperature rise test wiring

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination