CN110118013A - A kind of civic building construction scaffold height adjustment mechanism - Google Patents
A kind of civic building construction scaffold height adjustment mechanism Download PDFInfo
- Publication number
- CN110118013A CN110118013A CN201910545979.3A CN201910545979A CN110118013A CN 110118013 A CN110118013 A CN 110118013A CN 201910545979 A CN201910545979 A CN 201910545979A CN 110118013 A CN110118013 A CN 110118013A
- Authority
- CN
- China
- Prior art keywords
- fixed
- fixedly connected
- fixed block
- fixed column
- fixing pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/18—Scaffolds primarily resting on the ground adjustable in height
- E04G1/22—Scaffolds having a platform on an extensible substructure, e.g. of telescopic type or with lazy-tongs mechanism
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/24—Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/24—Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
- E04G2001/242—Scaffolds movable on wheels or tracks
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/24—Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
- E04G2001/248—Inclined struts
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Ladders (AREA)
Abstract
The invention discloses a kind of civic building construction scaffold height adjustment mechanisms, including scaffold board, the two sides of the scaffold board are fixedly connected to fixing pipe, bottom inside the fixing pipe is connected with fixed column, the bottom of the fixed pipe surface is arranged with sliding equipment, and the bottom of the fixed column is fixedly connected with the first fixed plate.The present invention passes through setting scaffold board, fixing pipe, fixed column, sliding equipment, casing, first fixed link, second fixed link, first fixed plate, second fixed plate, idler wheel, first fixed block, kelly, fixed mechanism, second fixed block, third fixed link, third fixed block and rivet are used cooperatively, solving existing scaffold in use can not be to being highly adjusted, it can not adapt to varying environment, to cause scaffold inconvenient problem with use, civic building construction scaffold height adjustment mechanism, has the advantages of facilitating adjusting, improve the practicability of scaffold.
Description
Technical field
The present invention relates to ++ technical field, specially a kind of civic building construction scaffold height adjustment mechanism.
Background technique
Scaffold refer to construction site be worker operation and solving vertically and horizontally transport and the various brackets set up, architecture field
Generic term, refer on construction site be used in exterior wall, interior decoration or the higher place that can not directly construct of layer height, mainly for
Construction personnel works up and down or perimeter security net is gone along with sb. to guard him and high-altitude installation component etc..
Site construction needs use scaffold, but existing scaffold in use can not be to highly adjusting
Section, can not adapt to varying environment, so that the phenomenon for causing scaffold inconvenient to use, reduces the practicability of scaffold.
Summary of the invention
The purpose of the present invention is to provide a kind of civic building construction scaffold height adjustment mechanisms, have and facilitate adjusting
The advantages of, varying environment can not can not be adapted to being highly adjusted in use by solving existing scaffold, thus
Cause scaffold inconvenient problem with use.
To achieve the above object, the invention provides the following technical scheme: a kind of civic building construction scaffold height tune
Mechanism is saved, including scaffold board, the two sides of the scaffold board are fixedly connected to fixing pipe, the bottom activity inside the fixing pipe
It is connected with fixed column, the bottom of the fixed pipe surface is arranged with sliding equipment, and the bottom of the fixed column is fixedly connected with
One fixed plate, the bottom of first fixed plate are provided with the second fixed plate, and the bottom of second fixed plate is fixedly connected with
Idler wheel, the two sides of the fixed column are provided with the first fixed block, and the top of first fixed block and the bottom of fixing pipe are solid
Fixed connection, the internal activity of first fixed block are connected with kelly, and the kelly runs through fixed column close to the side of fixed column
And the inside of fixed column is extended to, the fixing pipe is fixedly connected with fixed mechanism far from the side of scaffold board.
Preferably, the sliding equipment includes casing, and the inner wall of described sleeve pipe is flexibly connected with the bottom of fixed pipe surface,
The two sides of described sleeve pipe bottom are fixedly connected to the first fixed link, and it is solid that the bottom of first fixed link is fixedly connected with second
Fixed pole, second fixed link are fixedly connected close to the side of fixed column with the surface of fixed column.
Preferably, the fixed mechanism includes the second fixed block, and second fixed block is close to the side of fixing pipe and solid
The surface for determining pipe is fixedly connected, and the front of second fixed block is connected with third fixed link, the third by shaft
The bottom at the fixed link back side is connected with third fixed block by the second shaft, is provided with riveting at the top of the third fixed block
The bottom of nail, the rivet runs through third fixed block and extends to the bottom of third fixed block.
Preferably, sliding block is fixedly connected at the top of the fixed column, the surface of the sliding block and the inner wall of fixing pipe are living
Dynamic connection.
Preferably, the surface of the fixed column is arranged with fixing sleeve, side of the fixing sleeve far from fixed column surface with
The inner wall of fixing pipe is fixedly connected.
Preferably, the kelly is fixedly connected with the 4th fixed block, the surface set of the kelly far from the side of fixed column
Equipped with tension spring, the tension spring is fixedly connected close to the side of the first fixed block with the surface of the first fixed block, and the tension spring is separate
The side of first fixed block is fixedly connected with the surface of the 4th fixed block.
Preferably, the surface of the fixed column offers the card slot that cooperation kelly uses, and the quantity of the card slot is several
It is a, and it is evenly distributed on the surface of fixed column.
Preferably, the surrounding at the top of first fixed plate is provided with fixing bolt, and the bottom of the fixing bolt is passed through
The first fixed plate and the second fixed plate and the bottom for extending to the second fixed plate are worn, first fixed plate and the second fixed plate are logical
Fixing bolt is crossed to be fixedly connected.
Compared with prior art, beneficial effects of the present invention are as follows:
1, the present invention is consolidated by setting scaffold board, fixing pipe, fixed column, sliding equipment, casing, the first fixed link, second
Fixed pole, the first fixed plate, the second fixed plate, idler wheel, the first fixed block, kelly, fixed mechanism, the second fixed block, third are fixed
Bar, third fixed block and rivet are used cooperatively, and solving existing scaffold in use can not be to highly adjusting
Section, can not adapt to varying environment, so that scaffold inconvenient problem with use is caused, the civic building construction scaffold height
Regulating mechanism has the advantages of facilitating adjusting, improves the practicability of scaffold.
2, the present invention includes casing by the way that sliding equipment is arranged, and the bottom activity of the inner wall of casing and fixed pipe surface connects
It connecing, the two sides of sleeve bottom are fixedly connected to the first fixed link, and the bottom of the first fixed link is fixedly connected with the second fixed link,
Second fixed link is fixedly connected close to the side of fixed column with the surface of fixed column, can effectively increase the stabilization of the first fixed plate
Property, the shaking of the first fixed plate is reduced, the stuck of structure is avoided, facilitates the adjusting of structure.
3, the present invention includes the second fixed block, side and fixing pipe of second fixed block close to fixing pipe by fixed mechanism
Surface be fixedly connected, the front of the second fixed block is connected with third fixed link by shaft, the third fixed link back side
Bottom is connected with third fixed block by the second shaft, and rivet is provided at the top of third fixed block, and the bottom of rivet is passed through
It wears third fixed block and extends to the bottom of third fixed block, the stability of fixing pipe can be effectively increased, reduce fixing pipe
It shakes, avoids the stuck of structure, facilitate the fixation of structure, it is user-friendly, increase the safety that device uses.
4, the present invention is connected by being fixedly connected with sliding block, the surface of sliding block and the inner wall activity of fixing pipe at the top of fixed column
It connects, the stability that fixed column moves up and down can be effectively increased, reduce the shaking of fixed column, facilitate the adjusting of fixed column.
5, the present invention is arranged with fixing sleeve, side and fixation of the fixing sleeve far from fixed column surface by the surface of fixed column
The inner wall of pipe is fixedly connected, and can be avoided the phenomenon that fixed column is shaken, and is avoided fixed column from occurring stuck, is facilitated the biography of structure
It is dynamic.
6, the present invention is fixedly connected with the 4th fixed block far from the side of fixed column by kelly, and the surface of kelly is arranged with
Tension spring, tension spring are fixedly connected close to the side of the first fixed block with the surface of the first fixed block, and tension spring is far from the first fixed block
Side is fixedly connected with the surface of the 4th fixed block, can facilitate the clamping of kelly, avoids the loosening of structure, facilitates consolidating for structure
It is fixed, increase the stability that device uses, convenient for users to operation.
7, the present invention offers the card slot that cooperation kelly uses by the surface of fixed column, and the quantity of card slot is several,
And it is evenly distributed on the surface of fixed column, the fixed flexibility of kelly can be effectively increased, the fixation of structure is facilitated, increases device
Practicability.
8, the present invention is provided with fixing bolt by the surrounding at the top of the first fixed plate, and the bottom of fixing bolt runs through the
One fixed plate and the second fixed plate and the bottom for extending to the second fixed plate, the first fixed plate and the second fixed plate pass through fixed spiral shell
Bolt is fixedly connected, and can facilitate the fixation of the first fixed plate and the second fixed plate, is increased the stability that device uses, is avoided idler wheel
Loosening, facilitate the movement of device.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is the partial enlarged view of structure of the invention A;
Fig. 3 is the partial enlarged view of structure of the invention B;
Fig. 4 is the partial enlarged view of structure of the invention C;
Fig. 5 is the perspective view of structure of the invention sliding equipment;
Fig. 6 is the perspective view of structure of the invention kelly.
In figure: 1 scaffold board, 2 fixing pipes, 3 fixed columns, 4 sliding equipments, 401 casings, 402 first fixed links, 403 second
Fixed link, 5 first fixed plates, 6 second fixed plates, 7 idler wheels, 8 first fixed blocks, 9 kellies, 10 fixed mechanisms, 1,001 second are consolidated
Determine block, 1002 third fixed links, 1003 third fixed blocks, 1004 rivets, 11 sliding blocks, 12 fixing sleeves, 13 the 4th fixed blocks, 14 drawings
Spring, 15 card slots, 16 fixing bolts.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig. 1-6, a kind of civic building construction scaffold height adjustment mechanism, including scaffold board 1, scaffold board 1
Two sides be fixedly connected to fixing pipe 2, the bottom inside fixing pipe 2 is connected with fixed column 3, as shown in connection with fig. 2, fixed
The top of column 3 is fixedly connected with sliding block 11, and the surface of sliding block 11 is flexibly connected with the inner wall of fixing pipe 2, by the way that sliding block 11 is arranged,
The stability that fixed column 3 moves up and down can be effectively increased, the shaking of fixed column 3 is reduced, facilitates the adjusting of fixed column 3, in conjunction with
Shown in Fig. 3, the surface of fixed column 3 is arranged with fixing sleeve 12, side of the fixing sleeve 12 far from 3 surface of fixed column and fixing pipe 2
Inner wall is fixedly connected, and by the way that fixing sleeve 12 is arranged, can be avoided the phenomenon that fixed column 3 is shaken, fixed column 3 is avoided to block
Extremely, facilitating the transmission of structure, the bottom on 2 surface of fixing pipe is arranged with sliding equipment 4, in conjunction with shown in Fig. 4 and Fig. 5, sliding equipment 4
Including casing 401, the inner wall of casing 401 is flexibly connected with the bottom on 2 surface of fixing pipe, and the two sides of 401 bottom of casing are fixed
It is connected with the first fixed link 402, the bottom of the first fixed link 402 is fixedly connected with the second fixed link 403, the second fixed link 403
Side close to fixed column 3 is fixedly connected with the surface of fixed column 3, and by the way that sliding equipment 4 is arranged, it is solid can to effectively increase first
The stability of fixed board 5 reduces the shaking of the first fixed plate 5, avoids the stuck of structure, facilitate the adjusting of structure, the bottom of fixed column 3
Portion is fixedly connected with the first fixed plate 5, and the bottom of the first fixed plate 5 is provided with the second fixed plate 6, the bottom of the second fixed plate 6
It is fixedly connected with idler wheel 7, as shown in connection with fig. 4, the surrounding at 5 top of the first fixed plate is provided with fixing bolt 16, fixing bolt
16 bottom is through the first fixed plate 5 and the second fixed plate 6 and the bottom for extending to the second fixed plate 6, the first fixed plate 5 and the
Two fixed plates 6 are fixedly connected by fixing bolt 16, by the way that fixing bolt 16 is arranged, can facilitate the first fixed plate 5 and second
The fixation of fixed plate 6 increases the stability that uses of device, avoids the loosening of idler wheel 7, facilitates the movement of device, and the two of fixed column 3
Side is provided with the first fixed block 8, and the top of the first fixed block 8 is fixedly connected with the bottom of fixing pipe 2, the first fixed block 8
Internal activity is connected with kelly 9, and as shown in connection with fig. 3, kelly 9 is fixedly connected with the 4th fixed block 13 far from the side of fixed column 3,
The surface of kelly 9 is arranged with tension spring 14, and tension spring 14 is close to the fixed company in the side of the first fixed block 8 and the surface of the first fixed block 8
It connects, tension spring 14 is fixedly connected far from the side of the first fixed block 8 with the surface of the 4th fixed block 13, by the way that the 4th fixed block is arranged
13 and tension spring 14, the clamping of kelly 9 can be facilitated, avoid the loosening of structure, facilitate the fixation of structure, increase device use it is steady
It is qualitative, convenient for users to operation, kelly 9 through fixed column 3 and extends to the inside of fixed column 3 close to the side of fixed column 3,
As shown in connection with fig. 3, the surface of fixed column 3 offers the card slot 15 that cooperation kelly 9 uses, and the quantity of card slot 15 is several, and
It is evenly distributed on the surface of fixed column 3, by the way that card slot 15 is arranged, the fixed flexibility of kelly 9 can be effectively increased, facilitate structure
Fixation, increase the practicability of device, fixing pipe 2 is fixedly connected with fixed mechanism 10 far from the side of scaffold board 1, in conjunction with Fig. 1
Shown, fixed mechanism 10 includes the second fixed block 1001, side and fixing pipe 2 of second fixed block 1001 close to fixing pipe 2
Surface is fixedly connected, and the front of the second fixed block 1001 is connected with third fixed link 1002, third fixed link by shaft
The bottom at 1002 back sides is connected with third fixed block 1003 by the second shaft, and the top of third fixed block 1003 is provided with
The bottom of rivet 1004, rivet 1004 runs through third fixed block 1003 and extends to the bottom of third fixed block 1003, by setting
Fixed mechanism 10 is set, the stability of fixing pipe 2 can be effectively increased, the shaking of fixing pipe 2 is reduced, avoids the stuck of structure, side
Just the fixation of structure, it is user-friendly, increase the safety that device uses.
In use, pulling the 4th fixed block 13 to two sides, the 4th fixed block 13 drives card when user needs to adjust height
Bar 9 is mobile, and kelly 9 is made to be detached from the inside of fixed column 3, when kelly 9 is detached from the inside of fixed column 3, moves up and down fixed column 3,
Fixed column 3 is moved up and down with movable slider 11, makes sliding block 11 in the internal slide of fixing pipe 2, and fixed column 3 drives the first fixed plate 5
It moves up and down, the first fixed plate 5 drives the second fixed plate 6 to move up and down, and the second fixed plate 6 drives idler wheel 7 to move up and down, and works as tune
When saving suitable position, the 4th fixed block 13 is unclamped, tension spring 14 pulls the 4th fixed block 13, and the 4th fixed block 13 drives kelly 9
It is close to each other, so that kelly 9 is snapped onto the inside of fixed column 3, completes the fixation of fixed column 3, when fixed column 3 moves up and down, Gu
Fixed column 3 drives the second fixed link 403 to move up and down, and the second fixed link 403 drives the first fixed link 402 to move up and down, and first is solid
Fixed pole 402 drives casing 401 to move up and down, and slides casing 401 on the surface of fixing pipe 2, increases what fixed column 3 moved up and down
Stability rotates third fixed link 1002 when fixing pipe 2 needs to support, and turns third fixed link 1002 around first rotating shaft
Dynamic, third fixed link 1002 drives third fixed block 1003 mobile by the second shaft, connects third fixed block 1003 with ground
Touching presses down on rivet 1004, and rivet 1004 is made to be inserted into ground, completes the fixation of fixing pipe 2, improves the practical of scaffold
Property.
In summary: the civic building construction use scaffold height adjustment mechanism, by setting scaffold board 1, fixing pipe 2,
Fixed column 3, sliding equipment 4, casing 401, the first fixed link 402, the second fixed link 403, the first fixed plate 5, the second fixed plate
6, idler wheel 7, the first fixed block 8, kelly 9, fixed mechanism 10, the second fixed block 1001, third fixed link 1002, third fixed block
1003 and rivet 1004 be used cooperatively, solving existing scaffold in use can not be to being highly adjusted, nothing
Method adapts to varying environment, to cause scaffold inconvenient problem with use.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (8)
1. a kind of civic building construction scaffold height adjustment mechanism, including scaffold board (1), it is characterised in that: the foot hand
The two sides of plate (1) are fixedly connected to fixing pipe (2), and the internal bottom of the fixing pipe (2) is connected with fixed column (3),
The bottom on fixing pipe (2) surface is arranged with sliding equipment (4), and it is solid that the bottom of the fixed column (3) is fixedly connected with first
The bottom of fixed board (5), first fixed plate (5) is provided with the second fixed plate (6), and the bottom of second fixed plate (6) is solid
Surely it is connected with idler wheel (7), the two sides of the fixed column (3) are provided with the first fixed block (8), first fixed block (8)
Top is fixedly connected with the bottom of fixing pipe (2), and the internal activity of first fixed block (8) is connected with kelly (9), the card
Bar (9) runs through fixed column (3) close to the side of fixed column (3) and extends to the inside of fixed column (3), and the fixing pipe (2) is remote
Side from scaffold board (1) is fixedly connected with fixed mechanism (10).
2. a kind of civic building construction scaffold height adjustment mechanism according to claim 1, it is characterised in that: described
Sliding equipment (4) includes casing (401), and the inner wall of described sleeve pipe (401) is flexibly connected with the bottom on fixing pipe (2) surface, institute
The two sides for stating casing (401) bottom are fixedly connected to the first fixed link (402), and the bottom of first fixed link (402) is solid
Surely it is connected with the second fixed link (403), second fixed link (403) is close to the side of fixed column (3) and the table of fixed column (3)
Face is fixedly connected.
3. a kind of civic building construction scaffold height adjustment mechanism according to claim 1, it is characterised in that: described
Fixed mechanism (10) includes the second fixed block (1001), and second fixed block (1001) is close to the side of fixing pipe (2) and solid
The surface of fixed pipe (2) is fixedly connected, and the front of second fixed block (1001) is connected with third fixed link by shaft
(1002), the bottom at third fixed link (1002) back side is connected with third fixed block (1003) by the second shaft,
It is provided with rivet (1004) at the top of the third fixed block (1003), third fixed block is run through in the bottom of the rivet (1004)
(1003) and the bottoms of third fixed block (1003) is extended to.
4. a kind of civic building construction scaffold height adjustment mechanism according to claim 1, it is characterised in that: described
It is fixedly connected at the top of fixed column (3) sliding block (11), the inner wall activity on the surface and fixing pipe (2) of the sliding block (11) connects
It connects.
5. a kind of civic building construction scaffold height adjustment mechanism according to claim 1, it is characterised in that: described
The surface of fixed column (3) is arranged with fixing sleeve (12), side and fixing pipe of the fixing sleeve (12) far from fixed column (3) surface
(2) inner wall is fixedly connected.
6. a kind of civic building construction scaffold height adjustment mechanism according to claim 1, it is characterised in that: described
Kelly (9) is fixedly connected with the 4th fixed block (13) far from the side of fixed column (3), and the surface of the kelly (9) is arranged with drawing
Spring (14), the tension spring (14) is fixedly connected close to the side of the first fixed block (8) with the surface of the first fixed block (8), described
Tension spring (14) is fixedly connected far from the side of the first fixed block (8) with the surface of the 4th fixed block (13).
7. a kind of civic building construction scaffold height adjustment mechanism according to claim 1, it is characterised in that: described
The surface of fixed column (3) offers the card slot (15) that cooperation kelly (9) uses, and the quantity of the card slot (15) is several, and
It is evenly distributed on the surface of fixed column (3).
8. a kind of civic building construction scaffold height adjustment mechanism according to claim 1, it is characterised in that: described
Surrounding at the top of first fixed plate (5) is provided with fixing bolt (16), and the bottom of the fixing bolt (16) is solid through first
Fixed board (5) and the second fixed plate (6) and the bottom for extending to the second fixed plate (6), first fixed plate (5) and second are fixed
Plate (6) is fixedly connected by fixing bolt (16).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910545979.3A CN110118013A (en) | 2019-06-23 | 2019-06-23 | A kind of civic building construction scaffold height adjustment mechanism |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910545979.3A CN110118013A (en) | 2019-06-23 | 2019-06-23 | A kind of civic building construction scaffold height adjustment mechanism |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110118013A true CN110118013A (en) | 2019-08-13 |
Family
ID=67524350
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910545979.3A Pending CN110118013A (en) | 2019-06-23 | 2019-06-23 | A kind of civic building construction scaffold height adjustment mechanism |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110118013A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110805249A (en) * | 2019-11-15 | 2020-02-18 | 江苏优美特工程技术有限公司 | Indoor scaffold with protection structure |
CN112962942A (en) * | 2021-02-08 | 2021-06-15 | 广东省美术设计装修工程有限公司 | Height-adjustable scaffold for interior decoration |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103046729A (en) * | 2012-12-25 | 2013-04-17 | 袁士风 | Foldable scaffold |
CN205369884U (en) * | 2015-12-03 | 2016-07-06 | 无锡市晨源建筑器材有限公司 | High support base of security for construction scaffolding |
CN206753001U (en) * | 2017-04-01 | 2017-12-15 | 广州原点建设工程有限公司 | A kind of scaffold of moveable belt track |
CN208072912U (en) * | 2018-04-08 | 2018-11-09 | 驻马店职业技术学院 | A kind of Easy opened scaffold that construction site auxiliary is built |
CN108843006A (en) * | 2018-07-17 | 2018-11-20 | 合肥静美图文科技有限公司 | Scaffold is used in a kind of decoration of foldable indoor |
-
2019
- 2019-06-23 CN CN201910545979.3A patent/CN110118013A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103046729A (en) * | 2012-12-25 | 2013-04-17 | 袁士风 | Foldable scaffold |
CN205369884U (en) * | 2015-12-03 | 2016-07-06 | 无锡市晨源建筑器材有限公司 | High support base of security for construction scaffolding |
CN206753001U (en) * | 2017-04-01 | 2017-12-15 | 广州原点建设工程有限公司 | A kind of scaffold of moveable belt track |
CN208072912U (en) * | 2018-04-08 | 2018-11-09 | 驻马店职业技术学院 | A kind of Easy opened scaffold that construction site auxiliary is built |
CN108843006A (en) * | 2018-07-17 | 2018-11-20 | 合肥静美图文科技有限公司 | Scaffold is used in a kind of decoration of foldable indoor |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110805249A (en) * | 2019-11-15 | 2020-02-18 | 江苏优美特工程技术有限公司 | Indoor scaffold with protection structure |
CN112962942A (en) * | 2021-02-08 | 2021-06-15 | 广东省美术设计装修工程有限公司 | Height-adjustable scaffold for interior decoration |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110118013A (en) | A kind of civic building construction scaffold height adjustment mechanism | |
CN110301332A (en) | A kind of town road greenbelt automatic irrigation device | |
CN109654354A (en) | A kind of multifunction wall hanging display device | |
CN209011517U (en) | A kind of height-adjustable building construction scaffold | |
CN207489382U (en) | A kind of LED display being convenient for changing | |
CN219409202U (en) | Multipurpose bracket structure for aerial working platform | |
CN108506689A (en) | A kind of computer display holder device | |
CN210508300U (en) | Building platform convenient to use and capable of stretching | |
CN207878899U (en) | A kind of fall arrest construction holder | |
CN206957084U (en) | The adjustable stair of riser height and the assembled architecture with the stair | |
CN210810131U (en) | Combined apartment bed | |
CN210889589U (en) | Multimedia information display system | |
CN209570143U (en) | A kind of tuning net monitor station | |
CN210056406U (en) | Fracture positioning hanging ring | |
CN209671911U (en) | A kind of computer monitor of slidingtype | |
CN215569547U (en) | Telescopic suspender convenient to move | |
CN213165330U (en) | Instrument rack is used in afforestation construction | |
CN210274982U (en) | Shock attenuation electron radiator for electronic components | |
CN221896399U (en) | Engineering partition board convenient to assemble and disassemble | |
CN220175457U (en) | Medicine changing cart for mental health center | |
CN220477357U (en) | Airport counter | |
CN108861306A (en) | A kind of transport establishment's blanking slide | |
CN207584314U (en) | A kind of camera lifting stent with guide rail | |
CN211788146U (en) | Protective equipment of oil well fracturing equipment | |
CN208574820U (en) | A kind of plastic part surface spray process fixed frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190813 |