CN110117965A - A kind of pin-connected panel anchor draws retaining wall and method - Google Patents

A kind of pin-connected panel anchor draws retaining wall and method Download PDF

Info

Publication number
CN110117965A
CN110117965A CN201810124275.4A CN201810124275A CN110117965A CN 110117965 A CN110117965 A CN 110117965A CN 201810124275 A CN201810124275 A CN 201810124275A CN 110117965 A CN110117965 A CN 110117965A
Authority
CN
China
Prior art keywords
rib column
breast boards
retaining wall
pin
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810124275.4A
Other languages
Chinese (zh)
Inventor
高雪池
宋修广
周磊生
张宏博
庄培芝
岳红亚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
Original Assignee
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University filed Critical Shandong University
Priority to CN201810124275.4A priority Critical patent/CN110117965A/en
Publication of CN110117965A publication Critical patent/CN110117965A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0266Retaining or protecting walls characterised by constructional features made up of preformed elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Retaining Walls (AREA)

Abstract

The invention discloses a kind of pin-connected panel anchors to draw retaining wall and method, it solves the problems, such as that supporting height is low in the prior art, stability is insufficient, with convenient for assembly transport, with environmentally protective, economical and efficient beneficial effect, its scheme is as follows: a kind of pin-connected panel anchor drawing retaining wall, including bottom plate, it is set to ground;Breast boards is set to bottom plate vertically, is provided with multiple drain holes;First rib column, set on the both ends of breast boards side, the first rib column and breast boards are connected, and the first rib column and breast boards are provided with the through-hole for anchor pole to be arranged;Anchor pole, passes through the first rib column and breast boards is arranged.

Description

A kind of pin-connected panel anchor draws retaining wall and method
Technical field
The present invention relates to field of road, draw retaining wall and method more particularly to a kind of pin-connected panel anchor.
Background technique
The fields such as retaining wall technology saves the area in highway construction, slope support engineering play an important role.Due to skill The advantages such as art technical maturity, save land significant effect, and stability is good, have broad application prospects.Traditional retaining wall is such as: gravity The structures such as formula retaining wall, cantilever retaining wall, anchor retaining wall have been widely used in engineering.With the hair of social economy Exhibition, highway construction is also towards quality, efficient, environmentally protective theory development.The construction of tradition retaining wall is still using existing at present The form that field builds or pours, therefore long construction period, resource consumption are big, and such retaining wall has one-time formed office It is sex-limited, it cannot reuse.It generally takes to fill on the spot in highway reconstruction and expansion and uses as roadbed or directly remove, cause The wasting of resources and environmental pollution, and can be greatly increased in the region of sandstone raw material scarcity newly-built retaining wall duration and cost, because How this realizes that the recycling of retaining wall is a problem to be solved.In recent years, occur some pin-connected panel retaining wall knots in succession Structure, it is assembled by prefabrication and construction site, realize the rapid construction and secondary use of retaining wall.
But existing pin-connected panel retaining wall also has certain limitation, is mainly manifested in: existing pin-connected panel retaining wall Supporting height is limited, can only increase structure size and material utilization amount when being applied to high-fill roadbed;Retaining wall wall is directly made With on ground, the compatible deformation of retaining wall can not be realized, when differential settlement occurs, be easy to produce biggish inside and answer Power is unfavorable for the homeostasis of structure;Retaining wall bottom does not have counter-force constraint, is easy to appear sliding rupture, causes the top soil body Slump.
Therefore, it is necessary to draw retaining wall to carry out new researching and designing on a kind of pin-connected panel anchor.
Summary of the invention
For overcome the deficiencies in the prior art, the present invention provides a kind of pin-connected panel anchors to draw retaining wall, which can It realizes the rapid construction of retaining wall, improves traditional pin-connected panel anchor and draw retaining wall supporting height and stability, convenient for assembly transport, tool There is environmentally protective, economical and efficient advantage.
A kind of concrete scheme of pin-connected panel anchor drawing retaining wall is as follows:
A kind of pin-connected panel anchor drawing retaining wall, comprising:
Bottom plate is set to ground;
Breast boards is set to bottom plate vertically, is provided with multiple drain holes;
First rib column, set on the both ends of breast boards side, the first rib column and breast boards are connected, and the first rib column and breast boards It is provided with the through-hole for anchor pole to be arranged;
Anchor pole, passes through the first rib column and breast boards is arranged.
By above-mentioned retaining wall structure setting, it can be achieved that quick assembling is constructed, and by the setting of bottom plate, earth-retaining is realized The compatible deformation of wall, and improve the stability of whole retaining wall;And can realize the fixation of anchor pole, further improve retaining wall Stability and supporting height.
Further, in order to improve the flexibility of retaining wall height, the breast boards includes multistage splice plate, and breast boards can Including the multistage spliced up and down, to improve the height of breast boards according to landform.
Further, the second rib column is set in the side of the stitching portion breast boards of the breast boards, the second rib column is equally set The through-hole is set, through-hole is equally used for the insertion of anchor pole, and anchor pole is obliquely installed, and inclination angle size is 3~5 °.
Further, the through hole of first rib column and the second rib column is respectively provided with the backing plate with aperture.
Further, end pedestal is arranged in the first rib column bottom, and the first rib column passes through end pedestal and the earth-retaining Plate connection, end pedestal can and the two bottom integrally manufactured with the first rib column be flush;
Further, the width of end pedestal is greater than the width of the first rib column.
Further, second rib column bottom setting middle part pedestal, the second rib column pass through middle part pedestal and the earth-retaining Plate connection, middle part pedestal can and the two bottom integrally manufactured with the second rib column be flush, the second rib column in door type structure arrangement;
Further, the width of middle part pedestal is greater than the width of the second rib column.
Further, the end pedestal is of an L-shaped structure, and is unlikely to produce in connection in two neighboring retaining wall in this way Raw interference.
Further, in order to facilitate the connection of breast boards and bottom plate, the breast boards is L-type breast boards, breast boards it is short Plate and the bottom plate are connected, and the bottom plate is provided with the groove with breast boards cooperation.
Further, retaining wall further includes anchor plate, and anchor plate is connect with the anchor pole, and anchor pole isFinish rolling screw thread Steel, anchor pole are anchored at the first rib column or the second rib column by six rib sleeves, and anchor rod anchored section can connect anchor plate, anchor plate and anchor It is articulated connection between bar, anchor plate ultimate bearing capacity can be played to greatest extent, prevented because of roadbed and retaining wall relative settlement Generate anchor pole shear stress;Upper layer is anchored plate suqare and is not less than 0.5m2, lower layer's anchoring plate suqare is not less than 0.4m2
Alternatively, retaining wall further includes injecting cement paste in another program of the present invention, injecting cement paste detachably connects with the anchor pole It connects, slip casting body length is not less than 4m.
For overcome the deficiencies in the prior art, the present invention also provides a kind of pin-connected panel anchors to draw earth-retaining faced wall, including institute A kind of pin-connected panel anchor stated draws retaining wall, and adjacent retaining wall is connected by connector with fastener, and connector is strap bolt hole Connecting plate, fastener is bolt or screw, and fastener passes through the breast boards of bolt hole and two sides or the first rib column connects.
A kind of pin-connected panel anchor draws the construction technology of earth-retaining faced wall, comprising the following steps:
1) earth-retaining wall size, the position of each drain hole and quantity are determined according to roadbed supporting height;
2) smooth ground excavates bottom plate foundation pit, the blotter of 20-35cm thickness should be arranged below bottom plate, and be compacted Processing;
3) according to design position mounting base, before mounting base, it should be pre-placed bolt, be used for bottom plate and earth-retaining Connection between plate, the first rib column or the second rib column and breast boards and bottom plate;The seam of 2~3cm should be set between adjacent two bottom plate Gap, as the subsiding crack between retaining wall;
4) the first rib column and the second rib column are installed, connect the first rib column and the second rib column with bottom plate, and passes through bracket pair First rib column and the second rib column carry out temporary support;
5) breast boards is installed, breast boards is anchored with bottom plate, the first rib column and the second rib column by bolt respectively, and passes through branch Frame carries out temporary support to breast boards, when breast boards is two layers, first installs lower layer's breast boards and installs upper layer breast boards, earth-retaining again Geotextiles are arranged in sluicing hole site on the inside of plate, prevent sluicing hole plug;
6) it lays anchor pole and anchoring is then filling roadbed to certain altitude, setting prestressing force is applied to anchor pole, is removed interim Installation is completed in support.
Compared with prior art, the beneficial effects of the present invention are:
1) present invention is by assembled breast boards, the first rib column and the isostructural setting of the second rib column, it can be achieved that retaining wall Rapid construction, and facilitate installation, traditional pin-connected panel anchor can be improved and draw retaining wall supporting height and stability, convenient for assembly fortune It is defeated, there is environmentally protective, economical and efficient advantage.
2) present invention can prevent rib column and retaining wall caused by deforming as uneven settlement of foundation by the setting of bottom plate Between it is shear-deformable, improve structure overall stiffness, realize the compatible deformation of retaining wall.
3) the settable anchor pole of retaining wall in the present invention is suitable for the supporting of roadbed unilateral side and two sides supporting, and anchor pole, which can apply, to be set Fixed pretightning force can play the purpose of control retaining wall displacement and active defense, preferably improve stability of retaining wall and branch Shield height.
Detailed description of the invention
The accompanying drawings constituting a part of this application is used to provide further understanding of the present application, and the application's shows Meaning property embodiment and its explanation are not constituted an undue limitation on the present application for explaining the application.
Fig. 1 is retaining wall top view;
Fig. 2 is retaining wall three dimensional structure diagram;
Fig. 3 is retaining wall side view;
Fig. 4 is another embodiment retaining wall side view;
In figure: 1, bottom plate, 2, end pedestal, 3, breast boards, 4, drain hole, 5, anchor bolt, the 6, second rib column, 7, anchor Bar, the 8, first rib column, 9, backing plate, 10, anchor plate, 11, injecting cement paste.
Specific embodiment
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the application.Unless another It indicates, all technical and scientific terms used herein has usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singular Also it is intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet Include " when, indicate existing characteristics, step, operation, device, component and/or their combination.
As background technique is introduced, the deficiencies in the prior art, in order to solve technical problem as above, this Shen It please propose a kind of pin-connected panel anchor drawing retaining wall.
In a kind of typical embodiment of the application, as shown in Figure 1, a kind of pin-connected panel anchor draws retaining wall, including bottom plate 1, be set to ground, bottom plate 1 is reinforced concrete structure, and strength grade of concrete is not less than C30, bottom plate 1 with a thickness of 20~25cm, Width is 3~4m, and length is 6~8m, and by edge, the reserved 0.05m depth of 1m range inner bottom plating thickness is recessed inwardly in the width direction Slot, for installing breast boards 3, groove elongated laying along its length;Breast boards 3 is set to bottom plate 1 vertically, is provided with multiple sluicing Hole 4;First rib column 8, set on the both ends of 3 side of breast boards, the first rib column 8 is connected with breast boards 3, and the first rib column 8 and earth-retaining Plate 3 is provided with the through-hole for anchor pole 7 to be arranged;Anchor pole 7 passes through the first rib column 8 and is arranged with breast boards 3.
By above-mentioned retaining wall structure setting, it can be achieved that quick assembling is constructed, and by the setting of bottom plate, earth-retaining is realized The compatible deformation of wall, and improve the stability of whole retaining wall;And can realize the fixation of anchor pole, further improve retaining wall Stability and supporting height.
In order to improve the flexibility of retaining wall height, breast boards 3 includes multistage splice plate, and breast boards 3 may include left up and down The multistage of right splicing, to improve the height of breast boards according to landform.
Second rib column 6 is set in the side of the stitching portion breast boards of breast boards 3, the equally setting of the second rib column 6 is described to lead to Hole, through-hole are equally used for the insertion of anchor pole 7, and anchor pole 7 is obliquely installed, and inclination angle size is 3~5 °.
The through hole of first rib column 8 and the second rib column is respectively provided with the backing plate with aperture.
End pedestal is arranged in first rib column, 8 bottom, and the first rib column 8 is connect by end pedestal 2 with the breast boards, end Pedestal can and the two bottom integrally manufactured with the first rib column 8 be flush;The width of end pedestal 2 is greater than the width of the first rib column, As shown in Figure 2.
Second rib column, 6 bottom setting middle part pedestal, the second rib column 6 are connect by middle part pedestal with the breast boards 3, middle part Pedestal can and the two bottom integrally manufactured with the second rib column 6 be flush, the second rib column 6 in door type structure arrange;Middle part pedestal Width is greater than the width of the second rib column 6, bolt hole is provided in the first rib column 8 and the second rib column 6, for setting for anchor bolt 5 It sets, 8 height of the first rib column is 5~6m, and the second rib column width is 0.5m, and two sides the first rib column width is 0.3m, and all rib columns are thick Degree is not less than 0.4m.Bolt hole circular hole, aperture 32mm are set every 0.5m along short transverse.End pedestal is of an L-shaped structure, this Sample, in connection, is unlikely to generate interference in two neighboring retaining wall.
In order to facilitate the connection of breast boards 3 and bottom plate 1, breast boards 3 is L-type breast boards, the short slab of breast boards 3 and described Bottom plate 1 is connected, and 3 height of breast boards is 3~4m, and with a thickness of 0.2m, width is 3~4m, lays drain hole on breast boards, quantity is 1/m2Construction can be layered when supporting height is larger.
Retaining wall further includes anchor plate 10, and anchor plate 10 is connect with anchor pole 7, and anchor pole 7 isFining twisted steel, anchor pole are logical It crosses six rib sleeves and is anchored at the first rib column 8 or the second rib column, anchor rod anchored section can connect inclination anchor plate, as shown in figure 3, anchoring 10 area of plate is not less than 0.5m2
Alternatively, in an alternative embodiment of the invention, as shown in figure 4, retaining wall further includes injecting cement paste 11, injecting cement paste 11 and institute The anchor pole 7 stated is detachably connected, and 11 length of injecting cement paste is not less than 4m.
For overcome the deficiencies in the prior art, the present invention also provides a kind of pin-connected panel anchors to draw earth-retaining faced wall, including institute A kind of pin-connected panel anchor stated draws retaining wall, and adjacent retaining wall is connected by connector with fastener, and connector is strap bolt hole Connecting plate, fastener is bolt or screw, and fastener passes through the breast boards of bolt hole and two sides or the first rib column connects.
A kind of pin-connected panel anchor draws the construction technology of earth-retaining faced wall, comprising the following steps:
1) earth-retaining wall size, the position of each drain hole and quantity are determined according to roadbed supporting height;
2) smooth ground excavates bottom plate foundation pit, the blotter of 20-35cm thickness should be arranged below bottom plate, and be compacted Processing;
3) according to design position mounting base and set on lower layer's anchor plate of foundation pit side-wall, lower layer's anchor plate is away from inside bottom plate Distance is not less than 5m;Before mounting base, it should be pre-placed bolt, be used for bottom plate and breast boards, the first rib column or the second rib Connection between column and breast boards and bottom plate;The gap of 2~3cm should be set between adjacent two bottom plate, as between retaining wall Subsiding crack;
4) the first rib column and the second rib column are installed, connect the first rib column and the second rib column with bottom plate, and passes through bracket pair First rib column and the second rib column carry out temporary support;
5) breast boards is installed, breast boards is anchored with bottom plate, the first rib column and the second rib column by bolt respectively, and passes through branch Frame carries out temporary support to breast boards, when breast boards is two layers, first installs lower layer's breast boards and installs upper layer breast boards, earth-retaining again Geotextiles are arranged in sluicing hole site on the inside of plate, prevent sluicing hole plug;
6) lay anchor pole and upper layer anchor plate, it is anchor rod anchored to arrive retaining wall, and anchoring rod and upper layer anchor plate or under Layer anchor plate, it is then filling roadbed that anchor pole is applied and is set when roadbed filling height reaches at the top of retaining wall to certain altitude Pretightning force removes temporary support, backfills 40cm high soil layer on the outside of retaining wall.
Alternatively, carrying out slip casting when roadbed filling height reaches at the top of retaining wall and being applied after reaching intensity 70% to anchor pole It adds and determines pretightning force, remove falsework, backfill 40cm high soil layer on the outside of retaining wall.
The foregoing is merely preferred embodiment of the present application, are not intended to limit this application, for the skill of this field For art personnel, various changes and changes are possible in this application.Within the spirit and principles of this application, made any to repair Change, equivalent replacement, improvement etc., should be included within the scope of protection of this application.

Claims (10)

1. a kind of pin-connected panel anchor draws retaining wall characterized by comprising
Bottom plate is set to ground;
Breast boards is set to bottom plate vertically, is provided with multiple drain holes;
First rib column, set on the both ends of breast boards side, the first rib column and breast boards are connected, and the first rib column is provided with breast boards For the through-hole of anchor pole to be arranged;
Anchor pole, passes through the first rib column and breast boards is arranged.
2. a kind of pin-connected panel anchor according to claim 1 draws retaining wall, which is characterized in that the breast boards includes that multistage is spelled Fishplate bar.
3. a kind of pin-connected panel anchor according to claim 2 draws retaining wall, which is characterized in that in the stitching portion of the breast boards The second rib column is arranged in the side of breast boards, and the through-hole is equally arranged in the second rib column;
Further, the through hole of first rib column and the second rib column is respectively provided with the backing plate with aperture.
4. a kind of pin-connected panel anchor according to claim 1 draws retaining wall, which is characterized in that the first rib column bottom setting End pedestal, the first rib column are connect by end pedestal with the breast boards;
Further, the width of end pedestal is greater than the width of the first rib column.
5. a kind of pin-connected panel anchor according to claim 3 draws retaining wall, which is characterized in that the setting of second rib column bottom Middle part pedestal, the second rib column are connect by middle part pedestal with the breast boards;
Further, the width of middle part pedestal is greater than the width of the second rib column.
6. a kind of pin-connected panel anchor according to claim 4 draws retaining wall, which is characterized in that the L-shaped knot of end pedestal Structure.
7. a kind of pin-connected panel anchor according to claim 1 draws retaining wall, which is characterized in that the breast boards is L-type earth-retaining Plate, the short slab of breast boards and the bottom plate are connected, and the bottom plate is provided with the groove with breast boards cooperation.
8. a kind of pin-connected panel anchor according to claim 3 draws retaining wall, which is characterized in that further include anchor plate, anchor plate It is connect with the anchor pole;
Alternatively, further including injecting cement paste, injecting cement paste is detachably connected with the anchor pole.
9. a kind of pin-connected panel anchor draws earth-retaining faced wall, which is characterized in that including according to claim 1 to 8 one Kind pin-connected panel anchor draws retaining wall, and adjacent retaining wall is connected by connector with fastener.
10. the construction technology that a kind of pin-connected panel anchor according to claim 9 draws earth-retaining faced wall, which is characterized in that including Following steps:
1) earth-retaining wall size, the position of each drain hole and quantity are determined according to roadbed supporting height;
2) smooth ground excavates bottom plate foundation pit, the blotter of 20-35cm thickness should be arranged below bottom plate, and carry out compaction treatment;
3) according to design position mounting base, before mounting base, it should be pre-placed bolt, for bottom plate and breast boards, the Connection between one rib column or the second rib column and breast boards and bottom plate;The gap of 2~3cm should be set between adjacent two bottom plate, made Subsiding crack between retaining wall;
4) the first rib column and the second rib column are installed, connect the first rib column and the second rib column with bottom plate, and by bracket to first Rib column and the second rib column carry out temporary support;
5) breast boards is installed, breast boards is anchored with bottom plate, the first rib column and the second rib column by bolt respectively, and passes through bracket pair Breast boards carries out temporary support, when breast boards is two layers, first installs lower layer's breast boards and installs upper layer breast boards again, in breast boards Geotextiles are arranged in side sluicing hole site, prevent sluicing hole plug;
6) it lays anchor pole and anchors, it is then filling roadbed to certain altitude, setting prestressing force is applied to anchor pole, removes interim branch Installation is completed in support.
CN201810124275.4A 2018-02-07 2018-02-07 A kind of pin-connected panel anchor draws retaining wall and method Pending CN110117965A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810124275.4A CN110117965A (en) 2018-02-07 2018-02-07 A kind of pin-connected panel anchor draws retaining wall and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810124275.4A CN110117965A (en) 2018-02-07 2018-02-07 A kind of pin-connected panel anchor draws retaining wall and method

Publications (1)

Publication Number Publication Date
CN110117965A true CN110117965A (en) 2019-08-13

Family

ID=67519623

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810124275.4A Pending CN110117965A (en) 2018-02-07 2018-02-07 A kind of pin-connected panel anchor draws retaining wall and method

Country Status (1)

Country Link
CN (1) CN110117965A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111424703A (en) * 2020-04-07 2020-07-17 吉林建筑大学 Prefabricated base of road or bridge temporary retaining wall
CN112523256A (en) * 2021-02-08 2021-03-19 沈阳促晋科技有限公司 Prefabricated L-shaped concrete multi-layer multi-step retaining wall
CN112942413A (en) * 2021-02-09 2021-06-11 福建省交通规划设计院有限公司 Prefabricated UHPC rib plate type retaining wall system
CN112942414A (en) * 2021-02-09 2021-06-11 福建省交通规划设计院有限公司 Prefabricated UHPC superposed retaining wall system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6132465B2 (en) * 1982-06-10 1986-07-26 Takaaki Endo
CN103233486A (en) * 2013-05-10 2013-08-07 山东大学 Testing device and testing method of anchor-tension type retaining wall model
CN204919602U (en) * 2015-09-18 2015-12-30 山东大学 Compound anchored retaining wall by tie rods
CN205382507U (en) * 2016-01-29 2016-07-13 中冶集团武汉勘察研究院有限公司 Two -way anchored retaining wall by tie rods
CN105937244A (en) * 2016-05-20 2016-09-14 西南交通大学 Beam column plate type embankment earth-retaining wall on steep slope foundation and construction method thereof
CN205776339U (en) * 2016-07-01 2016-12-07 浙江省交通规划设计研究院 Both arms Retaining Wall

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6132465B2 (en) * 1982-06-10 1986-07-26 Takaaki Endo
CN103233486A (en) * 2013-05-10 2013-08-07 山东大学 Testing device and testing method of anchor-tension type retaining wall model
CN204919602U (en) * 2015-09-18 2015-12-30 山东大学 Compound anchored retaining wall by tie rods
CN205382507U (en) * 2016-01-29 2016-07-13 中冶集团武汉勘察研究院有限公司 Two -way anchored retaining wall by tie rods
CN105937244A (en) * 2016-05-20 2016-09-14 西南交通大学 Beam column plate type embankment earth-retaining wall on steep slope foundation and construction method thereof
CN205776339U (en) * 2016-07-01 2016-12-07 浙江省交通规划设计研究院 Both arms Retaining Wall

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111424703A (en) * 2020-04-07 2020-07-17 吉林建筑大学 Prefabricated base of road or bridge temporary retaining wall
CN112523256A (en) * 2021-02-08 2021-03-19 沈阳促晋科技有限公司 Prefabricated L-shaped concrete multi-layer multi-step retaining wall
CN112942413A (en) * 2021-02-09 2021-06-11 福建省交通规划设计院有限公司 Prefabricated UHPC rib plate type retaining wall system
CN112942414A (en) * 2021-02-09 2021-06-11 福建省交通规划设计院有限公司 Prefabricated UHPC superposed retaining wall system
CN112942414B (en) * 2021-02-09 2022-04-26 福建省交通规划设计院有限公司 Prefabricated UHPC superposed retaining wall system
CN112942413B (en) * 2021-02-09 2022-04-26 福建省交通规划设计院有限公司 Prefabricated UHPC rib plate type retaining wall system

Similar Documents

Publication Publication Date Title
CN110117965A (en) A kind of pin-connected panel anchor draws retaining wall and method
CN104947603B (en) A kind of rc beam bridge girder reinforcing construction and reinforcement means
CN103469939A (en) Flexible connection anti-seismic structure for masonry infilled wall and main body, and construction method for flexible connection anti-seismic structure
CN103741958B (en) A kind of peripheral hardware assembled minor structure reinforces the method for existing building
CN107524159B (en) A kind of hybrid reinforced soil retaining wall
CN107975176A (en) Assembly concrete mat formation in advance building cover board H-shaped node connector and connection method
CN105386454B (en) A kind of joint assembling type base for power transmission tower
CN108547191A (en) A kind of assembled road structure and its construction technology
CN109750681A (en) A kind of embankment side slope framework parts La Tuoding anchor slab supporting construction and its construction method a little
CN106760940A (en) A kind of hollow enclosure member of prefabricated complex fiber cement and construction method
CN109914472A (en) A kind of soft clay area assembled pipe gallery and its construction method
CN113073538A (en) High pile plate-soil combined road
CN205917717U (en) Transmission line basis
CN204715223U (en) A kind of abutment prestressed reinforcement structure
CN102587329B (en) Arched combined faceplate for earth-rock dam and construction method thereof
CN204589831U (en) A kind of rc beam bridge girder reinforcing construction
CN208415004U (en) A kind of pair of lacing wire material U-type groove reduces the railway bed structure of subgrade settlement deformation
CN208235579U (en) A kind of variable slope wave mutually-embedded ecological building block retaining wall system
CN103498572B (en) The construction method of the additional clamping plate beam of stone structure and clamping plate post ruggedized construction
CN203603525U (en) Reinforcing structure with clamp plate girder and clamp plate column externally arranged for stone structure
CN106283955B (en) Medium-and low-speed maglev traffic engineering single line embankment location pile foundation joist type support rail girder construction
CN110937862B (en) Pavement material based on three-dimensional reconstruction model
CN212452750U (en) Reinforced earth retaining wall technology unilateral widens structure
CN204663550U (en) Grid is gone along with sb. to guard him in the interval engineering glass fiber-reinforced polymer construction of the shield structure that starts in hole
CN207244350U (en) A kind of track structure for being capable of limiting displacement

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190813

RJ01 Rejection of invention patent application after publication