CN110117961A - 一种底板降水井泄压式预埋装置及实现方法 - Google Patents
一种底板降水井泄压式预埋装置及实现方法 Download PDFInfo
- Publication number
- CN110117961A CN110117961A CN201910392324.7A CN201910392324A CN110117961A CN 110117961 A CN110117961 A CN 110117961A CN 201910392324 A CN201910392324 A CN 201910392324A CN 110117961 A CN110117961 A CN 110117961A
- Authority
- CN
- China
- Prior art keywords
- steel plate
- pressure release
- diameter
- bottom plate
- dewatering well
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/10—Restraining of underground water by lowering level of ground water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/002—Concrete
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0026—Metals
- E02D2300/0029—Steel; Iron
Abstract
本发明专利的目的在于提供一种底板降水井泄压式预埋装置及实现方法,方便施工,确保封堵质量,避免了地下室渗漏。其主要组成部分有:垫层钢套管、密封层、底板止水套管总成、封堵泄压盖总成和防渗浇筑层5个部分。
Description
技术领域
本发明一种底板降水井泄压式预埋装置及实现方法一是杜绝了地下室降水底板降水井处渗水,二是避免了传统方法在封堵该处的施工难度,可在边降水边封堵施工的同时进行操作,确保了各道工序的施工质量。
背景技术
我国建筑工程施工,经常在地下水位较高且十分丰富的环境下进行的,施工期间的地下室降低地下承压水,对于建筑施工和有助于建筑抗浮是必须采取的措施。
当在施工面积较大的地下室时,在周边设置降水井点不能满足需求,还要在底板的相应位置设置降水井,当建筑物施工至一定程度时,需要将穿过底板的降水井封堵以满足建筑工程的使用功能。
由于地下水位较高且十分丰富,封闭穿过底板的降水井十分困难,传统的降水井封闭方法无法将地下承压水边泄压边封堵,造成封堵困难,导致地下室降水底板降水井处永久性渗水,严重影响地下室使用功能。
为解决上述弊端,本发明采用“一种底板降水井泄压式预埋装置及实现方法”,可将地下承压水边泄压边封堵,方便施工,确保封堵质量,避免了地下室渗漏。
发明内容
本发明专利的目的在于提供一种底板降水井泄压式预埋装置及实现方法,方便于现场施工,并能确保封堵的质量,很好的避免了地下室渗漏。
本发明其主要组成部分有:垫层钢套管、密封层、底板止水套管总成、封堵泄压盖总成和防渗浇筑层5个部分。
底板防水套管安装时将垫层钢套管四周涂满防水胶作为密封层后,插入预埋底板防水套管总成下端即可。
封堵泄压盖采用热镀锌做防腐处理,热镀锌厚度≮150g。当降水工作完成后,在镀锌直接头的上部安装DN40镀锌闸阀,镀锌闸阀的上部安装真空泵软管备用,在镀锌直接头的下部安装DN40长度为1500㎜的镀锌钢管,然后将封堵泄压盖总成安装在底板防水套管总成上,并加装防水胶垫和防水密封胶。上述工序完成后,当地下水位上升时,将真空泵接在真空泵软管上便可降低地下水。
防渗浇筑层为C45、P8抗渗微膨胀混凝土。
下面结合附图对本发明作进一步说明。
附图说明
图1为一种底板降水井泄压式预埋装置示意图。
图2为一种底板降水井泄压式预埋装置构造图。
图3 为一种底板降水井泄压式预埋装置A-A剖面构造图。
图4为一种底板降水井泄压式预埋装置A-A剖面示意图。
具体实施方式
图1、图2说明一种底板降水井泄压式预埋装置构造图。图1中1为镀锌闸阀,1置于圆形钢板2上,2用M12镀锌螺栓5固定于底板防水套管总成的环形钢板上,4为底板防水套管总成的止水环,3为防渗浇筑层。
图3、图4说明一种底板降水井泄压式预埋装置剖面构造图。图4中1为镀锌闸阀,2为圆形钢板,3为防渗浇筑层,4为止水环,5为M12镀锌螺栓,6为DN40镀锌直接头,7为焊缝,8为底板防水套管总成的环形钢板,9为底板防水套管总成的套管,10为底板混凝土,11为防水卷材附加层,12为防水卷材层,13为垫层混凝土,14为DN40镀锌钢管,15为垫层钢套管,16为降水井内侧,17为防水密封胶。
虽然通过实施例说明了本申请的实施过程,以上所述的实施方式仅用于说明本发明的技术思想和特点,其目的在于使本技术领域内的工程技术人员能够理解本发明的内容并据以实施。但不能以本实施方式来限定本发明的专利范围,对本发明所提出的技术思想的同等变化或修饰,仍应认为在本发明的专利范围内。
Claims (4)
1.一种底板降水井泄压式预埋装置,其结构特征在于采用壁厚5㎜直径480㎜长度300㎜的镀锌钢套管,当垫层混凝土浇筑前预埋在降水井处,上部外露100㎜,下部植入土中100㎜。
2.根据专利要求项1,所述底板防水套管其特征在于:预埋底板防水套管总成的立面特征呈”T”型,”T”型上部呈环形钢板,环形钢板厚度10㎜内径为510㎜外经为630㎜,沿环形钢板周长8等分和宽度的中心相交处设置直径14㎜的8个通孔;”T”型下部呈圆管,采用5㎜厚直径510㎜长度等于底板厚度减300㎜长的金属管,金属管中部相距150㎜的外侧焊接两道止水环,止水环采用内径等于525㎜外经采用825㎜的环形钢板,当上部环形钢板和两道止水环焊接牢固并严密后,采用热镀锌处理措施。
3.根据专利要求项1,所述封堵泄压盖其特征在于:封堵泄压盖总成采用直径与预埋底板防水套管总成的环形钢板相等的圆形钢板,圆形钢板厚度10㎜,圆形钢板中间部位开直径50㎜孔,孔中密闭焊接DN40镀锌直接头,镀锌直接头中心位置与圆形钢板垂直方向中心线垂直,沿圆形钢板周长8等分并与沿环形钢板8个孔相对应处设置直径14㎜的8个通孔。
4.根据专利要求项1,所述防渗浇筑层其特征在于:防渗浇筑层为C45、P8抗渗微膨胀混凝土,在封堵泄压盖总成安装完毕实现。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910392324.7A CN110117961A (zh) | 2019-05-13 | 2019-05-13 | 一种底板降水井泄压式预埋装置及实现方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910392324.7A CN110117961A (zh) | 2019-05-13 | 2019-05-13 | 一种底板降水井泄压式预埋装置及实现方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110117961A true CN110117961A (zh) | 2019-08-13 |
Family
ID=67522168
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910392324.7A Pending CN110117961A (zh) | 2019-05-13 | 2019-05-13 | 一种底板降水井泄压式预埋装置及实现方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110117961A (zh) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103334444A (zh) * | 2013-07-09 | 2013-10-02 | 中国一冶集团有限公司 | 一种基坑降水井泄压式的封堵方法 |
CN203768926U (zh) * | 2014-04-08 | 2014-08-13 | 江苏扬州建工建设集团有限公司 | 一种地下室深井封堵装置 |
-
2019
- 2019-05-13 CN CN201910392324.7A patent/CN110117961A/zh active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103334444A (zh) * | 2013-07-09 | 2013-10-02 | 中国一冶集团有限公司 | 一种基坑降水井泄压式的封堵方法 |
CN203768926U (zh) * | 2014-04-08 | 2014-08-13 | 江苏扬州建工建设集团有限公司 | 一种地下室深井封堵装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102797266B (zh) | 一种降水井封井防水施工方法 | |
CN206706791U (zh) | 基坑降水井封堵结构 | |
CN112647524A (zh) | 一种在基坑内降水井的封堵方法 | |
CN105926682A (zh) | 有承压水且水压较大的地下室底板后浇带施工方法 | |
CN202730786U (zh) | 一种降水井封井防水施工结构 | |
CN109025899B (zh) | 一种封井装置 | |
CN208981531U (zh) | 一种预制装配式女儿墙连接结构 | |
CN214497558U (zh) | 基坑降水井井口封堵套管及结构 | |
CN103205986A (zh) | 混凝土筏基施工缝处注浆装置及方法 | |
CN110117961A (zh) | 一种底板降水井泄压式预埋装置及实现方法 | |
CN111473165A (zh) | 一种叠合板与pvc水管连接处防水构造 | |
CN209040133U (zh) | 适用于地下水丰富区域的降水井封井装置 | |
CN208668952U (zh) | 一种厨房排水立管穿楼板结构 | |
CN208072433U (zh) | 一种用于基础柱坑及集水坑的临时降水钢套管 | |
CN207268010U (zh) | 排水管防渗漏装置 | |
CN205954651U (zh) | 一种混凝土沉井封底结构 | |
CN105780791B (zh) | 地下车库基坑内深井降水井口封井施工方法 | |
CN211849528U (zh) | 一种承压水降水井封井装置 | |
CN210113318U (zh) | 一种基坑基底涌水涌砂封堵装置 | |
CN211691115U (zh) | 一种出屋面雨水管预埋装置 | |
CN209760313U (zh) | 一种地下全封闭桩头防水结构 | |
CN112628477A (zh) | 一种带伸缩及防排水功能的排水管预埋装置及安装方法 | |
CN2814074Y (zh) | 止水节 | |
CN216615923U (zh) | 一种深基坑承压水降水井钢套管封堵结构 | |
CN209816930U (zh) | 地下室底板后浇带内置双层钢桶降排水系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190813 |
|
WD01 | Invention patent application deemed withdrawn after publication |