CN110110530B - Information authority management method and device based on BIM platform and storage device - Google Patents

Information authority management method and device based on BIM platform and storage device Download PDF

Info

Publication number
CN110110530B
CN110110530B CN201910074017.4A CN201910074017A CN110110530B CN 110110530 B CN110110530 B CN 110110530B CN 201910074017 A CN201910074017 A CN 201910074017A CN 110110530 B CN110110530 B CN 110110530B
Authority
CN
China
Prior art keywords
information
authority
bim
component
added
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910074017.4A
Other languages
Chinese (zh)
Other versions
CN110110530A (en
Inventor
刘亚鑫
唐崇武
林彬
刘凤杰
漆枋晨
吕柱
邢冬冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Huayang International Engineering Design Co ltd
Original Assignee
Shenzhen Huayang International Engineering Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Huayang International Engineering Design Co ltd filed Critical Shenzhen Huayang International Engineering Design Co ltd
Priority to CN201910074017.4A priority Critical patent/CN110110530B/en
Publication of CN110110530A publication Critical patent/CN110110530A/en
Application granted granted Critical
Publication of CN110110530B publication Critical patent/CN110110530B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/60Protecting data
    • G06F21/604Tools and structures for managing or administering access control systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/60Protecting data
    • G06F21/606Protecting data by securing the transmission between two devices or processes
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2221/00Indexing scheme relating to security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F2221/21Indexing scheme relating to G06F21/00 and subgroups addressing additional information or applications relating to security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F2221/2141Access rights, e.g. capability lists, access control lists, access tables, access matrices

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • General Physics & Mathematics (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • Computer Security & Cryptography (AREA)
  • Bioethics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Software Systems (AREA)
  • Automation & Control Theory (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • Storage Device Security (AREA)

Abstract

The invention discloses a BIM platform-based information authority management method, a BIM platform-based information authority management device and a BIM platform-based information authority management storage device. The method comprises the following steps: acquiring first information of a component in a BIM model; acquiring second information added to the components in the BIM; carrying out authority classification on the first information according to the information type of the first information; and carrying out authority classification on the second information according to the corresponding account adding authority when the second information is added. Through the mode, the information can be correspondingly displayed according to the authority, the problem that various information is mixed and disordered can not occur, on one hand, the second information is acquired aiming at the component, the second information can be accurate to the layer of the component, and compared with the existing layer only aiming at the BIM model, the information is more detailed and clearer. Therefore, great convenience is brought to design flow participators, and the information management cost is reduced.

Description

Information authority management method and device based on BIM platform and storage device
Technical Field
The invention relates to the field of BIM software, in particular to a BIM platform-based information authority management method, device and storage device.
Background
In the design of the existing BIM model, after general designers complete the design of the BIM model on BIM software, the BIM model is uploaded to a third-party platform for censorship and annotation by censorship personnel.
In the prior art, the information uploaded to the BIM model of the platform cannot be subjected to authority distribution, the information added from the platform can only be associated to the model of the corresponding edition, and the first information and the second information cannot be subjected to unified authority distribution management. When a plurality of persons participate in information addition and are modified for a plurality of times, information is easy to be confused, and information management is very inconvenient.
Disclosure of Invention
The invention provides a BIM platform-based information authority management method, a BIM platform-based information authority management device and a storage device. The problems that information is not clear and management is complex in the prior art are solved.
In order to solve the technical problems, the invention adopts a technical scheme that: the information authority management method based on the BIM platform comprises the following steps: acquiring first information of a component in a BIM model; acquiring second information added to the components in the BIM; carrying out authority classification on the first information according to the information type of the first information; and carrying out authority classification on the second information according to the corresponding account authority when the second information is added.
In order to solve the technical problem, the invention adopts another technical scheme that: the BIM platform-based information authority management device comprises a processor, a memory, a display module and a display module, wherein the processor is coupled with the memory, and the memory stores program instructions for realizing the display method of any one of the above; the processor is used for acquiring first information of a component in the BIM model; acquiring second information added to the components in the BIM; carrying out authority classification on the first information according to the information type of the first information; and carrying out authority classification on the second information according to the corresponding account authority when the second information is added.
In order to solve the above technical problem, another technical solution of the present invention is to provide a storage device, in which a program file capable of implementing any one of the above methods is stored.
The invention has the beneficial effects that: different from the prior art, the invention provides an information authority management method, an information authority management device and a storage device based on a BIM platform. The method comprises the steps of obtaining first information of a member in the BIM, namely second information added to the member, and then classifying the authority of the first information and the authority of the second information respectively. On one hand, the authority is added to the first information and the second information, so that the information can be correspondingly displayed and operated according to the authority, the problem that various information is mixed and disordered does not occur, on the other hand, the method is used for acquiring the second information of the component, so that the second information can be accurate to the layer of the component, and compared with the existing layer only aiming at the BIM model, the information is more detailed and clearer. Therefore, great convenience is brought to design flow participators, and the information management cost is reduced.
Drawings
FIG. 1 is a schematic structural diagram of a first embodiment of a BIM platform-based information authority management method according to the present invention;
FIG. 2 is a block diagram schematically illustrating the structure of an embodiment of the information inheritance device based on the BIM platform;
FIG. 3 is a schematic structural diagram of an embodiment of a memory device according to the invention.
Detailed description of the preferred embodiments
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In addition, if there is a description of "first", "second", etc. in an embodiment of the present invention, the description of "first", "second", etc. is for descriptive purposes only and is not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature. In addition, technical solutions between various embodiments may be combined with each other, but must be realized by a person skilled in the art, and when the technical solutions are contradictory or cannot be realized, such a combination should not be considered to exist, and is not within the protection scope of the present invention.
Referring to fig. 1, fig. 1 is a schematic flowchart illustrating a first embodiment of a BIM platform-based information authority management method according to the present invention, which specifically includes the following steps:
s11, acquiring first information of the member in the BIM model and second information added to the member.
The first information is based on the component in the BIM model, the BIM model is composed of a plurality of minimum units like the component, the first information is given when the BIM software constructs, designs or modifies the component, and the first information is some basic parameters required by the construction.
The first information generally comprises parameter names and parameter values, the parameter names are preset, then in the design process, designers can selectively add the parameter values of the first information to the component according to the preset parameter names, namely, the components can be selected only according to the preset parameter names, or corresponding parameter values can be added at the same time, and particularly, after the design is finished, the parameter values corresponding to some parameter names in the first information can be null values. Namely, it can perform corresponding parameter value addition or modification, etc. on the first information after uploading the BIM platform. The first information generally includes at least one or more of a size parameter, a performance parameter, a constraint, and location information.
After uploading the BIM model to the BIM platform, the first information of the member of the BIM model thereof may be extracted.
The BIM platform may be an operation platform such as a project management platform, a collaboration platform, or a model component platform, and may be used to enable other non-designers, such as reviewers, constructors, cost engineers, and the like, to visually check and review the uploaded BIM model and add the second information.
After the second information is specifically uploaded in the BIM model, other non-designers such as constructors add information to the components in the BIM model, namely, after the components in the BIM model are constructed, the information is uploaded to the BIM platform and added to the BIM platform, and specifically, the information at least comprises one or more of installation procedures, construction processes, approach time, purchase price, implementation units, supply units, inspection personnel, installation requirements and installation positions. I.e., additional information from other personnel, such as subsequent construction personnel, etc. Which is bound to the building block, in a specific embodiment, the building block has a unique identification information, and the second information can be used for binding with the identification information of the building block.
Such as a cost engineer may add second information, such as cost information, to the components in their BIM model, and so on.
In an embodiment, the second information may be different for different components, i.e. the second information that needs to be added is different.
In a specific embodiment, each of the first information and the second information includes a parameter name and a parameter value, and specifically, the parameter value may be null.
And S12, classifying the authority of the first information according to the information type of the first information.
In the prior art, a large number of participants may appear in the whole design process, which mainly includes designers, examiners, constructors and the like, and if all the first information is displayed to all people, the information is confused, and the management of the information is not safe enough, so that the first information needs to be classified according to the authority. The method specifically includes the classification of display authority and the classification of operation authority.
In a specific application scenario, for a certain component, the information type of the first information includes, for example, four types of size parameter, performance parameter, limitation condition, and location information.
The size parameters of the system can be divided into A display permission and operation permission, the performance parameters and the limiting conditions are divided into B display permission and operation permission, and the position information is divided into C display permission and D operation permission.
In the subsequent display process, the size parameters are displayed in a differentiated manner according to the classification of the authority, specifically, if a certain account has the operation authority of the types a, B and D, the user corresponding to the account can view and operate the size parameters, the performance parameters, the limiting conditions and the position information. Namely, the account user who has the operation authority has the corresponding display authority. And the account user only having the display authority does not have the operation authority.
Specifically, the account with the operation authority can only modify the parameter value of the first information, and cannot modify the parameter name.
And S13, classifying the second information according to the account adding authority corresponding to the second information adding.
In a specific embodiment, when the second information is uploaded to the BIM platform in the BIM model, other non-designers add information to the BIM platform, which is information that needs to be added after the building, designing or modifying of the component is completed.
Specifically, the second information may be added by other non-designer persons, so that the addition authority of the person who adds the second information, specifically, the addition authority of the account corresponding to the person who adds the second information or the account corresponding to the person who adds the second information, may be directly obtained.
The second information may inherit the addition permission of the account corresponding to the second information, and specifically, if the addition permission of the account includes an x-type display permission and a y-type operation permission, the added second information inherits the permission in the addition permission, so that the second information has the x-type display permission and the y-type operation permission.
Specifically, the addition right inherited by the second information from the account is different from or independent from the operation and display right of the account.
In a specific embodiment, the addition right of an account includes a display right of x type and an operation right of y type, and the second information added by the account can inherit the display right of x type and the operation right of y type according to the addition right of the account. However, the account itself has x, y, z-type operation authority, so that all the second information having x, y, z-type operation authority can be viewed and operated.
In a specific application scenario, if some second information is added to a certain component thereof, for example, the component includes four kinds of installation procedures, construction processes, approach time and purchase price, and for example, the authority inherited by the installation procedures and the construction processes is x-type display authority and operation authority.
When displaying, the user can display the operation frames distinguished according to the display authority and the operation authority, that is, the user can display the installation process and the construction process to an account having the x-type display authority and the operation authority, and further display the operation frames for the user corresponding to the account to operate.
Similarly, an account user who only has the x-type display right can only check the installation process and the construction process and cannot operate the account user. And the account user with the operation authority has the display authority by default, namely can view the display authority.
And S14, displaying the first information and the second information in a distinguishing way according to the authority classification of the first information and the second information.
After the first information and the second information are subjected to authority classification, the first information and the second information are distinguished and displayed to corresponding authority accounts according to the specific authority classification, or the operation right is given to the corresponding authority accounts. The specific display process or operation process is described in detail above, and is not described herein again.
In the above embodiment, after the first information is extracted, the display permission and the operation permission are classified, so that the first information can be clearly and simply released to the account corresponding to the display permission and the operation permission, that is, the related users, without crossing, and the users can intuitively know the information which needs to be processed.
Furthermore, due to the acquisition and the authority classification of the second information, the related users can complete the second information, and the second information is accurate to one layer of the basic unit of the component, so that the information is more detailed and specific. The problem of information redundancy can not occur, great convenience is brought to user personnel of the whole design process, and the whole data is clearer and more transparent.
Referring to fig. 2, fig. 2 is a block diagram illustrating a structure of an information authority management device of a BIM platform according to an embodiment of the present invention.
The information right management apparatus of the BIM platform provided in this embodiment specifically includes a processor 10 and a memory 11 coupled to the processor.
The processor 10 may also be referred to as a CPU (Central Processing Unit). The processor 10 may be an integrated circuit chip having signal processing capabilities. The processor 10 may also be a general purpose processor, a Digital Signal Processor (DSP), an Application Specific Integrated Circuit (ASIC), an off-the-shelf programmable gate array (FPGA) or other programmable logic device, discrete gate or transistor logic, discrete hardware components. A general purpose processor may be a microprocessor or the processor may be any conventional processor or the like.
In this implementation, the processor 10 may be configured to obtain first information of a component in the BIM model; acquiring second information added to the components in the BIM; carrying out authority classification on the first information according to the information type of the first information; and classifying the authority of the second information according to the adding authority of the corresponding account when the second information is added.
The memory 11 stores an instruction file 111 capable of implementing any of the embodiments described above.
Other module terminals of the above-mentioned device can respectively execute the corresponding steps in the above-mentioned method embodiment, so that the description of each module is omitted here, and please refer to the description of the corresponding steps above in detail.
Referring to fig. 3, fig. 3 is a schematic structural diagram of an embodiment of the storage apparatus of the present invention, which includes an instruction file 21 capable of implementing all the methods described above, where the instruction file 21 may be stored in the storage apparatus in the form of a software product, and also records data of various computations, and includes several instructions for enabling a computer device (which may be a personal computer, a server, an intelligent robot, or a network device) or a processor (processor) to execute all or part of the steps of the method of the embodiments of the present invention.
The instruction file 21 also has a certain independence, and can continue to cooperate with the processor 10 to execute relevant instructions when the running system and the backup system fail, and cannot be replaced, damaged and emptied in the upgrading, the boot program upgrading and the repairing.
The aforementioned storage device includes: various media capable of storing program codes, such as a usb disk, a mobile hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk or an optical disk, or terminal devices, such as a computer, a server, a mobile phone, and a tablet.
In summary, the present invention provides a method, an apparatus and a storage apparatus for managing information permissions based on a BIM platform. The method comprises the steps of obtaining first information and second information of a member in a BIM model, and respectively endowing the first information and the second information with related authority. On one hand, the authority is added to the first information and the second information, so that the information can be correspondingly displayed according to the authority, the problem that various information is mixed and disordered is avoided, on the other hand, the second information is obtained aiming at the component, so that the second information can be accurate to the layer of the component, and compared with the existing layer only aiming at the BIM model, the information is more detailed and clearer. Therefore, great convenience is brought to design flow participators, and the information management cost is reduced.
The above description is only an embodiment of the present invention, and not intended to limit the scope of the present invention, and all equivalent results or equivalent flow transformations performed by the present specification and drawings, or directly or indirectly applied to other related technical fields, are included in the scope of the present invention.

Claims (8)

1. An information authority management method based on a BIM platform is characterized by comprising the following steps:
acquiring first information of a component in a BIM model;
acquiring second information added to the components in the BIM;
carrying out authority classification on the first information according to the information type of the first information;
carrying out authority classification on the second information according to the corresponding account adding authority when the second information is added;
the first information is basic parameter information required when a component in the BIM is constructed, and the second information is other parameter information added to the component on the BIM platform after the component is constructed.
2. The method for managing according to claim 1, wherein the classifying the first information according to the information type of the first information includes:
and carrying out display authority classification and operation authority classification on different information types in the first information according to the information types in the first information.
3. The management method according to claim 1, wherein the classifying the second information according to the account adding authority corresponding to the second information adding comprises:
acquiring addition permission of an account corresponding to the second information when the second information is added;
and giving a display permission and an operation permission corresponding to the second information according to the adding permission of the account.
4. The method of managing of claim 1, further comprising:
and performing distinguishing display according to the authority classification of the first information and the second information.
5. The management method according to claim 1, wherein the first information includes at least one or more of a size parameter, a performance parameter, a limitation condition, and location information.
6. The management method according to claim 1, wherein the second information includes at least one or more of installation procedure, construction process, time of approach, purchase price, implementation unit, supply unit, acceptance member, installation requirement, and installation location.
7. The BIM platform based information authority management device is characterized in that a processor is connected with a memory coupled with the processor,
the memory stores program instructions for implementing the management method of any of claims 1-6;
the processor is used for acquiring first information of a component in the BIM model; acquiring second information added to the components in the BIM; carrying out authority classification on the first information according to the information type of the first information; classifying the authority of the second information according to the addition authority of the corresponding account when the second information is added;
the first information is basic parameter information required when a component in the BIM is constructed, and the second information is other parameter information added to the component on the BIM platform after the component is constructed.
8. A storage device in which a program file capable of implementing the method according to any one of claims 1 to 6 is stored.
CN201910074017.4A 2019-01-25 2019-01-25 Information authority management method and device based on BIM platform and storage device Active CN110110530B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910074017.4A CN110110530B (en) 2019-01-25 2019-01-25 Information authority management method and device based on BIM platform and storage device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910074017.4A CN110110530B (en) 2019-01-25 2019-01-25 Information authority management method and device based on BIM platform and storage device

Publications (2)

Publication Number Publication Date
CN110110530A CN110110530A (en) 2019-08-09
CN110110530B true CN110110530B (en) 2021-06-08

Family

ID=67483700

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910074017.4A Active CN110110530B (en) 2019-01-25 2019-01-25 Information authority management method and device based on BIM platform and storage device

Country Status (1)

Country Link
CN (1) CN110110530B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110879907A (en) * 2019-11-15 2020-03-13 上海宝冶集团有限公司 BIM model collaborative creation method
CN112883421A (en) * 2020-09-05 2021-06-01 蔡春梅 Information protection method and information protection system based on cloud computing and block chain service
CN113505350A (en) * 2021-05-12 2021-10-15 国网上海电力设计有限公司 Power management system and method for power grid engineering standardized BIM component library

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102006333B (en) * 2007-06-11 2012-12-26 华为技术有限公司 Method, system and device for installing software component
CN102520933A (en) * 2011-11-28 2012-06-27 深圳市五巨科技有限公司 Method and device for establishing tree menu based on user right
CN103324470B (en) * 2012-03-21 2017-09-22 阿里巴巴集团控股有限公司 A kind of method and apparatus of Web system generation
CN103426049B (en) * 2012-05-25 2018-02-27 张健 A kind of compound management method and system based on WEB
US9390240B1 (en) * 2012-06-11 2016-07-12 Dell Software Inc. System and method for querying data
CN102902898B (en) * 2012-09-21 2018-05-18 中国科学院信息工程研究所 The resource of multi-dimensional digital media uses control method and device
NO3021696T3 (en) * 2013-09-20 2018-10-20
CN105096104A (en) * 2015-07-21 2015-11-25 深圳市永兴元科技有限公司 Form operation authority control method, apparatus and office automation system
CN106920049A (en) * 2017-03-28 2017-07-04 内蒙古科技大学 A kind of Project Management System platform based on BIM network technologies
CN107239714A (en) * 2017-05-31 2017-10-10 北京凤凰理理它信息技术有限公司 Browser control access rights method, device, storage medium and electronic equipment
CN108427802A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 A kind of Deepen Design technique drawing generating method and device based on BIM
CN107480898A (en) * 2017-08-21 2017-12-15 上海中建东孚投资发展有限公司 The PC components processing platform and its processing method of a kind of assembled architecture
CN109087057A (en) * 2018-06-25 2018-12-25 中建三局智能技术有限公司 Collaborative Design method and system based on BIM cloud collaborative platform

Also Published As

Publication number Publication date
CN110110530A (en) 2019-08-09

Similar Documents

Publication Publication Date Title
WO2019134232A1 (en) Method for performing underwriting verification, device, storage medium, and terminal
CN108984418B (en) Software test management method and device, electronic equipment and storage medium
CN107909494B (en) Insurance data information configuration method and device, computer equipment and storage medium
CN110110530B (en) Information authority management method and device based on BIM platform and storage device
CN104765745B (en) Loading data in database are carried out with the method and system of logic checking
US20210224252A1 (en) Method and device for segmenting list, storage medium and terminal
CN109917978B (en) BiM model-based annotation corresponding component display method and device and storage device
US20170316159A1 (en) System And Method For Updating Customer Data
US20240143561A1 (en) Shared hierarchical data design model for transferring data within distributed systems
CN110675249A (en) Matching method, device, server and storage medium for network lending
CN109828783A (en) Document automatic creation method, device, electronic equipment and medium based on code
CN113051354A (en) Online source searching method and device based on dynamic configuration and computer equipment
CN109871593B (en) Information inheritance method and device based on BIM platform and storage device
CN112163962A (en) Method and device for model training and business wind control
CN110750435A (en) Test case management method and device
CN112085611A (en) Asynchronous data verification method and device, electronic equipment and storage medium
CN115269502A (en) Bid document processing method, device and storage medium
CN112348403B (en) Wind control model construction method and device and electronic equipment
CN114281306A (en) IT architecture management and control method, IT architecture management and control device, IT architecture processor and IT architecture electronic equipment
CN111832254B (en) Drawing annotation display processing method and device
CN115130450A (en) Document configuration and circulation method and computer device
CN114115933A (en) Method, system, device, electronic equipment and medium for software upgrading
CN112528100A (en) Label strategy recommending and marking method, terminal equipment and storage medium
CN109783598A (en) Categorization, device, electronic equipment and the storage medium of information resources
KR102421271B1 (en) Service operation system for insurance commission treatment of general agency

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant