CN110109756A - A kind of network target range construction method, system and storage medium - Google Patents

A kind of network target range construction method, system and storage medium Download PDF

Info

Publication number
CN110109756A
CN110109756A CN201910351213.1A CN201910351213A CN110109756A CN 110109756 A CN110109756 A CN 110109756A CN 201910351213 A CN201910351213 A CN 201910351213A CN 110109756 A CN110109756 A CN 110109756A
Authority
CN
China
Prior art keywords
task
server
target range
completion
control instruction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910351213.1A
Other languages
Chinese (zh)
Inventor
余慧英
蔡晶晶
陈俊
张凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Yongxin Zhicheng Technology Co Ltd
Original Assignee
Beijing Yongxin Zhicheng Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Yongxin Zhicheng Technology Co Ltd filed Critical Beijing Yongxin Zhicheng Technology Co Ltd
Priority to CN201910351213.1A priority Critical patent/CN110109756A/en
Publication of CN110109756A publication Critical patent/CN110109756A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/44Arrangements for executing specific programs
    • G06F9/455Emulation; Interpretation; Software simulation, e.g. virtualisation or emulation of application or operating system execution engines
    • G06F9/45533Hypervisors; Virtual machine monitors
    • G06F9/45558Hypervisor-specific management and integration aspects
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/50Allocation of resources, e.g. of the central processing unit [CPU]
    • G06F9/5005Allocation of resources, e.g. of the central processing unit [CPU] to service a request
    • G06F9/5027Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals
    • G06F9/5038Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals considering the execution order of a plurality of tasks, e.g. taking priority or time dependency constraints into consideration
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/50Allocation of resources, e.g. of the central processing unit [CPU]
    • G06F9/5083Techniques for rebalancing the load in a distributed system
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T19/00Manipulating 3D models or images for computer graphics
    • G06T19/006Mixed reality

Abstract

The embodiment of the invention discloses a kind of network target range construction method, system and storage mediums, this method comprises: generating task control instruction when there is task addition in the assignment database for detecting prebuild;Task control instruction is distributed to predetermined server;Receive the task action result of predetermined server feedback;When determining that the corresponding Scene case of current task has been built up completion according to task action result, and determine current task be not be it is first execute complete task when, establish the network connection relation between the corresponding Scene case of current task Scene case corresponding with having executed completion of the task, until the network connection between completion task, generates final network target range.By this kind of mode, different tasks is distributed on different servers respectively and is executed, each server node is made full use of, while avoiding the wasting of resources, additionally it is possible to alleviated building pressure, greatly promote building efficiency.

Description

A kind of network target range construction method, system and storage medium
Technical field
The present embodiments relate to field of computer technology, and in particular to a kind of network target range construction method, system and deposits Storage media.
Background technique
Network target range, which refers to, to be combined by virtual environment with real equipment, and analog simulation goes out live network Space Attack work War environment, being capable of supporting network attacking and defending fight capability research and cyberspace weaponry verification test platform.
In the building process in City-level network target range, it is most frequency that the instantiation of scene, which constructs in the everyday tasks in target range, One of numerous work.Stability, the high speed of Scene case directly affect the performance and experience in target range.Entire Scene case Process include that creation virtual network, creation firewall, configuration firewall rule, carry storage pool, creation storage volume, creation are empty A series of processes such as quasi- machine, connectivity self-test, the process steps are cumbersome, generally require to consume the more time, especially on the spot Structure is complicated for scape, it is larger when it is more prominent to the consumption of time.
So, how just can guarantee that structure is complicated, sweeping scenario building process can reduce the building time to the greatest extent, mention Height building efficiency becomes the application technical problem urgently to be resolved.
Summary of the invention
For this purpose, the embodiment of the present invention provides a kind of network target range construction method, system and storage medium, to solve existing skill In art building structure is complicated, larger network target range when the technical issues of spending the time excessive, constructing low efficiency.
To achieve the goals above, the embodiment of the present invention provides the following technical solutions:
According to a first aspect of the embodiments of the present invention, a kind of network target range construction method is provided, this method is applied to one Kind of network target range constructs system, and network target range building system includes task management engine, server cluster and assignment database, It include at least two servers in server cluster, method is executed by task management engine, comprising:
When there is task addition in the assignment database for detecting prebuild, task control instruction is generated;
Task control instruction is distributed to predetermined server, so that predetermined server is instructed according to task control, from task Task is transferred in database, and constructs Scene case corresponding with task, wherein predetermined server is appointing in server cluster One server;
Receive the task action result of predetermined server feedback;
When determining that the corresponding Scene case of current task has been built up completion according to task action result, and determine as predecessor When business is not first executing and completing for task, it is corresponding with having executed completion of the task to establish the corresponding Scene case of current task Scene case between network connection relation, until completion task between network connection, generate final network target range.
It further, further include task identification information in assignment instructions, so that predetermined server is according to task identification information, Task is transferred from assignment database.
Further, before task control instruction being distributed to predetermined server, method further include:
The current the smallest server of cpu resource that occupies is obtained as predetermined server from server cluster.
Further, before task control instruction being distributed to predetermined server, method further include:
It determines task type, and sets type identification information.
Further, when at least two servers one or more server current syncs execute task occupied by Resource between when mutually calling, method further include:
Respectively according to each task type identification information in the task of current sync execution, task priority level is determined;
The Task Switching that one or more server current syncs at least two servers are executed is asynchronous execution, And according to task priority level, determine that each server between one or more server executes the sequencing of task, Wherein, task of the task execution sequence of high priority prior to low priority.
Further, task type includes:
Virtual machine task, long consuming task and instantaneously complete task, wherein the long consuming task complete time is more than or equal to Preset time, instantaneous task completion time of completing are less than preset time;
The priority of virtual machine task is higher than the instantaneous priority for completing task, and the instantaneous priority for completing task is higher than length The priority of consuming task.
Further, when task type is virtual machine task, an one process in predetermined server will be occupied and executed Task;
Alternatively, will be occupied in predetermined server when task type is long consuming task or is instantaneous completion task One or more threads complete task, wherein include multiple threads in an one process.
Further, method further include: when detecting that new server is added to server cluster, dynamic adjustment service The load of each server in device cluster, so that Servers-all reaches load balancing in server cluster;
Alternatively, the loading condition of each server and the load that can bear periodically in detection service device cluster Ability, dynamic adjusts the load of each server in server cluster, so that Servers-all reaches negative in server cluster It carries balanced.
According to a second aspect of the embodiments of the present invention, a kind of network target range building system is provided, which includes: task Database, server cluster and task management engine;
Assignment database, for receiving and storing the task of user's building;
Task management engine, for either executing in a kind of network target range construction method as above method step.
Each of server cluster server, the control instruction for being sent according to task management engine, from task Task corresponding with control instruction is transferred in database, and constructs Scene case corresponding with task.
According to a third aspect of the embodiments of the present invention, a kind of computer storage medium is provided, the computer storage medium In comprising one or more program instructions, one or more program instructions are used to be executed a kind of as above network by task management engine Method step either in the construction method of target range.
The embodiment of the present invention has the advantages that the thought using distributed building task Scene case, will be complicated numerous Trivial building task is assigned on each server of server cluster.Specifically, including when task management engine detects When having task addition in assignment database, then task control instruction is generated.And task control instruction is distributed to predetermined server. That is, being distributed on a server when having detected task generation, executed for a server.Receive server feedback Task action result, if determine that the corresponding Scene case of current task has been built up completion according to implementing result, it is determined that Whether current task is first executing and completing for task.If being not first executing and completing for task, current task is established Network connection relation between corresponding Scene case Scene case corresponding with the task that other have executed completion.By this Kind mode, different tasks is distributed on different servers respectively and is executed, made full use of each server node, avoid While the wasting of resources, additionally it is possible to alleviate building pressure, greatly promote building efficiency.
Detailed description of the invention
It, below will be to embodiment party in order to illustrate more clearly of embodiments of the present invention or technical solution in the prior art Formula or attached drawing needed to be used in the description of the prior art are briefly described.It should be evident that the accompanying drawings in the following description is only It is merely exemplary, it for those of ordinary skill in the art, without creative efforts, can also basis The attached drawing of offer, which is extended, obtains other implementation attached drawings.
Structure depicted in this specification, ratio, size etc., only to cooperate the revealed content of specification, for Those skilled in the art understands and reads, and is not intended to limit the invention enforceable qualifications, therefore does not have technical Essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size are not influencing the function of the invention that can be generated Under effect and the purpose that can reach, should all still it fall in the range of disclosed technology contents obtain and can cover.
Fig. 1 is a kind of network target range construction method flow diagram that the embodiment of the present invention 1 provides;
Fig. 2 is that a kind of network target range that the embodiment of the present invention 2 provides constructs system structure diagram.
Specific embodiment
Embodiments of the present invention are illustrated by particular specific embodiment below, those skilled in the art can be by this explanation Content disclosed by book is understood other advantages and efficacy of the present invention easily, it is clear that described embodiment is the present invention one Section Example, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not doing Every other embodiment obtained under the premise of creative work out, shall fall within the protection scope of the present invention.
The embodiment of the present invention 1 provides a kind of network target range construction method, and this method is constructed applied to a kind of network target range System, it includes task management engine, server cluster and assignment database that network target range, which constructs system, is wrapped in server cluster At least two servers are included, method is executed by task management engine, and the method steps are as follows:
Step 110, when there is task addition in the assignment database for detecting prebuild, task control instruction is generated.
Specifically, user can be added in the assignment database of prebuild after generation task.Task management engine can be real When check assignment database, once discovery have task addition, will generate task control instruction.
Step 120, task control instruction is distributed to predetermined server.
Specifically, task control instruction can be distributed to predetermined server.And it is exactly to service that this predetermined server is practical A server in device cluster.The foundation specifically distributed, which can be, sequentially distributes, for example, can be stored with server in system Quantity and server identification information, such as server number.After giving some server distributed tasks, then make corresponding Record, when having task generation next time, be then distributed to next server.
Optionally, under the premise of considering load balancing, the current cpu resource of each server can also be previewed Occupancy situation, task is distributed to and current occupies the smallest server of cpu resource.That is to say will currently occupy cpu resource most Small server is as predetermined server described above.
And server can be instructed according to task control, and task is transferred from assignment database, and be constructed corresponding with task Scene case.
It optionally, may include task identification information in control instruction.The task identification information, which can be, to be detected After task is added, the task identification information corresponding with the task just generated, identification information is to identification mission.Convenient for default clothes Device be engaged according to task identification information, transfers task from the assignment database of prebuild.
It should be noted that be only to be illustrated for task in above content, but practical implementation In, not only one server executes a task.If only one initial task, a service can be only arranged Device executes.But it if including multiple tasks in task pool, needs to be separately dispensed into and is executed on different servers.Specifically The process of distribution is led to described above similar.Task can be distributed in sequence, or occupied according to current server The case where cpu resource, carries out reasonable distribution.
When multiple server syncs execute different tasks, it is also possible to can occur between different task, need phase intermodulation The case where with the source respectively occupied.If be still, different server is synchronous to execute respective task, it is possible that interlocking Situation.The occurrence of in order to avoid this kind, optionally, this method further include:
The Task Switching that one or more server current syncs at least two servers are executed is asynchronous execution.
If it is asynchronous execution, it is necessary to determine which task first carries out, be executed after which task.Therefore, it is inciting somebody to action Task control instruction is distributed to before predetermined server, method further include: determine task type, and set type identification information.
Then, determine that task is preferential according to each task type identification information in the task of current sync execution respectively Grade.
Finally, according to task priority level, determine that each server between one or more server executes task Sequencing, wherein high priority task execution sequence prior to low priority task.
Further alternative, task type can include but is not limited to one of following or a variety of: virtual machine task, length Consuming task and instantaneous completion task.Wherein, the long consuming task complete time is more than or equal to preset time, instantaneously completes task Deadline is less than preset time;
The priority of virtual machine task is higher than the instantaneous priority for completing task, and the instantaneous priority for completing task is higher than length The priority of consuming task.
Further, in same task type, and including multiple subtasks.Inside each middle task type, when depositing It further include that corresponding priority level is set separately in multiple subtasks according to preset rules at multiple subtasks.Also, Gao You The task prior to low priority of first grade first carries out.If the task of ad eundem in this case, still can be encountered, then A kind of task can be executed with random preferential.Another kind is in rear execution.
Pass through the setting of priority, it is ensured that when task concurrently executes, the higher task of priority needs to be lined up Situation.Moreover, if the case where encountering task interlocking, is converted to asynchronous execution by that will synchronize execution, it can be to avoid task not It can smoothly execute, lead to task schedule congestion, the case where system resource largely wastes, effectively improve task execution efficiency.
It is further alternative, when task type is virtual machine task, an one process in predetermined server will be occupied Execution task;Alternatively, will be occupied in predetermined server when task type is long consuming task or is instantaneous completion task One or more threads complete task, wherein include multiple threads in an one process.
For the task of high priority, need to be rapidly completed, then then arrange an entire one process to execute task for it, it is whole The resource of a process is distributed on a task execution, and task execution efficiency is very high at this time.And if it is high medium priority or The task of low priority can then arrange one or more threads in a process to execute completion.For example, instantaneous complete to appoint Business, general to occupy resource very little, the execution time is also very short, and the progress of work that a multithread mode can be used executes, multithreading The task efficiency for concurrently executing lightweight is very high.In this way, it while the occupancy situation of reasonable arrangement resource, mentions significantly It is promoted to the working efficiency that business is completed.It runs, is realized truly in addition, multiple processes are distributed to respectively on multiple servers Parallel computation.
And each process is during execution task, can be busy condition by the status indication of oneself, completes to task Afterwards, it is updated to idle state, waits next task assignment.Meanwhile task action result being fed back.
Step 130, the task action result of predetermined server feedback is received.
Specifically, states such as task action result are including running succeeded, executing unsuccessfully or executing interruption, execution continues. If task execution fails, Detection task is needed to execute the reason of failing, and issue corresponding warning information, so as to user's energy Enough adopt an effective measure in time is handled.Execute interruption, it is likely to interlocking state mentioned above occur, need in temporarily The execution of disconnected current task is further continued for executing current task after the completion of other task executions.Work as predecessor when continuing rectangular-ambulatory-plane When business, server can also feed back the state for executing and continuing.These states are essentially all the progress of work itself described above Feed back the implementing result to rear end.
Step 140, when determining that the corresponding Scene case of current task has been built up completion according to task action result, and really Determine current task not being to establish and the corresponding Scene case of current task and executed completion when being first executing and completing for task Network connection relation between the corresponding Scene case of task, until the network connection between completion task, generates final net Network target range.
Specifically, if the state of execution is that when running succeeded, then can determine the corresponding Scene case of current task Have been built up completion.At this time, if it is determined that current task is not being first execution completion of the task, then, it is also necessary to foundation is worked as Network connection relation between the corresponding Scene case of preceding task Scene case corresponding with having executed completion of the task, until complete At the network connection between task, final network target range is generated.If it is determined that current task is first executing and completing for task, The completion of other subsequent tasks such as then, resettles the network connection relation between the Scene case having had built up, until final Generate network target range.
Further alternative, on the basis of above method step, this method can also include: to appoint in order to further increase Business building efficiency, reaches the load balancing of each server in server cluster.It can be realized by the following two kinds mode:
The first is specifically included by computing resource extending transversely:
It, can dynamic increase server when user detects that current cluster scale is unsatisfactory for business demand.And system then may be used With when detecting that new server is added to server cluster, each server is negative in dynamic adjustment server cluster It carries, so that Servers-all reaches load balancing in server cluster.
Second, horizontal direction extends computing resource, specifically includes:
The loading condition of each server and the load capacity that can bear in periodic detection service device cluster, The load of each server in dynamic adjustment server cluster, so that Servers-all reaches load in server cluster Weighing apparatus.
Specifically, the task quantity periodically in the presence of detection Current task data library, and the process generated Quantity.The loading condition of each server in entire cluster is detected simultaneously, and the load capacity being able to bear.Dynamic adjusts every The load of a server realizes that load balancing, the execution task of each server of reasonable distribution reach overall task and execute effect The optimization of rate.
A kind of network target range construction method provided in an embodiment of the present invention, using distributed building task Scene case Complicated cumbersome building task is assigned on each server of server cluster by thought.Specifically, including working as task pipe Reason engine detects in assignment database when having task addition, then generates task control instruction.And task control is instructed and is distributed To predetermined server.That is, being distributed on a server when having detected task generation, executed for a server.It receives The task action result of server feedback, if determining that the corresponding Scene case of current task has had been built up according to implementing result Cheng Shi, it is determined that whether current task is first executing and completing for task.If being not first executing and completing for task, build Network connection between the vertical corresponding Scene case of current task Scene case corresponding with the task that other have executed completion Relationship.By this kind of mode, different tasks is distributed on different servers respectively and is executed, make full use of each service Device node, while avoiding the wasting of resources, additionally it is possible to alleviate building pressure, greatly promote building efficiency.
Corresponding with above-described embodiment, the embodiment of the present invention 2 additionally provides a kind of network target range building system, specifically such as It include task management engine 10, server set in Fig. 2 Fig. 2 shows the architecture diagram of network target range building system shown in Fig. 2 Group 20 and assignment database 30.Wherein server cluster 20 is made of at least two servers, and n service is shown in Fig. 2 Device.
Assignment database 30, for receiving and storing the task of user's building.
Task management engine 10, to execute any in a kind of network target range construction method that embodiment as above is introduced Method and step.Optionally, task management engine 10 may include second level management engine, and first order management engine is scene virtual net Network constructs engine, is mainly used for carrying out macro adjustments and controls, the Servers-all in macro adjustments and controls server cluster 20.Particularly By distributing control instruction to second level management engine, the macro adjustments and controls of server cluster 20 are realized indirectly.Second level management is drawn It holds up and instantiates management engine for distributed scene.Wherein distributed scene instantiation management engine is for managing server Cluster realizes that all tasks of concrete application scene construct by subset of servers group, such as all tasks in a hospital Building, including in each department such as diagnostics division, inpatient department and each department subunit scenario building.
Each of server cluster 20 server, the control instruction for being sent according to task management engine 10, from Task corresponding with control instruction is transferred in assignment database 30, and constructs Scene case corresponding with task.
Specifically, server is transferred and control instruction pair mainly first according to control instruction from assignment database 30 Then answering for task constructs the corresponding Scene case of task.Specifically building process may include:
Target template is called from main target template library, target here just refers to the one of above some independent task Part subtask.Alternatively, calling target template from increment target template library.Increment target template library is subsequent according to practical need It will additional increased increment target template library.It is of course also possible to without this increment target template library, but directly to original Main target module library carries out template renewal, and newly-increased target template is added in original main target template library, specifically can be with It limits according to the actual situation, does not do excessive explanation here.After getting target template again, pre-seted according to control instruction acquisition Configuration parameter constructs virtual target example then according to target mould and configuration parameter.Finally, it is real that multiple virtual targets are reconstructed Internal network connection between example.The Scene case building an of task is completed as a result,.Multiple server syncs execute multiple The building of business can accelerate network target building process by this kind of mode, be substantially reduced the target range building time, promote building Efficiency.
A kind of network target range provided in an embodiment of the present invention constructs system, using distributed building task Scene case Complicated cumbersome building task is assigned on each server of server cluster by thought.Specifically, including working as task pipe Reason engine detects in assignment database when having task addition, then generates task control instruction.And task control is instructed and is distributed To predetermined server.That is, being distributed on a server when having detected task generation, executed for a server.It receives The task action result of server feedback, if determining that the corresponding Scene case of current task has had been built up according to implementing result Cheng Shi, it is determined that whether current task is first executing and completing for task.If being not first executing and completing for task, build Network connection between the vertical corresponding Scene case of current task Scene case corresponding with the task that other have executed completion Relationship.By this kind of mode, different tasks is distributed on different servers respectively and is executed, make full use of each service Device node, while avoiding the wasting of resources, additionally it is possible to alleviate building pressure, greatly promote building efficiency.
Corresponding with above-described embodiment, the embodiment of the invention also provides a kind of computer storage medium, the computers Include one or more program instructions in storage medium.Wherein, one or more program instructions by task management engine for being held A kind of row network target range construction method as described above.
Although above having used general explanation and specific embodiment, the present invention is described in detail, at this On the basis of invention, it can be made some modifications or improvements, this will be apparent to those skilled in the art.Therefore, These modifications or improvements without departing from theon the basis of the spirit of the present invention are fallen within the scope of the claimed invention.

Claims (10)

1. a kind of network target range construction method, which is characterized in that the method is applied to a kind of network target range and constructs system, described It includes task management engine, server cluster and assignment database that network target range, which constructs system, is wrapped in the server cluster At least two servers are included, the method is executed by the task management engine, comprising:
When there is task addition in the assignment database for detecting prebuild, task control instruction is generated;
Task control instruction is distributed to predetermined server, so that the predetermined server refers to according to the task control It enables, the task is transferred from the assignment database, and construct Scene case corresponding with the task, wherein described pre- If server is any one server in the server cluster;
Receive the task action result of the predetermined server feedback;
When determining that the corresponding Scene case of current task has been built up completion according to the task action result, and determine as predecessor When business is not first executing and completing for task, establishes the corresponding Scene case of the current task and executed the task of completion Network connection relation between corresponding Scene case generates final net until completing the network connection between the task Network target range.
2. the method according to claim 1, wherein further include task identification information in the assignment instructions, with Toilet states predetermined server according to the task identification information, and the task is transferred from the assignment database.
3. the method according to claim 1, wherein described be distributed to preset service for task control instruction Before device, the method also includes:
The current the smallest server of cpu resource that occupies is obtained as the predetermined server from the server cluster.
4. the method according to claim 1, wherein described be distributed to preset service for task control instruction Before device, the method also includes:
It determines the task type, and sets type identification information.
5. according to the method described in claim 4, it is characterized in that, when one or more servers at least two servers Between the occupied resource of task that current sync executes when mutually calling, the method also includes:
Respectively according to each task type identification information in the task of current sync execution, task priority level is determined;
The Task Switching that one or more server current syncs at least two server are executed is asynchronous execution, And according to the task priority level, determine that each server between one or more of servers executes the elder generation of task Sequence afterwards, wherein task of the task execution sequence of high priority prior to low priority.
6. method according to claim 4 or 5, which is characterized in that the task type includes:
Virtual machine task, long consuming task and instantaneously complete task, wherein the long consuming task complete time is more than or equal to Preset time, the instantaneous completion task completion time are less than the preset time;
The priority of the virtual machine task be higher than the instantaneous completion task priority, the instantaneous completion task it is preferential Grade is higher than the priority of the long consuming task.
7. according to the method described in claim 6, it is characterized in that, will be occupied when the task type is virtual machine task An one process in the predetermined server executes task;
Alternatively, the predetermined server will be occupied when the task type is long consuming task or is instantaneous completion task In one or more threads complete task, wherein in one one process include multiple threads.
8. -5 or 7 described in any item methods according to claim 1, which is characterized in that the method also includes:
When detecting that new server is added to the server cluster, dynamically adjusts each in the server cluster and take The load of business device, so that Servers-all reaches load balancing in the server cluster;
Alternatively, periodically detecting the loading condition of each server and the load that can bear in the server cluster Ability, dynamic adjusts the load of each server in server cluster, so that Servers-all reaches in the server cluster To load balancing.
9. a kind of network target range constructs system, which is characterized in that the system comprises: assignment database, server cluster and appoint Business management engine;
The assignment database, for receiving and storing the task of user's building;
The task management engine, for executing the method according to claim 1;
Each of server cluster server, the control instruction for being sent according to the task management engine, from Task corresponding with the control instruction is transferred in assignment database, and constructs Scene case corresponding with the task.
10. a kind of computer storage medium, which is characterized in that refer in the computer storage medium comprising one or more programs It enables, one or more of program instructions are used to execute the method according to claim 1 by task management engine.
CN201910351213.1A 2019-04-28 2019-04-28 A kind of network target range construction method, system and storage medium Pending CN110109756A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910351213.1A CN110109756A (en) 2019-04-28 2019-04-28 A kind of network target range construction method, system and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910351213.1A CN110109756A (en) 2019-04-28 2019-04-28 A kind of network target range construction method, system and storage medium

Publications (1)

Publication Number Publication Date
CN110109756A true CN110109756A (en) 2019-08-09

Family

ID=67487082

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910351213.1A Pending CN110109756A (en) 2019-04-28 2019-04-28 A kind of network target range construction method, system and storage medium

Country Status (1)

Country Link
CN (1) CN110109756A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110942508A (en) * 2019-10-30 2020-03-31 北京邮电大学 Real-time scene large-screen display method and system for urban network shooting range
CN111399815A (en) * 2020-03-09 2020-07-10 北京计算机技术及应用研究所 Asynchronous function flow control method suitable for network target range construction
CN112055026A (en) * 2020-09-11 2020-12-08 湖南泛联新安信息科技有限公司 Network target range physical environment construction method and system
CN112270085A (en) * 2020-10-26 2021-01-26 广州锦行网络科技有限公司 Dynamic design method of 3D network shooting range
CN112349361A (en) * 2021-01-08 2021-02-09 浙江太美医疗科技股份有限公司 Execution scheduling method, system and readable medium for clinical trial data processing task
CN113542025A (en) * 2021-07-14 2021-10-22 南京赛宁信息技术有限公司 Streaming dynamic fair scene distribution method and device in network shooting range environment
CN114301784A (en) * 2021-12-09 2022-04-08 中国国家铁路集团有限公司 Network shooting range training environment construction method and device, electronic equipment and storage medium
CN114510352A (en) * 2022-02-15 2022-05-17 北京永信至诚科技股份有限公司 Method and system for automatically permeating project scheduling task
CN115334698A (en) * 2022-07-20 2022-11-11 烽台科技(北京)有限公司 Construction method, device, terminal and medium for 5G safety network of target range target

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103763378A (en) * 2014-01-24 2014-04-30 中国联合网络通信集团有限公司 Task processing method and system and nodes based on distributive type calculation system
US20140130056A1 (en) * 2012-11-05 2014-05-08 Rational Systems Llc Parallel Execution Framework
CN104239148A (en) * 2013-06-06 2014-12-24 腾讯科技(深圳)有限公司 Distributed task scheduling method and device
CN104811335A (en) * 2015-03-26 2015-07-29 华迪计算机集团有限公司 Method for realizing network target range system and network target range management system
CN108021428A (en) * 2017-12-05 2018-05-11 华迪计算机集团有限公司 A kind of method and system that network target range is realized based on Docker
CN108287756A (en) * 2018-01-25 2018-07-17 联动优势科技有限公司 A kind of method and device of processing task

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140130056A1 (en) * 2012-11-05 2014-05-08 Rational Systems Llc Parallel Execution Framework
CN104239148A (en) * 2013-06-06 2014-12-24 腾讯科技(深圳)有限公司 Distributed task scheduling method and device
CN103763378A (en) * 2014-01-24 2014-04-30 中国联合网络通信集团有限公司 Task processing method and system and nodes based on distributive type calculation system
CN104811335A (en) * 2015-03-26 2015-07-29 华迪计算机集团有限公司 Method for realizing network target range system and network target range management system
CN108021428A (en) * 2017-12-05 2018-05-11 华迪计算机集团有限公司 A kind of method and system that network target range is realized based on Docker
CN108287756A (en) * 2018-01-25 2018-07-17 联动优势科技有限公司 A kind of method and device of processing task

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110942508A (en) * 2019-10-30 2020-03-31 北京邮电大学 Real-time scene large-screen display method and system for urban network shooting range
CN111399815A (en) * 2020-03-09 2020-07-10 北京计算机技术及应用研究所 Asynchronous function flow control method suitable for network target range construction
CN111399815B (en) * 2020-03-09 2023-06-30 北京计算机技术及应用研究所 Asynchronous function flow control method suitable for network target range construction
CN112055026A (en) * 2020-09-11 2020-12-08 湖南泛联新安信息科技有限公司 Network target range physical environment construction method and system
CN112270085A (en) * 2020-10-26 2021-01-26 广州锦行网络科技有限公司 Dynamic design method of 3D network shooting range
CN112349361A (en) * 2021-01-08 2021-02-09 浙江太美医疗科技股份有限公司 Execution scheduling method, system and readable medium for clinical trial data processing task
CN113542025B (en) * 2021-07-14 2023-05-23 南京赛宁信息技术有限公司 Streaming dynamic fairness scene distribution method and device in network target range environment
CN113542025A (en) * 2021-07-14 2021-10-22 南京赛宁信息技术有限公司 Streaming dynamic fair scene distribution method and device in network shooting range environment
CN114301784A (en) * 2021-12-09 2022-04-08 中国国家铁路集团有限公司 Network shooting range training environment construction method and device, electronic equipment and storage medium
CN114301784B (en) * 2021-12-09 2024-02-09 中国国家铁路集团有限公司 Method and device for constructing network target range training environment, electronic equipment and storage medium
CN114510352B (en) * 2022-02-15 2022-09-02 北京永信至诚科技股份有限公司 Method and system for automatically permeating project scheduling tasks
CN114510352A (en) * 2022-02-15 2022-05-17 北京永信至诚科技股份有限公司 Method and system for automatically permeating project scheduling task
CN115334698A (en) * 2022-07-20 2022-11-11 烽台科技(北京)有限公司 Construction method, device, terminal and medium for 5G safety network of target range target
CN115334698B (en) * 2022-07-20 2023-05-23 烽台科技(北京)有限公司 Construction method, device, terminal and medium of target 5G safety network of target range

Similar Documents

Publication Publication Date Title
CN110109756A (en) A kind of network target range construction method, system and storage medium
Ishii et al. Elastic stream computing with clouds
US9703610B2 (en) Extensible centralized dynamic resource distribution in a clustered data grid
CN107346264A (en) A kind of method, apparatus and server apparatus of virtual machine load balance scheduling
CN108021435B (en) Cloud computing task flow scheduling method with fault tolerance capability based on deadline
CN102932422A (en) Cloud environment task scheduling method based on improved ant colony algorithm
CN103716381A (en) Control method and management node of distributed system
CN107291536B (en) Application task flow scheduling method in cloud computing environment
CN112783649A (en) Cloud computing-oriented interactive perception containerized micro-service resource scheduling method
CN105049536A (en) Load balancing system and load balancing method in IaaS (Infrastructure As A Service) cloud environment
Tantalaki et al. Pipeline-based linear scheduling of big data streams in the cloud
CN104102543A (en) Load regulation method and load regulation device in cloud computing environment
CN103297499A (en) Scheduling method and system based on cloud platform
Li et al. An effective scheduling strategy based on hypergraph partition in geographically distributed datacenters
CN104239555A (en) MPP (massively parallel processing)-based parallel data mining framework and MPP-based parallel data mining method
CN103023936B (en) Multi-hierarchy network system and task executing method based on same
CN106201701A (en) A kind of workflow schedule algorithm of band task duplication
Wu et al. Dynamically adjusting scale of a kubernetes cluster under qos guarantee
Kousalya et al. Hybrid algorithm based on genetic algorithm and PSO for task scheduling in cloud computing environment
Wang et al. Design and implementation of adaptive resource co-allocation approaches for cloud service environments
CN109408230A (en) Docker container dispositions method and system based on energy optimization
Butt et al. Optimization of response and processing time for smart societies using particle swarm optimization and levy walk
Zhang et al. Speeding up vm startup by cooperative vm image caching
Liu A Programming Model for the Cloud Platform
Dai et al. A resource occupancy ratio-oriented load balancing task scheduling mechanism for flink

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190809