CN110109692A - A kind of method for upgrading system - Google Patents

A kind of method for upgrading system Download PDF

Info

Publication number
CN110109692A
CN110109692A CN201910393334.2A CN201910393334A CN110109692A CN 110109692 A CN110109692 A CN 110109692A CN 201910393334 A CN201910393334 A CN 201910393334A CN 110109692 A CN110109692 A CN 110109692A
Authority
CN
China
Prior art keywords
control centre
network condition
upgrading
time
prediction data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910393334.2A
Other languages
Chinese (zh)
Other versions
CN110109692B (en
Inventor
李建伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lianyimeng (Tianjin) Supply Chain Co.,Ltd.
Original Assignee
Tianjin Lianxing Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Lianxing Technology Co Ltd filed Critical Tianjin Lianxing Technology Co Ltd
Priority to CN201910393334.2A priority Critical patent/CN110109692B/en
Publication of CN110109692A publication Critical patent/CN110109692A/en
Application granted granted Critical
Publication of CN110109692B publication Critical patent/CN110109692B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/60Software deployment
    • G06F8/65Updates
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/083Shipping
    • G06Q10/0833Tracking
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/08Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/06Protocols specially adapted for file transfer, e.g. file transfer protocol [FTP]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/34Network arrangements or protocols for supporting network services or applications involving the movement of software or configuration parameters 

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Theoretical Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Computer Security & Cryptography (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Environmental & Geological Engineering (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of method for upgrading system, it can solve the problems, such as that progress program upgrades the upgrading that can be potentially encountered slowly in network congestion in the prior art or upgrading fails, and network condition prediction data can more accurately be predicted by way of real-time detector data is combined with prediction model, and also multiple adjustment can be carried out to the time of fixed point upgrading according to the real-time prediction case of network condition prediction data under the mode of fixed point triggering, so as to so that the program upgrading of the control centre can be executed smoothly.

Description

A kind of method for upgrading system
Technical field
The present invention relates to computer fields, and in particular to a kind of method for upgrading system.
Background technique
With the development of intelligent terminal and electronic information technology, many traditional industries all gradually have paperization operation from heavy It is changed into no paper electronic operation, in order to guarantee that the electronics of various businesses handles process and formality is gone on smoothly, phase can be set The control centre answered is controlled and is managed to corresponding operation process, however perhaps multiple services process of handling is in accordance with accordingly Policy Conditions and real-time change, it is real-time according to Policy Conditions that this also requires that the control logic of corresponding control centre is needed Carry out readjust.
In traditional maintenance mode, control centre needs maintenance personnel to manually perform updating operation, however this operation It is time-consuming and laborious, and need maintenance personnel to be in the action and be updated the burning of program.With electronic technology and the communication technology Development, more and more upgradings update operation and are changed into automatic form by manual form, i.e., unified to be controlled by upgrade server Make corresponding updating operation.However inventors have found that control that often can not be intelligent executes in existing automatic upgrade technique The period of program upgrading, this, which is possible to will lead to be upgraded apply, executes updating operation under network congestion state, thus So that escalation process slowly even causes upgrading to fail.
Summary of the invention
The invention proposes a kind of method for upgrading system, execute efficient program suitable for the control centre to various businesses Upgrading can effectively prevent upgrading the case where failing.
The invention proposes a kind of method for upgrading system characterized by comprising
Step S1: network condition prediction data is determined;
Step S2: judge whether the control centre is online, S3 is entered step when the control centre is online, is otherwise moved back Out;
Step S3: upgrade server issues trigger parameter and updates the server end where file to control centre;
Step S4: corresponding triggering mode is selected to carry out program upgrading to the control centre according to the trigger parameter;
Step S5: judge whether control centre upgrades successfully and fed back.
Preferably, the method also includes:
The control centre is for controlling clearance logistics with the work of single system.
Preferably, the step S1 further include:
By one monitoring module of the setting network condition current come real-time monitoring, first network situation data are obtained;
Model is established according to the historical data of the network condition in upper one day or upper one month, by the first network situation number According to being input in the model to obtain network condition prediction data.
Preferably, the step S3 further include:
The trigger parameter includes triggering and pinpointing immediately two classes of triggering, determines institute according to the network condition prediction data Trigger parameter is stated, if the network condition prediction data is the free time, trigger parameter is to trigger immediately, if the network condition is pre- Measured data be it is busy, then trigger parameter be fixed point triggering, if the network condition prediction data be it is normal, can be by operator Specified trigger parameter.
Preferably, the step S4 further include:
The update time parameter can be also adjusted in real time, when the control centre according to fixed point trigger parameter from the liter After grade server receives update time for the first time, the upgrade server can persistently carry out network condition prediction data pre- It surveys, when the network condition prediction data differs by more than threshold value with the update time parameter issued before, into the control Server where the heart re-issues update time.
Preferably, the method also includes:
The threshold value is 1 hour.
Through the invention in propose a kind of method for upgrading system, can solve in the prior art in network congestion into The problem of upgrading that line program upgrading can be potentially encountered is slowly or upgrading fails, and pass through real-time detector data and prediction mould The form that type combines can more accurately predict network condition prediction data, and go back under the mode of fixed point triggering Can carry out multiple adjustment according to the time of the real-time prediction case of network condition prediction data to fixed point upgrading, so as to so that The program upgrading of the control centre can be executed smoothly.
On the other hand, the invention also provides a kind of clearance logistics with single system, it can be achieved that clearance logistics business was handled Speed that is with no paper and promoting business handling.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples, in attached drawing:
Fig. 1 is clearance logistics a kind of in the embodiment of the present invention one with the work flow diagram of single system;
Fig. 2 is clearance logistics a kind of in the embodiment of the present invention two with the system block diagram of single system;
Fig. 3 is a kind of work flow diagram of method for upgrading system in the embodiment of the present invention three.
Specific embodiment
Now in conjunction with attached drawing, elaborate to presently preferred embodiments of the present invention.
Embodiment one
A kind of method for upgrading system of the present invention, the control centre for declaring process to control clearance logistics execute Efficient program upgrade operations.
Before introducing the method for upgrading system, upgrading object first targeted to the present invention, i.e. clearance logistics is declared System and control centre therein are introduced.
It is declared in process in traditional clearance logistics, the logistics owner of cargo and cargo forwarder people or buyer need using conventional paper The form of material is declared, and this mode of declaring not only is spent human and material resources, can also be because of business handling personnel to policy Adjustment fail to understand to cause to declare process in time not meeting Policy Conditions, in turn result in should the logistics of fast reaction match Sending becomes without so quickly, the meaning of loglstics enterprise renewal model being greatly reduced, and paying because of update bring capital can not Compensation of effectively getting a profit is obtained, economic loss is brought to logistics distribution enterprise.It is existing in the prior art above-mentioned in order to overcome Problem realizes that the electronization and high efficiency of process are declared in clearance logistics, and reaches the purpose that uses manpower and material resources sparingly, and the present invention proposes A kind of clearance logistics can realize that handling with no paper at all for process is declared in clearance logistics with single system, by the system, and described System can adjust in real time with the variation of policy, and each working procedure declared in process is controlled and is assigned to by control centre Relative client is handled in time.
A kind of clearance logistics proposed by the invention with single system framework as shown in Figure 1, the system comprises process library, Information bank, control centre and several handheld terminals.
The corresponding custom clearance process of all flow rules is stored in the process library, the custom clearance process is walked by multiple operations Suddenly it is composed, wherein the trigger condition of each operating procedure is corresponding with the completion signal of upper level operating procedure, described Process library is used to provide current operating procedure to be triggered to control centre.All name of an article custom clearance processes that storage system is supported Database.The custom clearance process of different name of an article cargos is different, even if the identical name of an article, according to the different situations in actual mechanical process, It may also can generate different operating processes.The custom clearance stream of all names of an article (being stepped up with system perfecting) is stored in process library The different custom clearance processes that journey and each name of an article may generate under different situations.Custom clearance process can pass through background management system It increases newly and is compiled as completing Intelligent worker assigning, every operating procedure need to be pre-configured with field personnel operation (handheld terminal account) in process.
Described information storehouse is used to save the implementation procedure data and implementing result data of each operating procedure, described Information bank is used to provide the executive condition data of cycle and taking corresponding operation to control centre, so that the control centre judges current behaviour Make the implementation progress of step, and is judged whether to trigger next operating procedure according to the implementation progress.Specifically, in information bank There are two parts information: before starting operation, user passes through the business essential information of other module typings, such as bill of landing number, the name of an article Deng;After starting operation, handheld terminal completes the operation information reported after each operating procedure, than such as whether examine goods, place of examining goods, It examines goods mode.
The control centre is core of the clearance logistics with single system, is responsible for all data flows in operation system Logical interaction, the control program of the control centre can quickly be adjusted according to policy change, judge business according to the control program Data current schedules, and the business operation that real time down currently needs in a manner of backlog is to corresponding operating staff terminal, Data are again introduced into control centre after operator's receipt, and control centre will judge again what next step needed according to receipt data Operation be issued to corresponding operation staff terminal again in a manner of backlog, and so on until all operationss complete, Described in control centre by inquiry described information storehouse in information to judge whether an operating procedure is finished, when judgement is held Row calls the operating procedure in the process library to carry out subsequent operation when finishing.Wherein, operation flow is controlled in control centre While, the progress of handling of the operation flow will also be reminded in a manner of short message, instant push, mail to current service data Administrative staff's terminal, the consigner's terminal of the owner grasps data trend in real time.
Several handheld terminals can be the intelligent mobile terminal of clerical worker, and the clerical worker can be the logistics Owner of cargo, cargo forwarder people, logistics distribution personnel, storage personnel and international delivery personnel in merchandiser operation service etc., the control Center processed will complete to grasp accordingly using intelligent mobile terminal according to the corresponding clerical worker of the progress notification of the business handling It deals with, and the control centre is also responsible for monitoring the progress of the operation processing, to complete operation step according to the progress Circulation between rapid.
Preferably, the clearance logistics with single system can the form of common APP be installed on the intelligence of the clerical worker On mobile terminal, the processing of cycle and taking corresponding operation can be completed by the APP by corresponding clerical worker, and the APP is responsible for reporting The processing progress of cycle and taking corresponding operation, wherein the APP can realize automatic monitoring and root for the operating procedure of electronic declaration class Implementation progress information is reported to remote information library according to monitored results, needs the operation of practical operation class to walk logistics distribution etc. Suddenly, the processing progress letter that processing item fills in the operating procedure on the APP manually later is completed by corresponding clerical worker Breath.
Preferably, the clearance logistics is as follows with the workflow of single system:
Step S100: process library is constructed according to currently pending operation flow.
Preferably, several operating procedures corresponding with currently pending operation flow are stored in the process library, There are causal relations between the operating procedure.
Step S200: control centre receives " starting to operate " and instructs and start to execute the operation flow to be processed.
Preferably, as being possible to include operating procedure corresponding to multiple business process in the process library, It must include the relevant parameter that can judge flow rules in described " starting to operate " instruction, such as import/export, the methods of conducting trade, goods Item name, cargo property, duty paragraph, clearance mode, supervision method, examination mode, means of transportation, collect or exempt from property, settlement of exchange mode, at Friendship mode etc..
Step S300: remote information library real-time reception simultaneously stores implementation progress information.
Preferably, the APP on the hand-held intelligent mobile terminal of clerical worker is responsible for monitoring and receiving current operation step Implementation progress, and the implementation progress is sent to remote information library in real time, the remote information library is to the implementation progress It is saved.
Step S400: the control centre carries out Intelligent worker assigning according to the implementation progress information of current operation step.
Preferably, the control centre executes inquiry operation to the remote information library in real time, when inquiring current operation When step has been finished, next operation information is searched into the process library according to the execution result information inquired, and The operation information is sent to corresponding hand-held intelligent mobile terminal to handle.
Step S500: repeat the above steps S200-S400, until all operations step in current business process is all held Until row finishes.
Wherein, to the core of this system, i.e. the detailed function and operating process of control centre are described as follows:
1. being stored with the corresponding custom clearance process of all flow rules in process library.It must include energy in " starting to operate " instruction The relevant parameter for enough judging flow rules, as import/export, the methods of conducting trade, nature of goods, cargo property, duty paragraph, clearance mode, Supervision method, means of transportation, collects or exempts from property, settle the exchange mode, conclusion of the business mode etc. at examination mode.
2. because the initial step and end step of the corresponding custom clearance process of different flow rules may be different, so process The corresponding custom clearance process of each flow rules is equipped with a virtual beginning step and end step in library, when start operation or When completing operation, control centre can find unified starting and ending step.
3. each operating procedure is configured with " condition is in next step " of flow rules, i.e., should including virtual initial step After the completion of step operation, different next step is sent according to different conditions.
4. after control centre receives " starting to operate " instruction, taking out the parameter automatically requesting, analyzing carried in instruction and going out to flow Journey rule is initiated to inquire using the flow rules as querying condition to process library, obtains the virtual of the flow rules custom clearance process and rises Beginning operating procedure.
5. control centre takes out " condition is in next step " configured in virtual initial step, " condition is in next step " might have more A, control centre checks each " condition is in next step " one by one, and whether the information in cross-check information library meets " condition is in next step " In condition, if it is satisfied, send " next step ", if not satisfied, continuing to check next " condition is in next step ", until finding " condition is in next step " met.
6. taking out instruction after control centre receives " operating procedure for tasking me is completed " instruction that handheld terminal reports Parameter " operating procedure mark " is that querying condition inquires operating procedure configuration from process library with " the operating procedure mark " " condition in next step " set, with item 5 described in analyze the next step operating procedure that send as algorithm.
In the algorithm described in item 6, when being " virtual end step " when analysis obtains the next step that send, meaning Custom clearance be completed send work in control.
One of through this embodiment clearance logistics merchandiser method, can reach it is following the utility model has the advantages that
1. adding the form at individual client end to realize that system automatic job distribution operates using cloud, the complexity for artificially sending work is avoided Property, error probability, human cost can be saved;
2. system can instruct working specification, it can be achieved that the mode that hand-held mobile terminal is operated according to system command, reduction are each Business manpower training cost.
3. operation progress, which can be looked into, to be monitored, the existing artificial feelings for being notified to progress by phone or other communication tools are avoided Condition, speed operations efficiency.
4. data handover avoids artificially joining format mistake using unified format after the enterprise in supply chain uses system Accidentally, the case where error in data, handover efficiency and accuracy rate are effectively improved.
5. the owner of cargo active inquiry or can receive the real-time progress of my cargo and remind, existing notification/inquiry progress is solved It delays, complicated problem, so that it can adjust personal marketing strategy according to real-time dynamic, avoids causing fund because opportunity is delayed Loss.
Embodiment two
Fig. 2 is a kind of system block diagram of the clearance logistics shown according to an exemplary embodiment with single system, such as Fig. 2 institute Show, which includes:
Process library constructs module, and the process library building module is used to construct process according to currently pending operation flow Library;
Business process monitoring module, the business process monitoring module includes control centre, and passes through the control centre Receive the progress msg that corresponding operating user executes corresponding service process;
Intelligent worker assigning module, the Intelligent worker assigning module are used for the implementation progress information according to corresponding service process in process The follow-up business process of current business process, and the operation corresponding with the follow-up business process that will be found are searched in library Information is sent to corresponding hand-held intelligent mobile terminal and is handled.
Preferably, it is constructed in the process library that module is established and is stored with and currently pending operation flow by the process library Several corresponding operating procedures, there are causal relations between several described operating procedures.
Preferably, the control centre is also used to receive " starting to operate " and instructs and start to execute the Business Stream to be processed Journey, as being possible to " start to grasp described comprising operating procedure corresponding to multiple business process in the process library It must include the relevant parameter that can judge flow rules in work " instruction, such as import/export, the methods of conducting trade, nature of goods, cargo Property, clearance mode, supervision method, examination mode, means of transportation, collects or exempts from property, settle the exchange mode, conclusion of the business mode etc. at duty paragraph.
Preferably, it is real-time to be used for the APP on the hand-held intelligent terminal by clerical worker for the business process monitoring module Monitoring and the implementation progress for receiving current operation step, and the implementation progress is sent to remote information library in real time, it is described Remote information library saves the implementation progress.
Preferably, the control centre executes inquiry operation to the remote information library in real time, when inquiring current operation When step has been finished, next operation information is searched into the process library according to the execution result information inquired, and The operation information is sent to corresponding hand-held intelligent mobile terminal to handle.
Clearance logistics is with single system one of through this embodiment, can reach it is following the utility model has the advantages that
1. adding the form at individual client end to realize that system automatic job distribution operates using cloud, the complexity for artificially sending work is avoided Property, error probability, human cost can be saved;
2. system can instruct working specification, it can be achieved that the mode that hand-held mobile terminal is operated according to system command, reduces each enterprise Industry manpower training cost.
3. operation progress, which can be looked into, to be monitored, the existing artificial feelings for being notified to progress by phone or other communication tools are avoided Condition, speed operations efficiency.
4. data handover avoids artificially joining format mistake using unified format after the enterprise in supply chain uses system Accidentally, the case where error in data, handover efficiency and accuracy rate are effectively improved.
5. the owner of cargo active inquiry or can receive the real-time progress of my cargo and remind, existing notification/inquiry progress is solved It delays, complicated problem, so that it can adjust personal marketing strategy according to real-time dynamic, avoids causing fund because opportunity is delayed Loss.
Embodiment three
As clearance logistics declare by influenced as defined in relevant policies be it is very big, to guarantee the clearance logistics Declaration system can smoothly be completed to declare operation for user, it is necessary to timely be provided according to relevant policies to the clearance object The control centre of stream declaration system is controlled, this also just needs timely to be provided according to relevant policies to the control in control centre Processing procedure sequence carries out upgrading and update processing, and the automatic updating operation of program in the prior art often needs the specified set time Section is performed, this is possible to cause program to upgrade inefficiency because of network congestion in the fixed time period, even It will lead to the case where upgrading fails.
In order to avoid the generation of above situation, a kind of method for upgrading system is present embodiments provided, for control clearance The control centre that process is declared in logistics executes efficient program upgrade operations, and the method includes following operating procedures:
Step S1: network condition prediction data is determined.
Preferably, the network condition current come real-time monitoring by one monitoring module of setting, obtains first network situation number According to;Model is established according to the historical data of the network condition in upper one day or upper one month.The first network situation data are defeated Enter into the model to obtain network condition prediction data.
Preferably, the network condition prediction data includes idle, normal and busy three classes.
Step S2: judge whether the control centre is online, S3 is entered step when the control centre is online, is otherwise moved back Out.
Preferably, the judgement operation is realized by way of sending handshake.
Step S3: upgrade server issues trigger parameter and updates the server end where file to control centre.
Preferably, the trigger parameter includes triggering and pinpointing immediately two classes of triggering, predicts number according to the network condition According to the determination trigger parameter, if the network condition prediction data is the free time, trigger parameter is to trigger immediately, if the net Network situation prediction data be it is busy, then trigger parameter is fixed point triggering, if the network condition prediction data be it is normal, can be by Operator specifies trigger parameter.
Step S4: corresponding triggering mode is selected to carry out program upgrading to the control centre according to the trigger parameter.
Preferably, when the trigger parameter is to trigger immediately, then the server where the control centre will touch immediately The update file received is sent out, and executes program and updates operation.
It should be noted that the program upgrading progress for updating file and being used to control control centre, the update file Size it is smaller, therefore issue the update file to server where control centre and not will receive the influence of network condition, it is excellent Choosing, the update file is script file, can control control centre's server described in program escalation process and the liter Multiple interaction between grade server, and can report an error in time when the error occurs, to guarantee smoothly holding for program upgrading Row.
Preferably, when the trigger parameter is fixed point triggering, then the server where the control centre will be according to institute It states fixed point trigger parameter to establish a communications link with the upgrade server, the upgrading will be requested to take after establishing a communications link Business device issues update time parameter, and the update time parameter received is input in the update file, then is changed Update file after writing will execute journey to the control centre at defined time point according to the update time received Sequence updating operation.
Preferably, the update time parameter can be also adjusted in real time.When the control centre is according to fixed point trigger parameter After receiving update time for the first time from the upgrade server, the upgrade server can be persistently to network condition prediction data It is predicted, when the network condition prediction data differs by more than threshold value with the update time parameter issued before, Xiang Suoshu Server where control centre re-issues update time.Preferably, the threshold value is set as 1 hour.
Step S5: judge whether control centre upgrades successfully and fed back.
Preferably, the process and risen as a result, working as that the server meeting real-time monitor (RTM) where the control centre upgrades The information upgraded successfully can be fed back to the upgrade server when grade success, when can will upgrade when the error occurs in escalation process The information of failure feeds back to the upgrade server, further includes the specific reason for causing upgrading to fail in the upgrading failure information By.
A kind of method for upgrading system proposed in through this embodiment, can solve in the prior art in network congestion It carries out program to upgrade the upgrading that can be potentially encountered slowly or upgrade the problem of failing, and passes through real-time detector data and prediction The form that model combines can more accurately predict network condition prediction data, and under the mode of fixed point triggering Also multiple adjustment can be carried out to the time of fixed point upgrading according to the real-time prediction case of network condition prediction data, so as to The program of the control centre is set to upgrade and can smoothly execute.
In several embodiments provided by the present invention, it should be understood that disclosed device and method can pass through it Its mode is realized.For example, the apparatus embodiments described above are merely exemplary, for example, the division of the module, only Only a kind of logical function partition, there may be another division manner in actual implementation.
The module as illustrated by the separation member may or may not be physically separated, aobvious as module The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple In network unit.Some or all of the modules therein can be selected to realize the mesh of this embodiment scheme according to the actual needs 's.
It, can also be in addition, each functional module in each embodiment of the present invention can integrate in one processing unit It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of hardware adds software function module.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included in the present invention.Any attached associated diagram label in claim should not be considered as right involved in limitation to want It asks.Furthermore, it is to be understood that one word of " comprising " does not exclude other units or steps, odd number is not excluded for plural number.It is stated in system claims Multiple modules or device can also be implemented through software or hardware by a module or device.The first, the second equal words It is used to indicate names, and does not indicate any particular order.
Finally it should be noted that the above examples are only used to illustrate the technical scheme of the present invention and are not limiting, although reference Preferred embodiment describes the invention in detail, those skilled in the art should understand that, it can be to of the invention Technical solution is modified or equivalent replacement, without departing from the spirit and scope of the technical solution of the present invention.

Claims (6)

1. a kind of method for upgrading system characterized by comprising
Step S1: network condition prediction data is determined;
Step S2: judge whether the control centre is online, S3 is entered step when the control centre is online, is otherwise exited;
Step S3: upgrade server issues trigger parameter and updates the server end where file to control centre;
Step S4: corresponding triggering mode is selected to carry out program upgrading to the control centre according to the trigger parameter;
Step S5: judge whether control centre upgrades successfully and fed back.
2. a kind of method for upgrading system as described in claim 1, which is characterized in that further include:
The control centre is for controlling clearance logistics with the work of single system.
3. a kind of method for upgrading system as described in claim 1, which is characterized in that the step S1 further include:
By one monitoring module of the setting network condition current come real-time monitoring, first network situation data are obtained;
Model is established according to the historical data of the network condition in upper one day or upper one month, the first network situation data are defeated Enter into the model to obtain network condition prediction data.
4. a kind of method for upgrading system as described in claim 1, which is characterized in that the step S3 further include:
The trigger parameter includes triggering and pinpointing immediately two classes of triggering, determines the touching according to the network condition prediction data Parameter is sent out, if the network condition prediction data is the free time, trigger parameter is to trigger immediately, if the network condition predicts number According to be busy, then trigger parameter is fixed point triggering, if the network condition prediction data be it is normal, can be specified by operator Trigger parameter.
5. a kind of method for upgrading system as described in claim 1, which is characterized in that the step S4 further include:
The update time parameter can be also adjusted in real time, when the control centre takes according to fixed point trigger parameter from the upgrading After business device receives update time for the first time, the upgrade server can persistently be predicted network condition prediction data, when When the network condition prediction data and the update time parameter issued before differ by more than threshold value, where Xiang Suoshu control centre Server re-issue update time.
6. a kind of method for upgrading system as claimed in claim 5, which is characterized in that further include:
The threshold value is 1 hour.
CN201910393334.2A 2019-05-13 2019-05-13 System upgrading method Active CN110109692B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910393334.2A CN110109692B (en) 2019-05-13 2019-05-13 System upgrading method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910393334.2A CN110109692B (en) 2019-05-13 2019-05-13 System upgrading method

Publications (2)

Publication Number Publication Date
CN110109692A true CN110109692A (en) 2019-08-09
CN110109692B CN110109692B (en) 2020-02-14

Family

ID=67489481

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910393334.2A Active CN110109692B (en) 2019-05-13 2019-05-13 System upgrading method

Country Status (1)

Country Link
CN (1) CN110109692B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112600876A (en) * 2020-11-25 2021-04-02 宝能(广州)汽车研究院有限公司 OTA upgrade package downloading method, OTA server, electronic device and storage medium
CN113238770A (en) * 2021-04-13 2021-08-10 中车工业研究院有限公司 Product platform updating method and device, electronic equipment and storage medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103955381A (en) * 2014-04-04 2014-07-30 京信通信系统(中国)有限公司 Method and system for management server to perform batch software update on terminal equipment
CN104583950A (en) * 2012-08-23 2015-04-29 国际商业机器公司 Dynamic service class upgrades in data networks
CN106464597A (en) * 2014-06-18 2017-02-22 谷歌公司 Automatically updating an access point
CN106845903A (en) * 2016-12-23 2017-06-13 天津联兴科技技术有限公司 A kind of Foreign Trade Logistics processing system and method with instantly prompting function
US20180041400A1 (en) * 2012-04-27 2018-02-08 International Business Machines Corporation Network configuration predictive analytics engine
CN108256716A (en) * 2016-12-29 2018-07-06 同方威视技术股份有限公司 The method and apparatus of flow and/or atom flow is configured/performed based on table

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180041400A1 (en) * 2012-04-27 2018-02-08 International Business Machines Corporation Network configuration predictive analytics engine
CN104583950A (en) * 2012-08-23 2015-04-29 国际商业机器公司 Dynamic service class upgrades in data networks
CN103955381A (en) * 2014-04-04 2014-07-30 京信通信系统(中国)有限公司 Method and system for management server to perform batch software update on terminal equipment
CN106464597A (en) * 2014-06-18 2017-02-22 谷歌公司 Automatically updating an access point
CN106845903A (en) * 2016-12-23 2017-06-13 天津联兴科技技术有限公司 A kind of Foreign Trade Logistics processing system and method with instantly prompting function
CN108256716A (en) * 2016-12-29 2018-07-06 同方威视技术股份有限公司 The method and apparatus of flow and/or atom flow is configured/performed based on table

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112600876A (en) * 2020-11-25 2021-04-02 宝能(广州)汽车研究院有限公司 OTA upgrade package downloading method, OTA server, electronic device and storage medium
CN113238770A (en) * 2021-04-13 2021-08-10 中车工业研究院有限公司 Product platform updating method and device, electronic equipment and storage medium
CN113238770B (en) * 2021-04-13 2023-09-15 中车工业研究院有限公司 Product platform updating method and device, electronic equipment and storage medium

Also Published As

Publication number Publication date
CN110109692B (en) 2020-02-14

Similar Documents

Publication Publication Date Title
US20170116522A1 (en) Method For Task Scheduling And Resources Allocation And System Thereof
CN101872166B (en) Process simulation utilizing component-specific consumption data
Wong et al. Integrated process planning and scheduling/rescheduling—an agent-based approach
CN103679416B (en) A kind of lean supply chain logistics system and method
CN110175822B (en) Equipment standing book management method and system
US20070039001A1 (en) Method and system for tuning a taskscheduling process
CN102722785A (en) Workshop operation management method, system and server
US8694487B2 (en) Project management system
CN107767080A (en) A kind of bank outlets' Service Source dispatching method and device
CN110471671A (en) Using dispositions method, device, system, equipment and computer readable storage medium
CN109656587A (en) A kind of upgrade method and device of equipment firmware
CN110109692A (en) A kind of method for upgrading system
CN110826980A (en) ERP system based on cloud platform and operation method thereof
US20080052346A1 (en) System for mobile workforce, vehicle, asset and service management
CN111932099A (en) Marketing business management system and marketing business management method
Novas et al. A collaborative framework between a scheduling system and a holonic manufacturing execution system
CN105069590A (en) Factory order goods tracing and monitoring method
CN109829639A (en) Service item monitoring method and device
US9342805B2 (en) Method and system for generating an integration model
CN115660261B (en) Production order information processing method, computer device and storage medium
CN116777263A (en) Enterprise operation data analysis system and method
CN113780927B (en) Information generation method and device
CN103345672A (en) Vehicle-carried task control system for container yard
KR101357242B1 (en) Method and system for managing port logistics information by applying business process management system
US20230259843A1 (en) Methods, internet of things systems and storage media for visualizing work orders of smart gas platforms

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230531

Address after: Room 402, Door 4, Building 25, Chaoyang New Village, Xingang Road, Binhai New Area, Tianjin, 300450

Patentee after: Li Jianwei

Address before: No. 2, Bottom Floor, Building 4, Xilin Village, Tanggu, Binhai New Area, Tianjin, 300453

Patentee before: TIANJIN LIANXING SCIENCE AND TECHNOLOGY CO.,LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230803

Address after: No. 316A, Ground Floor, Building 22, Yuejin Lane, Hangzhou Road Street, Binhai New Area, Tianjin, 300451

Patentee after: Lianyimeng (Tianjin) Supply Chain Co.,Ltd.

Address before: Room 402, Door 4, Building 25, Chaoyang New Village, Xingang Road, Binhai New Area, Tianjin, 300450

Patentee before: Li Jianwei

TR01 Transfer of patent right