CN110106792A - Steel reinforcement cage binding device and manufacture craft - Google Patents

Steel reinforcement cage binding device and manufacture craft Download PDF

Info

Publication number
CN110106792A
CN110106792A CN201910501134.4A CN201910501134A CN110106792A CN 110106792 A CN110106792 A CN 110106792A CN 201910501134 A CN201910501134 A CN 201910501134A CN 110106792 A CN110106792 A CN 110106792A
Authority
CN
China
Prior art keywords
main reinforcement
stirrup
fixed
piece
stirrup piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910501134.4A
Other languages
Chinese (zh)
Inventor
苟超
闫兴非
姚嘉轶
宗霏
张彦
陈锋
方科
沈维克
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Investment And Investment Building Industrialization Co Ltd
Original Assignee
Chengdu Investment And Investment Building Industrialization Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Investment And Investment Building Industrialization Co Ltd filed Critical Chengdu Investment And Investment Building Industrialization Co Ltd
Priority to CN201910501134.4A priority Critical patent/CN110106792A/en
Publication of CN110106792A publication Critical patent/CN110106792A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Wire Processing (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention discloses a kind of steel reinforcement cage binding device and manufacture crafts, it is related to constructing device field, steel reinforcement cage binding device includes fixed pedestal and bracket, side plate, positioning plate and baffle are provided on fixed pedestal, sleeve is fixed on baffle, it is provided with L-type main reinforcement locating piece on bracket, is provided with positioning groove on positioning plate;Manufacture craft is the following steps are included: S1: processing stirrup piece;S2: stirrup piece is fixed on fixed pedestal;S3: main reinforcement passes through every stirrup piece;S4: main reinforcement is fixedly connected with stirrup piece;First the stirrup piece made in advance can be fixed on fixed pedestal by fixed pedestal, main reinforcement is set to pass through stirrup piece again, main reinforcement and stirrup piece are fixed together again, main reinforcement is when passing through stirrup piece, stirrup will not cause to limit to main reinforcement, while stirrup piece can shift to an earlier date and be processed on the lathe of factory, then transport to construction site and carry out the making step of next step, the time for making stirrup at the construction field (site) can be saved, work efficiency is high.

Description

Steel reinforcement cage binding device and manufacture craft
Technical field
The present invention relates to constructing device field more particularly to steel reinforcement cage binding device and manufacture crafts.
Background technique
With the development of bridge technology, the bridge of Long span gradually increases, and major diameter, overlength column and pile foundation steel bar cage are got over It is applied come more, but is had the following problems in traditional fabrication of reinforcing cage technique in the design:
1, main reinforcement is first fixed, then passes through main reinforcement with stirrup, but due to more main reinforcement position restrictions, it can be very when wearing stirrup Difficulty is worn;
It 2, is typically now to make steel reinforcement cage at the construction field (site), time consumption is long, and working efficiency is low.
Summary of the invention
The object of the invention is that devising a kind of steel reinforcement cage binding device and manufacture craft to solve the above-mentioned problems.
The present invention through the following technical solutions to achieve the above objectives:
A kind of steel reinforcement cage binding device, for the fixed stirrup piece made and main reinforcement, including fixed pedestal, fixed base The two sides of seat upper surface are provided with two blocks of side plates being parallel to each other, and are additionally provided on fixed pedestal for positioning determining for stirrup piece Position plate, positioning plate is parallel with side plate, and positioning plate is located between two blocks of side plates, the both ends of the stirrup piece side opposite with two blocks of side plates Contact is squeezed, one end of fixed pedestal is fixed with baffle, and side surrounding of the baffle close to fixed pedestal center is fixed with multiple use In the sleeve of positioning main reinforcement, one end of a main reinforcement is placed in a sleeve.
Further, steel reinforcement cage binding device further includes the bracket of multiple N-shapeds, and the lower end of each bracket is fixed on fixed base On seat, two blocks of side plates are respectively positioned between the both sides of each bracket, and each bracket is equidistantly set close to the side at fixed pedestal center It is equipped with multiple L-type main reinforcement locating pieces, the L-type main reinforcement of the sleeve for being located at baffle top or two sides and multiple bracket same positions Locating piece in the same horizontal line, is placed through above baffle and the main reinforcement of two sides square socket middle part is determined with L-type main reinforcement is placed on On the block of position.
Further, multiple positioning grooves are provided on positioning plate, it is recessed that the bottom of a stirrup piece is placed on a positioning In slot.
Manufacture craft based on steel reinforcement cage binding device, which comprises the following steps:
S1: production stirrup piece;
S2: stirrup piece is fixed on fixed pedestal;
S3: main reinforcement passes through every stirrup piece, is placed on corresponding L-type main reinforcement locating piece;
S4: main reinforcement is fixedly connected with stirrup piece.
Further, in S3, main reinforcement is vertical with stirrup.
The beneficial effects of the present invention are: first the stirrup piece made in advance can be fixed by the effect of fixed pedestal On fixed pedestal, then main reinforcement is made to pass through stirrup piece, finally main reinforcement and stirrup piece are fixed together again, change traditional fabrication The mode of steel reinforcement cage, when passing through stirrup piece, stirrup will not cause to limit main reinforcement to main reinforcement, while stirrup piece can shift to an earlier date in work It is processed on the lathe of factory, then transports to construction site and carry out the making step of next step, can be saved at the construction field (site) The time of stirrup is made, work efficiency is high.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of steel reinforcement cage binding device of the present invention and manufacture craft;
Fig. 2 is the structural schematic diagram of fixed pedestal in steel reinforcement cage binding device of the present invention and manufacture craft;
Fig. 3 is the structural schematic diagram of bracket in steel reinforcement cage binding device of the present invention and manufacture craft;
Fig. 4 is the structural schematic diagram of stirrup piece in steel reinforcement cage binding device of the present invention and manufacture craft;
Wherein corresponding appended drawing reference are as follows:
1- fixed pedestal, 2- side plate, 3- main reinforcement, 4- stirrup piece, 5- baffle, 6- sleeve, 7- positioning plate, 8- positioning groove, 9- bracket, 10-L type main reinforcement locating piece.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings:
As shown in Figure 1, Figure 2, Figure 3, Figure 4, a kind of steel reinforcement cage binding device, for fixed 4 He of stirrup piece made Main reinforcement 3, including fixed pedestal 1, the two sides of 1 upper surface of fixed pedestal are provided with two blocks of side plates 2 being parallel to each other, two blocks of side plates 2, for fixing the both ends of stirrup piece 4, are additionally provided with positioning plate 7, positioning plate 7 is for fixing and positioning stirrup piece on fixed pedestal 1 4 position, positioning plate 7 is parallel with side plate 2, and positioning plate 7 is located between two blocks of side plates 2, the both ends of stirrup piece 4 and two blocks of side plates 2 Opposite side squeezes contact, and one end of fixed pedestal 1 is fixed with baffle 5, side four of the baffle 5 close to 1 center of fixed pedestal It is fixed with multiple sleeves 6 for being used to position main reinforcement 3 week, baffle 5 and sleeve 6 are used to the position that limitation main reinforcement 3 is installed, a master One end of muscle 3 is placed in a sleeve 6.
As shown in Figure 1, Figure 2, Figure 3 shows, steel reinforcement cage binding device further includes the bracket 9 of multiple N-shapeds, bracket 9, each bracket 9 Lower end be fixed on fixed pedestal 1, two blocks of side plates 2 are respectively positioned between the both sides of each bracket 9, and each bracket 9 is close to fixed The side at 1 center of pedestal is equidistantly provided with multiple L-type main reinforcement locating pieces 10, and L-type main reinforcement locating piece 10 is for positioning main reinforcement 3 Support is provided for main reinforcement 3 when position and installation, one is located at the sleeve 6 and multiple 9 same positions of bracket of 5 top of baffle or two sides L-type main reinforcement locating piece 10 in the same horizontal line, be placed through 3 middle part of main reinforcement of the top of baffle 5 and two sides square socket 6 and put It sets on L-type main reinforcement locating piece 10.
As shown in Fig. 2, being provided with multiple positioning grooves 8 on positioning plate 7, positioning groove 8 is for fixing and positioning stirrup piece 4 Position, the bottom of a stirrup piece 4 is placed in a positioning groove 8.
Manufacture craft based on steel reinforcement cage binding device, which comprises the following steps:
S1: production stirrup piece 4;
S2: stirrup piece 4 is fixed on fixed pedestal 1;
S3: main reinforcement 3 passes through every stirrup piece 4, is placed on corresponding L-type main reinforcement locating piece 10, main reinforcement 3 is vertical with stirrup;
S4: main reinforcement 3 is fixedly connected with stirrup piece 4.
The working principle of steel reinforcement cage binding device of the present invention and manufacture craft is as follows:
The unified processing stirrup piece 4 on the lathe of factory can be shifted to an earlier date, then transported again to construction site, by stirrup piece 4 Be fixed on fixed pedestal 1 by side plate 2 and positioning groove 8, after having fixed stirrup piece 4, then by main reinforcement 3 pass through fixinig plate, wear It is positioned when main reinforcement 3 by the L-type main reinforcement locating piece 10 on bracket 9 and the sleeve 6 being fixed on baffle 5, finally by stirrup Piece 4 and main reinforcement 3 are fixed together, and such erection sequence stirrup will not cause to limit to main reinforcement 3;Stirrup piece 4 can shift to an earlier date It is processed on the lathe of factory, then transports to construction site and carry out the making step of next step, it can also be at the construction field (site) Stirrup piece 4 is made, same processing stirrup piece 4 can save the time for making stirrup at the construction field (site), work on the lathe of factory Make high-efficient.

Claims (5)

1. a kind of steel reinforcement cage binding device, for the fixed stirrup piece made and main reinforcement, it is characterised in that: including fixed base Seat, the two sides of fixed pedestal upper surface are provided with two blocks of side plates being parallel to each other, are additionally provided on fixed pedestal for positioning The positioning plate of stirrup piece, positioning plate is parallel with side plate, and positioning plate is located between two blocks of side plates, the both ends of stirrup piece and two blocks of side plates Opposite side squeezes contact, and one end of fixed pedestal is fixed with baffle, and side surrounding of the baffle close to fixed pedestal center is solid Surely there are multiple sleeves for being used to position main reinforcement, one end of a main reinforcement is placed in a sleeve.
2. steel reinforcement cage binding device according to claim 1, it is characterised in that: steel reinforcement cage binding device further includes multiple n The lower end of the bracket of type, each bracket is fixed on fixed pedestal, and two blocks of side plates are respectively positioned between the both sides of each bracket, each Bracket is equidistantly provided with multiple L-type main reinforcement locating pieces close to the side at fixed pedestal center, and one is located at baffle top or two The L-type main reinforcement locating piece of the sleeve of side and multiple bracket same positions in the same horizontal line, is placed through above baffle and two In the middle part of the main reinforcement of side sleeve and it is placed on L-type main reinforcement locating piece.
3. steel reinforcement cage binding device according to claim 1, it is characterised in that: it is recessed to be provided with multiple positioning on positioning plate Slot, the bottom of a stirrup piece are placed in a positioning groove.
4. the manufacture craft based on steel reinforcement cage binding device described in claim 1-3, which is characterized in that including following step It is rapid:
S1: production stirrup piece;
S2: stirrup piece is fixed on fixed pedestal;
S3: main reinforcement passes through every stirrup piece, is placed on corresponding L-type main reinforcement locating piece;
S4: main reinforcement is fixedly connected with stirrup piece.
5. manufacture craft according to claim 4, it is characterised in that: in S3, main reinforcement is vertical with stirrup.
CN201910501134.4A 2019-06-11 2019-06-11 Steel reinforcement cage binding device and manufacture craft Pending CN110106792A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910501134.4A CN110106792A (en) 2019-06-11 2019-06-11 Steel reinforcement cage binding device and manufacture craft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910501134.4A CN110106792A (en) 2019-06-11 2019-06-11 Steel reinforcement cage binding device and manufacture craft

Publications (1)

Publication Number Publication Date
CN110106792A true CN110106792A (en) 2019-08-09

Family

ID=67494571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910501134.4A Pending CN110106792A (en) 2019-06-11 2019-06-11 Steel reinforcement cage binding device and manufacture craft

Country Status (1)

Country Link
CN (1) CN110106792A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001349061A (en) * 2001-04-17 2001-12-21 Kajima Corp Method for vertically assembling cage for reinforced concrete column
JP2010281113A (en) * 2009-06-04 2010-12-16 Okabe Co Ltd Method for assembling reinforcement cage for cast-in-place concrete pile and device for assembling split reinforcement cage
CN201738305U (en) * 2010-07-10 2011-02-09 中铁六局集团有限公司 Butt-joint precision control device for steel reinforcement joint of steel reinforcement cage
CN104264590A (en) * 2014-09-30 2015-01-07 中交二航局第四工程有限公司 Pier column rebar prefabricating bed-jig capable of accurately positioning main rebars and stirrups simultaneously
CN105908902A (en) * 2016-05-17 2016-08-31 济南城建集团有限公司 Positioning frame for prefabricated pier column reinforcing bar cages and construction method of pier column reinforcing bar cages
CN205617664U (en) * 2016-05-17 2016-10-05 济南城建集团有限公司 Prefabricated pier stud locating rack for steel reinforcement cage
CN108729353A (en) * 2018-05-25 2018-11-02 成都交投建筑工业化有限公司 A kind of General reinforced cage binding moulding bed
CN109365696A (en) * 2018-11-30 2019-02-22 中国冶集团有限公司 A kind of fabrication of reinforcing cage mould bases and construction method
CN210420876U (en) * 2019-06-11 2020-04-28 成都交投建筑工业化有限公司 Binding device for reinforcement cage

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001349061A (en) * 2001-04-17 2001-12-21 Kajima Corp Method for vertically assembling cage for reinforced concrete column
JP2010281113A (en) * 2009-06-04 2010-12-16 Okabe Co Ltd Method for assembling reinforcement cage for cast-in-place concrete pile and device for assembling split reinforcement cage
CN201738305U (en) * 2010-07-10 2011-02-09 中铁六局集团有限公司 Butt-joint precision control device for steel reinforcement joint of steel reinforcement cage
CN104264590A (en) * 2014-09-30 2015-01-07 中交二航局第四工程有限公司 Pier column rebar prefabricating bed-jig capable of accurately positioning main rebars and stirrups simultaneously
CN105908902A (en) * 2016-05-17 2016-08-31 济南城建集团有限公司 Positioning frame for prefabricated pier column reinforcing bar cages and construction method of pier column reinforcing bar cages
CN205617664U (en) * 2016-05-17 2016-10-05 济南城建集团有限公司 Prefabricated pier stud locating rack for steel reinforcement cage
CN108729353A (en) * 2018-05-25 2018-11-02 成都交投建筑工业化有限公司 A kind of General reinforced cage binding moulding bed
CN109365696A (en) * 2018-11-30 2019-02-22 中国冶集团有限公司 A kind of fabrication of reinforcing cage mould bases and construction method
CN210420876U (en) * 2019-06-11 2020-04-28 成都交投建筑工业化有限公司 Binding device for reinforcement cage

Similar Documents

Publication Publication Date Title
CN202225295U (en) Integrally-forming mold base of steel reinforcement framework
CN110106792A (en) Steel reinforcement cage binding device and manufacture craft
CN201850508U (en) Non-strut bridge pier template
CN210420876U (en) Binding device for reinforcement cage
CN205853051U (en) A kind of band is magnetic the precast concrete production mould of dividing plate
CN205000633U (en) Customization arc steel form
CN106150084A (en) A kind of mold method wearing muscle template and formwork erecting structure thereof
CN203160428U (en) Connecting structure of beam steel and steel rib at node position of framework beam column
CN214785903U (en) Concrete building template for civil engineering
CN205836871U (en) A kind of brickmaking fragment of brick transport trolleys
CN204568808U (en) Push to rail mechanism
CN202411903U (en) Clamp used in producing process of sliding block insert by using computerized numerical control (CNC)
CN209850217U (en) Grid steel frame processor
CN207892243U (en) A kind of template assembly system
CN206527585U (en) Carrier detent mechanism
CN104723044B (en) A kind of frame manufacture technique for concrete modular
CN101357737B (en) Constant hoisting force conveying method for crane with multi-hoisting points
CN111576709A (en) Prefabricated local coincide floor
CN212801231U (en) Novel support base stone template
CN205394807U (en) From special cushion of prefabricated pipeline cross reinforcing bar of steady type
IT8323048A1 (en) SUPPORTING STRUCTURE FOR ARMING CONSTRUCTIONS
CN203613778U (en) Concrete-filled steel tube pouring platform
CN207139333U (en) Square steel blank saddle-shape stator milling both ends false boss frock
CN211256679U (en) Vertical finish rolling screw-thread steel locating support in bridgehead fort steel-concrete combined section
CN211172729U (en) Integrated steel bar protective layer cushion block

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination