CN110094050A - A kind of aluminium alloy platform mould - Google Patents

A kind of aluminium alloy platform mould Download PDF

Info

Publication number
CN110094050A
CN110094050A CN201910470953.7A CN201910470953A CN110094050A CN 110094050 A CN110094050 A CN 110094050A CN 201910470953 A CN201910470953 A CN 201910470953A CN 110094050 A CN110094050 A CN 110094050A
Authority
CN
China
Prior art keywords
profile
placing groove
aluminium alloy
bolt
protrusion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910470953.7A
Other languages
Chinese (zh)
Inventor
孔庆麟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Bo Heng Metal Products Co Ltd
Original Assignee
Guangdong Bo Heng Metal Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Bo Heng Metal Products Co Ltd filed Critical Guangdong Bo Heng Metal Products Co Ltd
Priority to CN201910470953.7A priority Critical patent/CN110094050A/en
Publication of CN110094050A publication Critical patent/CN110094050A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a kind of aluminium alloy platform moulds comprising: platform board component;Support component;Bracket component comprising have: the first profile connecting with platform board component, its underpart are equipped with the first placing groove that extending direction is identical as the length direction of the first profile and fluting direction is downward;Connect with support component and with vertically disposed second profile of the first profile, upper part be equipped with extending direction it is identical with the length direction of the second profile and slot direction upwards the second placing groove;External accessories are arranged in the first placing groove and/or the second placing groove;In assembly, external accessories are moved along the extending direction of the first placing groove and are detachably connected with the second profile, and/or external accessories are moved along the extending direction of the second placing groove and are detachably connected with the first profile, so that the first profile is fixed on the top of the second profile.The configuration of the present invention is simple, it is convenient for disassembly and assembly, it can quickly be re-assemblied according to different concrete structures.

Description

A kind of aluminium alloy platform mould
Technical field
The present invention relates to building implement technical field, in particular to a kind of aluminium alloy platform mould.
Background technique
Platform mould is generally made of platform board component, bracket component and support component etc., suitable for the cast-in-place mixed of skyscraper Solidifying soil floor construction has the advantages that less manpower and technical requirements are low etc., is widely used in construction industry.However, mesh The structure of preceding platform mould is single and fixed, when needing to carry out cast-in-place according to different concrete structures, needs in advance at zero Aperture processing is carried out on fixation position on part, to use bolt that each components are fixed, to enable to platform mould Dismounting is difficult, it is difficult to rapidly be re-assemblied according to different concrete structures, not meet the demand of modern production. Therefore, designing one kind platform mould convenient for disassembly and assembly becomes one of those skilled in the art's urgent problem to be solved.
Summary of the invention
The object of the present invention is to provide a kind of aluminium alloy platform moulds, and the aluminium alloy platform mode structure is simple, convenient for disassembly and assembly, can be fast Speed is re-assemblied according to different concrete structures, meets the demand of modern production.
To achieve the goals above, the technical scheme is that
A kind of aluminium alloy platform mould comprising: platform board component;Support component;Bracket component comprising have: it is put down with described First profile of platen component connection, its underpart are equipped with the first placing groove, the extending direction of first placing groove and described the The length direction of one profile is identical, and direction of slotting is downward;It connect and vertical with first profile sets with the support component The second profile set, upper part are equipped with the second placing groove, the length of the extending direction of second placing groove and second profile It is identical to spend direction, and direction of slotting is upward;External accessories are arranged in first placing groove and/or second placing groove It is interior;In assembly, the external accessories move and detachable with second profile along the extending direction of first placing groove Connection and/or the external accessories move along the extending direction of second placing groove and detachably connect with first profile It connects, so that first profile is fixed on the top of second profile.
When the concrete structure for needing to be poured changes, phase can occur for the platform board component for being poured concrete mechanism The change answered, at this point, the first profile connecting with platform board component, is also required to be changed with the installation site of the second profile Become, or even also needs to increase new the first profile or the second profile newly.Aluminium alloy platform mould using the above structure, is determining first After the installation site of profile and the second profile, is moved on the first placing groove by external accessories and detachably connected with the second profile It connects, and/or is moved on the second placing groove by external accessories and be detachably connected with the first profile, enable aluminium alloy platform mould It is enough to be re-assemblied according to different concrete structures, facilitate installation.In disassembly, external accessories need to only be dismantled, The fixation of the first profile and the second profile can be released, so that the dismounting of entire aluminium alloy platform mould becomes convenient.
Further, the external accessories include: bolt, and setting is put in first placing groove and/or described second It sets in slot;First locking nut is set on the bolt;For compressing the of first profile or second profile One compressed part is set on the bolt, and between first locking nut and the bolt head;Described first When locking nut and the bolt tighten cooperation, first compressed part is moved to the direction of the bolt head, so that described the One profile is fixed on the top of second profile.
Further, first compressed part is equipped with the first installation opening, the opening direction direction of first installation opening The bolt head;First profile includes the first web and the first lower flange for being arranged in below first web, In, the lower part of first web is equipped with first placing groove, and the both ends of first lower flange are equipped with and first dress The first protrusion to match with mouth;Second profile include the second web and be arranged in above second web second Top flange, the top of second top flange are equipped with second placing groove, and second top flange is equipped with and first dress The second protrusion to match with mouth;When first locking nut and the bolt tighten cooperation, first protrusion is caught in In first installation opening and/or second protrusion is caught in first installation opening.
Further, first profile further includes the first top flange being arranged in above first web;Described The both ends of one top flange are equipped with downward projection of third protrusion;The bracket component further includes having platform board installation part, described flat Platen installation part includes: the eyelet bolt connecting with the platform board component, and second be set on the eyelet bolt compresses Portion, and the second locking nut being set on the eyelet bolt;Wherein, second compressed part is equipped with and the third The opening direction of the second installation opening that protrusion matches, second installation opening is upward;Second locking nut with it is described When eyelet bolt tightens cooperation, the third protrusion is caught in second installation opening, so that first profile is fixed on institute State the lower section of platform board component.
Further, second profile further includes having the second lower flange being arranged in below second web, thereon Equipped with third placing groove and the 4th protrusion;Wherein, the length of the extending direction of the third placing groove and second lower flange Direction is identical, and direction of slotting is downward;4th protrusion matches with first installation opening.
Further, second web is equipped with first mounting hole and multiple groups of the multiple groups for connecting support component and is used for Connect the second mounting hole of bearing bracket;Wherein, first mounting hole and second mounting hole are alternately arranged setting.
Further, the bracket component further includes the external support having for connecting first profile and the second profile Part, between first profile and second profile;Be additionally provided in first placing groove for it is described external First locking member of the upper end connection of supporting element;It is additionally provided in second placing groove for the lower end with the external supporting element Second locking member of connection.
Further, the support component includes: telescoping mechanism comprising: the outer frame body being connect with second profile, And at least one support rod bush;Wherein, the support rod bush is arranged in the outer frame body;With the support rod bush The support rod to match is inserted in the support rod bush, and makees lifting fortune along the length direction of the support rod bush It is dynamic, so that the height of the telescoping mechanism changes.
Further, the support component further includes having locking piece, is used to for the support rod being fixed on described flexible In mechanism.
Further, which further includes the slide assemblies having for transporting aluminium alloy platform mould, with described The connection of two profiles;When the support component is not contacted with the upper surface on ground or concrete floor system, the slide assemblies and ground Face or the contact of the upper surface of concrete floor system.
In order to better understand and implement, the invention will now be described in detail with reference to the accompanying drawings.
Detailed description of the invention
Fig. 1 is the front view of the first embodiment of aluminium alloy platform mould of the invention;
Fig. 2 is the side view of the first embodiment of aluminium alloy platform mould of the invention;
Fig. 3 is the enlarged diagram of A in Fig. 1;
Fig. 4 is the enlarged diagram of B in Fig. 1;
Fig. 5 is the enlarged diagram of C in Fig. 2;
Fig. 6 is the enlarged diagram of D in Fig. 2;
Fig. 7 is the connection schematic diagram of the first profile and the second profile of the invention;
Fig. 8 is the front view of the first profile of the invention;
Fig. 9 is the side view of the second profile of the invention;
Figure 10 is the top view of telescoping mechanism of the invention;
Figure 11 is the front view of support component of the invention;
Figure 12 is the front view of second of embodiment of aluminium alloy platform mould of the invention.
[appended drawing reference]
100 platform board components
200 support component, 210 telescoping mechanism, 220 outer frame body
230 support 231 first support bar casings of rod bush
232 second support bar casing, 240 locking piece
250 support rod, 251 first support bar
252 second support bar, 260 limit hole
261 fixation holes
300 bracket component, 310 first profile, 311 first placing groove
312 first web, 313 first lower flange
314 first top flange, 315 first protrusion
316 third protrusions
320 second profile, 321 second placing groove
322 second web, 323 second top flange
324 second lower flange, 325 second protrusion
The 4th protrusion of 326 third placing groove 327
328 first mounting hole, 329 second mounting hole
330 external accessories, 331 bolt
332 first locking nut, 333 first compressed part
334 first installation openings
340 platform board installation part, 341 eyelet bolt
342 second compressed part, 343 second locking nut
344 second installation openings
350 external 351 first locking members of supporting element
352 second locking members
400 slide assemblies
Specific embodiment
In order to be fully understood from the purpose of the present invention, feature and effect, below with reference to attached drawing to design of the invention, tool Body structure and the technical effect of generation are described further.
Embodiment 1
As shown in Figures 1 to 8, the present embodiment provides a kind of aluminium alloy platform moulds comprising platform board component 100;Support group Part 200;Bracket component 300 comprising have: the first profile 310 connecting with the platform board component 100, its underpart are equipped with the One placing groove 311, the extending direction of first placing groove 311 is identical as the length direction of first profile 310, and slots Direction is downward;Connect with the support component 200 and with vertically disposed second profile 320 of first profile 310, upper part Equipped with the second placing groove 321, the extending direction of second placing groove 321 is identical as the length direction of second profile 320, And fluting direction is upward;External accessories 330 are arranged in first placing groove 311 and/or second placing groove 321; Assembly when, the external accessories 330 moved along the extending direction of first placing groove 311 and with second profile 320 It is detachably connected and/or the external accessories 330 is moved along the extending direction of second placing groove 321 and with described first Profile 310 is detachably connected, so that first profile 310 is fixed on the top of second profile 320.
In particular it is required that when the concrete structure of casting changes, for being poured the platform board component of concrete mechanism It can occur to change accordingly, at this point, the first profile 310 connecting with platform board component 100, the installation with the second profile 320 Position is also required to be changed, or even also needs to increase new the first profile or the second profile newly.Determining the first profile 310 and After the installation site of two profiles 320, as shown in fig. 7, external accessories 330 are placed on the first placing groove 311 by assembly crewman, and Move external accessories 330 along the extending direction of the first placing groove 311, until leading to after external accessories are contacted with the second profile 320 It crosses external accessories 330 to be attached with the second profile 320, thus from two sides to the first type on the extending direction of the first placing groove Material and the second profile are fixed.As shown in figure 3, assembly crewman can also by external accessories 330 on the second placing groove 321, And move external accessories 330 along the extending direction of the second placing groove 321, until after external accessories are contacted with the first profile 310, It is attached by external accessories 330 and the first profile 310, thus from two sides to first on the extending direction of the second placing groove Profile and the second profile are fixed, it should be noted that the extending direction of first placing groove and second placing groove The orthogonal setting of extending direction, enable to the connection of the first profile and the second profile stronger.And in disassembly, only External accessories 330 need to be dismantled, the fixation of the first profile 310 and the second profile 320 can be released, so that entire aluminium alloy The dismounting of platform mould becomes convenient.The present invention is compared with the bolt of the prior art passes through screw hole for the mode of each components, this hair Bright external accessories can move on the first placing groove and/or the second placing groove, and mobility strong is versatile, even if first The installation site of profile and the second profile changes, or needs newly-increased first profile and the second profile, and also only needing will be external Accessory, which is moved to corresponding position, can be completed installation, without as in the prior art, carrying out screw hole for new installation site Aperture, can enable aluminum alloy to platform mould can be re-assemblied according to different concrete structures, be easy for installation and removal.
Further, as shown in figure 3, the external accessories 330 include: bolt 331, it is arranged in first placing groove 311 and/or second placing groove 321 in;First locking nut 332 is set on the bolt 331;For compressing The first compressed part 333 for stating the first profile 310 or second profile 320, is set on the bolt 331, and is located at institute It states between the first locking nut 332 and the bolt head;Cooperation is tightened with the bolt 331 in first locking nut 332 When, first compressed part 333 is moved to the direction of the bolt head, so that first profile 310 is fixed on described second The top of profile 320.After the external accessories 330 are moved to installation site by assembly crewman, by tightening first locking Nut compresses first compressed part to the first profile 310 or the second profile 320, to make the first profile and second Profile is attached.
Further, as shown in figure 3, first compressed part 333 is equipped with the first installation opening 334, first assembly Mouthfuls 334 opening direction is towards the bolt head;As shown in figure 8, first profile 310 includes the first web 312 and sets Set the first lower flange 313 below first web 312, wherein the lower part of first web 312 is equipped with described first Placing groove 311, the both ends of first lower flange 311 are equipped with the first protrusion 315 to match with first installation opening 334; As shown in figure 9, second profile 320 includes the second web 322 and is arranged on the second of 322 top of the second web The edge of a wing 323, the top of second top flange 323 are equipped with second placing groove 321, second top flange 323 be equipped with The second protrusion 325 that first installation opening 334 matches;It tightens and matches with the bolt 331 in first locking nut 332 When conjunction, as shown in figure 3, first compressed part for the external accessories being located on the second placing groove pushes, by the first bottom wing Edge is compressed, and is connected and fixed the first profile with the second profile, and during the depression process, first protrusion 315 is caught in described In first installation opening 334, loosening is generated because of external force after preventing the first profile from connecting with the second profile;As shown in fig. 7, being located at the It is pressed in second compressed part of external accessories on one placing groove, by compressing to the second top flange, makes the first profile It is connected and fixed with the second profile, during upper pressure, second protrusion 325 is caught in first installation opening 334, prevents One profile generates loosening because of external force after connecting with the second profile.
Further, as shown in figures 3 and 8, first profile 310 further includes being arranged on first web 312 First top flange 314 of side;The both ends of first top flange 314 are equipped with downward projection of third protrusion 316;The bracket group Part 300 further includes having platform board installation part 340, and the platform board installation part 340 includes: to connect with the platform board component 100 Eyelet bolt 341, the second compressed part 342 being set on the eyelet bolt 341, and be set in the eyelet bolt The second locking nut 343 on 341;Wherein, second compressed part 342 is equipped with and matches with the third protrusion 316 The opening direction of second installation opening 344, second installation opening 344 is upward;In second locking nut 343 and the movable joint When bolt 341 tightens cooperation, the third protrusion 316 is caught in second installation opening 344, so that first profile 310 It is fixed on the lower section of the platform board component 100.By tightening second locking nut 343, in second compressed part 342 First top flange 314 is pressed, so that first profile and platform board component is attached fixation, the third protrusion is caught in institute It states in the second installation opening 344, generates loosening because of external force after preventing first profile from connecting with platform board component.
Further, as shown in figure 9, second profile 320 further includes has and be arranged in below second web 322 Second lower flange 324, which is provided with third placing groove 326 and the 4th protrusion 327;Wherein, the extension of the third placing groove 326 Direction is identical as the length direction of second lower flange 324, and direction of slotting is downward;4th protrusion 327 and described the One installation opening 334 matches.When second placing groove or the second protrusion are damaged and lead to not normal use, peace Dress personnel can also make third placing groove and the 4th protrusion replace the second placing groove by way of overturning second profile 320 It works with the script of the second protrusion, to increase the service life of the second profile.
Further, as shown in Fig. 1, Fig. 5 and Fig. 6, second web 322 is equipped with multiple groups for connecting support component 200 the first mounting hole 328 and multiple groups is used to connect the second mounting hole 329 of bearing bracket;Wherein, first mounting hole 328 and second mounting hole 329 be alternately arranged setting.Specifically, assembly crewman can by first mounting hole 328, Two piece of second profile 320 is fixed with support component 200, and in order to increase the stability of bracket component, assembly crewman Also by bearing bracket, the second profile being located above and underlying second profile are attached, and form trigonum Domain increases the structural stability of aluminium alloy platform mould.
Due to platform board component to the second profile distance can because platform board component whether need to be poured crossbeam and Variation, causes the distance between the first profile and the second profile that can also be varied, further, in order to cope with apart from biggish Connection between first profile and the second profile, as shown in Figure 4 and Figure 5, the bracket component 300 further includes having for connecting The external supporting element 350 of the first profile 310 and the second profile 320 is stated, first profile 310 and second profile are located at Between 320;The first locking for connecting with the upper end of the external supporting element 350 is additionally provided in first placing groove 311 Part 351;The second locking member for connecting with the lower end of the external supporting element 350 is additionally provided in second placing groove 321 352.First locking member can be moved along the extending direction of first placing groove, and second locking member can be along several The extending direction of second placing groove moves, so that mobility and versatility when increasing connection, can be applicable in mixed with difference The assembling of Xtah Crude Clay structure.
Further, as shown in Figure 1, Figure 2 and shown in Figure 10, the support component 200 includes: telescoping mechanism 210 comprising: The outer frame body 220 being connect with second profile 320 and at least one support rod bush 230;Wherein, the support rod set Pipe 230 is arranged in the outer frame body 220;The support rod 250 to match with the support rod bush 230, is inserted in described It supports in rod bush 110, and makees elevating movement along the length direction of the support rod bush 200, so that the telescoping mechanism 210 Height change.Specifically, by the collapsing length of the change support rod, the height of telescoping mechanism 210 can be changed, Then the height for changing aluminium alloy platform mould, facilitates the demoulding and transhipment of aluminium alloy platform mould.
Wherein, as shown in Figure 10 and Figure 11, at least one support rod bush 230, the support are equipped in the outer frame body Rod bush includes first support bar casing 231 and second support bar casing 232, and being equipped in the first support bar casing 231 can Flexible first support bar 251, the second support bar casing 232 is interior to be equipped with telescopic second support bar 252, passes through first Support rod 251 and the expansion fit of second support bar 252 use, and the height adjustment space that can enable aluminum alloy to platform mould becomes larger, and fit Casting for the higher concrete structure of floor.
Further, as shown in Figure 2 and Figure 6, the support component 200 further includes having locking piece 240, and being used for will be described Support rod 250 is fixed on the telescoping mechanism 210.Preferably, as shown in Fig. 1 and Figure 11, the support rod is equipped with multiple Limit hole 260, the telescoping mechanism are equipped with fixation hole 261, will after being directed at fixation hole with selected limit hole The locking piece 240 is sequentially inserted into the fixed block and limit hole, will be fixed to the collapsing length of support rod, is prevented aluminium The height of alloy platform mould changes in non-artificial situation.
Further, first profile, the second profile and the support component are all made of aluminum alloy materials and are made, so that should Aluminium alloy platform mould is corrosion-resistant, and intensity is high.
Embodiment 2
In order to facilitate the transhipment of aluminium alloy platform mould, as shown in figure 12, which further includes having to close for transporting aluminium The slide assemblies 400 of gold stand mould are connect with second profile 320;The support component 400 not with ground or concrete When the upper surface contact of superstructure, the slide assemblies are contacted with the upper surface of ground or concrete floor system.Specifically, assembly crewman When by being shunk and stored to the telescoping mechanism by support rod, slide assemblies 400 and ground or concrete can be made The upper surface of superstructure contacts, convenient to be transported through to aluminium alloy platform mould.
It should be noted that without conflicting with each other, those skilled in the art can will retouch in this specification The feature of the different embodiments or examples and different embodiments or examples stated is combined.
In the description of the present invention, it is to be understood that, term " vertical ", " transverse direction ", "front", "rear", "left", "right", The orientation or positional relationship of the instructions such as "vertical", "horizontal", "top", "bottom", "inner", "outside" be orientation based on the figure or Positional relationship is only the present invention and simplified description for ease of description, rather than it is necessary to indicate or imply signified device or element It constructs and operates with specific orientation, for specific orientation, thus should not be understood as the limitation to present invention protection content.
If the words such as " first ", " second " are used herein come if limiting components, those skilled in the art are answered This knows: the use of " first ", " second " is intended merely to facilitate the description present invention and simplifies description, does not in addition state such as, Above-mentioned word has no special meaning.
The invention is not limited to above embodiment, if not departing from the present invention to various changes or deformation of the invention Spirit and scope, if these changes and deformation belong within the scope of claim and equivalent technologies of the invention, then this hair It is bright to be also intended to encompass these changes and deformation.

Claims (10)

1. a kind of aluminium alloy platform mould characterized by comprising
Platform board component;
Support component;
Bracket component comprising have:
The first profile connecting with the platform board component, its underpart are equipped with the first placing groove, the extension of first placing groove Direction is identical as the length direction of first profile, and direction of slotting is downward;
Connect with the support component and with vertically disposed second profile of first profile, upper part be equipped with second place Slot, the extending direction of second placing groove is identical as the length direction of second profile, and direction of slotting is upward;
External accessories are arranged in first placing groove and/or second placing groove;
In assembly, the external accessories move and detachable with second profile along the extending direction of first placing groove Connection and/or the external accessories move along the extending direction of second placing groove and detachably connect with first profile It connects, so that first profile is fixed on the top of second profile.
2. aluminium alloy platform mould according to claim 1, which is characterized in that the external accessories include:
Bolt is arranged in first placing groove and/or second placing groove;
First locking nut is set on the bolt;
For compressing the first compressed part of first profile or second profile, it is set on the bolt, and be located at Between first locking nut and the bolt head;
When first locking nut and the bolt tighten cooperation, first compressed part is transported to the direction of the bolt head It is dynamic, so that first profile is fixed on the top of second profile.
3. aluminium alloy platform mould according to claim 2, it is characterised in that:
First compressed part is equipped with the first installation opening, and the opening direction of first installation opening is towards the bolt head;
First profile includes the first web and the first lower flange for being arranged in below first web, wherein described The lower part of first web is equipped with first placing groove, and the both ends of first lower flange are equipped with and the first installation opening phase The first protrusion matched;
Second profile includes the second web and the second top flange for being arranged in above second web, on described second The top on the edge of a wing is equipped with second placing groove, second top flange be equipped with match with first installation opening it is second convex Portion;
When first locking nut and the bolt tighten cooperation, first protrusion is caught in first installation opening, And/or second protrusion is caught in first installation opening.
4. aluminium alloy platform mould according to claim 3, it is characterised in that:
First profile further includes the first top flange being arranged in above first web;The both ends of first top flange Equipped with downward projection of third protrusion;
The bracket component further includes having platform board installation part, and the platform board installation part includes: to connect with the platform board component The eyelet bolt connect, the second compressed part being set on the eyelet bolt, and be set on the eyelet bolt second Locking nut;Wherein, second compressed part is equipped with the second installation opening to match with the third protrusion, second dress Opening direction with mouth is upward;
When second locking nut and the eyelet bolt tighten cooperation, the third protrusion is caught in second installation opening It is interior, so that first profile is fixed on the lower section of the platform board component.
5. aluminium alloy platform mould according to claim 3, it is characterised in that:
Second profile further includes having the second lower flange being arranged in below second web, which is provided with third placing groove With the 4th protrusion;
Wherein, the extending direction of the third placing groove is identical as the length direction of second lower flange, and slot direction to Under;4th protrusion matches with first installation opening.
6. aluminium alloy platform mould according to claim 3, it is characterised in that:
Second web is equipped with the first mounting hole that multiple groups are used to connect support component and multiple groups for connecting bearing bracket The second mounting hole;Wherein, first mounting hole and second mounting hole are alternately arranged setting.
7. aluminium alloy platform mould according to claim 1, it is characterised in that:
The bracket component further includes the external supporting element having for connecting first profile and the second profile, is located at described Between first profile and second profile;
The first locking member for connecting with the upper end of the external supporting element is additionally provided in first placing groove;
The second locking member for connecting with the lower end of the external supporting element is additionally provided in second placing groove.
8. aluminium alloy platform mould according to claim 1, it is characterised in that:
The support component includes:
Telescoping mechanism comprising: the outer frame body being connect with second profile and at least one support rod bush;Wherein, institute Support rod bush is stated to be arranged in the outer frame body;
The support rod to match with the support rod bush, is inserted in the support rod bush, and along the support rod set The length direction of pipe makees elevating movement, so that the height of the telescoping mechanism changes.
9. aluminium alloy platform mould according to claim 8, it is characterised in that:
The support component further includes having locking piece, is used to the support rod being fixed on the telescoping mechanism.
10. aluminium alloy platform mould according to claim 1, it is characterised in that:
The aluminium alloy platform mould further includes the slide assemblies having for transporting aluminium alloy platform mould, is connect with second profile;
When the support component is not contacted with the upper surface on ground or concrete floor system, the slide assemblies and ground or coagulation The upper surface of Tulou lid contacts.
CN201910470953.7A 2019-05-31 2019-05-31 A kind of aluminium alloy platform mould Pending CN110094050A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910470953.7A CN110094050A (en) 2019-05-31 2019-05-31 A kind of aluminium alloy platform mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910470953.7A CN110094050A (en) 2019-05-31 2019-05-31 A kind of aluminium alloy platform mould

Publications (1)

Publication Number Publication Date
CN110094050A true CN110094050A (en) 2019-08-06

Family

ID=67449932

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910470953.7A Pending CN110094050A (en) 2019-05-31 2019-05-31 A kind of aluminium alloy platform mould

Country Status (1)

Country Link
CN (1) CN110094050A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113944321A (en) * 2021-09-18 2022-01-18 湖北元拓铝合金模架制造有限公司 Building aluminum bench formwork convenient to assemble and install

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200378383Y1 (en) * 2004-12-27 2005-03-16 홍창모 supporter for a beam mould and a slab table
CN202012190U (en) * 2010-10-25 2011-10-19 山东新港国际模板工程技术有限公司 Integral bench mould
CN203821839U (en) * 2014-04-21 2014-09-10 广州景兴建筑科技有限公司 Integral bearing platform template for construction
KR101451877B1 (en) * 2013-05-03 2014-10-16 주식회사 지에스코 Execution structure for concrete slab
CN205777085U (en) * 2016-05-20 2016-12-07 上海宏金设备工程有限公司 A kind of main joist for dish buckle scaffold
CN210263907U (en) * 2019-05-31 2020-04-07 广东博恒金属制品有限公司 Aluminum alloy bench die

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200378383Y1 (en) * 2004-12-27 2005-03-16 홍창모 supporter for a beam mould and a slab table
CN202012190U (en) * 2010-10-25 2011-10-19 山东新港国际模板工程技术有限公司 Integral bench mould
KR101451877B1 (en) * 2013-05-03 2014-10-16 주식회사 지에스코 Execution structure for concrete slab
CN203821839U (en) * 2014-04-21 2014-09-10 广州景兴建筑科技有限公司 Integral bearing platform template for construction
CN205777085U (en) * 2016-05-20 2016-12-07 上海宏金设备工程有限公司 A kind of main joist for dish buckle scaffold
CN210263907U (en) * 2019-05-31 2020-04-07 广东博恒金属制品有限公司 Aluminum alloy bench die

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113944321A (en) * 2021-09-18 2022-01-18 湖北元拓铝合金模架制造有限公司 Building aluminum bench formwork convenient to assemble and install

Similar Documents

Publication Publication Date Title
CN201406639Y (en) Support of construction formworks of side flange plate of concrete-steel beam
CN109184190B (en) Climbing and bearing integrated beam type hydraulic climbing platform and mounting method thereof
CN107795120A (en) More curved surfaces freely stretch construction form and shoring system equipment
CN103452313A (en) Early-removing independent support strip
CN110094050A (en) A kind of aluminium alloy platform mould
CN208396714U (en) Supporting construction is adjusted in a kind of hollow concrete well unilateral side inner wall form
KR100816493B1 (en) Slip form for forming concrete wall of vertical tunnel and method for construction of the concrete wall
KR100897901B1 (en) Bridge construction and construction method of the same
CN207682650U (en) A kind of mold and cylindrical member manufacturing equipment
CN109944164A (en) Jack up hollow thin-walled high pier roller die system and its construction method
CN213418531U (en) Supporting and adjusting device for connecting steel members with prefabricated wall panels
CN210263907U (en) Aluminum alloy bench die
CN210679123U (en) External mold for casting cement rod
CN208685464U (en) A kind of bridge pier column template
CN209307871U (en) A kind of hanging basket formwork Integral lifting device
CN210067436U (en) Formwork support for steel structure floor slab construction
CN204849596U (en) Utensil is assisted with hoist and mount to concatenation of case beam mold board
CN107142961B (en) Concrete pouring integral movable formwork
CN201574572U (en) Angle-adjustable hanging rack for operation platform
CN212582424U (en) Supporting platform for track beam adjusting device and track beam adjusting device
CN212176557U (en) Caisson reinforcing apparatus
KR20020053795A (en) A mold supporting device of slab
CN113279569B (en) Early-dismantling supporting method for horizontal template of super-high floor
JP4476403B2 (en) Forming apparatus for manufacturing hollow PCa member and manufacturing method using the same
CN212507521U (en) Telescopic elevator shaft protection device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination