CN110086252B - Polymorphic feeder automation field test device - Google Patents

Polymorphic feeder automation field test device Download PDF

Info

Publication number
CN110086252B
CN110086252B CN201910264288.6A CN201910264288A CN110086252B CN 110086252 B CN110086252 B CN 110086252B CN 201910264288 A CN201910264288 A CN 201910264288A CN 110086252 B CN110086252 B CN 110086252B
Authority
CN
China
Prior art keywords
module
output
feeder automation
sections
feeder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910264288.6A
Other languages
Chinese (zh)
Other versions
CN110086252A (en
Inventor
潘建兵
曹蓓
刘洋
徐在德
范瑞祥
李升健
王华云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanchang Kechen Electric Power Test And Research Co ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Original Assignee
Nanchang Kechen Electric Power Test And Research Co ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanchang Kechen Electric Power Test And Research Co ltd, State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd filed Critical Nanchang Kechen Electric Power Test And Research Co ltd
Priority to CN201910264288.6A priority Critical patent/CN110086252B/en
Publication of CN110086252A publication Critical patent/CN110086252A/en
Application granted granted Critical
Publication of CN110086252B publication Critical patent/CN110086252B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/081Locating faults in cables, transmission lines, or networks according to type of conductors
    • G01R31/086Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution networks, i.e. with interconnected conductors
    • H02J13/0006
    • H02J13/0062
    • H02J13/0075
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • Y04S10/52Outage or fault management, e.g. fault detection or location
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/124Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wired telecommunication networks or data transmission busses
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/126Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

A multi-state feeder line automation field test device comprises a state indicator lamp, a man-machine interaction interface, a power management module, a CPU system, an analog output module, a switch state input module, a control output acquisition module, a communication module, a time synchronization module and a device shell for accommodating the above components. The communication module is connected with the satellite antenna through the time synchronization module; the communication module is provided with a SIM card, a USB port, an Ethernet port and a 232/485 serial port. The man-machine interaction interface comprises a liquid crystal touch screen, wherein the liquid crystal touch screen comprises system operation, feeder automation type selection, a typical wiring diagram, test scheme selection, feeder automation parameter input interface and power supply network selection. According to the invention, a power supply network structure, feeder automation types, input feeder automation related parameters, fault point positions and test device placement positions are selected through the device, and a test sequence and a scheme are automatically generated; the invention is suitable for any feeder automation field test requirement.

Description

Polymorphic feeder automation field test device
Technical Field
The invention relates to a polymorphic feeder line automation field test device, and belongs to the technical field of distribution automation.
Background
The feeder automation is to monitor the running condition of the distribution network by using an automation device or system, discover the fault of the distribution network in time, and perform fault location, isolation and recovery to supply power to the non-fault area. According to the power supply reliability requirements, communication modes, master station coordination and other forms, feeder automation technology is divided into centralized type and in-situ type, and in-situ type feeder automation comprises in-situ recloser type and intelligent distributed type. The in-situ recloser type can be divided into a voltage time type, a voltage current time type and a self-adaptive comprehensive type according to different criteria; the intelligent distribution type can be divided into quick-action type and slow-action type.
The feeder automation can realize fault handling by adopting centralized and local modes, the fault handling modes are reasonably selected according to the power supply reliability requirements and by combining the conditions of a grid structure of a power distribution network, the current situation of primary equipment, communication basic conditions and the like, and a main station and a terminal are reasonably configured.
The reasonable feeder automation technology is the primary problem of current distribution automation construction, whether the established feeder automation technical indexes meet the design requirements is further verified, at present, the feeder automation function testing devices capable of simultaneously meeting the concentrated type, voltage time type, voltage current time type, intelligent distributed type, fault positioning type and the like are lacking, wiring is complicated, and development of feeder automation testing work in basic operation and maintenance units is not facilitated. Therefore, it is necessary to provide a polymorphic feeder automation testing device with simple operation and wide application, which can simply select the operation such as the net rack to be tested, the feeder automation type, the inherent testing parameters, etc. on site, so as to quickly and automatically generate the test sequence and the scheme for automatically generating the test, archive and evaluate the test result, and improve the practical level of the distribution automation.
Disclosure of Invention
The invention aims to realize on-site testing of functions of different feeder automation types such as centralized type, voltage time type, voltage current time type, intelligent distributed type, fault positioning type and the like, reduce testing preparation time, matched equipment and wiring error probability, and rapidly and accurately develop the on-site testing of the feeder automation, and provides a polymorphic feeder automation on-site testing device.
The technical scheme of the invention is that the multi-state feeder automation field test device comprises a status indicator lamp, a man-machine interaction interface, a power management module, a CPU system, an analog output module, a switch status input module, a control output acquisition module, a communication module, a time synchronization module and a device shell for accommodating the components; the CPU system is respectively connected with the analog quantity output module, the switch state input module, the control output acquisition module, the state indicator lamp, the man-machine interaction interface and the power management module; the communication module is interconnected with the man-machine interaction interface; the communication module is connected with the satellite antenna through the time synchronization module; the communication module is provided with a SIM card, a USB port, an Ethernet port and a 232/485 serial port.
The state indicator lamp comprises an alternating current power supply input indicator lamp, a battery charging indicator lamp, a battery undervoltage indicator lamp, an operation state indicator lamp, a state output indicator lamp, a communication lamp, a satellite synchronous lamp, a switch position indicator lamp and a switch control state indicator lamp; the status indicator lamp is arranged on the right side of the man-machine interaction interface on the front side of the device.
The man-machine interaction interface comprises a liquid crystal touch screen, a 2-path Ethernet port, two paths of RS232 serial interfaces and a 2-path USB interface; the liquid crystal touch screen comprises system operation, feeder automation type selection, a typical wiring diagram, test scheme selection, a feeder automation parameter input interface and power supply network selection.
The device automatically generates a test sequence and a scheme by selecting a power supply network structure, an automatic feeder type, input feeder automation related parameters, fault point positions and test device placement positions in the device; then, receiving simulation test master stations or satellite pairs through a built-in GPS/Beidou satellite module in the time synchronization module, and ensuring that output time of a plurality of multi-state test devices related to the feeder automation test system is kept synchronous; the CPU system controls analog output, switch state input, alternating current and standby power supply switching, so that automatic generation of a test sequence is realized; and finally, comprehensively evaluating the accuracy of the feeder automation correct action through the information such as the switch action condition, the opening and closing position and the like fed back by the testing device, and generating an evaluation report.
The feeder automation type comprises centralized type, voltage time type, voltage current time type, self-adaptive comprehensive type, intelligent distributed type, fault positioning type and custom type 7;
the feeder automation parameter input interface comprises a CT transformation ratio, a PT transformation ratio, an X time fixed value, a Y time fixed value, an overcurrent I section fixed value (secondary value) and delay time, an overcurrent II section fixed value (secondary value) and delay time, an overcurrent III section fixed value (secondary value) and delay time, reclosing times and interval time limit and a switch attribute;
the power supply network selection comprises single radiation, single connection and multiple connection, wherein the single radiation network is mainly divided into two sections and multiple branches, three sections and multiple branches, four sections and multiple branches and five sections and multiple branches according to the number of the section switches; the single-link is mainly divided into two sections and multiple branches, three sections and multiple branches, four sections and multiple branches and five sections and multiple branches according to the number of the section switches; the multi-connection is mainly divided into two sections and branches, three sections and branches, four sections and branches and five sections and branches according to the number of the section switches;
the switch attribute comprises a breaker and a load switch, and is divided into sections, contacts, branches and boundaries according to the switch action.
The CPU system is an operating system for man-machine interaction interface menu and communication processing, and is used for switching value input, switching value output and system monitoring, the control task adopts an embedded operating system, and a plurality of systems are independently and parallelly processed in a cooperative mode.
The time synchronization module is a built-in GPS/Beidou satellite module, receives the simulation test master station or satellite time synchronization and synchronously outputs a synchronization signal.
The analog output module comprises alternating voltage output, alternating current output and direct current output; wherein the amplitude, phase and frequency of the voltage and current are adjustable; the voltage and the current meet the phase current and phase current output requirements, and output ports are distinguished according to the phases of A (yellow), B (green), C (red), zero sequence (blue) and N (black); the voltage and current output precision meets the requirement of 0.05%, meets the requirement of conventional electromagnetic or secondary fusion small signal precision output, and the direct current voltage can output 5V, 12V, 24V, 48V and 220V.
The switch state input module uses optical coupling output to simulate the split and combination signals of the circuit breaker, the simulation quantity is customized according to the field requirement, and the time error between any two paths of output is not more than 1ms.
The control output acquisition module responds by following a remote control instruction, automatically detects and adapts to whether a remote control opening and remote control closing loop has active nodes, and provides a direct-current voltage 24V power supply or a direct-current voltage 48V power supply if no passive node exists, so that the state of misoperation, refusal operation and slow operation of the switch can be set; false operation can be realized by setting an error control opening indication, refusing operation can be realized by setting a short-circuit closing loop, and slow operation can be realized by setting a switch delay time.
The communication module provides a wireless communication SIM port, supports 4G, 3G and 2G, can be automatically switched according to the strength of an on-site signal, and synchronously triggers and outputs a test signal through GPRS wireless networking.
The working principle of the invention is as follows, the invention automatically generates a test sequence and a scheme by selecting a power supply network structure, an automatic feeder type, input feeder automation related parameters, fault point positions and test device placement positions in the device; then, receiving simulation test master stations or satellite pairs through a built-in GPS/Beidou satellite module in the time synchronization module, and ensuring that output time of a plurality of multi-state test devices related to the feeder automation test system is kept synchronous; the CPU system controls analog output, switch state input, alternating current and standby power supply switching, so that automatic generation of a test sequence is realized; and finally, comprehensively evaluating the accuracy of the feeder automation correct action through the information such as the switch action condition, the opening and closing position and the like fed back by the testing device, and generating an evaluation report.
The invention has the beneficial effects that the power supply network structure, the feeder automation class, the input feeder automation related parameters, the fault point position and the test device placement position are selected through the device, the test sequence and the scheme are automatically generated, meanwhile, the test wiring diagram is displayed, the test steps and the test results are automatically recorded, the test results are evaluated, and the power distribution automation practical level is greatly improved.
The invention is suitable for any feeder automation field test requirement, and has simple wiring and wide application range.
Drawings
FIG. 1 is a block diagram showing the internal structure of the device of the present invention;
FIG. 2 is a front view of the device;
FIG. 3 is a top view of the device outline;
FIG. 4 is a right side view of the device outline;
FIG. 5 is a rear view of the device profile;
in the figure, 1 is a power switch key; 2, a human-computer interaction interface; 3 is a starting key; 4 is a stop button; 5 is a status indicator lamp; 6 is a first set of remote control loop keys; 7 is a second set of remote control loop keys; 8 is a switch state input module; 9 is a control output acquisition module; 10 is 232/485 serial port; 11 is a SIM card; 12 is an Ethernet port; 13 is wireless; 14 is a clock; 15 is direct current voltage and small signal output; 16 is an alternating voltage output; 17 is an alternating current output; 18 is a device handle; 19 is a battery access port; 20 is an ac power input.
Detailed Description
The structure of the multi-state feeder line automation field test device is shown in fig. 1, and the device comprises a state indicator lamp, a man-machine interaction interface, a power management module, a CPU system, an analog output module, a switch state input module, a control output acquisition module, a communication module, a time synchronization module and a device shell for accommodating the above components; the CPU system is respectively connected with the analog quantity output module, the switch state input module, the control output acquisition module, the state indicator lamp, the man-machine interaction interface and the power management module; the communication module is interconnected with the man-machine interaction interface; the communication module is connected with the satellite antenna through the time synchronization module; the communication module is provided with a SIM card, a USB port, an Ethernet port and a 232/485 serial port.
The frontal structural arrangement of the test device housing of this embodiment is shown in fig. 2. The liquid crystal touch screen of the man-machine interaction interface 2 is arranged in the middle of the device; the upper left corner is a power switch key 1; a start key 3 and a stop key 4 are arranged at the upper right; a first group of remote control loop keys 6 and a second group of remote control loop keys 7 are arranged below the man-machine interaction interface 2; a status indicator lamp 5 is arranged below the right start button 3 and the stop button 4.
The status indicator lamp 5 comprises an alternating current power input indicator lamp, a battery charging indicator lamp, a battery undervoltage indicator lamp, an operation status indicator lamp, a status output indicator lamp, a communication lamp, a satellite synchronous lamp, a switch position indicator lamp and a switch control status indicator lamp.
The AC power input indicator light is normally on (red) to indicate that the device is powered by mains supply or a generator, and the light is off (gray) to indicate that the device is powered by a backup battery or an external battery; the battery charge indicator light is normally on (red) to indicate that the battery is in a charged state, and the light is off (gray) to indicate that the battery is full or not in a charged state; the battery under-voltage indicator lamp is always on (red) to indicate that the battery has low electric quantity and needs to be charged as soon as possible; the running state indicates that the running lamp blinks (1 second intervals) to indicate that the equipment is running normally, and the non-blinks indicate that the equipment is abnormal; the state output indicator light is normally on (red) to indicate that analog quantity and the like of the equipment are in an output state, and is normally on (green) to indicate that analog quantity and the like of the equipment are in a stop state; the communication lamp is on to represent that the communication between the background of the equipment is normal, the red color indicates that the communication is normal, and the green color indicates that the communication is not connected; the satellite sync light is normally on (red) indicating that the satellite is locked and green flashing indicates no data reception or that the satellite is unlocked. The switch position indicator lamp comprises a switch-off position lamp and a switch-on position lamp, wherein the switch-off lamp is normally on (green) to indicate that the analog circuit breaker is at a switch-on position, and the switch-on lamp is normally on (red) to indicate that the analog circuit breaker is at a switch-on position; the switch control state indicator lamp comprises a control opening lamp and a control closing lamp, wherein the control opening lamp flashes (red) to indicate that the analog circuit breaker has received a remote control opening instruction, and the closing lamp flashes (red) to indicate that the analog circuit breaker has received a remote control closing instruction.
The top surface arrangement of the test device housing of this embodiment is shown in fig. 3. The top surface is provided with a switch state input module 8, a control output acquisition module 9, a 232/485 serial port 10, a SIM card 11, an Ethernet port 12, a wireless interface 13 and a clock 14 from left to right near the front end. The middle part of the top surface is provided with an alternating current output 17, an alternating voltage output 16 and a direct voltage and small signal output from left to right.
As shown in fig. 4, the right side of the test device housing of the present embodiment is provided with a battery access port 19 and a device handle bar 18.
As shown in fig. 5, the rear side of the test device housing of the present embodiment is provided with an ac power supply input port 20.
The man-machine interaction interface in the embodiment comprises a liquid crystal touch screen and a liquid crystal touch screen, wherein the liquid crystal touch screen comprises system operation, feeder automation type selection, a typical wiring diagram, test scheme selection, feeder automation parameter input interface and power supply network selection.
Feeder automation types include centralized, voltage-time, voltage-current-time, adaptive comprehensive, intelligent distributed, fault-locating, custom 7 broad categories.
The feeder automation parameter input interface comprises a CT transformation ratio, a PT transformation ratio, an X time fixed value, a Y time fixed value, an overcurrent I section fixed value (secondary value) and delay time, an overcurrent II section fixed value (secondary value) and delay time, an overcurrent III section fixed value (secondary value) and delay time, reclosing times and interval time limit and switch attribute.
The switch attribute comprises a breaker and a load switch, and is divided into sections, contacts, branches and boundaries according to the switching action.
The power supply network selection comprises single radiation, single connection and multiple connection, wherein the single radiation network is mainly divided into two sections and multiple branches, three sections and multiple branches, four sections and multiple branches and five sections and multiple branches according to the number of the section switches; the single-link is mainly divided into two sections and multiple branches, three sections and multiple branches, four sections and multiple branches and five sections and multiple branches according to the number of the section switches; the multi-connection is mainly divided into two sections and branches, three sections and branches, four sections and branches and five sections and branches according to the number of the section switches; the network structure can be selected by user definition according to the user requirements.
The power management module in this embodiment includes an ac power supply and a backup power supply; the alternating current power supply and the backup power supply refer to that when the alternating current power supply is input into the equipment, the equipment is powered by the alternating current and charges the backup power supply; when the alternating current power supply is in power failure, the device is powered by a backup power supply, the backup power supply can support the system to run for 4 hours, and the backup power supply can be external or integrated internally.
The CPU system in the embodiment is an operating system for man-machine interface and communication processing, and is an embedded operating system for switching value input and output and system monitoring and control tasks, and a plurality of systems are independently processed in parallel and cooperatively.
The time synchronization module in the embodiment is a built-in GPS/Beidou satellite module, receives the simulation test master station or satellite pair, and synchronously outputs a synchronization signal.
The analog output module in the embodiment comprises alternating voltage output, alternating current output and direct voltage output, wherein the amplitude, phase and frequency of the voltage and the current are adjustable; the voltage and the current meet the phase current and phase current output requirements, and output ports are distinguished according to the phases of A (yellow), B (green), C (red), zero sequence (blue) and N (black). The voltage and current output precision meets the requirement of 0.05%, meets the requirement of conventional electromagnetic or secondary fusion small signal precision output, and the direct current voltage can output 5V, 12V, 24V, 48V and 220V.
The switch state input module in the embodiment uses the optical coupling output to simulate the split and combination signals of the circuit breaker, the simulation quantity is customized according to the field requirement, and the time error between any two paths of output is not more than 1ms.
The control output acquisition module in the embodiment responds by following a remote control instruction, automatically detects and adapts to whether a remote control opening and closing loop has active nodes, and provides a direct-current voltage 24V power supply or a 48V power supply if no passive node exists, so that the state of misoperation, refusal and slow operation of the switch can be set; false operation can be realized by setting an error control opening indication, refusing operation can be realized by setting a short-circuit closing loop, and slow operation can be realized by setting a switch delay time.
The communication module in the embodiment provides a wireless communication SIM port, supports 4G, 3G and 2G, can be automatically switched according to the strength of the field signal, and synchronously triggers and outputs a test signal through GPRS wireless networking.

Claims (10)

1. The multi-state feeder line automation field test device is characterized by comprising a state indicator lamp, a man-machine interaction interface, a power management module, a CPU system, an analog output module, a switch state input module, a control output acquisition module, a communication module, a time synchronization module and a device shell for accommodating the above components; the CPU system is respectively connected with the analog quantity output module, the switch state input module, the control output acquisition module, the state indicator lamp, the man-machine interaction interface and the power management module; the communication module is interconnected with the man-machine interaction interface; the communication module is connected with the satellite antenna through the time synchronization module; the communication module is provided with a SIM card, a USB port, an Ethernet port and a 232/485 serial port;
the man-machine interaction interface comprises a liquid crystal touch screen, wherein the liquid crystal touch screen comprises system operation, feeder automation type selection, a typical wiring diagram, test scheme selection, feeder automation parameter input interface and power supply network selection;
the device automatically generates a test sequence and a scheme by selecting a power supply network structure, an automatic feeder type, input feeder automation related parameters, fault point positions and test device placement positions in the device; receiving the simulation test master station or satellite pairs through a built-in GPS/Beidou satellite module in the time synchronization module, and ensuring that the output time of a plurality of polymorphic test devices related to the feeder line automatic test system is kept synchronous; the CPU system controls analog output, switch state input, alternating current and standby power supply switching, so that automatic generation of a test sequence is realized; and finally, comprehensively evaluating the accuracy of the feeder automation correct action through the switch action condition and the opening and closing position information fed back by the testing device, and generating an evaluation report.
2. The multi-state feeder automation field test device of claim 1, wherein the status indicator light comprises an ac power input indicator light, a battery charge indicator light, a battery under-voltage indicator light, an operational status indicator light, a status output indicator light, a communication light, a satellite synchronization light, a switch position indicator light, a switch control status indicator light; the status indicator lamp is arranged on the right side of the man-machine interaction interface on the front side of the device.
3. The multi-state feeder line automation field test device according to claim 1, wherein the CPU system is an operating system for man-machine interaction interface menu and communication processing, and for switching value input, output and system monitoring, the control task adopts an embedded operating system, and a plurality of systems are independently processed in parallel and cooperatively.
4. The polymorphic feeder automation field test device of claim 1, wherein the time synchronization module is a built-in GPS/beidou satellite module, receives the analog test master station or satellite pair, and synchronously outputs the synchronization signal.
5. The multi-state feeder automation field test device of claim 1, wherein the analog output module comprises an ac voltage output, an ac current output, and a dc voltage output; wherein the amplitude, phase and frequency of the voltage and current are adjustable; the voltage and the current meet the phase current and phase current output requirements, and the output ports are respectively distinguished according to the colors of yellow, green, red, blue and black; the voltage and current output precision meets the requirement of 0.05 percent, meets the requirement of the precision output of the conventional electromagnetic type or secondary fusion small signal, and the direct current voltage outputs 5V, 12V, 24V, 48V and 220V.
6. The multi-state feeder automation field test device according to claim 1, wherein the switch state input module uses optical coupling output to simulate the split and combination signals of the circuit breaker, the simulation quantity is customized according to the field requirement, and the time error between any two paths of output is not more than 1ms.
7. The multi-state feeder line automation field test device according to claim 1, wherein the control output acquisition module responds by following a remote control command, automatically detects and adapts whether a remote control opening and closing loop has an active node, and provides a direct current voltage 24V power supply or a 48V power supply if no passive node exists, and sets a switch malfunction, refusal and slow movement state; false operation is realized by setting an error control opening indication, refusing operation is realized by setting a short-circuit closing loop, and slow operation is realized by setting a switch delay time.
8. The polymorphic feeder automation field test device of claim 1, wherein the communication module provides a wireless communication SIM port supporting 4G, 3G, 2G, and is capable of switching automatically according to the field signal strength, and triggering and outputting the test signal synchronously through GPRS wireless networking.
9. The polymorphic feeder automation field test device of claim 1, wherein the feeder automation type comprises centralized, voltage time type, voltage current time type, adaptive integrated, intelligent distributed, fault location, custom 7 broad class;
the feeder automation parameter input interface comprises a CT transformation ratio, a PT transformation ratio, an X time fixed value, a Y time fixed value, an overcurrent I section fixed value and delay time, an overcurrent II section fixed value and delay time, an overcurrent III section fixed value and delay time, reclosing times, interval time limit and switch attribute;
the power supply network selection comprises single radiation, single connection and multiple connection, wherein the single radiation network is divided into two sections and multiple branches, three sections and multiple branches, four sections and multiple branches and five sections and multiple branches according to the number of the section switches; the single-link is divided into two sections and multiple branches, three sections and multiple branches, four sections and multiple branches and five sections and multiple branches according to the number of the section switches; the multi-connection is divided into two sections and branches, three sections and branches, four sections and branches and five sections and branches according to the number of the section switches.
10. A multi-state feeder automation field test device according to claim 9, wherein the switching attribute comprises circuit breakers and load switches, and is divided into segments, links, branches, and demarcations based on switching action.
CN201910264288.6A 2019-04-03 2019-04-03 Polymorphic feeder automation field test device Active CN110086252B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910264288.6A CN110086252B (en) 2019-04-03 2019-04-03 Polymorphic feeder automation field test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910264288.6A CN110086252B (en) 2019-04-03 2019-04-03 Polymorphic feeder automation field test device

Publications (2)

Publication Number Publication Date
CN110086252A CN110086252A (en) 2019-08-02
CN110086252B true CN110086252B (en) 2024-03-12

Family

ID=67414209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910264288.6A Active CN110086252B (en) 2019-04-03 2019-04-03 Polymorphic feeder automation field test device

Country Status (1)

Country Link
CN (1) CN110086252B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110456233A (en) * 2019-09-19 2019-11-15 广东电网有限责任公司 A kind of voltage-time type feeder automation test equipment and its storage device
CN110988527A (en) * 2019-11-25 2020-04-10 国网宁夏电力有限公司电力科学研究院 Feeder automation testing device and using method thereof
CN111044815A (en) * 2019-12-02 2020-04-21 国网浙江嘉善县供电有限公司 On-spot detection device of multi-functional automatic distribution equipment
CN111123820A (en) * 2019-12-11 2020-05-08 国网浙江嘉善县供电有限公司 Portable distribution site automatic detection system
CN111308236A (en) * 2019-12-31 2020-06-19 广州得元电力科技有限公司 Testing system, device and method for power distribution terminal
CN111337790A (en) * 2020-03-18 2020-06-26 广西电网有限责任公司电力科学研究院 Distribution network real mirror test platform and detection method for primary and secondary fusion power distribution equipment
CN112540263A (en) * 2020-11-18 2021-03-23 广西电网有限责任公司电力科学研究院 Feeder automation logic operation and maintenance detection device and method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104122474A (en) * 2014-08-06 2014-10-29 国网上海市电力公司 Intelligent distributed feeder automation logic test system
CN104977486A (en) * 2015-06-15 2015-10-14 国网上海市电力公司 Portable power distribution terminal tester
CN204808712U (en) * 2015-07-16 2015-11-25 国网技术学院 Feeder automation emulation training system
CN206790104U (en) * 2017-05-31 2017-12-22 四川电力设计咨询有限责任公司 The automatic switching device of 10 kilovolts of inlet-outlet lines
CN108879964A (en) * 2018-08-10 2018-11-23 陕西银河天地智能配网技术有限公司 Type feed line automatization system field-checking is driven FA full-automatic testing method on the spot
CN108983006A (en) * 2018-08-10 2018-12-11 陕西银河天地智能配网技术有限公司 Type feeder automation switch terminal scene does not have a power failure full-automatic testing method on the spot
CN109245072A (en) * 2018-09-17 2019-01-18 南京国电南自电网自动化有限公司 Adaptive type feeder automation fault handling method on the spot based on region serial number
CN210327143U (en) * 2019-04-03 2020-04-14 国网江西省电力有限公司电力科学研究院 Automatic field test device for multi-state feeder

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104122474A (en) * 2014-08-06 2014-10-29 国网上海市电力公司 Intelligent distributed feeder automation logic test system
CN104977486A (en) * 2015-06-15 2015-10-14 国网上海市电力公司 Portable power distribution terminal tester
CN204808712U (en) * 2015-07-16 2015-11-25 国网技术学院 Feeder automation emulation training system
CN206790104U (en) * 2017-05-31 2017-12-22 四川电力设计咨询有限责任公司 The automatic switching device of 10 kilovolts of inlet-outlet lines
CN108879964A (en) * 2018-08-10 2018-11-23 陕西银河天地智能配网技术有限公司 Type feed line automatization system field-checking is driven FA full-automatic testing method on the spot
CN108983006A (en) * 2018-08-10 2018-12-11 陕西银河天地智能配网技术有限公司 Type feeder automation switch terminal scene does not have a power failure full-automatic testing method on the spot
CN109245072A (en) * 2018-09-17 2019-01-18 南京国电南自电网自动化有限公司 Adaptive type feeder automation fault handling method on the spot based on region serial number
CN210327143U (en) * 2019-04-03 2020-04-14 国网江西省电力有限公司电力科学研究院 Automatic field test device for multi-state feeder

Also Published As

Publication number Publication date
CN110086252A (en) 2019-08-02

Similar Documents

Publication Publication Date Title
CN110086252B (en) Polymorphic feeder automation field test device
CN202948040U (en) Intelligent electric energy meter having power failure monitoring and protection functions
CN102830255B (en) A kind of intelligent electric energy meter with electricity consumption malfunction monitoring defencive function
CN101980418B (en) System for detecting secondary wiring of relay protection system in transformer substation on line
CN210327143U (en) Automatic field test device for multi-state feeder
CN110988524B (en) Automatic function test device of full-automatic recloser formula feeder
CN112713586A (en) Low-voltage intelligent power distribution self-healing and power supply switching control system
CN102148529A (en) Control device and control method thereof for intelligently supplying power to circuit breaker control unit
CN108964259A (en) A kind of power grid intelligence control system
CN102290803B (en) Micro-grid relaying protection method and device
CN103455678A (en) Secondary virtual loop chart collaborative design method based on standardized virtual terminals
CN109103859A (en) A kind of distribution differential protection measure and control device for supporting 4G to communicate
CN203312920U (en) Intelligent integrated system of PT cabinet
CN201191712Y (en) Low voltage AC cabinet for touching integrated intelligent transforming plant
CN203180652U (en) Five-prevention electric display locking system
CN111142059A (en) Intelligent detection device and method for PT unit of outdoor ring main unit
CN114441896A (en) Distribution network automation simulation platform and FTU detection method
CN201270385Y (en) Intelligent synthetic electric distribution box
CN210016327U (en) Monitoring device and monitoring system for automatic switch of distributed power distribution network
CN100568646C (en) Combined switch for mining
An et al. Development of a smart low voltage circuit breaker with integrated protection and control functions based on wireless communications
CN203774749U (en) Digital display adjustable self-reset type overvoltage and undervoltage protector
CN113219367A (en) Energy controller loop state monitoring and testing system
CN202663097U (en) Improved structure of safety protection device of low-voltage distribution box
CN102487218A (en) Method for monitoring loop network cabinet and automated remote terminal for power distribution

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant