CN110086091A - Shunt nodes type PT cabinet - Google Patents
Shunt nodes type PT cabinet Download PDFInfo
- Publication number
- CN110086091A CN110086091A CN201910472561.4A CN201910472561A CN110086091A CN 110086091 A CN110086091 A CN 110086091A CN 201910472561 A CN201910472561 A CN 201910472561A CN 110086091 A CN110086091 A CN 110086091A
- Authority
- CN
- China
- Prior art keywords
- storehouse
- switch
- cabinet
- pass branch
- control mechanism
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000007246 mechanism Effects 0.000 claims abstract description 36
- 238000009413 insulation Methods 0.000 claims abstract description 14
- 230000005611 electricity Effects 0.000 claims description 6
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 claims description 3
- 238000004891 communication Methods 0.000 claims description 3
- 229910052802 copper Inorganic materials 0.000 claims description 3
- 239000010949 copper Substances 0.000 claims description 3
- 230000000694 effects Effects 0.000 description 7
- 238000010276 construction Methods 0.000 description 6
- 238000000034 method Methods 0.000 description 4
- 238000013461 design Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000003796 beauty Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 229910052738 indium Inorganic materials 0.000 description 1
- 230000001535 kindling effect Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 230000006855 networking Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000011218 segmentation Effects 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B1/00—Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
- H02B1/20—Bus-bar or other wiring layouts, e.g. in cubicles, in switchyards
- H02B1/202—Cable lay-outs
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B1/00—Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
- H02B1/26—Casings; Parts thereof or accessories therefor
- H02B1/30—Cabinet-type casings; Parts thereof or accessories therefor
- H02B1/306—Accessories, e.g. windows
Abstract
The present invention relates to a kind of shunt nodes type PT cabinet, including cabinet body, control mechanism storehouse is set gradually by matts sequence in cabinet body, switch storehouse, the storehouse PT, by-pass branch are plugged into storehouse;PT control mechanism and by-pass branch control mechanism are installed, switch the top of the warehouse is equipped with ejection and cabinet casing in control mechanism storehouse;By-pass branch switch, PT switch and busbar are installed in switch storehouse;PT all insulation connecting line, voltage transformer are installed, the storehouse PT is additionally provided with wall bushing in the storehouse PT;By-pass branch plugs into and is equipped with by-pass branch fast interface in storehouse;By-pass branch switch is connect by three road busbars in busbar with the fast interface of by-pass branch;PT switch is connect by other three roads busbars in busbar with the wall bushing in the storehouse PT;Wall bushing in the storehouse PT is connected with voltage transformer by PT all insulation connecting line.
Description
Technical field
The present invention relates to buckling cabinet fields, more specifically to a kind of shunt nodes type PT cabinet.
Background technique
For urban power distribution network largely using putting cable underground, solving urban aerial line influences beauty, tree line contradiction, building line at present
The problems such as contradiction etc..But new problem has also been bred simultaneously, i.e. cable run distance to the ground is close, so almost arriving using all insulation
The route at bottom designs, once breaking down or overhauling, can not carry out operation using livewire work mode, can only have a power failure and be made
Industry, and power off time is also very long.In traditional ring network cabinet or switching station, a standby spacing can be generally reserved, at certain
When line failure need to overhaul, powered using standby spacing to the load under this route.But it is quick due to city load
Increase and urban land is more and more nervous, there is no standby spacings in ring network cabinet and switching station in many cases, therefore work as
When line failure need to overhaul, it is necessary to have a power failure, this reduces power supply reliabilities.
The scheduled outage time of China's distribution at present accounts for relatively high (about 71.70%), and uninterrupted operation technology is in operation
There is also gaps compared with developed countries for method and project, operating personnel, power tool and equipment aspect.According to country
" QGDW/10520-2016 10kV distribution uninterrupted operation specification ", distribution upkeep operation should follow the principle of " energy band is not stopped ".
In view of the above problems, referring to the experience of external developed regions, national grid proposes the concept of first telegram in reply, rear operation.
Grid structure is improved first, by the way that bulk power grid is divided into several minor scale power nets, by the way of more segmentations, interconnecting more, auxiliary intelligence
Change electric power network technique and reaches uninterrupted operation.Secondly pressure electric car, case become vehicle in using, the operating equipments such as bypass cable carry out face or
The first telegram in reply operation of point reduces and has a power failure, and improves power supply reliability.But in practical applications, still following problems can not solve:
1, cable duct catches fire: in Chinese most cities, urban power consumption growth is much unable to catch up in cable duct design
Speed, so cable duct is constantly in state disorderly and unsystematic, crowded, more than hidden danger point, often major loop, back-up circuit, branch
Circuit is all in a bar ditch, once kindling, rack interconnection is directly disconnected.
2, switchgear house inlet wire failure: in Chinese most cities, it can not also accomplish that all switchgear houses have multiloop
Inlet wire, for single loop inlet wire, once power supply lacks, user can only have a power failure.
3, it capacity problem: carries out turning electricity band confession by grid structure, if regular link capacity is inadequate, can not meet failure
Uninterrupted operation purpose still cannot be achieved in line user capacity requirement.
4, temporary electricity: occasion encounters guarantor's electricity, not interim enough the increase-volume of capacity, needs to take electricity from existing rack or move
Dynamic plant-grid connection.
Problem above can not all be solved the short time by grid structure optimization.At present use in pressure electric car, case become vehicle,
The operating equipments such as bypass cable carry out the first telegram in reply operation of face or point.From technical know-how level it is that there is no problem, but in practical work
In work, these operating equipments seldom can find not have a power failure in cable system route and quickly access a little.
Summary of the invention
(1) technical problems to be solved
In order to solve the above problem of the prior art, the invention proposes a kind of shunt nodes type PT cabinets, in original PT
Increase a Branch control circuit in cabinet and branch's fast interface, the ring network cabinet for being combined with this PT cabinet are mounted in sets of lines
The places such as point, multi-line crosspoint, neighbouring, the resident concentrated area of emphasis user can be used as distribution telegram in reply equipment access at any time
Point, solve the problems, such as in pressure telegram in reply technology do not have a power failure rapid combination.
(2) technical solution
In order to achieve the above object, the main technical schemes that the present invention uses include:
Design a kind of shunt nodes type PT cabinet, including cabinet body, in cabinet body by matts sequence set gradually control mechanism storehouse,
Switch storehouse, the storehouse PT, by-pass branch are plugged into storehouse;
PT control mechanism and by-pass branch control mechanism, the switch the top of the warehouse installation are installed in the control mechanism storehouse
There are ejection and cabinet casing;
By-pass branch switch, PT switch and busbar are installed in the switch storehouse;
PT all insulation connecting line, voltage transformer are installed, the storehouse PT is additionally provided with wall bushing in the storehouse PT;
The by-pass branch plugs into and is equipped with by-pass branch fast interface in storehouse;
Wherein, the by-pass branch switch is connect by three road busbars in busbar with the fast interface of by-pass branch;The PT
Switch is connect by other three roads busbars in busbar with the wall bushing in the storehouse PT;Wall bushing and voltage in the storehouse PT is mutual
Sensor is connected by PT all insulation connecting line.
In the above scheme, the PT control mechanism is switching control mechanism, for controlling the power supply of the PT switch.
In the above scheme, the by-pass branch control mechanism is switching control mechanism, for controlling the by-pass branch
The power supply of switch.
In the above scheme, the PT all insulation connecting line is the single-core cable of a both ends installation elbow cable connector,
For realizing the electrical connection between the voltage transformer and PT switch.
In the above scheme, the fast interface of the by-pass branch is a kind of cable for having spring hoodle latching mechanical structure
Connecting interface inserts the quick electrical connection between terminal and by-pass branch switch for realizing cable fastly.
In the above scheme, the busbar is prolate shape rule copper bar, including six sets of major loop busbars and a set of ground connection mother
Row for the electrical communication between switch and interface and switchs ground connection contact.
In the above scheme, the by-pass branch switch is 10kV breaker, for controlling the power supply in by-pass branch circuit.
In the above scheme, the PT switch is 10kV disconnecting switch, for controlling the power supply in the circuit PT.
In the above scheme, it is described ejection and cabinet casing be 10kV switchgear cable outlet casing tube, for by PT cabinet with
Bus is attached.
(3) beneficial effect
The beneficial effects of the present invention are: the present invention does not increase ring network cabinet inlet-outlet line cabinet quantity, nothing is designed to cable system route
Particular/special requirement can substitute current PT cabinet completely;Have the function of branch node power supply control, uninterruption power source can be carried out
Switching;Using quick interconnection technique, PT cabinet passes in and out line interface and uses fast insert-pull mode, reliable from equipment level construction interconnection type
Electricity consumption Logistics networks form fixed power source hot spot on distribution line and are used as power supply source access point or load output point, in realization
Fast and flexible networking, fast power restoration are pressed, cable system uninterrupted operation efficiency can be increased substantially;Solves cable maintenance wiring
It is cumbersome, construction is complicated, the problems such as taking a long time, need to repeatedly having a power failure, will effectively promote wireline operation efficiency, and shorten power off time,
Improve power supply reliability.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of shunt nodes type PT cabinet.
[description of symbols]
1, PT control mechanism;
2, by-pass branch control mechanism;
3, control mechanism storehouse;
4, PT all insulation connecting line;
5, the storehouse PT;
6, voltage transformer;
7, by-pass branch is plugged into storehouse;
8, the fast interface of by-pass branch;
9, cabinet body;
10, busbar;
11, by-pass branch switchs;
12, PT is switched;
13, storehouse is switched;
14, ejection and cabinet casing.
Specific embodiment
In order to preferably explain the present invention, in order to understand, with reference to the accompanying drawing, by specific embodiment, to this hair
It is bright to be described in detail.
In the present embodiment, the meaning of " PT " is voltage transformer.
As shown in Figure 1, the present invention provides a kind of shunt nodes type PT cabinet, including cabinet body 9, matts sequence is pressed in cabinet body 9
Set gradually control mechanism storehouse 3, switch storehouse 13, the storehouse PT 5, by-pass branch are plugged into storehouse 7.PT control mechanism 1 and by-pass branch control
Mechanism 2 is located in control mechanism storehouse 3;PT all insulation connecting line 4 and voltage transformer 6 are in the storehouse PT 5;The fast interface of by-pass branch
8, which are located at by-pass branch, plugs into storehouse 7;Busbar 10, by-pass branch switch 11 and PT switch 12 are located in switch storehouse 13;Eject simultaneously cabinet
Casing 14 is located at 13 top of switch storehouse;By-pass branch switch 11 passes through three road busbars in busbar 10 and the fast interface 8 of by-pass branch
Connection;PT switch 12 is connect by other three roads busbars in busbar 10 with the wall bushing in the storehouse PT 5;PT all insulation connecting line 4
Wall bushing in the storehouse PT 5 is connected with voltage transformer 6.
PT control mechanism 1 is a kind of switching control mechanism of standard, is mainly used for 10kV switch divide-shut brake control.This implementation
In, PT control mechanism 1 is mainly used for controlling the power supply of PT switch 12.
By-pass branch control mechanism 2 is a kind of switching control mechanism of standard, is mainly used for 10kV switch divide-shut brake control.
In this implementation, by-pass branch control mechanism 2 is used to control the power supply of by-pass branch switch 11.
Control mechanism storehouse 3 is oblong hollow-core construction, and it acts as PT control mechanisms 1 and by-pass branch control mechanism 2 to mention
For installation site, and operator is facilitated to carry out control operation.
PT all insulation connecting line 4 is the single-core cable that a both ends are mounted with elbow cable connector, is used for voltage transformer 6
Electrical connection between PT switch 12.
The storehouse PT 5 is oblong hollow-core construction, and effect is mainly used for disposing voltage transformer 6.Voltage transformer is a kind of
High-voltage mutual inductor is mainly used to ring network cabinet offer voltage measurement, the voltage circuit for measuring meter, operation and control power supply, often
The needs of installing, the relay protection of section bus over voltage protection device, such as bus insulation, over-voltage, under-voltage, prepared auto restart condition.
By-pass branch storehouse 7 of plugging into is oblong hollow-core construction, and effect is placement by-pass branch fast interface 8, and to side
Road branch cable accesses operation and carries out five anti-protections.
The fast interface 8 of by-pass branch is a kind of cable connection interface for having spring hoodle latching mechanical structure, effect
It is to realize that a kind of special cable is inserted terminal fastly and is quickly electrically connected with by-pass branch switch.
Cabinet body 9 is a kind of cuboid metal safe of centre compartment there are four between, and effect is all shunt nodes type PT of placement
The components of cabinet.
Busbar 10 is a kind of prolate shape rule copper bar, 7 sets altogether, contains 6 sets of major loop busbars and a set of ground connection busbar.Busbar
Electrical communication and switch ground connection contact of 10 effect mainly between switch and interface.
By-pass branch switch 11 is a kind of common 10kV breaker, and effect is the power supply for controlling by-pass branch circuit.
PT switch 12 is a kind of common 10kV disconnecting switch, is mainly used for controlling the power supply in the circuit PT.
Switching storehouse 13 is oblong hollow-core construction, and effect is placement by-pass branch switch 11, PT switch 12 and busbar 10.
Eject and cabinet casing 14 be a kind of common 10kV switchgear cable outlet casing tube, main function be by PT cabinet with
Bus is attached.
The embodiment of the present invention is described in attached drawing, but the invention is not limited to above-mentioned specific embodiment parties
Formula, the above mentioned embodiment is only schematical, rather than restrictive, and those skilled in the art are in this hair
Under bright enlightenment, without breaking away from the scope protected by the purposes and claims of the present invention, many forms can be also made, this
It is belonged within protection of the invention a bit.
Claims (9)
1. shunt nodes type PT cabinet, which is characterized in that including cabinet body (9), set gradually control by matts sequence in cabinet body (9)
Mechanism storehouse (3), switch storehouse (13), the storehouse PT (5), by-pass branch plug into storehouse (7);
PT control mechanism (1) and by-pass branch control mechanism (2) are installed in the control mechanism storehouse (3);
By-pass branch switch (11), PT switch (12) and busbar (10), the switch storehouse are installed in the switch storehouse (13)
(13) top is equipped with ejection and cabinet casing (14);
PT all insulation connecting line (4), voltage transformer (6) are installed in the storehouse PT (5), the storehouse PT (5), which is additionally provided with, wears
Wall sleeve;
The by-pass branch is plugged into, and storehouse (7) is interior to be equipped with by-pass branch fast interface (8);
Wherein, the by-pass branch switch (11) is connect by three road busbars in busbar (10) with the fast interface of by-pass branch (8);
The PT switch (12) is connect by other three roads busbars in busbar (10) with the wall bushing in the storehouse PT (5);The storehouse PT (5)
In wall bushing and voltage transformer (6) connected by PT all insulation connecting line (4).
2. shunt nodes type PT cabinet as described in claim 1, it is characterised in that: the PT control mechanism (1) is switch control
Mechanism, for controlling the power supply of the PT switch (12).
3. shunt nodes type PT cabinet as described in claim 1, it is characterised in that: the by-pass branch control mechanism (2) is out
Control mechanism is closed, for controlling the power supply of the by-pass branch switch (11).
4. shunt nodes type PT cabinet as described in claim 1, it is characterised in that: the PT all insulation connecting line (4) is one
The single-core cable of elbow cable connector is installed at both ends, for realizing the electricity between the voltage transformer (6) and PT switch (12)
Gas connection.
5. shunt nodes type PT cabinet as described in claim 1, it is characterised in that: the fast interface of by-pass branch (8) is one
Kind has the cable connection interface of spring hoodle latching mechanical structure, inserts terminal fastly for realizing cable and opens with the by-pass branch
Close the quick electrical connection between (11).
6. shunt nodes type PT cabinet as described in claim 1, it is characterised in that: the busbar (10) is prolate shape rule copper
Row, including six sets of major loop busbars and a set of ground connection busbar for the electrical communication between switch and interface and switch ground connection
Contact.
7. shunt nodes type PT cabinet as described in claim 1, it is characterised in that: the by-pass branch switch (11) is 10kV disconnected
Road device, for controlling the power supply in by-pass branch circuit.
8. shunt nodes type PT cabinet as described in claim 1, it is characterised in that: the PT switch (12) is that 10kV keeps apart
It closes, for controlling the power supply in the circuit PT.
9. shunt nodes type PT cabinet as described in claim 1, it is characterised in that: simultaneously cabinet casing (14) is that 10kV is opened for the ejection
Cabinet cable outlet casing tube is closed, for PT cabinet to be attached with bus.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910472561.4A CN110086091A (en) | 2019-05-31 | 2019-05-31 | Shunt nodes type PT cabinet |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910472561.4A CN110086091A (en) | 2019-05-31 | 2019-05-31 | Shunt nodes type PT cabinet |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110086091A true CN110086091A (en) | 2019-08-02 |
Family
ID=67423041
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910472561.4A Pending CN110086091A (en) | 2019-05-31 | 2019-05-31 | Shunt nodes type PT cabinet |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110086091A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204190252U (en) * | 2014-10-27 | 2015-03-04 | 江苏华厦电力成套设备有限公司 | SF6 insulate vacuum demarcation switch cabinet |
CN204615165U (en) * | 2015-04-30 | 2015-09-02 | 安徽合电正泰电气成套设备有限公司 | A kind of AC metal sealed switch apparatus with bypass functionality |
CN205882542U (en) * | 2016-08-05 | 2017-01-11 | 河北电力装备有限公司 | Wear load switch's compact PT looped netowrk cabinet |
CN206585249U (en) * | 2017-03-24 | 2017-10-24 | 南方电网科学研究院有限责任公司 | Integrated switch cabinet |
CN107623279A (en) * | 2017-10-17 | 2018-01-23 | 杭州世创电子技术股份有限公司 | A kind of gas-insulated ring network cabinet metal enclosed switchgear |
CN207234266U (en) * | 2017-09-25 | 2018-04-13 | 河南古博电气有限公司 | A kind of high anti-error switchgear of compact |
CN209948370U (en) * | 2019-05-31 | 2020-01-14 | 国网电力科学研究院武汉南瑞有限责任公司 | Bypass node type PT cabinet |
-
2019
- 2019-05-31 CN CN201910472561.4A patent/CN110086091A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204190252U (en) * | 2014-10-27 | 2015-03-04 | 江苏华厦电力成套设备有限公司 | SF6 insulate vacuum demarcation switch cabinet |
CN204615165U (en) * | 2015-04-30 | 2015-09-02 | 安徽合电正泰电气成套设备有限公司 | A kind of AC metal sealed switch apparatus with bypass functionality |
CN205882542U (en) * | 2016-08-05 | 2017-01-11 | 河北电力装备有限公司 | Wear load switch's compact PT looped netowrk cabinet |
CN206585249U (en) * | 2017-03-24 | 2017-10-24 | 南方电网科学研究院有限责任公司 | Integrated switch cabinet |
CN207234266U (en) * | 2017-09-25 | 2018-04-13 | 河南古博电气有限公司 | A kind of high anti-error switchgear of compact |
CN107623279A (en) * | 2017-10-17 | 2018-01-23 | 杭州世创电子技术股份有限公司 | A kind of gas-insulated ring network cabinet metal enclosed switchgear |
CN209948370U (en) * | 2019-05-31 | 2020-01-14 | 国网电力科学研究院武汉南瑞有限责任公司 | Bypass node type PT cabinet |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203734209U (en) | Live working device for cable bypass | |
CN203367955U (en) | Low voltage power cable isolation device | |
CN201893536U (en) | Cable branch box | |
CN215419735U (en) | Bus duct measurement and control device and bus duct measurement and control system | |
CN208656179U (en) | A kind of moving emergency power cabinet for the bypass of power grid low-voltage equipment | |
CN206878459U (en) | A kind of electric-power metering comprehensive protection device | |
CN205829092U (en) | Ladder busbar formula joint-box | |
CN208209544U (en) | A kind of novel circuit configuration of electric main power connection in power plant | |
CN209948370U (en) | Bypass node type PT cabinet | |
CN110086091A (en) | Shunt nodes type PT cabinet | |
CN110829428A (en) | Low-voltage quick access communication device and power supply network | |
CN113708280B (en) | High-voltage cable compensation station wiring system | |
CN205543818U (en) | Alternating current -direct current lightning prevention box for photovoltaic power plant of family that can realize direct current side break -make | |
CN213151713U (en) | Multi-power-supply emergency quick access box system | |
CN203942491U (en) | A kind of photovoltaic array conflux box | |
CN207664589U (en) | A kind of removal cable feeder pillar | |
CN201616628U (en) | Distribution box for construction technology | |
CN111342549A (en) | Power supply system is synthesized to inside of large-scale coal-electricity integration power station | |
CN206742857U (en) | A kind of low-voltage distribution room outgoing line cabinet | |
CN212343023U (en) | Combined electrical apparatus with bypass isolating switch at incoming and outgoing line interval | |
CN205304239U (en) | Dry node lightning protection module of outdoor photovoltaic equipment | |
CN205693142U (en) | A kind of little bus connecting device of Medium Voltage Switchgear | |
CN214100437U (en) | Dual power supply power distribution cabinet for open pit coal mine | |
CN203932693U (en) | Rail traction substation 27.5kV main electrical scheme structure | |
CN218124323U (en) | Alternating current distribution box with three-phase balance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |