CN110083929A - The parallel short circuit calculation method of coalmine high-voltage power network based on simulated annealing - Google Patents

The parallel short circuit calculation method of coalmine high-voltage power network based on simulated annealing Download PDF

Info

Publication number
CN110083929A
CN110083929A CN201910336383.2A CN201910336383A CN110083929A CN 110083929 A CN110083929 A CN 110083929A CN 201910336383 A CN201910336383 A CN 201910336383A CN 110083929 A CN110083929 A CN 110083929A
Authority
CN
China
Prior art keywords
matrix
branch node
value
short circuit
assigned
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910336383.2A
Other languages
Chinese (zh)
Inventor
王新良
张利伟
刘志怀
刘娜
蔡小琳
方玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hami Yuxin Energy Industry Research Institute LLC
Original Assignee
Hami Yuxin Energy Industry Research Institute LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hami Yuxin Energy Industry Research Institute LLC filed Critical Hami Yuxin Energy Industry Research Institute LLC
Priority to CN201910336383.2A priority Critical patent/CN110083929A/en
Publication of CN110083929A publication Critical patent/CN110083929A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/30Circuit design
    • G06F30/36Circuit design at the analogue level
    • G06F30/367Design verification, e.g. using simulation, simulation program with integrated circuit emphasis [SPICE], direct methods or relaxation methods

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses the parallel short circuit calculation method of coalmine high-voltage power network based on simulated annealing, include the following steps: that n branch node is added separately to U queue R based on simulated annealingkIn, U new idle threads are added in idle thread queue QC, for each queue R by U new idle threads of creationkThe branch node set of middle preservation completes the parallel computation that each branch node corresponds to short circuit current;Short circuit calculation scheduling model of the parallel short circuit calculation method of coalmine high-voltage power network proposed by the present invention based on simulated annealing based on simulated annealing and parallel computing construction coalmine high-voltage power network, the branch node quantity for enabling per thread to handle during short circuit calculation is identical as far as possible, so as to effectively improve parallel short circuit calculation dispatching efficiency.

Description

The parallel short circuit calculation method of coalmine high-voltage power network based on simulated annealing
Technical field
The invention discloses the parallel short circuit calculation methods of coalmine high-voltage power network based on simulated annealing, belong to the confession of coal mine high pressure Electric network short circuit calculation field.
Background technique
There are multiple power supplys in the power network of 35kV or more, belong to complicated enclosed power grid, and short circuit calculation is complex;And mine Well high voltage supply system is 6kV or 10kV grade, and two power supplys should use fanout operation mode, or all the way using standby all the way With belonging to single supply open type power grid, fairly simple absolute-value scheme or relative value method can be used in short circuit calculation;Coal mine high-voltage electricity Branch node quantity is more in net, and how to complete short circuit calculation to all branch nodes with lesser time overhead is one Problem to be solved.
The parallel short circuit calculation method of coalmine high-voltage power network proposed by the present invention based on simulated annealing is calculated based on simulated annealing The short circuit calculation scheduling model of method and parallel computing construction coalmine high-voltage power network, makes per thread during short circuit calculation The branch node quantity of processing can be identical as far as possible, so as to effectively improve parallel short circuit calculation dispatching efficiency.
Summary of the invention
The power supply line directly controlled according to every branch node establishes branch node-power supply line adjacency list T;By this Adjacency list can number according to corresponding branch node and inquire its power supply line's basic parameter directly controlled, including power supply Line length, power supply line's model, unit resistance and unit reactance information;And coal mine high voltage supply system maximum operation side is set The system reactance under system reactance and minimum operational mode under formula;The power branch node of coal mine high voltage supply system is set, Power branch node refers to the branch node directly powered by higher level's power supply department.
The final power supply incidence matrix of branch node and branch node indicates that n is branch node quantity with G, and G is n row n Column;N is the quantity of branch node in coal mine high voltage supply system;In incidence matrix G, the line number of matrix is the suitable of branch node Serial number, matrix column number are the serial number of branch node;The element of i-th row jth column is usedIt indicates;If branch node i is by propping up Circuit node j power supply, then;If branch node i is not powered by branch node j,;If i=j,
Matrix P=[P1…Pi…Pn], wherein,, matrix, Q is the square of 1 row n column Battle array, jth arrange corresponding element valueIndicate that j-th of branch node carries out the number of, lines that short circuit calculation is related to, wherein
N branch node is added separately to U queue R based on simulated annealingkIn, wherein;U be System allows the Thread Count established, the specific steps are as follows:
Step 1): system allows to establish Thread Count and is expressed as U, and branch node j carries out number of, lines involved in short circuit calculation and is, wherein;Markov chain length indicates that attenuation parameter is used with LIt indicates, initial temperature is indicated with T, terminates temperature WithIt indicates, tolerance is usedIt indicates;
Step 2: n branch node needs to be divided into U group, is added separately in respective queue, and j-th of branch node is corresponding Grouping is usedIt indicates,
Step 3): the corresponding grouping individual of n branch node is usedIt indicates, Zk=[X1,X2…Xj…Xn], whereinIt is random whole Number,, according to the random generation individual of individual definition, execute step 4);
Step 4): by the individual of generationValue be assigned to matrix PreX, matrix PreX is the matrix of 1 row n column, and by matrix The value of PreX is assigned in matrix PreBestX, and PreBestX is the matrix of 1 row n column;FoundationDefinition regenerates one at random Individual, by the individual of generationValue be assigned to matrix B estX, BestX is the matrix of 1 row n column;By the value of matrix PreBest It is assigned to matrix PB, calculates its corresponding fitness f (PB) for matrix PB, the fitness of matrix PreBest is expressed as f (PreBest), the value of fitness f (PB) is assigned to f (PreBest);
Step 5): being assigned to matrix PB for the value of matrix B estX, calculates its corresponding fitness f (PB), matrix for matrix PB The fitness of BestX is f (BestX), and the value of fitness f (PB) is assigned to f (BestX);
Step 6): ifOr temperature, then simulated annealing process is completed, and executes step It is rapid 11);Otherwise, step 7) is executed;
Step 7): temperature T withMultiplication obtains numerical value Temp1, the numerical value of Temp1 is assigned to T, the initial value of m is set as 1;
Step 8): if, execute step 6);If, an individual is generated at random, is indicated with matrix N estX, it will The value of matrix N estX is assigned to matrix PB, calculates its corresponding fitness f (PB), the fitness table of matrix N estX for matrix PB It is shown as f (NestX), the value of fitness f (PB) is assigned to f (NestX);
Step 9): if f (NestX) < f (BestX), is assigned to matrix PreBestX for the value of matrix B estX, by matrix The value of NestX is assigned to matrix B estX;Execute step 10);If f (NestX) >=f (BestX), fitness variable quantity, withProbability receive NestX and make new current solution BestX, that is, will The value of matrix B estX is assigned to matrix PreBestX, and the value of matrix N estX is assigned to matrix B estX, executes step 10);
Step 10): the numerical value of m is added 1, repeats step 8);
Step 11): 1 is set by the numerical value that the numerical value of i is set as 1, k, executes step 12);
Step 12): BestXiFor i-th of element of BestX, if, branch node i is added to queueIn; If BestXiThe numerical value of i is added 1 by ≠ k;
Step 13): if i < n, step 12) is repeated;If i >=n, the numerical value of k is added 1, executes step 14);
Step 14): if k > U, grouping process is completed;If k≤U, 1 is set by the numerical value of i, executes step 12);
In above-mentioned steps, according to matrix PB generator matrix, and the corresponding fitness f (PB) of calculating matrix PB, it is specific to walk It is rapid as follows:
Step 1): PYk=[ PYk1…PYkj…PYkU], under initial situationIn each element numerical value be 0, i initial value The initial value for being set as 1, j is set as 1, executes step 2;
Step 2:For i-th of element of matrix PB, if, willNumerical value withThe numerical value obtained after addition It assigns;The numerical value of i is added 1, if, it thens follow the steps 3), if, repeat step 2;
Step 3): if, add the initial value of 1, i to be set as 1 the numerical value of j, executes step 2, if, execute Step 4);
Step 4):, the fitness of matrix PB
U new idle threads are created, U new idle threads are added to idle thread queueIn, for each Queue RkThe branch node set of middle preservation completes the parallel computation that each branch node corresponds to short circuit current, specifically executes step It is rapid as follows:
U new idle threads are added to idle thread queue by U step 1), creation new idle threadsIn,'s Initial value is set as 1;
Step 2, from idle thread queueOne idle thread of middle taking-up, by queue RkIt is bundled in newly-built idle thread In, busy thread is set by this thread, is added in busy thread queue B2, step 3) is executed;
It, will if step 3), j < UNumerical value add 1, execute step 2;If, execute step 4);
Step 4) is directed to the busy thread of each of busy thread queue B2, executes step 5);
Step 5) takes out the binding queue RkBusy thread, execute the busy thread, which is directed to queue RkIn include Each branch node execute step 6);
Step 6), the branch node serial number indicated with L, by numerical value in the L row of matrix G be 1 all elements it is corresponding Row number is added to setIn;If gatheringIn be not present power branch node, then illustrate that the corresponding route of the set does not have There is power supply power supply, without short circuit calculation;If setIn there are power branch nodes, then illustrate the corresponding route of the set There is power supply power supply, thens follow the steps 7);
Step 7), the query set in branch node-power supply line adjacency list TIn the corresponding power supply line of each branch node Information;The resistance and reactance of every route are calculated according to every power supply line's length, unit resistance and the unit reactance obtained, Execute step 8) and 9);
Step 8), according to the resistance of every route, the calculating of system reactance under reactance and pre-set maximum operational mode obtains Obtain the all-in resistance under maximum operational modeWith total reactance, then according to route where high voltage supply system short dot Average voltage and all-in resistance, total reactance calculate the three short circuit current under maximum operational mode;
Step 9), according to the resistance of every route, the calculating of system reactance under reactance and pre-set minimum operational mode obtains Obtain the all-in resistance under minimum operational modeWith total reactance, then according to route where high voltage supply system short dot Average voltage and all-in resistance, total reactance calculate the two-phase short circuit current under minimum operational mode.
Detailed description of the invention
Fig. 1 is coal mine high voltage supply system figure.
Specific embodiment
It with the high-voltage switch gear on the branch node of filled black is gate-dividing state in attached drawing 1, on unfilled branch node High-voltage switch gear be "on" position;In attached coal mine high voltage supply system figure shown in FIG. 1, branch node is (1), (2), (3) , (4), (5), (6), (7), (8), (9), (10), (11), (12), (13), (14), (15), (16), (17) and (18), wherein Power branch node is (1) and (2).
According to attached coal mine high voltage supply system figure shown in FIG. 1, the final power supply for obtaining branch node and branch contact is closed Join matrix G,
The final power supply incidence matrix G and matrix P calculating matrix Q of foundation,
18 branch nodes are added separately to U queue R based on simulated annealingkIn, wherein, U is to be System allows the Thread Count established.
U new idle threads are created, U new idle threads are added to idle thread queueIn, for each Queue RkThe branch node set of middle preservation completes the parallel computation that each branch node corresponds to short circuit current.

Claims (4)

1. the parallel short circuit calculation method of coalmine high-voltage power network based on simulated annealing, which is characterized in that described coal mine high pressure The parallel short circuit calculation method of power grid includes the following steps:
Step 11, the final power supply incidence matrix of branch node and branch node is indicated with G, and n is branch node quantity, and G is n row N column;N is the quantity of branch node in coal mine high voltage supply system;In incidence matrix G, the line number of matrix is branch node Serial number, matrix column number are the serial number of branch node;The element of i-th row jth column is usedIt indicates;If branch node i by Branch node j power supply, then;If branch node i is not powered by branch node j,;If i=j,
Step 12, matrix P=[P1…Pi…Pn], wherein,, matrix, Q is 1 row n column Matrix, jth arrange corresponding element valueIndicate that j-th of branch node carries out the number of, lines that short circuit calculation is related to, wherein
Step 13, n branch node is added separately to by U queue R based on simulated annealingkIn, wherein;U is System allows the Thread Count established;
Step 14, U new idle threads are added to idle thread queue by U new idle threads of creationIn, for Each queue RkThe branch node set of middle preservation completes the parallel computation that each branch node corresponds to short circuit current.
2. the parallel short circuit calculation method of the coalmine high-voltage power network according to claim 1 based on simulated annealing, feature exist In being substantially carried out following steps in step 13:
Step 21, system allow to establish Thread Count and are expressed as U, and branch node j carries out number of, lines involved in short circuit calculation and is, wherein;Markov chain length indicates that attenuation parameter is used with LIt indicates, initial temperature is indicated with T, terminates temperature WithIt indicates, tolerance is usedIt indicates;
Step 22, n branch node need to be divided into U group, are added separately in respective queue, and j-th of branch node is corresponding Grouping is usedIt indicates,
The corresponding grouping individual of step 23, n branch node is usedIt indicates, Zk=[X1,X2…Xj…Xn], whereinIt is random whole Number,, according to the random generation individual of individual definition, execute step 24;
Step 24, the individual by generationValue be assigned to matrix PreX, matrix PreX is the matrix of 1 row n column, and by matrix PreX Value be assigned in matrix PreBestX, PreBestX be 1 row n column matrix;FoundationDefinition, regenerates a random individual, by the individual of generationValue be assigned to matrix B estX, BestX is the matrix of 1 row n column;The value of matrix PreBest is assigned to Matrix PB calculates its corresponding fitness f (PB) for matrix PB, and the fitness of matrix PreBest is expressed as f (PreBest), The value of fitness f (PB) is assigned to f (PreBest);
The value of matrix B estX is assigned to matrix PB by step 25, calculates its corresponding fitness f (PB), matrix for matrix PB The fitness of BestX is f (BestX), and the value of fitness f (PB) is assigned to f (BestX);
If step 26,Or temperature, then simulated annealing process is completed, and executes step Rapid 2B;Otherwise, step 27 is executed;
Step 27, temperature T withMultiplication obtains numerical value Temp1, the numerical value of Temp1 is assigned to T, the initial value of m is set as 1;
If step 28,, execute step 26;If, an individual is generated at random, is indicated with matrix N estX, it will The value of matrix N estX is assigned to matrix PB, calculates its corresponding fitness f (PB), the fitness table of matrix N estX for matrix PB It is shown as f (NestX), the value of fitness f (PB) is assigned to f (NestX);
If step 29, f (NestX) < f (BestX), are assigned to matrix PreBestX for the value of matrix B estX, by matrix The value of NestX is assigned to matrix B estX;Execute step 2A;If f (NestX) >=f (BestX), fitness variable quantity, withProbability receive NestX and make new current solution BestX, that is, will The value of matrix B estX is assigned to matrix PreBestX, and the value of matrix N estX is assigned to matrix B estX, executes step 2A;
Step 2A, the numerical value of m is added 1, repeats step 28;
Step 2B, 1 is set by the numerical value that the numerical value of i is set as 1, k, executes step 2C;
Step 2C, BestXiFor i-th of element of BestX, if, branch node i is added to queueIn;Such as Fruit BestXiThe numerical value of i is added 1 by ≠ k;
If step 2D, i < n, step 2C is repeated;If i >=n, the numerical value of k is added 1, executes step 2E;
If step 2E, k > U, grouping process is completed;If k≤U, 1 is set by the numerical value of i, executes step 2C.
3. the parallel short circuit calculation method of the coalmine high-voltage power network according to claim 2 based on simulated annealing, feature exist According to matrix PB generator matrix, and the corresponding fitness f (PB) of calculating matrix PB, it is substantially carried out following steps:
Step 31, PYk=[ PYk1…PYkj…PYkU], under initial situationIn each element numerical value be 0, i initial value set The initial value for being set to 1, j is set as 1, executes step 32;
Step 32,For i-th of element of matrix PB, if, willNumerical value withThe numerical value obtained after addition It assigns;The numerical value of i is added 1, if, 33 are thened follow the steps, if, repeat step 32;
If step 33,, add the initial value of 1, i to be set as 1 the numerical value of j, executes step 32, if, execute step Rapid 34;
Step 34,, the fitness of matrix PB
4. the parallel short circuit calculation method of the coalmine high-voltage power network according to claim 1 based on simulated annealing, feature exist In at step 14, being substantially carried out following steps:
U new idle threads are added to idle thread queue by U step 41, creation new idle threadsIn,Just Initial value is set as 1;
Step 42, from idle thread queueOne idle thread of middle taking-up, by queue RkIt is bundled in newly-built idle thread, Busy thread is set by this thread, is added in busy thread queue B2, step 43 is executed;
It, will if step 43, j < UNumerical value add 1, execute step 42;If, execute step 44;
Step 44 is directed to the busy thread of each of busy thread queue B2, executes step 45;
Step 45 takes out the binding queue RkBusy thread, execute the busy thread, which is directed to queue RkIn include Each branch node execute step 46;
Step 46, the branch node serial number indicated with L, by numerical value in the L row of matrix G be 1 all elements it is corresponding Row number is added to setIn;If gatheringIn be not present power branch node, then illustrate that the corresponding route of the set does not have There is power supply power supply, without short circuit calculation;If setIn there are power branch nodes, then illustrate the corresponding route of the set There is power supply power supply, thens follow the steps 47;
Step 47, the query set in branch node-power supply line adjacency list TIn the corresponding power supply line of each branch node Information;The resistance and reactance of every route are calculated according to every power supply line's length, unit resistance and the unit reactance obtained, Execute step 48 and 49;
Step 48, according to the resistance of every route, the calculating of system reactance under reactance and pre-set maximum operational mode obtains Obtain the all-in resistance under maximum operational modeWith total reactance, then according to route where high voltage supply system short dot Average voltage and all-in resistance, total reactance calculate the three short circuit current under maximum operational mode;
Step 49, according to the resistance of every route, the calculating of system reactance under reactance and pre-set minimum operational mode obtains Obtain the all-in resistance under minimum operational modeWith total reactance, then according to route where high voltage supply system short dot Average voltage and all-in resistance, total reactance calculate the two-phase short circuit current under minimum operational mode.
CN201910336383.2A 2019-04-25 2019-04-25 The parallel short circuit calculation method of coalmine high-voltage power network based on simulated annealing Pending CN110083929A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910336383.2A CN110083929A (en) 2019-04-25 2019-04-25 The parallel short circuit calculation method of coalmine high-voltage power network based on simulated annealing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910336383.2A CN110083929A (en) 2019-04-25 2019-04-25 The parallel short circuit calculation method of coalmine high-voltage power network based on simulated annealing

Publications (1)

Publication Number Publication Date
CN110083929A true CN110083929A (en) 2019-08-02

Family

ID=67416558

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910336383.2A Pending CN110083929A (en) 2019-04-25 2019-04-25 The parallel short circuit calculation method of coalmine high-voltage power network based on simulated annealing

Country Status (1)

Country Link
CN (1) CN110083929A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106526427A (en) * 2016-11-28 2017-03-22 河南理工大学 Parallel calculation method for short-circuit current of coal mine high-voltage power grid based on load balancing
CN106709134A (en) * 2016-11-21 2017-05-24 河南理工大学 Parallel computing method for short-circuit currents of high voltage power grids of coal mines
CN106816872A (en) * 2017-03-30 2017-06-09 河南理工大学 Coalmine high-voltage power network self-adaptive parallel short circuit calculation method based on genetic algorithm

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106709134A (en) * 2016-11-21 2017-05-24 河南理工大学 Parallel computing method for short-circuit currents of high voltage power grids of coal mines
CN106526427A (en) * 2016-11-28 2017-03-22 河南理工大学 Parallel calculation method for short-circuit current of coal mine high-voltage power grid based on load balancing
CN106816872A (en) * 2017-03-30 2017-06-09 河南理工大学 Coalmine high-voltage power network self-adaptive parallel short circuit calculation method based on genetic algorithm

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘科研等: "基于分布式并行遗传算法的电力系统无功优化", 《北京航空航天大学学报》, vol. 34, no. 1, 31 January 2008 (2008-01-31), pages 9 *

Similar Documents

Publication Publication Date Title
CN107579518B (en) Power system environment economic load dispatching method and apparatus based on MHBA
CN104484833A (en) Photovoltaic power generation output power tracking algorithm based on genetics algorithm improved RBF-BP neural network
CN107358352A (en) Model in Reliability Evaluation of Power Systems system and method based on Monte Carlo simulation
CN107423839A (en) A kind of method of the intelligent building microgrid load prediction based on deep learning
CN106786977B (en) Charging scheduling method of electric vehicle charging station
Zhang et al. Application of simulated annealing genetic algorithm-optimized back propagation (BP) neural network in fault diagnosis
CN106777449A (en) Distribution Network Reconfiguration based on binary particle swarm algorithm
CN106102079A (en) Based on the C RAN carrier wave emigration resource requirement Forecasting Methodology improving PSO
CN103337861A (en) Power distribution network reactive power optimization method based on gold chaotic ecological niche particle swarm algorithm
CN106816872B (en) Coalmine high-voltage power network self-adaptive parallel short circuit calculation method based on genetic algorithm
CN106709134B (en) Coal mine high-voltage power grid short-circuit current parallel computing method
CN112491096A (en) Method and system for generating power grid simulation analysis examples
CN113435625B (en) Dynamic economic dispatching optimization method and device for power system
CN112347694A (en) Sea island micro-grid power supply planning method containing ocean current-offshore wind power-tidal current power generation
CN109507527A (en) A kind of SNP system Fault Locating Method containing distributed power distribution network based on synaptic plasticity
CN109214565A (en) A kind of subregion system loading prediction technique suitable for the scheduling of bulk power grid subregion
Mohapatra et al. Equivalent line limit calculation for power system equivalent networks
CN105633971B (en) A kind of intelligent distribution network probabilistic loadflow method based on imperial competition algorithm
CN105069517B (en) Power distribution network multiple target fault recovery method based on hybrid algorithm
Dong et al. Combination of genetic algorithm and ant colony algorithm for distribution network planning
CN106850253A (en) A kind of method of the transmission time reliability measurement based on multimode network
CN106169771A (en) A kind of combining inverter of measurable generated energy data
CN110083929A (en) The parallel short circuit calculation method of coalmine high-voltage power network based on simulated annealing
CN106526427B (en) A kind of coalmine high-voltage power network short circuit current parallel calculating method based on load balancing
CN107026450A (en) B2G and V2G power distribution networks power control system and method based on genetic algorithm

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination