CN110082070A - Jumping fiber test method - Google Patents

Jumping fiber test method Download PDF

Info

Publication number
CN110082070A
CN110082070A CN201910440558.4A CN201910440558A CN110082070A CN 110082070 A CN110082070 A CN 110082070A CN 201910440558 A CN201910440558 A CN 201910440558A CN 110082070 A CN110082070 A CN 110082070A
Authority
CN
China
Prior art keywords
website
fibre core
group
electric power
optical cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910440558.4A
Other languages
Chinese (zh)
Other versions
CN110082070B (en
Inventor
章海
林梓源
林俊敏
邢旭佳
陈佳鹏
郑旭东
林豪嘉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Jieyang Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Jieyang Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd, Jieyang Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN201910440558.4A priority Critical patent/CN110082070B/en
Publication of CN110082070A publication Critical patent/CN110082070A/en
Application granted granted Critical
Publication of CN110082070B publication Critical patent/CN110082070B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M11/00Testing of optical apparatus; Testing structures by optical methods not otherwise provided for
    • G01M11/02Testing optical properties
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M11/00Testing of optical apparatus; Testing structures by optical methods not otherwise provided for
    • G01M11/30Testing of optical devices, constituted by fibre optics or optical waveguides
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B10/00Transmission systems employing electromagnetic waves other than radio-waves, e.g. infrared, visible or ultraviolet light, or employing corpuscular radiation, e.g. quantum communication
    • H04B10/07Arrangements for monitoring or testing transmission systems; Arrangements for fault measurement of transmission systems
    • H04B10/075Arrangements for monitoring or testing transmission systems; Arrangements for fault measurement of transmission systems using an in-service signal
    • H04B10/077Arrangements for monitoring or testing transmission systems; Arrangements for fault measurement of transmission systems using an in-service signal using a supervisory or additional signal
    • H04B10/0775Performance monitoring and measurement of transmission parameters

Landscapes

  • Physics & Mathematics (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • General Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Electromagnetism (AREA)
  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Optical Communication System (AREA)
  • Testing Of Optical Devices Or Fibers (AREA)

Abstract

The present invention relates to technical field of optical fiber communication, a kind of jumping fiber test method is specifically disclosed, pairs of loopback wiring first is carried out to the fibre core of all website two sides, then cooperated using a group of people in starting point and tested, another a group of people successively carries out tearing fine docking open in each node, and the completion jumping fiber of limited manpower high efficiency high quality can be made full use of to work, work is allowed to become more simple, clear, the quality of jumping fiber is improved, once logical escape truck can be jumped immediately by being in an emergency, can ensure the fast quick-recovery of communication network.

Description

Jumping fiber test method
Technical field
The present invention relates to technical field of optical fiber communication more particularly to a kind of jumping fiber test methods.
Background technique
Multiple communication networks are constituted between office, south electric network prefectures and cities, some are connect by the way that optical cable is direct-connected between each communication network Logical, some are then to carry out jumping fiber connection by continuous several optical cables.Communication network run during, always unavoidably Ground can encounter need jumping fiber shift or jumping fiber restore situations such as, these when require carry out jumping fiber test.
The purpose of jumping fiber test is to guarantee lead between each website.Assuming that there is tetra- websites of A, B, C and D to be jumped Fibre is connected, and current jumping fiber test method is as follows:
1. the station A and the station B operate to light;
2. the station B is carried out with the station C to light, AB sections and BC sections then are connected to tail optical fiber jumper connection;
3. the station C is carried out with the station D to light, BC sections and CD sections then are connected to tail optical fiber jumping fiber;
4. finally, the station A carries out whole process to light with the station D.
Above-mentioned jumping fiber test method has the following drawbacks:
The fibre core quality of some optical cables is bad, and the loss in transmission process is larger, and eventually resulting in output power can not The case where power requirement needed for reaching site apparatus, however, current test method only carries out operating light, it can not be on the spot It detects the quality problems of optical cable, therefore, often will appear such as following situation:
Through detecting, the station the B station C can lead to, and the fibre core loss at the station the B station C is had been found that when being detected to the station the C station D too Greatly, the station B jumping fiber again need to be returned.
The working efficiency that above-mentioned drawback can greatly reduce jumping fiber test then needs in order to avoid repeatedly returning each The problem of website is all equipped with staff, this will lead to waste of human resource again.
Summary of the invention
It is an advantage of the invention to provide a kind of jumping fiber test methods, and the fibre core between website can be lost on the spot Situation is detected, and can be improved working efficiency and be saved manpower.
To achieve these objectives, the present invention provides a kind of jumping fiber test method, is suitable for carrying out jumping fiber test to communication network, The communication network successively includes A website, B website, C website ... J website and K website, passes through electricity between adjacent two website Power optical cable connection, which is characterized in that the jumping fiber test method includes:
Loopback wiring: the fibre core in the electric power optical cable between adjacent two website is divided into several fibre cores by every two for one group Group, and make the two fibre cores conducting for the same fibre core group being located in same website;The fibre core group quantity of all electric power optical cables is identical;
Broken string docking: disconnect A website and B website AB electric power optical cable be located at B website one end each fibre core group, it is disconnected Open connection B website and C website BC electric power optical cable be located at B website one end each fibre core group;The AB electric power that every group is disconnected The fibre core group for the BC electric power optical cable that the fibre core group of optical cable is disconnected with one group is docked, and the two fibre core groups docked were formed to the survey time Road;
Loss test: loss test is carried out to each group of circuit to be measured in A website, the 1/2 of loss test institute value is Fibre core loss value between A website and C website;If fibre core loss value is unsatisfactory for requiring, AB electric power optical cable and/or BC electricity are replaced Power optical cable;If fibre core loss value is met the requirements, broken string docking and loss test successively are carried out to next stop point.
Preferably, described that loss test carried out to each group of circuit to be measured in A website, the 1/2 of loss test institute value Fibre core loss value as between A website and C website, specifically:
Loss test is carried out to each group of circuit to be measured using light source device and optical power device in A website, detects resulting function The 1/2 of rate loss value is the fibre core loss value between A website and C website.
Preferably, further includes:
Disconnected end loopback: disconnect J website and K website JK electric power optical cable be located at K website one end each fibre core Group.
Preferably, further includes:
In A website and K website access device, communication is realized.
Preferably, the fibre core quantity of the electric power optical cable is plural number.
The beneficial effects of the present invention are: a kind of jumping fiber test method is provided, the fibre core between website can be lost on the spot Situation is detected, and can be improved working efficiency and be saved manpower.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention without any creative labor, may be used also for those of ordinary skill in the art To obtain other attached drawings according to these attached drawings.
Fig. 1 is the schematic diagram for the loopback wiring that embodiment provides;
Fig. 2 is that the broken string for three websites that embodiment provides docks schematic diagram;
Fig. 3 is that the broken string for four websites that embodiment provides docks schematic diagram.
Specific embodiment
To enable the purpose of the present invention, feature, advantage more obvious and understandable, implement below in conjunction with the present invention Attached drawing in example, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that reality disclosed below Applying example is only a part of the embodiment of the present invention, and not all embodiment.Based on the embodiments of the present invention, this field is common Technical staff's all other embodiment obtained without making creative work belongs to the model that the present invention protects It encloses.
In the description of the present invention, it is to be understood that, when a component is considered as " connection " another component, it can To be directly to another component or may be simultaneously present the component being centrally located.When a component is considered as " setting Set " another component, it, which can be, is set up directly on another component or may be simultaneously present the component being centrally located.
In addition, the indicating positions such as term " length " " short " "inner" "outside" or positional relationship for the orientation that is shown based on attached drawing or Person's positional relationship is merely for convenience of the description present invention, rather than the device or original part of indication or suggestion meaning must have this Specific orientation is operated with specific orientation construction, should not be understood as limitation of the invention with this.
To further illustrate the technical scheme of the present invention below with reference to the accompanying drawings and specific embodiments.
On the one hand, the present embodiment provides a kind of communication networks, successively include A website, B website, C website ... J website With K website, passes through electric power optical cable between adjacent two website and be connected to.Can in this present embodiment, A website is starting point website, the station B Point, C website ... J website etc. are intermediate stations, and K website is terminus point.It is understood that the quantity of intermediate stations can To be zero, one, two, three, four or any number of.Preferably, the fibre core quantity of the electric power optical cable is multiple Number.
On the other hand, the present embodiment provides a kind of jumping fiber test method, it is suitable for carrying out jumping fiber test to communication network, The following steps are included:
S10: loopback wiring: referring to Fig. 1, it is one that the fibre core in the electric power optical cable 2 between adjacent two website, which is pressed every two, Group is divided into several fibre core groups 201, and makes the two fibre cores conducting for the same fibre core group 201 being located in same website;All electric power light 201 quantity of fibre core group of cable 2 is identical.
Preferably, electric power optical cable is 24 cored structures, if all fibre cores are vacant fibre core, every section of electric power optical cable To form 12 groups of fibre core groups.Generally, jumping fiber is carried out using vacant fibre core.
Referring to FIG. 1 to FIG. 2, optical fiber distributing unit 1 is equipped in each website, specifically, starting point website and terminus point Configure an optical fiber distributing unit 1;Intermediate stations configure two optical fiber distributing units 2, and one is used for and a upper website Connection, another with next website for connecting.In step slo, first make between two optical fiber distributing units 1 being connected Electric power optical cable 2 constitutes loopback circuit.
Preferably, because each fibre core group of the one end for needing that AB electric power optical cable is used to be located at A website in step s 40 as The incoming end of detection device, so the AB electric power optical cable position of connection A website and B website can be not connected to when carrying out step S10 Each fibre core group in one end of A website.
Preferably, automatic switching-on device can be set, when a failure occurs, the automatic closing that each optical fiber distributing unit is equipped with Device automatic closing is to realize the loopback wiring between adjacent two website.Certainly, because jumping fiber mainly uses vacant fibre core, Vacant fibre core can be made to be initially in wrapped state, when needing to test, it is only necessary to which two batches staff, a batch directly exist Inception point point is tested, and another batch of each website for successively arriving downstream carries out broken string docking.
S20: broken string docking: disconnect A website and B website AB electric power optical cable be located at B website one end each fibre core Group, disconnect B website and C website BC electric power optical cable be located at B website one end each fibre core group;The AB that every group is disconnected The fibre core group for the BC electric power optical cable that the fibre core group of electric power optical cable is disconnected with one group is docked, the two fibre core groups docked composition to Survey time road.
Specifically, AB electric power optical cable and BC electric power optical cable are docked, can be obtained by 12 groups in A website and waits for the survey time Road, the length in each group of circuit to be measured are twice of AC electric power optical cable length.
S30: loss test: carrying out loss test to each group of circuit to be measured in A website, and the 1/ of loss test institute value 2 be the fibre core loss value between A website and C website;If fibre core loss value is unsatisfactory for requiring, replace AB electric power optical cable and/or BC electric power optical cable;If fibre core loss value is met the requirements, broken string docking and loss test successively are carried out to next stop point.
Specifically, successively 12 groups of circuits to be measured are detected in A website, it, can if fibre core loss value is unsatisfactory for requiring To find at once, without that could be found to C website, to reduce the time for returning to maintenance.
Preferably, described that loss test carried out to each group of circuit to be measured in A website, the 1/2 of loss test institute value Fibre core loss value as between A website and C website, specifically:
Loss test is carried out to each group of circuit to be measured using light source device and optical power device in A website, detects resulting function The 1/2 of rate loss value is the fibre core loss value between A website and C website.
In the present embodiment, if fibre core loss value is met the requirements, broken string docking successively is carried out to next stop point and loss is surveyed Examination, specific as follows:
It is understood that C website is terminus point, referring to fig. 2, the S30 if intermediate stations only have B website one Include:
If fibre core loss value is met the requirements, S40 is executed.
If intermediate stations have B website and C website two, D website is terminus point, referring to Fig. 3, each optical fiber distributing unit 1 It is attached by electric power optical cable 2, the S30 includes:
If fibre core loss value is met the requirements:
To C website execute broken string docking: the BC electric power optical cable for disconnecting B website and C website is located at one end of C website Each fibre core group, disconnect C website and D website CD electric power optical cable be located at C website one end each fibre core group;Every group is broken The fibre core group for the CD electric power optical cable that the fibre core group for the BC electric power optical cable opened is disconnected with one group is docked, the two fibre core groups docked Form circuit to be measured;
Loss test is executed to C website: loss test, loss test gained being carried out to each group of circuit to be measured in A website The 1/2 of numerical value is the fibre core loss value between A website and D website;If fibre core loss value is unsatisfactory for requiring, CD electric power light is replaced Cable;If fibre core loss value is met the requirements, S40 is executed.
So analogize, when the quantity of intermediate stations is gradually increased, broken string docking and loss successively are carried out to next stop point Test then executes S40 until the fibre core loss value that the intermediate stations connecting with terminus point are surveyed is met the requirements.
S40: disconnected end loopback: disconnect J website and K website JK electric power optical cable be located at K website one end it is each Fibre core group.
It is understood that K website is terminus point.
S50: in A website and K website access device, communication is realized.
It is understood that K website is terminus point.
Jumping fiber test method provided in this embodiment first carries out pairs of loopback wiring to the fibre core of all website two sides, so Cooperated afterwards using a group of people in starting point and tested, another a group of people successively carries out tearing fine docking open in each node, can make full use of limited The completion jumping fiber of manpower high efficiency high quality works, and allows work to become more simple, clear, improves the quality of jumping fiber, once Logical escape truck can be jumped immediately by being in an emergency, and can ensure the fast quick-recovery of communication network.
Relative to prior technique, jumping fiber test method provided in this embodiment has the following beneficial effects:
1, reduce the workload of operation maintenance personnel, it is opposite to shorten the time, the cost of operation is reduced, work effect is improved Rate.
2, replacement problem fibre core immediately can be found in time simultaneously using this method method, it is ensured that jumping fiber work quality improves work The reliability of work.Especially when there is urgent optical path failure, quick-recovery business, raising communication network stability it can reduce fastly Power grid risk.
Jumping fiber test method provided by the invention can on the spot detect the fibre core loss situation between website, can Working efficiency is improved, and manpower can be saved.
The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although with reference to the foregoing embodiments Invention is explained in detail, those skilled in the art should understand that: it still can be to aforementioned each implementation Technical solution documented by example is modified or equivalent replacement of some of the technical features;And these modification or Replacement, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution.

Claims (5)

1. a kind of jumping fiber test method, is suitable for carrying out communication network jumping fiber test, the communication network successively includes the station A Point, B website, C website ... J website and K website pass through electric power optical cable between adjacent two website and are connected to, which is characterized in that institute Stating jumping fiber test method includes:
Loopback wiring: being divided into several fibre core groups by every two by the fibre core in the electric power optical cable between adjacent two website for one group, And make the two fibre cores conducting for the same fibre core group being located in same website;The fibre core group quantity of all electric power optical cables is identical;
Broken string docking: disconnect A website and B website AB electric power optical cable be located at B website one end each fibre core group, the company of disconnection Connect B website and C website BC electric power optical cable be located at B website one end each fibre core group;The AB electric power optical cable that every group is disconnected The fibre core group of BC electric power optical cable that is disconnected with one group of fibre core group dock, the two fibre core groups docked form circuit to be measured;
Loss test: loss test is carried out to each group of circuit to be measured in A website, the 1/2 of loss test institute value is the station A Fibre core loss value between point and C website;If fibre core loss value is unsatisfactory for requiring, AB electric power optical cable and/or BC electric power light are replaced Cable;If fibre core loss value is met the requirements, broken string docking and loss test successively are carried out to next stop point.
2. jumping fiber test method according to claim 1, which is characterized in that it is described in A website to each group of circuit to be measured Loss test is carried out, the 1/2 of loss test institute value is the fibre core loss value between A website and C website, specifically:
Loss test is carried out to each group of circuit to be measured using light source device and optical power device in A website, detects resulting power damage The 1/2 of consumption value is the fibre core loss value between A website and C website.
3. jumping fiber test method according to claim 1, which is characterized in that further include:
Disconnected end loopback: disconnect J website and K website JK electric power optical cable be located at K website one end each fibre core group.
4. jumping fiber test method according to claim 3, which is characterized in that further include:
In A website and K website access device, communication is realized.
5. jumping fiber test method according to claim 1, which is characterized in that the fibre core quantity of the electric power optical cable is multiple Number.
CN201910440558.4A 2019-05-24 2019-05-24 Fiber jump testing method Active CN110082070B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910440558.4A CN110082070B (en) 2019-05-24 2019-05-24 Fiber jump testing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910440558.4A CN110082070B (en) 2019-05-24 2019-05-24 Fiber jump testing method

Publications (2)

Publication Number Publication Date
CN110082070A true CN110082070A (en) 2019-08-02
CN110082070B CN110082070B (en) 2021-03-12

Family

ID=67421710

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910440558.4A Active CN110082070B (en) 2019-05-24 2019-05-24 Fiber jump testing method

Country Status (1)

Country Link
CN (1) CN110082070B (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BR9604785A (en) * 1995-04-03 1998-07-07 Ericsson Telefon Ab L M Optical network and process for channel determination in an optical network
CN1314036A (en) * 1998-08-14 2001-09-19 艾利森电话股份有限公司 Path monitoring in optical communication systems
CN101160542A (en) * 2005-04-19 2008-04-09 Adc电信公司 Loop back plug and method
CN201577091U (en) * 2009-11-30 2010-09-08 中国移动通信集团北京有限公司 Optical fiber monitoring terminal
CN103368643A (en) * 2012-04-01 2013-10-23 华为技术有限公司 Method, system and device for detecting optical fiber link
CN104104433A (en) * 2014-06-18 2014-10-15 国网山东省电力公司青岛供电公司 Optical cable fiber series connection detection device and method
CN104639377A (en) * 2015-03-04 2015-05-20 太仓市同维电子有限公司 Method for indicating jumper connection state automatically
CN106059660A (en) * 2016-06-30 2016-10-26 瑞斯康达科技发展股份有限公司 Loopback detection method, BBU (Base Band Unit), RRU (Radio Remote Unit) and optical access network system
CN205829625U (en) * 2016-07-06 2016-12-21 江苏江城电气有限公司 A kind of Intelligent Bus on-line detector based on fiber-optic transfer
CN107181627A (en) * 2017-07-20 2017-09-19 浪潮天元通信信息系统有限公司 A kind of communication network light path dispatching method and device
CN108306675A (en) * 2018-04-17 2018-07-20 中山水木光华电子信息科技有限公司 A kind of method and system of Intelligent optical fiber wire jumper fault diagnosis
CN109004976A (en) * 2018-07-02 2018-12-14 北京市天元网络技术股份有限公司 The remote monitoring system of cable resource

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BR9604785A (en) * 1995-04-03 1998-07-07 Ericsson Telefon Ab L M Optical network and process for channel determination in an optical network
CN1314036A (en) * 1998-08-14 2001-09-19 艾利森电话股份有限公司 Path monitoring in optical communication systems
CN101160542A (en) * 2005-04-19 2008-04-09 Adc电信公司 Loop back plug and method
CN201577091U (en) * 2009-11-30 2010-09-08 中国移动通信集团北京有限公司 Optical fiber monitoring terminal
CN103368643A (en) * 2012-04-01 2013-10-23 华为技术有限公司 Method, system and device for detecting optical fiber link
CN104104433A (en) * 2014-06-18 2014-10-15 国网山东省电力公司青岛供电公司 Optical cable fiber series connection detection device and method
CN104639377A (en) * 2015-03-04 2015-05-20 太仓市同维电子有限公司 Method for indicating jumper connection state automatically
CN106059660A (en) * 2016-06-30 2016-10-26 瑞斯康达科技发展股份有限公司 Loopback detection method, BBU (Base Band Unit), RRU (Radio Remote Unit) and optical access network system
CN205829625U (en) * 2016-07-06 2016-12-21 江苏江城电气有限公司 A kind of Intelligent Bus on-line detector based on fiber-optic transfer
CN107181627A (en) * 2017-07-20 2017-09-19 浪潮天元通信信息系统有限公司 A kind of communication network light path dispatching method and device
CN108306675A (en) * 2018-04-17 2018-07-20 中山水木光华电子信息科技有限公司 A kind of method and system of Intelligent optical fiber wire jumper fault diagnosis
CN109004976A (en) * 2018-07-02 2018-12-14 北京市天元网络技术股份有限公司 The remote monitoring system of cable resource

Also Published As

Publication number Publication date
CN110082070B (en) 2021-03-12

Similar Documents

Publication Publication Date Title
CN110048507B (en) Automatic inspection method and system for power distribution automation system
CN104246521B (en) The method and device that intelligent substation relay protection function is tested automatically
CN102298106B (en) FPGA (field programmable gate array)-based arc monitoring system in valve hall
CN105527521B (en) A kind of protective relaying device verification ancillary equipment and monitoring system
CN102377484A (en) Method for detecting business security of station in-out cable of transmission network station
CN204065308U (en) A kind of polycore cable is to line and fault detection system
CN110266377A (en) Optical fiber remote detection and scheduling system in a kind of fiber optic network
CN205484589U (en) Overload protection device checkback auxiliary and monitoring system
CN104730397A (en) Interoperation test system and method between distribution automation terminals
CN104319887B (en) A kind of intelligent substation optical fiber chain rupture abnormality determination method
CN104348540B (en) Automatic monitoring and protection system of optical-fiber line
CN108493906B (en) Decentralized bus protection handset repair method and decentralized bus protection system
CN110082070A (en) Jumping fiber test method
CN113629879B (en) Portable SV/GOOSE common-network maintenance isolation device and method
CN205941794U (en) Adjustment device of direct current system generating line voltage -to -ground
CN205139323U (en) Distant examination testing system of intelligent substation relay protection
Scheer Comparison of fiber-optic star and ring topologies for electric power substation communications
CN109634849B (en) Visual signal interaction intelligent substation reconstruction and extension virtual testing device and method
CN110166128B (en) Communication network system
CN201600432U (en) Partial discharge monitoring system
CN206595998U (en) Optical fiber real-time monitoring remote control data Transmission system
CN104104144A (en) System and method for debugging spare power automatic switching equipment of intelligent substation, and intelligent substation
CN205015531U (en) Intelligence optic fibre distribution device
CN205301429U (en) Intelligent substation presses and becomes automatic nuclear phase ware of secondary
CN106506067B (en) Intelligent optical fiber distribution device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant