CN110080719A - A kind of solvable pressure difference sliding sleeve and horizontal well naked eye staged fracturing construction method - Google Patents

A kind of solvable pressure difference sliding sleeve and horizontal well naked eye staged fracturing construction method Download PDF

Info

Publication number
CN110080719A
CN110080719A CN201910225253.1A CN201910225253A CN110080719A CN 110080719 A CN110080719 A CN 110080719A CN 201910225253 A CN201910225253 A CN 201910225253A CN 110080719 A CN110080719 A CN 110080719A
Authority
CN
China
Prior art keywords
sliding sleeve
pressure difference
top connection
wall
solvable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910225253.1A
Other languages
Chinese (zh)
Inventor
王磊
朱太辉
陈思路
朱忠伟
高清春
王西贵
薛志永
杨行
罗欢
夏方杰
富新颖
霍爱莉
董清坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Great Wall Drilling Co
Original Assignee
CNPC Great Wall Drilling Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Great Wall Drilling Co filed Critical CNPC Great Wall Drilling Co
Priority to CN201910225253.1A priority Critical patent/CN110080719A/en
Publication of CN110080719A publication Critical patent/CN110080719A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C23/00Alloys based on magnesium
    • C22C23/02Alloys based on magnesium with aluminium as the next major constituent
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/063Valve or closure with destructible element, e.g. frangible disc
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B2200/00Special features related to earth drilling for obtaining oil, gas or water
    • E21B2200/06Sleeve valves

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to horizontal well naked eye staged fracturing technical field, in particular to a kind of solvable pressure difference sliding sleeve and horizontal well naked eye staged fracturing construction method.The top connection side wall circumferencial direction of the pressure difference sliding sleeve is evenly arranged with multiple pressure break holes, inner sliding sleeve is connected on top connection inner wall by sliding sleeve shear pin, inner sliding sleeve seals pressure break hole, inner sliding sleeve upper end between sealing ring I and top connection inner wall by sealing, and inner sliding sleeve lower end between sealing ring II and lower contact inner wall by sealing.The present invention is realized using shift sleeve structure inside the soluble internal conventional non-dissolution of shift sleeve structure substitution, in pressing crack construction process when pressure difference sliding sleeve cannot be opened smoothly, pass through the immersion of Klorvess Liquid, under setting time, internal sliding sleeve can be also completely dissolved, and tool pressure break hole equally can be realized unlatching, efficiently connection fracturing string and reservoir, circulation canal is established for subsequent pressing crack construction, to reduce entire pressing crack construction risk, high reliablity.

Description

A kind of solvable pressure difference sliding sleeve and horizontal well naked eye staged fracturing construction method
Technical field:
The present invention relates to horizontal well naked eye staged fracturing technical field, in particular to a kind of solvable pressure difference sliding sleeve and horizontal well Naked eye staged fracturing construction method.
Background technique:
Horizontal well naked eye staged fracturing technology is lower going-into-well together with completion tubular column is merged into one-trip string with fracturing string It is interior.This kind of fracturing string generally comprises hanging packer, open hole packer, ball-throwing type sliding sleeve, differential sliding sleeve and setting ball The tools such as seat insulate horizontal segment using open hole packer, select a certain number of pitching sliding sleeves and naked eye to seal according to pressure break number of segment Well section laterally selective staged fracturing is realized every device.By carrying out the transformation of selectivity to oil-gas Layer, to realize raising individual well The purpose of yield.This kind of segmentation well completion, fracturing string are completion tubular column, reduce construction cost, and without solid Well operations avoid the ropy problem of horizontal cementing.Although horizontal well naked eye staged fracturing technology is in construction period, expense And the advantage that fracturing transformation effect has other fractured horizontal well renovation techniques incomparable, but the pressure of present both at home and abroad Split tubing string first segment be by pressure difference sliding sleeve open, due to wellbore and reservoir situation complexity and bottom pressure temperature it is changeable Property, will cause pressure difference sliding sleeve sometimes can not open, and entire horizontal well fracturing pipe string circulation canal cannot be successfully established, to whole A fracturing work brings great risk, once there are this emergency situations, subsequent each section will not can be carried out pressing crack construction, and this When open hole packer swollen envelope, completion tubular column can not be played out, this will imply that scrapping for a bite horizontal well, direct economic loss Several ten million.
Summary of the invention:
The technical problem to be solved in the present invention is to provide a kind of solvable pressure difference sliding sleeves and horizontal well naked eye staged fracturing to construct Method, the pressure difference sliding sleeve are realized using shift sleeve structure inside the soluble internal conventional non-dissolution of shift sleeve structure substitution, in pressure break In work progress when pressure difference sliding sleeve cannot be opened smoothly, pass through the immersion of Klorvess Liquid, under setting time, internal sliding sleeve Also it can be completely dissolved, tool pressure break hole equally can be realized unlatching, efficiently be connected to fracturing string and reservoir, apply for subsequent pressure break Work establishes circulation canal, to reduce entire pressing crack construction risk, high reliablity.It overcomes existing pressure difference sliding sleeve and there is opening The deficiency of the risk of failure.
The technical solution used in the present invention is: a kind of solvable pressure difference sliding sleeve, including top connection, inner sliding sleeve and top connection The lower contact being connected;Top connection side wall circumferencial direction is evenly arranged with multiple pressure break holes, and inner sliding sleeve is connected by sliding sleeve shear pin On top connection inner wall, inner sliding sleeve seals pressure break hole, and inner sliding sleeve upper end is interior by sealing between sealing ring I and top connection inner wall Lock ring, top connection lower part is arranged by sealing between sealing ring II and lower contact inner wall in sliding sleeve lower end in inner sliding sleeve unit with grooves in outer wall Inner surface is machined with lock, and inner sliding sleeve is displaced downwardly to lock rings when opening pressure break hole, and on lock, inner sliding sleeve uses magnesium alloy Material is made, the magnesium alloy by the magnesium of weight percent 85%, 10% aluminium, 3% nickel, 2% copper form.
Inner sliding sleeve outer wall is provided with limited step, and the limited step can be limited in lower contact after inner sliding sleeve moves down On end face.
A kind of horizontal well naked eye staged fracturing construction method using solvable pressure difference sliding sleeve, the construction method step are as follows: First with drilling rod by staged fracturing tool string G.I.H design position, which includes hanging packer, naked Eye packer, pitching sliding sleeve, solvable pressure difference sliding sleeve, setting ball seat+ball-and-seat and guide shoe pump pitching with Klorvess Liquid, to After open hole packer and the swollen envelope of hanging packer, act drilling rod, then oil pipe of the tripping in hydraulic anchor carries out tieback, most Solvable pressure difference sliding sleeve is opened afterwards and pitching sliding sleeve carries out the fracturing work of equivalent layer position, if solvable pressure difference sliding sleeve is not opened, etc. After until the inner sliding sleeve of solvable pressure difference sliding sleeve is completely dissolved, realizing thoroughly being connected to of staged fracturing tool string and stratum, Carry out the pressing crack construction of next step.
Klorvess Liquid mass concentration is 5%-10%.
The beneficial effects of the present invention are: the present invention is realized using in the soluble internal conventional non-dissolution of shift sleeve structure substitution Portion's shift sleeve structure, by the immersion of Klorvess Liquid, is being set in pressing crack construction process when pressure difference sliding sleeve cannot be opened smoothly It fixes time down, internal sliding sleeve can be also completely dissolved, and tool pressure break hole equally can be realized unlatching, efficiently be connected to fracturing string and storage Layer establishes circulation canal for subsequent pressing crack construction, to reduce entire pressing crack construction risk, high reliablity.
Detailed description of the invention:
The present invention will be further described in detail with reference to the accompanying drawings and detailed description.
Fig. 1 is the structural schematic diagram of solvable pressure difference sliding sleeve.
Staged fracturing tool string is sent into design position schematic diagram in well for drilling rod by Fig. 2.
Fig. 3 is staged fracturing tool string schematic diagram after oil tube tieback well head.
Specific embodiment:
As shown in Figure 1, a kind of solvable pressure difference sliding sleeve, including top connection 1, inner sliding sleeve 4, be connected with top connection 1 under connect First 10;Top connection 1 passes through to be fixed between screw 9 and lower contact 10, and 1 side wall circumferencial direction of top connection is evenly arranged with multiple pressure breaks Hole 3, inner sliding sleeve 4 are connected on 1 inner wall of top connection by sliding sleeve shear pin 5, and inner sliding sleeve 4 seals pressure break hole 3, and 4 upper end of inner sliding sleeve is logical It crosses between 1 inner wall of sealing ring I 2 and top connection and seals, 4 lower end of inner sliding sleeve passes through close between 10 inner wall of sealing ring II 8 and lower contact Envelope, 4 unit with grooves in outer wall of inner sliding sleeve is interior to be arranged C-shaped lock ring 6, and 1 lower inner surface of top connection is machined with lock 7, and inner sliding sleeve 4, which is displaced downwardly to, to be beaten C-shaped lock ring 6 is locked on lock 7 when opening pressure break hole 3, and inner sliding sleeve 4 is avoided to reset;Inner sliding sleeve 4 is made of magnesium-aluminium alloy material, The magnesium alloy by the magnesium of weight percent 85%, 10% aluminium, 3% nickel, 2% copper form.
4 outer wall of inner sliding sleeve is provided with limited step, and the limited step can be limited in lower contact after inner sliding sleeve 4 moves down On 10 upper surfaces.
As shown in Figure 2 and Figure 3, a kind of horizontal well naked eye staged fracturing construction method using solvable pressure difference sliding sleeve, the construction Method and step is as follows: using drilling rod 11 by staged fracturing tool string G.I.H design position, the staged fracturing tool string packet first Include hanging packer 12, open hole packer 13, pitching sliding sleeve 14, solvable pressure difference sliding sleeve 15, setting ball seat 17+ ball-and-seat and guide shoe 18, start to carry out mud replacement, puts into low-density ball after having replaced mud, pumped with Klorvess Liquid, fall on setting ball to ball After on seat 17,16-18MPa is suppressed, the shear pin of hanging packer 12, open hole packer 13 is cut, enables hanging packer 12, naked eye Packer 13 starts to set, and improves pressure step by step to 20MPa, pressure stabilizing 3min, hanging packer 12, open hole packer 13 rise and sealed Finish, continues to improve pressure to 25MPa pressure stabilizing 5min, hanging packer 12 is given up, and acts drilling rod 11, and then tripping in has hydraulic anchor 19 oil pipe 20 carries out tieback, and after completing tieback, annular space ties weighing apparatus pressure 10MPa and tests envelope, and pressure stabilizing 5min does not drop, and tests sealing lattice, 35MPa is gradually suppressed in oil pipe 20 and opens solvable pressure difference sliding sleeve 15, carries out first segment pressing crack construction, it, can be with if do not opened Pressure is properly increased, is incremented by 3MPa, pressure stabilizing 3min step by step, if solvable pressure difference sliding sleeve 15 still cannot be opened successfully, waits one It fixes time, the inner sliding sleeve 4 to solvable pressure difference sliding sleeve 15 is completely dissolved, and realizes that staged fracturing tool string is connected to the thorough of stratum 16 Afterwards, the pressing crack construction of first segment can be carried out.Then according to detail design, the low-density ball of corresponding size is successively put into, to low Density ball opens pitching sliding sleeve 14 after reaching ball seat, successively carries out the pressing crack construction of corresponding interval.When final stage pressing crack construction After, production is asked in open flow drain.
Klorvess Liquid mass concentration is 5%-10%.
It is understood that being merely to illustrate the present invention above with respect to specific descriptions of the invention and being not limited to this Technical solution described in inventive embodiments, those skilled in the art should understand that, still the present invention can be carried out Modification or equivalent replacement, to reach identical technical effect;As long as meet use needs, all protection scope of the present invention it It is interior.

Claims (4)

1. a kind of solvable pressure difference sliding sleeve, including top connection (1), inner sliding sleeve (4), the lower contact (10) being connected with top connection (1); It is characterized by: top connection (1) side wall circumferencial direction is evenly arranged with multiple pressure break holes (3), inner sliding sleeve (4) passes through sliding sleeve shear pin (5) be connected on top connection (1) inner wall, inner sliding sleeve (4) seal pressure break hole (3), inner sliding sleeve (4) upper end by sealing ring I (2) with It is sealed between top connection (1) inner wall, inner sliding sleeve (4) lower end is interior by sealing between sealing ring II (8) and lower contact (10) inner wall Lock ring (6) are set in sliding sleeve (4) unit with grooves in outer wall, top connection (1) lower inner surface is machined with lock (7), and inner sliding sleeve (4) is displaced downwardly to It opens pressure break hole (3) Shi Suohuan (6) to be locked on lock (7), inner sliding sleeve (4) is made of magnesium-aluminium alloy material, which closes Gold by the magnesium of weight percent 85%, 10% aluminium, 3% nickel, 2% copper form.
2. solvable pressure difference sliding sleeve described in accordance with the claim 1, it is characterised in that: inner sliding sleeve (4) outer wall is provided with limit Step, the limited step can be limited on lower contact (10) upper surface after inner sliding sleeve (4) moves down.
3. a kind of horizontal well naked eye staged fracturing construction method using solvable pressure difference sliding sleeve described in accordance with the claim 1, Be characterized in that: the construction method step is as follows: first with drilling rod by staged fracturing tool string G.I.H design position, the segmentation Fracturing tool string includes hanging packer, open hole packer, pitching sliding sleeve, solvable pressure difference sliding sleeve, setting ball seat+ball-and-seat and draws Shoes, with Klorvess Liquid pump pitching, to open hole packer and the swollen envelope of hanging packer after, rise drilling rod, then tripping in Oil pipe with hydraulic anchor carries out tieback, finally opens solvable pressure difference sliding sleeve and pitching sliding sleeve carries out the pressure break work of equivalent layer position Industry, if solvable pressure difference sliding sleeve is not opened, waiting is completely dissolved up to the inner sliding sleeve (4) of solvable pressure difference sliding sleeve, realizes segmentation pressure After splitting thoroughly being connected to of tool string and stratum, the pressing crack construction of next step can be carried out.
4. the horizontal well naked eye staged fracturing construction method described in accordance with the claim 3 using solvable pressure difference sliding sleeve, feature Be: the Klorvess Liquid mass concentration is 5%-10%.
CN201910225253.1A 2019-03-25 2019-03-25 A kind of solvable pressure difference sliding sleeve and horizontal well naked eye staged fracturing construction method Pending CN110080719A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910225253.1A CN110080719A (en) 2019-03-25 2019-03-25 A kind of solvable pressure difference sliding sleeve and horizontal well naked eye staged fracturing construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910225253.1A CN110080719A (en) 2019-03-25 2019-03-25 A kind of solvable pressure difference sliding sleeve and horizontal well naked eye staged fracturing construction method

Publications (1)

Publication Number Publication Date
CN110080719A true CN110080719A (en) 2019-08-02

Family

ID=67413561

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910225253.1A Pending CN110080719A (en) 2019-03-25 2019-03-25 A kind of solvable pressure difference sliding sleeve and horizontal well naked eye staged fracturing construction method

Country Status (1)

Country Link
CN (1) CN110080719A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110439522A (en) * 2019-08-16 2019-11-12 中石化石油工程技术服务有限公司 The controllable corrosion opening device in first section pressure break channel and pressure break segmentation operation construction technology
CN111236879A (en) * 2020-01-19 2020-06-05 中国石油天然气股份有限公司 Soluble tool packing and unpacking method
CN111396015A (en) * 2020-05-19 2020-07-10 中国海洋石油集团有限公司 Desirable big latus rectum fracturing sliding sleeve of ball seat
CN112483009A (en) * 2019-09-12 2021-03-12 中国石油化工股份有限公司 Fracturing connector and well cementation tubular column comprising same
CN113323627A (en) * 2020-02-28 2021-08-31 中国石油化工股份有限公司 Differential pressure sliding sleeve and oil-gas well fracturing construction method
CN113803021A (en) * 2020-06-12 2021-12-17 中国石油化工股份有限公司 Fracturing nipple and fracturing string comprising same
CN114482958A (en) * 2020-10-26 2022-05-13 中国石油化工股份有限公司 Casing cementing full-bore infinite staged fracturing well completion device and fracturing well completion method thereof
CN114622885A (en) * 2020-12-11 2022-06-14 中国石油化工股份有限公司 Cement device is prevented in well cementation sliding sleeve thermal degradation
CN116084905A (en) * 2023-03-13 2023-05-09 大庆市璞庆钻采设备制造有限公司 Sand blaster for oilfield stratum fracturing
WO2023160732A1 (en) * 2022-02-28 2023-08-31 哈尔滨艾拓普科技有限公司 Full-bore and infinite-stage segmented-fracturing sliding sleeve based on intelligent label control, and implementation method
US11933138B2 (en) 2020-06-12 2024-03-19 China Petroleum & Chemical Corporation Sliding sleeve device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201714364U (en) * 2010-07-02 2011-01-19 中国石油集团川庆钻探工程有限公司 Staged fracturing acidizing tool string for open hole completion of horizontal well
CN104453778A (en) * 2014-11-06 2015-03-25 中国石油天然气股份有限公司 Fracturing sliding sleeve with dissoluble ball seat and fracturing method
CN204532261U (en) * 2014-12-12 2015-08-05 中国石油天然气股份有限公司 Controllable soluble ball seat multistage fracturing sliding sleeve
CN206071557U (en) * 2016-09-14 2017-04-05 中国石油天然气股份有限公司 Anti-jamming ball sliding sleeve hydraulic ejector and fracturing string
US20180010217A1 (en) * 2014-07-28 2018-01-11 Magnesium Elektron Limited Corrodible downhole article
CN109252845A (en) * 2018-10-15 2019-01-22 中国石油集团渤海钻探工程有限公司 A kind of solvable slide bushing assembly of separate stratum fracfturing full-bore

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201714364U (en) * 2010-07-02 2011-01-19 中国石油集团川庆钻探工程有限公司 Staged fracturing acidizing tool string for open hole completion of horizontal well
US20180010217A1 (en) * 2014-07-28 2018-01-11 Magnesium Elektron Limited Corrodible downhole article
CN104453778A (en) * 2014-11-06 2015-03-25 中国石油天然气股份有限公司 Fracturing sliding sleeve with dissoluble ball seat and fracturing method
CN204532261U (en) * 2014-12-12 2015-08-05 中国石油天然气股份有限公司 Controllable soluble ball seat multistage fracturing sliding sleeve
CN206071557U (en) * 2016-09-14 2017-04-05 中国石油天然气股份有限公司 Anti-jamming ball sliding sleeve hydraulic ejector and fracturing string
CN109252845A (en) * 2018-10-15 2019-01-22 中国石油集团渤海钻探工程有限公司 A kind of solvable slide bushing assembly of separate stratum fracfturing full-bore

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110439522A (en) * 2019-08-16 2019-11-12 中石化石油工程技术服务有限公司 The controllable corrosion opening device in first section pressure break channel and pressure break segmentation operation construction technology
CN110439522B (en) * 2019-08-16 2022-03-18 中国石油化工集团有限公司 Controllable corrosion opening device for first-section fracturing channel and fracturing sectional operation construction process
CN112483009A (en) * 2019-09-12 2021-03-12 中国石油化工股份有限公司 Fracturing connector and well cementation tubular column comprising same
CN112483009B (en) * 2019-09-12 2022-11-25 中国石油化工股份有限公司 Fracturing connector and well cementation tubular column comprising same
CN111236879A (en) * 2020-01-19 2020-06-05 中国石油天然气股份有限公司 Soluble tool packing and unpacking method
CN111236879B (en) * 2020-01-19 2022-06-03 中国石油天然气股份有限公司 Soluble tool packing and unpacking method
CN113323627A (en) * 2020-02-28 2021-08-31 中国石油化工股份有限公司 Differential pressure sliding sleeve and oil-gas well fracturing construction method
CN111396015A (en) * 2020-05-19 2020-07-10 中国海洋石油集团有限公司 Desirable big latus rectum fracturing sliding sleeve of ball seat
CN111396015B (en) * 2020-05-19 2022-05-06 中国海洋石油集团有限公司 Desirable big latus rectum fracturing sliding sleeve of ball seat
CN113803021A (en) * 2020-06-12 2021-12-17 中国石油化工股份有限公司 Fracturing nipple and fracturing string comprising same
US11933138B2 (en) 2020-06-12 2024-03-19 China Petroleum & Chemical Corporation Sliding sleeve device
CN114482958A (en) * 2020-10-26 2022-05-13 中国石油化工股份有限公司 Casing cementing full-bore infinite staged fracturing well completion device and fracturing well completion method thereof
CN114622885A (en) * 2020-12-11 2022-06-14 中国石油化工股份有限公司 Cement device is prevented in well cementation sliding sleeve thermal degradation
WO2023160732A1 (en) * 2022-02-28 2023-08-31 哈尔滨艾拓普科技有限公司 Full-bore and infinite-stage segmented-fracturing sliding sleeve based on intelligent label control, and implementation method
CN116084905A (en) * 2023-03-13 2023-05-09 大庆市璞庆钻采设备制造有限公司 Sand blaster for oilfield stratum fracturing

Similar Documents

Publication Publication Date Title
CN110080719A (en) A kind of solvable pressure difference sliding sleeve and horizontal well naked eye staged fracturing construction method
CN106223917A (en) A kind of side tracked slim hole layered fracturing pipe string and method
WO2019085472A1 (en) Tubular column for drill-free and catch-free integrated well cementing and well completion and application thereof
CN108625830A (en) Ball-throwing type selective sand control process pipe string and its method
CN111119784B (en) Suspension plugging device for open hole well and using method
CN206668234U (en) A kind of ball-throwing type selective sand control process pipe string
CN113803020A (en) Rapid leaking stoppage and production recovery method for horizontal well
CN108547589B (en) Method for producing tubular column without killing well by electric setting recoverable hanging packer
CN108999591A (en) Fracturing sliding sleeve
CN111058817B (en) Multi-section perforation fracturing horizontal well shaft integrity recovery method
CN101818619B (en) Temporary sealing open hole casing branch well cementing and completion structure and process
CN211692340U (en) Clean well completion tubular column of high temperature high pressure oil gas well
CN108625841A (en) Horizontal well annulus sealing and ball-throwing sliding sleeve combined repeated fracturing method
CN110617057A (en) Full-pipe type underground testing pipe column and testing method thereof
CN115199228B (en) Drilling-free windowing sidetracking tool and casing windowing sidetracking construction method
CN114991657A (en) Device suitable for gas and liquid drilling downhole under-pressure well completion and use method thereof
CN106801589A (en) High temperature resistant big orifice hydraulic booster expanding suspension instrument and method
CN109915097A (en) 4-inch half-casing separate-layer fracturing string and fracturing method
CN111485844B (en) Continuous plugging construction method for multi-section leakage points of oil-water well
CN108979583A (en) A kind of sidetracked hole layer and section cementing unit and application method
CN210858645U (en) Packer
CN203685094U (en) Multi-clamp sleeve layered packing repair device for expansion pipe of long-section casing damage well
CN205955693U (en) Easy compound bridging plug of brill formula
CN111058792A (en) Coiled tubing perforation-free under-pressure operation-free well completion device and method
CN113863860A (en) Horizontal well casing pipe column combined structure and using method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200928

Address after: 100120 Beijing Xicheng District six laying Kang

Applicant after: CHINA NATIONAL PETROLEUM Corp.

Applicant after: China National Petroleum Corporation Great Wall Drilling Engineering Co.,Ltd.

Address before: 124010 Xinglongtai, Liaoning Province, oil street, No. 96, No.

Applicant before: China National Petroleum Corporation Great Wall Drilling Engineering Co.,Ltd.

WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190802