CN110080705A - A kind of mud circulating system for drilled pile construction - Google Patents

A kind of mud circulating system for drilled pile construction Download PDF

Info

Publication number
CN110080705A
CN110080705A CN201910459315.5A CN201910459315A CN110080705A CN 110080705 A CN110080705 A CN 110080705A CN 201910459315 A CN201910459315 A CN 201910459315A CN 110080705 A CN110080705 A CN 110080705A
Authority
CN
China
Prior art keywords
mud
slurry
storehouse
pipe
drilled pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910459315.5A
Other languages
Chinese (zh)
Other versions
CN110080705B (en
Inventor
曹少华
詹超
陈俊峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
5th Engineering Co Ltd of MBEC
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
5th Engineering Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC, 5th Engineering Co Ltd of MBEC filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN201910459315.5A priority Critical patent/CN110080705B/en
Publication of CN110080705A publication Critical patent/CN110080705A/en
Application granted granted Critical
Publication of CN110080705B publication Critical patent/CN110080705B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/06Arrangements for treating drilling fluids outside the borehole
    • E21B21/063Arrangements for treating drilling fluids outside the borehole by separating components
    • E21B21/065Separating solids from drilling fluids
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/12Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor using drilling pipes with plural fluid passages, e.g. closed circulation systems

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

A kind of mud circulating system for drilled pile construction is related to science of bridge building foundation construction field, including more than one drilling platform, being fixedly installed with gravel pump in the drilled pile of drilling platform;Center mud pit, it includes slurrying storehouse and slurry storehouse, slurrying storehouse is connected to close to upper surface location with slurry storehouse, and mud separator is installed above slurrying storehouse, is equipped with slush pump in slurry storehouse;Pipe-line system, connects drilling platform and center mud pit, and pipe-line system includes the first slurry pipe, the second slurry pipe and connecting tube;When mud circulating system operation, the mud in drilled pile is extracted out by gravel pump, is reached mud separator from the first slurry pipe and is flowed into slurrying storehouse;Mud in slurry storehouse is extracted out by slush pump, flows into drilled pile from the second slurry pipe.Mud outward transport amount can not only be greatly decreased in the present invention, use manpower and material resources sparingly, and reduce material cost;It is also able to satisfy correlative link guaranteed request, cleans construction environment more.

Description

A kind of mud circulating system for drilled pile construction
Technical field
The present invention relates to science of bridge building foundation construction field, specially a kind of mud cyclic system for drilled pile construction System.
Background technique
Nowadays in urban development process of construction, the construction of elevated bridge is more and more, area involved in elevated bridge construction Domain environment also becomes increasingly complex;At the same time, in the construction process, requirement of the people to civilized construction is also more stringent.Especially It is when nearby residents are more, safety of residents, civilization and the requirement of environmental protection are higher and higher.
Original drilled pile original position mud circulation needs that more than one mud pit is arranged near each drilling platform, exists Following disadvantage:
1, mud is easy to trickle down, and makes ground dirty, and related environmental requirement hardly results in guarantee.
2, it needs to carry out mud outward transport using original pulp mode, and outer freight volume is huge, generally requires setting ten or more The mud pit and multiple sand traps welded with steel form, manpower and material resources investment are huge.
3, using original pulp mode, it is also necessary to individually carry out slurrying, need to consume a large amount of loess, material cost It is higher.
Summary of the invention
In view of the deficiencies in the prior art, the purpose of the present invention is to provide a kind of mud for drilled pile construction The circulatory system can not only be greatly decreased mud outward transport amount, use manpower and material resources sparingly, and reduce material cost;Also it is able to satisfy correlative link Guaranteed request cleans construction environment more.
To achieve the above objectives, using a kind of mud circulating system for drilled pile construction, including more than one brill Hole platform is fixedly installed with gravel pump in the drilled pile of the drilling platform;Center mud pit, it includes slurrying storehouses and storage slurry Storehouse, the slurrying storehouse are connected to close to upper surface location with the slurry storehouse, are equipped with mud separator above the slurrying storehouse, institute It states and slush pump is installed in slurry storehouse;Pipe-line system, connects the drilling platform and center mud pit, and pipe-line system includes the One slurry pipe, the second slurry pipe and connecting tube;The gravel pump and mud separator pass through connecting tube and are parallel to the first slurry pipe, described Slush pump and drilled pile are parallel to the second slurry pipe by connecting tube;It is provided in the first slurry pipe, the second slurry pipe and connecting tube Multiple valves;When mud circulating system operation, the mud in drilled pile is extracted out by gravel pump, reaches mud point from the first slurry pipe Slurrying storehouse is flowed into from device;Mud in slurry storehouse is extracted out by slush pump, flows into drilled pile from the second slurry pipe.
Preferably, when mud circulating system is run, part valve opening makes gravel pump to the pipe between mud separator Road and slush pump are to the pipeline connection between drilled pile;The closing of remaining valve closes remaining pipeline.
Preferably, the connecting tube and each drilling platform and second of the gravel pump of each drilling platform and the first slurry pipe It starches and is equipped with a branch road valve in the connecting tube of pipe.
Preferably, the both ends of the first slurry pipe and the second slurry pipe are respectively equipped with the first main road valve, all drilling platforms It is connected in parallel between the first main road valve at both ends, is also set respectively between the first slurry pipe and two the first main road valves of the second slurry pipe There is a second main road valve.
Preferably, the center mud pit also includes detritus tank, and the detritus tank is adjacent with slurrying storehouse, detritus tank height Lower than slurrying storehouse height, the sand export of the mud separator is located above detritus tank.
Preferably, the center mud pit further includes the shifting board for separating slurrying storehouse and slurry storehouse, the shifting board Top is provided with filter hole.
Preferably, it is respectively arranged at least one supporting steel pipe in the slurrying storehouse and slurry storehouse, the supporting steel pipe hangs down Directly in the longer side wall setting of center mud pit length.
Preferably, the drilling platform is two, and the center mud pit is located among two drilling platforms.
Preferably, the first slurry pipe isSeamless steel pipe, it is described second slurry pipe isNothing Stitch steel pipe.
Preferably, the center mud pit is welded by steel form, and the valve uses regulating valve.
The beneficial effects of the present invention are:
1, mud circulating system of the invention can connect all drilling platforms, and the mud in drilled pile is by sand Stone pumping goes out to pass through pipe influx into slurrying storehouse, it is no longer necessary to a center mud pit is made beside each drilling platform, Batch production is formd, standardizes, the cost of manufacture of center mud pit can be greatlyd save;Simultaneously in the construction process, Wu Xukao The problem of cleaning when considering transport, effectively increases pile foundation construction efficiency, also meets the civilized construction requirement that owner emphasizes.
2, mud circulating system of the invention, the mud in drilled pile are extracted out by gravel pump, reach mud from the first slurry pipe Separator, then flow into slurrying storehouse;In slurrying storehouse, slurry storehouse, the mud in slurry storehouse are reached after precipitating filtering It is extracted out by slush pump, is back in drilled pile from the second slurry pipe;Mud can be recycled for multiple times in the mud circulating system, It no longer needs a large amount of loess to carry out slurrying, shortens the time of slurrying and borehole cleaning, improve the access times of mud, drop Low material cost.
3, the center mud pit design side amount of the mud circulating system is larger, has the function of deposit mud, was constructing Cheng Zhong when mud side's amount has exceeded the reserve capabillity of center mud pit, just needs to coordinate outward transport, reduces mud outward transport vehicle Number reduces transportation cost, and has achieved the effect that energy-saving and emission-reduction.
Detailed description of the invention
Fig. 1 is the General Arrangement of the embodiment of the present invention.
Fig. 2 is the center mud pit main view of the embodiment of the present invention.
Fig. 3 is the right view of Fig. 2.
Appended drawing reference: 1- slurrying storehouse, 2- slurry storehouse, 3- detritus tank, 4- mud separator, 5- shifting board, 6- side plate, the bottom 7- Plate, 8- supporting steel pipe, 9- slush pump, 10- gravel pump, the slurry of 11- first pipe, 12- second starch pipe, 13- drilling platform, 14- connection Pipe, 15- branch road valve, the first main road of 16- valve, 17- the second main road valve.
Specific embodiment
Invention is further described in detail with reference to the accompanying drawings and embodiments.
As shown in Figure 1, a kind of mud circulating system for drilled pile construction, including center mud pit, pipe-line system and More than one drilling platform 13.
Center mud pit includes slurrying storehouse 1 and slurry storehouse 2, and slurrying storehouse 1 is connected to close to upper surface location with slurry storehouse 2, is made Mud separator 4 is installed above pulp bin 1, slush pump 9 is installed in slurry storehouse 2.
Pipe-line system is for connecting drilling platform 13 and center mud pit.Pipe-line system includes that the first slurry pipe 11, second is starched Pipe 12 and connecting tube 14.Wherein, gravel pump 10 and mud separator 4 are parallel to the first slurry pipe 11, mud by connecting tube 14 Pump 9 and drilled pile pass through connecting tube 14 and are parallel to the second slurry pipe 12.
Specifically, each drilling platform 13 includes multiple drilled piles.In the present embodiment, drilling platform 13 is two, in Heart mud pit is located among two drilling platforms 13, and a drilling platform includes six drilled piles.The drilled pile of drilling platform 13 Inside it is fixedly installed with gravel pump 10.
When mud circulating system operation, the mud in drilled pile is extracted out by gravel pump 10, reaches mud from the first slurry pipe 11 Separator 4 is starched, then is flowed into slurrying storehouse 1;Mud in slurry storehouse 2 is extracted out by slush pump 9, flows into brill from the second slurry pipe 12 In the stake of hole.
In the present embodiment, the first slurry pipe 11, second, which is starched, is provided with multiple valves in pipe 12 and connecting tube 14.When mud follows When loop system is run, part valve opening, the pipeline and slush pump 9 for arriving gravel pump 10 between mud separator 4 to drilling Pipeline connection between stake;Remaining valve is closed to guarantee remaining pipeline closing.
Specifically, the connecting tube 14 and each drilling of the gravel pump 10 of each drilling platform 13 and the first slurry pipe 11 are flat A branch road valve 15 is equipped in the connecting tube 14 of platform 13 and the second slurry pipe 12.The branch road valve 15 determines that drilling platform is It is no to be connected to two slurry pipes.When the drilled pile of some drilling platform 13 is in running order, close to the branch of the drilling platform 13 Road valve 15 is opened;Remaining when close.
Further, the both ends of the first slurry pipe 11 and the second slurry pipe 12 are respectively equipped with the first main road valve 16, all drillings Platform 13 is connected in parallel between the first main road valve 16 at both ends.First main road valve 16 makes mud circulating system be in closed In circuit, prevent mud from outflowing.It is further respectively had between first slurry pipe 11 and two the first main road valves 16 of the second slurry pipe 12 One the second main road valve 17.The effect of second main road valve 17 not only can guarantee that mud follows to limit the mud flow in pipeline Loop system operates normally, it is also ensured that mud stroke is as short as possible, and can also prevent mud from flowing into the brill for being in off working state In hole stake and pipeline.
In the present embodiment, two the second main road valves 17, one of them is located at flat from the drilling of detritus tank 3 relatively far away from On the first slurry pipe 11 between platform 13 and mud separator 4, another be located at from the drilling platform 13 relatively far away from of detritus tank 3 with On the second slurry pipe 12 between slush pump 9.
Preferably, valve uses regulating valve, can adjust the mud flow rate in pipeline according to the actual situation.
As shown in Fig. 2, in the present embodiment, center mud pit is welded by steel form, it includes one piece of bottom plate 7 and four Block side plate 6.Center mud pit further includes a shifting board 5, and shifting board 5 separates slurrying storehouse 1 and slurry storehouse 2, the compartment 5 top of plate is provided with filter hole.The bottom edge of shifting board 5 is closely connect with bottom plate 7, and the side of shifting board 5 and two block lengths are longer Side plate 6 is vertical and closely connects.Shifting board 5 is divided to for upper and lower two parts, lower part be it is solid, slurrying storehouse 1 and slurry storehouse 2 is thorough It separates;Top is provided with filter hole, so that the mud of part enters in slurry storehouse 2 after filtering on slurrying storehouse 1.Preferably, The top of shifting board 5 accounts for 2/3rds of height, and filter hole part accounts for the one third of height.
Preferably, be respectively arranged at least one supporting steel pipe 8 in slurrying storehouse 1 and slurry storehouse 2, supporting steel pipe 8 perpendicular to The longer side wall setting of center mud pit length.Specifically, supporting steel pipe 8 is set perpendicular to the longer fixation of side plate 6 of two block lengths It sets.Supporting steel pipe 8 can enhance the intensity of center mud pit.In the present embodiment, the supporting steel in slurrying storehouse 1 and slurry storehouse 2 Pipe 8 is respectively one.
As shown in figure 3, in the present embodiment, center mud pit also includes detritus tank 3, detritus tank 3 and 1 phase of slurrying storehouse Neighbour, for 3 height of detritus tank lower than 1 height of slurrying storehouse, the sand export of mud separator 4 is located at 3 top of detritus tank.Mud is passing through mud After starching the processing of separator 4, the sandstone in mud reaches in detritus tank 3 by the sand export of mud separator 4, remaining mud portion The grout outlet that lease making crosses mud separator 4 is fallen into slurrying storehouse 1.
Preferably, the first slurry pipe 11 isSeamless steel pipe, second slurry pipe 12 isIt is seamless Steel pipe.
The working principle of the embodiment of the present invention is as follows:
As shown in Figure 1, there are two drilling platforms in the present embodiment, the first slurry pipe 11 and the second slurry 12 both ends of pipe are reserved There is certain length, in case other drilling platforms that connection is likely to occur.In the embodiment, the first slurry pipe 11 and the second 12 liang of pipe of slurry Four first main road valves 16 at end are constantly in closed state.
During mud circulation, most start to need to make a small amount of mud, slush pump 9 in slurry storehouse 1 using loess The mud is drawn in the drilled pile for preparing construction, starts to drill.Mud is mainly used for cooling drill bit, lubrication drilling tool herein, Increase hydrostatic pressure, and prevents the hole that collapses.
When only in running order close to the drilling platform 13 of detritus tank 3, close to two branch of the drilling platform 13 Road valve 15 is opened, and two the second main road valves 17 are closed.
When only in running order from the drilling platform 13 of detritus tank 3 relatively far away from, close to the drilling platform 13 Two branch road valves 15 are opened, and two the second main road valves 17 are opened, close to two branch road valves of another drilling platform 13 15 close.
When two drilling platforms 13 all at work, four branch road valves 15 and two the second main road valves 17 are opened.
When mud starts the cycle over, the mud in drilled pile is extracted out by gravel pump 10, reaches mud point from the first slurry pipe 11 From device 4.After handling by mud separator 4, it is heavy that the sandstone in mud is reached mud by the sand export of mud separator 4 In slag bath 3, remaining slurry content flows into slurrying storehouse 1 by the grout outlet of mud separator 4.The sandstone of mud in slurrying storehouse 1 Part starts to deposit, and is flowed into slurry storehouse 2 containing the less mud of sand by the filter hole on 5 top of shifting board, in slurry storehouse 2 Mud extracted out by slush pump 9, from second slurry pipe 12 be back in drilled pile.
As mud circulating system is constantly run, the mud in slurrying storehouse 1 and slurry storehouse 2 can be more and more, in detritus tank 3 Sandstone also can be more and more, when reach storage side amount when, periodic cleaning.
In the process, which connects all drilling platforms 13 by pipe-line system and center mud pit It picks up and, the mud in drilled pile passes through pipe influx into slurrying storehouse 1 by the extraction of gravel pump 10, it is no longer necessary in each drilling A center mud pit is made beside platform 13, can greatly save the cost of manufacture of center mud pit;Simultaneously in work progress In, without considering the problems of that mud transports daily, while regardless of transport when clean the problem of, not only effectively increase pile foundation Construction efficiency also meets the civilized construction requirement that owner emphasizes.
The mud of the mud circulating system can be recycled for multiple times, it is no longer necessary to which a large amount of loess carries out slurrying, shortens The time of slurrying and borehole cleaning, the access times of mud is improved, material cost is reduced.
The center mud pit design side amount of the mud circulating system is larger, has the function of deposit mud, in work progress In, when mud side's amount has exceeded the reserve capabillity of center mud pit, just needs to coordinate mud outward transport, reduce mud outward transport vehicle Number, reduce transportation cost, and achieved the effect that energy-saving and emission-reduction.
The present invention is not limited to the above-described embodiments, for those skilled in the art, is not departing from Under the premise of the principle of the invention, several improvements and modifications can also be made, these improvements and modifications are also considered as protection of the invention Within the scope of.The content being not described in detail in this specification belongs to the prior art well known to professional and technical personnel in the field.

Claims (10)

1. a kind of mud circulating system for drilled pile construction characterized by comprising
Drilling platform (13) is fixedly installed with gravel pump (10) in the drilled pile of the drilling platform (13);
Center mud pit, it includes slurrying storehouse (1) and slurry storehouse (2), the slurrying storehouse (1) is close to upper surface location and the storage Pulp bin (2) connection, slurrying storehouse (1) top are equipped with mud separator (4), are equipped with slush pump in the slurry storehouse (2) (9);
Pipe-line system, connects the drilling platform (13) and center mud pit, and pipe-line system includes that the first slurry manages (11), second Slurry pipe (12) and connecting tube (14);The gravel pump (10) and mud separator (4) are parallel to first by connecting tube (14) Slurry pipe (11), the slush pump (9) and drilled pile are parallel to the second slurry pipe (12) by connecting tube (14);The first slurry pipe (11), multiple valves are provided in the second slurry pipe (12) and connecting tube (14);
When mud circulating system operation, the mud in drilled pile is extracted out by gravel pump (10), reaches mud from the first slurry pipe (11) Slurry separator (4) flows into slurrying storehouse (1);Mud in slurry storehouse (2) is extracted out by slush pump (9), is flowed from the second slurry pipe (12) Enter drilled pile.
2. a kind of mud circulating system for drilled pile construction as described in claim 1, it is characterised in that: when mud recycles System run when, part valve opening, make gravel pump (10) between mud separator (4) pipeline and slush pump (9) arrive Pipeline connection between drilled pile;The closing of remaining valve closes remaining pipeline.
3. a kind of mud circulating system for drilled pile construction as claimed in claim 2, it is characterised in that: drilling platform (13) connecting tube (14) and each drilling platform (13) of gravel pump (10) and the first slurry pipe (11) manage (12) with the second slurry Connecting tube (14) on be equipped with a branch road valve (15).
4. a kind of mud circulating system for drilled pile construction as claimed in claim 3, it is characterised in that: first slurry The both ends of pipe (11) and the second slurry pipe (12) are respectively equipped with the first main road valve (16), and all drilling platforms (13) are connected in parallel on both ends The first main road valve (16) between, first slurry pipe (11) and second slurry pipe (12) two the first main road valves (16) between go back It is respectively equipped with a second main road valve (17).
5. a kind of mud circulating system for drilled pile construction as described in claim 1, it is characterised in that: the centre mud Stock tank also includes detritus tank (3), and the detritus tank (3) is adjacent with slurrying storehouse (1), and detritus tank (3) is highly lower than slurrying storehouse (1) Highly, the sand export of the mud separator (4) is located above detritus tank (3).
6. a kind of mud circulating system for drilled pile construction as described in claim 1, it is characterised in that: the centre mud Stock tank further includes the shifting board (5) for separating slurrying storehouse (1) and slurry storehouse (2), and shifting board (5) top is provided with filtering Hole.
7. a kind of mud circulating system for drilled pile construction as described in claim 1, it is characterised in that: the slurrying storehouse (1) and in slurry storehouse (2) it is respectively arranged at least one supporting steel pipe (8), the supporting steel pipe (8) is perpendicular to center mud pit The longer side wall setting of length.
8. a kind of mud circulating system for drilled pile construction as described in claim 1, it is characterised in that: the drilling is flat Platform (13) is two, and it is intermediate that the center mud pit is located at two drilling platforms (13).
9. a kind of mud circulating system for drilled pile construction as described in claim 1-8 any one, it is characterised in that: First slurry manages (11) and isSeamless steel pipe, it is described second slurry pipe (12) isSeamless steel Pipe.
10. a kind of mud circulating system for drilled pile construction as described in claim 1-8 any one, feature exist In: the center mud pit is welded by steel form, and the valve uses regulating valve.
CN201910459315.5A 2019-05-29 2019-05-29 Slurry circulation system for bored pile construction Active CN110080705B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910459315.5A CN110080705B (en) 2019-05-29 2019-05-29 Slurry circulation system for bored pile construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910459315.5A CN110080705B (en) 2019-05-29 2019-05-29 Slurry circulation system for bored pile construction

Publications (2)

Publication Number Publication Date
CN110080705A true CN110080705A (en) 2019-08-02
CN110080705B CN110080705B (en) 2024-06-25

Family

ID=67422567

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910459315.5A Active CN110080705B (en) 2019-05-29 2019-05-29 Slurry circulation system for bored pile construction

Country Status (1)

Country Link
CN (1) CN110080705B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111042137A (en) * 2019-12-18 2020-04-21 付志成 Underground pilot tunnel construction mud circulation system
CN112302552A (en) * 2020-09-18 2021-02-02 海洋石油工程股份有限公司 Treatment method for recycling slurry
CN113404453A (en) * 2021-08-03 2021-09-17 中国港湾工程有限责任公司 Mud preparation and circulation piece-rate system
CN113565458A (en) * 2021-07-22 2021-10-29 民航机场建设工程有限公司 Pile foundation slurry circulation and zero discharge system and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4474254A (en) * 1982-11-05 1984-10-02 Etter Russell W Portable drilling mud system
US20140021114A1 (en) * 2012-07-19 2014-01-23 R2S Solutions, Llc Drilling mud cleaning and recirculating system and vehicle formed therewith
CN205605146U (en) * 2016-03-18 2016-09-28 温州宏源水电建设有限公司 Ecological utilization and processing system of drilling bored concrete pile mud
CN205712079U (en) * 2016-05-23 2016-11-23 中建三局第二建设工程有限责任公司 A kind of reusable circulation product mud sizing device
CN206785331U (en) * 2017-06-02 2017-12-22 宁波易通建设有限公司 A kind of rig for campshed of constructing
CN210152587U (en) * 2019-05-29 2020-03-17 中铁大桥局集团第五工程有限公司 A mud circulation system for bored pile construction

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4474254A (en) * 1982-11-05 1984-10-02 Etter Russell W Portable drilling mud system
US20140021114A1 (en) * 2012-07-19 2014-01-23 R2S Solutions, Llc Drilling mud cleaning and recirculating system and vehicle formed therewith
CN205605146U (en) * 2016-03-18 2016-09-28 温州宏源水电建设有限公司 Ecological utilization and processing system of drilling bored concrete pile mud
CN205712079U (en) * 2016-05-23 2016-11-23 中建三局第二建设工程有限责任公司 A kind of reusable circulation product mud sizing device
CN206785331U (en) * 2017-06-02 2017-12-22 宁波易通建设有限公司 A kind of rig for campshed of constructing
CN210152587U (en) * 2019-05-29 2020-03-17 中铁大桥局集团第五工程有限公司 A mud circulation system for bored pile construction

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111042137A (en) * 2019-12-18 2020-04-21 付志成 Underground pilot tunnel construction mud circulation system
CN112302552A (en) * 2020-09-18 2021-02-02 海洋石油工程股份有限公司 Treatment method for recycling slurry
CN113565458A (en) * 2021-07-22 2021-10-29 民航机场建设工程有限公司 Pile foundation slurry circulation and zero discharge system and method
CN113404453A (en) * 2021-08-03 2021-09-17 中国港湾工程有限责任公司 Mud preparation and circulation piece-rate system
CN113404453B (en) * 2021-08-03 2022-07-29 中国港湾工程有限责任公司 Mud preparation and circulation piece-rate system
WO2023010725A1 (en) * 2021-08-03 2023-02-09 中国港湾工程有限责任公司 Mud preparation and circulation separation system

Also Published As

Publication number Publication date
CN110080705B (en) 2024-06-25

Similar Documents

Publication Publication Date Title
CN110080705A (en) A kind of mud circulating system for drilled pile construction
CN208792969U (en) Coal mine hydraulic slag discharging drilling orifice blowout prevention buffered device
CN204457515U (en) A kind of bored pile mud circulation treatment system
CN109629561A (en) A kind of high trestle operation platform reacting cycle pile system of clean and environmental protection
CN201058939Y (en) Water-saving device of laundry apparatus
CN107794954A (en) A kind of anti-floating sluicing pressure relief
CN210152587U (en) A mud circulation system for bored pile construction
CN204645011U (en) One-sided Main Corridor road-horizontal gallery-topmast hole ship lock dispersed delivery system
CN107354949B (en) Cyclic utilization system for the Metro station excavation water resource close to high slope
CN206131521U (en) Earth source heat pump is with well system of recharging
CN2893131Y (en) Sand flushing packer
CN110374124B (en) Subway construction drainage system
CN107165673A (en) A kind of buried Underwater Traffic Tunnel waste water Fractional Collections grading, lifting construction of Mining Method
CN209483248U (en) Boring mud deposit box for high trestle operation platform reacting cycle pile system
CN207286917U (en) One kind is used for sewage water filtration dregs quick treatment device in shield-tunneling construction
CN206972293U (en) Carbonated drink slag separator box with cinder function of weighing
CN106498936B (en) A kind of cast-in-situ bored pile mud desanding system
CN105804124B (en) Underground engineering gushes hydraulic pressure control method with protrusion-dispelling
CN211692357U (en) Multifunctional efficient cleaning pool
CN209398382U (en) A kind of mud circulation technology system
CN211285727U (en) Shaft type underground space capable of adjusting water buoyancy
CN209293715U (en) A kind of Drilling by inverse circulation mud circulating system
CN206889021U (en) A kind of buried Underwater Traffic Tunnel waste water Fractional Collections grading, lifting construction of Mining Method
CN207582645U (en) A kind of rain collector based on sponge city
CN208183719U (en) A kind of closed drainage pipe-line system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant