CN110078169A - A kind of vanadium extraction plant area zero emission method of wastewater - Google Patents

A kind of vanadium extraction plant area zero emission method of wastewater Download PDF

Info

Publication number
CN110078169A
CN110078169A CN201910498077.9A CN201910498077A CN110078169A CN 110078169 A CN110078169 A CN 110078169A CN 201910498077 A CN201910498077 A CN 201910498077A CN 110078169 A CN110078169 A CN 110078169A
Authority
CN
China
Prior art keywords
water
waste water
wastewater
zero
emission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910498077.9A
Other languages
Chinese (zh)
Inventor
王雪刚
黄世礼
何向东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengyu Vanadium Titanium Science and Technology Co Ltd
Chengyu Tranvic Science and Technology Co Ltd
Original Assignee
Chengyu Tranvic Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengyu Tranvic Science and Technology Co Ltd filed Critical Chengyu Tranvic Science and Technology Co Ltd
Priority to CN201910498077.9A priority Critical patent/CN110078169A/en
Publication of CN110078169A publication Critical patent/CN110078169A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/40Devices for separating or removing fatty or oily substances or similar floating material
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/52Treatment of water, waste water, or sewage by flocculation or precipitation of suspended impurities
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/02Arrangement of sewer pipe-lines or pipe-line systems
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2103/00Nature of the water, waste water, sewage or sludge to be treated
    • C02F2103/16Nature of the water, waste water, sewage or sludge to be treated from metallurgical processes, i.e. from the production, refining or treatment of metals, e.g. galvanic wastes
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2301/00General aspects of water treatment
    • C02F2301/06Pressure conditions
    • C02F2301/066Overpressure, high pressure
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2301/00General aspects of water treatment
    • C02F2301/08Multistage treatments, e.g. repetition of the same process step under different conditions

Abstract

The present invention relates to technical field of waste water processing, and disclose a kind of vanadium extraction plant area zero emission method of wastewater, the following steps are included: general pipeline is laid with, the general pipeline of a wastewater collection along the river installation near vanadium extraction doorway → river bank water plant → steel rolling bridge → steel-making bridge → ironmaking bridge → sanitary sewage disposal station location is completed.The vanadium extraction plant area zero emission method of wastewater, by completing the general pipeline of a wastewater collection along the river installation near vanadium extraction doorway → river bank water plant → steel rolling bridge → steel-making bridge → ironmaking bridge → sanitary sewage disposal station location, then increase by six sets of chemistry and go out oil sump, and gradual perfection water treatment facility and pipe network system, special steel zero-emission water treatment system and wastewater comprehensive treatment system are set simultaneously, so that this method is when implementing, it is supported with good facility, not only increase the processing capacity to waste water, it goes to river without obvious production waste water, also make collection of the plant area to waste water, processing and balance use process are steady, it is controlled.

Description

A kind of vanadium extraction plant area zero emission method of wastewater
Technical field
The present invention relates to technical field of waste water processing, specially a kind of vanadium extraction plant area zero emission method of wastewater.
Background technique
Vanadium is silvery white non-ferrous metal, and fusing point is very high, often with niobium, tantalum, tungsten and molybdenum and referred to as refractory metal, has ductility, matter is hard Firmly, nonmagnetic, the ability with resistance to hydrochloric acid and sulfuric acid, and vanadium can generate a large amount of waste water, simultaneously during producing extraction Also a large amount of waste water can be generated inside vanadium extraction plant area, if these direct discharging of waste water to Ha Noi not only would seriously pollute the environment, Can also certain fixed effect be caused to the health of people.
Present vanadium extraction plant area is incomplete to the processing method of waste water, and on-site not only has obvious waste water to be discharged into Ha Noi, It is all incomplete to the processing, collection and equilibrium process of waste water, vanadium extracting waste water can not be handled well, so propose one kind Vanadium extraction plant area zero emission method of wastewater.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of vanadium extraction plant area zero emission method of wastewater, have without obvious Production waste water go to river, and the collection to waste water, processing and balance use process it is steady, controlled the advantages that, solve present Vanadium extraction plant area is incomplete to the processing method of waste water, and on-site not only has obvious waste water to be discharged into Ha Noi, processing, receipts to waste water The problem of collection and equilibrium process are all incomplete, can not handle vanadium extracting waste water very well.
(2) technical solution
Go to river to realize that above-mentioned nothing obviously produces waste water, and the collection to waste water, processing and balance use process it is steady, Controlled purpose, the invention provides the following technical scheme: a kind of vanadium extraction plant area zero emission method of wastewater, comprising the following steps:
1) general pipeline be laid with: complete one from vanadium extraction doorway → river bank water plant → steel rolling bridge → steel-making bridge → ironmaking bridge → The general pipeline of wastewater collection along the river installation near sanitary sewage disposal station location;
2) system and facility setting: first increase by six sets chemistry go out oil sumps, and gradual perfection water treatment facility with Pipe network system, while special steel zero-emission water treatment system and wastewater comprehensive treatment system are set;
3) waste water recycling device: ironmaking, steel-making, steel rolling, vanadium extraction subsidiary factory's gradual perfection inside zero-emission related to power etc. Facility, subsidiary factory's process it is extra can not the waste water of balanced use pass through corresponding internal zero-emission and collect pond and water pump pressurization input The total pipe network system of wastewater collection is finally recovered to special steel zero-emission water treatment system and is handled;
4) wastewater treatment recycles: being recovered to the waste water of special steel zero-emission water treatment system processing, uses back after processing It takes out blowback and is extracted into head-tank, then supplied water and conveyed by production water supply pipe network system, it is final to meet related subsidiary factory and concerned process steps Repetition, recycle;
5) waste water balances: carrying out management and running, it is ensured that head-tank water level balance, head-tank are not in turn over regimen Condition;
6) plant area manages: related subsidiary factory being guided to improve cycles of concentration, water in series, waste water reclaiming, repair system bypass The water systems facility such as filter reinforces site inspection, supervision and management, forbids each subsidiary factory that waste water is discharged into Ha Noi.
Preferably, the caliber of the wastewater collection general pipeline is dn300mm, and the length of wastewater collection general pipeline is no less than 2438 Rice, the volume of head-tank are 3000 cubic metres.
(3) beneficial effect
Compared with prior art, the present invention provides a kind of vanadium extraction plant area zero emission method of wastewater, have following beneficial to effect Fruit:
1, vanadium extraction plant area zero emission method of wastewater, by completing one from vanadium extraction doorway → river bank water plant → steel rolling The general pipeline of wastewater collection along the river installation near bridge → steel-making bridge → ironmaking bridge → sanitary sewage disposal station location, then increases by six sets Chemistry goes out oil sump, and gradual perfection water treatment facility and pipe network system, while special steel zero-emission water treatment system is arranged And wastewater comprehensive treatment system, so that this method when implementing, there is good facility to be supported, and wastewater collection is total Pipe can collect waste water in time, and various related facilities are connected, so that the concentration to waste water of being more convenient for, processing and scheduling, special Steel zero-emission water treatment system and wastewater comprehensive treatment system can reinforce the treatment effect to waste water, so that the processing to waste water It is more convenient, and the caliber of wastewater collection general pipeline is dn300mm, the length of wastewater collection general pipeline is no less than 2438 meters, so that useless Water, which collects general pipeline, has good wastewater collection ability and stronger waste water transport capacity, passes through ironmaking, steel-making, steel rolling, vanadium extraction Zero-emission facility inside subsidiary factory related to power etc. gradual perfection, subsidiary factory's process it is extra can not the waste water of balanced use pass through correspondence Inside zero-emission collect pond and the water pump pressurization input total pipe network system of wastewater collection, be finally recovered to special steel zero-emission and discharge water place Reason system is handled, and the waste water that produces produced inside each subsidiary factory of entire vanadium extraction plant area has all been carried out zero discharge treatment, and Extra Waste Water Centralized collection is handled, it is more preferable to the treatment effect of waste water.
2, vanadium extraction plant area zero emission method of wastewater, by the waste water that will be recovered to the processing of special steel zero-emission water treatment system It is extracted into head-tank with pumpback blowback after processing, then is supplied water and is conveyed by production water supply pipe network system, it is final to meet related point The repetition of factory and concerned process steps recycles, so that waste water can continue to be recycled by plant area after treatment, avoids resource Waste, not only further reduce the discharge of waste water, and effective protection environment also adds the recycling rate of waterused of water resource, subtracts The introduction for having lacked water resource, further protects water resource, by carrying out management and running, it is ensured that and head-tank water level balance is high Position pond is not in turn over regimen condition, can avoid waste water and is overflowed by the top of head-tank, is arranged so as to avoid the accident of waste water It puts, and the volume of head-tank is 3000 cubic metres, has biggish wastewater collection ability, reduces the possibility of waste water spilling, By guiding related subsidiary factory to improve cycles of concentration, water in series, the water systems such as waste water reclaiming, repair system bypass strainer are set It applies, reinforces site inspection, supervision and management, forbid each subsidiary factory that waste water is discharged into Ha Noi, the place to waste water can be further increased Reason ability is not only gone to river without obvious production waste water, also make plant area to the collection of waste water, processing and balance use process it is steady, It is controlled, it has been finally reached the purpose of zero-emission, has protected environment, so that the water quality near plant area is improved.
Specific embodiment
Below in conjunction with the embodiment of the present invention, technical solution in the embodiment of the present invention is clearly and completely retouched It states, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based on the present invention In embodiment, every other implementation obtained by those of ordinary skill in the art without making creative efforts Example, shall fall within the protection scope of the present invention.
A kind of embodiment one: vanadium extraction plant area zero emission method of wastewater, comprising the following steps:
1) general pipeline be laid with: complete one from vanadium extraction doorway → river bank water plant → steel rolling bridge → steel-making bridge → ironmaking bridge → The general pipeline of wastewater collection along the river installation near sanitary sewage disposal station location;
2) system and facility setting: first increase by six sets chemistry go out oil sumps, and gradual perfection water treatment facility with Pipe network system, while special steel zero-emission water treatment system and wastewater comprehensive treatment system are set;
3) waste water recycling device: ironmaking, steel-making, steel rolling, vanadium extraction subsidiary factory's gradual perfection inside zero-emission related to power etc. Facility, subsidiary factory's process it is extra can not the waste water of balanced use pass through corresponding internal zero-emission and collect pond and water pump pressurization input The total pipe network system of wastewater collection is finally recovered to special steel zero-emission water treatment system and is handled;
4) wastewater treatment recycles: being recovered to the waste water of special steel zero-emission water treatment system processing, uses back after processing It takes out blowback and is extracted into head-tank, then supplied water and conveyed by production water supply pipe network system, it is final to meet related subsidiary factory and concerned process steps Repetition, recycle;
5) waste water balances: carrying out management and running, it is ensured that head-tank water level balance, head-tank are not in turn over regimen Condition;
6) plant area manages: related subsidiary factory being guided to improve cycles of concentration, water in series, waste water reclaiming, repair system bypass The water systems facility such as filter reinforces site inspection, supervision and management, forbids each subsidiary factory that waste water is discharged into Ha Noi.
The caliber of wastewater collection general pipeline is dn300mm, and the length of wastewater collection general pipeline is no less than 2438 meters, head-tank Volume is 3000 cubic metres.
A kind of embodiment two: vanadium extraction plant area zero emission method of wastewater, comprising the following steps:
1) general pipeline be laid with: complete one from vanadium extraction doorway → river bank water plant → steel rolling bridge → steel-making bridge → ironmaking bridge → The general pipeline of wastewater collection along the river installation near sanitary sewage disposal station location;
2) system and facility setting: first increase by six sets chemistry go out oil sumps, and gradual perfection water treatment facility with Pipe network system, while special steel zero-emission water treatment system and wastewater comprehensive treatment system are set;
3) waste water recycling device: ironmaking, steel-making, steel rolling, vanadium extraction subsidiary factory's gradual perfection inside zero-emission related to power etc. Facility, subsidiary factory's process it is extra can not the waste water of balanced use pass through corresponding internal zero-emission and collect pond and water pump pressurization input The total pipe network system of wastewater collection is finally recovered to special steel zero-emission water treatment system and is handled;
4) wastewater treatment recycles: being recovered to the waste water of special steel zero-emission water treatment system processing, uses back after processing It takes out blowback and is extracted into head-tank, then supplied water and conveyed by production water supply pipe network system, it is final to meet related subsidiary factory and concerned process steps Repetition, recycle;
5) waste water balances: carrying out management and running, it is ensured that head-tank water level balance, head-tank are not in turn over regimen Condition;
6) plant area manages: related subsidiary factory being guided to improve cycles of concentration, water in series, waste water reclaiming, repair system bypass The water systems facility such as filter reinforces site inspection, supervision and management, forbids each subsidiary factory that waste water is discharged into Ha Noi.
The caliber of wastewater collection general pipeline is dn300mm, and the length of wastewater collection general pipeline is no less than 2438 meters, head-tank Volume is 3000 cubic metres.
A kind of embodiment three: vanadium extraction plant area zero emission method of wastewater, comprising the following steps:
1) general pipeline be laid with: complete one from vanadium extraction doorway → river bank water plant → steel rolling bridge → steel-making bridge → ironmaking bridge → The general pipeline of wastewater collection along the river installation near sanitary sewage disposal station location;
2) system and facility setting: first increase by six sets chemistry go out oil sumps, and gradual perfection water treatment facility with Pipe network system, while special steel zero-emission water treatment system and wastewater comprehensive treatment system are set;
3) waste water recycling device: ironmaking, steel-making, steel rolling, vanadium extraction subsidiary factory's gradual perfection inside zero-emission related to power etc. Facility, subsidiary factory's process it is extra can not the waste water of balanced use pass through corresponding internal zero-emission and collect pond and water pump pressurization input The total pipe network system of wastewater collection is finally recovered to special steel zero-emission water treatment system and is handled;
4) wastewater treatment recycles: being recovered to the waste water of special steel zero-emission water treatment system processing, uses back after processing It takes out blowback and is extracted into head-tank, then supplied water and conveyed by production water supply pipe network system, it is final to meet related subsidiary factory and concerned process steps Repetition, recycle;
5) waste water balances: carrying out management and running, it is ensured that head-tank water level balance, head-tank are not in turn over regimen Condition;
6) plant area manages: related subsidiary factory being guided to improve cycles of concentration, water in series, waste water reclaiming, repair system bypass The water systems facility such as filter reinforces site inspection, supervision and management, forbids each subsidiary factory that waste water is discharged into Ha Noi.
The caliber of wastewater collection general pipeline is dn300mm, and the length of wastewater collection general pipeline is no less than 2438 meters, head-tank Volume is 3000 cubes.
The beneficial effects of the present invention are: the vanadium extraction plant area zero emission method of wastewater, by complete one from vanadium extraction doorway → Wastewater collection along the river near river bank water plant → steel rolling bridge → steel-making bridge → ironmaking bridge → sanitary sewage disposal station location is total Then pipe installation increases by six sets of chemistry and goes out oil sump, and gradual perfection water treatment facility and pipe network system, while spy is arranged Steel zero-emission water treatment system and wastewater comprehensive treatment system so that this method implement when, have good facility into Row support, and wastewater collection general pipeline can collect waste water in time, and various related facilities are connected, to be more convenient for waste water It concentrates, processing and scheduling, special steel zero-emission water treatment system and wastewater comprehensive treatment system can reinforce the effect of the processing to waste water Fruit, so that the processing to waste water is more convenient, and the caliber of wastewater collection general pipeline is dn300mm, the length of wastewater collection general pipeline No less than 2438 meters, so that wastewater collection general pipeline has good wastewater collection ability and stronger waste water transport capacity, pass through Ironmaking, steel-making, steel rolling, vanadium extraction subsidiary factory's gradual perfection inside zero-emission facility related to power etc., subsidiary factory's process is extra to put down The waste water utilized that weighs collects pond and the water pump pressurization input total pipe network system of wastewater collection by corresponding internal zero-emission, finally It is recovered to special steel zero-emission water treatment system to be handled, produces waste water all for produced inside each subsidiary factory of entire vanadium extraction plant area Zero discharge treatment has been carried out, and extra Waste Water Centralized collection has been handled, it is more preferable to the treatment effect of waste water, by that will be recovered to The waste water of special steel zero-emission water treatment system processing is extracted into head-tank with pumpback blowback after processing, then passes through production water supply pipe The conveying of net system water supply, the final repetition for meeting related subsidiary factory and concerned process steps recycle, so that waste water after treatment can Continuation is recycled by plant area, avoids the wasting of resources, not only further reduce the discharge of waste water, effective protection environment, The recycling rate of waterused for also adding water resource reduces the introduction of water resource, further protects water resource, by carrying out scheduling Management, it is ensured that head-tank water level balance, head-tank are not in turn over regimen condition, can avoid waste water by the top of head-tank It overflows, so as to avoid the accidental discharge of waste water, and the volume of head-tank is 3000 cubic metres, has biggish wastewater collection Ability reduces the possibility of waste water spilling, and by guiding related subsidiary factory to improve cycles of concentration, water in series, waste water reclaiming is repaired The water systems facility such as complex system bypass strainer reinforces site inspection, supervision and management, forbids each subsidiary factory that waste water is discharged into river It is interior, the processing capacity to waste water can be further increased, not only goes to river without obvious production waste water, also makes plant area to the receipts of waste water Collection, processing and balance use process are steady, controlled, have been finally reached the purpose of zero-emission, have protected environment, so that near plant area Water quality be improved, solve that present vanadium extraction plant area is incomplete to the processing method of waste water, and on-site not only has obviously Waste water is discharged into Ha Noi, all incomplete to the processing, collection and equilibrium process of waste water, can not handle asking for vanadium extracting waste water very well Topic.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (2)

1. a kind of vanadium extraction plant area zero emission method of wastewater, which comprises the following steps:
1) general pipeline is laid with: completing one from vanadium extraction doorway → river bank water plant → steel rolling bridge → steel-making bridge → ironmaking bridge → life The general pipeline of wastewater collection along the river installation near sewage treatment station location;
2) system and facility setting: increase by six sets of chemistry first and go out oil sump, and gradual perfection water treatment facility and pipe network System, while special steel zero-emission water treatment system and wastewater comprehensive treatment system are set;
3) waste water recycling device: ironmaking, steel-making, steel rolling, vanadium extraction subsidiary factory's gradual perfection inside zero-emission facility related to power etc., Subsidiary factory's process it is extra can not the waste water of balanced use pass through corresponding internal zero-emission and collect pond and water pump pressurization input waste water Total pipe network system is collected, special steel zero-emission water treatment system is finally recovered to and is handled;
4) wastewater treatment recycles: being recovered to the waste water of special steel zero-emission water treatment system processing, is pumped after processing with pumpback Pumpback is to head-tank, then is supplied water and conveyed by production water supply pipe network system, the final weight for meeting related subsidiary factory and concerned process steps Again, it recycles;
5) waste water balances: carrying out management and running, it is ensured that head-tank water level balance, head-tank are not in turn over regimen condition;
6) plant area manages: related subsidiary factory being guided to improve cycles of concentration, water in series, waste water reclaiming, repair system by-passing filter The water systems facility such as device reinforces site inspection, supervision and management, forbids each subsidiary factory that waste water is discharged into Ha Noi.
2. a kind of vanadium extraction plant area zero emission method of wastewater according to claim 1, it is characterised in that: the wastewater collection is total The caliber of pipe is dn300mm, and the length of wastewater collection general pipeline is no less than 2438 meters, and the volume of head-tank is 3000 cubic metres.
CN201910498077.9A 2019-06-10 2019-06-10 A kind of vanadium extraction plant area zero emission method of wastewater Pending CN110078169A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910498077.9A CN110078169A (en) 2019-06-10 2019-06-10 A kind of vanadium extraction plant area zero emission method of wastewater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910498077.9A CN110078169A (en) 2019-06-10 2019-06-10 A kind of vanadium extraction plant area zero emission method of wastewater

Publications (1)

Publication Number Publication Date
CN110078169A true CN110078169A (en) 2019-08-02

Family

ID=67423959

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910498077.9A Pending CN110078169A (en) 2019-06-10 2019-06-10 A kind of vanadium extraction plant area zero emission method of wastewater

Country Status (1)

Country Link
CN (1) CN110078169A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050064993A (en) * 2003-12-24 2005-06-29 재단법인 포항산업과학연구원 Automation system for water quality management of open circulation cooling water
US7335309B1 (en) * 1993-05-25 2008-02-26 Stevenson Sanford M Method for removing metal compounds from waste water
CN101386457A (en) * 2008-10-28 2009-03-18 北京首钢国际工程技术有限公司 Comprehensive recovery and utilization method of various waste waters in iron and steel plant
CN103074503A (en) * 2013-02-27 2013-05-01 老河口市绿华环保科技有限公司 Wastewater zero discharging system and method for vanadium extraction from stone coal
CN204779155U (en) * 2015-06-05 2015-11-18 宿迁南钢金鑫轧钢有限公司 Profile steel producing sewage treatment system
CN105502737A (en) * 2015-12-09 2016-04-20 大唐国际化工技术研究院有限公司 Treatment system and treatment method of wastewater regenerated produced by SCR (Selective Catalytic Reduction) denitration catalyst regeneration
CN106904776A (en) * 2015-12-23 2017-06-30 哈尔滨工大金涛科技股份有限公司 Roasting process for extracting vanadium wastewater treatment equipment
CN107827302A (en) * 2017-09-26 2018-03-23 上海晶宇环境工程股份有限公司 Vanadium-containing water technique of zero discharge and its special purpose device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7335309B1 (en) * 1993-05-25 2008-02-26 Stevenson Sanford M Method for removing metal compounds from waste water
KR20050064993A (en) * 2003-12-24 2005-06-29 재단법인 포항산업과학연구원 Automation system for water quality management of open circulation cooling water
CN101386457A (en) * 2008-10-28 2009-03-18 北京首钢国际工程技术有限公司 Comprehensive recovery and utilization method of various waste waters in iron and steel plant
CN103074503A (en) * 2013-02-27 2013-05-01 老河口市绿华环保科技有限公司 Wastewater zero discharging system and method for vanadium extraction from stone coal
CN204779155U (en) * 2015-06-05 2015-11-18 宿迁南钢金鑫轧钢有限公司 Profile steel producing sewage treatment system
CN105502737A (en) * 2015-12-09 2016-04-20 大唐国际化工技术研究院有限公司 Treatment system and treatment method of wastewater regenerated produced by SCR (Selective Catalytic Reduction) denitration catalyst regeneration
CN106904776A (en) * 2015-12-23 2017-06-30 哈尔滨工大金涛科技股份有限公司 Roasting process for extracting vanadium wastewater treatment equipment
CN107827302A (en) * 2017-09-26 2018-03-23 上海晶宇环境工程股份有限公司 Vanadium-containing water technique of zero discharge and its special purpose device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
环境保护部环境影响评价司: "《战略环境影响评价案例讲评 第3辑》", 30 June 2010, 中国环境科学出版社 *

Similar Documents

Publication Publication Date Title
CN103316907B (en) Heavy-metal-polluted site soil leaching remediation method and device
CN108145522A (en) A kind of machine chip liquid processing device and its processing method
CN100352946C (en) Technique and equipment for processing blast furnace smelting slag
Carneiro et al. Assessing the impacts of uncertain future closure costs when evaluating strategies for tailings management
CN100593873C (en) A discharge, collection and recycling method of the electrolyte of the wasted accumulator
CN110078169A (en) A kind of vanadium extraction plant area zero emission method of wastewater
CN216584551U (en) Slag ladle cooling water circulation system of copper smelting plant
WO2023115840A1 (en) Wastewater circulation system for cemented alloy recovery production line
CN205999413U (en) Pickling sludge drying pelletizing returns AOD furnace system
CN204607581U (en) A kind of acid-restoring plant of lead acid cell
CN208628132U (en) A kind of high pressure water dephosphorization system
CN210419535U (en) Movable shield mud wastewater circulating treatment system
CN112875804A (en) Process for reducing ultrafiltration self-water utilization rate and improving water yield recovery rate
CN204873983U (en) Filter equipment backwash water processing system
CN205979118U (en) Water tank emollient subsides circulation system on line
CN108906897A (en) A kind of high pressure water dephosphorization system
CN203976528U (en) Turbid circulating water treatment system for gas-based shaft kiln directly reduced ironmaking
CN201506736U (en) Clinker and sewage water disposal device
CN207738851U (en) A kind of electrolytic cell of the real-time discharge earth of positive pole
CN105063733B (en) A kind of vertical electroplating production facility
CN108083514A (en) A kind of continuous annealing battery steel hardening filter device and process
CN208406545U (en) A kind of exhaust gas sewage recovering system
CN204470266U (en) A kind of changing food waste slurry slag removing system
CN217811330U (en) Recycling system and mining system are collected to mine initial stage rainwater
CN104773713B (en) The acid-restoring plant and recovery method of a kind of lead-acid accumulator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190802

RJ01 Rejection of invention patent application after publication