CN110075538A - Reversely hung Yong rope exploration equipment - Google Patents
Reversely hung Yong rope exploration equipment Download PDFInfo
- Publication number
- CN110075538A CN110075538A CN201910467901.4A CN201910467901A CN110075538A CN 110075538 A CN110075538 A CN 110075538A CN 201910467901 A CN201910467901 A CN 201910467901A CN 110075538 A CN110075538 A CN 110075538A
- Authority
- CN
- China
- Prior art keywords
- support portion
- pedestal
- equipment
- rope
- explored
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 51
- 239000000725 suspension Substances 0.000 claims abstract description 33
- 239000002023 wood Substances 0.000 claims description 4
- 244000025254 Cannabis sativa Species 0.000 claims description 3
- 235000012766 Cannabis sativa ssp. sativa var. sativa Nutrition 0.000 claims description 3
- 235000012765 Cannabis sativa ssp. sativa var. spontanea Nutrition 0.000 claims description 3
- 235000009120 camo Nutrition 0.000 claims description 3
- 235000005607 chanvre indien Nutrition 0.000 claims description 3
- 239000011487 hemp Substances 0.000 claims description 3
- 229910000831 Steel Inorganic materials 0.000 claims 1
- 239000010959 steel Substances 0.000 claims 1
- 208000027418 Wounds and injury Diseases 0.000 description 2
- 230000006378 damage Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 208000014674 injury Diseases 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 238000003491 array Methods 0.000 description 1
- 230000009194 climbing Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63G—MERRY-GO-ROUNDS; SWINGS; ROCKING-HORSES; CHUTES; SWITCHBACKS; SIMILAR DEVICES FOR PUBLIC AMUSEMENT
- A63G31/00—Amusement arrangements
Landscapes
- Walking Sticks, Umbrellas, And Fans (AREA)
Abstract
This application discloses reversely hung Yong rope exploration equipment, including pedestal, multiple suspension cords, multiple connection components and multiple walking support portions, multiple walking support portions are arranged below pedestal, each walking support portion, which is corresponded, is set to pedestal by suspension cord suspension, and each suspension cord corresponds and is connected to pedestal by connection component;Pedestal is bridge or beam.It is installed below pontic or beam body by directly hanging rope exploration equipment as a result, is not necessarily to independent occupied ground, makes full use of the space below outdoor pontic or beam body.
Description
Technical field
The present invention relates to amusement facility more particularly to reversely hung Yong rope exploration equipment.
Background technique
Existing rope exploration equipment needs special equipment place, needs to set up special frame, to suspension strop
Rope exploration equipment, construction cost are higher.
And the space below existing pontic or building girder is usually vacant, purposes of without nothing special, causes waste.
Summary of the invention
The purpose of the invention is to provide reversely hung Yong rope exploration equipment, solve one in above-mentioned prior art problem
Or it is multiple.
According to an aspect of the present invention, reversely hung Yong rope exploration equipment is provided, including pedestal, multiple suspension cords, more
A connection component and multiple walking support portions, multiple walking support portions are arranged below pedestal, and each walking support portion is equal
It corresponds and pedestal is set to by suspension cord suspension, each suspension cord corresponds and is connected to base by connection component
Seat;Pedestal is bridge or beam.
The present invention is installed below pontic or beam body by directly hanging rope exploration equipment, without individually occupying field
Ground makes full use of the space below outdoor pontic or beam body.
In some embodiments: connection component includes connecting plate and a pair of of supporting element, and a pair of of supporting element is respectively arranged at
Two sides of base, connection board ends are connect with two supporting elements respectively, and suspension cord is connected to connecting plate.As a result, suspension cord and
Walking support portion can be hung by connection component in the case where not destroying pontic or beam body.
In some embodiments: supporting element includes upper support portion, lower support portion and side panel, and upper support portion is set to base
Seat upper side, lower support portion are set to pedestal downside, and side panel is located at pedestal beside, and side panel is separately connected two sides up and down
In upper support portion and lower support portion, connecting plate is connect with lower support portion.Connection component can not destroy pontic or beam body as a result,
In the case where be fixed.
In some embodiments: upper support portion is fixed on pedestal, upper clamping screw and upper support by upper clamping screw
Portion is threadedly coupled.Reinforcement fixation is carried out in the case where not destroying pontic or beam body as a result,.
In some embodiments: stating lower clamping screw and be threadedly coupled between support portion and connecting plate with lower respectively.As a result,
It will be fixedly connected between lower support portion and link plate.
In some embodiments: the array of at least one column is arranged into walking support portion.Thus, it is possible to increase rope
The setting quantity for equipment of exploring, can play for more people.
In some embodiments: walking support portion is plank, the lumps of wood, log or the string bag.Row is trampled for visitor as a result,
It walks, improves the interest played.
In some embodiments: the both ends for support portion of walking pass through suspension cord respectively and are set to pedestal.Thus, it is possible to
Increase the stability of walking support portion suspension.
In some embodiments: suspension cord is wirerope or the rope made of hemp.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the first embodiment of reversely hung Yong rope exploration equipment of the present invention;
Fig. 2 is the structural schematic diagram of the second embodiment of reversely hung Yong rope exploration equipment of the present invention.
Specific embodiment
Illustrate with reference to the accompanying drawing, invention is further described in detail.
The equipment as shown in Figure 1, reversely hung Yong rope is explored, including pedestal 1, multiple suspension cords 2,3 and of multiple connection components
Multiple walking support portions 4, pedestal 1 are bridge or beam, and bridge or beam can be outdoor pontic or building beam body.
Multiple walking support portions 4 are arranged in 1 lower section of pedestal, and plurality of walking support portion 4 can be along the length of pedestal 1
Degree direction or width direction arrangement hang on 1 lower section of pedestal, and in the present embodiment, multiple walking support portions 4 are the length along pedestal 1
The arrangement of degree direction hangs on 1 lower section of pedestal.
In addition, the array of at least one column can be arranged into walking support portion 4, it specifically can be according to bridge or the width of beam
Or length determines, in the present embodiment, walking support portion 4 be that two arrays arranged are arranged into.Thus, it is possible to increase rope
The setting quantity for equipment of exploring, can play for more people, can also more make full use of the space below bridge or beam.
Each walking support portion 4, which is corresponded, is set to pedestal 1 by the suspension of suspension cord 2, and each suspension cord 2 is
It corresponds and pedestal 1 is connected to by connection component 3.
In one embodiment, connection component 3 may include connecting plate 31 and a pair of of supporting element 32, a pair of of supporting element 32
It is arranged in 1 two sides of pedestal respectively, 31 both ends of connecting plate are connect with two supporting elements 32 respectively, and suspension cord 2 can pass through buckle
Or rivet is fixedly connected on connecting plate 31.Suspension cord and walking support portion can not destroy bridge by connection component as a result,
It is hung in the case where body or beam body.
Wherein, supporting element 32 may include upper support portion 33, lower support portion 34 and side panel 35, and upper support portion 33 is attached at
1 upper side of pedestal, lower support portion 34 are attached at 1 downside of pedestal, and side panel 35 is attached at 1 beside of pedestal.
About 35 two sides of side panel are connected to support portion 33 and lower support portion 34, and side panel 35 can be with upper support
Portion 33 is fixedly connected with the integrated molding of lower support portion 34, is also possible to carry out by hinge hingedly, if using hingedly can be square
Just supporting element 32 is arranged in 1 side of pedestal.Connecting plate 31 is fixedly connected with lower support portion 34.Connection component can be not as a result,
It is fixed in the case where destroying pontic or beam body.
Wherein, upper support portion 33 is fixed on pedestal 1, upper clamping screw 36 and upper 33 spiral shell of support portion by upper clamping screw 36
Line connection specifically offers the threaded hole with the cooperation of upper clamping screw 36 on upper support portion 33.Do not destroying bridge as a result,
Reinforcement fixation is carried out in the case where body or beam body.
It is fixed by lower clamping screw 37 between lower support portion 34 and connecting plate 31, lower clamping screw 37 respectively with lower support
It is threadedly coupled between portion 34 and connecting plate 31, specifically, is offered on lower support portion 34 and connecting plate 31 and lower locking screw
The threaded hole that bolt 37 cooperates.It will be fixedly connected between lower support portion and link plate as a result,.
In another embodiment, as shown in Fig. 2, connection component 3 can be bolt and pressing plate, pressing plate is by suspension cord
2 end is pressed in 1 downside of pedestal, then pressing plate is fixed by bolt, can directly be directly anchored to suspension cord 2
The downside of pedestal 1.
Support portion 4 of walking is plank, the lumps of wood, log or the string bag.Walking is trampled for visitor as a result, improves the entertaining played
Property.
The both ends of walking support portion 4 can be set to pedestal 1 by suspension cord 2 respectively.Thus, it is possible to increase walking branch
The stability of support part suspension.
Suspension cord 2 is wirerope or the rope made of hemp.
In addition, preventing trip player from falling injury to swim the safety of player, following several protected modes being used:
It 1, may include sliding rail, pulley and safety line, sliding rail can be fixedly installed in connecting plate 31, and pulley can slide
It is set to sliding rail, safety line upper end is fixedly connected on pulley, and safety line lower end can be tied up in trip player's waist, if trip player
It accidentally falls, safety line can hold trip player, prevent trip player from falling injury.
2, can use longer suspension cord 2 so that walking support portion 4 close to bottom surface, even if thus trip player not
Carefully fall, bottom surface can be slammed with foot, will not fallen.Trip player can also be facilitated to climb up walking support portion 4, conveniently played.
3, the string bag can also be set below walking support portion 4, string bag both sides of the edge can be fixedly connected on by rope
Connecting plate 31 can also fall on the string bag, will not directly fall on ground even if trip player drops down as a result, improve and play
Safety.
In addition, ladder can be set at the both ends of rope exploration equipment, use when the setting of support portion 4 position of walking is higher
In climbing up or step on lower rope exploration equipment.
In conclusion the present invention is installed below pontic or beam body by directly hanging rope exploration equipment, without single
Only occupied ground makes full use of the space below outdoor pontic or beam body.
The above is only one embodiment of the present invention, it is noted that those skilled in the art,
Without departing from the concept of the premise of the invention, some similar deformation and improvement can be made, these also should be regarded as this
Within the protection scope of invention.
Claims (9)
- The equipment 1. reversely hung Yong rope is explored, it is characterised in that: including pedestal (1), multiple suspension cords (2), multiple connection components (3) it is arranged below the pedestal (1) with multiple walking support portions (4), multiple walking support portions (4), Mei Gesuo It states walking support portion (4) one-to-one correspondence to be set to the pedestal (1) by suspension cord (2) suspension, each suspension strop Rope (2), which is corresponded, is connected to the pedestal (1) by the connection component (3);The pedestal (1) is bridge or beam.
- The equipment 2. reversely hung Yong rope according to claim 1 is explored, it is characterised in that: the connection component (3) includes connecting Fishplate bar (31) and a pair of of supporting element (32), a pair of supporting element (32) are respectively arranged at the pedestal (1) two sides, the connection Plate (31) both ends are connect with two supporting elements (32) respectively, and the suspension cord (2) is connected to the connecting plate (31).
- The equipment 3. reversely hung Yong rope according to claim 2 is explored, it is characterised in that: the supporting element (32) includes upper branch Support part (33), lower support portion (34) and side panel (35), the upper support portion (33) are set to the pedestal (1) upper side, institute It states lower support portion (34) and is set to the pedestal (1) downside, the side panel (35) is located at the pedestal (1) beside, institute Stating side panel (35), two sides are connected to the upper support portion (33) and lower support portion (34) up and down, the connecting plate (31) with Lower support portion (34) connection.
- The equipment 4. reversely hung Yong rope according to claim 3 is explored, it is characterised in that: the upper support portion (33) passes through upper Clamping screw (36) is fixed on the pedestal (1), and the upper clamping screw (36) is threadedly coupled with the upper support portion (33).
- The equipment 5. reversely hung Yong rope according to claim 3 is explored, it is characterised in that: the lower support portion (34) with it is described It is fixed by lower clamping screw (37) between connecting plate (31), the lower clamping screw (37) respectively with the lower support portion (34) It is threadedly coupled between connecting plate (31).
- The equipment 6. reversely hung Yong rope according to claim 1 is explored, it is characterised in that: walking support portion (4) arrangement It is arranged to the array of at least one column.
- The equipment 7. reversely hung Yong rope according to claim 1 is explored, it is characterised in that: the walking support portion (4) is wood Plate, the lumps of wood, log or the string bag.
- The equipment 8. reversely hung Yong rope according to claim 1 is explored, it is characterised in that: the two of walking support portion (4) End is set to the pedestal (1) by the suspension cord (2) respectively.
- The equipment 9. reversely hung Yong rope according to claim 1 is explored, it is characterised in that: the suspension cord (2) is steel wire Rope or the rope made of hemp.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910467901.4A CN110075538A (en) | 2019-05-31 | 2019-05-31 | Reversely hung Yong rope exploration equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910467901.4A CN110075538A (en) | 2019-05-31 | 2019-05-31 | Reversely hung Yong rope exploration equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110075538A true CN110075538A (en) | 2019-08-02 |
Family
ID=67422915
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910467901.4A Pending CN110075538A (en) | 2019-05-31 | 2019-05-31 | Reversely hung Yong rope exploration equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110075538A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2311284Y (en) * | 1997-10-08 | 1999-03-24 | 张琳 | Rope threading bar assembling swing |
CN201710950U (en) * | 2010-07-07 | 2011-01-19 | 李明 | Multifunctional indoor lifting swing |
CN203641670U (en) * | 2013-12-27 | 2014-06-11 | 中铁十九局集团电务工程有限公司 | U-shaped fixing device for pipe hanger |
CN106760617A (en) * | 2016-12-13 | 2017-05-31 | 中国二冶集团有限公司 | A kind of inspection platform translation construction method |
CN206792886U (en) * | 2017-06-02 | 2017-12-26 | 李霞 | Quickly test and the combination of exercising device of a set of strength |
CN210096904U (en) * | 2019-05-31 | 2020-02-21 | 上海缘界体育发展有限公司 | Inverted rope exploration equipment |
-
2019
- 2019-05-31 CN CN201910467901.4A patent/CN110075538A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2311284Y (en) * | 1997-10-08 | 1999-03-24 | 张琳 | Rope threading bar assembling swing |
CN201710950U (en) * | 2010-07-07 | 2011-01-19 | 李明 | Multifunctional indoor lifting swing |
CN203641670U (en) * | 2013-12-27 | 2014-06-11 | 中铁十九局集团电务工程有限公司 | U-shaped fixing device for pipe hanger |
CN106760617A (en) * | 2016-12-13 | 2017-05-31 | 中国二冶集团有限公司 | A kind of inspection platform translation construction method |
CN206792886U (en) * | 2017-06-02 | 2017-12-26 | 李霞 | Quickly test and the combination of exercising device of a set of strength |
CN210096904U (en) * | 2019-05-31 | 2020-02-21 | 上海缘界体育发展有限公司 | Inverted rope exploration equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101945159B1 (en) | Double floor cable suspension pedestrian bridge | |
US5330400A (en) | Climbing and play structure | |
US6095950A (en) | Playground equipment comprising upright posts | |
WO2006078174A1 (en) | Device for a gangway | |
KR101442558B1 (en) | A mixed experience equipment | |
CN217300449U (en) | Ladder structure of hack lever bed | |
CA2354292A1 (en) | Method and apparatus for providing lateral support to a post | |
CN110075538A (en) | Reversely hung Yong rope exploration equipment | |
CN210096904U (en) | Inverted rope exploration equipment | |
US5810114A (en) | Scaffolding | |
US6220391B1 (en) | Scaffolding structure | |
US20050161284A1 (en) | Safety device | |
BR0112737B1 (en) | earthquake proof support for escalator or treadmill. | |
CN209780190U (en) | Hanging platform for large-span beam string beam daylighting roof construction | |
CN215057032U (en) | A high altitude construction cat ladder for bridge construction | |
CN203634714U (en) | Child outward training device | |
KR20200112476A (en) | Safety footrest for steel tower passage | |
CN211037737U (en) | Pier shaft protection platform | |
KR100585816B1 (en) | A railing can be regulated height of veranda | |
CN209967664U (en) | String bag bridge | |
CN107724945A (en) | Combine cat ladder | |
KR102151075B1 (en) | Rocking bridge having module type rail and footplate | |
CN207970350U (en) | Escape device for high-rise buildings | |
US3834491A (en) | Rail or truss stairway | |
CN212141459U (en) | Children amusement facility |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |