CN110070417A CN201910318331.2A CN201910318331A CN110070417A CN 110070417 A CN110070417 A CN 110070417A CN 201910318331 A CN201910318331 A CN 201910318331A CN 110070417 A CN110070417 A CN 110070417A
Authority
CN
China
Prior art keywords
order
information
team
unmanned plane
record
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910318331.2A
Other languages
Chinese (zh)
Inventor
江亮亮
江双
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Development Of Aviation Technology (beijing) Co Ltd North Highway
Original Assignee
Development Of Aviation Technology (beijing) Co Ltd North Highway
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Development Of Aviation Technology (beijing) Co Ltd North Highway filed Critical Development Of Aviation Technology (beijing) Co Ltd North Highway
Priority to CN201910318331.2A priority Critical patent/CN110070417A/en
Publication of CN110070417A publication Critical patent/CN110070417A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0601Electronic shopping [e-shopping]
    • G06Q30/0633Lists, e.g. purchase orders, compilation or processing
    • G06Q30/0635Processing of requisition or of purchase orders
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/02Agriculture; Fishing; Mining

Abstract

This disclosure relates to unmanned plane plant protection administrative skill field, specially a kind of agricultural plant protection unmanned plane job management system and method, the system includes background server, background server obtains order information, and order information includes working area and operation time, and carries out order audit according to order information, when order is audited successfully, background server obtains team information, and team information includes work capacity, and pushes order information according to work capacity, working area and operation time.This method includes obtaining order information to carry out order audit, when order is audited successfully, obtains team information, and push order information according to team information.This programme applies to the push in unmanned plane plant protection to order, and order information can be pushed to the team that can complete order using this programme.

Description

Agricultural plant protection unmanned plane job management system and method
Technical field
This disclosure relates to unmanned plane plant protection administrative skill field, specially a kind of agricultural plant protection unmanned plane job management system And method.
Background technique
With the development of unmanned air vehicle technique, the application of unmanned plane is constantly excavated by people, therefore many and nobody also occurs The relevant management platform of machine demand, for example, unmanned plane is applied to the management platform of the plant protection in agricultural plant protection, this plant protection management Platform uploads job requirements by client, and platform issues order according to job requirements, and team checks order and connect on platform It is single.Due to being that platform issues order, all team can check order on platform and carry out order, while in order process In, which can be locked, remaining team cannot connect the order again, thus can exist certain team not with the matched energy of order Power, but the case where still order, occurs, it cannot be by competent team's order so as to cause customer order, while also extending and ordering Single time by success order, the job requirements of client may be delayed.
Summary of the invention
The disclosure is intended to provide a kind of agricultural plant protection unmanned plane job management system and method, can push order information To the team that can complete order.
The disclosure provides a kind of agricultural plant protection unmanned plane job management method, obtains order information and carries out order audit, when When order is audited successfully, team information is obtained, and order information is pushed according to team information.
The technical scheme provided by this disclosed embodiment can include the following benefits: the demand for obtaining client, which is used as, to be ordered Single information, order information include the necessary informations such as contact details, working area, operation time, job requirements, to order information into Row audit, whether the main necessary information audited in order information fills in completely, such as contact details, when being convenient for team's order, It is contacted with client, understands whether client has special requirement, determine whether order.When order is audited successfully, obtain The team information of all team is taken, team information includes unmanned plane quantity, flies hand quantity and factory work logging etc., passes through the group The team information and order information of team judge that can the team complete the order, if can complete, push this to the team and order Order information is pushed to the team that can complete order to realize by single information.
Optionally, order information includes working area and operation time, and team information includes work capacity, according to work surface Long-pending and operation time matches work capacity, when successful match, pushes order information according to team information.
The utility model has the advantages that being matched according to working area, operation time and work capacity, for example, work capacity is one day 0 to 50 mu is completed, working area is 80 mu, and operation time is two days, then learns needs one day according to working area, operation time 40 mu are completed, and work capacity is to complete within one day 0 to 50 mu, which has the ability to complete the order, therefore successful match, to this Team pushes order information.
Optionally, team information includes flying hand information and unmanned machine information, is generated according to winged hand information and unmanned machine information Work capacity.
The utility model has the advantages that the work capacity of team is calculated according to winged hand information and unmanned machine information, flying hand information includes flying Hand personal information and winged hand quantity etc., unmanned plane information includes unmanned plane quantity and unmanned plane parameter etc., if unmanned plane one is heaven-made 20 mu of industry, when winged hand quantity is two people, unmanned plane quantity is two framves, then maximum operation ability is to complete 40 mu in one day;When winged hand Quantity is three people, and unmanned plane quantity is two framves, then maximum operation ability is still to complete 40 mu in one day;Flying hand quantity is two people, nothing Man-machine quantity is three framves, then maximum operation ability is to complete 60 mu in one day, using maximum operation ability as the operation energy of the team Power.
Optionally, team information includes factory work logging, when record has unfinished record in factory work logging, root Work capacity is updated according to unfinished record.
The utility model has the advantages that after team's order success factory work logging will be generated, if team is not timely completed order Unfinished record can be generated, factory work logging is updated, work capacity is updated according to unfinished record.For example, the work of certain team Industry ability is to complete within one day 0 to 60 mu, and order requirements one day of order completes 50 mu, but on time not complete after team's order At operation, then the work capacity of the team is adjusted to 0 to 50 mu, in other words, is only pushed one day to the team later and complete 50 Mu order information below.
Optionally, team information includes factory work logging, when team's order is successful, carries out operation according to order information, And current work situation is generated according to operation, when operation is timely completed, is generated according to current work situation and complete record, and more New job historical record generates unfinished record according to current work situation, and more new job is gone through when operation is not timely completed Records of the Historian record.
The utility model has the advantages that after team's order success, if being timely completed operation, increase in factory work logging one it is new Record is completed, when operation is not timely completed, then increases a unfinished record in factory work logging, regardless of whether on time It fulfils assignment, all needs to update factory work logging, convenient for during order, client can be understood by factory work logging should The case where team, determines whether and the team unity.
Optionally, order information includes the operation deadline, when this operation is finished or reaching the operation deadline, is obtained Existing customer evaluation and confirmation signal terminate order according to confirmation signal, while being evaluated according to existing customer and updating team information.
The utility model has the advantages that when team terminates operation, is finally confirmed an order completion by client, respect client, promote client's Experience sense.Client is obtained simultaneously to evaluate the existing customer of team assignments process, updates team information, convenient for other subsequent visitors Family can understand the case where team by factory work logging, determine whether and the team unity.
The disclosure also provides a kind of agricultural plant protection unmanned plane job management system, including background server, background server Order information is obtained, order information includes working area and operation time, and carries out order audit according to order information, works as order When auditing successfully, background server obtains team information, and team information includes work capacity, and according to work capacity, work surface Long-pending and operation time pushes order information.
Optionally, background server includes record screening module and ability auditing module, team information include job history Record flies hand information and unmanned machine information;
Record screening module screens unfinished record from factory work logging, will when not screening unfinished record Fly hand information and unmanned machine information is sent to ability auditing module, ability auditing module is raw according to winged hand information and unmanned machine information At work capacity, when screening unfinished record, unfinished record is sent to ability auditing module, ability auditing module root Work capacity is updated according to unfinished record.
It optionally, further include at least one first user terminal, when this operation is finished, background server generates operation and completes letter Number, and it is sent to the first user terminal, when the first user terminal receives job complete signal, confirmation signal is obtained, and be sent to backstage Server when background server receives confirmation signal, generates order end signal.
It optionally, further include at least one second user end, background server includes team's update module;
Second user end obtains current work situation when operation, and is sent to background server, and the first user terminal obtains Existing customer evaluation is obtained while confirmation signal, and existing customer evaluation is sent to background server, team's update module When receiving current work situation and existing customer evaluation, team information is updated.
Detailed description of the invention
Fig. 1 is the logic diagram of disclosure agricultural plant protection unmanned plane job management system.
Fig. 2 is the flow chart of disclosure agricultural plant protection unmanned plane job management method.
Specific embodiment
It is further described below by specific embodiment:
Embodiment
Agricultural plant protection unmanned plane job management system, as shown in Fig. 1, including first user terminal, second use Family end and background server, background server include database, record screening module, ability auditing module, team's update module, Client's auditing module, order pushing module, order module and charge book module, database purchase have order requirements and team's letter Breath, team information include flying hand information, unmanned machine information, factory work logging, work capacity and customer evaluation.
First user terminal is used to obtain the order information of client, and is sent to background server, in the present embodiment, order Information includes contact details, working area, operation time and operation deadline.After client's auditing module receives order information, Order requirements are obtained from database, and whether according to order requirements judge order information complete, if completely, generate audit at Function signal, and it is sent to record screening module and ability auditing module, and working area and operation time are sent to ability and examined Core module generates audit failure signal if imperfect, and is sent to the first user terminal.For example, order requirements have name and connection It is mode, if also having name and contact method in order information, audits success, it is on the contrary then audit and fail.
When recording screening module reception audit pass signal, is obtained from database and fly hand quantity, unmanned plane quantity, operation Historical record and work capacity, and unfinished record is screened from factory work logging, when not screening unfinished record, say Bright team order for the first time is timely completed order every time, then records screening module and send winged hand quantity and unmanned plane quantity Ability auditing module is given, when screening unfinished record, then unfinished record is sent to ability auditing module.
When receiving winged hand quantity and unmanned plane quantity, ability auditing module is raw according to winged hand quantity and unmanned plane quantity At or update work capacity, for example, flying hand quantity is two people, unmanned plane quantity is two framves, and a frame unmanned plane one day is maximum to be completed Workload is 20 mu, then calculates by maximal workload, then the maximum operation ability of the team is to complete 40 mu, i.e. masterpiece in one day Industry ability is to complete 0 to 40 mu in one day.When receiving unfinished record, ability auditing module according to unfinished record generate or Update work capacity, for example, the work capacity of certain team is to complete within one day 0 to 60 mu, the order of order illustrate to require one day it is complete At 50 mu, but it is not timely completed operation after team's order, then the work capacity of the team is adjusted to 0 to 50 mu.
Ability auditing module receives working area and operation time, and matches operation according to working area and operation time Ability, for example, 100 mu of working area, operation time two days, then order could be completed by completing 50 mu within one day, if work capacity is 0 It to 60 mu, then matches, if work capacity is 0 to 40 mu, mismatches.Upon a match, ability auditing module generates successful match Signal issues order pushing module, after order pushing module receives successful match signal, obtains hand position signal and team information, and Order information is pushed to second user end according to team information;When mismatching, ability auditing module generates it fails to match signal, And it is sent to record screening module, record screening module receives it fails to match signal, and the work capacity for obtaining another team carries out Matching.
Second user end shows order information, and in team's order, obtains order signal, and be sent to background service Device.Order module receives order signal, obtains team information and order information from database, and according to order information to first User terminal pushes team information.First user terminal shows team information, and when client agrees to, obtains order confirmation signal, and It is sent to background server.Order module receives order confirmation signal, team's order success.
When team starts operation, second user end obtains operation commencing signal, and is sent to background server, operation note The factory work logging of the team is screened after record module reception operation commencing signal from database.When team carries out operation, Second user end obtains current work situation in real time, and is sent to background server, and charge book module receives current work feelings Condition.When team fulfils assignment, second user end obtains job complete signal, and is sent to background server, charge book mould Block receives job complete signal, and is sent to the first user terminal, and current work situation is sent to team's update module.First After user terminal receives job complete signal, confirmation signal and existing customer evaluation are obtained, and be sent to background server.Team is more New module receive confirmation signal, current work situation and existing customer evaluation, and obtain order information the operation deadline and Current time, when current time be more than the operation deadline, illustrate that the team is not timely completed operation, then according to current work feelings Condition and existing customer evaluation generate unfinished record, and update factory work logging, when current time, which is less than operation, to be completed Between, then it generates according to current work situation and existing customer evaluation and completes record, and update factory work logging, while according to true Recognize signal and generate order end signal, order terminates.
Agricultural plant protection unmanned plane job management method based on agricultural plant protection unmanned plane job management system, such as 2 institute of attached drawing Show, obtains order information, order information includes contact details, working area, operation time and operation deadline.
Contact details be customer name, telephone number and contact address, working area be need to carry out operation region it is big It is small, such as 100 mu, operation time is to carry out the time limit of operation, such as need in progress operation in 2 days 2 months to 8 days 2 months, then Operation time is 6 days, and the operation deadline is 8 days 2 months.
Order requirements are obtained, order audit is carried out according to order information and order requirements and is ordered if order information is imperfect Single audit failure, reacquires order information;If order information is complete, order is audited successfully.For example, order requirements have name And contact method audits success if also having name and contact method in order information, it is on the contrary then audit and fail.
After order is audited successfully, team information is obtained, team information includes flying hand information, unmanned machine information, job history Record, work capacity and customer evaluation, flying hand information including winged hand personal information and winged hand quantity, unmanned plane information includes nobody Machine quantity and unmanned plane parameter.After the completion of every subjob, a factory work logging can be generated according to handling situations, one is ordered Single factory work logging, at the end of customer evaluation is order, evaluation of the client to team.
With the presence or absence of unfinished record, (record not being timely completed can be marked as not completing in screening operation historical record Record), unfinished record, then generate according to winged hand quantity and unmanned plane quantity or update work capacity if it does not exist;If it exists Unfinished record then generates according to unfinished record or updates work capacity.
Judge that can work capacity meet order according to working area and operation time, for example, 100 mu of working area, make Industry duration two days, then order could be completed by completing 50 mu within one day, if work capacity is 0 to 60 mu, be met, if work capacity is It 0 to 40 mu, is then unsatisfactory for.If not satisfied, the work capacity for then obtaining the team information of another team is judged;If satisfied, Then order information is pushed to the team.
After pushing order information, judge whether to receive order signal, when receiving order signal, illustrates that team is agreed to Order sends the team information of the team according to order information, judges whether to receive order confirmation signal, is receiving order When confirmation signal, illustrate team's order success.
After team's order success, judge whether to receive operation commencing signal, when receiving operation commencing signal, obtain Current work situation judges whether to receive job complete signal, when receiving job complete signal, to pushes customer operation Complete signal.Judge whether to receive confirmation signal and existing customer evaluation, if receiving confirmation signal and existing customer is commented When valence, the factory work logging of the team is updated according to existing customer evaluation and current work situation.
When receiving job complete signal, current time is obtained, judges whether current time is more than the operation deadline, If being more than, unfinished record is generated according to existing customer evaluation and current work situation, and update team information, if not surpassing It crosses, is then generated according to existing customer evaluation and current work situation and complete record, and update the team information of the team.
Above-described is only embodiment of the disclosure, and the common sense such as well known specific structure and characteristic are not made herein in scheme Excessive description, technical field that the present invention belongs to is all before one skilled in the art know the applying date or priority date Ordinary technical knowledge can know the prior art all in the field, and have using routine experiment hand before the date The ability of section, one skilled in the art can improve and be implemented in conjunction with self-ability under the enlightenment that the application provides This programme, some typical known features or known method should not become one skilled in the art and implement the application Obstacle.It should be pointed out that for those skilled in the art, under the premise of not departing from disclosure structure, can also make Several modifications and improvements out, these also should be considered as the protection scope of the disclosure, these all will not influence the effect of disclosure implementation Fruit and patent practicability.The scope of protection required by this application should be based on the content of the claims, the tool in specification The records such as body embodiment can be used for explaining the content of claim.

Claims (10)

1. agricultural plant protection unmanned plane job management method, it is characterised in that: obtain order information and carry out order audit, when order is examined When core success, team information is obtained, and order information is pushed according to team information.
2. agricultural plant protection unmanned plane job management method according to claim 1, it is characterised in that: order information includes making Industry area and operation time, team information include work capacity, according to working area and operation time to work capacity progress Match, when successful match, order information is pushed according to team information.
3. agricultural plant protection unmanned plane job management method according to claim 2, it is characterised in that: team information includes flying Hand information and unmanned machine information generate work capacity according to winged hand information and unmanned machine information.
4. agricultural plant protection unmanned plane job management method according to claim 3, it is characterised in that: team information includes making Industry historical record updates work capacity according to unfinished record when record has unfinished record in factory work logging.
5. agricultural plant protection unmanned plane job management method according to claim 1, it is characterised in that: team information includes making Industry historical record when team's order is successful, carries out operation according to order information, and generate current work situation according to operation, when When operation is timely completed, is generated according to current work situation and complete record, and update factory work logging, when operation is not on time complete Cheng Shi generates unfinished record according to current work situation, and updates factory work logging.
6. agricultural plant protection unmanned plane job management method according to claim 5, it is characterised in that: order information includes making The industry deadline when this operation is finished or reaching the operation deadline, obtains existing customer evaluation and confirmation signal, according to true Recognizing signal terminates order, while being evaluated according to existing customer and updating team information.
7. agricultural plant protection unmanned plane job management system, it is characterised in that: including background server, background server obtains order Information, order information includes working area and operation time, and carries out order audit according to order information, when order is audited successfully When, background server obtains team information, and team information includes work capacity, and according to work capacity, working area and operation Duration pushes order information.
8. agricultural plant protection unmanned plane job management system according to claim 7, it is characterised in that: background server includes Screening module and ability auditing module are recorded, team information includes factory work logging, flies hand information and unmanned machine information;
Record screening module screens unfinished record from factory work logging, when not screening unfinished record, by winged hand Information and unmanned machine information are sent to ability auditing module, and ability auditing module is generated according to winged hand information and unmanned machine information to be made Unfinished record is sent to ability auditing module, ability auditing module is not according to when screening unfinished record by industry ability It completes record and updates work capacity.
9. according to the described in any item agricultural plant protection unmanned plane job management systems of claim 7 or 8, it is characterised in that: also wrap At least one first user terminal is included, when this operation is finished, background server generates job complete signal, and is sent to the first user End when the first user terminal receives job complete signal, obtains confirmation signal, and be sent to background server, background server connects When receiving confirmation signal, order end signal is generated.
10. agricultural plant protection unmanned plane job management system according to claim 9, it is characterised in that: further include at least one A second user end, background server include team's update module;
Second user end obtains current work situation when operation, and is sent to background server, and the first user terminal obtains confirmation Existing customer evaluation is obtained while signal, and existing customer evaluation is sent to background server, and team's update module receives When current work situation and existing customer are evaluated, team information is updated.
CN201910318331.2A 2019-04-19 2019-04-19 Agricultural plant protection unmanned plane job management system and method Pending CN110070417A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910318331.2A CN110070417A (en) 2019-04-19 2019-04-19 Agricultural plant protection unmanned plane job management system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910318331.2A CN110070417A (en) 2019-04-19 2019-04-19 Agricultural plant protection unmanned plane job management system and method

Publications (1)

Publication Number Publication Date
CN110070417A true CN110070417A (en) 2019-07-30

Family

ID=67368103

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910318331.2A Pending CN110070417A (en) 2019-04-19 2019-04-19 Agricultural plant protection unmanned plane job management system and method

Country Status (1)

Country Link
CN (1) CN110070417A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170374323A1 (en) * 2015-01-11 2017-12-28 A.A.A Taranis Visual Ltd Systems and methods for agricultural monitoring
CN107578321A (en) * 2017-09-27 2018-01-12 江苏蒲公英无人机有限公司 A kind of order method of plant protection unmanned plane
CN107808550A (en) * 2017-10-30 2018-03-16 北京博鹰通航科技有限公司 A kind of unmanned machine management system of plant protection
CN108428192A (en) * 2018-05-18 2018-08-21 广州市智慧农林科技有限公司 A kind of agricultural machinery supply service system and its method
CN109074094A (en) * 2017-12-18 2018-12-21 深圳市大疆创新科技有限公司 A kind of job task distribution method, relevant device and the storage medium of unmanned plane

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170374323A1 (en) * 2015-01-11 2017-12-28 A.A.A Taranis Visual Ltd Systems and methods for agricultural monitoring
CN107578321A (en) * 2017-09-27 2018-01-12 江苏蒲公英无人机有限公司 A kind of order method of plant protection unmanned plane
CN107808550A (en) * 2017-10-30 2018-03-16 北京博鹰通航科技有限公司 A kind of unmanned machine management system of plant protection
CN109074094A (en) * 2017-12-18 2018-12-21 深圳市大疆创新科技有限公司 A kind of job task distribution method, relevant device and the storage medium of unmanned plane
CN108428192A (en) * 2018-05-18 2018-08-21 广州市智慧农林科技有限公司 A kind of agricultural machinery supply service system and its method

Similar Documents

Publication Publication Date Title
US20070299953A1 (en) Centralized work distribution management
US20050144062A1 (en) Business continuity information management system
US20060224440A1 (en) Systems and methods for determining process cycle efficiency in production environments
CN104270787B (en) A kind of full-automatic closed loop management-control method of wireless network work order
CN112001594A (en) Robot management system based on material contract management and management method thereof
CN110175822A (en) A kind of equipment account management method and system
CN106982251B (en) It is mobile device-based to reconnoitre project field work data reporting method and system
US20040167790A1 (en) Method of conducting business in a system requiring frequency up-dates and corrections
CN115392771A (en) Enterprise efficiency management system and method in park
CN110060031A (en) Agricultural plant protection online management platform and method
CN107133711A (en) A kind of performance check management system and management method
CN113994282A (en) Control system and control method
CN110599302A (en) Order production node overtime unoperated unified monitoring method based on merchant
CN103971187A (en) Automatic production plan generation method and system based on RFID
CN110032154B (en) Production control method and system for small-batch products
US20060149568A1 (en) Multi-perspective business process configuration
CN107885850A (en) A kind of localization method and device of banking class problem
CN110070417A (en) Agricultural plant protection unmanned plane job management system and method
CN109615849A (en) A kind of new-type monitoring method for running and system of super expressway
CN116757628A (en) BPMN-based flow management module and method
CN105608561A (en) Method and apparatus for processing mail
CN110910048B (en) Railway work site operation monitoring command method and system
CN112801314A (en) Intelligent service method and system for coal mine enterprises
CN110503394A (en) Tourism card on-line processing system
CN111369087A (en) ERP system-based vehicle management method suitable for vehicle group

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190730