CN110070417A - Agricultural plant protection unmanned plane job management system and method - Google Patents
Agricultural plant protection unmanned plane job management system and method Download PDFInfo
- Publication number
- CN110070417A CN110070417A CN201910318331.2A CN201910318331A CN110070417A CN 110070417 A CN110070417 A CN 110070417A CN 201910318331 A CN201910318331 A CN 201910318331A CN 110070417 A CN110070417 A CN 110070417A
- Authority
- CN
- China
- Prior art keywords
- order
- information
- team
- unmanned plane
- record
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title abstract description 14
- 238000007726 management method Methods 0.000 claims abstract description 24
- 238000012550 audit Methods 0.000 claims abstract description 16
- 238000011156 evaluation Methods 0.000 claims description 19
- 238000012790 confirmation Methods 0.000 claims description 17
- 238000012216 screening Methods 0.000 claims description 17
- 230000003111 delayed effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/06—Buying, selling or leasing transactions
- G06Q30/0601—Electronic shopping [e-shopping]
- G06Q30/0633—Lists, e.g. purchase orders, compilation or processing
- G06Q30/0635—Processing of requisition or of purchase orders
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/02—Agriculture; Fishing; Forestry; Mining
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Finance (AREA)
- Development Economics (AREA)
- Accounting & Taxation (AREA)
- Life Sciences & Earth Sciences (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Agronomy & Crop Science (AREA)
- Animal Husbandry (AREA)
- Marine Sciences & Fisheries (AREA)
- Mining & Mineral Resources (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
This disclosure relates to unmanned plane plant protection administrative skill field, specially a kind of agricultural plant protection unmanned plane job management system and method, the system includes background server, background server obtains order information, and order information includes working area and operation time, and carries out order audit according to order information, when order is audited successfully, background server obtains team information, and team information includes work capacity, and pushes order information according to work capacity, working area and operation time.This method includes obtaining order information to carry out order audit, when order is audited successfully, obtains team information, and push order information according to team information.This programme applies to the push in unmanned plane plant protection to order, and order information can be pushed to the team that can complete order using this programme.
Description
Technical field
This disclosure relates to unmanned plane plant protection administrative skill field, specially a kind of agricultural plant protection unmanned plane job management system
And method.
Background technique
With the development of unmanned air vehicle technique, the application of unmanned plane is constantly excavated by people, therefore many and nobody also occurs
The relevant management platform of machine demand, for example, unmanned plane is applied to the management platform of the plant protection in agricultural plant protection, this plant protection management
Platform uploads job requirements by client, and platform issues order according to job requirements, and team checks order and connect on platform
It is single.Due to being that platform issues order, all team can check order on platform and carry out order, while in order process
In, which can be locked, remaining team cannot connect the order again, thus can exist certain team not with the matched energy of order
Power, but the case where still order, occurs, it cannot be by competent team's order so as to cause customer order, while also extending and ordering
Single time by success order, the job requirements of client may be delayed.
Summary of the invention
The disclosure is intended to provide a kind of agricultural plant protection unmanned plane job management system and method, can push order information
To the team that can complete order.
The disclosure provides a kind of agricultural plant protection unmanned plane job management method, obtains order information and carries out order audit, when
When order is audited successfully, team information is obtained, and order information is pushed according to team information.
The technical scheme provided by this disclosed embodiment can include the following benefits: the demand for obtaining client, which is used as, to be ordered
Single information, order information include the necessary informations such as contact details, working area, operation time, job requirements, to order information into
Row audit, whether the main necessary information audited in order information fills in completely, such as contact details, when being convenient for team's order,
It is contacted with client, understands whether client has special requirement, determine whether order.When order is audited successfully, obtain
The team information of all team is taken, team information includes unmanned plane quantity, flies hand quantity and factory work logging etc., passes through the group
The team information and order information of team judge that can the team complete the order, if can complete, push this to the team and order
Order information is pushed to the team that can complete order to realize by single information.
Optionally, order information includes working area and operation time, and team information includes work capacity, according to work surface
Long-pending and operation time matches work capacity, when successful match, pushes order information according to team information.
The utility model has the advantages that being matched according to working area, operation time and work capacity, for example, work capacity is one day
0 to 50 mu is completed, working area is 80 mu, and operation time is two days, then learns needs one day according to working area, operation time
40 mu are completed, and work capacity is to complete within one day 0 to 50 mu, which has the ability to complete the order, therefore successful match, to this
Team pushes order information.
Optionally, team information includes flying hand information and unmanned machine information, is generated according to winged hand information and unmanned machine information
Work capacity.
The utility model has the advantages that the work capacity of team is calculated according to winged hand information and unmanned machine information, flying hand information includes flying
Hand personal information and winged hand quantity etc., unmanned plane information includes unmanned plane quantity and unmanned plane parameter etc., if unmanned plane one is heaven-made
20 mu of industry, when winged hand quantity is two people, unmanned plane quantity is two framves, then maximum operation ability is to complete 40 mu in one day;When winged hand
Quantity is three people, and unmanned plane quantity is two framves, then maximum operation ability is still to complete 40 mu in one day;Flying hand quantity is two people, nothing
Man-machine quantity is three framves, then maximum operation ability is to complete 60 mu in one day, using maximum operation ability as the operation energy of the team
Power.
Optionally, team information includes factory work logging, when record has unfinished record in factory work logging, root
Work capacity is updated according to unfinished record.
The utility model has the advantages that after team's order success factory work logging will be generated, if team is not timely completed order
Unfinished record can be generated, factory work logging is updated, work capacity is updated according to unfinished record.For example, the work of certain team
Industry ability is to complete within one day 0 to 60 mu, and order requirements one day of order completes 50 mu, but on time not complete after team's order
At operation, then the work capacity of the team is adjusted to 0 to 50 mu, in other words, is only pushed one day to the team later and complete 50
Mu order information below.
Optionally, team information includes factory work logging, when team's order is successful, carries out operation according to order information,
And current work situation is generated according to operation, when operation is timely completed, is generated according to current work situation and complete record, and more
New job historical record generates unfinished record according to current work situation, and more new job is gone through when operation is not timely completed
Records of the Historian record.
The utility model has the advantages that after team's order success, if being timely completed operation, increase in factory work logging one it is new
Record is completed, when operation is not timely completed, then increases a unfinished record in factory work logging, regardless of whether on time
It fulfils assignment, all needs to update factory work logging, convenient for during order, client can be understood by factory work logging should
The case where team, determines whether and the team unity.
Optionally, order information includes the operation deadline, when this operation is finished or reaching the operation deadline, is obtained
Existing customer evaluation and confirmation signal terminate order according to confirmation signal, while being evaluated according to existing customer and updating team information.
The utility model has the advantages that when team terminates operation, is finally confirmed an order completion by client, respect client, promote client's
Experience sense.Client is obtained simultaneously to evaluate the existing customer of team assignments process, updates team information, convenient for other subsequent visitors
Family can understand the case where team by factory work logging, determine whether and the team unity.
The disclosure also provides a kind of agricultural plant protection unmanned plane job management system, including background server, background server
Order information is obtained, order information includes working area and operation time, and carries out order audit according to order information, works as order
When auditing successfully, background server obtains team information, and team information includes work capacity, and according to work capacity, work surface
Long-pending and operation time pushes order information.
Optionally, background server includes record screening module and ability auditing module, team information include job history
Record flies hand information and unmanned machine information;
Record screening module screens unfinished record from factory work logging, will when not screening unfinished record
Fly hand information and unmanned machine information is sent to ability auditing module, ability auditing module is raw according to winged hand information and unmanned machine information
At work capacity, when screening unfinished record, unfinished record is sent to ability auditing module, ability auditing module root
Work capacity is updated according to unfinished record.
It optionally, further include at least one first user terminal, when this operation is finished, background server generates operation and completes letter
Number, and it is sent to the first user terminal, when the first user terminal receives job complete signal, confirmation signal is obtained, and be sent to backstage
Server when background server receives confirmation signal, generates order end signal.
It optionally, further include at least one second user end, background server includes team's update module;
Second user end obtains current work situation when operation, and is sent to background server, and the first user terminal obtains
Existing customer evaluation is obtained while confirmation signal, and existing customer evaluation is sent to background server, team's update module
When receiving current work situation and existing customer evaluation, team information is updated.
Detailed description of the invention
Fig. 1 is the logic diagram of disclosure agricultural plant protection unmanned plane job management system.
Fig. 2 is the flow chart of disclosure agricultural plant protection unmanned plane job management method.
Specific embodiment
It is further described below by specific embodiment:
Embodiment
Agricultural plant protection unmanned plane job management system, as shown in Fig. 1, including first user terminal, second use
Family end and background server, background server include database, record screening module, ability auditing module, team's update module,
Client's auditing module, order pushing module, order module and charge book module, database purchase have order requirements and team's letter
Breath, team information include flying hand information, unmanned machine information, factory work logging, work capacity and customer evaluation.
First user terminal is used to obtain the order information of client, and is sent to background server, in the present embodiment, order
Information includes contact details, working area, operation time and operation deadline.After client's auditing module receives order information,
Order requirements are obtained from database, and whether according to order requirements judge order information complete, if completely, generate audit at
Function signal, and it is sent to record screening module and ability auditing module, and working area and operation time are sent to ability and examined
Core module generates audit failure signal if imperfect, and is sent to the first user terminal.For example, order requirements have name and connection
It is mode, if also having name and contact method in order information, audits success, it is on the contrary then audit and fail.
When recording screening module reception audit pass signal, is obtained from database and fly hand quantity, unmanned plane quantity, operation
Historical record and work capacity, and unfinished record is screened from factory work logging, when not screening unfinished record, say
Bright team order for the first time is timely completed order every time, then records screening module and send winged hand quantity and unmanned plane quantity
Ability auditing module is given, when screening unfinished record, then unfinished record is sent to ability auditing module.
When receiving winged hand quantity and unmanned plane quantity, ability auditing module is raw according to winged hand quantity and unmanned plane quantity
At or update work capacity, for example, flying hand quantity is two people, unmanned plane quantity is two framves, and a frame unmanned plane one day is maximum to be completed
Workload is 20 mu, then calculates by maximal workload, then the maximum operation ability of the team is to complete 40 mu, i.e. masterpiece in one day
Industry ability is to complete 0 to 40 mu in one day.When receiving unfinished record, ability auditing module according to unfinished record generate or
Update work capacity, for example, the work capacity of certain team is to complete within one day 0 to 60 mu, the order of order illustrate to require one day it is complete
At 50 mu, but it is not timely completed operation after team's order, then the work capacity of the team is adjusted to 0 to 50 mu.
Ability auditing module receives working area and operation time, and matches operation according to working area and operation time
Ability, for example, 100 mu of working area, operation time two days, then order could be completed by completing 50 mu within one day, if work capacity is 0
It to 60 mu, then matches, if work capacity is 0 to 40 mu, mismatches.Upon a match, ability auditing module generates successful match
Signal issues order pushing module, after order pushing module receives successful match signal, obtains hand position signal and team information, and
Order information is pushed to second user end according to team information;When mismatching, ability auditing module generates it fails to match signal,
And it is sent to record screening module, record screening module receives it fails to match signal, and the work capacity for obtaining another team carries out
Matching.
Second user end shows order information, and in team's order, obtains order signal, and be sent to background service
Device.Order module receives order signal, obtains team information and order information from database, and according to order information to first
User terminal pushes team information.First user terminal shows team information, and when client agrees to, obtains order confirmation signal, and
It is sent to background server.Order module receives order confirmation signal, team's order success.
When team starts operation, second user end obtains operation commencing signal, and is sent to background server, operation note
The factory work logging of the team is screened after record module reception operation commencing signal from database.When team carries out operation,
Second user end obtains current work situation in real time, and is sent to background server, and charge book module receives current work feelings
Condition.When team fulfils assignment, second user end obtains job complete signal, and is sent to background server, charge book mould
Block receives job complete signal, and is sent to the first user terminal, and current work situation is sent to team's update module.First
After user terminal receives job complete signal, confirmation signal and existing customer evaluation are obtained, and be sent to background server.Team is more
New module receive confirmation signal, current work situation and existing customer evaluation, and obtain order information the operation deadline and
Current time, when current time be more than the operation deadline, illustrate that the team is not timely completed operation, then according to current work feelings
Condition and existing customer evaluation generate unfinished record, and update factory work logging, when current time, which is less than operation, to be completed
Between, then it generates according to current work situation and existing customer evaluation and completes record, and update factory work logging, while according to true
Recognize signal and generate order end signal, order terminates.
Agricultural plant protection unmanned plane job management method based on agricultural plant protection unmanned plane job management system, such as 2 institute of attached drawing
Show, obtains order information, order information includes contact details, working area, operation time and operation deadline.
Contact details be customer name, telephone number and contact address, working area be need to carry out operation region it is big
It is small, such as 100 mu, operation time is to carry out the time limit of operation, such as need in progress operation in 2 days 2 months to 8 days 2 months, then
Operation time is 6 days, and the operation deadline is 8 days 2 months.
Order requirements are obtained, order audit is carried out according to order information and order requirements and is ordered if order information is imperfect
Single audit failure, reacquires order information;If order information is complete, order is audited successfully.For example, order requirements have name
And contact method audits success if also having name and contact method in order information, it is on the contrary then audit and fail.
After order is audited successfully, team information is obtained, team information includes flying hand information, unmanned machine information, job history
Record, work capacity and customer evaluation, flying hand information including winged hand personal information and winged hand quantity, unmanned plane information includes nobody
Machine quantity and unmanned plane parameter.After the completion of every subjob, a factory work logging can be generated according to handling situations, one is ordered
Single factory work logging, at the end of customer evaluation is order, evaluation of the client to team.
With the presence or absence of unfinished record, (record not being timely completed can be marked as not completing in screening operation historical record
Record), unfinished record, then generate according to winged hand quantity and unmanned plane quantity or update work capacity if it does not exist;If it exists
Unfinished record then generates according to unfinished record or updates work capacity.
Judge that can work capacity meet order according to working area and operation time, for example, 100 mu of working area, make
Industry duration two days, then order could be completed by completing 50 mu within one day, if work capacity is 0 to 60 mu, be met, if work capacity is
It 0 to 40 mu, is then unsatisfactory for.If not satisfied, the work capacity for then obtaining the team information of another team is judged;If satisfied,
Then order information is pushed to the team.
After pushing order information, judge whether to receive order signal, when receiving order signal, illustrates that team is agreed to
Order sends the team information of the team according to order information, judges whether to receive order confirmation signal, is receiving order
When confirmation signal, illustrate team's order success.
After team's order success, judge whether to receive operation commencing signal, when receiving operation commencing signal, obtain
Current work situation judges whether to receive job complete signal, when receiving job complete signal, to pushes customer operation
Complete signal.Judge whether to receive confirmation signal and existing customer evaluation, if receiving confirmation signal and existing customer is commented
When valence, the factory work logging of the team is updated according to existing customer evaluation and current work situation.
When receiving job complete signal, current time is obtained, judges whether current time is more than the operation deadline,
If being more than, unfinished record is generated according to existing customer evaluation and current work situation, and update team information, if not surpassing
It crosses, is then generated according to existing customer evaluation and current work situation and complete record, and update the team information of the team.
Above-described is only embodiment of the disclosure, and the common sense such as well known specific structure and characteristic are not made herein in scheme
Excessive description, technical field that the present invention belongs to is all before one skilled in the art know the applying date or priority date
Ordinary technical knowledge can know the prior art all in the field, and have using routine experiment hand before the date
The ability of section, one skilled in the art can improve and be implemented in conjunction with self-ability under the enlightenment that the application provides
This programme, some typical known features or known method should not become one skilled in the art and implement the application
Obstacle.It should be pointed out that for those skilled in the art, under the premise of not departing from disclosure structure, can also make
Several modifications and improvements out, these also should be considered as the protection scope of the disclosure, these all will not influence the effect of disclosure implementation
Fruit and patent practicability.The scope of protection required by this application should be based on the content of the claims, the tool in specification
The records such as body embodiment can be used for explaining the content of claim.
Claims (10)
1. agricultural plant protection unmanned plane job management method, it is characterised in that: obtain order information and carry out order audit, when order is examined
When core success, team information is obtained, and order information is pushed according to team information.
2. agricultural plant protection unmanned plane job management method according to claim 1, it is characterised in that: order information includes making
Industry area and operation time, team information include work capacity, according to working area and operation time to work capacity progress
Match, when successful match, order information is pushed according to team information.
3. agricultural plant protection unmanned plane job management method according to claim 2, it is characterised in that: team information includes flying
Hand information and unmanned machine information generate work capacity according to winged hand information and unmanned machine information.
4. agricultural plant protection unmanned plane job management method according to claim 3, it is characterised in that: team information includes making
Industry historical record updates work capacity according to unfinished record when record has unfinished record in factory work logging.
5. agricultural plant protection unmanned plane job management method according to claim 1, it is characterised in that: team information includes making
Industry historical record when team's order is successful, carries out operation according to order information, and generate current work situation according to operation, when
When operation is timely completed, is generated according to current work situation and complete record, and update factory work logging, when operation is not on time complete
Cheng Shi generates unfinished record according to current work situation, and updates factory work logging.
6. agricultural plant protection unmanned plane job management method according to claim 5, it is characterised in that: order information includes making
The industry deadline when this operation is finished or reaching the operation deadline, obtains existing customer evaluation and confirmation signal, according to true
Recognizing signal terminates order, while being evaluated according to existing customer and updating team information.
7. agricultural plant protection unmanned plane job management system, it is characterised in that: including background server, background server obtains order
Information, order information includes working area and operation time, and carries out order audit according to order information, when order is audited successfully
When, background server obtains team information, and team information includes work capacity, and according to work capacity, working area and operation
Duration pushes order information.
8. agricultural plant protection unmanned plane job management system according to claim 7, it is characterised in that: background server includes
Screening module and ability auditing module are recorded, team information includes factory work logging, flies hand information and unmanned machine information;
Record screening module screens unfinished record from factory work logging, when not screening unfinished record, by winged hand
Information and unmanned machine information are sent to ability auditing module, and ability auditing module is generated according to winged hand information and unmanned machine information to be made
Unfinished record is sent to ability auditing module, ability auditing module is not according to when screening unfinished record by industry ability
It completes record and updates work capacity.
9. according to the described in any item agricultural plant protection unmanned plane job management systems of claim 7 or 8, it is characterised in that: also wrap
At least one first user terminal is included, when this operation is finished, background server generates job complete signal, and is sent to the first user
End when the first user terminal receives job complete signal, obtains confirmation signal, and be sent to background server, background server connects
When receiving confirmation signal, order end signal is generated.
10. agricultural plant protection unmanned plane job management system according to claim 9, it is characterised in that: further include at least one
A second user end, background server include team's update module;
Second user end obtains current work situation when operation, and is sent to background server, and the first user terminal obtains confirmation
Existing customer evaluation is obtained while signal, and existing customer evaluation is sent to background server, and team's update module receives
When current work situation and existing customer are evaluated, team information is updated.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910318331.2A CN110070417A (en) | 2019-04-19 | 2019-04-19 | Agricultural plant protection unmanned plane job management system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910318331.2A CN110070417A (en) | 2019-04-19 | 2019-04-19 | Agricultural plant protection unmanned plane job management system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110070417A true CN110070417A (en) | 2019-07-30 |
Family
ID=67368103
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910318331.2A Pending CN110070417A (en) | 2019-04-19 | 2019-04-19 | Agricultural plant protection unmanned plane job management system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110070417A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114021914A (en) * | 2021-10-22 | 2022-02-08 | 北京市农林科学院信息技术研究中心 | Unmanned aerial vehicle cluster flight control method and device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20170374323A1 (en) * | 2015-01-11 | 2017-12-28 | A.A.A Taranis Visual Ltd | Systems and methods for agricultural monitoring |
CN107578321A (en) * | 2017-09-27 | 2018-01-12 | 江苏蒲公英无人机有限公司 | A kind of order method of plant protection unmanned plane |
CN107808550A (en) * | 2017-10-30 | 2018-03-16 | 北京博鹰通航科技有限公司 | A kind of unmanned machine management system of plant protection |
CN108428192A (en) * | 2018-05-18 | 2018-08-21 | 广州市智慧农林科技有限公司 | A kind of agricultural machinery supply service system and its method |
CN109074094A (en) * | 2017-12-18 | 2018-12-21 | 深圳市大疆创新科技有限公司 | A kind of job task distribution method, relevant device and the storage medium of unmanned plane |
-
2019
- 2019-04-19 CN CN201910318331.2A patent/CN110070417A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20170374323A1 (en) * | 2015-01-11 | 2017-12-28 | A.A.A Taranis Visual Ltd | Systems and methods for agricultural monitoring |
CN107578321A (en) * | 2017-09-27 | 2018-01-12 | 江苏蒲公英无人机有限公司 | A kind of order method of plant protection unmanned plane |
CN107808550A (en) * | 2017-10-30 | 2018-03-16 | 北京博鹰通航科技有限公司 | A kind of unmanned machine management system of plant protection |
CN109074094A (en) * | 2017-12-18 | 2018-12-21 | 深圳市大疆创新科技有限公司 | A kind of job task distribution method, relevant device and the storage medium of unmanned plane |
CN108428192A (en) * | 2018-05-18 | 2018-08-21 | 广州市智慧农林科技有限公司 | A kind of agricultural machinery supply service system and its method |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114021914A (en) * | 2021-10-22 | 2022-02-08 | 北京市农林科学院信息技术研究中心 | Unmanned aerial vehicle cluster flight control method and device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20070299953A1 (en) | Centralized work distribution management | |
US20030217062A1 (en) | Method and system for asset transition project management | |
US20050144062A1 (en) | Business continuity information management system | |
CN104270787B (en) | A kind of full-automatic closed loop management-control method of wireless network work order | |
CN112001594A (en) | Robot management system based on material contract management and management method thereof | |
CN106982251B (en) | It is mobile device-based to reconnoitre project field work data reporting method and system | |
CN107133711A (en) | A kind of performance check management system and management method | |
CN115392771A (en) | Enterprise efficiency management system and method in park | |
CN110060031A (en) | Agricultural plant protection online management platform and method | |
CN110070417A (en) | Agricultural plant protection unmanned plane job management system and method | |
CN113994282A (en) | Control system and control method | |
CN110599302A (en) | Order production node overtime unoperated unified monitoring method based on merchant | |
CN117455358A (en) | Tool priority ex-warehouse control method based on radio frequency reading technology | |
CN212460603U (en) | Robot management system based on material contract management | |
CN116757628A (en) | BPMN-based flow management module and method | |
CN110503394A (en) | Tourism card on-line processing system | |
CN105608561A (en) | Method and apparatus for processing mail | |
CN110910048B (en) | Railway work site operation monitoring command method and system | |
CN112801314A (en) | Intelligent service method and system for coal mine enterprises | |
CN1543138B (en) | Automatic processing system for broadband ADSL service | |
CN111369087A (en) | ERP system-based vehicle management method suitable for vehicle group | |
CN109816193A (en) | Architectural design work management method, platform and the system quickly delivered | |
CN102609818A (en) | Circulating method of 3rd Generation (3G) mobile communication operating and maintaining flows based on sequence number | |
CN109063861A (en) | A kind of online repair-reporting service system | |
CN114866540B (en) | Enterprise data operation management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190730 |
|
RJ01 | Rejection of invention patent application after publication |