CN110070342A - A kind of Emission trading normalized service platform - Google Patents

A kind of Emission trading normalized service platform Download PDF

Info

Publication number
CN110070342A
CN110070342A CN201910329662.6A CN201910329662A CN110070342A CN 110070342 A CN110070342 A CN 110070342A CN 201910329662 A CN201910329662 A CN 201910329662A CN 110070342 A CN110070342 A CN 110070342A
Authority
CN
China
Prior art keywords
management
ring
transaction
examination
approval
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910329662.6A
Other languages
Chinese (zh)
Inventor
张月
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lanzhou Environmental Energy Trading Center Co Ltd
Original Assignee
Lanzhou Environmental Energy Trading Center Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lanzhou Environmental Energy Trading Center Co Ltd filed Critical Lanzhou Environmental Energy Trading Center Co Ltd
Priority to CN201910329662.6A priority Critical patent/CN110070342A/en
Publication of CN110070342A publication Critical patent/CN110070342A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/04Trading; Exchange, e.g. stocks, commodities, derivatives or currency exchange
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • Technology Law (AREA)
  • Data Mining & Analysis (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Abstract

The invention discloses a kind of Emission trading normalized service platforms, belong to service platform field.Service platform includes: enterprises end, examination & approval end, ring friendship center-side and management end;Four big customer ends cover enterprise, government and ring and hand over center catergories of user, mutually indepedent to be formed integral with one another again, so that Emission Trading System, procedure and standardization.For enterprise customer, the dumping right application and management of procedure, enterprise work is simpler quick;For government customer, simplify approval process, improves working efficiency;For ring hands over central user, convenient supervision and management to transaction.

Description

A kind of Emission trading normalized service platform
Technical field
The invention belongs to service platform fields, and in particular to a kind of Emission trading normalized service platform.
Background technique
Dumping right refers to that associated emission enterprise appraises and decides and permits by the department that has the right, and allows pollutant discharging unit in a certain range The type and quantity to discharge pollutants.Emission trading refers to that within a certain area, being no more than in gross contamination emission allows Under the premise of discharge amount, blowdown flow rate is mutually adjusted between internal each pollution sources by way of exchange through money, to reach reduction Blowdown flow rate, the purpose for protecting environment.Its main thought is exactly to establish legal pollutant emission right i.e. dumping right (this right Show usually in the form of pollutant discharging license), and this right is allowed to be bought in and sold as commodity, dirt is carried out with this Contaminate the emission control of object.
For Emission trading as market-based economic system arrangement, it is dumping right to the economic incentives of enterprise The side of selling make dumping right remaining due to excess emission reduction, obtain economy return, this essence by selling remaining dumping right later It is compensation of the market to environmental protection of enterprise behavior.Buyer is since newly-increased dumping right has to pay a price, the expense essence of expenditure On be environmental pollution cost.The meaning of Emission Trading System is the product that it can make the interests of enterprise itself improve pollution treatment Polarity is achieved total amount control of pollution target really.In this way, just to become enterprise from the coercive action of government conscious for pollution treatment The market behavior, transaction also become the economic transaction in market from government and enterprise's administration transaction.It may be said that Emission Trading System It can yet be regarded as and carry out the effective means of overall control.
But there is presently no a perfect Emission trading service platforms, can integrate in enterprise, government and ring friendship The resource of the heart, so that Emission trading more institutionalization, procedure and standardization.
Summary of the invention
It is an object of the invention to: a kind of Emission trading normalized service platform is provided, solves Emission trading Inadequate institutionalization, procedure and standardized problem.
The technical solution adopted by the invention is as follows:
A kind of Emission trading normalized service platform, comprising: enterprises end, examination & approval end, ring hand over center-side and management end.
The enterprises end is used for corporate user registration, including enterprises end homepage, enterprises end license management, enterprises end item Mesh reorganization and expansion, enterprises end paid utilization and transaction, the management of enterprises end IC card and enterprises end mortgage loan option;
The enterprises end homepage need by carried out after system login existing blowdown enterprise initially really power or grassroot project refer to Mark application rear can enter the page, and enterprises end homepage includes: enterprises end my pollutant discharging license, enterprises end my total amount information I pending of table, enterprises end dumping right trend and enterprises end;
System login includes: login account and login system;
Initially really power includes: that Initial Emission Permits index is applied to purchase and licensing application for existing blowdown enterprise;
Grassroot project index application includes: the application of construction project total quantity index, construction project total amount transaction reporting, participates in friendship Easily, it gets blowdown warrant and licensing claims;
The enterprises end license management option includes: licensing inquiry, licensing annual test, licensing change and licensing Continue;
The enterprises end reconstruction and expansion option includes: reconstruction and expansion application, application record is inquired, blowdown warrant is looked into It askes;
Enterprises end paid utilization and transaction options include: assign application, sell application and transaction record;
The enterprises end IC card management options include: real time data monitoring, alert data, statistical report form and IC card information;
The enterprises end mortgage loan option includes: mortgage application, solution signature application and application record inquiry.
Further, the examination & approval end logs in for government staff and uses, comprising: examination & approval end homepage, the license of examination & approval end Card management, examination & approval the management of end Initial Emission Permits, examination & approval the management of end construction project total amount, examination & approval end paid utilization with trade management, It examines end mortgage loan management and option is audited in examination & approval end enterprises registration;
It is described examination & approval end homepage option include: examine end I it is pending, examination & approval end policies and regulations and examination & approval end data statistics;
Examination & approval end license management option includes: licensing examination & approval, licensing library and licensing statistical analysis;
Examination & approval end Initial Emission Permits management options include: Initial Emission Permits examination & approval and dumping right statistical analysis;
The examination & approval end construction project total amount management options include: the examination & approval of construction project total amount, blowdown warrant payroll management, Total quantity index management and total quantity index statistical analysis;
The examination & approval end paid utilization includes: that transaction application approval and transaction statistically analyze with trade management option.
Further, the ring hands over center-side to hand over care workers to use for ring, comprising: ring hands over center-side homepage, ring Center-side business handling, ring is handed over to hand over center-side capital management, ring that center-side trade management, ring is handed over to hand over center-side store keeping, ring Center-side information announcing, ring is handed over to hand over the management of center-side account, ring that center-side statistical analysis and ring is handed over to hand over center-side transaction setting choosing ?;
It includes: that ring hands over center-side my pending, ring to hand over center-side policies and regulations and ring that the ring, which hands over center-side homepage option, Hand over the general view of center-side trading situation;
It includes: to sell examination & approval, examination & approval of assigning, construction project examination & approval and mortgage to borrow that the ring, which hands over center-side business handling option, Money examination & approval;
It includes: guarantee fund, transaction cost, government fund clearing and trade management that the ring, which hands over center-side capital management option, Take;
It includes: trade at competitive price that the ring, which hands over center-side trade management option, list, agreement transfer and lease;
It includes: that transaction sales confirmation, trade contract and transaction are discerned that the ring, which hands over center-side store keeping option,;
It includes: Notice Of Transactions, the publicity of conclusion of the business result and transaction bulletin that the ring, which hands over center-side information announcing option,;
It includes: that ring hands over center-side transaction audit account and ring to hand over center-side paid that the ring, which hands over center-side account management options, Using with transaction account;
It includes: that ring hands over the center-side amount of the selling amount of assigning and ring to hand over center-side transaction that the ring, which hands over center-side statistical analysis option, Liveness;
It includes: merchandise control, trade at competitive price parameter and funding parameters that the ring, which hands over center-side transaction setting options,.
Further, the management end is logged in for administrative staff and is used, and is logged in after managing end system first it is seen that " row Dirt power transaction panorama analytical method ", it can be seen that including total quantity index, blowdown real time monitoring of swiping the card, Emission trading analysis of related results etc. Content;
The management end includes: that pollutant discharging license management system, Initial Emission Permits appraise and decide system, construction project total quantity index Management system, paid utilization and trade managing system, total pollution discharge quantity control system by wiping card and transaction six sons of effect simulation system System;
The pollutant discharging license management system include: pollutant discharging license management homepage, pollutant discharging license management statistics analysis, Pollutant discharging license manages licensing library and pollutant discharging license manages mortgage loan option;
Pollutant discharging license management homepage option includes: that licensing operations handle general view, license issuance distribution, licensing industry Business is handled ratio and is had a guide look of by industry license issuance amount;
Pollutant discharging license management statistics analysis option includes: granting amount statistics and license amount statistics;
It includes: that Initial Emission Permits appraise and decide homepage, Initial Emission Permits management and initial row that the Initial Emission Permits, which appraise and decide system, Dirt power appraises and decides statistical analysis;
Initial Emission Permits appraise and decide homepage include: with compensation apply to purchase gratuitously apply to purchase general view, whole city's Initial Emission Permits appraise and decide general view and Each area's Initial Emission Permits general view;
Initial Emission Permits appraise and decide statistical analysis and include: industry, area, pollutant and apply to purchase mode;
The construction project total quantity index management system includes: construction project total quantity index management homepage, total quantity index pipe Reason, the management total amount examination of construction project total quantity index and the analysis of construction project total quantity index management statistics;
It includes: total amount, surplus, applications, granting amount, whole city's total amount of pollutant that construction project total quantity index, which manages homepage, Index situation and pollutant index service condition;
It includes: index allocation, operation index and the result of appraisal that construction project total quantity index, which manages total amount examination,;
The analysis of construction project total quantity index management statistics includes: construction project total amount application situation, whole city's Initial Emission Permits Appraise and decide general view and each region total quantity index applications;
The paid utilization and trade managing system include: paid utilization and trade management homepage, paid utilization and transaction Trade management, paid utilization and the management of trade management account and paid utilization is managed to statistically analyze with trade management;
Paid utilization and trade management homepage include: the amount of selling, the amount of assigning, exchange hand, the last concluded price, strike a bargain Subject matter proportion grading and transaction ranking list;
Paid utilization with trade management trade management include: can tradable emissions power, sell inquiry, assign inquiry and tissue friendship Easily inquiry;
Paid utilization includes: transaction audit account, transaction account and deposit dumping right transfer with the management of trade management account Account;
It includes: the amount of the selling amount of assigning that paid utilization is statisticallyd analyze with trade management, can trading volume and brisk trade degree.
In conclusion by adopting the above-described technical solution, the beneficial effects of the present invention are:
1. service platform is related to enterprise, government and ring simultaneously hands over center, including enterprises end, examination & approval end, ring friendship center-side With four big customer end common service of management end so that Emission trading more institutionalization, procedure and standardization.
2. service platform, for enterprise customer, the dumping right application and management of procedure, so that enterprise work is more Add simple and fast;For government customer, simplify approval process, improves working efficiency;For ring hands over central user, side Just to the supervision of transaction and management.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings, in which:
Fig. 1 is a kind of Emission trading normalized service platform structure block diagram;
Fig. 2 is enterprises end frame diagram of the present invention;
Fig. 3 is that Initial Emission Permits index is applied to purchase and licensing application flow chart;
Fig. 4 is that the application of grassroot project total quantity index and licensing claim flow chart;
Fig. 5 is licensing changing process figure;
Fig. 6 is mortgage loan flow chart;
Fig. 7 is present invention examination & approval end frame figure;
Fig. 8 is examination & approval end licensing approval process figure;
Fig. 9 is that ring of the present invention hands over center-side frame diagram;
Figure 10 is management end frame diagram of the present invention.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that described herein, specific examples are only used to explain the present invention, not For limiting the present invention, i.e., described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is logical The component for the embodiment of the present invention being often described and illustrated herein in the accompanying drawings can be arranged and be designed with a variety of different configurations.
Therefore, the detailed description of the embodiment of the present invention provided in the accompanying drawings is not intended to limit below claimed The scope of the present invention, but be merely representative of selected embodiment of the invention.Based on the embodiment of the present invention, those skilled in the art Member's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
It should be noted that the relational terms of term " first " and " second " or the like be used merely to an entity or Operation is distinguished with another entity or operation, and without necessarily requiring or implying between these entities or operation, there are any This actual relationship or sequence.Moreover, the terms "include", "comprise" or its any other variant be intended to it is non-exclusive Property include so that include a series of elements process, method, article or equipment not only include those elements, but also Further include other elements that are not explicitly listed, or further include for this process, method, article or equipment it is intrinsic Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including described There is also other identical elements in the process, method, article or equipment of element.
As shown in Figure 1, a kind of Emission trading normalized service platform, comprising: enterprises end, examination & approval end, ring hand over center-side And management end.The user that enterprise, government and ring hand over center is served at four big customer ends, and co-ordination guarantees Emission trading Institutionalization, procedure and standardization.
As shown in Figure 2: the enterprises end is used for corporate user registration, including enterprises end homepage, enterprises end licensing pipe Reason, the paid utilization of enterprises end reconstruction and expansion, enterprises end and transaction, the management of enterprises end IC card and enterprises end mortgage loan option;
The enterprises end homepage need by carried out after system login existing blowdown enterprise initially really power or grassroot project refer to Mark application rear can enter the page, and enterprises end homepage includes: enterprises end my pollutant discharging license, enterprises end my total amount information I pending of table, enterprises end dumping right trend and enterprises end;
System login includes: login account and login system;
Initially really power includes: that Initial Emission Permits index is applied to purchase and licensing application for existing blowdown enterprise;
Grassroot project index application includes: the application of construction project total quantity index, construction project total amount transaction reporting, participates in friendship Easily, it gets blowdown warrant and licensing claims;
The enterprises end license management option includes: licensing inquiry, licensing annual test, licensing change and licensing Continue;
The enterprises end reconstruction and expansion option includes: reconstruction and expansion application, application record is inquired, blowdown warrant is looked into It askes;
Enterprises end paid utilization and transaction options include: assign application, sell application and transaction record;
The enterprises end IC card management options include: real time data monitoring, alert data, statistical report form and IC card information;
The enterprises end mortgage loan option includes: mortgage application, solution signature application and application record inquiry.
Specifically, enterprises end network address is inputted in browser, opens the enterprises end of Emission trading normalized service platform, it is first The user of secondary login system needs first to carry out " registering new account ".Into new user's registration, registered units' title, legal person's surname are filled in Enterprises' essential informations such as name, unified social credibility code, user name, password, phone number, E-mail address, have all been filled in simultaneously Confirm that errorless rear click is submitted, the bullet frame of " succeeding in registration " occurs.Auditing result circular mail to be received, by being later The account name code entry system filled in when can be by registration.
After logging in the system of being successfully entered, for existing blowdown enterprise, first have to enter is " it is paid to apply to purchase Initial Emission Permits Service index " the page clicks " starting to apply to purchase " and starts the process of applying to purchase." making a report on guide " is read over first, then fills in finger again Mark applies to purchase table.It has been filled in table after all information by dendrogram, " generating licensing application form ", then has clicked " submitting application ", Approval process can be entered.
Into Initial Emission Permits index apply to purchase in " progress chasing ", can grasp Initial Emission Permits index apply to purchase apply into Degree, when approval process proceeds to " enterprise's payment ", enterprise need to go to environmental energy trade center to handle at the appointed time and pay Take formality.It, can access permit application process after whole approval processes.
Access permit claims the page, and enterprise can be carried corresponding by checking " bill of materials " and " handling address " Material goes to Environmental Protection Agency to get pollutant discharging license.The completion of waiting Environmental Protection Agency is issued licence after process, and the blowdown that enterprise can be obtained oneself is permitted It can demonstrate,prove, system can jump to the homepage of enterprises end automatically.
Initial Emission Permits index is applied to purchase as shown in Figure 3 with licensing application detailed process.
After logging in the system of being successfully entered, for grassroot project, what enterprise initially entered is that " application construction project total amount refers to Mark " the page clicks " starting to apply " and starts application process." guide for application " is read over first, then fills in construction project again Total quantity index application form, then " submitting application " is clicked, into approval process.Wherein environmental impact assessment is calculated in pollutant discharge amount, enterprise It needs to select mode of doing business, there are three types of (list, trade at competitive price, association the mode of doing business for the grassroot project that system is supported at present View is transferred the possession of), enterprise can be selected according to their own needs.
Into " progress chasing " in construction project total quantity index application, application progress can be grasped, when approval process whole Pass through, " construction project total amount transaction registration " can be entered.It needs to read over " Transactional Directory " first, then to " dumping right is assigned report Famous-brand clock " is confirmed.After confirmation registration, process enters guarantee fund and pays the stage, and enterprise needs to carry corresponding data to ring Border energy trade center pays guarantee fund and completes handling for corresponding entries.It is only paid under Support Line at present, rear extended meeting is open Entrance is paid on line.
After environmental energy trade center completes examination & approval, process can enter " participating in transaction ".Enterprise is receiving respective organization After the notice of transaction, can login system carry out index purchase.It clicks " online transaction ", trade at competitive price system can be entered. Corresponding Transaction Information is found, clicks " entering trade at competitive price " i.e. into operation pages of bidding.Before transaction does not start, operation pages It can only be checked, bid operation can not be carried out.After transaction starts, enterprise can be bid according to their own needs, be raised the price, Buy the grassroot project index of oneself needs.Enterprise needs according to system suggestion after the completion of purchase into environmental energy transaction The heart signs trade contract and handles payment procedure etc..Enterprise, which only buys just to can be carried out after enough applications, gets dumping right operation.
Enterprise receive Environmental Protection Agency get notification sheet after need to download printing stamping, then gone with the notification sheet to Environmental Protection Agency Get blowdown warrant.Get after blowdown warrant enterprise can with blowdown warrant application mortgage loan or after the completion of project after Continuous application pollutant discharging license.
Apply to purchase with Initial Emission Permits index it is similar, access permit claim the page, enterprise can be by checking that " material is clear It is single " and " handling address ", it carries corresponding material and Environmental Protection Agency is gone to get pollutant discharging license.Environmental Protection Agency is waited to complete process of issuing licence Afterwards, enterprise can be obtained the pollutant discharging license of oneself, and system can also jump to the homepage of enterprises end automatically.
The application of grassroot project total quantity index and licensing application detailed process are as shown in Figure 4.
Complete Initial Emission Permits appraise and decide or grassroot project index application after, enterprise can be flat with Entry Firm end management service Platform homepage shows that information is as follows in enterprises end homepage:
My pollutant discharging license: the information of pollutant discharge of enterprise licensing, including the information such as validity period and blowdown limit are shown.
My total amount information: the usage amount and surplus information in my IC card are shown.
Dumping right trend: real-time blowdown flow rate and IC card surplus are statisticallyd analyze.
My Transaction Information: show that enterprise currently trades the progress of application.Enterprise can " I wants by fast operating button Buy ", " I will sell " assigned application out.
Mine is doing: checking the schedule of enterprise's present application item, and can quickly be handled by clicking.
License management:
Enterprise can check that the licensing of oneself is handled by " licensing inquiry " function under " license management " menu Information.And the reserved copy and duplicate of the pollutant discharging license of oneself is checked by click " checking details " or handles details.It clicks and " enters and do Reason " carries out flow operations.
When enterprise needs to carry out licensing annual test, " the licensing annual test " clicked under " license management " menu bar can be Line licensing annual test.Filled in " blowdown copyright license annual test application form " afterwards click " submission ", it is waiting for approval by.
When enterprise needs to carry out the change of licensing essential information, can click under " license management " menu bar " perhaps Change can be demonstrate,proved " change of online application licensing.It fills in " pollutant discharging license modification application table ", after submitting application, that is, enters examination & approval Process.When approval process enters " get a license notice ", enterprise needs to download " getting licensing notice " and affixes one's seal, then arrives Environmental Protection Agency exchanges licensing for, completes licensing changing process.
It is as shown in Figure 5 that licensing changes concrete operations process.
Enterprise's licensing needs to carry out licensing continuity after expiring when, can click under " license management " menu bar " perhaps Continuity can be demonstrate,proved " carry out online application.Its operating process can refer to Initial Emission Permits index apply to purchase in licensing claim, enterprise exists Filled in it is waiting for approval after application form after the completion of carry out payment continuity process can be completed.
Reconstruction and expansion:
Enterprise can carry out total quantity index application by click " reconstruction and expansion application " when carrying out reconstruction and expansion. It, which is operated, is similar to " application of grassroot project index " process, does not do excessively repeat here.
After reconstruction and expansion application is submitted, enterprise can find the note of application by click " application record inquiry " Record, and the progress situation accordingly applied is tracked by clicking " checking details ".
" inquiry of blowdown warrant " under " reconstruction and expansion " menu bar is clicked, can check all blowdown warrants of enterprise Book.By the setting of search condition, the blowdown warrant for meeting screening conditions can be searched.
Paid utilization and transaction:
Assign application: enterprise needs to apply to buy pollutant emission index, at this time may be used when pollutant emission index is not able to satisfy blowdown demand Online application is carried out with " application of assigning " under click " paid utilization and transaction " menu bar.It, which is operated, is similar to " grassroot project Index application " process, I will not elaborate.
The function is placed in homepage " my Transaction Information " plate, enterprise can also by system for convenience of enterprise customer's operation With the application operation that carries out assigning directly from homepage.
Sell application: enterprise can apply selling pollutant emission index, can click " has at this time when pollutant emission index has more than needed Repay using and transaction " " selling apply " progress online application under menu bar.It, which is operated, is similar to " application of grassroot project index " Process.It is noted that enterprise first have to carry out before sell application can tradable emissions power application, energy is confirmed by Environmental Protection Agency The index amount enough sold.
With assign apply it is identical, in order to facilitate enterprise operations, enterprise can also directly from homepage click " I will sell " carry out The online application sold.
Transaction record: enterprise can check the blowdown of enterprise by " transaction record " in click " paid utilization and transaction " The transaction record for meeting screening conditions can be searched by the setting of search condition by weighing transactions history record sheet, and pass through click " checking details " checks the application list and process progress of this record.
IC card management:
Enterprise customer can check that this enterprise is real-time by " the real time data monitoring " under click " IC card management " menu bar Water or atmosphere pollutant index emission behaviour.
Enterprise customer can check enterprise's warning message by " alert data " under click " IC card management " menu bar, The alarm conditions such as, concentration of emission exceeded, Sorry, your ticket has not enough value, network state exceeded including discharge amount.
Enterprise customer can check the blowdown day of enterprise by " statistical report form " under click " IC card management " menu bar Report, annual report, annual report, and the data sheet under corresponding conditions can be checked by conditional filtering, export button can also be clicked, Export corresponding table.
Enterprise customer can check the note of swiping the card of this enterprise by " IC card information " under click " IC card management " menu bar Record, and Excel can be exported.Enterprise can check the IC card charging information of oneself by " IC card is supplemented with money ".
Mortgage loan:
Enterprise customer can be by " mortgage be applied " under click " mortgage loan " menu bar, and checking " can mortgage certificate Table " clicks " mortgage application " button if necessary to mortgage to blowdown warrant, then can be to corresponding blowdown warrant application Mortgage loan.The operation of the application process of mortgage loan is similar with other application processes, and enterprise is after filling application form etc. It is pending that mortgage can be completed after.Specific application process is as shown in Figure 6.
When enterprise needs to solve the blowdown warrant for giving as security mortgaged, " the solution signature Shen under " mortgage loan " menu bar can be clicked It please " finds corresponding blowdown warrant and carries out solution signature application online, it is waiting for approval to pass through after filling in solution signature loan application table.
After enterprise's application carries out mortgage loan to blowdown warrant, application can be found by " application record inquiry " Record, and by checking that details track the progress situation accordingly applied.
It is used as shown in fig. 7, the examination & approval end is logged in for government staff, comprising: examination & approval end homepage, the license of examination & approval end Card management, examination & approval the management of end Initial Emission Permits, examination & approval the management of end construction project total amount, examination & approval end paid utilization with trade management, It examines end mortgage loan management and option is audited in examination & approval end enterprises registration;
It is described examination & approval end homepage option include: examine end I it is pending, examination & approval end policies and regulations and examination & approval end data statistics;
Examination & approval end license management option includes: licensing examination & approval, licensing library and licensing statistical analysis;
Examination & approval end Initial Emission Permits management options include: Initial Emission Permits examination & approval and dumping right statistical analysis;
The examination & approval end construction project total amount management options include: the examination & approval of construction project total amount, blowdown warrant payroll management, Total quantity index management and total quantity index statistical analysis;
The examination & approval end paid utilization includes: that transaction application approval and transaction statistically analyze with trade management option.
Specifically, end network address is examined in input in a browser, opens the examination & approval end of Emission trading normalized service platform, Input username and password login system.
After login system success, what is initially entered is the homepage for examining end service platform, and homepage includes my pending, policy The map of regulation and statistical data is shown.
Mine is pending: showing the backlog of approving person.System can be pushed according to permission accordingly wait handle affairs , the approving person of different user permission only needs login system, clicks " enter and handle " to handle the corresponding examination & approval of oneself permission Work.This part mainly includes licensing examination & approval, Initial Emission Permits apply to purchase examination & approval, construction project total quantity index is examined, made with compensation It is examined with transaction examination & approval, mortgage loan.This five part with level-one title be it is corresponding, approving person can also pass through correspondence Menu find pending application and handled.
Policies and regulations: the relevant policies and regulations of dumping right are illustrated.
The map of statistical data is shown: being illustrated the relevant information of dumping right, can be cut by click " area ", " industry " Change the information for checking region-by-region and branch trade statistics.The detailed of corresponding district can be checked by clicking the different districts on map Statistical information.
License management:
Approving person can view being permitted for enterprise by clicking " licensing examination & approval " under " license management " menu bar The related application that can be demonstrate,proved, the application including licensing application, license information change, licensing annual test, licensing continuity etc..It is logical Conditional filtering is crossed, the application information of corresponding conditions can be found.For the application finished, clicking " checking details " can be looked into See the process of handling.For pending application, the examination and approval work of " enter and handle " progress related application is clicked, approval process is as schemed Shown in 8.
The specific examination & approval page is divided into two parts, can see this in " approval process " part approving person and applies at present The information such as flow state and the link locating for oneself." department's approval form " part can check first enterprise application form and on The attachment of biography, approving person partially fill in further according to actual conditions in " audit opinion " suggestions made after examination of oneself after checking, finally It clicks " accepting " or " submission " and completes examination & approval.
" the licensing library " clicked under " license management " menu bar can check the licensing situation in compass of competency.Point The licensing of corresponding enterprise can be checked or download by hitting " original " " copy " " checking details ".By the setting of search condition, The license passport for meeting screening conditions can be searched.
" statistical analysis " under " license management " menu is clicked, can check the amount of issuing licence statistics and license amount statistics." hair In card amount statistics ", user can view license issuance amount statistics and (click " industry ", " region " button can change and check row The statistical conditions of industry and region), licensing operations handle ratio, the licensing operations amount of handling statistics.It clicks " license amount statistics ", It can view by region and by the blowdown license amount of industry statistic.
Initial Emission Permits management:
" the Initial Emission Permits examination & approval " clicked under " Initial Emission Permits management " menu can examine Initial Emission Permits application Batch operation, the review operation is similar with licensing review operation, is no longer described in detail.
Clicking " statistical analysis " under " Initial Emission Permits management " menu can be switched by clicking the three-level list column in left side It checks branch trade, region-by-region, divides pollutant, divides the relevant statistics for applying to purchase the Initial Emission Permits that mode counts.
Construction project total amount management:
" examination & approval of construction project total amount " option under " management of construction project total amount " menu bar is clicked, it is total into construction project Review operation process is measured, the operation is similar with licensing review operation process, therefore is also no longer described in detail.
The row of enterprise can be viewed by clicking " blowdown warrant payroll management " under " management of construction project total amount " menu bar Dirty warrant application record, approving person's click " notification sheet is got in generation " generation get notification sheet and download printing stamping for enterprise, When enterprise is with getting notification sheet and getting blowdown warrant to Environmental Protection Agency, clicking " issuing licence " can be completed work of issuing licence.
For having provided the blowdown warrant finished, can click " checking details " check blowdown warrant get record sheet with And the blowdown warrant.
" the total quantity index management " clicked under " management of construction project total amount " menu bar can be to total amount of pollutant index storehouse It is safeguarded, different index storehouses can choose by switching.It clicks " modification " to be filled in, fills in the errorless rear point of completion confirmation It hits " preservation " and completes maintenance.
Click " management of construction project total amount " menu bar under " statistical analysis " can check total quantity index application situation with And total quantity index provides the statistical analysis of situation.User can switch the statistical conditions for checking different year by the time.Pass through Switching " area ", " industry " check region-by-region, industry-specific statistical information.Mouse is parked in different regions on map, Ke Yicha See the data of different regions.
Paid utilization and trade management:
" the transaction application approval " clicked under " paid utilization and trade management " menu bar can check enterprise and environment energy Every transaction application that source trade center is submitted, including the apply that can trade, sell apply, application of assigning, tissue are traded and are examined.It examines The personnel of criticizing can switch different types of paid utilization by left side three-level title and be examined with transaction to examine the Shen of corresponding types Please.Its review operation is examined similar to licensing, is no longer described in detail.
" statistical analysis " clicked under " paid utilization and trade management " menu bar can check out the amount of assigning, can trade The statistical analysis of the paid utilization and transaction such as amount, brisk trade degree.User can check different year, difference by clicking switching Index object, disparity items data statistical analysis.
Mortgage loan management:
The application of loan, examination & approval behaviour are given as security in the mortgage loan reconciliation that clicking " mortgage loan management " can check that enterprise submits Make to be similar to licensing examination & approval, no longer be described in detail.
Enterprises registration audit:
The account registration of enterprise needs the Environmental Protection Agency in corresponding area under one's jurisdiction to be examined, and can look forward to after approving person's login system The application of enterprise is viewed in industry registration audit.The application record of respective conditions can be filtered out by screening conditions.It clicks and " examines Batch " the application for registration check list that can check enterprise, after confirming that the information filled in is errorless, approving person needs to select enterprise higher level The type of environmentally friendly authorities and enterprise after confirmation all information is errorless, clicks " passing through " and completes examination & approval.
As shown in figure 9, the ring hands over center-side to hand over care workers to use for ring, comprising: ring hands over center-side homepage, ring Center-side business handling, ring is handed over to hand over center-side capital management, ring that center-side trade management, ring is handed over to hand over center-side store keeping, ring Center-side information announcing, ring is handed over to hand over the management of center-side account, ring that center-side statistical analysis and ring is handed over to hand over center-side transaction setting choosing ?;
It includes: that ring hands over center-side my pending, ring to hand over center-side policies and regulations and ring that the ring, which hands over center-side homepage option, Hand over the general view of center-side trading situation;
It includes: to sell examination & approval, examination & approval of assigning, construction project examination & approval and mortgage to borrow that the ring, which hands over center-side business handling option, Money examination & approval;
It includes: guarantee fund, transaction cost, government fund clearing and trade management that the ring, which hands over center-side capital management option, Take;
It includes: trade at competitive price that the ring, which hands over center-side trade management option, list, agreement transfer and lease;
It includes: that transaction sales confirmation, trade contract and transaction are discerned that the ring, which hands over center-side store keeping option,;
It includes: Notice Of Transactions, the publicity of conclusion of the business result and transaction bulletin that the ring, which hands over center-side information announcing option,;
It includes: that ring hands over center-side transaction audit account and ring to hand over center-side paid that the ring, which hands over center-side account management options, Using with transaction account;
It includes: that ring hands over the center-side amount of the selling amount of assigning and ring to hand over center-side transaction that the ring, which hands over center-side statistical analysis option, Liveness;
It includes: merchandise control, trade at competitive price parameter and funding parameters that the ring, which hands over center-side transaction setting options,.
Specifically, input ring hands over center-side network address in a browser, opens the ring of Emission trading normalized service platform Center-side is handed over, username and password login system is inputted;After login system, center-side management service platform homepage is handed over into ring, It is level-one, second-level menu title on the left of homepage, includes my pending, policies and regulations on the right side of homepage and shown with map view Trading situation general view.
Mine is pending: showing that ring hands over the backlog of center personnel.System can according to permission push accordingly to The ring of working item, different user permission hands over care workers only to need login system, clicks " enter and handle " to handle oneself power It limits and corresponding handles work.Ring hands over care workers that can also find application to be handled by a corresponding second-level menu It carries out checking processing.
Policies and regulations: the relevant policies and regulations of dumping right are illustrated.
Trading situation general view: the trading volume that illustrates different subject matters, averagely information such as transaction value recently.Pass through The detail statistics information in corresponding district can be checked by clicking the different districts on map.
Further menu title on the left of homepage includes: that business handling, capital management, trade management, store keeping, information are draped over one's shoulders Dew, account management, statistical analysis and transaction setting.
Business handling includes " selling examination & approval ", " examination & approval of assigning ", " construction project examination & approval " and " mortgage loan examination & approval " four Examination and approval procedure.For having examined the record of end, user can check that it handles situation by click " checking ".
Capital management include it is all it is relevant to fund handle work, mainly guarantee fund collects, cost of trading is collected, political affairs Mansion capital settlement and trade management expense are collected.Ring hands over center when needing to carry out government's clearing with Environmental Protection Agency, can click " fund " government fund clearing " under management " menu bar, choose the transaction fund settled accounts, and clicking " clearing " can be completed knot Calculate work.
It include that the tissues of four kinds of modes of doing business (trade at competitive price is listed, agreement transfer and lease) is handed in trade management Easily.For the record that transaction terminates, " checking details " can be clicked and check its trading program, clicked " checking transaction results " and check Its conclusion of the business result situation.
Store keeping includes that the management of these three types of documents is discerned for transaction sales confirmation, trade contract and transaction.? Document through uploading, user can click " checking ", check the attachment document and essential information of upload.
Information announcing includes Notice Of Transactions publication, conclusion of the business result publicity publication and transaction bulletin publication.User can pass through Screening conditions filter out the record of respective conditions.Enterprise sells after application approval passes through, and needs ring that central user publication is handed over to hand over Easily bulletin." the transaction bulletin " in " information announcing " menu bar is clicked, the application of respective conditions, point are filtered out by screening conditions Corresponding Emission trading bulletin can be viewed by hitting " publication ".Issued transaction is announced, user can also click " recalling " carries out recalling movement, or clicks " checking " and check bulletin content in detail.
Account management:
" the transaction audit account " under " account management " menu is clicked, user can check the detailed record of All Activity. The transaction record under corresponding conditions can be filtered out by screening conditions.Clicking " checking " can check that the conclusion of the business of corresponding transaction is detailed The details such as feelings and exchange hand, expense.
" paid utilization with transaction account " under " account management " menu is that every Day Trading summarizes table, can allow user Understand daily trading situation.By the screening of trade date, corresponding trade date can be filtered out to gathering information.
Statistical analysis:
The statistical analysis of the paid utilization and transaction such as the amount of assigning and brisk trade degree can be checked out by clicking " statistical analysis ". User can by click switching check different year, different index object, disparity items data statistical analysis.
Transaction setting:
" merchandise control " clicked under " transaction setting " menu can be configured merchandise news.Clicking " modification " can be with Government guided price and minimum price markup amplitude are safeguarded.It is i.e. successfully modified that " confirmation " is clicked after the completion of modification.
" the trade at competitive price parameter " clicked under " transaction setting " menu can carry out the relevant temporal parameter of trade at competitive price Setting.Current value can be safeguarded by clicking " modification ".It is i.e. successfully modified that " confirmation " is clicked after the completion of modification.
" funding parameters " clicked under " transaction setting " menu can be checked and be arranged to the relevant parameter of fund.It is logical Different Funding Types can be switched by crossing click, mainly include guarantee fund, administration fee and preferential policy.The content of the page is mainly wrapped Include two parts: formula and publicity parameter configuration.It is the specific formula used when calculating in formula, is checked for user.Publicity The information such as the title of each parameter, unit, numerical value in publicity can be checked in parameter configuration.Clicking " editor " in action bar can It is modified with the numerical value to corresponding parameter, clicking " confirmation " after having modified can be completed modification.
Initial Emission Permits quota transfers the possession of process and check-ins step:
S1. trade Cost Balance: enterprise appraises and decides after examination & approval pass through in application Initial Emission Permits, and ring hands over center to need to enterprise Collect quota transfer transaction cost, staff can be searched in " mine is pending " corresponding item click " enter and handle " into Row Cost Balance;This step can also search corresponding item by " the transaction cost " under " capital settlement " menu bar and carry out valence Money clearing;
After confirmation transaction cost information, clicking " confirmation gathering " can be completed gathering.After the completion of gathering, clicks and " upload and receive According to " information such as the number of making out a receipt and upload receipt.
S2. transaction, which is discerned, handles: after transaction cost is collected, ring friendship center, which needs to issue transaction to enterprise, is discerned.Ring Hand over care workers that can quickly be handled in " mine is pending ";This step can also be under " store keeping " menu bar " transaction is discerned " in find corresponding record and handled;
" generating transaction to discern " is clicked, click " uploading transaction to discern " uploads part of affixing one's seal after downloading printing stamping, can be complete Apply to purchase process at the Initial Emission Permits of enterprise, this Initial Emission Permits will really be weighed in portal carry out publicity at this time.
Construction project total quantity index application process check-ins step:
S1. guarantee fund pays: after the completion of the construction project total quantity index application Environmental Protection Agency examination & approval of enterprise, carrying out transaction registration When hand over center to pay guarantee fund firstly the need of in ring, ring hands over care workers that can be expedited fastly in " mine is pending " Reason;Second-level menu " guarantee fund " can also be entered from " capital management ", check respective record." confirmation gathering " is clicked, to guarantee fund The amount of money is confirmed;After confirmation, then " uploading receipt " is clicked, guarantee fund can be completed and collect process.
S2. construction project is examined: after guarantee fund pays, ring hands over center that need to examine to signing up with for submission, Corresponding backlog is found in " mine is pending ".
" enter and handle " is clicked into approval process, the specific page of examining is divided into two parts: " approval process " part works Personnel can see this and apply for current flow state and the link locating for oneself etc.;First may be used " department's approval form " part It is partially filled out further according to actual conditions in " audit opinion " after the application form of enterprise and the attachment of upload, staff are checked with checking Oneself suggestions made after examination are written from, " passing through " is finally clicked and completes examination & approval.
S3. it tissue transaction: clicks " trade management " and corresponding mode of doing business is selected to be operated, click " tissue transaction " i.e. Tissue transaction page can be entered, user need to select trade date, opening, mode of doing business, transferor, and from selling It selects corresponding enterprise as transferor and assignee in library, library of assigning, needs exist for it is specifically intended that making for Environmental Protection Agency For the transaction of transferor, need to fill in the amount of selling manually.After all information solicitations, clicks " submission " and produce transaction Plan, after trading program generates, user, which clicks " confirmation plan ", can be completed confirmation.
S4. issue Notice Of Transactions: after plan has confirmed, user needs to issue Notice Of Transactions to transaction, it is noted here that , the transaction of primary market could issue Notice Of Transactions after needing Environmental Protection Agency to examine, and secondary market does not need Environmental Protection Agency then Examination & approval, can directly issue Notice Of Transactions." Notice Of Transactions " under " information announcing " menu bar is clicked, corresponding transaction is found Plan, the publication of Notice Of Transactions can be completed in " publication " in clicking operation column.
S5. trade sales confirmation: enterprise needs to ring to hand over center first to handle transaction and strikes a bargain confirmation after buying index Book.It is rapidly entered by " mine is pending ", or " transaction sales confirmation " for clicking under " store keeping " menu bar is found pair The enterprise's record answered is handled, and operation, which is similar to trade to discern, handles process.
S6. trade contract: enterprise needs to sign trade contract after completing transaction sales confirmation, clicks " store keeping " " trade contract " under menu bar finds the record of corresponding enterprise, and operation, which is similar to trade to discern, handles process.
S7. trade Cost Balance: enterprise's contract signing and after uploading needs to carry out Cost Balance to Finance Department, this Certain customers' operation is identical as transaction Cost Balance.
S8. trade management takes clearing: the transaction in secondary market, and enterprise needs to pay trade management expense, and trade management takes It is to be deducted in collateral security gold, trade management expense clearing can be completed after clicking " deducting guarantee fund " confirmation.It needs exist for infusing Meaning, the transaction of primary market do not need to pay trade management expense, directly can enter to trade to discern and handle.
S9. transaction is discerned and handled: after transaction cost and trade management expense are taken over, ring hands over center to need to provide to enterprise Transaction is discerned, this part operation discerned with transaction handle it is identical.After transaction is discerned and handled, enterprise can freely carry out subsequent permitted The application of application or licensing change can be demonstrate,proved.
S10. conclusion of the business result publicity: " publicity of conclusion of the business result " in " information announcing " is clicked, can view and not yet issue Conclusion of the business as a result, click " publication " can be completed conclusion of the business result publicity work.
As shown in Figure 10, the management end for administrative staff log in use, log in management end system after first it is seen that " Emission trading panorama analytical method ", it can be seen that including total quantity index, blowdown real time monitoring of swiping the card, Emission trading analysis of related results Etc. contents;
The management end includes: that pollutant discharging license management system, Initial Emission Permits appraise and decide system, construction project total quantity index Management system, paid utilization and trade managing system, total pollution discharge quantity control system by wiping card and transaction six sons of effect simulation system System;
The pollutant discharging license management system include: pollutant discharging license management homepage, pollutant discharging license management statistics analysis, Pollutant discharging license manages licensing library and pollutant discharging license manages mortgage loan option;
Pollutant discharging license management homepage option includes: that licensing operations handle general view, license issuance distribution, licensing industry Business is handled ratio and is had a guide look of by industry license issuance amount;
Pollutant discharging license management statistics analysis option includes: granting amount statistics and license amount statistics;
It includes: that Initial Emission Permits appraise and decide homepage, Initial Emission Permits management and initial row that the Initial Emission Permits, which appraise and decide system, Dirt power appraises and decides statistical analysis;
Initial Emission Permits appraise and decide homepage include: with compensation apply to purchase gratuitously apply to purchase general view, whole city's Initial Emission Permits appraise and decide general view and Each area's Initial Emission Permits general view;
Initial Emission Permits appraise and decide statistical analysis and include: industry, area, pollutant and apply to purchase mode;
The construction project total quantity index management system includes: construction project total quantity index management homepage, total quantity index pipe Reason, the management total amount examination of construction project total quantity index and the analysis of construction project total quantity index management statistics;
It includes: total amount, surplus, applications, granting amount, whole city's total amount of pollutant that construction project total quantity index, which manages homepage, Index situation and pollutant index service condition;
It includes: index allocation, operation index and the result of appraisal that construction project total quantity index, which manages total amount examination,;
The analysis of construction project total quantity index management statistics includes: construction project total amount application situation, whole city's Initial Emission Permits Appraise and decide general view and each region total quantity index applications;
The paid utilization and trade managing system include: paid utilization and trade management homepage, paid utilization and transaction Trade management, paid utilization and the management of trade management account and paid utilization is managed to statistically analyze with trade management;
Paid utilization and trade management homepage include: the amount of selling, the amount of assigning, exchange hand, the last concluded price, strike a bargain Subject matter proportion grading and transaction ranking list;
Paid utilization with trade management trade management include: can tradable emissions power, sell inquiry, assign inquiry and tissue friendship Easily inquiry;
Paid utilization includes: transaction audit account, transaction account and deposit dumping right transfer with the management of trade management account Account;
It includes: the amount of the selling amount of assigning that paid utilization is statisticallyd analyze with trade management, can trading volume and brisk trade degree.
Specifically, management end network address is inputted in a browser, is opened Emission trading and is standardized trading service platform, input Username and password logs in management end system.First it is seen that " Emission trading panorama analytical method ", administrator after login system Member is it can be seen that include the contents such as total quantity index, blowdown real time monitoring of swiping the card, Emission trading analysis of related results.
It clicks the Home button and enters management end system home page, system home page is according to Emission trading normalized service platform The requirement of six one by six system sets together, including " pollutant discharging license management system ", " Initial Emission Permits, which are appraised and decided, is System ", " construction project total quantity index management system ", " paid utilization and trade managing system ", " card reading blow-off amount control system System " and " transaction effect simulation system ", administrative staff can be by clicking to enter in specific subsystem.
Pollutant discharging license management system:
Including pollutant discharging license management system homepage, pollutant discharging license management system statistical analysis, pollutant discharging license management System license library and pollutant discharging license management system mortgage loan option.
" pollutant discharging license management system " is clicked from management end system home page and enters pollutant discharging license management system homepage, is used Family can switch the summary information for checking different year by the time, and " the returning to homepage " for clicking the upper right corner may return to management end System home page.
It clicks pollutant discharging license management system and statisticallys analyze option, can check the amount of issuing licence statistics and license amount statistics." hair In card amount statistics ", user can view license issuance amount statistics, and click " industry ", " region " button, which can switch, to be checked The statistical conditions of industry and region can also look at licensing operations and handle ratio, the licensing operations amount of handling statistics.It clicks " license amount statistics " can be viewed by region and by the blowdown license amount of industry statistic.
Pollutant discharging license management system licensing library option is clicked, can check all the case where issuing license.It clicks The licensing of corresponding enterprise can be checked or be downloaded to " original ", " copy ", " checking details ".By the setting of search condition, The license passport for meeting screening conditions can be searched.
Pollutant discharging license management system mortgage loan option is clicked, can check the mortgage loan reconciliation that all enterprises submit The application for giving as security loan can search the application for meeting screening conditions by the setting of search condition.Clicking operation column " is checked in detail Feelings " are it can be seen that specifically applies handles situation.
Initial Emission Permits appraise and decide system:
System home page, Initial Emission Permits management and Initial Emission Permits, which are appraised and decided, including Initial Emission Permits appraises and decides system statistical analysis Option.
" Initial Emission Permits appraise and decide system ", which is clicked, from management end system home page appraises and decides system head into blowdown Initial Emission Permits Page.It is the data statistics that the Initial Emission Permits shown with map view are appraised and decided on the left of homepage, user can be by stopping mouse Stay in the information that corresponding district is checked on corresponding district, left bottom user can be checked by switching " applying to purchase general view with compensation " and " gratuitously applying to purchase general view ".Homepage upper right side can check that whole city's Initial Emission Permits appraise and decide general view, and lower right side is the initial blowdown in each area Power appraises and decides general view, and user can check that the incipient nucleus of different index objects is pledged love condition general view by clicking switching.
" Initial Emission Permits management " option is clicked, can check the Shen that the Initial Emission Permits index that all enterprises submit is applied to purchase Please, by the setting of search condition, the application for meeting screening conditions can be searched.Clicking operation column " checking details " can see That specifically applies handles situation, and management end can be checked for specifically handling situation, without being operated.
" Initial Emission Permits appraise and decide system statistical analysis " option is clicked, can be switched by clicking the second-level menu column in left side It checks branch trade, region-by-region, divides pollutant, divides the relevant statistics for applying to purchase the Initial Emission Permits that mode counts.Click " pollution Object ", user can apply to purchase situation by click that switching check different pollutant region-by-regions.
Construction project total quantity index management system:
Including construction project total quantity index management system homepage, total quantity index management, total amount examination and construction project total amount INDEX MANAGEMENT system statistical analysis option.
" construction project total quantity index management system ", which is clicked, from management end system home page enters construction project total quantity index pipe Manage system home page.Homepage top half user can see total amount, surplus, applications, the statistics of granting amount of each index object Situation;It is the whole city's total amount of pollutant index situation showed with map view on the left of homepage lower half portion, user can pass through Mouse is rested on corresponding district to the information for checking corresponding district;It is that pollutant index uses feelings on the right side of homepage lower half portion The histogram of condition counts.
" total quantity index management " option is clicked, can check application record, the transaction of the construction project total quantity index of enterprise Record and record of adjusting.
" total amount examination " option is clicked, total amount assessment mode can be carried out.Firstly the need of under click " total amount examination " menu " index allocation " carry out intangibles measurement system configuration." result of appraisal " under " total amount examination " menu can check examination knot Fruit situation, ranking can be checked by clicking " checking ranking ", and the result of appraisal can be downloaded by clicking " export result ".
Click " construction project total quantity index management system statistical analysis " option, can check total quantity index application situation with And total quantity index provides the statistical analysis of situation.User can switch the statistical conditions for checking different year by the time, pass through Switching " area ", " industry " check region-by-region, industry-specific statistical information;Mouse is parked in different regions on map, Ke Yicha See the data of different regions.
Paid utilization and trade managing system:
Including using with compensation with trade managing system homepage, paid utilization and trade managing system trade management, making with compensation Option is statisticallyd analyze with the management of trade managing system account, paid utilization and trade managing system.
" paid utilization and trade managing system ", which is clicked, from management end system home page enters paid utilization and trade management system System homepage.User can view the basic condition of paid utilization and transaction in homepage, can check difference by clicking switching The statistical data of subject matter, different indexs.
" paid utilization and trade managing system trade management " option is clicked, can be checked in enterprise and environmental energy transaction Every transaction application that the heart is submitted, including the apply that can trade, sell apply, application of assigning, tissue are traded and are examined.Administrative staff can To switch different types of paid utilization and the application examined to check corresponding types of trading by left side three-level title.It clicks What " checking " can check corresponding application handles situation.
" paid utilization with the management of trade managing system account " option is clicked, can check paid utilization and trade management Transaction audit account, transaction account and deposit dumping right transfer the possession of account.It can be checked in transaction audit account all paid Using the record with transaction, the Transaction Details and expense situation of respective record can be checked by clicking " checking "." transaction account " is Every Day Trading summarizes table, and management user can be allowed to understand daily trading situation.
Click " paid utilization with trade managing system statistically analyze " option, can check out the amount of assigning, can trading volume, hand over The statistical analysis of the paid utilization and transaction such as easy liveness.User can check different year, different indexs by clicking switching Object, disparity items data statistical analysis.
Total pollution discharge quantity control system by wiping card:
" total pollution discharge quantity control system by wiping card ", which is clicked, from management end system home page enters total pollution discharge quantity control system by wiping card.With Family can check the general view situation for blowdown of swiping the card, and the blowdown flow rate situation for checking different districts can be switched by clicking district.
The foregoing is merely illustrative of the preferred embodiments of the present invention, the protection scope being not intended to limit the invention, any Those skilled in the art within the spirit and principles in the present invention made by any modifications, equivalent replacements, and improvements etc., It should all be included in the protection scope of the present invention.

Claims (4)

1. a kind of Emission trading normalized service platform characterized by comprising enterprises end, examination & approval end, ring hand over center-side and Management end.
The enterprises end is used for corporate user registration, including enterprises end homepage, enterprises end license management, enterprises end project change Enlarging, enterprises end paid utilization and transaction, the management of enterprises end IC card and enterprises end mortgage loan option;
The enterprises end homepage need by carried out after system login existing blowdown enterprise initially really power or grassroot project index Shen Please rear can enter the page, enterprises end homepage includes: enterprises end my pollutant discharging license, enterprises end my total amount information table, enterprise I pending of industry end dumping right trend and enterprises end;
System login includes: login account and login system;
Initially really power includes: that Initial Emission Permits index is applied to purchase and licensing application for existing blowdown enterprise;
Grassroot project index application include: the application of construction project total quantity index, construction project total amount transaction reporting, participate in transaction, It gets blowdown warrant and licensing claims;
The enterprises end license management option includes: that licensing inquiry, licensing annual test, licensing change and licensing prolong It is continuous;
The enterprises end reconstruction and expansion option includes: reconstruction and expansion application, application record inquiry, the inquiry of blowdown warrant;
Enterprises end paid utilization and transaction options include: assign application, sell application and transaction record;
The enterprises end IC card management options include: real time data monitoring, alert data, statistical report form and IC card information;
The enterprises end mortgage loan option includes: mortgage application, solution signature application and application record inquiry.
2. a kind of Emission trading normalized service platform according to claim 1, which is characterized in that the examination & approval end supplies Government staff, which log in, to be used, comprising: examination & approval end homepage, examination & approval end Initial Emission Permits management, is examined examination & approval end license management It criticizes end construction project total amount management, the paid utilization of examination & approval end and trade management, examine end mortgage loan management and examination & approval end enterprise Registration audit option;
It is described examination & approval end homepage option include: examine end I it is pending, examination & approval end policies and regulations and examination & approval end data statistics;
Examination & approval end license management option includes: licensing examination & approval, licensing library and licensing statistical analysis;
Examination & approval end Initial Emission Permits management options include: Initial Emission Permits examination & approval and dumping right statistical analysis;
The examination & approval end construction project total amount management options include: the examination & approval of construction project total amount, blowdown warrant payroll management, total amount INDEX MANAGEMENT and total quantity index statistical analysis;
The examination & approval end paid utilization includes: that transaction application approval and transaction statistically analyze with trade management option.
3. a kind of Emission trading normalized service platform according to claim 1, which is characterized in that the ring hands over center Care workers are handed over to use for ring in end, comprising: ring hands over center-side homepage, ring that center-side business handling, ring is handed over to hand over center-side money Gold management, ring hand over center-side trade management, ring to hand over center-side store keeping, ring that center-side information announcing, ring is handed over to hand over center end stand Account management, ring hand over center-side statistical analysis and ring to hand over center-side transaction setting options;
It includes: that ring hands over center-side my pending, ring to hand in center-side policies and regulations and ring friendship that the ring, which hands over center-side homepage option, The trading situation general view of heart end;
It includes: to sell examination & approval, examination & approval of assigning, construction project examination & approval and mortgage loan to examine that the ring, which hands over center-side business handling option, Batch;
It includes: guarantee fund, transaction cost, government fund clearing and trade management expense that the ring, which hands over center-side capital management option,;
It includes: trade at competitive price that the ring, which hands over center-side trade management option, list, agreement transfer and lease;
It includes: that transaction sales confirmation, trade contract and transaction are discerned that the ring, which hands over center-side store keeping option,;
It includes: Notice Of Transactions, the publicity of conclusion of the business result and transaction bulletin that the ring, which hands over center-side information announcing option,;
It includes: that ring hands over center-side transaction audit account and ring to hand over center-side paid utilization that the ring, which hands over center-side account management options, With transaction account;
It includes: that ring hands over the center-side amount of the selling amount of assigning and ring to hand over center-side brisk trade that the ring, which hands over center-side statistical analysis option, Degree;
It includes: merchandise control, trade at competitive price parameter and funding parameters that the ring, which hands over center-side transaction setting options,.
4. a kind of Emission trading normalized service platform according to claim 1, which is characterized in that the management end supplies Administrative staff, which log in, to be used, and is logged in after managing end system first it is seen that " Emission trading panorama analytical method ", it can be seen that packet Include the contents such as total quantity index, blowdown real time monitoring of swiping the card, Emission trading analysis of related results;
The management end includes: that pollutant discharging license management system, Initial Emission Permits appraise and decide system, construction project total quantity index management System, paid utilization and trade managing system, total pollution discharge quantity control system by wiping card and transaction six subsystems of effect simulation system;
The pollutant discharging license management system includes: pollutant discharging license management homepage, the analysis of pollutant discharging license management statistics, blowdown License management licensing library and pollutant discharging license manage mortgage loan option;
Pollutant discharging license management homepage option includes: that licensing operations handle general view, license issuance is distributed, licensing operations are done Reason ratio and by industry license issuance amount have a guide look of;
Pollutant discharging license management statistics analysis option includes: granting amount statistics and license amount statistics;
It includes: that Initial Emission Permits appraise and decide homepage, Initial Emission Permits management and Initial Emission Permits that the Initial Emission Permits, which appraise and decide system, Appraise and decide statistical analysis;
Initial Emission Permits appraise and decide homepage include: with compensation apply to purchase gratuitously apply to purchase general view, whole city's Initial Emission Permits appraise and decide general view and each area Initial Emission Permits general view;
Initial Emission Permits appraise and decide statistical analysis and include: industry, area, pollutant and apply to purchase mode;
The construction project total quantity index management system includes: construction project total quantity index management homepage, total quantity index management, builds If project total quantity index manages total amount examination and the analysis of construction project total quantity index management statistics;
It includes: total amount, surplus, applications, granting amount, whole city's total amount of pollutant index that construction project total quantity index, which manages homepage, Situation and pollutant index service condition;
It includes: index allocation, operation index and the result of appraisal that construction project total quantity index, which manages total amount examination,;
The analysis of construction project total quantity index management statistics includes: that construction project total amount application situation, whole city's Initial Emission Permits are appraised and decided General view and each region total quantity index applications;
The paid utilization and trade managing system include: paid utilization and trade management homepage, paid utilization and trade management Trade management, paid utilization and the management of trade management account and paid utilization are statisticallyd analyze with trade management;
Paid utilization includes: the amount of selling, the amount of assigning, exchange hand, the last concluded price, conclusion of the business target with trade management homepage Object proportion grading and transaction ranking list;
Paid utilization with trade management trade management include: can tradable emissions power, sell inquiry, assign inquiry and organize trade look into It askes;
Paid utilization includes: that transaction audit account, transaction account and deposit dumping right transfer the possession of account with the management of trade management account;
It includes: the amount of the selling amount of assigning that paid utilization is statisticallyd analyze with trade management, can trading volume and brisk trade degree.
CN201910329662.6A 2019-04-23 2019-04-23 A kind of Emission trading normalized service platform Pending CN110070342A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910329662.6A CN110070342A (en) 2019-04-23 2019-04-23 A kind of Emission trading normalized service platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910329662.6A CN110070342A (en) 2019-04-23 2019-04-23 A kind of Emission trading normalized service platform

Publications (1)

Publication Number Publication Date
CN110070342A true CN110070342A (en) 2019-07-30

Family

ID=67368512

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910329662.6A Pending CN110070342A (en) 2019-04-23 2019-04-23 A kind of Emission trading normalized service platform

Country Status (1)

Country Link
CN (1) CN110070342A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110991848A (en) * 2019-11-26 2020-04-10 浙江省环境科技有限公司 Enterprise environment information management system
CN113516394A (en) * 2021-07-19 2021-10-19 甘肃省生态环境科学设计研究院(甘肃省生态环境规划院) Intelligent system and method for managing whole-process environment of two-high project

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
中国擎天软件: "《排污权交易平台》", 2 November 2016 *
贾继薇: "排污权交易管理信息系统设计", 《中国环境管理》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110991848A (en) * 2019-11-26 2020-04-10 浙江省环境科技有限公司 Enterprise environment information management system
CN113516394A (en) * 2021-07-19 2021-10-19 甘肃省生态环境科学设计研究院(甘肃省生态环境规划院) Intelligent system and method for managing whole-process environment of two-high project

Similar Documents

Publication Publication Date Title
CN1987919A (en) Exciting method and system for enterprise credit in electronic business
CN102750594A (en) Method for internal accounting control of enterprise
CN110458636A (en) A kind of petrochemical industry transaction platform of connected applications management system and business model
CN110070342A (en) A kind of Emission trading normalized service platform
Sanda et al. Managing stakeholder opportunism in public-private partnership (PPP) housing projects
Mähönen Finland: Corporate governance: Nordic tradition with American spices
Vallabhaneni Wiley CIA exam review 2013, internal audit practice
Reddick Public-sector e-commerce and state financial management: Capacity versus wealth
CN208636876U (en) Transaction in assets module
Amadi-Echendu An analysis of conveyancing business processes in South Africa
Bhatnagar et al. Results from a Study of Impact of E-government Projects in India
Akdogan Digital Service Taxes as the Fiscal Result of Digital Transformation
AU2014100917A4 (en) Product for unaudited financial statements and method for qualifying the eligibility for such a product
Board Constitution
Baughman Minnesota county forest land: alternative policies for program funding, timber sales, and land ownership
Vezenkoska et al. Internal audit of financial operations
Simon Proposal for: Tackling Internet sales taxes in a post-wayfair world
Ladda Nature of the Audit
Hoadley et al. Surprise Billing: Volume Of Cases Using Independent Dispute Resolution Continues Higher Than Anticipated
Hailu ASSESSMENT OF ELECTRONIC BANKING IMPLEMENTATION IN SELECTED COMMERCIAL BANKS IN ETHIOPIA
Authority Capital Markets Authority Handbook
AU2015100581A6 (en) Product for unaudited financial statements and method for qualifying the eligibility for such a product
Wise et al. Overseas Real Property: State Department Needs to Improve Guidance and Records Management
Jaeger et al. Montenegro Financial Sector Assessment Program: Framework for Nonperforming Loans Workout and Insolvency and Creditor Rights
Healthcare Limited

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190730