CN110068025A - Boiler top flexible seal device and its construction method - Google Patents

Boiler top flexible seal device and its construction method Download PDF

Info

Publication number
CN110068025A
CN110068025A CN201910311664.2A CN201910311664A CN110068025A CN 110068025 A CN110068025 A CN 110068025A CN 201910311664 A CN201910311664 A CN 201910311664A CN 110068025 A CN110068025 A CN 110068025A
Authority
CN
China
Prior art keywords
steel plate
ceiling
sleeve
connecting rope
seal device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910311664.2A
Other languages
Chinese (zh)
Other versions
CN110068025B (en
Inventor
姚广富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Borun Electric Power Technology Co Ltd
Original Assignee
Anhui Borun Electric Power Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Borun Electric Power Technology Co Ltd filed Critical Anhui Borun Electric Power Technology Co Ltd
Priority to CN201910311664.2A priority Critical patent/CN110068025B/en
Publication of CN110068025A publication Critical patent/CN110068025A/en
Application granted granted Critical
Publication of CN110068025B publication Critical patent/CN110068025B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16JPISTONS; CYLINDERS; SEALINGS
    • F16J15/00Sealings
    • F16J15/02Sealings between relatively-stationary surfaces
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23MCASINGS, LININGS, WALLS OR DOORS SPECIALLY ADAPTED FOR COMBUSTION CHAMBERS, e.g. FIREBRIDGES; DEVICES FOR DEFLECTING AIR, FLAMES OR COMBUSTION PRODUCTS IN COMBUSTION CHAMBERS; SAFETY ARRANGEMENTS SPECIALLY ADAPTED FOR COMBUSTION APPARATUS; DETAILS OF COMBUSTION CHAMBERS, NOT OTHERWISE PROVIDED FOR
    • F23M5/00Casings; Linings; Walls
    • F23M5/06Crowns or roofs for combustion chambers

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Installation Of Indoor Wiring (AREA)

Abstract

The invention discloses a kind of boiler top flexible seal device and its construction method, including ceiling, wall pipe and fixation steel plate, the fixation steel plate is sealedly connected on the ceiling;Metal sealing box is sealedly connected on the fixation steel plate, the wall pipe sequentially passes through the top surface of the ceiling and the fixation steel plate and the top surface center of the metal sealing box, the outer surface of the metal sealing box is laid with ceramic fibre sealant in one week around the wall pipe, steel mesh is installed outside the ceramic fibre sealant, the steel mesh is fixed by steel nail and ceiling, fixation steel plate, it further include the connected nail for being inserted into ceramic fibre sealant, the connected nail includes the taper guide part that the sleeve and sleeve fixed with steel mesh are fixedly connected.By glue by steel mesh connecting rope and ceramic fibre sealant link together, entire sealing device is more stable.

Description

Boiler top flexible seal device and its construction method
Technical field
The present invention relates to boiler seal fields, in particular to boiler top flexible seal device and its construction method.
Background technique
Pulverized-coal fired boiler flexible sealing is key position in entire boiler operatiopn, and is easiest to occur leaking out, leaks ash, is scattered Heat, the boiler roof sealing of existing boiler be usually in a manner of physical seal based on, (place such as through walls can use the sealing of bottom steel plate Steel plate structure of seal box), then sealed with hard materials such as refractory mortar, castable refractory, insulated pouring material, then use semi-rigid Rock wool board, rock wool or silicate aluminum board, aluminium silicate wool, pasted with binder, or whole plaster again with wire netting, with flame retardant coating. If there is the Vibration Condition under the condition of high temperature after boiler puts into operation, it can make to deform after hard steel plate is heated, lead to refractory material And semi hard insulating material cracking, shelling, cause to leak cigarette due to that can not restore to the original state during boiler fortune is stopped, leak ash, scattered The problems such as hot, can not only reduce boiler thermal efficiency, and the dust flown upward influences production environment;In addition, top dust stratification overtemperature, Difficulty can be brought to the maintenance of normal boiler maintenance.
Current sealing device structure as notification number be CN207471578U disclosed in patent, including it is ceiling, through walls Pipe and fixation steel plate, ceiling are made of roof tube and ceiling floor, are tightly connected at the top of ceiling and boiler, and fixation steel plate is tightly connected On ceiling;Be sealedly connected with metal sealing box on fixation steel plate, wall pipe sequentially pass through the top surface of ceiling and fixation steel plate with And the top surface center of metal sealing box, the outer surface of metal sealing box was laid with flexible seal device around wall pipe one week, flexible Sealing device includes ceramic fibre sealant, and ceramic fibre sealant is made of ceramic fibre and high temperature binder.
But there is no direct connection, ceramic fibre sealants to be easy to happen phase for current steel mesh and ceramic fibre sealant To movement, causes it to be easy ceramic fibre sealant and be easy to happen damage.
Summary of the invention
In view of the deficienciess of the prior art, the first object of the present invention is to provide a kind of boiler top flexible sealing dress It sets, the service life of lift-off seal device.
Above-mentioned technical purpose of the invention has the technical scheme that a kind of boiler top flexible sealing Device, including ceiling, wall pipe and fixation steel plate, the fixation steel plate are sealedly connected on the ceiling;The fixation steel plate On be sealedly connected with metal sealing box, the wall pipe sequentially passes through the top surface of the ceiling and the fixation steel plate and described The outer surface in the top surface center of metal sealing box, the metal sealing box is laid with ceramic fibre sealing for one week around the wall pipe Layer, the ceramic fibre sealant are equipped with steel mesh outside, and the steel mesh passes through steel nail and ceiling, wall pipe, fixation steel plate, metal Seal box is fixed, and further includes the connected nail for being inserted into ceramic fibre sealant, the connected nail include the sleeve fixed with steel mesh and The taper guide part that sleeve is fixedly connected, the taper guide part along the circumferential direction uniformly distributed multiple mounting holes, the mounting hole with The inner cavity of sleeve is connected to, and a connecting rope is respectively provided in each mounting hole, and described connecting rope one end extends in sleeve and formed always Diameter is greater than the clamping portion of connecting rope diameter, and the other end of the connecting rope fixes a guide part, the guide part and connecting rope phase Pair cross section be greater than the cross section size of connecting rope, the diameter of the connecting rope is less than installation bore dia;Peace in the sleeve Fill a connection ring, open up blocked hole in the connection ring, the wedging position in blocked hole upper end and be greater than clamping bore dia; The sleeve lining fixes a lantern ring, and the thrust column of the opposite lantern ring sealing sliding of setting one, the thrust column lean in the sleeve Link slot is offered on one end side wall of nearly taper guide part.
It is located in the space positioned at thrust column and taper guide part in sleeve and injects glue, push thrust column, glue is to leading It exerting a force to part, guide part drives connecting rope mobile guide part to drive connecting rope that connecting rope is made to have penetrated ceramic fibre sealant, And glue is flowed out along mounting hole so that connecting rope is bonded together with ceramic fibre sealant, and sleeve steel mesh is fixed on Together, it is promoted to the relatively fixed of ceramic fibre sealant, it is more stable.
Further, the thrust column is fixed with elastic hook far from lantern ring one end, and the elastic hook is connect with thrust column certainly One end is obliquely outward to outside sleeve, and when the elastic hook abuts sleeve end face, link slot is connected to inner cavity and the exocoel of lantern ring.
So when elastic hook abuts sleeve end face, glue can be injected, glue passes into set along exocoel, link slot In ring inner cavity.
Further, the thrust column is fixed with push rod far from one end of link slot, and a briquetting is fixed on the push rod, The end face evagination of end face relative sleeve of the briquetting far from push rod side.
So that being not easy to adhere to end face of the briquetting far from push rod side when glue enters.
Further, the briquetting forms an annular chamfer far from the end face of push rod side.
The setting of annular chamfer is convenient for glue entrance.
Further, the guide part is cone, and the big end of cone is fixed with connecting rope.
Further, the clamping portion is sphere.
Further, the connecting rope is steel cable.Steel cable bonding strength is high.
The second object of the present invention is to provide a kind of construction method of boiler top flexible seal device, including walks as follows Rapid: step 1) ceiling, fixation steel plate, metal sealing box successively weld;Wall pipe is sequentially passed through ceiling, fixed steel by step 2 Plate, metal sealing box;Step 3) by ceramic fibre sealant be coated on wall pipe surrounding and with ceiling, fixation steel plate, metal it is close Jacket bonding;Step 4) covers steel mesh, and passes through steel nail for steel mesh and ceiling, fixation steel plate;Connected nail is inserted into and makes pottery by step 5) Porcelain fibrous encapsulation layer, and connected nail and steel mesh are welded.
In conclusion the invention has the following advantages: the service life of the effective lift-off seal device of the present invention.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of embodiment;
Fig. 2 is the schematic diagram of connected nail;
Fig. 3 is the portion the A enlarged drawing of Fig. 2;
Fig. 4 is the portion the B enlarged drawing of Fig. 2.
Appended drawing reference: 1, ceiling;2, wall pipe;3, fixation steel plate;4, metal sealing box;5, ceramic fibre sealant;6, Steel mesh;7, steel nail;8, connected nail;81, sleeve;82, taper guide part;821, mounting hole;83, connecting rope;84, clamping portion;85, Guide part;86, connection ring;861, blocked hole;87, stop collar;88, lantern ring;91, thrust column;911, link slot;92, elastic hook; 93, push rod;94, briquetting;95, annular chamfer.
Specific embodiment
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this All by the protection of Patent Law in the scope of the claims of invention.
A kind of boiler top flexible seal device, such as Fig. 1, including ceiling 1, wall pipe 2 and fixation steel plate 3, the fixation Steel plate 3 is sealedly connected on the ceiling 1;Metal sealing box 4 is sealedly connected on fixation steel plate 3, wall pipe 2 sequentially passes through top The top surface center of the top surface and the metal sealing box 4 of canopy 1 and the fixation steel plate 3, the outer surface of the metal sealing box 4 It is laid within 2 one weeks ceramic fibre sealant 5 around the wall pipe, steel mesh 6 is installed outside ceramic fibre sealant 5, steel mesh 6 passes through Steel nail 7 and ceiling 1, wall pipe 2, fixation steel plate 3, metal sealing box 4 are fixed.Ceramic fibre sealant 5 is bonded by ceramic fibre It forms.
It further include the connected nail 8 for being inserted into ceramic fibre sealant 5 such as Fig. 2, connected nail 8 includes the sleeve fixed with steel mesh 6 81 taper guide parts 82 being fixedly connected with sleeve 81;Such as Fig. 3-4, the along the circumferential direction uniformly distributed multiple installations of taper guide part 82 Hole 821, mounting hole 821 are connected to the inner cavity of sleeve 81, and a connecting rope 83 is respectively provided in each mounting hole 821.Connecting rope 83 1 End extends in sleeve 81 clamping portion 84 formed greater diameter than 83 diameter of connecting rope, and clamping portion 84 is sphere;Connecting rope 83 The other end fix a guide part 85.Guide part 85 is cone, and the big end of cone and connecting rope 83 are fixed;Guide part 85 The cross section opposite with connecting rope 83 is greater than the cross section size of connecting rope 83;Connecting rope 83 can have for various high-intensitive The rope of certain deformability, connecting rope 83 is steel cable, 83 long enough of connecting rope, when guide part 85 is located at taper in the present embodiment When in guide part 82, connecting rope 83 is in bending state.The diameter of connecting rope 83 is less than 821 diameter of mounting hole.Installation in sleeve 81 One connection ring 86 and stop collar 87, stop collar 87 and sleeve 81 are fixed, and connection ring 86 and stop collar 87,81 inner wall of sleeve support It connects.Blocked hole 861 is opened up in connection ring 86, blocked hole 861 axially penetrates through connection ring 86 along sleeve 81, and clamping portion 84 is located at clamping The upper end in hole 861 and be greater than 861 diameter of blocked hole.Such as Fig. 2,81 inner wall of sleeve fixes a lantern ring 88, a phase is arranged in sleeve 81 To the thrust column 91 of the sealing sliding of lantern ring 88,91 diameter of thrust column is identical as the annular diameters of lantern ring 88, and thrust column 91 is close to cone Link slot 911 is offered on one end side wall of shape guide part 82.
Such as Fig. 2, thrust column 91 is fixed with elastic hook 92 far from 88 one end of lantern ring, and elastic hook 92 is by elastic steel at elasticity Hook 92 is arranged three along 91 circumferencial direction uniform intervals of thrust column, and connect one end with thrust column 91 is tilted towards extension to elastic hook 92 certainly It extends to outside sleeve 81, when elastic hook 92 abuts 81 end face of sleeve, link slot 911 is connected to inner cavity and the exocoel of lantern ring 88.Thrust column 91 one end far from link slot 911 are fixed with push rod 93, a briquetting 94 are fixed on push rod 93, briquetting 94 is far from push rod 93 1 The end face evagination of the end face relative sleeve 81 of side.Briquetting 94 forms an annular chamfer 95 far from the end face of 93 side of push rod.
A kind of construction method of boiler top flexible seal device, includes the following steps: step 1) ceiling 1, fixation steel plate 3, metal sealing box 4 successively welds;Wall pipe 2 is sequentially passed through ceiling 1, fixation steel plate 3, metal sealing box 4 by step 2;Step 3) ceramic fibre sealant 5 is coated on 2 surrounding of wall pipe and be bonded with ceiling 1, fixation steel plate 3, metal sealing box 4;Step 4) steel mesh 6 is covered, and passes through steel nail 7 for steel mesh 6 and ceiling 1, fixation steel plate 3;Step 5) is close by the insertion ceramic fibre of connected nail 8 Sealing 5 injects glue, and glue passes into 88 inner cavity of lantern ring along exocoel, link slot 911, pushes thrust column 91, glue It exerts a force to guide part 85, guide part 85 drives 83 mobile guide part 85 of connecting rope to drive connecting rope 83 that connecting rope 83 has been penetrated Ceramic fibre sealant 5, and glue is flowed out along mounting hole 821 so that connecting rope 83 and ceramic fibre sealant 5 are bonded in one It rises;Finally sleeve 81 and steel mesh 6 are welded.

Claims (8)

1. a kind of boiler top flexible seal device, including ceiling (1), wall pipe (2) and fixation steel plate (3), the fixed steel Plate (3) is sealedly connected on the ceiling (1);It is sealedly connected with metal sealing box (4) on the fixation steel plate (3), it is described to wear Wall coil (2) sequentially passes through the top surface of the ceiling (1) and the fixation steel plate (3) and the top surface of the metal sealing box (4) The outer surface in center, the metal sealing box (4) is laid with ceramic fibre sealant (5) for (2) one weeks around the wall pipe, described It is equipped with steel mesh (6) outside ceramic fibre sealant (5), the steel mesh (6) passes through steel nail (7) and ceiling (1), wall pipe (2), consolidates It is fixed to determine steel plate (3), metal sealing box (4), it is characterised in that: further include the connected nail for being inserted into ceramic fibre sealant (5) (8), the connected nail (8) includes the taper guide part that the sleeve (81) and sleeve (81) fixed with steel mesh (6) are fixedly connected (82), the taper guide part (82) is along the circumferential direction evenly distributed with multiple mounting holes (821), the mounting hole (821) and sleeve (81) inner cavity connection, each mounting hole (821) is interior to be respectively provided with a connecting rope (83), and described connecting rope (83) one end extends to set The clamping portion (84) greater diameter than connecting rope (83) diameter is formed in cylinder (81), the other end of the connecting rope (83) fixes one Guide part (85), the guide part (85) and connecting rope (83) opposite cross section are greater than the cross section size of connecting rope (83), The diameter of the connecting rope (83) is less than mounting hole (821) diameter;A connection ring (86) are installed in the sleeve (81), the company It connects and opens up blocked hole (861) on ring (86), the clamping portion (84) is located at the upper end of blocked hole (861) and is greater than blocked hole (861) diameter;Sleeve (81) inner wall is fixed a lantern ring (88), and setting one opposite lantern ring (88) seals in the sleeve (81) The thrust column (91) of sliding, the thrust column (91) offer link slot on one end side wall of taper guide part (82) (911)。
2. boiler top flexible seal device according to claim 1, it is characterized in that: further, the thrust column (91) it is fixed with elastic hook (92) far from lantern ring (88) one end, the elastic hook (92) tilts from one end is connect with thrust column (91) Extend out to sleeve (81) outside, when the elastic hook (92) abuts sleeve (81) end face, link slot (911) is connected to lantern ring (88) Inner cavity and exocoel.
3. boiler top flexible seal device according to claim 2, it is characterized in that: the thrust column (91) is far from connection One end of slot (911) is fixed with push rod (93), is fixed a briquetting (94) on the push rod (93), and the briquetting (94) is separate The end face evagination of the end face relative sleeve (81) of push rod (93) side.
4. boiler top flexible seal device according to claim 3, it is characterized in that: the briquetting (94) is far from push rod (93) end face of side forms an annular chamfer (95).
5. boiler top flexible seal device according to claim 1, it is characterized in that: the guide part (85) is circular cone Body, and the big end of cone and connecting rope (83) are fixed.
6. boiler top flexible seal device according to claim 1, it is characterized in that: the clamping portion (84) are sphere.
7. boiler top flexible seal device according to claim 1, it is characterized in that: the connecting rope (83) is steel cable.
8. a kind of construction method of boiler top flexible seal device, characterized in that include the following steps: step 1) ceiling (1), Fixation steel plate (3), metal sealing box (4) successively weld;Wall pipe (2) is sequentially passed through ceiling (1), fixation steel plate by step 2 (3), metal sealing box (4);Step 3) by ceramic fibre sealant (5) be coated on wall pipe (2) surrounding and with ceiling (1), solid Determine steel plate (3), metal sealing box (4) bonding;Step 4) covers steel mesh (6), and passes through steel nail (7) for steel mesh (6) and ceiling (1), fixation steel plate (3);Connected nail is inserted into ceramic fibre sealant (5) by step 5), and connected nail and steel mesh (6) are welded.
CN201910311664.2A 2019-04-18 2019-04-18 Boiler top flexible sealing device and construction method thereof Expired - Fee Related CN110068025B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910311664.2A CN110068025B (en) 2019-04-18 2019-04-18 Boiler top flexible sealing device and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910311664.2A CN110068025B (en) 2019-04-18 2019-04-18 Boiler top flexible sealing device and construction method thereof

Publications (2)

Publication Number Publication Date
CN110068025A true CN110068025A (en) 2019-07-30
CN110068025B CN110068025B (en) 2020-08-21

Family

ID=67367956

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910311664.2A Expired - Fee Related CN110068025B (en) 2019-04-18 2019-04-18 Boiler top flexible sealing device and construction method thereof

Country Status (1)

Country Link
CN (1) CN110068025B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112856476A (en) * 2021-01-28 2021-05-28 中国华冶科工集团有限公司 Boiler top sealing and heat preservation construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4336783A1 (en) * 1993-10-25 1995-04-27 Ver Energiewerke Ag Arrangement for sealing an unutilised space with respect to a flue-gas-channelling chamber
CN102338369A (en) * 2010-07-20 2012-02-01 王悦 Method and device for sealing body of power station boiler
CN203115968U (en) * 2012-12-29 2013-08-07 杭州锅炉集团股份有限公司 Sealing device of manhole door of waste heat boiler of combustion gas turbine
CN205842726U (en) * 2016-07-27 2016-12-28 江苏兴鼎力炉窑工程有限公司 A kind of oven roof sealing device
CN206291195U (en) * 2016-12-23 2017-06-30 中能戈润(北京)环保科技有限公司 A kind of furnace roof flexible stereo press mold sealing structure
CN207298898U (en) * 2017-07-13 2018-05-01 江苏勤恒实业有限公司 A kind of station boiler flexible seal device
CN207471578U (en) * 2017-10-11 2018-06-08 江苏射阳港发电有限责任公司 Boiler top sealing device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4336783A1 (en) * 1993-10-25 1995-04-27 Ver Energiewerke Ag Arrangement for sealing an unutilised space with respect to a flue-gas-channelling chamber
CN102338369A (en) * 2010-07-20 2012-02-01 王悦 Method and device for sealing body of power station boiler
CN203115968U (en) * 2012-12-29 2013-08-07 杭州锅炉集团股份有限公司 Sealing device of manhole door of waste heat boiler of combustion gas turbine
CN205842726U (en) * 2016-07-27 2016-12-28 江苏兴鼎力炉窑工程有限公司 A kind of oven roof sealing device
CN206291195U (en) * 2016-12-23 2017-06-30 中能戈润(北京)环保科技有限公司 A kind of furnace roof flexible stereo press mold sealing structure
CN207298898U (en) * 2017-07-13 2018-05-01 江苏勤恒实业有限公司 A kind of station boiler flexible seal device
CN207471578U (en) * 2017-10-11 2018-06-08 江苏射阳港发电有限责任公司 Boiler top sealing device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112856476A (en) * 2021-01-28 2021-05-28 中国华冶科工集团有限公司 Boiler top sealing and heat preservation construction method

Also Published As

Publication number Publication date
CN110068025B (en) 2020-08-21

Similar Documents

Publication Publication Date Title
CN207597816U (en) A kind of flue structure
CA2898425C (en) Monolithic refractory structure
CN110068025A (en) Boiler top flexible seal device and its construction method
US10280639B2 (en) Materials and methods for lining a chimney
US4290457A (en) Truncated triangular insulator
CN203336841U (en) Furnace top thermocouple installing device for hot air furnace
CN113088604B (en) Hot blast stove three-fork flat-joint masonry structure and process
US20120005984A1 (en) Materials and methods for lining a chimney
JP2019128039A (en) Bellows seal for pipe penetrating through floor or wall
CN210399543U (en) Hot-blast furnace top temperature thermocouple installation device
JP4358565B2 (en) Coke oven riser base structure
CN202648407U (en) Fireproof prefabricated brick for rotary kiln
CN111609417B (en) Hot cigarette pipeline sealing connection structure
RU146803U1 (en) CHIMNEY
CN113551103B (en) Method for fixing super heat-insulating material of water beam of heating furnace
CN210123062U (en) Non-metal expansion joint for connecting lower header and slag well of power plant boiler
CN115650605B (en) Double-chamber lime kiln fire hole pulling structure and preparation method
CN215767420U (en) High-low temperature core-pulling type temperature sensor
CN109538243B (en) High-temperature-resistant grouting check valve for shield segment
CN106051814A (en) Furnace top seal device
CN110864169A (en) Improved connecting frame
RU171677U1 (en) CERAMIC FITTING FOR CHIMNEY FROM CERAMIC PIPES
CN214534895U (en) Improved armoured snap ring interface device for prestressed steel cylinder concrete pipe
CN103307755B (en) Air heating furnace roof the installation of TC device and method
CN213835403U (en) Hot-blast furnace three-fork mouth restores ceramic wear-resisting material anti-seepage device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200821

CF01 Termination of patent right due to non-payment of annual fee