CN110067394A - A kind of wire grip of building a wall helping integrated construction - Google Patents

A kind of wire grip of building a wall helping integrated construction Download PDF

Info

Publication number
CN110067394A
CN110067394A CN201910180263.8A CN201910180263A CN110067394A CN 110067394 A CN110067394 A CN 110067394A CN 201910180263 A CN201910180263 A CN 201910180263A CN 110067394 A CN110067394 A CN 110067394A
Authority
CN
China
Prior art keywords
wall
standpipe
wire
measuring tape
slide plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910180263.8A
Other languages
Chinese (zh)
Inventor
徐有清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910180263.8A priority Critical patent/CN110067394A/en
Publication of CN110067394A publication Critical patent/CN110067394A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1808Holders for bricklayers' lines, bricklayers' bars; Sloping braces

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of wire grip of building a wall helping integrated construction, can overcome prior art disadvantage, easy to use, can guarantee verticality, without being to guarantee the frequent messenger wire ball of verticality.Including patch wall standpipe, sliding wire grip, wherein: the patch wall standpipe includes standpipe ontology and protrudes setting T word slide plate in standpipe body outer wall, the sliding wire grip setting and the matched T word sliding slot of T word slide plate, sliding wire grip fitting T word slide plate are slided up and down along T word slide plate;Described other three faces outer walls in addition to outer wall be arranged except T word slide plate of patch wall standpipe are arranged grafting slot, and grafting slot interpolation accesses wall fixed link, it is described enter wall fixed link include anti-other cross bar, enter wall inserted link, on return power bar;It is described enter wall inserted link be linear type shape or zigzag shape;The sliding wire grip includes lifting bracing wire block, mark post measuring tape, and the top vertical of lifting bracing wire block is arranged mark post measuring tape, is additionally provided with balancing point wire pressing device at the top of the lifting bracing wire block.

Description

A kind of wire grip of building a wall helping integrated construction
Technical field
The present invention relates to architectural engineering and building implement technical field more particularly to a kind of integrated construction is helped to build a wall Wire grip.
Background technique
Traditional construction technology is first to add 1cm to calculate as standard the thickness of every skin brick by layer height using brick thickness, in the small lumps of wood Skin number is drawn on marked rod, is laid bricks since corner, and three to four skin bricks of every block hang primary line with thread ball, correct verticality, such as Fruit out of plumb needs to tap brick adjustment verticality from side with the hard object such as brick or trowel, and so just mortar is struck loosely, Influence the caking property of mortar, the quality decline of brick setting.
In the height of the 4th skin brick or so or more, that is, can marked rod stand when getting up, marked rod is stood At the back side of brick wall, in place by Pass line adjustment, fixation is pegged or pushed down with iron nail or brick.And bricklayer's master worker is not very willing Skin number is found because drawing marked rod with marked rod, keeping marked rod is all more troublesome, different common brick specifications, different positions, Skin number is different, and thickness is also different, and marked rod will remake.And marked rod is not had to it cannot be guaranteed that construction quality.By biography The construction method of system is first to lay bricks, and is inserted into brickwork joint with the hard object such as iron nail, and then, the weights such as blind header are respectively tied up at two online ends, Line is hung on iron nail, is pressed from both sides on line with small bamboo plate on line after line is tensed, and keeps line at a distance from about 1mm with wall.Only The brick of one end is wanted to fall down, the other end also falls down, and accidentally also line is broken, and needs rewiring, constructs very troublesome.
Summary of the invention
Technical problems based on background technology, the invention proposes it is a kind of help integrated construction wire grip of building a wall, Prior art disadvantage can be overcome, it is easy to use, it can guarantee verticality, without being to guarantee the frequent messenger wire ball of verticality.
A kind of wire grip of building a wall helping integrated construction proposed by the present invention, is realized by following embodiments:
A kind of wire grip of building a wall helping integrated construction, including patch wall standpipe, sliding wire grip, in which: the patch wall standpipe packet It includes standpipe ontology and protrudes setting T word slide plate, the sliding wire grip setting and the matched T of T word slide plate in standpipe body outer wall Word sliding slot, sliding wire grip fitting T word slide plate are slided up and down along T word slide plate;
Grafting slot, grafting slot is arranged in other the three faces outer walls of the patch wall standpipe in addition to the outer wall being arranged except T word slide plate Interpolation accesses wall fixed link, it is described enter wall fixed link include anti-other cross bar, enter wall inserted link, on return power bar, anti-other cross bar is rectangular The plate body of shape, top and bottom are respectively arranged a rod aperture, return power bar in the rod aperture insertion at top, the rod aperture of bottom is inserted into wall Inserted link;It is the I-shaped shape screw rod for being sheathed with spring that power bar is returned on described, and the end for above returning power bar is equipped with auxiliary spring gasket, described Entering wall inserted link is linear type shape or zigzag shape, and inside fitting spring, the top nose deduction of spring is in the inside of anti-other cross bar On outer wall
, that is, spring top deduction in rear end, the top nose deduction of spring is on the inside outer wall of anti-other cross bar;It is described Sliding wire grip includes going up and down bracing wire block, mark post measuring tape, the top vertical setting mark post measuring tape of lifting bracing wire block, on T word slide plate The top of symmetrical mark post measuring tape be provided with clamping be arranged 1 scale fasten sliding block (fastener is similar file clip, not with mark Ruler connection), the lifting bracing wire block top is additionally provided with balancing point wire pressing device, and a drawing is arranged towards T word slide plate in lifting bracing wire block Spring, which controls in screw hole tension spring control screw hole, is arranged a tension spring screw, and the pine of bracing wire block is gone up and down by the elastic control of tension spring screw Dynamic or fitting.
Two main spring bars are welded in rod aperture two sides as in the preferred main spring gasket group, main spring bar is sheathed with master Spring, instead there is corresponding two main spring rod aperture on other cross bar, main spring bar passes through and corresponds to main spring rod aperture, main bullet on anti-other cross bar There is fastening screw in spring base end.It is not ejected for constraining fixed main spring.
U-lag hole, U-lag hole and most similar grafting slot is arranged in top and bottom as the preferably described patch wall standpipe Distance be no more than the length or equal of anti-other cross bar.This set can make the U-lag hole for being inserted into bottom into wall fixed link match The brick for closing bottommost carries out the accurate adjusting of height, adapts to the rebasing height in different bottoms.
It is at least 5cm ~ 25cm long rectangle or oblong shape groove body as the preferred grafting slot.This length The adjustment that some length details are carried out with the height that shape adapts to brick, to adapt to the brick of various thickness, to guarantee It is inserted between the middle seam of brick.
It is zigzag shape as the preferred wall inserted link include the horizontal inserted link being laterally arranged, horizontal inserted link head end insertion is not anti-horizontal In the jack of bar matching setting, wherein hole is removed in the head end setting of horizontal inserted link, anti-skidding inverted teeth, horizontal inserted link is arranged in the entire head end whole body End bend downward after laterally straight setting again, and be sharp conical shape, pulled out when easy to dismantle.This structure can be formed Relatively good fitting ability and enabling capabilities are also relatively high when support long patch wall standpipe, the shape of horizontal inserted link and Structure can be easier among the gap of insertion brick, and not allowed into wall inserted link by its tilting, according to demand downwards or upward Carry out using.
Top and bottom being traversed vertically as the preferred lifting bracing wire block, one measuring tape slot being set, mark post measuring tape is vertical Insertion is arranged in measuring tape slot, and measuring tape slot is laterally arranged a measuring tape and controls screw hole.It is arranged one in measuring tape control screw hole Tension spring screw control mark post measuring tape is used to engage or unclamps control mark post measuring tape, and measuring tape controls screw hole parallel beneath setting one Upgrading controls screw hole, and be spirally connected 1 lifting drawspring screw in elevating control screw hole.
Include balance staff bolt, bracing wire tongue axis, coiling roller bearing as the preferred balancing point wire pressing device, matches balance staff bolt location One balance staff mounting hole of center setting of lifting bracing wire block is set, and bracing wire tongue axis matching setting balance staff mounting hole is also provided with a peace Hole is filled, at least on the middle position of balance staff, balance staff bolt is spirally connected in the mounting hole of balance staff pacifies this mounting hole into balance staff It fills in hole, and bracing wire tongue axis is fixed, and one compresses screw rod, balance staff bolt are set in its tail end as matching balancing point wire pressing device Screw terminal under be sheathed with 1 coiling roller bearing, coiling roller bearing bottom or top fitting spring.This wire grip is easier to prevent Line is broken when bracing wire or take-up when is relatively difficult.
At least one vertical collimator is set as preferred patch wall standpipe top of grafting slot at least at 2, vertical collimator is used To check verticality.And 1 winder is also set up at the top of patch wall standpipe.Line is distributed to coiling roller bearing by winder.
It is caught in as the preferably described anti-other cross bar entering to be provided with a rebound piece, the head end for the piece that rebounds above wall inserted link In anti-skidding inverted teeth.Rebound piece can have certain rebound along spring, this rebound can be repelled piece after entering wall inserted link insertion brickwork joint The structure for being caught in anti-skidding inverted teeth is blocked, and prevents from springing back into wall inserted link excessive.
It is additionally provided with diagonal brace wall connecting rod on T word slide plate as the preferably described patch wall standpipe, diagonal brace wall connecting rod includes character cut in bas-relief The oblique fixed sliding block of shape and the diagonal brace axis rotated along articulated shaft always being hinged on tiltedly fixed sliding block, diagonal brace spindle nose end The diagonal brace wall connecting rod being arranged inwardly is set.
Compared with prior art, the present invention has the beneficial effects that the steady straight patch wall standpipe of structure first incorporates into Displacement can will not be generated to brick in very good insertion brickwork joint after wall inserted link, the height for relying on itself that can be relatively good carries out Lifting;Possessing sliding wire grip can be carried out the small height adjustment to 0.5mm or so, and accuracy is good, directly carry out sliding adjustment and And point-device can judge whether line is straightened, scale is set after two this product a pair are installed and in patch wall standpipe If, all data can be very clear, helps people directly to carry out identification operation, the technical ability of this operational requirements compares the prior art Operation want small very more;Do not need multiple dowel nail, could bracing wire, if constructing by this wire grip, by skin number regulating device, Skin number is accurately adjusted, and after wire grip assembly is moved up in place, is adjusted line tongue adjusting screw, is built by the line on wire grip line tongue Brick, verticality is good, wall surface levelling, can save a large amount of plastering material and plastering labour cost, not have to marked rod, can The labour cost of the materials such as the small lumps of wood with saving and production marked rod;It constructs by this wire grip, changes traditional lay bricks Construction technology.The device integrate marked rod, verticality, bracing wire the very convenient new tool of construction, improve production work efficiency, Labor intensity is reduced, construction quality is improved.Save construction material.
Detailed description of the invention
Fig. 1 is total example structure figure.
Fig. 2 is to implement Facad structure figure.
Fig. 3 is that integral product overlooks assembling figure.
Fig. 4 is into 1 figure of wall fixed link accessory embodiment.
Fig. 5 is into 2 figure of wall fixed link accessory embodiment.
Fig. 6 is into wall fixed link front elevation.
Fig. 7 is main groups of springs sectional view.
Fig. 8 is sliding wire grip three-dimensional structure diagram.
Fig. 9 is sliding wire grip cross section structure figure.
Figure 10 is to implement schematic enlarged-scale view.
Figure 11 is patch wall standpipe solid and Facad structure figure.
Figure 12 is that wire grip implements elevation.
Specific embodiment
Below by embodiment, in conjunction with attached drawing, preferred specific description is used as to technical solution of the present invention:
The orientation being previously mentioned in following embodiments refers specifically to orientation shown in corresponding Figure of description, and connection structure does not have such as Illustrate general integrated moulding only in the prior art, engaging, axis connection, hinged etc., main structure of the invention be all by Aluminium alloy moulding or plastics, which are blow molded and are molded, carries out moulding, and shape described in the text is primarily referred to as shown in corresponding diagram Shape and structure content, prior art person are well understood by the connection type for changing structure;
As shown in Figure 1-3, a kind of wire grip of building a wall for helping integrated construction, including patch wall standpipe (1), sliding wire grip (2), In: the patch wall standpipe (1) includes standpipe ontology (3) and protrudes setting T word slide plate (4) in standpipe ontology (3) outer wall, and patch wall is vertical Pipe is aluminium alloy one moulding, which is the rectangular tube body of (3) rectangular square tube cavity, and the outer wall surface of square tube can be with Printing or etching length scale, the cavity of this tube body, and combine its T word slide plate and can be formed in internal and main cavity appearance Square tube cavity shares two cavitys, a main cavity (101) as soon as, secondary cavity (102), also this square cavity and avris It is common aluminium side's pipe structure that being extended, which has laminated structure, and this structure fabrication is very cheap, and materials are easy.The sliding Wire grip (2) setting and the matched T word sliding slot (5) of T word slide plate (4), T word sliding slot (5) here refer to that main chamber body side surface has one Secondary cavity (I-shape construction), the outside of secondary cavity are equipped with two and go to front and back stretching, formed for bracing wire assembly apparatus The track slided up and down;
Sliding wire grip (2) fitting T word slide plate (4) slides up and down after being inserted in from its head along T word slide plate (4);
Grafting slot (6) are arranged in non-T word slide plate (4) setting side outer wall in the patch wall standpipe (1), with shown in Fig. 1-2, this sentence The meaning of words really says that the left side is provided with T word slide plate so using T word slide plate as main perspective, then the left side of standpipe ontology (3) Grafting slot (6), that is, the obverse and reverse in Fig. 1 can be set as shown in the figure with the right side, and this of setting runs through Empty slot physical efficiency allow arrangement described below perforation grafting setting, grafting slot (6) interpolation access wall fixed link (7), as Fig. 1, 4,5, enter wall fixed link (7) plug in pricker of building a wall (the first shown implementation method namely of the invention namely in the prior art Enter wall hinge pedestal structure, more there is simple person directly to use nail), respectively there are a U-shaped hole slot, its master in main cavity positive and negative up and down Act on is can have plug-in position, main cavity positive and negative respectively have one up and down when bottommost or top carry out plugging in pricker U-shaped hole slot, mainly standpipe (1) can be turned around up and down using left and right is general after standpipe (1) turns around.And match centre The grafting slot (6) of standpipe ontology (3) hollow out have that several are elongated and as shown in Figs. 1-2, middle both ends are that the hole slot of semicircle comes Increase adjustment distance.Main cavity back side two sides respectively have a prominent bar-shaped object to contact with wall.
It is described enter wall fixed link (7) there are two types of embodiment, two kinds may be used alone, can also be used in combination;
Enter the first embodiment of wall fixed link, as shown in figure 4, include anti-other cross bar (8), enter wall inserted link (9), on return power bar (10), anti-other cross bar (8) is rectangular plate body, and a rod aperture (11), the rod aperture (11) at top is respectively arranged in top and bottom It is returned in insertion power bar (10), the rod aperture (11) of bottom is inserted into wall inserted link (9), is entered wall inserted link (9) and is being passed over anti-other cross bar (8) One spring shim is set in the distance of 2cm ~ 5cm after the rod aperture (11) of lower end, in this spring shim and anti-other cross bar (8) Between a spring can be set, prevent this structure (entering excessive in wall inserted link pyramidal structure insertion brickwork joint) from exerting oneself for buffering To the impact force of wall block when more;It is the I-shaped shape screw rod for being sheathed with spring, this spiral shell that power bar (10) is returned on described What the head of bar can weld a sheet supports its effect of mark structure and lower end, it is described enter wall inserted link (9) be linear type shape, such as Fig. 6, shown in 7, two main spring bars are welded in rod aperture (11) two sides in main spring gasket group (12), main spring bar is sheathed with main bullet Spring, instead there is corresponding two main spring rod aperture (38) on other cross bar (8), main spring bar passes through and corresponds to main spring on anti-other cross bar (8) Rod aperture (38), main spring boom end have fastening screw.It is not ejected for constraining fixed main spring.It deducts in master at the top of spring Spring shim group (12) rear end, the top nose deduction of spring is on the inside outer wall of anti-other cross bar (8);This embodiment master It is the improvement of existing plug in pricker if direct inserting mode, refers mainly to joined and return power bar to prevent insertion from excessively causing brick Seam expansion;
As shown in Fig. 1,2,8, wire grip (2) are slided followed by the main tool of bracing wire, by right at two as shown in Figs. 1-2 Claim that standpipe ontology (3) Lai Jinhang bracing wire process that building pastes thirty years of age of wall is arranged in, that is to say, that described two symmetrical slidings Wire grip (2) can be used in up and down adjustment to same axis, and the graticule drawing on wire grip is then slided in one end and arrives the other side Bracing wire is realized on sliding wire grip, his structure is by the lifting bracing wire block (13) of carry out elevating control and for measuring height The mark post measuring tape (21) of distance forms, and mark post measuring tape (21) are arranged in the top vertical of lifting bracing wire block (13), mark post measuring tape (21) For carrying out the adjusting and measurement of details height, scale fastening sliding block (15), the fastening are sheathed in mark post measuring tape (21) Part is that scale fastens sliding block similar file clip, he can be clipped in mark post measuring tape or the T word slide plate with mark post measuring tape parallel distance (4) on, because when promoting scale: 1, its meeting and T word slide plate (4) solve friction obstruction with interval, and 2, be to be used for this Carry out the height of 1 piece of brick on traversal marker.Going up and down bracing wire block is metal or plastics block structure, and back side one moulding has above-mentioned armful The T word sliding slot (5) for clasping T word slide plate slides closed, 1 measuring tape slot (22) of vertical hollow out perforation, main body lateral the past is inwardly Measuring tape control screw hole (23) of T word sliding slot is extended through always, and measuring tape controls screw hole (23) parallel beneath and a upgrading control is arranged Screw hole (30), be spirally connected in elevating control screw hole 1 lifting drawspring screw (31), these three pore structures are the lifting of scale respectively, The elastic control of the lifting of scale, and the control of entire lifting bracing wire block lifting carriage, last lifting bracing wire block (13) top It is additionally provided with balancing point wire pressing device (16), tension spring screw (21) are arranged towards T word slide plate (4) in lifting bracing wire block (13), pass through tension spring The loosening or fitting of elastic control lifting bracing wire block (13) of screw, loosening can slide up and down, and press if tension spring screw supports It so can not just be slided up and down on the outer wall of standpipe ontology (3);
As shown in figure 8, the balancing point wire pressing device (16) includes balance staff bolt (25), bracing wire tongue axis (26), coiling roller bearing (27), One balance staff mounting hole (28) of center setting with balance staff bolt (25) position in lifting bracing wire block (13), bracing wire tongue axis (26) It is also provided with a mounting hole with setting balance staff mounting hole (28), this mounting hole is at least on the middle position of balance staff, balance staff spiral shell Bolt (25), which passes through, to be spirally connected in the mounting hole of balance staff into balance staff mounting hole (28), and bracing wire tongue axis (26) is fixed, and as One compresses screw rod (29) is set in its tail end with balancing point wire pressing device (16), compresses screw rod (29) can be set in lifting bracing wire block Avris protrusion one piece of plate perhaps 1 boss then be arranged screw hole be convenient for compresses screw rod be threadingly advanced or retreated, For adjusting the line on line tongue at a distance from wall, 1 coiling roller bearing (27) is sheathed under the screw terminal of balance staff bolt (25), around Line roller bearing (27) bottom or top fitting spring.This wire grip is easier to prevent to break line or take-up when bracing wire When it is more difficult.
As shown in figure 9, the coiling roller bearing (27) of balancing point wire pressing device (16) can be useful similar to wrapping above the yarn axis of weaving loom In the bracing wire of label, then line pull is directed in a short slot hole of bracing wire tongue axis (26) head end due to being angularly disposed This slot, then he can clasp line, then along shown in Figure 12, this wire grip can lead other end and set On the bracing wire tongue axis of this product of a same mirror settings, that is, again from the bracing wire tongue axis of second this product reversely by line It imports in the coiling roller bearing (27) of second this product, rolls two coiling roller bearings and tighten bracing wire, and complete the operation of bracing wire;
As shown in figure 5, U-lag hole (17) are arranged in the top and bottom as preferably described patch wall standpipe (1), U-lag hole (17) The distance of most similar grafting slot (6) is no more than the length of anti-other cross bar (8).This set can make bottom be inserted into bottom U-lag hole (17) cooperation bottommost brick carry out height accurate adjusting, adapt to the rebasing height in different bottoms.
It is at least 5cm ~ 25cm long rectangle or oblong shape groove body as the preferred grafting slot (6).It is this The height that length and shape adapt to brick carries out the adjustment of some length details, to adapt to the brick of various thickness, to protect Card can be inserted between the middle seam of brick.
Enter second of embodiment of wall fixed link, as shown in Figure 4,5, it is described enter wall inserted link (9) be zigzag shape include cross To the horizontal inserted link (18) of setting, hole (19) are removed in the setting of the head end of horizontal inserted link (18), and (same directly right cone structure enters wall inserted link , the same structure of head end setting), entire head end anti-skidding inverted teeth (20) setting up and down enters wall inserted link after preventing grafting good (9) meeting stress is jumped out, laterally straight again after causing solid failure, the end of horizontal inserted link (18) to bend downward to be arranged (namely So-called zigzag shape), and be sharp conical shape, it is pulled out when easy to dismantle, other structures and embodiment one are identical, embodiment party Formula two is also including vertically arranged anti-other cross bar (8), and anti-other cross bar (8) is rectangular plate body, and top and bottom are respectively set A rod aperture (11) to be set, is returned power bar (10) in rod aperture (11) insertion at top, the rod aperture (11) of bottom is inserted into wall inserted link (9), Enter wall inserted link (9) and a spring pad is set in the distance of 2cm ~ 5cm after the rod aperture (11) for passing over anti-other cross bar (8) lower end A spring can be arranged between this spring shim and anti-other cross bar (8) in piece;It is to be sheathed with spring that power bar (10) are returned on described I-shaped shape screw rod, above return power bar (10) end be equipped with auxiliary spring gasket (14), it is described enter wall inserted link (9) be it is noted earlier Zigzag shape, in inside fitting spring, the top of spring is deducted in main spring gasket group (12) rear end.This structure can compare Enabling capabilities are also relatively high when forming relatively good fitting ability and support long patch wall standpipe (1), horizontal inserted link (18) shape and structure can be easier among the gap of insertion brick, and do not allowed and allowed it to tilt into wall inserted link (9), more Demand is downward or is configured upward.
Top and bottom are traversed vertically as the preferred lifting bracing wire block (13), and one measuring tape slot (22), mark post are set Vertically insertion is arranged in measuring tape slot (22) measuring tape (21), and measuring tape slot (22) is laterally arranged a measuring tape and controls screw hole (23), one tension spring screw (24) of setting controls mark post measuring tape (21) for engaging or unclamping control in measuring tape control screw hole (23) Mark post measuring tape (21), measuring tape controls one upgrading of setting of screw hole (23) parallel beneath and controls screw hole (30), in elevating control screw hole Be spirally connected 1 lifting drawspring screw (31).Cooperate again top compresses screw rod (29) these structures mainly formed three it is elastic Structure is the lifting of control lifting bracing wire block (13), the lifting of mark post measuring tape and the advance of compresses screw rod (29) pine respectively Tightly.
As shown in Figure 11,12, it is at least set as preferred patch wall standpipe (1) top of grafting slot (6) at least at 1 1 vertical collimator (32) is set, and pastes and also sets up 1 winder (33) at the top of wall standpipe (1).Vertical collimator (32) is used to check vertical Line is distributed to coiling roller bearing (27) by degree, winder (33).
Entering to be provided with a rebound piece (34) above wall inserted link (9) as the preferably described anti-other cross bar (8), rebound piece (34) head end is caught in anti-skidding inverted teeth (20).Rebound piece (34) can have one along spring after entering wall inserted link (9) insertion brickwork joint Fixed rebound, this rebound, which can be repelled piece (34) and be caught in the structure of anti-skidding inverted teeth (20), to be blocked, and prevents from springing back into wall inserted link (9) It is more.
As shown in Figure 10, diagonal brace wall connecting rod is additionally provided on the T word slide plate (4) as preferably described patch wall standpipe (1) (35), diagonal brace wall connecting rod (35) include the oblique fixed sliding block (36) of character cut in bas-relief shape and be hinged on tiltedly fixed sliding block always along hinge The diagonal brace axis (37) that spindle is rotated, tiltedly fixed sliding block (36) are consistent with the lifting shrink-fit structure of bracing wire block (13), diagonal brace axis (37) the diagonal brace wall connecting rod (35) being arranged inwardly is arranged in head end.
A kind of specific wire grip of building a wall using this integrated construction quickly carries out the method that bracing wire is built a wall, as shown in Figure 10, It is attached to wall outer wall in patch wall standpipe (1), the wall that enters that z word shape is put into out of the first skin of the end of wall mortar mortar joint is fixed Bar (7), after being put into wall fixed link (7) in mortar mortar joint between the second skin brick and third skin, patch wall standpipe (1) lower part U-shaped hole slot (17) alignment z word shape enter that wall fixed link (7) and grafting grafting slot (6) be directed at linear type shape enter wall inserted link (9) it stands directly, by the vertical collimator (32) of a front surface and a side surface, adjusts the verticality in two directions of a front surface and a side surface, keep vertical;
The alignment and fixation wall bar (18) in hole (11) on the hole of main spring gasket and anti-other cross bar (8) or enter wall inserted link (9) later, Gently pressure makes main spring stress, and anti-skidding buckle rebound piece (34) moves clamping, by anti-other cross bar (8) power transmission, makes Auxiliary spring (21) stress.The power of main spring is bigger, and the bounce of auxiliary spring (21) is also bigger, and the wall that enters of anti-other z word shape is consolidated The power of fixed pole is also bigger, and rectangular tube body is just fixed tighter, and the wall fixed link that enters of z word shape is also less susceptible to pull out.
As shown in figure 11, it is put into away from the mortar mortar joint at standpipe (1) top down about 40cm ~ 60cm into wall inserted link (9), Wall fixed link (7) is installed in place by aforementioned claim.When brick wall is successively built to standpipe bodies top height, the first skin at the top of it It is put into brick and down the mortar mortar joint of the second skin brick into wall inserted link (9), moves up and prepare for standpipe (1).
After highest skin brick masonry is complete in standpipe (1) height, following wall fixed link (7) is removed, standpipe is taken out (1), the U-shaped hole slot (17) of patch wall standpipe (1) lower part alignment linear type shape is entered wall fixed link (7) and grafting grafting slot (6) enter wall inserted link (9) for being directed at linear type shape are stood directly, are installed by aforementioned installation requirement.
When building next skin brick, we only need will slide wire grip (2) simultaneously raise a skin brick height ( Exactly carry out the sliding of a skin brick height distance upwards along standpipe ontology), measure the height of a skin brick: we are first the The brick first piece of brick of two skins, then using mark post measuring tape (21) measure brick output is high and height (the specific height of mortar As the first skin brick), if it is determined that, we are just with reference to first piece of brick just having built by the bracing wire tongue axis of balancing point wire pressing device (16) (26) movement indicia is to parallel at the top of first piece of brick, then line is drawn to, then online end exceptionally straight to other end progress It is measured using level meter, level can start whole masonry projects of the skin brick after maintaining an equal level, then reciprocal until last;And We do not need to be adjusted otherwise structure, are and so on just easy to.Another wire grip being used cooperatively It installs according to the above method, two matching used wire grips of building a wall calibrate the height of standpipe ontology level by horizontal control lines.
If top enters wall fixed link according to the combined method practical operation of Fig. 1-4 and noted earlier using linear type shape It is consistent using the operating method for entering wall fixed link (7) of Z-shaped shape, be installed in the wall fixed link that enters of first linear type shape Afterwards, the fixed support in one side is set in the side of the identical and above height for entering wall fixed link of first linear type shape.
When the brick wall height of masonry and rectangular tube body top horizontal, the z word shape of lower part is entered wall fixed link and linear type The fixed lever fixing apparatus of wall that enters of shape is removed, and is removed also very simply, as long as after the auxiliary spring of fixed device is pushed, light pressure is blocked Button can easily disassemble fixed device.Rectangular tube body is taken out.Rectangular tube body lower part U hole slot alignment is past from above Second linear type shape of lower number enters wall fixed link, repeats above-mentioned installation steps and is installed.
Specific embodiment described herein is only an example for the spirit of the invention.The neck of technology belonging to the present invention The technical staff in domain can make various modifications or additions to the described embodiments or replace by a similar method In generation, however, it does not deviate from the spirit of the invention or beyond the scope of the appended claims.

Claims (9)

1. a kind of wire grip of building a wall for helping integrated construction, including patch wall standpipe, sliding wire grip, it is characterized in that: the patch wall Standpipe includes standpipe ontology and protrudes setting T word slide plate, the sliding wire grip setting and T word slide plate in standpipe body outer wall The T word sliding slot matched, sliding wire grip fitting T word slide plate are slided up and down along T word slide plate;
Grafting slot, grafting slot is arranged in other the three faces outer walls of the patch wall standpipe in addition to the outer wall being arranged except T word slide plate Interpolation accesses wall fixed link, it is described enter wall fixed link include anti-other cross bar, enter wall inserted link, on return power bar, anti-other cross bar is rectangular The plate body of shape, top and bottom are respectively arranged a rod aperture, return power bar in the rod aperture insertion at top, the rod aperture of bottom is inserted into wall Inserted link;It is the I-shaped shape screw rod for being sheathed with spring that power bar is returned on described, it is described enter wall inserted link be linear type shape or zigzag shape, Its inside fitting spring, the top nose deduction of spring is on the inside outer wall of anti-other cross bar;The sliding wire grip includes rising Bracing wire block, mark post measuring tape drop, and mark post measuring tape is arranged in the top vertical of lifting bracing wire block, the top of symmetrical mark post measuring tape on T word slide plate End is provided with clamping and 1 scale fastening sliding block is arranged, and is additionally provided with balancing point wire pressing device at the top of the lifting bracing wire block, goes up and down bracing wire Block is arranged a tension spring towards T word slide plate and controls one tension spring screw of setting in screw hole tension spring control screw hole, passes through tension spring screw Elastic control lifting bracing wire block loosening or fitting.
2. a kind of wire grip of building a wall for helping integrated construction according to claim 1, it is characterized in that: the patch wall standpipe The distance of top and bottom setting U-lag hole, U-lag hole and most similar grafting slot is no more than the length or phase of anti-other cross bar Deng.
3. a kind of wire grip of building a wall for helping integrated construction according to claim 1 or 2, it is characterized in that: the inserting groove Hole is at least 5cm ~ 25cm long rectangle or oblong shape groove body.
4. a kind of wire grip of building a wall for helping integrated construction according to claim 1, it is characterized in that: entering wall inserted link is Z-shaped Shape includes the horizontal inserted link being laterally arranged, in the jack of the horizontal anti-other cross bar matching setting of inserted link head end insertion, wherein horizontal inserted link Hole is removed in head end setting, and anti-skidding inverted teeth is arranged in the entire head end whole body, and the end of horizontal inserted link is laterally set straight again after bending downward It sets, and is sharp conical shape.
5. a kind of wire grip of building a wall for helping integrated construction according to claim 1, it is characterized in that: the lifting bracing wire block Top and bottom being traversed vertically, one measuring tape slot being set, mark post measuring tape, which is vertically inserted into, to be arranged in measuring tape slot, and measuring tape is inserted Slot is laterally arranged a measuring tape and controls screw hole, and one tension spring screw of setting controls mark post measuring tape and is used to engage in measuring tape control screw hole Or control mark post measuring tape is unclamped, measuring tape controls screw hole parallel beneath and an elevating control screw hole, spiral shell in elevating control screw hole is arranged Connect 1 lifting drawspring screw.
6. a kind of wire grip of building a wall for helping integrated construction according to claim 1, it is characterized in that: the balancing point wire pressing device Including balance staff bolt, bracing wire tongue axis, coiling roller bearing, one pendulum of center setting of balance staff bolt location setting lifting bracing wire block is matched Shaft mounting hole, bracing wire tongue axis matching setting balance staff mounting hole are also provided with a mounting hole, this mounting hole is at least in balance staff Between on position, balance staff bolt, which passes through, to be spirally connected in the mounting hole of balance staff into balance staff mounting hole, and bracing wire tongue axis is fixed, and conduct It matches balancing point wire pressing device and one compresses screw rod is set in its tail end, be sheathed with 1 coiling roller bearing under the screw terminal of balance staff bolt, around Line roller bearing bottom or top fitting spring.
7. a kind of wire grip of building a wall for helping integrated construction according to claim 1, it is characterized in that: the patch wall standpipe is extremely At least one vertical collimator is arranged in few top of grafting slot at 2, and pastes and also set up 1 winder at the top of wall standpipe.
8. a kind of wire grip of building a wall for helping integrated construction according to claim 1 or 4, it is characterized in that: described anti-not horizontal Bar is caught in anti-skidding inverted teeth entering to be provided with a rebound piece, the head end for the piece that rebounds above wall inserted link.
9. according to claim 1, a kind of wire grip of building a wall of help integrated construction, feature described in 2,7 any claims It is: is additionally provided with diagonal brace wall connecting rod on the T word slide plate of the patch wall standpipe, diagonal brace wall connecting rod includes the oblique fixed cunning of character cut in bas-relief shape Block and the diagonal brace axis rotated along articulated shaft always being hinged on tiltedly fixed sliding block, the setting of diagonal brace spindle nose end are arranged inwardly Diagonal brace wall connecting rod.
CN201910180263.8A 2019-03-11 2019-03-11 A kind of wire grip of building a wall helping integrated construction Pending CN110067394A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910180263.8A CN110067394A (en) 2019-03-11 2019-03-11 A kind of wire grip of building a wall helping integrated construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910180263.8A CN110067394A (en) 2019-03-11 2019-03-11 A kind of wire grip of building a wall helping integrated construction

Publications (1)

Publication Number Publication Date
CN110067394A true CN110067394A (en) 2019-07-30

Family

ID=67366211

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910180263.8A Pending CN110067394A (en) 2019-03-11 2019-03-11 A kind of wire grip of building a wall helping integrated construction

Country Status (1)

Country Link
CN (1) CN110067394A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109972816A (en) * 2019-03-08 2019-07-05 苏州同美展示股份有限公司 A kind of interior decoration altitude control equipment
CN110748172A (en) * 2019-10-28 2020-02-04 宁夏昌禾装饰工程有限公司 Household mark paying-off method
CN111005565A (en) * 2019-12-25 2020-04-14 武艳灵 Mounting and positioning construction method for building wall decoration curtain wall

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109972816A (en) * 2019-03-08 2019-07-05 苏州同美展示股份有限公司 A kind of interior decoration altitude control equipment
CN109972816B (en) * 2019-03-08 2020-10-23 苏州绿诚企业管理有限公司 Height control equipment for interior decoration
CN110748172A (en) * 2019-10-28 2020-02-04 宁夏昌禾装饰工程有限公司 Household mark paying-off method
CN111005565A (en) * 2019-12-25 2020-04-14 武艳灵 Mounting and positioning construction method for building wall decoration curtain wall
CN111005565B (en) * 2019-12-25 2021-08-27 广东珠江工程总承包有限公司 Mounting and positioning construction method for building wall decoration curtain wall

Similar Documents

Publication Publication Date Title
CN110067394A (en) A kind of wire grip of building a wall helping integrated construction
JP2019078586A (en) Positioning ruler
US20050086901A1 (en) Device for laying brick constructs
CN210032681U (en) Wall-building wire grip for assisting integrated construction
CN111636695A (en) Laser skin number pole device of steerable brickwork roughness
CN201924607U (en) Wall body vertical wire hanging instrument
CN207730217U (en) A kind of concrete wall column and mold plate verticality detection device
CN204286338U (en) Convenient verticality measuring instrument
US4285139A (en) Trig pole for masonry construction
CN207147493U (en) The testing apparatus for verticality of vertical member
CN205300453U (en) Height measuring ruler for buildings
CN215407520U (en) Masonry wall body verticality and flatness control device
CN211373592U (en) Measuring equipment for verticality of historic building
US1880261A (en) Means for gauging round chimneys
CN208563988U (en) A kind of building mould tool
CN216049913U (en) Template verticality detection tool with high voice broadcasting function
CN215254733U (en) Pre-buried steel sheet straightness control instrument that hangs down
CN214470782U (en) Device for rapidly measuring verticality
CN215631795U (en) Positioning and paying-off tool for building construction
CN111678418A (en) Verticality measuring device is built in room
CN209672991U (en) A kind of supporting mechanism being convenient for measuring spinning pipe size
CN102418421A (en) Construction method and used construction tool
CN220705213U (en) Floor thickness control device in concrete pouring process
CN209910650U (en) Novel laser inclinometer
CN109811739A (en) A kind of civil construction adjustable base drill rod

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination