CN110067386A - A kind of exterior wall and aproll integral structure construction method - Google Patents

A kind of exterior wall and aproll integral structure construction method Download PDF

Info

Publication number
CN110067386A
CN110067386A CN201810060155.2A CN201810060155A CN110067386A CN 110067386 A CN110067386 A CN 110067386A CN 201810060155 A CN201810060155 A CN 201810060155A CN 110067386 A CN110067386 A CN 110067386A
Authority
CN
China
Prior art keywords
aproll
exterior wall
wall
integral structure
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810060155.2A
Other languages
Chinese (zh)
Inventor
周成伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201810060155.2A priority Critical patent/CN110067386A/en
Publication of CN110067386A publication Critical patent/CN110067386A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Retaining Walls (AREA)

Abstract

A kind of exterior wall and aproll integral structure construction method, characterized by the following steps: a, in exterior wall and aproll design process, conventional aproll one end is mounted in wall, b, in exterior wall and aproll integral structure work progress, first suspend by normal construction basis and outer wall foundation section to aproll component bottom absolute altitude, it after outer wall foundation section intensity reaches requirement, then backfills and tamps the foot of a wall two sides soil, until foot wall top surface absolute altitude;Then reinforcing bar, formwork in aproll are installed pour aproll concrete;Finally continue to build exterior wall main paragraph to designed elevation, completes exterior wall and the construction of aproll integral structure.Exterior wall and aproll integral structure construction method of the invention has a building simple structure and reasonable design, easy to operate of exterior wall and aproll integral structure, and construction quality is securely and reliably and the advantages of prevent aproll from cracking.

Description

A kind of exterior wall and aproll integral structure construction method
Technical field
The present invention relates to a kind of aproll structures, specifically, being a kind of exterior wall and aproll integral structure construction method.
Background technique
With the protective layer that masonry or concrete are paved into it is aproll around the buildings such as house, is join vertical with exterior wall plinth Protect the wall base from rain erosion to exclude rainwater in inclined outdoor ground part.The masonry or concrete exterior wall of building For the building enclosure of building, concrete apron is the building blocks of function for protecting the wall base.Current building trade is interior for exterior wall and scattered The design and construction of water use separate type mode.
Fig. 1 is known aproll plan view, and Fig. 2 is known aproll schematic perspective view.Conventional exterior wall It builds, builds all the way up to design height at the top of since basis.Conventional outdoor aproll formwork after backfill pours coagulation Soil.By flexible material filleting between two kinds of components of conventional exterior wall and conventional outdoor aproll, flexible material, which plays, prevents rainwater logical Cross the effect that gap seepage flow corrodes the foot of a wall.
But the separation design and construction method of conventional exterior wall and aproll, by outdoor temperature, rainwater, underground water, ground The influence of sedimentation, largely occur wall crazing, aproll everywhere subsoil settlement the phenomenon that, and be difficult to avoid.Even exterior wall and dissipate The fist that can protrude into people is arrived greatly in crack between water, and this phenomenon absolutely proves conventional exterior wall and aproll separation design and construction Defect.
Therefore known exterior wall and aproll separation design and construction there are problems that it is above-mentioned various inconvenient and.
Summary of the invention
The purpose of the present invention is to propose a kind of exterior wall for avoiding aproll crack and aproll integral structure construction method.
To achieve the above object, the technical solution of the invention is as follows:
A kind of exterior wall and aproll integral structure construction method, it is characterised in that the following steps are included:
A, in exterior wall and aproll design process, by conventional aproll root, i.e., close to the part of the side of exterior wall in aproll section Extend, be mounted in aproll one end in wall, become cantilever member, and according to several ordinary reinforced concretes of configuration in aproll The steel bar stress and distribution bar of structure, to enhance the component load-bearing ability of aproll;
B, in exterior wall and aproll integral structure work progress, normal construction basis and outer wall foundation section are first pressed to aproll component bottom Absolute altitude pause after outer wall foundation section intensity reaches requirement, then backfills and tamps the foot of a wall two sides soil, until foot wall top surface is marked It is high;Then reinforcing bar, formwork in aproll are installed pour aproll concrete;Finally continue build exterior wall main paragraph to designed elevation, it is complete It constructs at exterior wall and aproll integral structure.
Exterior wall and aproll integral structure construction method of the invention can also be using technical measures below come further It realizes.
Method above-mentioned, wherein the steel bar stress is not less than Φ 8 200, distribution bar is not less than Φ 6 250, uses HPB300 grades of reinforcing bars.
Method above-mentioned, wherein being cohered between the basis and outer wall foundation section with the masonry mortar of exterior wall;Outer wall foundation It is cohered between section and aproll with the concrete of aproll;It is cohered between aproll and exterior wall main paragraph with the masonry mortar of exterior wall.
Method above-mentioned, wherein the overhanging partial width of the aproll is 600mm-1200mm, aproll root is stayed It is appraised and decided in the intracorporal segment thickness of wall according to design specification≤1200mm cantilever slab, no less than 100mm, and the slope from root 1-3% slope aspect end.
After adopting the above technical scheme, exterior wall and aproll integral structure construction method of the invention has the advantage that
1, the building simple structure and reasonable design of exterior wall and aproll integral structure, easy to operate;
2, construction quality is safe and reliable, the exterior wall after incorporating aproll, enhances the flat in-plane stiffness of exterior wall horizontal direction at this, Reduce the crack risk of outer walling (or concrete);
3, aproll changes Path of Force Transfer as cantilever design, cooperates with external wall, avoids aproll to backfill soil matrix Dependence, it is therefore prevented that aproll because foundation soil settle due to follow sedimentation, deformation, problem of Cracking.
Detailed description of the invention
Fig. 1 is known aproll plan view;
Fig. 2 is known aproll schematic perspective view;
Fig. 3 is the aproll plan view of the embodiment of the present invention;
Fig. 4 is the aproll schematic perspective view of the embodiment of the present invention;
Fig. 5 is the aproll construction rapid schematic diagram of step 1 of the embodiment of the present invention;
Fig. 6 is the aproll construction second step schematic diagram of the embodiment of the present invention;
Fig. 7 is the aproll construction third step schematic diagram of the embodiment of the present invention.
In figure: 1 exterior wall, 2 filletings, 3 aprolls, 4 bases, 5 indoor terraces, 6 backfills, 7 reinforcing bars, 8 plank sheathings.
Specific embodiment
With reference to embodiments and its attached drawing further explains the present invention.
Embodiment 1
Exterior wall and aproll integral structure construction method of the invention, in including the following steps.
It is the aproll plan view of the embodiment of the present invention referring now to Fig. 3 and Fig. 4, Fig. 3, Fig. 4 is that the present invention is real Apply the aproll schematic perspective view of example.
A, in exterior wall and aproll design process, by conventional aproll root, i.e., close to the side of exterior wall 1 in aproll section Part extends, and is mounted in 3 one end of aproll in wall, becomes cantilever member, and according to several regular reinforcements of configuration in aproll The steel bar stress and distribution bar of concrete structure, to enhance the component load-bearing ability of aproll;The steel bar stress is not less than Φ 8@200, distribution bar is not less than 6@250 of Φ, using HPB300 grades of reinforcing bars.
B, in exterior wall and aproll integral structure work progress, normal construction basis 4 and 1 section of foundation of exterior wall are first pressed to aproll Absolute altitude pause in component bottom after outer wall foundation section intensity reaches requirement, then backfills backfill 6 and compacting the foot of a wall two sides soil, until Foot wall top surface absolute altitude;Then reinforcing bar, formwork in aproll are installed pour aproll concrete;Finally continue to build exterior wall main paragraph extremely Designed elevation completes exterior wall and the construction of aproll integral structure.The masonry sand of exterior wall is used between the basis and outer wall foundation section Slurry coheres;It is cohered between outer wall foundation section and aproll with the concrete of aproll;The block of exterior wall is used between aproll and exterior wall main paragraph Mortar is built to cohere.The overhanging partial width of the aproll is 600mm-1200mm, aproll root stays in the intracorporal portion of wall Thickness is divided to appraise and decide according to design specification≤1200mm cantilever slab, no less than 100mm, and the slope 1-3% slope aspect end from root Portion.Fig. 5-Fig. 7 is the aproll construction schematic diagram step by step of the embodiment of the present invention.
After the completion of exterior wall of the invention and the construction of aproll integral structure, after a period of time (general 1-2), due to Backfill Foundation under aproll settles, and can be detached between aproll and soil, and generates gap, and this phenomenon will not be to scattered Water generates the harm in structure, but should timely use backfill blind during building working service.
The present invention has substantive distinguishing features and significant technological progress, exterior wall of the invention and the construction of aproll integral structure Method overcomes the shortcomings of conventional exterior wall and aproll separation design and construction method.It adheres to and " point just gets clear, company just gets jail continuously Gu " theory by integration conventional separating concrete aproll and exterior wall forms the integrated building element of cooperative bearing, both The local stiffness for strengthening wall in turn avoids dependence of the aproll to Backfill Foundation, and avoiding aproll, subsoil settlement generates everywhere Strain cracking and influence building using function.
Aproll of the invention becomes cantilever design and exists, and forms entirety with building, changes conventional separate type Power transmission form of the aproll based on backfill, reduces the compaction requirement to backfill, reduces conventional separate type and dissipates The sedimentation of water, deformation, possibility of cracks.In addition, increasing rigidity in exterior wall horizontal plane, masonry (concrete) is reduced outside The crack risk of wall.
Above embodiments are used for illustrative purposes only, rather than limitation of the present invention, the technology people in relation to technical field Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, all equivalent Technical solution also should belong to scope of the invention, should be limited by each claim.

Claims (4)

1. a kind of exterior wall and aproll integral structure construction method, it is characterised in that the following steps are included:
A, in exterior wall and aproll design process, by conventional aproll root, i.e., close to the part of the side of exterior wall in aproll section Extend, be mounted in aproll one end in wall, become cantilever member, and according to several ordinary reinforced concretes of configuration in aproll The steel bar stress and distribution bar of structure, to enhance the component load-bearing ability of aproll;
B, in exterior wall and aproll integral structure work progress, normal construction basis and outer wall foundation section are first pressed to aproll component bottom Absolute altitude pause after outer wall foundation section intensity reaches requirement, then backfills and tamps the foot of a wall two sides soil, until foot wall top surface is marked It is high;Then reinforcing bar, formwork in aproll are installed pour aproll concrete;Finally continue build exterior wall main paragraph to designed elevation, it is complete It constructs at exterior wall and aproll integral structure.
2. exterior wall as described in claim 1 and aproll integral structure construction method, which is characterized in that the steel bar stress is not Less than 8@200 of Φ, distribution bar is not less than 6@250 of Φ, using HPB300 grades of reinforcing bars.
3. exterior wall as described in claim 1 and aproll integral structure construction method, which is characterized in that the basis and exterior wall It is cohered between section of foundation with the masonry mortar of exterior wall;It is cohered between outer wall foundation section and aproll with the concrete of aproll;Aproll with It is cohered between exterior wall main paragraph with the masonry mortar of exterior wall.
4. exterior wall as described in claim 1 and aproll integral structure construction method, which is characterized in that the overhanging of the aproll Partial width is 600mm-1200mm, aproll root, that is, stay in the intracorporal segment thickness of wall according to design specification≤ The cantilever slab of 1200mm is appraised and decided, no less than 100mm, and the slope 1-3% slope aspect end from aproll root.
CN201810060155.2A 2018-01-22 2018-01-22 A kind of exterior wall and aproll integral structure construction method Pending CN110067386A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810060155.2A CN110067386A (en) 2018-01-22 2018-01-22 A kind of exterior wall and aproll integral structure construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810060155.2A CN110067386A (en) 2018-01-22 2018-01-22 A kind of exterior wall and aproll integral structure construction method

Publications (1)

Publication Number Publication Date
CN110067386A true CN110067386A (en) 2019-07-30

Family

ID=67364753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810060155.2A Pending CN110067386A (en) 2018-01-22 2018-01-22 A kind of exterior wall and aproll integral structure construction method

Country Status (1)

Country Link
CN (1) CN110067386A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113062363A (en) * 2021-03-30 2021-07-02 中国二十二冶集团有限公司 Winter outdoor water-dispersing construction method
CN114687583A (en) * 2022-05-31 2022-07-01 中国二十二冶集团有限公司 Construction method and construction structure for preventing scattered water from sinking at outer wall of building coating
CN114687584A (en) * 2022-05-31 2022-07-01 中国二十二冶集团有限公司 Construction method and structure for preventing scattered water from sinking at outer wall of building curtain wall

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202247963U (en) * 2011-10-20 2012-05-30 重庆电力建设总公司 Water-dispersing structure for house
CN102852164A (en) * 2012-10-10 2013-01-02 中国建筑第七工程局有限公司 Construction method of self-waterproof type concrete water dispersing structure
CN103835361A (en) * 2014-02-28 2014-06-04 中天建设集团有限公司 '7'-shaped structure self-waterproof apron design and construction method
CN205348697U (en) * 2015-12-29 2016-06-29 山东科技大学 Prevent aproll that ftractures
CN206554126U (en) * 2017-03-02 2017-10-13 山东科技大学 A kind of crack resistence concrete apron structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202247963U (en) * 2011-10-20 2012-05-30 重庆电力建设总公司 Water-dispersing structure for house
CN102852164A (en) * 2012-10-10 2013-01-02 中国建筑第七工程局有限公司 Construction method of self-waterproof type concrete water dispersing structure
CN103835361A (en) * 2014-02-28 2014-06-04 中天建设集团有限公司 '7'-shaped structure self-waterproof apron design and construction method
CN205348697U (en) * 2015-12-29 2016-06-29 山东科技大学 Prevent aproll that ftractures
CN206554126U (en) * 2017-03-02 2017-10-13 山东科技大学 A kind of crack resistence concrete apron structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
钱嘉琦: "悬挑式散水坡的应用", 《上海电力工》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113062363A (en) * 2021-03-30 2021-07-02 中国二十二冶集团有限公司 Winter outdoor water-dispersing construction method
CN114687583A (en) * 2022-05-31 2022-07-01 中国二十二冶集团有限公司 Construction method and construction structure for preventing scattered water from sinking at outer wall of building coating
CN114687584A (en) * 2022-05-31 2022-07-01 中国二十二冶集团有限公司 Construction method and structure for preventing scattered water from sinking at outer wall of building curtain wall

Similar Documents

Publication Publication Date Title
CN103266767B (en) Construction method for preventing and treating cracks between concrete structure and filler wall
US11384501B2 (en) Method for sealing post-cast strip in foundation with no gap
CN103669114B (en) Ballast bed base prefabricated slab and application thereof
CN104612018B (en) Dowel bar and durable shrinkage joint structure of cement concrete pavement composite structure
CN108086113A (en) A kind of road surface precast assembly fast repairing method for being suitable for southern damp-heat area
CN104060781A (en) Cast-in-situ cranked slab stair without seams at stair sections and construction method
CN110067386A (en) A kind of exterior wall and aproll integral structure construction method
CN105297905A (en) Method for connecting prefabricated floor and prefabricated vertical component
CN101818577B (en) Reinforcing method of plate type overhanging component
CN103343503B (en) Bridge-type prefabricated reinforced concrete trough slab wear resistant road surface structural system and construction method
CN104612142B (en) Integral abutment bridge structure based on composite flexible piles and construction method thereof
CN203905331U (en) Cast-in-place plate-type staircase with seamless steps
CN206529712U (en) Assembled steel reinforced concrete aliform type culvert opening
CN103334360B (en) The dark beam slab wear-resistant pavement system of bridge-type prefabricated reinforced concrete and construction method thereof
CN104675138B (en) A kind of slab balcony reinforcement means for sound insulation and noise reducing transformation
CN204590307U (en) A kind of hole site operation structure of precast shear wall plate
CN209011307U (en) A kind of wall is equipped with the node structure of deformation joint with floorboard junction
CN216237943U (en) Small traffic rural highway cement concrete pavement prefabricated structure
CN206174293U (en) Prefabricated constructional column
CN109267580B (en) Concrete steel bar composite structure and pouring method
CN210262566U (en) Concrete gravel road surface reserved notch
CN204298708U (en) Arrangement of reinforcement compound outdoor ground brick
CN209468773U (en) A Composite Cutting Slope Support and Reinforcement Structure
KR101103680B1 (en) Architectural Slab with Arch Support Ribs
CN111926927A (en) Underground chamber roof post-cast strip plugging structure and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190730

RJ01 Rejection of invention patent application after publication