CN110067202A - A kind of steel nose girder and trough girder connection method - Google Patents

A kind of steel nose girder and trough girder connection method Download PDF

Info

Publication number
CN110067202A
CN110067202A CN201910300280.0A CN201910300280A CN110067202A CN 110067202 A CN110067202 A CN 110067202A CN 201910300280 A CN201910300280 A CN 201910300280A CN 110067202 A CN110067202 A CN 110067202A
Authority
CN
China
Prior art keywords
steel
girder
nose girder
trough
wire bundle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910300280.0A
Other languages
Chinese (zh)
Inventor
李家宏
朱勇
贺对喜
陈谨
林定位
李朝刚
曾大平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Guangzhou Engineering Group Co Ltd CRECGZ
CRECGZ Shenzhen Engineering Co Ltd
Original Assignee
China Railway Guangzhou Engineering Group Co Ltd CRECGZ
CRECGZ Shenzhen Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Guangzhou Engineering Group Co Ltd CRECGZ, CRECGZ Shenzhen Engineering Co Ltd filed Critical China Railway Guangzhou Engineering Group Co Ltd CRECGZ
Priority to CN201910300280.0A priority Critical patent/CN110067202A/en
Publication of CN110067202A publication Critical patent/CN110067202A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of steel nose girders and trough girder connection method, by the way that vertical reinforcement steel plate will be welded between steel nose girder top plate and bottom plate in junction, and weld horizontal reinforces steel plate formation anchor case on steel nose girder web, by being connected as one in the pre-buried steel wire bundle of beam body with anchor case, the power transmission of both steel nose girders and trough girder after connection is uniform, stress performance is good, steel wire bundle is embedded into groove profile web end and is connected as one by anchorage and beam body, and steel nose girder setting anchor case is connected as one with steel wire bundle exposed parts by anchorage, increase the bending strength of steel nose girder Yu groove profile web connecting portion, the installation of steel wire bundle, tensioning process is mature, easy construction, it is easy to grasp.The invention is used for beam connection area.

Description

A kind of steel nose girder and trough girder connection method
Technical field
The present invention relates to beam connection areas, more particularly to a kind of steel nose girder and trough girder connection method.
Background technique
When building a bridge, it is contemplated that the requirement above highway, railway line to space and operation security, on design scheme Trough girder pushing tow scheme is usually selected, above bridge pier or the progress of abutment rear is prefabricated, carries out after the completion by pushing tow jack Incremental launching construction.Steel nose girder is set in trough girder front end, the purpose is to reduce the maximum cantilever length of trough girder, to reduce groove profile Internal force of beam front end during incremental launching construction, the use of steel nose girder achieve good effect in incremental launching construction.Currently, Steel nose girder has the disadvantage that groove profile beam end reinforcing bar is intensive with trough girder junction, vibrates when if pouring trough girder not in place, It is easy to appear cavity or leakiness, when fining twisted steel tensioning easily causes beam-ends structure to be destroyed, only relies on steel nose girder girder top plate It is embedded into slot web with bottom plate and fining twisted steel, the weight of unbearable steel nose girder, steel nose girder and slot beam junction are strong Degree deficiency is easily broken off and leads to grave consequences.
Summary of the invention
The purpose of the present invention is to provide a kind of safe and reliable, steel nose girder of easy construction and trough girder connection methods.
The technical solution used in the present invention is:
A kind of steel nose girder and trough girder connection method, comprising the following steps:
S1: a point several segments make steel nose girder, and vertical add is welded between the first segment top plate and bottom plate of steel nose girder Strong steel plate, weld horizontal reinforces steel plate and forms anchor case on web;
S2: installation groove profile beam bottom board, by the first segment of steel nose girder hang to groove profile beam end docking location, and be arranged The firm support steel nose girder of support device;
S3: groove profile beam body prestress pipe, pre-buried connection steel are installed in bottom and abdomen assembling reinforcement in trough girder Nose girder and trough girder steel wire bundle;
S4: pouring trough girder concrete, reaches design requirement, tensioning and locking steel strand wires to trough girder concrete strength Beam.
It is further used as the improvement of technical solution of the present invention, and in step sl, the steel nose girder is divided into three segment processing Production.
It is further used as the improvement of technical solution of the present invention, in step s 2, when hanging steel nose girder first segment, steel nose girder First segment bottom is equipped with protective layer, hangs in place, the firmware of the firm steel nose girder of setting in the bottom end of steel nose girder first segment.
It is further used as the improvement of technical solution of the present invention, and in step s3, steel wire bundle passes through steel nose girder by pipeline Anchor case, the both ends of steel wire bundle reserve tensioning length.
It is further used as the improvement of technical solution of the present invention, in step s3, symmetrically sets in trough girder abdomen middle position Steel wire bundle is set, the steel wire bundle end inside trough girder is embedded to and is fixed using anchorage.
It is further used as the improvement of technical solution of the present invention, in step s 4, using centre-hole jack by steel wire bundle Single steel strand grading tension in place.
Beneficial effects of the present invention: this steel nose girder and trough girder connection method, in junction steel nose girder top plate and bottom plate it Between weld it is vertical reinforce steel plate, and weld horizontal reinforces steel plate and forms anchor case on steel nose girder web, is twisted by beam body pre-buried steel Harness is connected as one with anchor case, and the power transmission of both steel nose girder and trough girder after connection is uniform, stress performance is good, and steel wire bundle is pre- Embedment groove profile web end is connected as one by anchorage and beam body, and steel nose girder setting anchor case and steel wire bundle exposed parts It is connected as one by anchorage, increases the bending strength of steel nose girder Yu groove profile web connecting portion, the installation of steel wire bundle, Tensioning process is mature, and easy construction is easy to grasp.
Detailed description of the invention
The present invention will be further explained below with reference to the attached drawings:
Fig. 1 is the schematic diagram of the embodiment of the present invention.
Specific embodiment
Referring to Fig.1, the present invention is a kind of steel nose girder and trough girder connection method comprising following steps: S1: point several sections Section production steel nose girder 1, and vertical reinforcement steel plate is welded between the first segment top plate 3 and bottom plate 4 of steel nose girder 1, on web 5 Weld horizontal reinforces steel plate and forms anchor case;S2: installation groove profile beam bottom board, by the first segment of steel nose girder 1 hang to trough girder 2 End docking location, and the firm support steel nose girder 1 of support device is set;S3: steel is bound in the bottom of trough girder 2 and abdomen Muscle installs 2 main body prestress pipe of trough girder, pre-buried connection steel nose girder 1 and 2 steel wire bundle 6 of trough girder;S4: trough girder is poured Concrete, band trough girder concrete strength reach design requirement, tensioning and locking steel wire bundle 6.Pass through this connection method, connection The power transmission of both steel nose girders 1 and trough girder 2 afterwards is uniform, stress performance is good, and it is logical that steel wire bundle 6 is embedded into 2 web end of trough girder It crosses anchorage to be connected as one with beam body, and steel nose girder 1 is arranged anchor case and connect with 6 exposed parts of steel wire bundle by stretching end anchorage It is integrated, increases the bending strength of steel nose girder 1 Yu 2 web connecting portion of trough girder, the installation of steel wire bundle 6, tensioning process Maturation, easy construction are easy to grasp, and steel wire bundle 6 is prestressing tendon, and bearing capacity height, endurance, safety can It leans on.
As a preferred embodiment of the present invention, in step sl, the steel nose girder 1 is divided into three segment production.Steel is led Beam 1 is welded into an entirety in factory using steel plate welding piecemeal production, each segment, and bottom surface is welded between adjacent segment Outside, other faces are connected by screw bolts.Steel nose girder 1 uses variable cross-section form.
As a preferred embodiment of the present invention, in step s 2, when hanging the first segment of steel nose girder 1, steel nose girder 1 One segment bottom is equipped with protective layer, hangs in place, the firmware of the firm steel nose girder 1 of setting in the bottom end of 1 first segment of steel nose girder. As a preference, supporting firm steel nose girder in the bottom end of 1 first segment of the steel nose girder setting lumps of wood.In step s3, steel strand wires Beam 6 passes through the anchor case of steel nose girder 1 by pipeline, reserves tensioning length at the both ends of steel wire bundle 6.Further, in step S3 In, it is symmetrical arranged steel wire bundle 6 in 2 abdomen middle position of trough girder, the steel wire bundle 6 inside trough girder 2 is embedded to and uses anchorage It is fixed.In this embodiment, in 2 abdomen of trough girder, middle position is avoided the permanent steel strand wires position of trough girder 2 and is symmetrically arranged 15.2 steel wire bundle 6 of φ of 7.5m and 5m, steel wire bundle are embedded into 2 inner end of trough girder and are fixed using OVM anchorage, pacified simultaneously Fill the iron sheet plastic film capicitor of internal diameter 220mm.
As a preferred embodiment of the present invention, since anchor box space limits, when 6 tensioning of steel wire bundle, is very heavy with punching It pushes up the single steel strand grading tension of steel wire bundle 6 in place.
Certainly, the invention is not limited to above embodiment, and those skilled in the art are without prejudice to originally Equivalent deformation or replacement can be also made under the premise of spirit, these equivalent variation or replacement are all contained in the application right It is required that in limited range.

Claims (6)

1. a kind of steel nose girder and trough girder connection method, it is characterised in that: the following steps are included:
S1: point several segment production steel nose girder (1), and welded between the first segment top plate (3) and bottom plate (4) of steel nose girder (1) Vertical reinforcement steel plate is connect, weld horizontal reinforces steel plate and forms anchor case on web (5);
S2: installation groove profile beam bottom board, by the first segment of steel nose girder (1) hang to trough girder (2) end docking location, and set Set firm support steel nose girder (1) of support device;
S3: trough girder (2) main body prestress pipe, pre-buried connection are installed in bottom and abdomen assembling reinforcement in trough girder (2) Steel nose girder (1) and trough girder (2) steel wire bundle (6);
S4: pouring trough girder concrete, reaches design requirement, tensioning and locking steel wire bundle (6) to trough girder concrete strength.
2. steel nose girder according to claim 1 and trough girder connection method, it is characterised in that: in step sl, the steel Nose girder (1) is divided into three segment processing and fabricatings.
3. steel nose girder according to claim 1 and trough girder connection method, it is characterised in that: in step s 2, hang steel When nose girder (1) first segment, protective layer is added in steel nose girder (1) first segment bottom, is hung in place, in steel nose girder (1) first The firmware of firm steel nose girder (1) is arranged in the bottom end of segment.
4. steel nose girder according to claim 1 and trough girder connection method, it is characterised in that: in step s3, steel strand wires Beam (6) passes through the anchor case of steel nose girder (1) by pipeline, reserves tensioning length at steel wire bundle (6) both ends.
5. steel nose girder according to claim 1 and trough girder connection method, it is characterised in that: in step s3, in groove profile Beam (2) abdomen middle position is symmetrical arranged steel wire bundle (6), and internal steel wire bundle (6) end of embedment trough girder (2) uses anchorage It is fixed.
6. steel nose girder according to claim 1 and trough girder connection method, it is characterised in that: in step s 4, using wearing Core type jack by the single steel strand grading tension of steel wire bundle (6) in place.
CN201910300280.0A 2019-04-15 2019-04-15 A kind of steel nose girder and trough girder connection method Pending CN110067202A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910300280.0A CN110067202A (en) 2019-04-15 2019-04-15 A kind of steel nose girder and trough girder connection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910300280.0A CN110067202A (en) 2019-04-15 2019-04-15 A kind of steel nose girder and trough girder connection method

Publications (1)

Publication Number Publication Date
CN110067202A true CN110067202A (en) 2019-07-30

Family

ID=67367773

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910300280.0A Pending CN110067202A (en) 2019-04-15 2019-04-15 A kind of steel nose girder and trough girder connection method

Country Status (1)

Country Link
CN (1) CN110067202A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113832859A (en) * 2021-09-22 2021-12-24 中建钢构工程有限公司 Construction method for connecting joint of steel box girder and guide beam

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102733308A (en) * 2012-06-19 2012-10-17 中铁八局集团昆明铁路建设有限公司 Method for connecting steel guide girder with box girder
CN103614969A (en) * 2013-12-10 2014-03-05 中铁二十局集团第一工程有限公司 Steel truss girder assembling, erecting and construction process
KR101433064B1 (en) * 2013-03-14 2014-09-23 임성묵 Composite beam using steel plate beam and tendon and the construction method therefor
CN103266571B (en) * 2013-05-31 2015-10-28 中交二航局第四工程有限公司安徽分公司 A kind of gap bridge type steel strand stopping means
CN205741937U (en) * 2016-05-16 2016-11-30 中电建路桥集团有限公司 A kind of Wavelike steel webplate nose girder steel reinforced concrete joint portion structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102733308A (en) * 2012-06-19 2012-10-17 中铁八局集团昆明铁路建设有限公司 Method for connecting steel guide girder with box girder
KR101433064B1 (en) * 2013-03-14 2014-09-23 임성묵 Composite beam using steel plate beam and tendon and the construction method therefor
CN103266571B (en) * 2013-05-31 2015-10-28 中交二航局第四工程有限公司安徽分公司 A kind of gap bridge type steel strand stopping means
CN103614969A (en) * 2013-12-10 2014-03-05 中铁二十局集团第一工程有限公司 Steel truss girder assembling, erecting and construction process
CN205741937U (en) * 2016-05-16 2016-11-30 中电建路桥集团有限公司 A kind of Wavelike steel webplate nose girder steel reinforced concrete joint portion structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113832859A (en) * 2021-09-22 2021-12-24 中建钢构工程有限公司 Construction method for connecting joint of steel box girder and guide beam

Similar Documents

Publication Publication Date Title
US8627530B2 (en) Constructing method of cable-stayed bridge and temporary cable therefor
CN110409304B (en) Cantilever assembling construction method for segment prefabricated bent cap
KR100727172B1 (en) Precast Concrete Panel and Nonsupport Construction Method of Bridge's Cantilever Work Utilizing P.C.P
CN205188797U (en) Concrete tied arch bridge jib casts anchor and holds connection structure
KR100991869B1 (en) Single and continuous prestressed concrete girder bridge and the construction method
CN111608084B (en) Integral prefabrication and assembly construction method for reinforced concrete arch bridge arch ring segments
WO2012030018A1 (en) Partially/completely earth-anchored and cable-stayed bridge using a main span tension means, and method for constructing same
CN110258289A (en) Prestressed concrete continuous box girder bridge laterally spells wide structure
CN103210148A (en) Truss structure having an open-section upper chord member and a production method for the same, and a truss bridge using the truss structure having an open-section upper chord member and a method for constructing the same
CN112064519A (en) Long platform guy cable hanging basket and main beam segment construction method
CN115724331A (en) Prefabricated box girder hoisting device and rapid construction method
CN105586826A (en) Connecting structure of anchorage ends of booms of concrete tied arch bridge and construction method of connecting structure
CN110067202A (en) A kind of steel nose girder and trough girder connection method
CN106087692A (en) A kind of Simply supported non-uniform T negative moment of girder section structure and construction method
CN110409279A (en) Strong bridge structure and construction method
CN113073555B (en) Pier top block positioning system and construction method thereof
CN212404845U (en) Temporary continuous beam pier beam consolidation system and continuous beam bridge
CN109016127A (en) A kind of bridge arch box Prefabrication and its lateral connection method
CN210368674U (en) Bridge cantilever pouring construction device based on inclined pull buckle hanging
CN101245628A (en) Prefabricated slab for lamination
CN101245626A (en) Prefabricated slab for lamination
CN203530831U (en) Hanging rod anchoring structure of concrete composite beam
KR20070049777A (en) Suspension bridge construction method using a composite cables
KR101389821B1 (en) Prestressed concrete girder with means to add additional stress and method of production and maintenance thereof
CN117569445B (en) Super-long seamless slow-bonding prestressed concrete structure and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190730

RJ01 Rejection of invention patent application after publication