CN110067051A - A kind of double drawing-off Siro-spinning devices and Yarn spinning method - Google Patents
A kind of double drawing-off Siro-spinning devices and Yarn spinning method Download PDFInfo
- Publication number
- CN110067051A CN110067051A CN201910109643.2A CN201910109643A CN110067051A CN 110067051 A CN110067051 A CN 110067051A CN 201910109643 A CN201910109643 A CN 201910109643A CN 110067051 A CN110067051 A CN 110067051A
- Authority
- CN
- China
- Prior art keywords
- roller
- draft
- draft area
- bottom roll
- area
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- D—TEXTILES; PAPER
- D01—NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
- D01H—SPINNING OR TWISTING
- D01H5/00—Drafting machines or arrangements ; Threading of roving into drafting machine
- D01H5/18—Drafting machines or arrangements without fallers or like pinned bars
- D01H5/22—Drafting machines or arrangements without fallers or like pinned bars in which fibres are controlled by rollers only
-
- D—TEXTILES; PAPER
- D01—NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
- D01H—SPINNING OR TWISTING
- D01H5/00—Drafting machines or arrangements ; Threading of roving into drafting machine
- D01H5/18—Drafting machines or arrangements without fallers or like pinned bars
- D01H5/70—Constructional features of drafting elements
- D01H5/74—Rollers or roller bearings
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Textile Engineering (AREA)
- Spinning Or Twisting Of Yarns (AREA)
Abstract
The present invention provides a kind of double drawing-off Siro-spinning devices and Yarn spinning method, drafting system uses three roller draft structures, left roller set and right roller set are provided on the roller shaft of each bottom roll, left rubber roller set and right rubber roller set are provided on the rubber roller of corresponding each upper glue roller, and the variation for changing the corresponding diameter for cooperating the left rubber roller set of corresponding each upper glue roller to cover with right rubber roller of the diameter covered by the left roller of each bottom roll set and right roller is realized and covers the different drafting process of the first rove and the second rove that feed respectively in the draft area under roller shaft synchronous drive with right roller to the left roller set by rear bottom roll, to realize that the roller shaft in each bottom roll unifies double drafting process of each spindle position under synchronous drive, to according to the characteristic requirements of the Siro Yarn of the property and required spinning of the first rove and the second rove fed, It realizes the optimization design of specific spinning process, then realizes the production of various different composite yarns.
Description
Technical field
The present invention relates to ring spinning new technical field, particularly relate to a kind of double drawing-off Siro-spinning devices and
Yarn spinning method.
Background technique
With the continuous advance in epoch, requirement of the people for garment material is continuously improved, and textile clothing industry is at present
One follow the fashion, the epoch of diversification and high-quality.Therefore, the development of textile raw material, textile technology also proposed new
It is required that.Among these, textile high-quality, high performance and its production and processing cleans the master for having become Modern Textile Industry
Developing direction is wanted, and improves the effective way of product specification and added value.With the raising and work of modern life level
The quickening of rhythm, the high conformality and easy care performance of textile have become the important attribute of high quality fabric and clothes and significantly mark
Will.But there is also many problems, such as cotton fabric dress easily to play fold, washing in terms of conformality for difference Fiber Materials fabric at present
Drying rear poor flatness needs ironing, and wool fabric is machine-washed, and easy felting, fabric rivel conformality are poor, and it is conformal that chemical & blended fabric wears easy arch camber
Deng.Conformality is inadequate, conformal effect is unstable, existing conformal technique environmental protection index many realistic problems such as not up to standard difficult to control
As the serious obstruction of textile high-quality, demand of the modern society people to high-quality dressing has not been adapted to.Research and development are high
Conformal textile key technology of preparing simultaneously realizes that its industrial application is to promote China's textile quality and competitiveness in the international market
Important channel and industry common recognition.Composite yarn is the yarn that a kind of mutually compound and production structure is carried out using different fibers
Line can realize the control of yarn texture and performance in spinning by the control to fiber compound structure, thus needed for realizing
The production of yarn.
In view of this, the present invention provides a kind of double drawing-off Siro-spinning devices and Yarn spinning method, drafting system uses three rollers
Drawing-off structure, is provided with left roller set and right roller set on the roller shaft of each bottom roll, on the rubber roller of corresponding each upper glue roller
It is provided with left rubber roller set and right rubber roller set, and phase is cooperated by the variation of the left roller of each bottom roll set and the diameter of right roller set
The variation of the corresponding diameter of the left rubber roller set and right rubber roller set for each upper glue roller answered is realized to the left roller set by rear bottom roll
It is led with different in the draft area under roller shaft synchronous drive of right roller the first rove for feeding respectively of set and the second rove
Journey is extended through, to realize that the roller shaft in each bottom roll unifies double drafting process of each spindle position under synchronous drive, thus root
According to the characteristic requirements of the Siro Yarn of the property and required spinning of the first rove and the second rove fed, specific spinner is realized
The optimization design of skill then realizes the production of various different composite yarns.
Summary of the invention
The purpose of the present invention provides a kind of double drawing-off Siro-spinning devices and Yarn spinning method, passes through the roller in each bottom roll
The left and right roller set of diameter change is set on axis, realizes and unifies each spindle position under synchronous drive in the roller shaft of each bottom roll
Double drafting process, thus according to the characteristic of the property of the first rove and the second rove fed and the Siro Yarn of required spinning
It is required that realizing the optimization design of specific spinning process, the production of various different composite yarns is then realized.
In order to achieve the above object, the present invention relates to a kind of double drawing-off Siro-spinning devices, including drafting system, drawing-off systems
System include after drawing roller to, middle drawing rollers to, front traction roller pair, first break draft roller is to including rear bottom roll and rear gluing
Roller, middle drawing rollers are to including middle bottom roller and middle upper glue roller, and front traction roller is to including preceding bottom roll and preceding upper glue roller, under rear
Roller, middle bottom roller, preceding bottom roll include roller shaft, and roller shaft is solid cylindrical structure, the preceding ride of a spinning frame
The roller shaft integration of the rear bottom roll of all spindle positions in face is fixedly connected, the roller shaft of the middle bottom roller of all spindle positions is integrated
Be fixedly connected, the roller shaft integration of the preceding bottom roll of all spindle positions is fixedly connected, the rear car table top of a spinning frame it is all
The roller shaft integration of the rear bottom roll of spindle position, which is fixedly connected, the roller shaft integration of the middle bottom roller of all spindle positions is fixed connects
Connect, the roller shaft integration of the preceding bottom roll of all spindle positions is fixedly connected, roller set is provided in the exterior circumference of roller shaft,
Roller set is identical with the material of roller shaft and is irony or steel, rear bottom roll, middle bottom roller, preceding bottom roll roller set wrap
Include left roller set, right roller set, left roller set, right roller set is integrated with roller shaft is fixedly connected, left roller set and right roller
The length of set is identical, and the right end of the roller shaft of preceding bottom roll is driven by first motor to be rotated, the right side of the roller shaft of middle bottom roller
It is sequentially connected between the right end of the roller shaft of end and preceding bottom roll by the first connection gear group, the right side of the roller shaft of rear bottom roll
It holds and is sequentially connected between the right end the roller shaft of middle bottom roller by the second connection gear group, it is rear upper glue roller, middle upper glue roller, preceding
Upper glue roller includes rubber roller, and rubber roller is irony material, and rubber roller is solid cylindrical structure, the rear ride of a spinning frame
Face, the adjacent spindle position of one spindle position of front truck table top and right side constitute a spindle position group, in two spindle positions of a spindle position group
Rear upper glue roller rubber roller integration connection, middle upper glue roller rubber roller integration connection, preceding upper glue roller rubber roller one
Change connection, the rear upper glue roller of each spindle position, middle upper glue roller, preceding upper glue roller rubber roller exterior circumference on be cased with rubber roller set,
Rubber roller set be rubber material, rear upper glue roller, middle upper glue roller, preceding upper glue roller rubber roller set include left rubber roller set, right rubber roller set, left glue
Roller set, right rubber roller set are connect with rubber roller by respective intermediate bearing respectively, and left rubber roller set, right rubber roller set are respectively around rubber roller
Independent rotation is covered, the length of the equal length that left rubber roller set and right rubber roller cover and respectively equal to left roller set and right roller set,
The rear upper glue rollers of two spindle positions of one spindle position group, middle upper glue roller, preceding upper glue roller rubber roller set between rubber roller successively from rear
In the rear insertion for being embedded in pressure-applying unit forward grabs, middle insertion is grabbed, preceding insertion is grabbed, thus upper glue roller after realizing, middle upper glue roller,
The rear portion of installation of the preceding upper glue roller on pressure-applying unit, pressure-applying unit is fixed on the ride face of spinning frame by fixing axle, and
Pressure-applying unit can be rotated along fixing axle, so that upper glue roller, middle upper glue roller, preceding upper glue roller exist after realizing during rotation
Pushing under certain pressure, wherein led in the front left that the left rubber roller set of left roller set and preceding upper glue roller by preceding bottom roll forms
Stretch roller and by the left roller set of middle bottom roller and the left rubber roller set of middle upper glue roller form in formed between left drawing rollers pair
Left front draft area, the drafting multiple L of left front draft area11Radius R is covered with the left roller of preceding bottom roll11, middle bottom roller left roller
Cover radius R12, the first driving gear set gear ratio C1Between relationship are as follows:
The left drawing rollers and by under rear in being made of the left roller of middle bottom roller set and the left rubber roller set of middle upper glue roller
The left roller of roller, which is covered, forms left back draft area between the rear left drawing rollers pair of the left rubber roller of rear upper glue roller set composition, left back
The drafting multiple L of draft area12Radius R is covered with the left roller of middle bottom roller12, rear bottom roll left roller cover radius R13, second pass
The gear ratio C of moving gear group2Between relationship are as follows:
So that the total drafting multiple L for the left draft area that left front draft area and left back draft area are formed1Are as follows:
Under the front right drawing rollers being made of the right rubber roller set of the right roller of preceding bottom roll set and preceding upper glue roller and in
The right roller of roller covers and the right rubber roller of middle upper glue roller covers and forms right front draft zone in composition between right drawing rollers pair, before right
The drafting multiple L of draft area21Radius R is covered with the right roller of preceding bottom roll21, middle bottom roller right roller cover radius R22, first pass
The gear ratio C of moving gear group1Between relationship are as follows:
The right drawing rollers and by under rear in being made of the right roller of middle bottom roller set and the right rubber roller set of middle upper glue roller
The right roller of roller, which is covered, forms right first break draft area between the rear right drawing rollers pair of the right rubber roller of rear upper glue roller set composition, after right
The drafting multiple L of draft area22Radius R is covered with the right roller of middle bottom roller22, rear bottom roll right roller cover radius R23, second pass
The gear ratio C of moving gear group2Between relationship are as follows:
So that the total drafting multiple L for the right draft area that right front draft zone and right first break draft area are formed2Are as follows:
The left roller of preceding bottom roll covers radius R11, middle bottom roller left roller cover radius R12, rear bottom roll left roller set
Radius R13, preceding bottom roll right roller cover radius R21, middle bottom roller right roller cover radius R22, rear bottom roll right roller set
Radius R23Diameter be all larger than equal to each roller set setting datum diameter R0, roller set datum diameter R0It is straight greater than roller shaft
The left roller of diameter R, the preceding bottom roll under the conditions of being met by setting cover radius R11, middle bottom roller left roller cover radius R12, after
The left roller of bottom roll covers radius R13, to realize the adjusting of the drafting multiple of left front draft area, left back draft area, pass through setting
The right roller of preceding bottom roll under the conditions of satisfaction covers radius R21, middle bottom roller right roller cover radius R22, rear bottom roll right sieve
Help pull a cart radius R23Diameter, thus realize right front draft zone, right first break draft area drafting multiple adjusting, meanwhile, according to setting
Each bottom roll roller set diameter setting it is corresponding before the left rubber roller of upper glue roller cover radius r11, middle upper glue roller left rubber roller set
Radius r12, rear upper glue roller left rubber roller cover radius r13, preceding upper glue roller right rubber roller cover radius r21, middle upper glue roller right rubber roller set
Radius r22, rear upper glue roller right rubber roller cover radius r23Diameter be all larger than equal to each rubber roller set setting datum diameter r0, rubber roller
Cover datum diameter r0Greater than the diameter r of rubber roller, mid-rubber roll covers datum diameter r0Diameter to cover when roller is set as roller set
Datum diameter R0When corresponding rubber roller cover diameter, when meeting pressure-applying unit and pushing, it is r that rubber roller, which covers diameter,0When rubber roller set and roller
Set diameter is R0When roller set between close face contact, diameter and the benchmark rubber roller set that the rubber roller set of each lower rubber roller is arranged be straight
Positive difference between the diameter of negative difference between diameter and corresponding roller set and benchmark roller set diameter is identical, including single-roller
Set diameter changes, double rollers set diameter changes, three rollers set diameter changes, four rollers set diameter changes, five rollers set diameter changes
Become, six rollers set diameter change spinning, for single-roller set diameter change spinning, at this time be arranged after bottom roll left roller set,
Middle bottom roller left roller set or preceding bottom roll left roller set diameter change, or setting after bottom roll right roller
The diameter of the right roller set of the right roller set or preceding bottom roll of set or middle bottom roller changes, and the diameter of other each roller sets
Equal to benchmark roller cover diameter, at this time or the drafting multiple of left back draft area it is different from the drafting multiple in right first break draft area but
After the drafting multiple of the drafting multiple of left front draft area draft area identical or left back with the drafting multiple of right front draft zone and the right side
The drafting multiple of draft area is identical but the drafting multiple of left front draft area is different from the drafting multiple of right front draft zone or left
The drafting multiple of the drafting multiple in first break draft area draft area different and left front from the drafting multiple in right first break draft area and right front draft
The drafting multiple difference in area but the total draft multiple and right first break draft of left back draft area and the left draft area of left front draft area composition
The total draft multiple for the right draft area that area and right front draft zone form is identical, changes spinning, including list for double rollers set diameter
Double roller set diameters change in left draft area or in single right draft area between double roller set diameters changes and left and right draft area, right
In double rollers set diameters change in single left draft area or in single right draft area, the left roller including bottom roll after in single left draft area
The left roller set and front lower sieve of bottom roll after in the diameter change simultaneously of the left roller of set and middle bottom roller set or single left draft area
The left roller of left the roller set and preceding bottom roll of middle bottom roller in the left roller set diameter change simultaneously drawn or single left draft area
Set diameter change simultaneously, or the right roller set of rear bottom roll and the right roller of middle bottom roller cover diameter simultaneously in single right draft area
Change or single right draft area in after bottom roll right roller set and preceding bottom roll right roller set simultaneously diameter change or
Diameter changes the right roller set of the right roller set of middle bottom roller and preceding bottom roll simultaneously in single right draft area, and other at this time each
Roller set diameter be equal to benchmark roller cover diameter, at this time left back draft area and right first break draft area drafting multiple it is similar and different,
And similar and different and left back draft area and a left side for left front draft area composition are led with right front draft zone drafting multiple for left front draft area
The total draft multiple for stretching area is different from the total draft multiple of right draft area that right first break draft area and right front draft zone form or left
First break draft area draft area different and left front from right first break draft area drafting multiple is different and left back with right front draft zone drafting multiple
The right side that the total draft multiple and right first break draft area of draft area and the left draft area of left front draft area composition and right front draft zone form
The total draft multiple of draft area is similar and different or left back draft area is different from right first break draft area drafting multiple and left front leads
Stretch the total of the area left draft area that similar and different and left back draft area and left front draft area form with right front draft zone drafting multiple
Drafting multiple is different from the total draft multiple of right draft area that right first break draft area and right front draft zone form, and other at this time each
The diameter of roller set is equal to benchmark roller and covers diameter;Roller set diameters double between the draft area of left and right are changed, including left drawing-off
The left roller of bottom roll covers the right roller set with middle bottom roller in right draft area after in area while diameter changes or left draft area
The right roller of preceding bottom roll covers in diameter change simultaneously or left draft area in the left roller set of interior rear bottom roll and right draft area
Diameter changes the right roller set of preceding bottom roll simultaneously in the left roller set of middle bottom roller and right draft area, and each sieve other at this time
The diameter helped pull a cart is equal to benchmark roller and covers diameter, and left back draft area is different from right first break draft area drafting multiple at this time and left front leads
Stretch the total draft times of area different and left back draft area and the left draft area of left front draft area composition from right front draft zone drafting multiple
Several total draft multiples of right draft area formed from right first break draft area and right front draft zone are different;Three rollers set diameter is changed
Double roller set diameters change double roller sets between the draft area of left and right in spinning, including single left draft area or in single right draft area
Diameter changes, for three rollers set diameter changes in single left draft area or in single right draft area, including in single left draft area after under
Diameter changes the left roller set of the left roller set of roller and the left roller set of middle bottom roller and preceding bottom roll simultaneously or single right side is led
Diameter changes the right roller set of the right roller set of bottom roll and the right roller set of middle bottom roller and preceding bottom roll simultaneously after stretching in area,
And the diameter of each roller sets other at this time is equal to benchmark roller and covers diameter, left back draft area and right first break draft area drawing-off times at this time
Number is similar and different and left front draft areas similar and different and left back draft area and left front are led with right front draft zone drafting multiple
Stretch district's groups at left draft area total draft multiple and the total draft of right draft area that forms of right first break draft area and right front draft zone
Multiple is similar and different;Roller set diameters double between the draft area of left and right are changed, the left side including bottom roll rear in left draft area
The right roller of roller set and the middle bottom roller in right draft area covers and the right roller of preceding bottom roll covers diameter change simultaneously or a left side
The right roller of right the roller set and preceding bottom roll of the left roller set and rear bottom roll in right draft area of middle bottom roller in draft area
The right roller of left the roller set and the rear bottom roll in right draft area of preceding bottom roll in set diameter change simultaneously or left draft area
The right roller of set and middle bottom roller set while diameter change, and the diameter of each roller sets other at this time is equal to benchmark roller set directly
Diameter, left back draft area draft area different and left front from right first break draft area drafting multiple and right front draft zone drafting multiple be not at this time
With or the total draft multiple and right first break draft area and the right side of identical and left back draft area and the left draft area of left front draft area composition before
The total draft multiple of the right draft area of draft area composition is different or left back draft area is different from right first break draft area drafting multiple,
And the left front draft area left draft area that different and left back draft area and left front draft area form from right front draft zone drafting multiple
Total draft multiple and the total draft multiple for the right draft area that right first break draft area and right front draft zone form are similar and different or left
First break draft area draft area similar and different and left front from right first break draft area drafting multiple is different with right front draft zone drafting multiple,
And the total draft multiple and right first break draft area and right front draft district's groups of left back draft area and the left draft area of left front draft area composition
At right draft area total draft multiple it is different;For four rollers set diameter change spinning, including in left draft area after bottom roll,
The left roller set of any one bottom roll in middle bottom roller, preceding bottom roll in right draft area after bottom roll, in lower sieve
Bottom roll, middle bottom roller after in the right roller set diameter change simultaneously of the bottom roll of bottom roll draw, preceding or left draft area
, the left roller set of any two bottom roll in preceding bottom roll in right draft area afterwards bottom roll, middle bottom roller, it is front lower
The right side of not exactly the same any two bottom roll in any two and left draft area in the right roller set of the bottom roll of roller
Diameter changes roller set simultaneously, and the diameter of each roller sets other at this time is equal to benchmark roller and covers diameter, at this time left back drawing-off
Area draft area different and left front from right first break draft area drafting multiple and right front draft zone drafting multiple difference and left back draft area
The right draft area formed with the total draft multiple of the left draft area of left front draft area composition and right first break draft area and right front draft zone
Total draft multiple is similar and different or left back draft area is similar and different with right first break draft area drafting multiple and left front leads
Stretch the total of the area left draft area that similar and different and left back draft area and left front draft area form with right front draft zone drafting multiple
Drafting multiple and the total draft multiple for the right draft area that right first break draft area and right front draft zone form are similar and different;For five sieve
Diameter of helping pull a cart changes spinning, including bottom roll after in left draft area, middle bottom roller, sieve under any two in preceding bottom roll
The left roller set drawn in right draft area after bottom roll, middle bottom roller, preceding bottom roll bottom roll right roller cover it is straight simultaneously
Diameter change or right draft area in after bottom roll, middle bottom roller, any two bottom roll in preceding bottom roll right roller
Set in left draft area after bottom roll, middle bottom roller, preceding bottom roll bottom roll left roller set diameter changes simultaneously, and this
When remaining roller set diameter be equal to benchmark roller and cover diameter, left back draft area and right first break draft area drafting multiple at this time
Similar and different and left front draft area and right front draft zone drafting multiple is similar and different and left back draft area and left front drawing-off
District's groups at left draft area total draft multiple and the total draft times of right draft area that forms of right first break draft area and right front draft zone
Number is similar and different;Spinning is changed for six rollers set diameter, including bottom roll after in left draft area, middle bottom roller, it is front lower
The left roller set of roller in right draft area after bottom roll, middle bottom roller, preceding bottom roll bottom roll right roller set simultaneously
Diameter changes, at this time left back draft area similar and different and left front draft area and right front draft with right first break draft area drafting multiple
Area's drafting multiple is similar and different and the total draft multiple of left back draft area and the left draft area of left front draft area composition and it is right after
The total draft multiple of draft area and the right draft area of right front draft zone composition is similar and different.
In use, pressure-applying unit is rotated along fixing axle under force, thus realize the pushing of pressure-applying unit, thus
So that the left rubber roller set of the rear upper glue roller of each spindle position, right rubber roller set cover it with left roller set, the right roller of rear bottom roll respectively
Between close face contact, the left rubber roller set of middle upper glue roller, right rubber roller set cover it with left roller set, the right roller of middle bottom roller respectively
Between close face contact, the left rubber roller set of preceding upper glue roller, right rubber roller set cover it with left roller set, the right roller of preceding bottom roll respectively
Between close face contact, the roller shaft rotation of bottom roll, then drives and the roller shaft one of preceding bottom roll before first motor drives
The left roller set for the preceding bottom roll that body is fixedly connected, the set rotation of right roller, then drive and the left roller set of preceding bottom roll, the right side
The left rubber roller set of the preceding upper glue roller of close face contact, the set rotation of right rubber roller, the roller shaft of preceding bottom roll rotate roller set respectively
Then the roller shaft rotation that middle bottom roller is driven by the first connection gear group, then drives and the roller shaft of middle bottom roller one
Left roller set, the set rotation of right roller for changing the middle bottom roller being fixedly connected, then drive left roller set, right sieve with middle bottom roller
Help pull a cart the left rubber roller set of the middle upper glue roller of close face contact, the set rotation of right rubber roller respectively, the roller shaft rotation of middle bottom roller after
And the roller shaft of bottom roll rotates after being driven by the second connection gear group, then drives integrated with the roller shaft of rear bottom roll
The left roller set for the rear bottom roll being fixedly connected, the set rotation of right roller, then drive left roller set, the right roller with rear bottom roll
Left rubber roller set, the set rotation of right rubber roller for covering the rear upper glue roller of close face contact, add at the rear portion of first break draft roller pair and feed
Enter bell mouth arrangement, feeding bell mouth arrangement includes left horn mouth, right horn mouth, and left horn mouth, right horn mouth are horizontal by connection
Bar is fixedly connected, and the first rove is fed by left horn mouth, and the second rove is fed by right horn mouth, and the first rove is after left horn mouth
Pressing is fed by rear left drawing rollers, then pressing is exported by middle left drawing rollers, is during which led by left back draft area
The effect of stretching finally exports pressing by middle front traction roller, and during which the drawing-off by left front draft area acts on, and the first palpus is made
Item, right drawing rollers feed pressing to the second rove after after right horn mouth, are then exported by middle right drawing rollers to pressing,
Period is acted on by the drawing-off in right first break draft area, is finally exported by right front traction roller to pressing, during which by right front draft zone
Drawing-off effect, the second yarn is made, in use process, left back leads is realized in the variation of the diameter covered by the roller of each bottom roll
Stretch area, left front draft area, right first break draft area, right front draft zone drafting multiple adjusting, to need to realize institute according to spinning
The production of the various different yarns needed.
The present invention is realized by the left and right roller set of the setting diameter change on the roller shaft of each bottom roll in each lower sieve
The roller shaft of drawing unifies double drafting process of each spindle position under synchronous drive, thus according to the first rove fed and second
The characteristic requirements of the Siro Yarn of the property of rove and required spinning, realize the optimization design of specific spinning process, then realize each
The production of kind different composite yarn.
Detailed description of the invention
Fig. 1 is double drawing-off Siro-spinning apparatus structure schematic diagrams of the invention.
Specific embodiment
As shown in Figure 1, a kind of double drawing-off Siro-spinning devices, including drafting system, drafting system pull roller after including
To, middle drawing rollers to, front traction roller pair, first break draft roller is to including rear bottom roll 1 and rear upper glue roller 2, middle drawing rollers
To include middle bottom roller 3 and middle upper glue roller 4, front traction roller to include preceding bottom roll 5 and preceding upper glue roller 6, rear bottom roll, under
Roller, preceding bottom roll include roller shaft 7, and roller shaft is solid cylindrical structure, and the front truck table top of a spinning frame owns
The roller shaft integration of the rear bottom roll of spindle position, which is fixedly connected, the roller shaft integration of the middle bottom roller of all spindle positions is fixed connects
Connect, the roller shaft integration of the preceding bottom roll of all spindle positions is fixedly connected, all spindle positions of the rear car table top of a spinning frame
The roller shaft integration of bottom roll is fixedly connected afterwards, the roller shaft integration of the middle bottom roller of all spindle positions is fixedly connected, owns
The roller shaft integration of the preceding bottom roll of spindle position is fixedly connected, and roller set, roller set are provided in the exterior circumference of roller shaft
It is identical with the material of roller shaft and be irony or steel, rear bottom roll, middle bottom roller, preceding bottom roll roller set include left sieve
8, right roller of helping pull a cart set 9, left roller set, right roller set is integrated with roller shaft is fixedly connected, what left roller set and right roller covered
Length is identical, and the right end of the roller shaft of preceding bottom roll drives rotation, the right end of the roller shaft of middle bottom roller by first motor 13
It is sequentially connected between the right end of the roller shaft of preceding bottom roll by the first connection gear group 14, the right side of the roller shaft of rear bottom roll
Hold and be sequentially connected between the right end the roller shaft of middle bottom roller by the second connection gear group 15, rear upper glue roller, middle upper glue roller,
Preceding upper glue roller includes rubber roller 10, and rubber roller is irony material, and rubber roller is solid cylindrical structure, after a spinning frame
Ride face, the adjacent spindle position of one spindle position of front truck table top and right side constitute a spindle position group, two ingots of a spindle position group
The rubber roller integration of rear upper glue roller on position connects, the rubber roller integration of middle upper glue roller connects, the rubber roller of preceding upper glue roller
Integration connection, the rear upper glue roller of each spindle position, middle upper glue roller, preceding upper glue roller rubber roller exterior circumference on be cased with rubber roller
Set, rubber roller set be rubber material, rear upper glue roller, middle upper glue roller, preceding upper glue roller rubber roller set include left rubber roller cover 11, right rubber roller set
12, left rubber roller set, right rubber roller set are connect with rubber roller by respective intermediate bearing respectively, and left rubber roller set, right rubber roller set are respective
Independent rotation is covered around rubber roller, the equal length and respectively equal to left roller set and right roller set that left rubber roller set and right rubber roller cover
Length, the rear upper glue rollers of two spindle positions of a spindle position group, middle upper glue roller, preceding upper glue roller rubber roller set between rubber roller according to
In the secondary rear insertion for being embedded in pressure-applying unit from back to front grabs, middle insertion is grabbed, preceding insertion is grabbed, thus upper glue roller after realizing, in
The installation of upper glue roller, preceding upper glue roller on pressure-applying unit, the rear portion of pressure-applying unit are fixed on the ride of spinning frame by fixing axle
On face, and pressure-applying unit can be rotated along fixing axle, thus upper glue roller after realizing during rotation, middle upper glue roller, preceding
The pushing of upper glue roller under a certain pressure, wherein by preceding bottom roll left roller set and the left rubber roller set of preceding upper glue roller form
Front left drawing rollers and by left roller set and the left rubber roller set of middle upper glue roller of middle bottom roller form in left drawing rollers pair
Between form left front draft area, left drawing-off sieve in left roller set and the left rubber roller set of middle upper glue roller by middle bottom roller form
It is formed between drawing and the rear left drawing rollers pair being made of the left roller set of rear bottom roll and the left rubber roller set of rear upper glue roller left back
Draft area, sieve under the front right drawing rollers being made of the right rubber roller set of the right roller of preceding bottom roll set and preceding upper glue roller and in
Right front draft zone is formed between right drawing rollers pair in the right rubber roller set composition of the right roller set drawn and middle upper glue roller, in
The right roller set of bottom roll and right drawing rollers and the right roller set by rear bottom roll in the right rubber roller set composition of middle upper glue roller
Right first break draft area is formed between the rear right drawing rollers pair of the right rubber roller set composition of rear upper glue roller.
Change including single-roller set diameter, double rollers set diameter changes, three rollers set diameter changes, four rollers set diameter changes
Become, five rollers set diameter changes, six rollers set diameter changes spinning.
Spinning is changed for single-roller set diameter, the left roller set of bottom roll 1 or a left side for middle bottom roller 3 after being arranged at this time
The left roller of roller set or preceding bottom roll 5 set diameter change, or setting after bottom roll 1 right roller set or middle bottom roller
The diameter that 3 right roller set or the right roller of preceding bottom roll 5 cover changes, and the diameter of other each roller sets is equal to benchmark sieve
It helps pull a cart diameter, at this time or the drafting multiple of left back draft area draft area different but left front from the drafting multiple in right first break draft area
The drafting multiple of drafting multiple draft area identical or left back with the drafting multiple of right front draft zone and leading for right first break draft area
Stretch that multiple is identical but the drafting multiple draft area different or left back from the drafting multiple of right front draft zone of left front draft area
The drawing-off times of the drafting multiple and right front draft zone of drafting multiple draft area different and left front from the drafting multiple in right first break draft area
It is led before the total draft multiple and right first break draft area and the right side of number difference but left back draft area and the left draft area of left front draft area composition
Stretch district's groups at right draft area total draft multiple it is identical.
Double rollers set diameter is changed in spinning, including single left draft area or double roller set diameters change in single right draft area
Become double roller set diameters between the draft area of left and right to change, for double roller sets are straight in single left draft area or in single right draft area
Diameter changes, the left roller set diameter change simultaneously of left roller set and middle bottom roller 3 including rear bottom roll 1 in single left draft area,
Or the left roller set diameter change simultaneously of the left roller set of rear bottom roll 1 and preceding bottom roll 5 or Dan Zuo in single left draft area
Diameter changes the left roller set of the left roller set of middle bottom roller 3 and preceding bottom roll 5 simultaneously in draft area, or in single right draft area
Bottom roll after the right roller set of bottom roll 1 and the right roller of middle bottom roller 3 cover in diameter change simultaneously or single right draft area afterwards
Right sieve of middle bottom roller 3 in the right roller set diameter change simultaneously of 1 right roller set and preceding bottom roll 5 or single right draft area
It helps pull a cart and diameter changes the right roller of preceding bottom roll 5 set simultaneously, and the diameter of each roller sets other at this time is equal to benchmark roller
Diameter is covered, at this time left back draft area and right first break draft area drafting multiple is similar and different and left front draft area and right front draft zone
It is led after drafting multiple is similar and different and the total draft multiple of left back draft area and the left draft area of left front draft area composition and the right side
Stretch the right draft area that area and right front draft zone form total draft multiple is different or left back draft area and the drawing-off of right first break draft area
Multiple is different and different and left back draft area and left front draft area form from right front draft zone drafting multiple left front draft area
The total draft multiple of right draft area that the total draft multiple of left draft area and right first break draft area and right front draft zone form it is different or
Identical or left back draft area draft area different and left front from right first break draft area drafting multiple and right front draft zone drafting multiple
The total draft multiple and right first break draft area and the right side of similar and different and left back draft area and the left draft area of left front draft area composition
The total draft multiple of the right draft area of front draft zone composition is different, and the diameter of each roller sets other at this time is equal to benchmark roller
Cover diameter;Rollers set diameters double between the draft area of left and right are changed, left roller set including bottom roll after in left draft area and
The left roller set of bottom roll and the right side after the right roller of middle bottom roller covers in diameter change simultaneously or left draft area in right draft area
The right roller of preceding bottom roll covers the left roller set of middle bottom roller in diameter change simultaneously or left draft area in draft area and the right side is led
The right roller set diameter change simultaneously of preceding bottom roll in area is stretched, and the diameter of each roller sets other at this time is equal to benchmark roller set
Diameter, at this time left back draft area draft area different and left front from right first break draft area drafting multiple and right front draft zone drafting multiple
The total draft multiple and right first break draft area and right front draft of different and left back draft area and the left draft area of left front draft area composition
District's groups at right draft area total draft multiple it is different.
Three rollers set diameter is changed in spinning, including single left draft area or double roller set diameters change in single right draft area
Become and cover diameters change rollers double between the draft area of left and right, for three rollers cover directly in single left draft area or in single right draft area
Diameter changes, the left roller set and preceding bottom roll 5 of left roller set and middle bottom roller 3 including rear bottom roll 1 in the left draft area of list
The right roller set of right the roller set and middle bottom roller 3 of bottom roll 1 after in left roller set diameter change simultaneously or single right draft area
Diameter changes simultaneously with the right roller set of preceding bottom roll 5, and the diameter of each roller sets other at this time is straight equal to benchmark roller set
Diameter, at this time left back draft area similar and different and left front draft area and right front draft zone drawing-off with right first break draft area drafting multiple
Multiple is similar and different and the total draft multiple and right first break draft area of left back draft area and the left draft area of left front draft area composition
It is similar and different with the total draft multiple of the right draft area of right front draft zone composition;It is straight for roller sets double between the draft area of left and right
Diameter change, left roller set and the right roller of the middle bottom roller 3 in right draft area including bottom roll 1 rear in left draft area are covered with before
In the right roller set diameter change simultaneously of bottom roll 5 or left draft area in the left roller set and right draft area of middle bottom roller 3
The right roller set of bottom roll 1 and the right roller of preceding bottom roll 5 cover preceding bottom roll 5 in diameter change simultaneously or left draft area afterwards
Left roller set and right draft area in rear bottom roll 1 right roller set and middle bottom roller 3 right roller set simultaneously diameter change
Become, and the diameter of each roller sets other at this time is equal to benchmark roller and covers diameter, left back draft area is led with right first break draft area at this time
Stretch multiple different and left front draft area and right front draft zone drafting multiple is similar and different and left back draft area and left front drawing-off
District's groups at left draft area total draft multiple and the total draft times of right draft area that forms of right first break draft area and right front draft zone
Number difference or left back draft area draft area different and left front from right first break draft area drafting multiple and right front draft zone drawing-off times
It is led before the total draft multiple and right first break draft area and the right side of number difference and left back draft area and the left draft area of left front draft area composition
Stretch district's groups at right draft area total draft multiple is similar and different or left back draft area and right first break draft area drafting multiple not
With or identical and left front draft area from right front draft zone drafting multiple different and left back draft area and left front draft area composition
The total draft multiple of left draft area is different from the total draft multiple of right draft area that right first break draft area and right front draft zone form.
Spinning is changed for four rollers set diameter, including rear bottom roll 1, middle bottom roller 3, preceding bottom roll 5 in left draft area
In any one bottom roll left roller set with right draft area in after bottom roll 1, middle bottom roller 3, preceding bottom roll 5 lower sieve
The right roller set drawn simultaneously diameter change or left draft area in after bottom roll, middle bottom roller, it is any in preceding bottom roll
The left roller set of two bottom rolls in right draft area after bottom roll, middle bottom roller, preceding bottom roll bottom roll right roller
Diameter changes the right roller set of not exactly the same any two bottom roll simultaneously in any two and left draft area in set, and
The diameter of each roller sets other at this time is equal to benchmark roller and covers diameter, at this time left back draft area and right first break draft area drafting multiple
Different and left back draft area and a left side for left front draft area composition are led from right front draft zone drafting multiple for different and left front draft area
Stretch area total draft multiple and right first break draft area and right front draft zone composition right draft area total draft multiple it is similar and different,
Or left back draft area and right first break draft area drafting multiple is similar and different and left front draft area and right front draft zone drafting multiple
The total draft multiple and right first break draft area and the right side of similar and different and left back draft area and the left draft area of left front draft area composition
The total draft multiple of the right draft area of front draft zone composition is similar and different.
Spinning is changed for five rollers set diameter, including rear bottom roll 1, middle bottom roller 3, preceding bottom roll 5 in left draft area
In any two bottom roll left roller set with right draft area in after bottom roll 1, middle bottom roller 3, preceding bottom roll 5 lower sieve
The right roller set drawn simultaneously diameter change or right draft area in after bottom roll, middle bottom roller, it is any in preceding bottom roll
The right roller set of two bottom rolls in left draft area after bottom roll, middle bottom roller, preceding bottom roll bottom roll left roller
Diameter changes set simultaneously, and the diameter of remaining roller set covers diameter equal to benchmark roller at this time, at this time left back draft area
With right first break draft area drafting multiple similar and different and left front draft area and right front draft zone drafting multiple it is similar and different and
The total draft multiple and right first break draft area of left back draft area and the left draft area of left front draft area composition and right front draft zone form
Right draft area total draft multiple it is similar and different.
Spinning is changed for six rollers set diameter, including rear bottom roll 1, middle bottom roller 3, preceding bottom roll 5 in left draft area
Left roller set in right draft area after bottom roll 1, middle bottom roller 3, preceding bottom roll 5 bottom roll right roller set diameter simultaneously
Change, similar and different and left front draft area is led with right front draft zone with right first break draft area drafting multiple for left back draft area at this time
Stretch similar and different multiple and the total draft multiple and right first break draft of left back draft area and the left draft area of left front draft area composition
The total draft multiple of area and the right draft area of right front draft zone composition is similar and different.
In use, pressure-applying unit is rotated along fixing axle under force, thus realize the pushing of pressure-applying unit, thus
So that the left rubber roller set of the rear upper glue roller 2 of each spindle position, right rubber roller set respectively with the left roller set of rear bottom roll 1, right roller set
Between close face contact, the left rubber roller set of middle upper glue roller 4, right rubber roller set respectively with left roller set, the right sieve of middle bottom roller 3
Close face contact between helping pull a cart, the left rubber roller set of preceding upper glue roller 6, right rubber roller set respectively with the left roller set of preceding bottom roll 5, the right side
Close face contact between roller set, the roller shaft rotation of bottom roll, then drives and preceding bottom roll before first motor 13 drives
The left roller set of the preceding bottom roll that is fixedly connected of roller shaft integration, the set rotation of right roller, then drive and preceding bottom roll
The left rubber roller set of the preceding upper glue roller of close face contact, right rubber roller set rotate respectively for left roller set, right roller set, preceding bottom roll
Roller shaft rotation then drives the roller shaft rotation of middle bottom roller by the first connection gear group 14, then drive and middle bottom roller
The left roller set of the middle bottom roller that is fixedly connected of roller shaft integration, the set rotation of right roller, then drive and middle bottom roller
The left rubber roller set of the middle upper glue roller of close face contact, right rubber roller set rotate respectively for left roller set, right roller set, middle bottom roller
The roller shaft rotation of bottom roll after roller shaft rotation is then driven by the second connection gear group 15 then drives and lower sieve afterwards
The left roller set for the rear bottom roll that the roller shaft integration of drawing is fixedly connected, the set rotation of right roller, then drive and rear bottom roll
Left roller set, right roller cover close face contact rear upper glue roller left rubber roller set, right rubber roller set rotation, in first break draft roller
Pair rear portion add feeding bell mouth arrangement, feeding bell mouth arrangement includes left horn mouth, right horn mouth, left horn mouth, the right side
Horn mouth is fixedly connected by connecting cross bar, and the first rove 16 is fed by left horn mouth, and the second rove 17 is fed by right horn mouth,
First rove feeds pressing by rear left drawing rollers after left horn mouth, is then exported by middle left drawing rollers to pressing, the phase
Between by left back draft area drawing-off act on, finally by middle front traction roller to pressing export, during which by left front draft area
The first yarn is made in drawing-off effect, and right drawing rollers feed pressing to the second rove after after right horn mouth, then by the middle right side
Drawing rollers export pressing, and during which the drawing-off by right first break draft area acts on, and are finally exported by right front traction roller to pressing,
Period is acted on by the drawing-off of right front draft zone, obtained second yarn, in use process, is covered by the roller of each bottom roll straight
The variation of diameter realize left back draft area, left front draft area, right first break draft area, right front draft zone drafting multiple adjusting, thus
The production of various different yarns needed for needing to realize according to spinning.
Claims (1)
1. the present invention relates to a kind of double drawing-off Siro-spinning devices, including drafting system, drafting system include after drawing roller to,
Middle drawing rollers are to, front traction roller pair, and first break draft roller is to including rear bottom roll and rear upper glue roller, and middle drawing rollers are to including
Middle bottom roller and middle upper glue roller, front traction roller are rear bottom roll, middle bottom roller, front lower to including preceding bottom roll and preceding upper glue roller
Roller includes roller shaft, and roller shaft is solid cylindrical structure, all spindle positions of the front truck table top of a spinning frame it is rear under
The roller shaft integration of roller is fixedly connected, the roller shaft integration of the middle bottom roller of all spindle positions is fixedly connected, all spindle positions
The roller shaft integration of preceding bottom roll be fixedly connected, sieve of the rear bottom roll of all spindle positions of the rear car table top of a spinning frame
Pulling shaft integration is fixedly connected, the roller shaft integration of the middle bottom roller of all spindle positions is fixedly connected, front lower sieve of all spindle positions
The roller shaft integration of drawing is fixedly connected, and roller set, the material of roller set and roller shaft are provided in the exterior circumference of roller shaft
Matter is identical and is irony or steel, rear bottom roll, middle bottom roller, preceding bottom roll roller set include left roller set, right roller
Set, left roller set, right roller set is integrated with roller shaft is fixedly connected, left roller cover it is identical with the length that right roller covers, it is front lower
The right end of the roller shaft of roller is driven by first motor and is rotated, the roller of the right end of the roller shaft of middle bottom roller and preceding bottom roll
It is sequentially connected between the right end of axis by the first connection gear group, the right end of the roller shaft of rear bottom roll and the roller of middle bottom roller
It being sequentially connected between the right end of axis by the second connection gear group, rear upper glue roller, middle upper glue roller, preceding upper glue roller include rubber roller,
Rubber roller is irony material, and rubber roller is solid cylindrical structure, one ingot of rear car table top, front truck table top of a spinning frame
A position spindle position adjacent with right side constitutes a spindle position group, the rubber roller of the rear upper glue roller in two spindle positions of a spindle position group
Integration connection, the rubber roller integration of middle upper glue roller connection, the rubber roller integration of preceding upper glue roller connection, in each spindle position
Afterwards upper glue roller, middle upper glue roller, preceding upper glue roller rubber roller exterior circumference on be cased with rubber roller set, rubber roller set is rubber material, after
Upper glue roller, middle upper glue roller, preceding upper glue roller rubber roller set include left rubber roller set, right rubber roller set, left rubber roller set, right rubber roller set respectively with
Rubber roller is connected by respective intermediate bearing, and left rubber roller set, right rubber roller set respectively cover independent rotation, left rubber roller around rubber roller
The length of the equal length of set and right rubber roller set and respectively equal to left roller set and right roller set, two spindle positions of a spindle position group
Rear upper glue roller, middle upper glue roller, preceding upper glue roller rubber roller set between rubber roller successively from back to front be embedded in pressure-applying unit
Rear insertion grab, it is middle insertion grab, it is preceding insertion grab in, thus realize after upper glue roller, middle upper glue roller, preceding upper glue roller on pressure-applying unit
Installation, the rear portion of pressure-applying unit is fixed on the ride face of spinning frame by fixing axle, and pressure-applying unit can be along fixing axle
It is rotated, thus upper glue roller, middle upper glue roller, the pushing of preceding upper glue roller under a certain pressure after realizing during rotation,
In, the front left drawing rollers that are formed with the left rubber roller set of preceding upper glue roller in the left roller set by preceding bottom roll and by middle bottom roller
Left front draft area, left front draft area are formed between left drawing rollers pair in the left rubber roller set composition of left roller set and middle upper glue roller
Drafting multiple L11Radius R is covered with the left roller of preceding bottom roll11, middle bottom roller left roller cover radius R12, the first transmission gear
The gear ratio C of group1Between relationship are as follows:
The left drawing rollers and by rear bottom roll in left roller set and the left rubber roller set of middle upper glue roller by middle bottom roller form
Left roller set and the rear left drawing rollers pair of the left rubber roller of rear upper glue roller set composition between form left back draft area, left back drawing-off
The drafting multiple L in area12Radius R is covered with the left roller of middle bottom roller12, rear bottom roll left roller cover radius R13, the second driving cog
The gear ratio C of wheel group2Between relationship are as follows:
So that the total drafting multiple L for the left draft area that left front draft area and left back draft area are formed1Are as follows:
The front right drawing rollers that are formed with the right rubber roller set of preceding upper glue roller in the right roller set by preceding bottom roll and by middle bottom roller
Right roller set and middle upper glue roller right rubber roller set composition in form right front draft zone, right front draft between right drawing rollers pair
The drafting multiple L in area21Radius R is covered with the right roller of preceding bottom roll21, middle bottom roller right roller cover radius R22, the first driving cog
The gear ratio C of wheel group1Between relationship are as follows:
The right drawing rollers and by rear bottom roll in right roller set and the right rubber roller set of middle upper glue roller by middle bottom roller form
Right roller set and the rear right drawing rollers pair of the right rubber roller of rear upper glue roller set composition between form right first break draft area, right first break draft
The drafting multiple L in area22Radius R is covered with the right roller of middle bottom roller22, rear bottom roll right roller cover radius R23, the second driving cog
The gear ratio C of wheel group2Between relationship are as follows:
So that the total drafting multiple L for the right draft area that right front draft zone and right first break draft area are formed2Are as follows:
The left roller of preceding bottom roll covers radius R11, middle bottom roller left roller cover radius R12, rear bottom roll left roller cover radius
R13, preceding bottom roll right roller cover radius R21, middle bottom roller right roller cover radius R22, rear bottom roll right roller cover radius
R23Diameter be all larger than equal to each roller set setting datum diameter R0, roller set datum diameter R0Greater than the diameter R of roller shaft,
The left roller of preceding bottom roll under the conditions of being met by setting covers radius R11, middle bottom roller left roller cover radius R12, descend sieve afterwards
The left roller drawn covers radius R13, to realize the adjusting of the drafting multiple of left front draft area, left back draft area, met by setting
Under the conditions of preceding bottom roll right roller cover radius R21, middle bottom roller right roller cover radius R22, rear bottom roll right roller set
Radius R23Diameter, thus realize right front draft zone, right first break draft area drafting multiple adjusting, meanwhile, according to each of setting
The left rubber roller of upper glue roller covers radius r before the diameter setting of the roller set of bottom roll is corresponding11, middle upper glue roller left rubber roller cover radius
r12, rear upper glue roller left rubber roller cover radius r13, preceding upper glue roller right rubber roller cover radius r21, middle upper glue roller right rubber roller cover radius
r22, rear upper glue roller right rubber roller cover radius r23Diameter be all larger than equal to each rubber roller set setting datum diameter r0, rubber roller set base
Collimate diameter r0Greater than the diameter r of rubber roller, mid-rubber roll covers datum diameter r0Diameter to cover when roller is set as roller set benchmark
Diameter R0When corresponding rubber roller cover diameter, when meeting pressure-applying unit and pushing, it is r that rubber roller, which covers diameter,0When rubber roller set and roller set it is straight
Diameter is R0When roller set between close face contact, be arranged each lower rubber roller rubber roller set diameter and benchmark rubber roller set diameter it
Between negative difference and corresponding roller set diameter and benchmark roller set diameter between positive difference it is identical, including single-roller set is straight
Diameter changes, double rollers set diameter changes, three rollers cover diameter change, four rollers set diameter changes, the change of five rollers set diameter, six
Roller cover diameter change spinning, for single-roller set diameter change spinning, at this time be arranged after bottom roll left roller set or under
The diameter of the left roller of the left roller set of roller or preceding bottom roll set changes, or after setting the right roller set of bottom roll or in
The diameter of the right roller set of the right roller set or preceding bottom roll of bottom roll changes, and the diameter of other each roller sets is equal to base
Quasi- roller covers diameter, and at this time or the drafting multiple of left back draft area is different from the drafting multiple in right first break draft area but left front lead
Stretch the drafting multiple draft area identical or left back with the drafting multiple of right front draft zone in area drafting multiple and right first break draft area
Drafting multiple is identical but the drafting multiple drawing-off different or left back from the drafting multiple of right front draft zone of left front draft area
The drafting multiple of the drafting multiple in area draft area different and left front from the drafting multiple in right first break draft area is led with right front draft zone
Stretch different multiple but the total draft multiple and right first break draft area and the right side of left back draft area and the left draft area of left front draft area composition
The total draft multiple of the right draft area of front draft zone composition is identical, changes spinning, including single left drawing-off for double rollers set diameter
Double roller set diameters change in area or in single right draft area between double roller set diameters changes and left and right draft area, for Dan Zuo
Double rollers cover diameters change in draft area or in the right draft area of list, and the left roller set including rear bottom roll in single left draft area is in
A left side for left the roller set and preceding bottom roll of bottom roll after in the left roller set diameter change simultaneously of bottom roll or single left draft area
The left roller set of middle bottom roller and the left roller of preceding bottom roll cover simultaneously in roller set while diameter change or single left draft area
Diameter changes, or in single right draft area after bottom roll right roller set and middle bottom roller right roller set simultaneously diameter change,
Or the right roller set diameter change simultaneously of the right roller set of rear bottom roll and preceding bottom roll or single right side are led in single right draft area
Stretch the right roller set diameter change, and each roller sets other at this time simultaneously of the right roller set and preceding bottom roll of middle bottom roller in area
Diameter be equal to benchmark roller cover diameter, left back draft area and right first break draft area drafting multiple are similar and different and left front at this time
Draft area and right front draft zone drafting multiple is similar and different and left back draft area and the left draft area of left front draft area composition
Total draft multiple drawing-off different or left back from the total draft multiple of right draft area that right first break draft area and right front draft zone form
Area draft area different and left front from right first break draft area drafting multiple and right front draft zone drafting multiple difference and left back draft area
The right draft area formed with the total draft multiple of the left draft area of left front draft area composition and right first break draft area and right front draft zone
Total draft multiple is similar and different or left back draft area draft area different and left front from right first break draft area drafting multiple with
Right front draft zone drafting multiple is similar and different and the total draft times of left back draft area and the left draft area of left front draft area composition
Several total draft multiples of right draft area formed from right first break draft area and right front draft zone are different, and each roller sets other at this time
Diameter be equal to benchmark roller cover diameter;Rollers set diameters double between the draft area of left and right are changed, including in left draft area after
Under after the right roller of middle bottom roller covers in diameter change simultaneously or left draft area in the left roller set of bottom roll and right draft area
The right roller of preceding bottom roll covers lower sieve in diameter change simultaneously or left draft area in the left roller set of roller and right draft area
Diameter changes the right roller set of preceding bottom roll simultaneously in the left roller set drawn and right draft area, and each roller sets other at this time
Diameter be equal to benchmark roller cover diameter, at this time left back draft area draft area different and left front from right first break draft area drafting multiple and
The total draft multiple and the right side of right front draft zone drafting multiple difference and left back draft area and the left draft area of left front draft area composition
The total draft multiple for the right draft area that first break draft area and right front draft zone form is different;Spinning is changed for three rollers set diameter,
Including double roller set diameters change in single left draft area or in single right draft area between double roller set diameters changes and left and right draft area
Become, three rollers set diameter changes in draft area left for list or in single right draft area, including rear bottom roll in single left draft area
In the left roller set diameter change simultaneously of left roller set and the left roller set and preceding bottom roll of middle bottom roller or single right draft area
Diameter changes the right roller set of the right roller set of bottom roll and the right roller set of middle bottom roller and preceding bottom roll simultaneously afterwards, and at this time
The diameter of other each roller sets is equal to benchmark roller and covers diameter, and left back draft area is different from right first break draft area drafting multiple at this time
Or identical and left front draft area and right front draft zone drafting multiple is similar and different and left back draft area and left front drawing-off district's groups
At left draft area total draft multiple and the total draft multiple of right draft area that forms of right first break draft area and right front draft zone not
With or it is identical;Roller set diameters double between the draft area of left and right are changed, the left roller set including bottom roll rear in left draft area
The diameter change simultaneously of right roller set or left draft area with the right roller set and preceding bottom roll of the middle bottom roller in right draft area
The right roller set of the left roller set of interior middle bottom roller and the right roller set of the rear bottom roll in right draft area and preceding bottom roll is simultaneously
The left roller set of preceding bottom roll and the right roller set of the rear bottom roll in right draft area are in diameter change or left draft area
Diameter changes the right roller set of bottom roll simultaneously, and the diameter of each roller sets other at this time is equal to benchmark roller and covers diameter, this
The draft area Shi Zuohou draft area different and left front from right first break draft area drafting multiple and right front draft zone drafting multiple difference or phase
The total draft multiple and right first break draft area and right front draft zone of same and left back draft area and the left draft area of left front draft area composition
The total draft multiple difference of the right draft area of composition or left back draft area are different and left front from right first break draft area drafting multiple
The total draft of draft area different and left back draft area and the left draft area of left front draft area composition from right front draft zone drafting multiple
The total draft multiple for the right draft area that multiple and right first break draft area and right front draft zone form is similar and different or left back drawing-off
Area draft area similar and different and left front from right first break draft area drafting multiple and right front draft zone drafting multiple are different and left back
The right side that the total draft multiple and right first break draft area of draft area and the left draft area of left front draft area composition and right front draft zone form
The total draft multiple of draft area is different;Spinning is changed for four rollers set diameter, including in left draft area after bottom roll, in lower sieve
The left roller set of any one bottom roll drawing, in preceding bottom roll in right draft area afterwards bottom roll, middle bottom roller, it is preceding
The right roller set of the bottom roll of bottom roll simultaneously diameter change or left draft area in after bottom roll, middle bottom roller, front lower sieve
The left roller set of any two bottom roll in drawing in right draft area after bottom roll, middle bottom roller, under preceding bottom roll
The right roller set of not exactly the same any two bottom roll is same in any two and left draft area in the right roller set of roller
When diameter change, and the diameter of each rollers other at this time set is equal to benchmark roller and covers diameter, at this time left back draft area and it is right after
Draft area drafting multiple is different and left front draft area draft area different and left back from right front draft zone drafting multiple and left front leads
Stretch district's groups at left draft area total draft multiple and the total draft of right draft area that forms of right first break draft area and right front draft zone
Multiple is similar and different or left back draft area and right first break draft area drafting multiple is similar and different and left front draft area and right
Front draft zone drafting multiple is similar and different and the total draft multiple of left back draft area and the left draft area of left front draft area composition
It is similar and different with the total draft multiple in right first break draft area and the right draft area of right front draft zone composition;Diameter is covered for five rollers
Change spinning, including bottom roll after in left draft area, middle bottom roller, any two bottom roll in preceding bottom roll left sieve
Help pull a cart in right draft area after bottom roll, middle bottom roller, preceding bottom roll bottom roll right roller set diameter changes simultaneously, or
Bottom roll after in the right draft area of person, middle bottom roller, any two bottom roll in preceding bottom roll right roller set are led with a left side
Bottom roll after stretching in area, middle bottom roller, preceding bottom roll bottom roll left roller set diameter changes simultaneously, and it is remaining at this time
The diameter of one roller set is equal to benchmark roller and covers diameter, and left back draft area is different from right first break draft area drafting multiple at this time or phase
With and left front draft area and right front draft zone drafting multiple is similar and different and left back draft area and left front draft area composition
The total draft multiple of right draft area that the total draft multiple of left draft area and right first break draft area and right front draft zone form it is different or
It is identical;Spinning is changed for six rollers set diameter, including bottom roll after in left draft area, middle bottom roller a, preceding bottom roll left side
Roller set in right draft area after bottom roll, middle bottom roller, preceding bottom roll bottom roll right roller set diameter changes simultaneously,
Left back draft area and right first break draft area drafting multiple is similar and different and left front draft area and right front draft zone drafting multiple at this time
The total draft multiple and right first break draft area and the right side of similar and different and left back draft area and the left draft area of left front draft area composition
The total draft multiple of the right draft area of front draft zone composition is similar and different.
In use, pressure-applying unit is rotated along fixing axle under force, thus realize the pushing of pressure-applying unit, so that
Left rubber roller set, the right rubber roller set of the rear upper glue roller of each spindle position are tight between the left roller set of rear bottom roll, right roller set respectively
Close face contact, left rubber roller set, the right rubber roller set of middle upper glue roller are tight between the left roller set of middle bottom roller, right roller set respectively
Close face contact, left rubber roller set, the right rubber roller set of preceding upper glue roller are tight between the left roller set of preceding bottom roll, right roller set respectively
Close face contact, the roller shaft rotation of bottom roll, then drives integrated with the roller shaft of preceding bottom roll before first motor drives
The left roller set for the preceding bottom roll being fixedly connected, the set rotation of right roller, then drive left roller set, the right roller with preceding bottom roll
The left rubber roller set of the preceding upper glue roller of close face contact, the set rotation of right rubber roller, the roller shaft of preceding bottom roll rotate then set respectively
The roller shaft rotation that middle bottom roller is driven by the first connection gear group, then drives the roller shaft integrated solid with middle bottom roller
Surely the left roller set of the middle bottom roller connected, the set rotation of right roller, then drive left roller set, the right roller set with middle bottom roller
The left rubber roller set of the middle upper glue roller of close face contact, the set rotation of right rubber roller, the roller shaft rotation of middle bottom roller are then led to respectively
The roller shaft rotation for crossing bottom roll after the second connection gear group drives, then drives fix integrated with the roller shaft of rear bottom roll
The left roller set of the rear bottom roll of connection, the set rotation of right roller, then drive and are locked with left roller set, the right roller of rear bottom roll
The left rubber roller set of the rear upper glue roller of close face contact, the set rotation of right rubber roller, add feeding loudspeaker at the rear portion of first break draft roller pair
Mouth device, feeding bell mouth arrangement include left horn mouth, right horn mouth, and left horn mouth, right horn mouth are solid by connection cross bar
Fixed connection, the first rove are fed by left horn mouth, and the second rove is fed by right horn mouth, and the first rove is after left horn mouth after
Left drawing rollers feed pressing, are then exported by middle left drawing rollers to pressing, and during which the drawing-off by left back draft area is made
With, finally pressing is exported by middle front traction roller, during which the drawing-off by left front draft area acts on, the first yarn is made, the
Right drawing rollers feed pressing to two rove after after right horn mouth, are then exported by middle right drawing rollers to pressing, during which
Drawing-off by right first break draft area acts on, and is finally exported by right front traction roller to pressing, is during which led by right front draft zone
The second yarn is made in the effect of stretching, and in use process, left back drawing-off is realized in the variation for passing through the diameter that the roller of each bottom roll covers
Area, left front draft area, right first break draft area, right front draft zone drafting multiple adjusting, thus according to spinning need realize needed for
Various different yarns production.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910109643.2A CN110067051A (en) | 2019-02-11 | 2019-02-11 | A kind of double drawing-off Siro-spinning devices and Yarn spinning method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910109643.2A CN110067051A (en) | 2019-02-11 | 2019-02-11 | A kind of double drawing-off Siro-spinning devices and Yarn spinning method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110067051A true CN110067051A (en) | 2019-07-30 |
Family
ID=67366130
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910109643.2A Withdrawn CN110067051A (en) | 2019-02-11 | 2019-02-11 | A kind of double drawing-off Siro-spinning devices and Yarn spinning method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110067051A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113062022A (en) * | 2021-03-17 | 2021-07-02 | 绍兴市柯桥区东纺纺织产业创新研究院 | Production method of high-elastic yarn |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01192847A (en) * | 1988-01-26 | 1989-08-02 | Kanebo Ltd | Fabric with sirospun yarn |
CN105671702A (en) * | 2016-04-19 | 2016-06-15 | 江南大学 | Spatially twisting spinning device and spinning method |
CN106367855A (en) * | 2016-12-06 | 2017-02-01 | 江南大学 | Three-roller double-drawing spinning device |
CN206157295U (en) * | 2016-11-01 | 2017-05-10 | 江南大学 | V type first break draft match twine spinning device |
CN107488911A (en) * | 2017-08-21 | 2017-12-19 | 江南大学 | A kind of spinning section increases pre- twisting spinning apparatus and Yarn spinning method paragraph by paragraph |
CN108179507A (en) * | 2018-03-20 | 2018-06-19 | 江南大学 | A kind of conformal pure process units, production method and pure spinning Siro Yarn for spinning Siro Yarn of drawing-offs double up and down |
-
2019
- 2019-02-11 CN CN201910109643.2A patent/CN110067051A/en not_active Withdrawn
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01192847A (en) * | 1988-01-26 | 1989-08-02 | Kanebo Ltd | Fabric with sirospun yarn |
CN105671702A (en) * | 2016-04-19 | 2016-06-15 | 江南大学 | Spatially twisting spinning device and spinning method |
CN206157295U (en) * | 2016-11-01 | 2017-05-10 | 江南大学 | V type first break draft match twine spinning device |
CN106367855A (en) * | 2016-12-06 | 2017-02-01 | 江南大学 | Three-roller double-drawing spinning device |
CN107488911A (en) * | 2017-08-21 | 2017-12-19 | 江南大学 | A kind of spinning section increases pre- twisting spinning apparatus and Yarn spinning method paragraph by paragraph |
CN108179507A (en) * | 2018-03-20 | 2018-06-19 | 江南大学 | A kind of conformal pure process units, production method and pure spinning Siro Yarn for spinning Siro Yarn of drawing-offs double up and down |
Non-Patent Citations (2)
Title |
---|
刘全新等: "棉纺细纱机的后区牵伸变换", 《纺织导报》 * |
叶鸿玑: "《实用棉纺技术》", 31 October 1990, 济南出版社 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113062022A (en) * | 2021-03-17 | 2021-07-02 | 绍兴市柯桥区东纺纺织产业创新研究院 | Production method of high-elastic yarn |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108930078A (en) | The soft clean Pure Yarn process units of one kind and production method | |
CN105624872B (en) | A kind of section coloured yarn spinning apparatus and Yarn spinning method | |
CN108179507A (en) | A kind of conformal pure process units, production method and pure spinning Siro Yarn for spinning Siro Yarn of drawing-offs double up and down | |
CN109097884A (en) | A kind of production method for matching the high-elastic yarn of network | |
CN105671703B (en) | A kind of three rove feeding section color bunchy yarn process units and production method | |
CN106435898B (en) | A kind of rove control feeding spinning apparatus and Yarn spinning method | |
CN109594167A (en) | Mariages cored fasciated yarn process units and its production method | |
CN107190393A (en) | High-elastic double-core yarn production device and production method | |
CN106757621A (en) | A kind of drawing-off spinning apparatus of three roller three and Yarn spinning method | |
CN108315843A (en) | A kind of production method of high-strength conformal yarn process units and high-strength conformal yarn | |
CN109234864A (en) | A kind of double twist yarn synchronous production devices and production method | |
CN106367855A (en) | Three-roller double-drawing spinning device | |
CN106592041B (en) | A kind of double drawing-off spinning apparatus of V-type | |
CN109706560A (en) | Control spinning apparatus and Yarn spinning method are gathered in a kind of double drawing-offs | |
CN106929966A (en) | A kind of slub process units and production method | |
CN106283289A (en) | A kind of three rove controlled feeding spinning apparatus and Yarn spinning methods | |
CN110067051A (en) | A kind of double drawing-off Siro-spinning devices and Yarn spinning method | |
CN109137178A (en) | A kind of three primary colors fiber secondary colour Spinning process device and production method | |
CN106319699B (en) | A kind of three rove single ingots are controllable or unification controllably feeds spinning apparatus and Yarn spinning method | |
CN109680381A (en) | A kind of mariages is entwined covering yarn process units and production method | |
CN109881310A (en) | One kind is pure to spin conformal yarn process units and production method | |
CN109837631B (en) | Production device and production process of composite fasciated yarn | |
CN106757571A (en) | A kind of double ingot separate transmission feeding spinning apparatus of three rove | |
CN109554796A (en) | A kind of composite core-spun yarn process units and production method | |
CN109554786A (en) | A kind of double drawing-offs control spinning apparatus and Yarn spinning method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190730 |
|
WW01 | Invention patent application withdrawn after publication |