CN110046721A - Piping lane construction wisdom method for managing security and system based on BIM technology - Google Patents
Piping lane construction wisdom method for managing security and system based on BIM technology Download PDFInfo
- Publication number
- CN110046721A CN110046721A CN201910309504.4A CN201910309504A CN110046721A CN 110046721 A CN110046721 A CN 110046721A CN 201910309504 A CN201910309504 A CN 201910309504A CN 110046721 A CN110046721 A CN 110046721A
- Authority
- CN
- China
- Prior art keywords
- information
- pipe gallery
- piping lane
- current
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 79
- 238000000034 method Methods 0.000 title claims abstract description 43
- 238000005516 engineering process Methods 0.000 title claims abstract description 23
- 238000009430 construction management Methods 0.000 claims abstract description 51
- 239000002131 composite material Substances 0.000 claims abstract description 32
- 238000012423 maintenance Methods 0.000 claims abstract description 27
- 238000004891 communication Methods 0.000 claims description 7
- 230000008569 process Effects 0.000 claims description 7
- 239000007789 gas Substances 0.000 claims description 5
- 238000009423 ventilation Methods 0.000 claims description 5
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 claims description 4
- 238000012806 monitoring device Methods 0.000 claims description 4
- 239000001301 oxygen Substances 0.000 claims description 4
- 229910052760 oxygen Inorganic materials 0.000 claims description 4
- 230000000505 pernicious effect Effects 0.000 claims description 4
- 230000001360 synchronised effect Effects 0.000 claims description 4
- 230000007613 environmental effect Effects 0.000 claims description 3
- 238000009736 wetting Methods 0.000 claims 1
- 238000012545 processing Methods 0.000 abstract description 16
- 238000012544 monitoring process Methods 0.000 abstract description 9
- 230000006870 function Effects 0.000 description 6
- 238000010168 coupling process Methods 0.000 description 3
- 238000005859 coupling reaction Methods 0.000 description 3
- 238000001514 detection method Methods 0.000 description 3
- 230000008878 coupling Effects 0.000 description 2
- 238000012800 visualization Methods 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 238000005286 illumination Methods 0.000 description 1
- 230000001939 inductive effect Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
Landscapes
- Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Strategic Management (AREA)
- Marketing (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses piping lane construction wisdom method for managing security and system based on BIM technology, it is related to piping lane construction management technical field, it solves from monitoring accident, to that will be transferred between operational staff according to the resulting emergency measure of current crash analysis there are hysteresis quality, thus the volatile Best Times problem for going processing burst accident or plant maintenance;It include: to obtain current Construction State information, current device information;From the corresponding relationship of pipe gallery construction management information, current composite piping lane construction management information is searched;Pipe gallery construction management information includes emergence treatment scheme and plant maintenance;The historgraphic data recording of piping lane construction management information;Pipe gallery management service is provided for current composite piping lane according to current composite piping lane construction management information, and can provide the information backtracking of unit time T;Piping lane construction wisdom method for managing security and system based on BIM technology of the invention, hedge effectiveness, reduction life and property loss.
Description
Technical field
The present invention relates to piping lane administrative skill fields, in particular to the piping lane construction wisdom safety management based on BIM technology
Method and system.
Background technique
Pipe gallery is a kind of Urban Underground that is built in for accommodating the structures of two classes and the above municipal engineering pipeline and attached
Belong to facility, is the comprehensive corridor of urban Underground pipeline.
The leak detection of each medium, early warning, processing etc. are all more demanding to management level in piping lane.Secondly, integrated pipe
In corridor work progress, the systems such as ventilation, illumination, power supply, fire-fighting, draining, mark, monitoring, alarm itself are also provided with, there is
A large amount of equipment maintenance and management problem.
The prior art, piping lane in the construction process, for the construction data inside pipe gallery get emergency measure or
There are certain hysteresis qualitys for implementation between person's plant maintenance.For example, burst accident occurs in work progress in pipe gallery, prison
Survey department needs to monitor accident first, and the information that accident occurs then is transmitted to analysis department, secondly analysis department
It is given after analysis is discussed after receiving information to for accident and generation position, ultimate analysis department provides after analysis is discussed and answers
Emergency plan is simultaneously passed to operational staff and gives emergency processing by anxious processing scheme, therefore from monitoring accident, to will be according to working as
The preceding resulting emergency measure of crash analysis is transferred at operational staff, and there are hysteresis qualitys, thus volatile place to go director event or equipment
The Best Times of maintenance lead to serious life and property loss, there is improved space.
Summary of the invention
The first object of the present invention is to provide the construction wisdom method for managing security of the piping lane based on BIM technology, reduces and executes
Personnel lose the probability of processing burst accident or plant maintenance Best Times, and hedge effectiveness reduces life and property loss.
Above-mentioned technical purpose of the invention has the technical scheme that
Piping lane construction wisdom method for managing security based on BIM technology, the method are applied to an at least information control center and set
Standby, the information control center equipment is connect with data acquisition equipment, terminal equipment in communication;The described method includes:
Obtain current Construction State information in pipe gallery;
Obtain current device information in pipe gallery;
Out of pre-set pipe gallery status information, in pipe gallery facility information and pipe gallery construction management information it
Between corresponding relationship in, search it is corresponding with facility information in Construction State information current in the pipe gallery, pipe gallery
Current composite piping lane construction management information;Status information by the data acquisition equipment by being obtained in the pipe gallery, institute
It includes associated with facility information in status information in the pipe gallery, pipe gallery for stating pipe gallery construction management information
: emergence treatment scheme and the historgraphic data recording of plant maintenance, piping lane construction management information;
Pipe gallery construction management clothes are provided according to the current composite piping lane construction management information for the current composite piping lane
Business, and can provide the information backtracking of unit time T.
By using above-mentioned technical proposal, according to currently being set in Construction State information current in pipe gallery, pipe gallery
Standby information, lookup and the mutual corresponding current composite piping lane construction management information of the information, are based on the default status information
The emergence treatment scheme taken needed for lower operational staff and plant maintenance provide corresponding pipe gallery construction management service,
Realization corresponding emergence treatment scheme and plant maintenance measure are directly matched according to information in current composite piping lane, avoid from
Burst accident is monitored, to the hysteresis quality between operational staff will be transferred to according to the resulting emergency measure of current crash analysis;
Secondly, the information of unit time T is recalled so that major event occurs for piping lane construction, can fast and effeciently orientation problem point, minute
Clear responsibility simultaneously analyzes reason, reduces the probability that operational staff loses processing burst accident or plant maintenance Best Times, ensure that
The safety of pipe gallery and the security of the lives and property of staff effectively promote burst accident rescue, dangerous situation flash appeal etc.
The processing capacity of event.
The present invention is further arranged to: further including the location information for obtaining current construction personnel position.
By using above-mentioned technical proposal, the location information by obtaining construction personnel position is realized in piping lane
Construction personnel carries out precise positioning, can know the position of construction personnel at any time, personnel's distributed quantity in each region facilitates hilllock
Position scheduling.
The present invention is further arranged to: piping lane construction wisdom method for managing security can be transferred to the piping lane O&M stage and answer
With.
By using above-mentioned technical proposal, piping lane construction wisdom method for managing security can be transferred to the piping lane O&M stage and answer
With, realize the O&M stage of piping lane schedule maintenance.
The present invention is further arranged to: the information control center equipment believes Construction State current in the pipe gallery
Current device information is stored to terminal device and/or synchronized upload to cloud server in breath and the pipe gallery.
By using above-mentioned technical proposal, the information control center equipment is by current Construction State in the pipe gallery
Current device information is stored to terminal device and/or synchronized upload to cloud server in information and the pipe gallery, is convenient for
Personnel long-range, relevant to pipe gallery construction management can be checked in pipe gallery by terminal device or cloud server
Current device information in current Construction State information and pipe gallery, can learn Construction State information in pipe gallery at any time, make
It obtains Construction State information in pipe gallery and is in open state, convenient for supervision.
The present invention is further arranged to: current Construction State information is stored in the pipe gallery in the terminal device
With in the pipe gallery when current device information, the terminal device is given by BIM3D modeling and is shown.
By using above-mentioned technical proposal, is given in displaying pipe gallery in terminal device by BIM3D modeling and currently applied
Current device information in work status information and pipe gallery, so that personnel's reality long-range, relevant to pipe gallery construction management
Now the visualization of current composite piping lane is watched, the safety of pipe gallery and the security of the lives and property of staff is improved, mentions
The high accuracy rate and efficiency of working efficiency and information transmitting.
The present invention is further arranged to: current Construction State information includes current environment shape in pipe gallery in pipe gallery
State information;
When Construction State information matches in current ambient conditions information in the pipe gallery and pre-set, pipe gallery
When, it is described according to the current composite piping lane construction management information corresponding with current ambient conditions information in pipe gallery
Active user provides pipe gallery construction management service.
By using above-mentioned technical proposal, the acquisition of current ambient conditions information in pipe gallery, convenient for from pipe gallery
Interior current ambient conditions information matches at the first time and plant maintenance scheme and emergence treatment scheme, improves the reasonable of scheme
Property, to reduce danger brought by hidden danger in pipe gallery.
The present invention is further arranged to: in the pipe gallery environmental state information include temperature information in pipe gallery,
Humidity information in pipe gallery, oxygen content in air information in pipe gallery, pernicious gas content information, support knot in pipe gallery
Structure stress-strain data information.
By using above-mentioned technical proposal, temperature information in pipe gallery, humidity information in pipe gallery, in pipe gallery
Pernicious gas content information is convenient for discovery at the first time because environment brought by accident becomes in oxygen content in air information, pipe gallery
Change, and then matches emergence treatment scheme at the first time.
The present invention is further arranged to: facility information includes ventilation equipment information, lighting apparatus letter in the pipe gallery
Breath, power supply unit information, fire-fighting equipment information, drainage equipment information, monitoring device information.
By using above-mentioned technical proposal, ventilation equipment information, lighting apparatus information, power supply unit information, fire-fighting equipment
The acquisition of information, drainage equipment information, monitoring device information, convenient for matching plant maintenance measure at the first time.
The second object of the present invention is to provide the construction wisdom safety management system of the piping lane based on BIM technology, reduces and executes
Personnel lose the probability of processing hidden danger or daily maintenance Best Times, hedge effectiveness.
Above-mentioned technical purpose of the invention has the technical scheme that
Piping lane construction wisdom safety management system based on BIM technology, is applied to an at least information control center equipment, the letter
Breath control centre's equipment is connect with data acquisition equipment, terminal equipment in communication;Further include:
First information acquiring unit obtains current Construction State information in pipe gallery;
Second information acquisition unit obtains current device information in pipe gallery;
Information process unit, status information, facility information and pipe gallery in pipe gallery out of pre-set pipe gallery
In corresponding relationship between construction management information, search in Construction State information current in the pipe gallery, pipe gallery
The corresponding current composite piping lane construction management information of facility information;Status information by the data by being adopted in the pipe gallery
Collect equipment to obtain, the pipe gallery construction management information includes setting in status information in the pipe gallery, pipe gallery
Standby information is associated: emergence treatment scheme and plant maintenance;
Information management unit provides integrated pipe according to the current composite piping lane construction management information for the current composite piping lane
Corridor management service.
By using above-mentioned technical proposal, according to currently being set in Construction State information current in pipe gallery, pipe gallery
Standby information, lookup and the mutual corresponding current composite piping lane construction management information of the information, are based on the default status information
The emergence treatment scheme taken needed for lower operational staff and plant maintenance provide corresponding pipe gallery management service, realize
Corresponding emergence treatment scheme and plant maintenance measure are directly matched according to information in current composite piping lane, are avoided from monitoring
It reduces and executes to hidden danger to the hysteresis quality between operational staff will be transferred to according to the resulting emergency measure of current Analysis of Potential
Personnel lose the probability of processing hidden danger or daily maintenance Best Times, hedge effectiveness.
In conclusion the invention has the following advantages: reducing operational staff loses processing burst accident or equipment dimension
The probability for protecting Best Times, ensure that the safety of pipe gallery and the security of the lives and property of staff, effectively promote burst
The processing capacity of the events such as accident rescue, dangerous situation flash appeal.
Detailed description of the invention
Fig. 1 is the flow chart of the piping lane construction wisdom method for managing security based on BIM technology;
Fig. 2 is current Construction State information in pipe gallery in the piping lane construction wisdom method for managing security based on BIM technology
Module composition figure.
Specific embodiment
Below in conjunction with attached drawing 1-2, invention is further described in detail.
The embodiment of the present invention provides the piping lane construction wisdom method for managing security based on BIM technology, and method is applied at least
One information control center equipment, information control center equipment are connect with data acquisition equipment, terminal equipment in communication.Method it is main
Process is described as follows.
Referring to Fig.1:
Step 110: obtaining current Construction State information in pipe gallery;Obtain current device information in pipe gallery;
Step 120: out of pre-set pipe gallery status information, facility information and pipe gallery construction are managed in pipe gallery
It manages in the corresponding relationship between information, searches and facility information pair in Construction State information current in pipe gallery, pipe gallery
The current composite piping lane construction management information answered;Status information by data acquisition equipment by being obtained in pipe gallery, integrated pipe
Corridor construction management information includes associated with facility information in status information in pipe gallery, pipe gallery: emergency processing side
Case and the historgraphic data recording of plant maintenance, piping lane construction management information;
Step 130: providing pipe gallery construction management clothes according to current composite piping lane construction management information for current composite piping lane
It is engaged in and can provide the information backtracking of unit time T.
In the present embodiment, the information backtracking of unit time T is provided, so that major event occurs for piping lane construction, it can be fast
Speed efficiently locates problem, distinguishes responsibility and analyze reason;Wherein unit time T can be 1h, 1day, 1month.
Piping lane construction wisdom method for managing security can be transferred to the application of piping lane O&M stage, to realize the O&M stage of piping lane
Schedule maintenance.
According to current device information in Construction State information current in pipe gallery, pipe gallery, search and the information phase
Mutual corresponding current composite piping lane construction management information, is answered based on what is taken needed for operational staff under the default status information
Anxious processing scheme and plant maintenance provide corresponding pipe gallery management service, realize directly according in current composite piping lane
Information matches corresponding emergence treatment scheme and plant maintenance measure, avoids from monitoring hidden danger, to will be according to current hidden
Suffer from and analyze resulting emergency measure and be transferred to the hysteresis quality between operational staff, reduce operational staff lose processing burst accident or
The probability of plant maintenance Best Times ensure that the safety of pipe gallery and the security of the lives and property of staff, effectively mention
Rise the processing capacity of the events such as burst accident rescue, dangerous situation flash appeal.
It further include the location information for obtaining current construction personnel position, by the position for obtaining construction personnel position
It sets information realization and precise positioning is carried out to the construction personnel in piping lane, can know the position of construction personnel, each region at any time
Personnel's distributed quantity, facilitate post to dispatch;Secondly the attendance to construction personnel can be realized by positioning.In the present embodiment,
Wireless transmitter is installed at equal intervals, construction personnel carries wireless receiver and then with it to realize construction personnel inside piping lane
Precise positioning.
Information control center equipment will be current in current Construction State information in the pipe gallery and the pipe gallery
Facility information is stored to terminal device and/or synchronized upload to cloud server.Convenient for long-range and pipe gallery construction management
Relevant personnel can check current Construction State information and integrated pipe in pipe gallery by terminal device or cloud server
Current device information in corridor can learn Construction State information in pipe gallery at any time, so that Construction State information in pipe gallery
In open state, convenient for supervision.Wherein, terminal device can be industrial PC, display, personal mobile terminal.
It in the present embodiment, further include being obtained to progress msg, and be shown in BIM threedimensional model in plant maintenance,
In order to which related personnel understands piping lane construction speed situation.
When being stored in pipe gallery current device information in current Construction State information and pipe gallery in terminal device,
Terminal device is given and is shown by BIM3D modeling, to realize that terminal device may be viewed by pipe gallery entirety 3 D sand table and its each
Item information.Personnel relevant to pipe gallery construction management realize that the visualization to current composite piping lane is watched, and improve integrated pipe
The safety of corridor and the security of the lives and property of staff improve work efficiency accuracy rate and efficiency with information transmitting.
Current Construction State information includes current ambient conditions information in pipe gallery in pipe gallery;When the integrated pipe
In corridor in current ambient conditions information and pre-set, pipe gallery when Construction State information matches, according to pipe gallery
The corresponding current composite piping lane construction management information of interior current ambient conditions information, provides integrated pipe for the active user
Corridor construction management service.In the pipe gallery environmental state information include temperature information in pipe gallery, it is wet in pipe gallery
Spend information, oxygen content in air information in pipe gallery, pernicious gas content information, support construction ess-strain number in pipe gallery
It is believed that breath.
Referring to Fig. 2, the detection for corresponding to medium in the present embodiment is given by corresponding sensor to be detected.In pipe gallery
Facility information include ventilation equipment information, lighting apparatus information, power supply unit information, fire-fighting equipment information, drainage equipment information,
Monitoring device information.
The acquisition of facility information in the present embodiment is realized by video monitoring.Support construction stress-strain data information is logical
Cross the sensor realization detection for being installed on corresponding support construction.
In addition, the terms "and/or", only a kind of incidence relation for describing affiliated partner, indicates may exist
Three kinds of relationships, for example, A and/or B, can indicate: individualism A exists simultaneously A and B, these three situations of individualism B.Separately
Outside, character "/" herein typicallys represent the relationship that forward-backward correlation object is a kind of "or" unless otherwise specified.
For example, in the construction process when in pipe gallery somewhere temperature increase when, information control center equipment by pair
Inductive sensing device gives obtained data to pre-set data and is matched and judge whether to be in an emergency, occur it is tight
It compares confirmation with video monitoring data when anxious situation and generates emergence treatment scheme, operational staff can be obtained by monitoring screen
Know that emergence treatment scheme can also be by terminal device and/or cloud server;And monitoring screen and terminal device and/or cloud
The location information having at temperature raising is uploaded on server.
Based on the same inventive concept, the embodiment of the present invention provides the piping lane construction wisdom safety management system based on BIM technology
System, comprising:
First information acquiring unit obtains current Construction State information in pipe gallery;
Second information acquisition unit obtains current device information in pipe gallery;
Information process unit, status information, facility information and pipe gallery in pipe gallery out of pre-set pipe gallery
In corresponding relationship between construction management information, search in Construction State information current in the pipe gallery, pipe gallery
The corresponding current composite piping lane construction management information of facility information;Status information by the data by being adopted in the pipe gallery
Collect equipment to obtain, the pipe gallery construction management information includes setting in status information in the pipe gallery, pipe gallery
Standby information is associated: emergence treatment scheme and plant maintenance;
Information management unit provides integrated pipe according to the current composite piping lane construction management information for the current composite piping lane
Corridor construction management service.
It is apparent to those skilled in the art that for convenience and simplicity of description, only with above-mentioned each function
The division progress of module can according to need and for example, in practical application by above-mentioned function distribution by different function moulds
Block is completed, i.e., the internal structure of device is divided into different functional modules, to complete all or part of function described above
Energy.The specific work process of the system, apparatus, and unit of foregoing description, can be with reference to corresponding in preceding method embodiment
Journey, details are not described herein.
In embodiment provided herein, it should be understood that disclosed system, device and method can pass through
Other modes are realized.For example, the apparatus embodiments described above are merely exemplary, for example, the module or unit
Division, only a kind of logical function partition, there may be another division manner in actual implementation, such as multiple units or group
Part can be combined or can be integrated into another system, or some features can be ignored or not executed.Another point, it is shown
Or the mutual coupling, direct-coupling or communication connection discussed can be through some interfaces, device or unit it is indirect
Coupling or communication connection can be electrical property, mechanical or other forms.
Above-mentioned unit as illustrated by the separation member may or may not be physically separated, aobvious as unit
The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple
In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme
's.
It, can also be in addition, each functional unit in each embodiment of the application can integrate in one processing unit
It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list
Member both can take the form of hardware realization, can also realize in the form of software functional units.
Those of ordinary skill in the art will appreciate that: realize that all or part of the steps of above method embodiment can pass through
The relevant hardware of program instruction is completed, and program above-mentioned can store in computer-readable storage medium, which exists
When execution, step including the steps of the foregoing method embodiments is executed;And storage medium above-mentioned includes: movable storage device, read-only deposits
The various media that can store program code such as reservoir (Read Only Memory, ROM), magnetic or disk.
If alternatively, the above-mentioned integrated unit of the present invention is realized in the form of software function module and as independent product
When selling or using, it also can store in a computer readable storage medium.Based on this understanding, the present invention is implemented
Substantially the part that contributes to existing technology can be embodied in the form of software products the technical solution of example in other words,
The computer software product is stored in a storage medium, including some instructions are used so that computer equipment (can be with
It is personal computer, server or network equipment etc.) execute all or part of each embodiment the method for the present invention.
And storage medium above-mentioned includes: various Jie that can store program code such as movable storage device, ROM, magnetic or disk
Matter.
Above embodiments are only described in detail to the technical solution to the application, but the explanation of above embodiments is only
It is to be used to help understand method and its core concept of the invention, should not be construed as limiting the invention.The art
In the technical scope disclosed by the present invention, any changes or substitutions that can be easily thought of by technical staff, should all cover in guarantor of the invention
Within the scope of shield.
Claims (9)
- The wisdom method for managing security 1. the piping lane based on BIM technology is constructed, it is characterised in that: the method is applied at least one letter Control centre's equipment is ceased, the information control center equipment is connect with data acquisition equipment, terminal equipment in communication;The method packet It includes:Obtain current Construction State information in pipe gallery;Obtain current device information in pipe gallery;Out of pre-set pipe gallery Construction State information, facility information and pipe gallery construction management are believed in pipe gallery In corresponding relationship between breath, search and facility information pair in Construction State information current in the pipe gallery, pipe gallery The current composite piping lane construction management information answered;Construction State information passes through by the data acquisition equipment in the pipe gallery It obtains, the pipe gallery construction management information includes and equipment in Construction State information in the pipe gallery, pipe gallery Information is associated: emergence treatment scheme and the historgraphic data recording of plant maintenance, piping lane construction management information;Pipe gallery construction management clothes are provided according to the current composite piping lane construction management information for the current composite piping lane Business, and can provide the information backtracking of unit time T.
- The wisdom method for managing security 2. the piping lane according to claim 1 based on BIM technology is constructed, it is characterized in that: also wrapping Include the location information for obtaining current construction personnel position.
- The wisdom method for managing security 3. the piping lane according to claim 2 based on BIM technology is constructed, it is characterized in that: described Piping lane construction wisdom method for managing security can be transferred to the application of piping lane O&M stage.
- The wisdom method for managing security 4. the piping lane according to claim 2 based on BIM technology is constructed, it is characterized in that: described Information control center equipment is by current device information in current Construction State information in the pipe gallery and the pipe gallery It stores to terminal device and/or synchronized upload to cloud server.
- The wisdom method for managing security 5. the piping lane according to claim 4 based on BIM technology is constructed, it is characterized in that: described When being stored in the pipe gallery current device information in current Construction State information and the pipe gallery in terminal device, The terminal device is given by BIM3D modeling and is shown.
- The wisdom method for managing security 6. the piping lane according to claim 1 based on BIM technology is constructed, it is characterized in that: comprehensive Current Construction State information includes current ambient conditions information in pipe gallery in piping lane;When Construction State information matches in current ambient conditions information in the pipe gallery and pre-set, pipe gallery When, it is described according to the current composite piping lane construction management information corresponding with current ambient conditions information in pipe gallery Active user provides pipe gallery construction management service.
- The wisdom method for managing security 7. the piping lane according to claim 6 based on BIM technology is constructed, it is characterized in that: described In pipe gallery environmental state information include temperature information in pipe gallery, humidity information in pipe gallery, it is empty in pipe gallery Pernicious gas content information, support construction stress-strain data information in gas oxygen content information, pipe gallery.
- The wisdom method for managing security 8. the piping lane according to claim 1 based on BIM technology is constructed, it is characterized in that: described Facility information includes ventilation equipment information, lighting apparatus information, power supply unit information, fire-fighting equipment information, row in pipe gallery Wetting system information, monitoring device information.
- The wisdom safety management system 9. the piping lane based on BIM technology is constructed, it is characterized in that: the method is applied to an at least information Control centre's equipment, the information control center equipment are connect with data acquisition equipment, terminal equipment in communication;Further include:First information acquiring unit obtains current Construction State information in pipe gallery;Second information acquisition unit obtains current device information in pipe gallery;Information process unit, status information, facility information and pipe gallery in pipe gallery out of pre-set pipe gallery In corresponding relationship between construction management information, search in Construction State information current in the pipe gallery, pipe gallery The corresponding current composite piping lane construction management information of facility information;Status information by the data by being adopted in the pipe gallery Collect equipment to obtain, the pipe gallery construction management information includes setting in status information in the pipe gallery, pipe gallery Standby information is associated: emergence treatment scheme and plant maintenance;Information management unit provides integrated pipe according to the current composite piping lane construction management information for the current composite piping lane Corridor construction management service.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910309504.4A CN110046721A (en) | 2019-04-17 | 2019-04-17 | Piping lane construction wisdom method for managing security and system based on BIM technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910309504.4A CN110046721A (en) | 2019-04-17 | 2019-04-17 | Piping lane construction wisdom method for managing security and system based on BIM technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110046721A true CN110046721A (en) | 2019-07-23 |
Family
ID=67277674
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910309504.4A Pending CN110046721A (en) | 2019-04-17 | 2019-04-17 | Piping lane construction wisdom method for managing security and system based on BIM technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110046721A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111555233A (en) * | 2020-03-30 | 2020-08-18 | 薛淑华 | Power pipe gallery communication device and using method thereof |
CN113467353A (en) * | 2021-07-23 | 2021-10-01 | 四川君逸数码科技股份有限公司 | Underground pipe network comprehensive monitoring system based on industrial interconnection |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104880986A (en) * | 2015-06-03 | 2015-09-02 | 中建地下空间有限公司 | System and method for comprehensive pipe gallery management based on BIM |
CN107392459A (en) * | 2017-07-17 | 2017-11-24 | 青岛海信网络科技股份有限公司 | A kind of emergency preplan generation method, apparatus and system |
CN108830462A (en) * | 2018-05-25 | 2018-11-16 | 中建三局安装工程有限公司 | A kind of pipe gallery wisdom operation management platform and method |
-
2019
- 2019-04-17 CN CN201910309504.4A patent/CN110046721A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104880986A (en) * | 2015-06-03 | 2015-09-02 | 中建地下空间有限公司 | System and method for comprehensive pipe gallery management based on BIM |
CN107392459A (en) * | 2017-07-17 | 2017-11-24 | 青岛海信网络科技股份有限公司 | A kind of emergency preplan generation method, apparatus and system |
CN108830462A (en) * | 2018-05-25 | 2018-11-16 | 中建三局安装工程有限公司 | A kind of pipe gallery wisdom operation management platform and method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111555233A (en) * | 2020-03-30 | 2020-08-18 | 薛淑华 | Power pipe gallery communication device and using method thereof |
CN113467353A (en) * | 2021-07-23 | 2021-10-01 | 四川君逸数码科技股份有限公司 | Underground pipe network comprehensive monitoring system based on industrial interconnection |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106097642B (en) | A kind of city integrated piping lane intelligent monitoring and warning device | |
CN103477606B (en) | Systems for Detecting, Collecting, Communicating, and Using Information About Environmental Conditions and Occurrences | |
CN107991999A (en) | Power cable tunnel comprehensive monitoring system and method | |
CN108830462A (en) | A kind of pipe gallery wisdom operation management platform and method | |
CN109724610A (en) | A kind of method and device of full information real scene navigation | |
CN209218140U (en) | A kind of city fire-fighting remote monitoring management system based on Internet of Things | |
CN111257507B (en) | Unmanned aerial vehicle-based gas concentration detection and accident early warning system | |
CN104574765A (en) | Fire alarm remote monitoring and urban networking system | |
CN104991593A (en) | Intelligent monitoring system of computer room | |
CN108717765A (en) | A kind of isolated area Wireless Networking type fire alarm system and method | |
CN109858826A (en) | A kind of gas operation intelligent and safe managing and control system and method | |
CN108301872A (en) | A kind of visual mine warning system for real time monitoring and method based on data filtering | |
CN112423225B (en) | UWB technology-based method for positioning target object in railway passenger station | |
CN203288035U (en) | Abnormal-behavior analysis and early-warning system based on wearing-type sensor | |
CN115393142A (en) | Intelligent park management method and management platform | |
CN107328412B (en) | Underground disaster alarm system based on acceleration | |
CN103325212A (en) | Abnormal behavior analyzing and prewarning system based on wearing-type sensor and work method thereof | |
CN109446290A (en) | A kind of intelligent three-dimensional virtual visualization meteorological equipment comprehensive coverage method | |
CN110046721A (en) | Piping lane construction wisdom method for managing security and system based on BIM technology | |
CN105320093A (en) | Intelligent building monitoring system and method | |
CN109186684A (en) | Unmanned plane equipment monitoring system and method | |
CN110058196B (en) | Position monitoring system for chemical plant | |
CN207661428U (en) | Piping lane safety monitoring assembly | |
CN104850970A (en) | Emergency-linkage three-dimensional visualized operation management platform for spatial-temporal data | |
CN110366111A (en) | Fire extinguisher orientation management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190723 |
|
RJ01 | Rejection of invention patent application after publication |