CN110040676A - A kind of issuing method for island oil depot automatic filling system - Google Patents
A kind of issuing method for island oil depot automatic filling system Download PDFInfo
- Publication number
- CN110040676A CN110040676A CN201910231529.7A CN201910231529A CN110040676A CN 110040676 A CN110040676 A CN 110040676A CN 201910231529 A CN201910231529 A CN 201910231529A CN 110040676 A CN110040676 A CN 110040676A
- Authority
- CN
- China
- Prior art keywords
- entrucking
- valve
- controller
- flow
- monitoring station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B67—OPENING, CLOSING OR CLEANING BOTTLES, JARS OR SIMILAR CONTAINERS; LIQUID HANDLING
- B67D—DISPENSING, DELIVERING OR TRANSFERRING LIQUIDS, NOT OTHERWISE PROVIDED FOR
- B67D7/00—Apparatus or devices for transferring liquids from bulk storage containers or reservoirs into vehicles or into portable containers, e.g. for retail sale purposes
- B67D7/06—Details or accessories
- B67D7/08—Arrangements of devices for controlling, indicating, metering or registering quantity or price of liquid transferred
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B67—OPENING, CLOSING OR CLEANING BOTTLES, JARS OR SIMILAR CONTAINERS; LIQUID HANDLING
- B67D—DISPENSING, DELIVERING OR TRANSFERRING LIQUIDS, NOT OTHERWISE PROVIDED FOR
- B67D7/00—Apparatus or devices for transferring liquids from bulk storage containers or reservoirs into vehicles or into portable containers, e.g. for retail sale purposes
- B67D7/06—Details or accessories
- B67D7/08—Arrangements of devices for controlling, indicating, metering or registering quantity or price of liquid transferred
- B67D7/16—Arrangements of liquid meters
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B67—OPENING, CLOSING OR CLEANING BOTTLES, JARS OR SIMILAR CONTAINERS; LIQUID HANDLING
- B67D—DISPENSING, DELIVERING OR TRANSFERRING LIQUIDS, NOT OTHERWISE PROVIDED FOR
- B67D7/00—Apparatus or devices for transferring liquids from bulk storage containers or reservoirs into vehicles or into portable containers, e.g. for retail sale purposes
- B67D7/06—Details or accessories
- B67D7/08—Arrangements of devices for controlling, indicating, metering or registering quantity or price of liquid transferred
- B67D7/30—Arrangements of devices for controlling, indicating, metering or registering quantity or price of liquid transferred with means for predetermining quantity of liquid to be transferred
- B67D7/302—Arrangements of devices for controlling, indicating, metering or registering quantity or price of liquid transferred with means for predetermining quantity of liquid to be transferred using electrical or electro-mechanical means
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B67—OPENING, CLOSING OR CLEANING BOTTLES, JARS OR SIMILAR CONTAINERS; LIQUID HANDLING
- B67D—DISPENSING, DELIVERING OR TRANSFERRING LIQUIDS, NOT OTHERWISE PROVIDED FOR
- B67D7/00—Apparatus or devices for transferring liquids from bulk storage containers or reservoirs into vehicles or into portable containers, e.g. for retail sale purposes
- B67D7/06—Details or accessories
- B67D7/32—Arrangements of safety or warning devices; Means for preventing unauthorised delivery of liquid
- B67D7/3236—Arrangements of safety or warning devices; Means for preventing unauthorised delivery of liquid relating to electrostatic charges
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Mathematical Physics (AREA)
- Theoretical Computer Science (AREA)
- Loading And Unloading Of Fuel Tanks Or Ships (AREA)
Abstract
The present invention provides a kind of issuing method for island oil depot automatic filling system, the steps include: tank car into library;When being grounded undesirable, it is unable to entrucking and alarms;Site operation personnel presses " starting " button and starts entrucking;Entrucking starts;Controlling opening of valve enters the second segment small flow entrucking stage;Control valve emergency stop;Two-part control valve and termination of pumping is automatically closed in system, and entrucking terminates;Operator removes static grounding clamp, unloads anti-overflow protector, withdraws entrucking oil filling riser;Tank car entrucking finishes, and returns to entrucking control room;The switch state of liquid level and valve, whole entrucking process are monitored on monitoring station in entrucking control room.The invention saves time and labor, uses flow feedback Closed-loop Control Strategy by valve opening, is smoothly opened and closed to control valve, under the premise of guaranteeing filling accuracy, effectively mitigate water attack, avoids damage flowmeter and valve arrangement, extend service life of equipment.
Description
Technical field
The present invention relates to the material issuance technical fields of automatic filling system, more particularly to one kind to be used for island oil depot auto-filling
The issuing method of system.
Background technique
Automatic filling system is the common issuing system of Hainan Insular oil depot, automatic filling system usually by field instrument,
Controller and monitoring make out an invoice host computer composition.The oil delivery consoles field instrument such as flowmeter, Numerical control valve, static oil spill protector control letter
Number it is introduced directly into batch controller, is connected to monitoring computer in a manner of bus by every batch controller.Hair oil monitoring management
Active station is for showing hair oil process flow, procedure parameter and trend curve figure;Monitor capital equipment operation conditions and entrucking stream
Journey executes the operational order of the entrucking process in hair oil area, completes data storage and the inquiry of various managerial reports, printing.
With gradually increasing for access times of automatic filling system at this stage and usage quantity, oil depot is being filled automatically
Problem continuously emerges in the material issuance process of dress system, and then influences actual use.Especially in Hainan Insular oil depot automatic filling system
In, the valve control in entrucking of traditional issuing method is unreasonable, easily because water attack damages flowmeter and valve arrangement, and then reduces
Service life of equipment.
Summary of the invention
Present invention seek to address that the deficiencies in the prior art, and a kind of material issuance for island oil depot automatic filling system is provided
Method.
The present invention to achieve the above object, using following technical scheme:
A kind of issuing method for island oil depot automatic filling system, which is characterized in that the steps include:
(1) tank car logs in entrucking control room transacting business into library, is inputted and joined by automatic loading system on monitoring station
Number, opens and takes entrucking bill formality, while data are write in IC card;
(2) after tank car enters specified entrucking crane position, site operation personnel connects entrucking oil filling riser and antistatic overflow protector,
When being grounded undesirable, it is unable to entrucking and alarms;
(3) site operation personnel swipes the card on entrucking controller carries out train loading data reading, presses " starting " button and starts to fill
Vehicle;
(4) entrucking starts, and automatically opens entrucking valve, using flow feedback Closed-loop Control Strategy, opens valve, and adjust
Valve opening, into the small flow entrucking of first segment, entrucking controller makes valve open 100% into just to valve signal after delay
Normal entrucking state, flowmeter issue flow signal and give entrucking controller, and entrucking controller shows instantaneous flow and integrated flow, and
Send data to control room entrucking monitoring station;
(5) when reaching the 1/2-3/4 of entrucking set amount, controlling opening of valve, system makes entrucking valve close 60-70%,
Enter the second segment small flow entrucking stage;
(6) when anti-overflow switch detects that liquid level reaches specified altitude assignment, it can issue and alarm and to entrucking controller signal,
Control valve emergency stop;
(7) when reaching the loading of freight waggon, two-part control valve and termination of pumping is automatically closed in system, and entrucking terminates;
(8) operator removes static grounding clamp, unloads anti-overflow protector, withdraws entrucking oil filling riser;
(9) tank car entrucking finishes, and returns to entrucking control room, checks train loading data, settles accounts if coincideing, and print entrucking ticket
It dispatches from the factory according to driver, the system alarm if misfitting, operator checks reason;
(10) switch state of liquid level and valve, whole entrucking process are monitored on monitoring station in entrucking control room,
And whole scene is monitored by " entrucking monitoring ", " monitoring of single crane position " window information comprehensively, by flowmeter accumulative total before and after entrucking
Difference is as handover data-printing on outbound list.
Preferably, the parameter inputted on monitoring station in the step (1) includes user name, license number, crane position number, flowing water
Number, oil product.
Preferably, the automatic loading system in the step (1) uses JSK-2012 automatic loading system.
Preferably, entrucking starts in the step (4), entrucking valve is automatically opened, using flow feedback closed-loop control plan
Slightly, open valve, and controlling opening of valve is 20-30%, into the small flow entrucking of first segment, entrucking controller is given after delay
Valve signal makes valve open 100% and enters normal entrucking state, and flowmeter issues flow signal and gives entrucking controller, entrucking control
Instrument processed shows instantaneous flow and integrated flow, and sends data to control room entrucking monitoring station.
Preferably, the monitoring station uses batch controller.
Preferably, the model HD2301-D of the entrucking controller.
The beneficial effects of the present invention are: the present invention provides a kind of issuing method for island oil depot automatic filling system,
It is time saving and energy saving, flow feedback Closed-loop Control Strategy is used by valve opening, control valve is smoothly opened and closed,
Under the premise of guaranteeing filling accuracy, effectively mitigation water attack avoids damage flowmeter and valve arrangement, extends equipment and uses the longevity
Life.
Specific embodiment
Below with reference to embodiment, the invention will be further described:
A kind of issuing method for island oil depot automatic filling system, which is characterized in that the steps include:
(1) tank car logs in entrucking control room transacting business into library, is inputted and joined by automatic loading system on monitoring station
Number, opens and takes entrucking bill formality, while data are write in IC card;
(2) after tank car enters specified entrucking crane position, site operation personnel connects entrucking oil filling riser and antistatic overflow protector,
When being grounded undesirable, it is unable to entrucking and alarms;
(3) site operation personnel swipes the card on entrucking controller carries out train loading data reading, presses " starting " button and starts to fill
Vehicle;
(4) entrucking starts, and automatically opens entrucking valve, using flow feedback Closed-loop Control Strategy, opens valve, and adjust
Valve opening, into the small flow entrucking of first segment, according to service condition, setting delay, entrucking controller is believed to valve after delay
So that valve is opened 100% and enter normal entrucking state, flowmeter issues flow signal and gives entrucking controller, and entrucking controller is aobvious
Show instantaneous flow and integrated flow, and sends data to control room entrucking monitoring station;
(5) when reaching the 1/2-3/4 of entrucking set amount, controlling opening of valve, system makes entrucking valve close 60-70%,
Enter the second segment small flow entrucking stage;
(6) when anti-overflow switch detects that liquid level reaches specified altitude assignment, it can issue and alarm and to entrucking controller signal,
Control valve emergency stop;
(7) when reaching the loading of freight waggon, two-part control valve and termination of pumping is automatically closed in system, and entrucking terminates;
(8) operator removes static grounding clamp, unloads anti-overflow protector, withdraws entrucking oil filling riser;
(9) tank car entrucking finishes, and returns to entrucking control room, checks train loading data, settles accounts if coincideing, and print entrucking ticket
It dispatches from the factory according to driver, the system alarm if misfitting, operator checks reason;
(10) switch state of liquid level and valve, whole entrucking process are monitored on monitoring station in entrucking control room,
And whole scene is monitored by " entrucking monitoring ", " monitoring of single crane position " window information comprehensively, by flowmeter accumulative total before and after entrucking
Difference is as handover data-printing on outbound list.
Preferably, the parameter inputted on monitoring station in the step (1) includes user name, license number, crane position number, flowing water
Number, oil product.
Preferably, the automatic loading system in the step (1) uses JSK-2012 automatic loading system.
Preferably, entrucking starts in the step (4), entrucking valve is automatically opened, using flow feedback closed-loop control plan
Slightly, open valve, and controlling opening of valve is 20-30%, into the small flow entrucking of first segment, entrucking controller is given after delay
Valve signal makes valve open 100% and enters normal entrucking state, and flowmeter issues flow signal and gives entrucking controller, entrucking control
Instrument processed shows instantaneous flow and integrated flow, and sends data to control room entrucking monitoring station.
Preferably, the monitoring station uses batch controller.
Preferably, the model HD2301-D of the entrucking controller.
JSK-2012 automatic loading system uses JSK-2012 type batch controller with industrial 32 insertions of ARM9 series
Formula controller is core, is integrated with that high speed interrupt input, analog input, digital quantity inputs, the numerous I/O of digital output connect
Mouthful, from RS485 communication interface, designed using technical grade chip, anti-interference ability and strong environmental adaptability, it is stable can
Lean on, possess 7 " high light color TFT liquid crystal display, Contactless IC Card Reader, magnetic control keyboard, flame proof waterproof aluminium casting machine
Shell can control quantitative filling, the control of oil product harmonic proportion and the additive filling in 1-4 goods yard simultaneously.
Embodiment 1
A kind of issuing method for island oil depot automatic filling system, the steps include:
(1) tank car is logged in entrucking control room transacting business, is filled automatically on monitoring station by using JSK-2012 into library
Vehicle system inputs parameter, and monitoring station uses batch controller, the parameter inputted on monitoring station include user name, license number, crane position number,
Serial number, oil product are opened and take entrucking bill formality, while data are write in IC card;
(2) after tank car enters specified entrucking crane position, site operation personnel connects entrucking oil filling riser and antistatic overflow protector,
When being grounded undesirable, it is unable to entrucking and alarms;
(3) site operation personnel swipes the card on the entrucking controller of model HD2301-D and carries out train loading data reading, presses
" starting " button starts entrucking;
(4) entrucking starts, and automatically opens entrucking valve, using flow feedback Closed-loop Control Strategy, opens valve, and adjust
Valve opening is 20%, and into the small flow entrucking of first segment, entrucking controller opens valve to valve signal after the 3s that is delayed
100% enters normal entrucking state, and flowmeter issues flow signal and gives entrucking controller, entrucking controller show instantaneous flow and
Integrated flow, and send data to control room entrucking monitoring station;
(5) when reaching the 1/2 of entrucking set amount, controlling opening of valve, system makes entrucking valve close 60%, enters the
The two sections small flow entrucking stage;
(6) when anti-overflow switch detects that liquid level reaches specified altitude assignment, it can issue and alarm and to entrucking controller signal,
Control valve emergency stop;
(7) when reaching the loading of freight waggon, two-part control valve and termination of pumping is automatically closed in system, and entrucking terminates;
(8) operator removes static grounding clamp, unloads anti-overflow protector, withdraws entrucking oil filling riser;
(9) tank car entrucking finishes, and returns to entrucking control room, checks train loading data, settles accounts if coincideing, and print entrucking ticket
It dispatches from the factory according to driver, the system alarm if misfitting, operator checks reason;
(10) switch state of liquid level and valve, whole entrucking process are monitored on monitoring station in entrucking control room,
And whole scene is monitored by " entrucking monitoring ", " monitoring of single crane position " window information comprehensively, by flowmeter accumulative total before and after entrucking
Difference is as handover data-printing on outbound list.
Embodiment 2
A kind of issuing method for island oil depot automatic filling system, the steps include:
(1) tank car is logged in entrucking control room transacting business, is filled automatically on monitoring station by using JSK-2012 into library
Vehicle system inputs parameter, and monitoring station uses batch controller, the parameter inputted on monitoring station include user name, license number, crane position number,
Serial number, oil product are opened and take entrucking bill formality, while data are write in IC card;
(2) after tank car enters specified entrucking crane position, site operation personnel connects entrucking oil filling riser and antistatic overflow protector,
When being grounded undesirable, it is unable to entrucking and alarms;
(3) site operation personnel swipes the card on the entrucking controller of model HD2301-D and carries out train loading data reading, presses
" starting " button starts entrucking;
(4) entrucking starts, and automatically opens entrucking valve, using flow feedback Closed-loop Control Strategy, opens valve, and adjust
Valve opening is 30%, and into the small flow entrucking of first segment, entrucking controller opens valve to valve signal after the 4s that is delayed
100% enters normal entrucking state, and flowmeter issues flow signal and gives entrucking controller, entrucking controller show instantaneous flow and
Integrated flow, and send data to control room entrucking monitoring station;
(5) when reaching the 3/4 of entrucking set amount, controlling opening of valve, system makes entrucking valve close 70%, enters the
The two sections small flow entrucking stage;
(6) when anti-overflow switch detects that liquid level reaches specified altitude assignment, it can issue and alarm and to entrucking controller signal,
Control valve emergency stop;
(7) when reaching the loading of freight waggon, two-part control valve and termination of pumping is automatically closed in system, and entrucking terminates;
(8) operator removes static grounding clamp, unloads anti-overflow protector, withdraws entrucking oil filling riser;
(9) tank car entrucking finishes, and returns to entrucking control room, checks train loading data, settles accounts if coincideing, and print entrucking ticket
It dispatches from the factory according to driver, the system alarm if misfitting, operator checks reason;
(10) switch state of liquid level and valve, whole entrucking process are monitored on monitoring station in entrucking control room,
And whole scene is monitored by " entrucking monitoring ", " monitoring of single crane position " window information comprehensively, by flowmeter accumulative total before and after entrucking
Difference is as handover data-printing on outbound list.
Embodiment 3
A kind of issuing method for island oil depot automatic filling system, the steps include:
(1) tank car is logged in entrucking control room transacting business, is filled automatically on monitoring station by using JSK-2012 into library
Vehicle system inputs parameter, and monitoring station uses batch controller, the parameter inputted on monitoring station include user name, license number, crane position number,
Serial number, oil product are opened and take entrucking bill formality, while data are write in IC card;
(2) after tank car enters specified entrucking crane position, site operation personnel connects entrucking oil filling riser and antistatic overflow protector,
When being grounded undesirable, it is unable to entrucking and alarms;
(3) site operation personnel swipes the card on the entrucking controller of model HD2301-D and carries out train loading data reading, presses
" starting " button starts entrucking;
(4) entrucking starts, and automatically opens entrucking valve, using flow feedback Closed-loop Control Strategy, opens valve, and adjust
Valve opening is 25%, and into the small flow entrucking of first segment, entrucking controller opens valve to valve signal after the 5s that is delayed
100% enters normal entrucking state, and flowmeter issues flow signal and gives entrucking controller, entrucking controller show instantaneous flow and
Integrated flow, and send data to control room entrucking monitoring station;
(5) when reaching the 5/8 of entrucking set amount, controlling opening of valve, system makes entrucking valve close 65%, enters the
The two sections small flow entrucking stage;
(6) when anti-overflow switch detects that liquid level reaches specified altitude assignment, it can issue and alarm and to entrucking controller signal,
Control valve emergency stop;
(7) when reaching the loading of freight waggon, two-part control valve and termination of pumping is automatically closed in system, and entrucking terminates;
(8) operator removes static grounding clamp, unloads anti-overflow protector, withdraws entrucking oil filling riser;
(9) tank car entrucking finishes, and returns to entrucking control room, checks train loading data, settles accounts if coincideing, and print entrucking ticket
It dispatches from the factory according to driver, the system alarm if misfitting, operator checks reason;
(10) switch state of liquid level and valve, whole entrucking process are monitored on monitoring station in entrucking control room,
And whole scene is monitored by " entrucking monitoring ", " monitoring of single crane position " window information comprehensively, by flowmeter accumulative total before and after entrucking
Difference is as handover data-printing on outbound list.
The present invention is exemplarily described above, it is clear that present invention specific implementation is not subject to the restrictions described above,
As long as using the various improvement that the inventive concept and technical scheme of the present invention carry out, or not improved directly apply to other fields
It closes, it is within the scope of the present invention.
Claims (6)
1. a kind of issuing method for island oil depot automatic filling system, which is characterized in that the steps include:
(1) tank car logs in entrucking control room transacting business into library, inputs parameter by automatic loading system on monitoring station,
It opens and takes entrucking bill formality, while data are write in IC card;
(2) after tank car enters specified entrucking crane position, site operation personnel connects entrucking oil filling riser and antistatic overflow protector, ground connection
When undesirable, it is unable to entrucking and alarms;
(3) site operation personnel swipes the card on entrucking controller carries out train loading data reading, presses " starting " button and starts entrucking;
(4) entrucking starts, and automatically opens entrucking valve, using flow feedback Closed-loop Control Strategy, opens valve, and control valve
Aperture, into the small flow entrucking of first segment, entrucking controller makes valve open 100% and enters normal dress to valve signal after delay
Car state, flowmeter issue flow signal and give entrucking controller, and entrucking controller shows instantaneous flow and integrated flow, and number
According to being sent to control room entrucking monitoring station;
(5) when reaching the 1/2-3/4 of entrucking set amount, controlling opening of valve, system makes entrucking valve close 60-70%, enters
To the second segment small flow entrucking stage;
(6) when anti-overflow switch detects that liquid level reaches specified altitude assignment, it can issue and alarm and to entrucking controller signal, control
Valve emergency stop;
(7) when reaching the loading of freight waggon, two-part control valve and termination of pumping is automatically closed in system, and entrucking terminates;
(8) operator removes static grounding clamp, unloads anti-overflow protector, withdraws entrucking oil filling riser;
(9) tank car entrucking finishes, and returns to entrucking control room, checks train loading data, settles accounts if identical, and print entrucking bill to
Driver's factory, the system alarm if misfitting, operator check reason;
(10) switch state of liquid level and valve, whole entrucking process are monitored, and led on monitoring station in entrucking control room
Cross " entrucking monitoring ", " single crane position monitoring " window information monitors whole scene comprehensively, by flowmeter accumulative total difference before and after entrucking
As handover data-printing on outbound list.
2. a kind of issuing method for island oil depot automatic filling system according to claim 1, which is characterized in that institute
Stating the parameter inputted on monitoring station in step (1) includes user name, license number, crane position number, serial number, oil product.
3. a kind of issuing method for island oil depot automatic filling system according to claim 1, which is characterized in that institute
The automatic loading system in step (1) is stated using JSK-2012 automatic loading system.
4. a kind of issuing method for island oil depot automatic filling system according to claim 1, which is characterized in that institute
It states entrucking in step (4) to start, automatically opens entrucking valve, using flow feedback Closed-loop Control Strategy, open valve, and adjust
Valve opening is 20-30%, and into the small flow entrucking of first segment, entrucking controller opens valve to valve signal after delay
100% enters normal entrucking state, and flowmeter issues flow signal and gives entrucking controller, entrucking controller show instantaneous flow and
Integrated flow, and send data to control room entrucking monitoring station.
5. a kind of issuing method for island oil depot automatic filling system according to claim 1, which is characterized in that institute
Monitoring station is stated using batch controller.
6. a kind of issuing method for island oil depot automatic filling system according to claim 1, which is characterized in that institute
State the model HD2301-D of entrucking controller.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910231529.7A CN110040676A (en) | 2019-03-26 | 2019-03-26 | A kind of issuing method for island oil depot automatic filling system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910231529.7A CN110040676A (en) | 2019-03-26 | 2019-03-26 | A kind of issuing method for island oil depot automatic filling system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110040676A true CN110040676A (en) | 2019-07-23 |
Family
ID=67275197
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910231529.7A Pending CN110040676A (en) | 2019-03-26 | 2019-03-26 | A kind of issuing method for island oil depot automatic filling system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110040676A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111137700A (en) * | 2019-09-02 | 2020-05-12 | 浙江中控技术股份有限公司 | Method suitable for batch ordering of train loading |
CN112850217A (en) * | 2020-12-31 | 2021-05-28 | 常熟宏川石化仓储有限公司 | Automatic filling system for liquid chemicals and control method thereof |
CN113120840A (en) * | 2021-05-25 | 2021-07-16 | 广东摩尔物联技术有限公司 | Train quantitative loading system and loading method |
CN113562679A (en) * | 2021-07-16 | 2021-10-29 | 清远华新达饮品有限公司 | Integrated production process of bottled purified water |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101231514A (en) * | 2007-11-28 | 2008-07-30 | 蓝星(天津)化工有限公司 | Quantitative car loading numeral control method |
CN102070116A (en) * | 2009-11-19 | 2011-05-25 | 上海轻叶工程科技有限公司 | Distributed quantitative loading control system |
CN102653385A (en) * | 2012-04-16 | 2012-09-05 | 深圳市奥图威尔科技有限公司 | Explosion-proof loading batch control instrument system |
CN104950788A (en) * | 2015-06-02 | 2015-09-30 | 江苏德大自动化设备有限公司 | Ration loading control system and ration loading instrument |
CN204938967U (en) * | 2015-08-23 | 2016-01-06 | 吉林工商学院 | A kind of loading system |
CN105314583A (en) * | 2014-07-21 | 2016-02-10 | 上海弘特自动化电气仪表有限公司 | Oil-depot batch loading management method and system |
CN106483905A (en) * | 2016-12-09 | 2017-03-08 | 珠海市摩尔自动化技术有限公司 | Quantifying and loading controller and quantifying and loading method and device |
CN107450440A (en) * | 2017-08-25 | 2017-12-08 | 天津市毅进通用石油工业设备有限公司 | Intelligent Oil Filling Monitoring and Control System and its monitoring method |
-
2019
- 2019-03-26 CN CN201910231529.7A patent/CN110040676A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101231514A (en) * | 2007-11-28 | 2008-07-30 | 蓝星(天津)化工有限公司 | Quantitative car loading numeral control method |
CN102070116A (en) * | 2009-11-19 | 2011-05-25 | 上海轻叶工程科技有限公司 | Distributed quantitative loading control system |
CN102653385A (en) * | 2012-04-16 | 2012-09-05 | 深圳市奥图威尔科技有限公司 | Explosion-proof loading batch control instrument system |
CN105314583A (en) * | 2014-07-21 | 2016-02-10 | 上海弘特自动化电气仪表有限公司 | Oil-depot batch loading management method and system |
CN104950788A (en) * | 2015-06-02 | 2015-09-30 | 江苏德大自动化设备有限公司 | Ration loading control system and ration loading instrument |
CN204938967U (en) * | 2015-08-23 | 2016-01-06 | 吉林工商学院 | A kind of loading system |
CN106483905A (en) * | 2016-12-09 | 2017-03-08 | 珠海市摩尔自动化技术有限公司 | Quantifying and loading controller and quantifying and loading method and device |
CN107450440A (en) * | 2017-08-25 | 2017-12-08 | 天津市毅进通用石油工业设备有限公司 | Intelligent Oil Filling Monitoring and Control System and its monitoring method |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111137700A (en) * | 2019-09-02 | 2020-05-12 | 浙江中控技术股份有限公司 | Method suitable for batch ordering of train loading |
CN112850217A (en) * | 2020-12-31 | 2021-05-28 | 常熟宏川石化仓储有限公司 | Automatic filling system for liquid chemicals and control method thereof |
CN113120840A (en) * | 2021-05-25 | 2021-07-16 | 广东摩尔物联技术有限公司 | Train quantitative loading system and loading method |
CN113562679A (en) * | 2021-07-16 | 2021-10-29 | 清远华新达饮品有限公司 | Integrated production process of bottled purified water |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110040676A (en) | A kind of issuing method for island oil depot automatic filling system | |
CN101546181B (en) | Operation recording device of port gate seat type crane | |
CN108116907B (en) | Silo unloading control system | |
CN112634115A (en) | Intelligent weighing system and method for port goods | |
CN109919271A (en) | A kind of hot-metal car scheduling system and dispatching method | |
CN114037289B (en) | Railway station freight operation management system based on station yard graphics | |
CN113723768B (en) | Steel production control system and method | |
CN104915687A (en) | Intelligent logistics IC card automatic receiving and issuing system and working method thereof | |
CN207624176U (en) | A kind of wisdom managing system of car parking | |
CN107507552B (en) | A kind of signal processing method and sequential control circuit | |
CN209946975U (en) | Petrochemical intelligent loading and unloading vehicle system | |
CN205983569U (en) | Intelligent warehouse management system | |
CN210172112U (en) | Intelligent control system of laser cleaning equipment | |
CN116029481A (en) | Freight management method, device, equipment and storage medium | |
CN205827476U (en) | Multi-functional gate control system | |
CN205844784U (en) | Goods shipping power taking control system | |
CN221759506U (en) | Unmanned intelligent loading system of LNG | |
CN204883763U (en) | Automatic identification device weighs | |
CN203241125U (en) | Electronic vehicle scale weighing system | |
CN210691601U (en) | Remote-controlled rod lifting device for high-speed entrance toll station | |
CN206921127U (en) | A kind of number system based on RFID | |
CN201576315U (en) | Port gantry crane operation recording device | |
CN209216177U (en) | A kind of oil gas module production scene positioning gate inhibition's Work attendance management system | |
CN108107818A (en) | A kind of train quantitative loading control system based on PLC | |
CN208922681U (en) | A kind of equipment state manages Sign Board automatically |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190723 |
|
RJ01 | Rejection of invention patent application after publication |