CN110033185A - Task management method and task management system - Google Patents

Task management method and task management system Download PDF

Info

Publication number
CN110033185A
CN110033185A CN201910277118.1A CN201910277118A CN110033185A CN 110033185 A CN110033185 A CN 110033185A CN 201910277118 A CN201910277118 A CN 201910277118A CN 110033185 A CN110033185 A CN 110033185A
Authority
CN
China
Prior art keywords
task
demand
raising
event
task management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910277118.1A
Other languages
Chinese (zh)
Inventor
杨翔
袁书蒙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Shadow Technology Co Ltd
Original Assignee
Guangzhou Shadow Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Shadow Technology Co Ltd filed Critical Guangzhou Shadow Technology Co Ltd
Priority to CN201910277118.1A priority Critical patent/CN110033185A/en
Publication of CN110033185A publication Critical patent/CN110033185A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/02Agriculture; Fishing; Forestry; Mining

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Primary Health Care (AREA)
  • Animal Husbandry (AREA)
  • General Health & Medical Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Marine Sciences & Fisheries (AREA)
  • Agronomy & Crop Science (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of task management method and task management systems.Task management method includes: the rules of life cycle for obtaining managed object, and obtains managed object in the object event of each life stage according to rules of life cycle;It determines the Obj State of managed object, and demand task is generated according to object event and Obj State;Regulatory requirement task, and demand task is pushed into client.In the task management method of embodiment of the present invention, rules of life cycle based on managed object, managed object is obtained in the object event and Obj State of each life stage, it further generates standardization, templating, digitized demand task and pushes to client, so that demand task management is more reasonable, the rules of life cycle for meeting managed object is conducive to the efficiency for improving task management.

Description

Task management method and task management system
Technical field
The present invention relates to field of computer technology more particularly to a kind of task management method and task management systems.
Background technique
In the related art, management of the people for affairs is all often to go to formulate a plan by artificial, then A series of task is formed, corresponding people is dispatched to and goes to execute.In such transaction management process, for plan reasonability and Regularity is difficult to accurately be judged, the efficiency in face of how to improve transaction management rarely has good research method and solution Scheme.
Summary of the invention
The present invention provides a kind of task management method and task management system.
The task management method of embodiment of the present invention includes:
The rules of life cycle of managed object is obtained, and the managed object is obtained according to the rules of life cycle In the object event of each life stage;
It determines the Obj State of the managed object, and demand is generated according to the object event and the Obj State Task;
The demand task is managed, and the demand task is pushed into client.
In the task management method of embodiment of the present invention, the rules of life cycle based on managed object is obtained by pipe Object is managed in the object event and Obj State of each life stage, further generates standardization, templating, digitized demand Task simultaneously pushes to client, so that demand task management is more reasonable, meets the rules of life cycle of managed object, favorably In the efficiency for improving task management.
In some embodiments, the managed object includes raising object, and the task management method includes:
The rules of life cycle of the raising object is obtained, and the raising object is obtained according to the rules of life cycle In the raising event of each life stage;
It determines the raising state of the raising object, and raising is generated according to the raising event and the raising state and is appointed Business;
The raising task is managed, and the raising task is pushed into client.
In some embodiments, the raising state of the raising object is obtained, comprising:
Obtain gene data, nutrition data, bio-safety data, production management data, the environment prison of the raising object Control at least one of data, animal doctor's detection data;
According to the gene data, nutrition data, the bio-safety data, the production management data, described At least one of environmental monitoring data, described animal doctor's detection data determine the raising state.
In some embodiments, before the rules of life cycle for obtaining managed object, the task management Method includes:
Register the managed object.
In some embodiments, demand task is generated according to the object event and the Obj State, comprising:
Abstract operation is carried out to the object event;
According to the object event after abstract determine the managed object each life stage demand simultaneously Digitize the demand;
Requirement templet is established according to the demand after digitlization.
In some embodiments, demand task is generated according to the object event and the Obj State, comprising:
The example that the managed object is instantiated to obtain the managed object;
The example demand of the example of the managed object is determined according to the requirement templet and the Obj State;
The example demand is stored, and the demand task is generated according to the example demand.
In some embodiments, the example demand is stored, comprising: by example demand storage to demand data Library.
In some embodiments, it manages the demand task and the demand task is pushed into client, comprising:
According to the demand task, the time of the demand task execution, the space of the demand task execution and execution At least one of the ability label of personnel configures the demand task;
Priority, push time and the operational staff of the demand task are determined according to configuration result.
In some embodiments, the task management method includes:
In the case where determining that the demand task is completed to execute according to the feedback signal of the client, the need are closed It seeks task and the object event is updated.
In some embodiments, the demand task includes mandatory period, and the task management method includes:
In the case where not receiving the feedback signal of the client in the mandatory period, the demand task is determined It does not complete and executes, close the demand task and alarm.
The task management system of embodiment of the present invention includes that task generating algorithm module, task management module, task push away Module and task execution module are sent, the task execution module includes client, and the task generating algorithm module is for obtaining The rules of life cycle of managed object, and the managed object is obtained in each life stage according to the rules of life cycle Object event, and the Obj State for determining the managed object, and according to the object event and the object State generates demand task, and for the task management module for managing the demand task, the task pushing module is used for will The demand task pushes to the client.
In the task management system of embodiment of the present invention, the rules of life cycle based on managed object is obtained by pipe Object is managed in the object event and Obj State of each life stage, further generates standardization, templating, digitized demand Task simultaneously pushes to client, so that demand task management is more reasonable, meets the rules of life cycle of managed object, favorably In the efficiency for improving task management.
In some embodiments, the managed object includes raising object, and the task generating algorithm module is used for The rules of life cycle of the raising object is obtained, and the raising object is obtained in each life according to the rules of life cycle The raising event in stage, and the raising state for determining the raising object, and according to the raising event and the feeding The state of supporting generates raising task, and for managing the raising task, the task pushing module is used for the task management module The raising task is pushed into client.
In some embodiments, the task generating algorithm module includes status determining unit, and the state determines single Member is for obtaining gene data, the nutrition data, bio-safety data, production management data, environmental monitoring of the raising object At least one of data, animal doctor's detection data, and for according to the gene data, the nutrition data, the biology At least one of secure data, the production management data, the environmental monitoring data, described animal doctor's detection data determine institute State raising state.
In some embodiments, the task generating algorithm module is for carrying out abstract behaviour to the object event Make, and for according to the object event after abstract determine the managed object each life stage demand simultaneously The demand is digitized, and for establishing requirement templet according to the demand after digitlization.
In some embodiments, the demand task includes mandatory period, and the task management system includes that task is returned The case where shelves module, the task profiling module is used to not receive the feedback signal of the client in the mandatory period Under, it determines that the demand task does not complete and executes, close the demand task and alarm.
The task management system of embodiment of the present invention, including processor and memory, the memory are stored with one Or multiple programs, described program realize the task management method of any of the above-described embodiment when being executed by the processor.
In above-mentioned task management system, corresponding program is can be performed with the life cycle rule based on managed object in processor Rule, obtain managed object each life stage object event and Obj State, further generate standardization, templating, Digitized demand task simultaneously pushes to client, so that demand task management is more reasonable, meets the life of managed object Periodic law is conducive to the efficiency for improving task management.
Additional aspect and advantage of the invention will be set forth in part in the description, and will partially become from the following description Obviously, or practice through the invention is recognized.
Detailed description of the invention
Above-mentioned and/or additional aspect and advantage of the invention is from combining in description of the following accompanying drawings to embodiment by change It obtains obviously and is readily appreciated that, in which:
Fig. 1 is the module diagram of the task management system of embodiment of the present invention.
Fig. 2 is the flow diagram of the task management method of embodiment of the present invention.
Fig. 3 is the logical schematic of the task management method of embodiment of the present invention.
Fig. 4 is another flow diagram of the task management method of embodiment of the present invention.
Fig. 5 is another logical schematic of the task management method of embodiment of the present invention.
Fig. 6 is the another flow diagram of the task management method of embodiment of the present invention.
Fig. 7 is another module diagram of the task management system of embodiment of the present invention.
Fig. 8 is another flow diagram of the task management method of embodiment of the present invention.
Fig. 9 is the another module diagram of the task management system of embodiment of the present invention.
Figure 10 is another flow diagram of the task management method of embodiment of the present invention.
Figure 11 is another flow diagram of the task management method of embodiment of the present invention.
Figure 12 is another module diagram of the task management system of embodiment of the present invention.
Figure 13 is another flow diagram of the task management method of embodiment of the present invention.
Figure 14 is the breeding cycle schematic diagram of the feeding mother pig of embodiment of the present invention.
Figure 15 is the demand task execution environment schematic diagram of embodiment of the present invention.
Figure 16 is another flow diagram of the task management method of embodiment of the present invention.
Figure 17 is another module diagram of the task management system of embodiment of the present invention.
Figure 18 is another flow diagram of the task management method of embodiment of the present invention.
Figure 19 is another module diagram of the task management system of embodiment of the present invention.
Figure 20 is another module diagram of the task management system of embodiment of the present invention.
Main element symbol description:
Task management system 100, task generating algorithm module 10, object registration component 11, task management module 20, task Pushing module 30, task execution module 40, client 41, detection module 50, demand pond module 60, demand database 61, task Profiling module 70, task input module 80, processor 110, memory 120.
Specific embodiment
Embodiments of the present invention are described below in detail, the embodiment of the embodiment is shown in the accompanying drawings, wherein Same or similar label indicates same or similar element or element with the same or similar functions from beginning to end.Lead to below It crosses the embodiment being described with reference to the drawings to be exemplary, for explaining only the invention, and should not be understood as to limit of the invention System.
In the description of the present invention, the meaning of " plurality " is two or more, unless otherwise specifically defined. It should be noted that unless otherwise clearly defined and limited, term " installation ", " connected ", " connection " shall be understood in a broad sense, example Such as, it may be fixed connection or may be dismantle connection, or integral connection;It can be mechanical connection, be also possible to be electrically connected It connects or can mutually communicate;It can be directly connected, can also can be inside two elements indirectly connected through an intermediary Connection or two elements interaction relationship.It for the ordinary skill in the art, can be as the case may be Understand the concrete meaning of above-mentioned term in the present invention.
Following disclosure provides many different embodiments or example is used to realize different structure of the invention.In order to Simplify disclosure of the invention, hereinafter the component of specific examples and setting are described.Certainly, they are merely examples, and And it is not intended to limit the present invention.
Please refer to Fig. 1 and Fig. 2, it includes task generating algorithm that embodiment of the present invention, which provides a kind of task management system 100, Module 10, task management module 20, task pushing module 30 and task execution module 40.Wherein, task execution module 40 includes Client 41.Task generating algorithm module 10 connects task management module 20, and task management module 20 connects task pushing module 30, task pushing module 30 connects task execution module 40.
Embodiment of the present invention, which provides a kind of task management method, can be used for task management system 100.That is, this The task management system 100 of invention embodiment can embodiment through the invention task management method to managed object Demand task be managed, for example, generate demand task, demand task configuration, demand task push and demand task navigation Deng.
Specifically, task management method includes:
Step S100, obtains the rules of life cycle of managed object, and is managed pair according to rules of life cycle acquisition As the object event in each life stage;
Step S200 determines the Obj State of managed object, and generates demand according to object event and Obj State and appoint Business;
Step S300, regulatory requirement task;
Demand task is pushed to client 41 by step S400.
For task management system 100, step S100 and step S200 can be realized by task generation module, step S300 It can be realized by task management module 20, step S400 can be realized by task pushing module 30.In other words, task generates mould Block can be used for obtaining the rules of life cycle of managed object, and obtain managed object in each life according to rules of life cycle The object event in life stage, and the Obj State for determining managed object, and it is raw according to object event and Obj State At demand task.Task management module 20 can be used for regulatory requirement task.Task pushing module 30 can be used for appointing demand Business pushes to client 41.
In the task management method and task management system 100 of embodiment of the present invention, the life based on managed object Periodic law obtains managed object in the object event and Obj State of each life stage, further generates standardization, mould Plate, digitized demand task simultaneously push to client 41 and meet managed object so that demand task management is more reasonable Rules of life cycle, be conducive to improve task management efficiency.
Specifically, managed object includes but is not limited to people, animal, plant, space, affairs, article, property, system etc.. The rules of life cycle of managed object refers to that managed object is necessarily abided by within the period since life to end of life The rule followed.As shown in figure 3, the life rule of managed object include but is not limited to birth/output, growth/development early stage, at Length/development mid-term, growth/development later period, life termination etc.
Object event can refer to that object has to generation based on its rules of life cycle in the different phase of life cycle Event or the required event that it is done (people, equipment or machine need the thing done to the object).In other words, object thing Part includes at least one of the event that the event that managed object passively occurs and managed object actively occur.
In one example, managed object can be people, people necessarily undergo birth, infancy, infancy, the learning period, The stages such as work phase, endowment phase, last life termination.In each stage, it is anticipated that people needs to undergo corresponding event.Example Such as, the event that people needs to undergo at birth includes but is not limited to Birth Registration and vaccinates, and needs to undergo in infancy Event includes but is not limited to lactation and vaccinates, and needing the event undergone in infancy includes but is not limited to children education and upper child Garden etc., needing the event that undergoes in the learning period includes but is not limited at primary school and in the middle school etc., the thing undergone to be needed in the work phase Part includes but is not limited to choose a job and go to work, and the event that the endowment phase needs to undergo includes but is not limited to select endowment place and retirement Deng.These events can be obtained by step S100.It should be noted that the division of the life stage of people is not limited only to above-mentioned beg for The embodiment of opinion can supplement iteration, form the life cycle of complete people.
In another example, managed object can be animal, and animal necessarily undergoes birth, mother to accompany the phase, be detached from The stages such as mother's growth stage, the phase of growing up to and breeding period, last life termination.In each stage, it is anticipated that animal needs to undergo Corresponding event.For example, the event that animal needs to undergo at birth includes but is not limited to Birth Registration and vaccinates, in mother It includes but is not limited to lactation (for mammal) and wean (being directed to mammal) etc. that close company phase, which needs the event undergone, Being detached from mother's growth stage needs the event undergone to include but is not limited to child care and be bred as etc., is growing up to the phase event package that undergoes of needs It includes but is not limited to choose seeds and turn group etc., needing the event that undergoes in breeding period includes but is not limited to that heat, breeding, farrowing (or produce Egg) etc..These events can be obtained by step S100.It should be noted that the division of the life stage of animal is not limited only to Embodiment discussed above can supplement iteration, form the life cycle of complete animal.
In another example, managed object can be plant, plant necessarily undergo sowing, germination period, Seedling Stage and Grow up to the stages such as phase, last life termination.In each stage, it is anticipated that plant needs to undergo corresponding event.For example, plant The event for needing to undergo at seeding time includes but is not limited to apply fertilizer and removal of impurities etc., needs the event that undergoes to include but not in germination period It is limited to pour and nurse etc., needing the event undergone in Seedling Stage includes but is not limited to illumination and provisions etc., is growing up to phase needs The event of experience includes but is not limited to pollinate and graft etc..These events can be obtained by step S100.It should be noted that The division of the life stage of plant is not limited only to embodiment discussed above, can supplement iteration, form complete plant Life cycle.
In further example, managed object can be space, and space necessarily undergoes birth and discovery, transformation phase, dress It repairs the stages such as phase and validity period, last life termination.In each stage, it is anticipated that human use space needs to undergo corresponding Event.For example, the event that space needs to undergo when being born and discovery includes but is not limited to explore and survey registration etc., it is being transformed Phase needs the event that undergoes to include but is not limited to planning and designing and build etc., needs the event undergone to include but unlimited in the finishing phase It include but is not limited to enabling and personage etc. in the event that validity period needs to undergo in Decoration Design and finishing etc..These events can To be obtained by step S100.It should be noted that the division of the life stage in space is not limited only to embodiment party discussed above Formula can supplement iteration, form the life cycle in complete space.
In another example, managed object can be affairs, affairs necessarily undergo generation, plan, execution, tracking and The stages such as improvement, last life termination.In each stage, it is anticipated that the mankind complete affairs and need to undergo corresponding event.Example Such as, it includes but is not limited to idea and brainstorming etc. that affairs, which need the event undergone when generating, needs to undergo in plan Event includes but is not limited to decomposition and layout etc., and the event for needing to undergo when being executed includes but is not limited to do and put into resource Deng needing the event that undergoes in tracking includes but is not limited to check and find the problem, the event for needing to undergo when improving Including but not limited to problem analysis and find solution etc..These events can be obtained by step S100.It needs to illustrate It is that the division of the life stage of affairs is not limited only to embodiment discussed above, iteration can be supplemented, form complete affairs Life cycle.
In another example, managed object can be article, article necessarily undergo generation, storage phase, the logistics phase and The stages such as stage of exhaustion, last life termination.In each stage, it is anticipated that human use's article needs to undergo corresponding event. For example, the event that article needs to undergo when generating includes but is not limited to need to undergo in storage phase at member record and label etc. Event include but is not limited to be put in storage and outbound etc., include but is not limited to be packaged and entrucking in the event that the logistics phase needs to undergo Deng needing the event that undergoes in stage of exhaustion includes but is not limited to receive with maintenance etc..These events can be obtained by step S100 It takes.It should be noted that the division of the life stage of article is not limited only to embodiment discussed above, iteration can be supplemented, Form the life cycle of complete object.
In further example, managed object can be property, and property necessarily undergoes generation, the acquisition phase, utilizes conversion The stages such as phase and stage of exhaustion, last life termination.In each stage, it is anticipated that the mankind need to undergo corresponding thing using property Part.For example, the event that property needs to undergo when generating includes but is not limited to distribution and valuation etc., need to undergo in the acquisition phase Event includes but is not limited to take in and receive present etc., using transition phase need the event that undergoes include but is not limited to save and Investment etc. includes but is not limited to pay and present etc. in the event that stage of exhaustion needs to undergo.These events can pass through step S100 is obtained.It should be noted that the division of the life stage of property is not limited only to embodiment discussed above, can supplement Iteration forms the life cycle of complete wealth.
In another example, managed object can be system, and system includes software systems and hardware system.System must So experience project verification phase, demand analysis phase, design period, the implementation stages such as phase and O&M phase, last life termination.In each stage, It is contemplated that system needs to undergo corresponding event.For example, system includes but is not limited to vertical in the event that the project verification phase needs to undergo Application and project verification examination & approval etc., the demand analysis phase need the event that undergoes include but is not limited to requirement investigation, interview record and Demand analysis etc., needing the event that undergoes in design period includes but is not limited to Outline Design, detailed design and design review etc., Event that implementation phase needs are undergone includes but is not limited to develop, test and be packaged etc., includes in the event that O&M phase needs are undergone But be not limited to operation monitoring and troubleshooting etc..These events can be obtained by step S100.It should be noted that system The division of life stage is not limited only to embodiment discussed above, can supplement iteration, form the Life Cycle of complete system Phase.
In addition, Obj State includes life stage locating for managed object, life stage locating for managed object The event etc. that life stage locating for growth or development process and managed object has been undergone.So.Step S200 can basis Object event and Obj State generate corresponding demand task.And then demand task is managed and is pushed.
In the step s 100, the rules of life cycle of managed object can be in managed object typing task management system While 100, it is stored in task management system 100, it can also be in the object event for needing to obtain managed object, from cloud End obtains the rules of life cycle of managed object.Concrete mode not to the rules of life cycle for obtaining managed object herein It is defined.
In task execution module 40, client 41 can be used for showing demand task to indicate operational staff to being managed Object executes the demand task of push.Wherein, demand task is pushed to client 41 by step S400, e.g. appoints demand Business pushes to client application (Application, APP), appoints in this way, operational staff can be facilitated to execute corresponding demand Business.
Referring to Fig. 4, in some embodiments, managed object includes raising object, embodiment of the present invention is appointed Business management method can be used for managing raising task.
Specifically, task management method includes:
Step S10 obtains the rules of life cycle of raising object, and obtains raising object each according to rules of life cycle The raising event of life stage;
Step S20 determines the raising state of raising object, and generates raising task according to raising event and raising state;
Step S30 manages raising task;
Raising task is pushed to client 41 by step S40.
For task management system 100, step S10 and step S20 can be realized by task generating algorithm module 10, step S30 can be realized that step S40 can be realized by task pushing module 30 by task management module 20.In other words, task generates Algoritic module 10 can be used for obtaining the rules of life cycle of raising object, and obtains raising object according to rules of life cycle and exist The raising event of each life stage, and the raising state for determining raising object, and according to raising event and raising state Generate raising task.Task management module 20 can be used for managing raising task.Task pushing module 30 can be used for raise Task pushes to client 41.
Referring to Fig. 5, sow is by taking feeding mother pig as an example commonly used in breeding piglet, during raising, the Life Cycle of sow Phase includes but is not limited to oestrus, the gestational period, nursing period, is finally eliminated.Sow includes in the raising event of each life stage But it is not limited to detection of oestrus, bred, looked into and return the events such as feelings, pregnant inspection, upper obstetric table, childbirth, wean.Raising state includes that heat need to match State, Pregnancy status return the states such as situation state, empty cup stage, miscarriage state, inleakaging state.Raising task includes but is not limited to Detection of oestrus task, breeding task look into feelings task of returning, pregnant inspection task, upper obstetric table task, childbirth task, wean task dispatching.Such as This, the raising task of management raising object may be implemented in the task management method of embodiment of the present invention.
In one example, the life cycle of sow is obtained, Pregnancy status is in after insemination of sows, according to the state of sow Produce and look into and return feelings task and task is managed, so 21 days after breeding arrive before return feelings task and push away to looking into It send, to indicate that corresponding operational staff looking into sow execution for 21 days or so after insemination of sows returns feelings task.
Referring to Fig. 6, in some embodiments, for raising object, step S20 includes:
Step S21, gene data, the nutrition data, bio-safety data, production management data, ring of raising object are obtained At least one of border monitoring data, animal doctor's detection data;
Step S22, according to gene data, nutrition data, bio-safety data, production management data, environmental monitoring data, At least one of animal doctor's detection data determines raising state.
For task management system 100, step S21 and step S22 can be realized by task generating algorithm module 10.Namely To say, task generating algorithm module 10 can be used for obtaining the raising gene data of object, nutrition data, bio-safety data, At least one of production management data, environmental monitoring data, animal doctor's detection data, and for according to gene data, nutrition At least one of data, bio-safety data, production management data, environmental monitoring data, animal doctor's detection data determine raising State.
Referring to Fig. 7, further, task management system 100 includes detection module 50, detection module 50 can pass through biography Sensor obtains gene data, nutrition data, bio-safety data, production management data, environmental monitoring data, animal doctor's detection data At least one of.
Wherein, gene data can detect to obtain by gene sensor, take nutrition data that can examine by nutrient sensor It measures, bio-safety data can detect to obtain by bio-safety sensor, production management data can be passed by production management Sensor detects to obtain, environmental monitoring data can detect to obtain by environmental monitoring sensor, animal doctor's detection data can pass through animal doctor Detection data sensor detects to obtain.
Specifically, task generating algorithm module 10 utilizes gene data, nutrition data, bio-safety data, production management At least one of data, environmental monitoring data, animal doctor's detection data reach corresponding threshold in calculated result by edge calculations It can trigger the change of raising state after value.After raising Status Change, task generating algorithm module 10 can be used for according to after change Raising state regenerate raising task.
Fig. 8 and Fig. 9 are please referred to, in some embodiments, before step S100, task management method includes:
Step S001: registration managed object.
Wherein, task generating algorithm module 10 includes object registration component 11 (ObjectRegister), and step S01 can be with It is realized by object registration component 11, in other words, object registration component 11 is for registering managed object.Specifically, object is infused Volume component 11 is for registering managed object in task management system 100.
Managed object is registered in task management system 100 in this way, realizing.It is appreciated that due to task management system It is usually the managed object for being not intended to management in system 100 before being managed to managed object.Therefore, it is obtaining It takes the rules of life cycle of managed object and obtains managed object accordingly before the object event of each life stage, need Managed object is registered in task management system 100, generation and the pipe of demand task then could be carried out to managed object Reason.Certainly, in other embodiments, registered before can also change the data of picture, to pair after change As carrying out task generation and management.
Specifically, when task management system 100 registers managed object, the life cycle of managed object can be advised Restrain typing task management system 100 together.
Referring to Fig. 10, in some embodiments, step S200 includes:
Step S210: managed object is abstracted in the object event of each life stage according to rules of life cycle;
Step S220: determine managed object in the demand of each life stage and number according to the object event after abstract Change demand;
Step S230: requirement templet is established according to the demand after digitlization.
For task management system 100, step S210, step S220 and step S230 can be by task generating algorithm module 10 realize.In other words, task generating algorithm module 10 can be used for abstracting managed object according to rules of life cycle and exist The object event of each life stage, and for determining managed object in each life stage according to the object event after abstract Demand simultaneously digitizes demand, and for establishing requirement templet according to the demand after digitlization.
It is appreciated that complete managed object in the object event of each life stage, it can first determine and be managed pair As the demand in each life stage, so as to realize the requirement templet for establishing managed object according to rules of life cycle.
Specifically, longitudinal decomposition can be carried out according to life stage to rules of life cycle, so that it is determined that each life stage Object event;The rules of life cycle of different managed objects can also be subjected to lateral comparison, so that it is determined that each quilt Manage the object event of object.Do not determine that the concrete mode of object event is defined to according to rules of life cycle herein.
In step S210, abstract operation can be carried out to object event by the way that the feature of object event is arranged.Example Such as, object event (can be included into article, fund, system, collaboration people, association with time, place, personage, object, required resource With object etc.), trigger condition, one or several in the features such as preposition event describe, and by these features with digitized Template abstract expression comes out.
Further, the time can use the format digitised expression of " year-month-day ";Place can use " state-province-city-area " Format abstract expression;The particular content of personage, object, required resource, trigger condition, preposition event can be classified, And corresponding coding is set for one kind of each feature.For example, the corresponding coding of personage can be 10, personage includes administrator Member and operational staff, the corresponding coding of administrative staff can be 11, and the corresponding coding of operational staff can be 12;Object is Object, the corresponding coding of object can be 20, and object includes pig and sheep, and the corresponding coding of pig can be 21, and the corresponding coding of sheep can To be 22 ... and so on.It note that the above is only examples, do not represent the limitation of the concrete mode to abstract operation.
Correspondingly, demand can be digitized by the way that the feature of demand is arranged.The feature of demand include object identity mark, Object type, Obj State, event category, event code, event title, event sequence, preposition event, planned start time, One or more of planned end time, life cycle age, pre-set time and abnormal alarm time.
In one example, for the main demand of farrowing, object type is animal, and object identity identifies corresponding volume Code can be 20.Obj State be it is normal, corresponding coding can be 01.Event category is late incident, and corresponding classification is compiled Code can be 05.Event entitled breeding period, corresponding event code can be 051.The corresponding coding of event sequence can be 5.Preposition event is to grow up to the phase, and corresponding coding can be 042.Planned start time can be 2018-01-01, and plan terminates Time can be 2018-01-02.The life cycle age can be age in days 114.Pre-set time can be 2017-12-20 extremely 2017-12-31.The abnormal alarm time can be before 2017-12-20.It should be noted that the above is only example, not generation Limitation of the table to the concrete mode for digitizing main demand.
Please refer to Figure 11, in some embodiments, step 200, comprising:
Step S240 instantiates example of the managed object to obtain managed object;
Step S250, template and Obj State determine the example demand of the example of managed object according to demand;
Step S260 stores example demand, and generates demand task according to example demand.
For task management system 100, step S240, step S250 and step S260 can be by task generating algorithm module 10 realize.In other words, task generating algorithm module 10 can be used for instantiating managed object to obtain managed object Example, and determine for template according to demand and Obj State the example demand of the example of managed object, and for storing Example demand, and demand task is generated according to example demand.
Specifically, Figure 12 is please referred to, task management system 100 includes demand pond module 60 (RequirementPool), is needed Pond module 60 is asked to connect task generating algorithm module 10, task generating algorithm module 10 is used for example demand storage to demand pond Module 60.
Requirement templet can be understood as the algorithm for determining the example demand of managed object, according to managed object Obj State and corresponding demand template can determine the example demand of managed object.Further, example demand is realized Storage, and generate corresponding demand task.Specifically, the example of managed object is the concrete case of managed object.? I other words the example of managed object is being embodied for managed object.
In one example, managed object is animal, and the example of managed object is to live in the pig of some breeding house. In another example, managed object is plant, and the example of managed object is the green vegetables for being planted in certain block vegetable plot.According to dynamic The requirement templet of object can determine the example demand of the pig of the breeding house, such as feeding feed.According to the requirement templet of plant, It can determine the example demand of the green vegetables in the vegetable plot, such as apply fertilizer.
In some embodiments, step S260 includes:
By example demand storage to demand database 61.
In some embodiments, task generating algorithm module 10 is used for example demand storage to demand pond module 60 Demand database 61.
In this way, realizing the storage of example demand, when needing to call example demand, need to only be read from database, it can To improve the efficiency of task management.Specifically, demand pond module 60 can be with support structure database or unstructured database. The concrete form of demand database 61 is not defined herein.
Figure 13 is please referred to, in some embodiments, step S300 includes:
Step S310, according to demand task, the time of demand task execution, the space of demand task execution and operational staff Ability label at least one demand task is configured;
Step S320 determines priority, push time and the operational staff of demand task according to configuration result.
For task management system 100, step S310 and step S320 can be realized by task management module 20.It that is to say Say, task management module 20 can be used for task according to demand, the time of demand task execution, demand task execution space and At least one of the ability label of operational staff configures demand task, and for determining that demand is appointed according to configuration result Priority, push time and the operational staff of business.
In this way, realizing the management to demand task, layout, matching reasonably are carried out to demand task, to improve task The efficiency of management.Wherein, demand task can be corresponding with corresponding example demand, for example, being feeding for the example demand of pig Feed, demand task can be feeding task;And be fertilising for the example demand of green vegetables, demand task can be fertilising and appoint Business.
Specifically, in one example, demand task can according to demand task execution time carry out layout, for example, The sequencing of task execution carries out layout according to demand.So, it may be determined that the urgency level of task guarantees that demand task is orderly It executes.Of course, it is possible to according to demand the time of task execution determine push time of demand task, it is for executing the time longer Demand task, 1 day can be shifted to an earlier date or 2 days are pushed, for executing time shorter demand task, 1 hour can be shifted to an earlier date or 2 is small Shi Jinhang push, in this way, be prepared operational staff can by time enough.
In another example, demand task can according to demand task execution space carry out layout, particularly, for Multiple managed objects in different spaces, can the space length of task execution according to demand carry out deploying, for example, the sky executed Between adjacent demand task adjacent can carry out.In this way, can avoid operational staff's reciprocating in multiple spaces, appoint to improve The efficiency of business management.
In having an example, demand task can be according to the corresponding operational staff of ability tag match of operational staff.Example It such as, is pig for managed object, the ability label of operational staff can be feeding personnel, animal doctor testing staff, care giver Deng, wherein feeding person can be matched with feeding task.It is green vegetables, the ability label of operational staff for managed object It can be fertilising personnel, deinsectization personnel, picking personnel etc., wherein fertilising personnel can match with fertilising task.In this way, The match management of demand task and operational staff can be passed through.
Figure 14 is please referred to, for feeding mother pig, different raising tasks can execute in different spaces (pig house), example Such as, breeding task can execute in breeding house, look into and return feelings task and can execute in first half period of gestation house, pregnant inspection task can be It being executed in second trimester of pregnancy house, upper obstetric table task can execute in latter half of gestation house, and childbirth task can execute in a delivery room, Wean task can execute in another delivery room.
Specifically, the sow of breeding task will be executed in nature week of breeding as a batch, as benchmark when breeding Breed subsequent task generation and configuration are carried out, is first combined to each stage by column home space, then by column home Field be ranked up layout, reminded by three colors of red, yellow, and green, realize system Auto-matching corresponding demand task.
It should be noted that please referring to Figure 15, all demand tasks must be based on operational staff, managed object, object Money, execution space quaternity could execute.Wherein, in the case that third party does not show up, task, Zhi Nengyuan cannot be individually performed Journey is performed in unison with.
Figure 16 and Figure 17 are please referred to, in some embodiments, task management method includes:
Step S500, in the case where determining that demand task is completed to execute according to the feedback signal of client 41, closing is needed It seeks task and object event is updated.
Specifically, task management system 100 includes task profiling module 70, and step S500 can be by task profiling module 70 It realizes.In other words, task profiling module 70 can be used for determining that demand task is completed according to the feedback signal of client 41 In the case where execution, closes demand task and object event is updated.
In this way, operational staff can feed back in client 41 after the completion of task execution, so as to close completed need It seeks task and realizes and the demand task for executing completion is filed.Wherein, being updated to object event can be understood as pair The feature for having executed object event corresponding to the demand task of completion is recorded, for example, the record deadline, executor Member completes place, is in consumption resource (comprising article, fund, system, collaboration people, collaboration objects etc.) feature one or several.
It is appreciated that in some embodiments, task management system 100 can be changed according to the object event of update by pipe Manage the Obj State of object.The change of Obj State can trigger the reality that task generating algorithm module 10 redefines managed object The example demand of example.In this way, demand database 61 may be updated in the example demand for redefining the example of managed object.
In some embodiments, demand task includes mandatory period, and task management method includes:
Step S600 in the case where not receiving the feedback signal of client 41 in mandatory period, determines demand task It does not complete and executes, close demand task and alarm.
For task management system 100, step S600 can be realized by task profiling module 70.In other words, task is returned In the case that shelves module 70 can be used for not receiving the feedback signal of client 41 in mandatory period, the demand task of determination is not It completes to execute, close demand task and alarms.
It is appreciated that demand task cannot be delayed always without executing, can not be pushed always because of not executing, because This can be arranged in the case that mandatory period demand task is not carried out in demand task, and client 41 can not issue feedback Signal is gone forward side by side so that task profiling module 70 can close demand task and alarm so that related personnel can find the problem in time Row processing.
In one example, if execution is completed in demand task, operational staff does not make feedback in client 41 and causes Demand task expires in the case where closing and alarming, and operational staff can be by examination & approval amended record data with upgating object event.
Figure 18 and Figure 19 are please referred to, in some embodiments, task management method includes:
Step S700 generates dynamic task according to user's operation;
Dynamic task is pushed to client 41 by step S800.
Wherein, task management system 100 includes task input module 80, and step S700 can be real by task input module 80 Existing, step S800 can be realized by task pushing module 30.In other words, task input module 80 is used for raw according to user's operation At dynamic task, task pushing module 30 is used to dynamic task pushing to client 41.
It is appreciated that the object event determined according to the life cycle of managed object is managed object in each life The event that stage must occur.And for emergency event, also need to make corresponding management, for example, animals got sick or in advance The emergency events such as the emergency events such as death and pathological changes of plant or death are appointed at this point it is possible to generate dynamic by user's operation Business, and push to client 41 and handled by related personnel.
In one example, for feeding mother pig, when pig is jumped, user can be marked by scanning The operation (sweep and sweep) of label generates task of jumping accordingly, and related personnel can jump to corresponding pig, and updates corresponding Event guarantee to appoint so that task management system can configure subsequent demand task according to the spatial alternation of pig Business efficient administration carries out.
Figure 20, the task management system 100 of embodiment of the present invention, including processor 110 and memory 120 are please referred to, Memory 120 is stored with one or more programs, and program realizes the task of any of the above-described embodiment when being executed by processor 110 Management method.
In one example, it is performed the steps of when program is executed by processor 110
Step S100, obtains the rules of life cycle of managed object, and is managed pair according to rules of life cycle acquisition As the object event in each life stage;
Step S200 determines the Obj State of managed object, and generates demand according to object event and Obj State and appoint Business;
Step S300, regulatory requirement task;
Demand task is pushed to client 41 by step S400.
Corresponding program can be performed to be based on being managed in the task management system 100 of embodiment of the present invention, processor 110 The rules of life cycle of object obtains managed object in the object event and Obj State of each life stage, further life At standardization, templating, digitized demand task and client 41 is pushed to, so that demand task management is more reasonable, symbol The rules of life cycle for closing managed object is conducive to the efficiency for improving task management.
In the description of this specification, reference term " embodiment ", " certain embodiments ", " schematically implementation The description of mode ", " example ", " specific example " or " some examples " etc. means embodiment or example is combined to describe specific Feature, structure, material or feature are contained at least one embodiment or example of the invention.In the present specification, right The schematic representation of above-mentioned term is not necessarily referring to identical embodiment or example.Moreover, the specific features of description, knot Structure, material or feature can be combined in any suitable manner in any one or more embodiments or example.
Any process described otherwise above or method description are construed as in flow chart or herein, and expression includes It is one or more for realizing specific logical function or process the step of executable instruction code module, segment or portion Point, and the range of the preferred embodiment of the present invention includes other realization, wherein can not press shown or discussed suitable Sequence, including according to related function by it is basic simultaneously in the way of or in the opposite order, Lai Zhihang function, this should be of the invention Embodiment person of ordinary skill in the field understood.
Expression or logic and/or step described otherwise above herein in flow charts, for example, being considered use In the order list for the executable instruction for realizing logic function, may be embodied in any computer-readable medium, for Instruction execution system, device or equipment (such as computer based system, including the system of processing module or other can be from instruction Execute system, device or equipment instruction fetch and the system that executes instruction) use, or combine these instruction execution systems, device or Equipment and use.For the purpose of this specification, " computer-readable medium " can be it is any may include, store, communicating, propagating or Transfer program uses for instruction execution system, device or equipment or in conjunction with these instruction execution systems, device or equipment Device.The more specific example (non-exhaustive list) of computer-readable medium include the following: there are one or more wirings Electrical connection section (control method), portable computer diskette box (magnetic device), random access memory (RAM), read-only memory (ROM), erasable edit read-only storage (EPROM or flash memory), fiber device and portable optic disk is read-only deposits Reservoir (CDROM).In addition, computer-readable medium can even is that the paper that can print described program on it or other are suitable Medium, because can then be edited, be interpreted or when necessary with it for example by carrying out optical scanner to paper or other media His suitable method is handled electronically to obtain described program, is then stored in computer storage.
It should be appreciated that each section of embodiments of the present invention can be with hardware, software, firmware or their combination come real It is existing.In the above-described embodiment, multiple steps or method can be with storages in memory and by suitable instruction execution system The software or firmware of execution is realized.For example, if realized with hardware, in another embodiment, ability can be used Any one of following technology or their combination well known to domain is realized: being had for realizing logic function to data-signal The discrete logic of logic gates, the specific integrated circuit with suitable combinational logic gate circuit, programmable gate array (PGA), field programmable gate array (FPGA) etc..
Those skilled in the art are understood that realize all or part of step that above-described embodiment method carries It suddenly is that relevant hardware can be instructed to complete by program, the program can store in a kind of computer-readable storage medium In matter, which when being executed, includes the steps that one or a combination set of embodiment of the method.
In addition, each functional unit in various embodiments of the present invention can integrate in a processing module, it can also To be that each unit physically exists alone, can also be integrated in two or more units in a module.It is above-mentioned integrated Module both can take the form of hardware realization, can also be realized in the form of software function module.The integrated module If in the form of software function module realize and when sold or used as an independent product, also can store one calculating In machine read/write memory medium.
Storage medium mentioned above can be read-only memory, disk or CD etc..
Although embodiments of the present invention have been shown and described above, it is to be understood that above embodiment is Illustratively, it is not considered as limiting the invention, those skilled in the art within the scope of the invention can be right Above embodiment is changed, modifies, replacement and variant.

Claims (16)

1. a kind of task management method characterized by comprising
The rules of life cycle of managed object is obtained, and the managed object is obtained each according to the rules of life cycle The object event of life stage;
It determines the Obj State of the managed object, and demand is generated according to the object event and the Obj State and is appointed Business;
The demand task is managed, and the demand task is pushed into client.
2. task management method according to claim 1, which is characterized in that the managed object includes raising object, The task management method includes:
The rules of life cycle of the raising object is obtained, and the raising object is obtained each according to the rules of life cycle The raising event of life stage;
It determines the raising state of the raising object, and raising task is generated according to the raising event and the raising state;
The raising task is managed, and the raising task is pushed into client.
3. task management method according to claim 2, which is characterized in that the raising state of the raising object is obtained, Include:
Obtain gene data, nutrition data, bio-safety data, production management data, the environmental monitoring number of the raising object According at least one of, animal doctor's detection data;
According to the gene data, the nutrition data, the bio-safety data, the production management data, the environment At least one of monitoring data, described animal doctor's detection data determine the raising state.
4. task management method according to claim 1, which is characterized in that in the Life Cycle for obtaining managed object Before phase rule, the task management method includes:
Register the managed object.
5. task management method according to claim 1, which is characterized in that according to the object event and the object shape State generates demand task, comprising:
Abstract operation is carried out to the object event;
Determine the managed object in the demand of each life stage and number according to the object event after abstract Change the demand;
Requirement templet is established according to the demand after digitlization.
6. task management method according to claim 5, which is characterized in that according to the object event and the object shape State generates demand task, comprising:
The example that the managed object is instantiated to obtain the managed object;
The example demand of the example of the managed object is determined according to the requirement templet and the Obj State;
The example demand is stored, and the demand task is generated according to the example demand.
7. task management method according to claim 6, which is characterized in that store the example demand, comprising: will be described Example demand is stored to demand database.
8. task management method according to claim 1, which is characterized in that manage the demand task and by the demand Task pushes to client, comprising:
According to the demand task, the time of the demand task execution, the space of the demand task execution and operational staff Ability label at least one the demand task is configured;
Priority, push time and the operational staff of the demand task are determined according to configuration result.
9. task management method according to claim 1, which is characterized in that the task management method includes:
In the case where determining that the demand task is completed to execute according to the feedback signal of the client, closes the demand and appoint It is engaged in and the object event is updated.
10. task management method according to claim 1, which is characterized in that the demand task includes mandatory period, institute Stating task management method includes:
In the case where not receiving the feedback signal of the client in the mandatory period, determine that the demand task is not complete At execution, closes the demand task and alarm.
11. a kind of task management system, which is characterized in that including task generating algorithm module, task management module, task push Module and task execution module, the task execution module include client, and the task generating algorithm module is for obtaining quilt The rules of life cycle of object is managed, and the managed object is obtained in each life stage according to the rules of life cycle Object event, and the Obj State for determining the managed object, and according to the object event and the object shape State generates demand task, and the task management module is used for for managing the demand task, the task pushing module by institute The demand task of stating pushes to the client.
12. task management system according to claim 11, which is characterized in that the managed object includes raising pair As the task generating algorithm module is used to obtain the rules of life cycle of the raising object, and according to the life cycle Rule obtains the raising object in the raising event of each life stage, and the raising shape for determining the raising object State, and raising task is generated according to the raising event and the raising state, the task management module is described for managing Raising task, the task pushing module are used to the raising task pushing to client.
13. task management system according to claim 12, which is characterized in that the task generating algorithm module includes shape State determination unit, the status determining unit are used to obtain gene data, nutrition data, the bio-safety number of the raising object According to, at least one of production management data, environmental monitoring data, animal doctor's detection data, and for according to the gene number According to, the nutrition data, the bio-safety data, the production management data, the environmental monitoring data, the animal doctor inspection At least one of measured data determines the raising state.
14. task management system according to claim 11, which is characterized in that the task generating algorithm module for pair The object event carries out abstract operation, and for determining the managed object according to the object event after abstract Each life stage demand and digitize the demand, and for establishing demand according to the demand after digitlization Template.
15. task management system according to claim 11, which is characterized in that the demand task includes mandatory period, The task management system includes task profiling module, and the task profiling module in the mandatory period for not receiving In the case where the feedback signal of the client, determines that the demand task does not complete and execute, close the demand task and report It is alert.
16. a kind of task management system, which is characterized in that including processor and memory, the memory be stored with one or Multiple programs, described program realize task management side described in any one of claims 1 to 10 when being executed by the processor Method.
CN201910277118.1A 2019-04-08 2019-04-08 Task management method and task management system Pending CN110033185A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910277118.1A CN110033185A (en) 2019-04-08 2019-04-08 Task management method and task management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910277118.1A CN110033185A (en) 2019-04-08 2019-04-08 Task management method and task management system

Publications (1)

Publication Number Publication Date
CN110033185A true CN110033185A (en) 2019-07-19

Family

ID=67237669

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910277118.1A Pending CN110033185A (en) 2019-04-08 2019-04-08 Task management method and task management system

Country Status (1)

Country Link
CN (1) CN110033185A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112085346A (en) * 2020-08-18 2020-12-15 远光软件股份有限公司 Calendar-based safety inspection work display method and device and electronic equipment
CN112189622A (en) * 2020-10-10 2021-01-08 四川厚全好鲜见信息科技有限公司 Data driving type digital laying hen breeding system
CN112258145A (en) * 2020-10-10 2021-01-22 四川厚全好鲜见信息科技有限公司 Data driving type breeding system
CN112258147A (en) * 2020-10-10 2021-01-22 四川厚全好鲜见信息科技有限公司 Data-driven brooding management system
CN112257996A (en) * 2020-10-10 2021-01-22 四川厚全好鲜见信息科技有限公司 Data-driven laying hen management system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104778545A (en) * 2015-04-08 2015-07-15 深圳市科陆电子科技股份有限公司 Work task management system based on mobile equipment
CN105512949A (en) * 2015-12-30 2016-04-20 福州微猪信息科技有限公司 Culturing farm informationized management system based on social platform and method thereof
CN107563730A (en) * 2017-08-31 2018-01-09 临沂市兔兔畜牧科技有限公司 A kind of scale rabbit cultivates intelligent management system
CN107862621A (en) * 2017-11-10 2018-03-30 临武县舜湘牛业发展有限公司 A kind of ox biosystem of Internet of Things
KR20180045967A (en) * 2016-10-26 2018-05-08 사단법인 빌딩스마트협회 Integrated Management System for BIM Property Information
CN109087210A (en) * 2018-08-27 2018-12-25 中国联合网络通信集团有限公司 A kind of animal epidemic prevention processing method and system based on block chain technology

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104778545A (en) * 2015-04-08 2015-07-15 深圳市科陆电子科技股份有限公司 Work task management system based on mobile equipment
CN105512949A (en) * 2015-12-30 2016-04-20 福州微猪信息科技有限公司 Culturing farm informationized management system based on social platform and method thereof
KR20180045967A (en) * 2016-10-26 2018-05-08 사단법인 빌딩스마트협회 Integrated Management System for BIM Property Information
CN107563730A (en) * 2017-08-31 2018-01-09 临沂市兔兔畜牧科技有限公司 A kind of scale rabbit cultivates intelligent management system
CN107862621A (en) * 2017-11-10 2018-03-30 临武县舜湘牛业发展有限公司 A kind of ox biosystem of Internet of Things
CN109087210A (en) * 2018-08-27 2018-12-25 中国联合网络通信集团有限公司 A kind of animal epidemic prevention processing method and system based on block chain technology

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
非凡软件站: "宏达猪场管理系统 v1.0 普及版", 《HTTPS://WWW.CRSKY.COM/SOFT/104800.HTML》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112085346A (en) * 2020-08-18 2020-12-15 远光软件股份有限公司 Calendar-based safety inspection work display method and device and electronic equipment
CN112189622A (en) * 2020-10-10 2021-01-08 四川厚全好鲜见信息科技有限公司 Data driving type digital laying hen breeding system
CN112258145A (en) * 2020-10-10 2021-01-22 四川厚全好鲜见信息科技有限公司 Data driving type breeding system
CN112258147A (en) * 2020-10-10 2021-01-22 四川厚全好鲜见信息科技有限公司 Data-driven brooding management system
CN112257996A (en) * 2020-10-10 2021-01-22 四川厚全好鲜见信息科技有限公司 Data-driven laying hen management system

Similar Documents

Publication Publication Date Title
CN110033185A (en) Task management method and task management system
Ellis et al. Synergy between mechanistic modelling and data-driven models for modern animal production systems in the era of big data
Dent Systems simulation in agriculture
Ivanova et al. Automation of processes in dairy cattle production
Piewthongngam et al. System dynamics modelling of an integrated pig production supply chain
Adenuga et al. Economic viability of adoption of automated oestrus detection technologies on dairy farms: A review
CN104751367A (en) System for sensing, controlling and tracking breeding quality of breeding pigs in pig farm in whole process
Oczak et al. Dynamics of sows’ activity housed in farrowing pens with possibility of temporary crating might indicate the time when sows should be confined in a crate before the onset of farrowing
Plà Review of mathematical models for sow herd management
Hansen et al. The ruminant farm systems animal module: a biophysical description of animal management
Berezowski et al. Complex system approaches for animal health surveillance
Kavlak et al. Disease detection in pigs based on feeding behaviour traits using machine learning
CN109902941A (en) Cultivate task management method and device, cultivation task management equipment and system
Gomes et al. A scientific software ecosystem architecture for the livestock domain
Lokhorst An introduction to smart dairy farming
Gu et al. An industrial internet platform for massive pig farming (IIP4MPF)
Halachmi Systems engineering for ornamental fish production in a recirculating aquaculture system
Nleya et al. Smart dairy farming overview: innovation, algorithms and challenges
Shamsuddoha et al. Sustainability process innovations resulting in new value-added byproducts: principal lessons from second-order system-dynamics engineering (SOSDE)
EP4075370A1 (en) Livestock information management system, livestock information management server, livestock information management method, livestock information management program, and data structure for livestock information management
McVey et al. Livestock informatics toolkit: a case study in visually characterizing complex behavioral patterns across multiple sensor platforms, using novel unsupervised machine learning and information theoretic approaches
Liang et al. A virtual dairy farm brain
Halachmi Mathematical principles of production management and robust layout design: Part I. 250-ton/year recirculating aquaculture system (RAS)
Jensen et al. A multi-dimensional dynamic linear model for monitoring slaughter pig production
de Carvalho Machine Learning in Poultry Companies' Data. Applications and Methodologies

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190719