CN110029670A - The earthwork for foundation construction configures silt particle pumping installations and its operating method - Google Patents

The earthwork for foundation construction configures silt particle pumping installations and its operating method Download PDF

Info

Publication number
CN110029670A
CN110029670A CN201910302207.7A CN201910302207A CN110029670A CN 110029670 A CN110029670 A CN 110029670A CN 201910302207 A CN201910302207 A CN 201910302207A CN 110029670 A CN110029670 A CN 110029670A
Authority
CN
China
Prior art keywords
mud
water
pipe
solid
phase
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910302207.7A
Other languages
Chinese (zh)
Inventor
李龙波
洪天有
顾拥军
艾浩源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHAO FENG STEEL STRUCTURE GROUP Co Ltd
Original Assignee
CHAO FENG STEEL STRUCTURE GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHAO FENG STEEL STRUCTURE GROUP Co Ltd filed Critical CHAO FENG STEEL STRUCTURE GROUP Co Ltd
Priority to CN201910302207.7A priority Critical patent/CN110029670A/en
Publication of CN110029670A publication Critical patent/CN110029670A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Treatment Of Sludge (AREA)

Abstract

The present invention relates to a kind of earthwork for foundation construction to configure silt particle pumping installations and its operating method, affiliated architectural engineering foundation construction technical field, including mud sump and settling pit, mud sump is equipped with base rack, base rack is equipped with reuse supply mains, reuse supply mains is equipped with several recycle-water branch pipes, if being equipped with dry mud branch pipe below base rack, mud is equipped between mud branch pipe and settling pit to be responsible for, it is equipped with mud gathering tube between mud supervisor and mud branch pipe, if mud supervisor is equipped with dry mud booster pump.Settling pit side is separated by solid-liquid separation between component and settling pit equipped with component is separated by solid-liquid separation and is equipped with jelly suction pipe, and jelly suction pipe and separation of solid and liquid inter-module are pumped equipped with impeller, is separated by solid-liquid separation between component and reuse supply mains and is equipped with suction pump.Have the advantages that compact-sized, energy-saving and emission-reduction, reusing sewage, protection environment and installation supervision are convenient.The working efficiency and discharge capacity for improving spoil disposal slurry, avoid the requirement to construction environment from limiting.

Description

The earthwork for foundation construction configures silt particle pumping installations and its operating method
Technical field
The present invention relates to architectural engineering foundation construction technical fields, and in particular to a kind of earthwork configuration for foundation construction Silt particle pumping installations and its operating method.
Background technique
Site construction configures mud outward transport using the earthwork of recursion flowing water at present, and digging machine and the cooperation of earthwork vehicle are cut the earth, therefore existing Field mud configuration needs clean water leaching, live jelly suction pipe road and fresh water pipeline to be all made of pre-buried form, foundation pit periphery in site of road Pressurized freshwater pump is set altogether, and live jelly suction pipe road is buried.Pipeline is finally laid with outer tube outward transport along river course.Clear water uses Tap water is forced into area to be dug by fresh water pump, and water outlet pump end point multichannel is in charge of, and artificial punching slurry forms mud.Mud passes through Multichannel drinking-water pipe summarizes to suction pump, is forced into outward transport pipeline by suction pump, and outward transport pipeline is mainly laid with along the river, is laid with and is completed to sink To river bed.
This method is easy the risk that landslide causes personnel to bury there are construction site.And mud is by being transported to river outside pipeline Road, although not influencing, navigation channel is current and municipal administration is afforested.But there are sand washings to be easily destroyed river levee, the risk of bed-silt accumulation, shadow Ring water quality of river and flow velocity.
Summary of the invention
Present invention mainly solves exist in the prior art water resource waste, riverway sludge accumulation, pipe laying length it is long and Inconvenient deficiency is supervised, a kind of earthwork configuration silt particle pumping installations and its operating method for foundation construction is provided, Earthwork configuration silt particle pumping installations for foundation construction has compact-sized, energy-saving and emission-reduction, reusing sewage, protection environment and peace Dress supervises convenient advantage.Its operating method solves the problems, such as that pipe laying length is too long.Improve the work effect of spoil disposal slurry Rate and discharge capacity avoid the requirement to construction environment from limiting.Accelerate construction period, reduces construction cost, prevent security risk.
Above-mentioned technical problem of the invention is mainly to be addressed by following technical proposals:
A kind of earthwork for foundation construction configures silt particle pumping installations, including mud sump and settling pit, on the mud sump Equipped be equipped with base rack, the base rack be equipped with reuse supply mains, the reuse supply mains be equipped with it is several with The recycle-water branch pipe that reuse supply mains is connected, the base rack lower section are equipped with several mud branch being connected with mud sump Pipe is equipped with mud and is responsible between the mud branch pipe and settling pit, be equipped between the described mud supervisor and mud branch pipe and mud It is responsible for the mud gathering tube of phase flanged joint, the mud supervisor is tightly connected equipped with several with mud supervisor's phase flange form Mud booster pump.The settling pit side is equipped with the separation of solid and liquid component with settling pit pipeline connection, the solid-liquid point From jelly suction pipe is equipped between component and settling pit, the jelly suction pipe is equipped with and jelly suction pipe phase flanged joint with inter-module is separated by solid-liquid separation Impeller pump, be equipped between separations of solid and liquid component and the reuse supply mains and separation of solid and liquid component phase pipeline connection draw water Pump, the suction pump are fixed with reuse supply mains's phase flanged joint.
Preferably, the separation of solid and liquid component includes Slurry treatment pond, water storage is equipped in the Slurry treatment pond Chamber, the storage chamber upper end are equipped with filtering water sucting cavity, and the filtering water sucting cavity side is equipped with mutually open folded with storage chamber The pressure mud chamber of conjunction.The plate and frame MBR film being halved together with filtering water sucting cavity, the plate and frame are equipped in the filtering water sucting cavity MBR film is equipped with and the jelly suction pipe and muddy water on Slurry treatment pond above the water pipe of phase anchor ear clamping, the water pipe It is clamped in processing pond along phase anchor ear, the intracavitary pressing plate being equipped with the pressure mutually movable socket of mud chamber of the pressure mud.
It is halved together fixed collection mud box preferably, the plate and frame MBR film bottom end is equipped with plate and frame MBR film, institute It is equipped in the collection mud box stated and collection mud box is mutually movable is socketed and extends to the cylinder piston in storage chamber.The pressure mud chamber with Filter and be equipped with mud discharging mouth between water sucting cavity, be equipped in the mud discharging mouth with the mutually movable elastic reset door being screwed on of mud discharging mouth, The elastic reset door is halved together with plate and frame MBR film phase elastic connection, the mud discharging mouth with collection mud box, the elasticity Reset gate with cylinder piston is mutually movable touches.
Preferably, the pressing plate upper end is equipped with the telescopic cylinder fixed with pressure mud cavity wall phase bolt, the pressure The water filter plate being halved together with pressure mud bottom of chamber portion, the water filter plate and the mutually movable touching of pressing plate are equipped between mud chamber and storage chamber It connects.Pressure discharging is completed using telescopic displacement driving pressing plate above and below telescopic cylinder.
Preferably, the Slurry treatment pond side, which is equipped with, pumps bracket with the impeller of impeller pump phase flanged joint, it is described The Slurry treatment pond other side be equipped with suction pump bracket with suction pump phase flanged joint, the suction pump pedestal upper end is equipped with The overflow pipe being connected with storage chamber, the overflow pipe upper end are equipped with the hand valve with the sealing interlocking of overflow pipe phase screw-type.
Preferably, the front end of the recycle-water branch pipe is equipped with the nozzle nested with recycle-water branch pipe phase pipeline type.Institute The mud branch pipe stated between mud sump be equipped with the slush pump nested with mud branch pipe phase pipeline type.
Preferably, the operating method of the earthwork configuration silt particle pumping installations for foundation construction includes following behaviour Make step:
Step 1: live soil dust is flown upward, and will be returned by reuse supply mains on base rack when digging machine and the cooperation of earthwork vehicle are cut the earth It is delivered to recycle-water branch pipe with water to be absorbed soil dust by nozzle, the slime water after absorption is discharged into mud sump.
If if step 2: slime water in mud sump by dry mud branch pipe by dry mud booster pump be pumped into mud be responsible for into Row slurry transportation is to settling pit, if dry mud branch pipe is connected with mud supervisor using mud gathering tube;
Step 3: slime water after precipitating, is delivered to admittedly by the slime water in settling pit by the impeller pump on impeller pump bracket Liquid separation assembly, using the filtering for reaching the plate and frame MBR film progress first step in separation of solid and liquid component;By the filtering of the first step Slime water afterwards enters in collection mud box, is pushed out the mud discharging mouth with elastic reset door by cylinder piston, and enter pressure mud chamber It is interior, pushed by the intracavitary telescopic cylinder band dynamic pressure plate of pressure mud and finally obtain separation of solid and liquid process with water filter plate completion, recycle-water into Enter storage chamber and carries out reuse storage.
Step 4: the water in storage chamber passes through the suction pump on suction pump bracket for reuse when needing using recycle-water Water is delivered in reuse supply mains.
Preferably, mud sump uses the ladder gradient of 1:5, bath landslide is avoided the occurrence of.Mud, water ratio in mud sump For 3:1, slime water made of configuration by 22W power slush pump by using diameter be 150mmPPC manage and resistance to compression 1.2~ It is 400PPC pipe and the mud supervisor of 1.2~1.5MPa of resistance to compression, mud that the mud branch pipe of 1.5MPa, which is delivered to mud sump overall diameter, The mud booster pump for being connected with 280KW power on supervisor at 1~5 kilometer carries out in pressurization long-distance sand transport to settling pit, Realize the centralized processing for preventing making each building site slime water while mud supervisor's blocking.
Preferably, impeller pump carries out 1000~2000 cubic metres per hour to the slime water in settling pit by jelly suction pipe Conveying capacity, when slime water enter be separated by solid-liquid separation component in by plate and frame MBR film carry out first step filtering, the clear water filtered out It is directly used in greening and building site water;It is pushed through the intracavitary telescopic cylinder band dynamic pressure plate of over-voltage mud and completes to be separated by solid-liquid separation with water filter plate The recycle-water of process enters storage chamber, carries out recycle-water to reuse supply mains by the suction pump of 160KW and absorbs the soil dust flown upward.
Preferably, pushing elastic reset door open by cylinder piston for the mud deposited in water sucting cavity is filtered by mud discharging mouth It is sent into pressure mud chamber.It bounces back after mud is sent in cylinder piston completion, elastic reset door is in the spring tension being fixed on plate and frame MBR film The lower state for restoring to remain turned-off mud discharging mouth of effect, prevents the water in filtering water sucting cavity from flowing into pressure mud intracavitary.When water in storage chamber When measuring excessive, extra water is discharged in time by overflow pipe by opening hand valve, avoids influencing the pressure intracavitary squeezing to mud of mud Journey.Cylinder piston is identical as the time of a reciprocating stroke of telescopic cylinder.
The present invention can reach following effect:
The present invention provides a kind of earthwork for foundation construction to configure silt particle pumping installations and its operating method, with the prior art It compares, which has compact-sized, energy-saving and emission-reduction, reusing sewage, guarantor Convenient advantage is supervised in retaining ring border and installation.Its operating method solves the problems, such as that pipe laying length is too long.Improve spoil disposal The working efficiency and discharge capacity of slurry avoid the requirement to construction environment from limiting.Accelerate construction period, reduces construction cost, prevent from pacifying Full hidden danger.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Fig. 2 is the structure sectional view of separation of solid and liquid component of the invention.
In figure: nozzle 1, recycle-water branch pipe 2, reuse supply mains 3, base rack 4, mud sump 5, slush pump 6, mud branch pipe 7, mud gathering tube 8, mud supervisor 9, mud booster pump 10, settling pit 11, jelly suction pipe 12, impeller pump 13, separation of solid and liquid component 14, suction pump 15, impeller pumps bracket 16, and water sucting cavity 18, plate and frame MBR film 19 are filtered in Slurry treatment pond 17, and water pipe 20 is stretched Contracting cylinder 21, pressing plate 22 press mud chamber 23, water filter plate 24, hand valve 25, overflow pipe 26, suction pump bracket 27, storage chamber 28, elasticity Reset gate 29, mud discharging mouth 30, collection mud box 31, cylinder piston 32.
Specific embodiment
Below with reference to the embodiments and with reference to the accompanying drawing the technical solution to invention is described in further detail.
Embodiment: as depicted in figs. 1 and 2, a kind of earthwork configuration silt particle pumping installations for foundation construction, including mud Hole 5 and settling pit 11, mud sump 5 are equipped with base rack 4, and base rack 4 is equipped with reuse supply mains 3, and recycle-water is total Pipe 3 is equipped with 8 recycle-water branch pipes 2 being connected with reuse supply mains 3, and the front end of recycle-water branch pipe 2 is equipped with and recycle-water branch The nozzle 1 of 2 phase pipeline type nesting of pipe.6 mud branch pipes 7 being connected with mud sump 5, mud branch are equipped with below base rack 4 The slush pump 6 nested with 7 phase pipeline type of mud branch pipe is equipped between pipe 7 and mud sump 5.It is equipped between mud branch pipe 7 and settling pit 11 Mud supervisor 9, mud supervisor 9 are responsible for the mud gathering tube 8 of 9 phase flanged joints, mud master with being equipped between mud branch pipe 7 with mud Pipe 9 is equipped with 2 and is responsible for the mud booster pump 10 that 9 phase flange forms are tightly connected with mud.11 side of settling pit is equipped with and precipitating The separation of solid and liquid component 14 of 11 pipeline connections is cheated, is separated by solid-liquid separation between component 14 and settling pit 11 and is equipped with jelly suction pipe 12, jelly suction pipe 12 13 are pumped with the impeller of 12 phase flanged joint of jelly suction pipe with being separated by solid-liquid separation to be equipped between component 14, component 14 is separated by solid-liquid separation and recycle-water is total The suction pump 15 for being equipped between pipe 3 and being separated by solid-liquid separation 14 phase pipeline connection of component, suction pump 15 and 3 phase flanged joint of reuse supply mains It is fixed.
Being separated by solid-liquid separation component 14 includes Slurry treatment pond 17, and 17 side of Slurry treatment pond, which is equipped with, pumps 13 phase flanges company with impeller The impeller pump bracket 16 connect, 17 other side of Slurry treatment pond is equipped with the suction pump bracket 27 with 15 phase flanged joint of suction pump, takes out 27 upper end of water pump bracket is equipped with the overflow pipe 26 being connected with storage chamber 28, and 26 upper end of overflow pipe is equipped with and 26 phase screw thread of overflow pipe The hand valve 25 of formula sealing interlocking.Storage chamber 28 is equipped in Slurry treatment pond 17,28 upper end of storage chamber is equipped with filtering water sucting cavity 18, mistake 18 side of water sucting cavity is filtered equipped with the pressure mud chamber 23 with the mutually open overlapping of storage chamber 28.It filters to be equipped in water sucting cavity 18 and be inhaled with filtering The plate and frame MBR film 19 that water cavity 18 is halved together, 19 bottom end of plate and frame MBR film are fixed equipped with being halved together with plate and frame MBR film 19 Collection mud box 31 is equipped in collection mud box 31 and the mutually movable socket of collection mud box 31 and extends to the cylinder piston 32 in storage chamber 28. It presses and is equipped with mud discharging mouth 30 between mud chamber 23 and filtering water sucting cavity 18, be equipped in mud discharging mouth 30 and mud discharging mouth 30 is mutually movable is screwed on Elastic reset door 29,19 phase elastic connection of elastic reset door 29 and plate and frame MBR film, mud discharging mouth 30 are halved together with collection mud box 31, Elastic reset door 29 with cylinder piston 32 is mutually movable touches.Plate and frame MBR film 19 be equipped with on Slurry treatment pond 17 along phase The jelly suction pipe 12 of the water pipe 20 of anchor ear clamping, 20 top of water pipe is clamped on Slurry treatment pond 17 along phase anchor ear, presses mud chamber The pressing plate 22 with the pressure mutually movable socket of mud chamber 23 is equipped in 23.22 upper end of pressing plate is equipped with to be fixed with pressure 23 inner wall phase bolt of mud chamber Telescopic cylinder 21, press and be equipped between mud chamber 23 and storage chamber 28 and water filter plate 24 that pressure 23 bottom of mud chamber is halved together, water filter plate 24 with pressing plate 22 is mutually movable touches.
The operating method of earthwork configuration silt particle pumping installations for foundation construction includes following operating procedure:
Step 1: live soil dust is flown upward, will by reuse supply mains 3 on base rack 4 when digging machine and the cooperation of earthwork vehicle are cut the earth Recycle-water is delivered to recycle-water branch pipe 2 and is absorbed soil dust by nozzle 1, and the slime water after absorption is discharged into mud sump 5.Mud sump 5 is adopted With the ladder gradient of 1:5, bath landslide is avoided the occurrence of.Mud, water ratio in mud sump 5 are 3:1.
Step 2: the slime water in mud sump 5 is pumped into mud supervisor by 2 mud booster pumps 10 by 6 mud branch pipes 7 9 carry out slurry transportation to settling pit 11, and 6 mud branch pipes 7 are connected with mud supervisor 9 using mud gathering tube 8.Configuration and At slime water by 22W power slush pump 6 by using diameter be 150mmPPC manage and resistance to compression 1.2MPa mud branch pipe 7 it is defeated Sending to 5 overall diameter of mud sump is 400PPC pipe and the mud supervisor 9 of resistance to compression 1.2MPa, is connected at 2 kilometers on mud supervisor 9 There is the mud booster pump 10 of 280KW power to carry out in pressurization long-distance sand transport to settling pit 11, realization prevents 9 blocking of mud supervisor While make the centralized processing of each building site slime water.
Step 3: the slime water in settling pit 11 pumps 13 for mud after precipitating, by the impeller on impeller pump bracket 16 Water, which is delivered to, is separated by solid-liquid separation component 14, using the filtering for reaching the progress first step of plate and frame MBR film 19 in separation of solid and liquid component 14; Enter in collection mud box 31 by the filtered slime water of the first step, is carried out being pushed out band elastic reset door 29 by cylinder piston 32 Mud discharging mouth 30, the mud that deposits will be filtered in water sucting cavity 18 by mud discharging mouth 30, elastic reset door is pushed open by cylinder piston 32 29 are sent into pressure mud chamber 23.It bounces back after mud is sent in the completion of cylinder piston 32, elastic reset door 29 is on being fixed on plate and frame MBR film 19 The lower state for restoring to remain turned-off mud discharging mouth 30 of spring tension effect, prevent the water in filtering water sucting cavity 18 from flowing into pressure mud chamber 23 It is interior.It is pushed by the telescopic cylinder 21 in pressure mud chamber 23 with dynamic pressure plate 22 and finally obtains separation of solid and liquid process with the completion of water filter plate 24, Recycle-water enters storage chamber 28 and carries out the soil dust that recycle-water absorption is flown upward to reuse supply mains 3 by the suction pump 15 of 160KW.Impeller Pump 13 carries out 1000 cubic metres of conveying capacities hourly to the slime water in settling pit 11 by jelly suction pipe 12, when slime water enters It is separated by solid-liquid separation in component 14 and first step filtering is carried out by plate and frame MBR film 19, the clear water filtered out is directly used in greening and work Ground water.
Step 4: the water in storage chamber 28 passes through the suction pump 15 on suction pump bracket 27 when needing using recycle-water Recycle-water is delivered in reuse supply mains 3.When hypervolia in storage chamber 28, by open hand valve 25 by overflow pipe 26 and When extra water is discharged, avoid influencing in pressure mud chamber 23 to the expressing process of mud;The one of cylinder piston 32 and telescopic cylinder 21 The time of a reciprocating stroke is identical.
In conclusion the earthwork configuration silt particle pumping installations for being used for foundation construction has compact-sized, energy-saving and emission-reduction, dirt Convenient advantage is supervised in water reuse, protection environment and installation.Its operating method solves the problems, such as that pipe laying length is too long.It mentions The high working efficiency and discharge capacity of spoil disposal slurry, avoids the requirement to construction environment from limiting.Accelerate construction period, reduction is constructed into This, prevents security risk.
Above is only a specific embodiment of the present invention, but structure feature of the invention is not limited thereto, Ren Heben Within the field of the present invention, made changes or modifications all cover within the scope of the patent of the present invention the technical staff in field.

Claims (10)

1. a kind of earthwork for foundation construction configures silt particle pumping installations, it is characterised in that: including mud sump (5) and settling pit (11), the mud sump (5) is equipped with base rack (4), and the base rack (4) is equipped with reuse supply mains (3), the reuse supply mains (3) is equipped with several recycle-water branch pipes (2) being connected with reuse supply mains (3), described Several mud branch pipes (7) being connected with mud sump (5), the mud branch pipe (7) and precipitating are equipped with below base rack (4) Cheat and be equipped with mud supervisor (9) between (11), the described mud supervisor (9) be equipped between mud branch pipe (7) and mud supervisor's (9) phase method The mud gathering tube (8) of orchid connection, the mud supervisor (9) connect equipped with several with mud supervisor's (9) phase flange form sealing The mud booster pump (10) connect;Settling pit (11) side is equipped with the separation of solid and liquid component with settling pit (11) pipeline connection (14), jelly suction pipe (12) are equipped between the separation of solid and liquid component (14) and settling pit (11), the jelly suction pipe (12) and solid It is equipped between liquid separation assembly (14) and pumps (13) with the impeller of jelly suction pipe (12) phase flanged joint, the separation of solid and liquid component (14) The suction pump (15) for being equipped between reuse supply mains (3) and being separated by solid-liquid separation component (14) phase pipeline connection, the suction pump (15) it is fixed with reuse supply mains (3) phase flanged joint.
2. the earthwork according to claim 1 for foundation construction configures silt particle pumping installations, it is characterised in that: described Being separated by solid-liquid separation component (14) includes Slurry treatment pond (17), is equipped with storage chamber (28) in the Slurry treatment pond (17), described Storage chamber (28) upper end be equipped with filtering water sucting cavity (18), filtering water sucting cavity (18) side be equipped with and storage chamber (28) phase The pressure mud chamber (23) of open overlapping;The sheet frame being halved together with filtering water sucting cavity (18) is equipped in the filtering water sucting cavity (18) Formula MBR film (19), the plate and frame MBR film (19) be equipped with on Slurry treatment pond (17) along phase anchor ear clamping water pipe (20), the jelly suction pipe (12) above the water pipe (20) is clamped on Slurry treatment pond (17) along phase anchor ear, the pressure The pressing plate (22) with pressure mud chamber (23) mutually movable socket is equipped in mud chamber (23).
3. the earthwork according to claim 2 for foundation construction configures silt particle pumping installations, it is characterised in that: described Plate and frame MBR film (19) bottom end is equipped with and is halved together fixed collection mud box (31) with plate and frame MBR film (19), the collection mud box (31) in be equipped with collection mud box (31) it is mutually movable be socketed and extend to the cylinder piston (32) in storage chamber (28);The pressure Mud discharging mouth (30) are equipped between mud chamber (23) and filtering water sucting cavity (18), are equipped with and mud discharging mouth (30) in the mud discharging mouth (30) The mutually movable elastic reset door (29) being screwed on, the elastic reset door (29) and plate and frame MBR film (19) phase elastic connection, The mud discharging mouth (30) is halved together with collection mud box (31), and the elastic reset door (29) and cylinder piston (32) are mutually movable It touches.
4. the earthwork according to claim 2 for foundation construction configures silt particle pumping installations, it is characterised in that: described Pressing plate (22) upper end is equipped with the telescopic cylinder (21) fixed with pressure mud chamber (23) inner wall phase bolt, the pressure mud chamber (23) and storage It is equipped with and presses the water filter plate (24) that is halved together of mud chamber (23) bottom between water cavity (28), the water filter plate (24) and pressing plate (22) It is mutually movable to touch.
5. the earthwork according to claim 2 for foundation construction configures silt particle pumping installations, it is characterised in that: described Slurry treatment pond (17) side, which is equipped with, pumps bracket (16) with the impeller of impeller pump (13) phase flanged joint, the Slurry treatment pond (17) other side is equipped with the suction pump bracket (27) with suction pump (15) phase flanged joint, described suction pump bracket (27) upper end Equipped with the overflow pipe (26) being connected with storage chamber (28), the overflow pipe (26) upper end is equipped with and overflow pipe (26) phase screw thread The hand valve (25) of formula sealing interlocking.
6. the earthwork according to claim 1 for foundation construction configures silt particle pumping installations, it is characterised in that: described The front end of recycle-water branch pipe (2) is equipped with the nozzle (1) nested with recycle-water branch pipe (2) phase pipeline type;The mud branch pipe (7) The slush pump (6) nested with mud branch pipe (7) phase pipeline type is equipped between mud sump (5).
7. the earthwork according to claim 1 for foundation construction configures silt particle pumping installations, it is characterised in that: described The operating method of earthwork configuration silt particle pumping installations for foundation construction includes following operating procedure:
Step 1: live soil dust is flown upward, and passes through reuse supply mains on base rack (4) when digging machine and the cooperation of earthwork vehicle are cut the earth (3) recycle-water is delivered to recycle-water branch pipe (2) to be absorbed soil dust by nozzle (1), the slime water after absorption is discharged into mud sump (5);
Step 2: mud sump (5) if in slime water by dry mud branch pipe (7) if by dry mud booster pump (10) be pumped into mud It is responsible for (9) and carries out slurry transportation to settling pit (11), using mud gathering tube (8) if dry mud branch pipe (7) and mud are responsible for (9) it is connected;
Step 3: the slime water in settling pit (11) pumps (13) for mud after precipitating, by the impeller on impeller pump bracket (16) Pulp-water, which is delivered to, is separated by solid-liquid separation component (14), reaches plate and frame MBR film (19) progress first using being separated by solid-liquid separation in component (14) The filtering of step;Filtered slime water by the first step enters in collection mud box (31), is pushed out by cylinder piston (32) Mud discharging mouth (30) with elastic reset door (29), and enter in pressure mud chamber (23), by the telescopic cylinder (21) in pressure mud chamber (23) Band dynamic pressure plate (22), which is pushed, to be completed to finally obtain separation of solid and liquid process with water filter plate (24), and recycle-water enters storage chamber (28) progress Reuse storage;
Step 4: the water in storage chamber (28) passes through the suction pump on suction pump bracket (27) when needing using recycle-water (15) recycle-water is delivered in reuse supply mains (3).
8. the operating method of the earthwork configuration silt particle pumping installations according to claim 7 for foundation construction, feature Be: mud sump (5) uses the ladder gradient of 1:5, avoids the occurrence of bath landslide;Mud, water ratio in mud sump (5) are 3:1, Slime water made of configuration is 150mmPPC pipe and 1.2~1.5MPa of resistance to compression by using diameter by the slush pump (6) of 22W power Mud branch pipe (7) be delivered to mud sump (5) overall diameter be 400PPC pipe and 1.2~1.5MPa of resistance to compression mud be responsible for (9), mud The mud booster pump (10) for being connected with 280KW power on slurry supervisor (9) at 1~5 kilometer carries out pressurization long-distance sand transport extremely In settling pit (11), the centralized processing for preventing making each building site slime water while mud supervisor (9) blocking is realized.
9. the operating method of the earthwork configuration silt particle pumping installations according to claim 7 for foundation construction, feature Be: impeller pumps (13) and carries out 1000~2000 cubic metres per hour to the slime water in settling pit (11) by jelly suction pipe (12) Conveying capacity, when slime water enter be separated by solid-liquid separation component (14) in by plate and frame MBR film (19) carry out first step filtering, filter out The clear water come is directly used in greening and building site water;It is pushed through telescopic cylinder (21) band dynamic pressure plate (22) in over-voltage mud chamber (23) The recycle-water for completing separation of solid and liquid process with water filter plate (24) enters storage chamber (28), by the suction pump (15) of 160KW to reuse Supply mains (3) carries out recycle-water and absorbs the soil dust flown upward.
10. the operating method of the earthwork configuration silt particle pumping installations according to claim 9 for foundation construction, feature It is: the mud deposited in water sucting cavity (18) will be filtered by mud discharging mouth (30) and push elastic reset door open by cylinder piston (32) (29) it is sent into pressure mud chamber (23);It bounces back after cylinder piston (32) complete to send mud, elastic reset door (29) is being fixed on plate and frame The lower state for restoring to remain turned-off mud discharging mouth (30) of spring tension effect on MBR film (19), prevents in filtering water sucting cavity (18) Water flow into pressure mud chamber (23) in;When storage chamber (28) interior hypervolia, by open hand valve (25) by overflow pipe (26) and When extra water is discharged, avoid influencing in pressure mud chamber (23) to expressing process of mud;Cylinder piston (32) and telescopic cylinder (21) time of a reciprocating stroke is identical.
CN201910302207.7A 2019-04-16 2019-04-16 The earthwork for foundation construction configures silt particle pumping installations and its operating method Pending CN110029670A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910302207.7A CN110029670A (en) 2019-04-16 2019-04-16 The earthwork for foundation construction configures silt particle pumping installations and its operating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910302207.7A CN110029670A (en) 2019-04-16 2019-04-16 The earthwork for foundation construction configures silt particle pumping installations and its operating method

Publications (1)

Publication Number Publication Date
CN110029670A true CN110029670A (en) 2019-07-19

Family

ID=67238481

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910302207.7A Pending CN110029670A (en) 2019-04-16 2019-04-16 The earthwork for foundation construction configures silt particle pumping installations and its operating method

Country Status (1)

Country Link
CN (1) CN110029670A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116240894A (en) * 2023-04-23 2023-06-09 中铁一局集团市政环保工程有限公司 Slurry pumping transportation system and method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202246372U (en) * 2011-09-20 2012-05-30 中国建筑股份有限公司 Circulative purifying and dewatering system for engineering slurry
CN103615010A (en) * 2013-12-03 2014-03-05 明业建设集团有限公司 Construction method of digging and conveying earth of deep foundation pit through current scour
CN105016592A (en) * 2015-08-05 2015-11-04 浙江绩丰岩土技术股份有限公司 Slurry recycling circulation system and slurry recycling method thereof
CN204752410U (en) * 2015-06-19 2015-11-11 揭阳市揭东易成陶瓷实业有限公司 System of recycling is retrieved in useless mud, waste water separation
CN205876244U (en) * 2016-08-18 2017-01-11 中建三局基础设施工程有限公司 Self -control mud circulating device
CN108894741A (en) * 2018-07-12 2018-11-27 方碧水 A kind of mud cyclic processing device
CN208700669U (en) * 2018-07-31 2019-04-05 杭州凯滤膜技术有限公司 A kind of MBR membrane module of effluent cycle
CN210031816U (en) * 2019-04-16 2020-02-07 潮峰钢构集团有限公司 A earthwork configuration silt pumping device for foundation construction

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202246372U (en) * 2011-09-20 2012-05-30 中国建筑股份有限公司 Circulative purifying and dewatering system for engineering slurry
CN103615010A (en) * 2013-12-03 2014-03-05 明业建设集团有限公司 Construction method of digging and conveying earth of deep foundation pit through current scour
CN204752410U (en) * 2015-06-19 2015-11-11 揭阳市揭东易成陶瓷实业有限公司 System of recycling is retrieved in useless mud, waste water separation
CN105016592A (en) * 2015-08-05 2015-11-04 浙江绩丰岩土技术股份有限公司 Slurry recycling circulation system and slurry recycling method thereof
CN205876244U (en) * 2016-08-18 2017-01-11 中建三局基础设施工程有限公司 Self -control mud circulating device
CN108894741A (en) * 2018-07-12 2018-11-27 方碧水 A kind of mud cyclic processing device
CN208700669U (en) * 2018-07-31 2019-04-05 杭州凯滤膜技术有限公司 A kind of MBR membrane module of effluent cycle
CN210031816U (en) * 2019-04-16 2020-02-07 潮峰钢构集团有限公司 A earthwork configuration silt pumping device for foundation construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116240894A (en) * 2023-04-23 2023-06-09 中铁一局集团市政环保工程有限公司 Slurry pumping transportation system and method

Similar Documents

Publication Publication Date Title
CN208578132U (en) A kind of dirty abandoned stream filter arrangement of Rain Garden rainwater-collecting section
CN206760309U (en) A kind of afforestation irrigation rig
CN205124580U (en) Irrigation system is collected with rainwater in gardens
CN104631547A (en) Rainwater collecting system
CN204530842U (en) Rain water collecting system
CN103706152B (en) Waste kieselguhr collecting equipment and method for treating waste kieselguhr by using same
CN206467757U (en) Rainwater recycle utilizes system
CN110029670A (en) The earthwork for foundation construction configures silt particle pumping installations and its operating method
CN208830395U (en) A kind of gardens rainwater-collecting irrigation rig
CN107558571B (en) Municipal drainage pipeline
CN210031816U (en) A earthwork configuration silt pumping device for foundation construction
CN206289598U (en) A kind of anti-clogging water pipeline
CN210713163U (en) Self-collecting sludge self-cleaning pump station base
CN211113448U (en) Supporting structure is consolidated to hydraulic engineering bank protection
CN209798710U (en) Water storage device for Wo citrus planting field irrigation
CN113931279A (en) Municipal works plumbing shaft
CN207176812U (en) Pipeline is specialized in a kind of plumbing
CN216855945U (en) Gardens are with drainage device convenient to trash
CN109502796A (en) Efficient whirlpool flow filters water butt with solid-liquid automatic separation
CN213329124U (en) Building main body underground structure antiseep device
CN209429231U (en) A kind of rainwater after-treatment system
CN220225544U (en) Sinking type green land multistage rainwater collection management system for sponge city landscape
CN213153262U (en) Ecological micro-irrigation device for road side slope of scenic spot
CN207419646U (en) Substation's multi stage precipitation sponge type drainage system against rain
CN210519676U (en) Underflow type landscaping water-saving device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190719

RJ01 Rejection of invention patent application after publication