CN110029574A - The novel bridge telescopic device and its installation method that can quickly repair - Google Patents

The novel bridge telescopic device and its installation method that can quickly repair Download PDF

Info

Publication number
CN110029574A
CN110029574A CN201910360179.4A CN201910360179A CN110029574A CN 110029574 A CN110029574 A CN 110029574A CN 201910360179 A CN201910360179 A CN 201910360179A CN 110029574 A CN110029574 A CN 110029574A
Authority
CN
China
Prior art keywords
steel plate
telescopic device
horizontal steel
vertical reinforcement
notch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910360179.4A
Other languages
Chinese (zh)
Inventor
刘其伟
王成明
罗文林
肖宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Borui Auspicious Engineering Technology Co Ltd
Original Assignee
Nanjing Borui Auspicious Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Borui Auspicious Engineering Technology Co Ltd filed Critical Nanjing Borui Auspicious Engineering Technology Co Ltd
Priority to CN201910360179.4A priority Critical patent/CN110029574A/en
Publication of CN110029574A publication Critical patent/CN110029574A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/06Arrangement, construction or bridging of expansion joints

Abstract

The present invention provides a kind of novel bridge telescopic device that can quickly repair, and vertical reinforcement (4), transverse steel (5) and genesis analysis reinforcing bar are arranged in the notch of expansion joint;A pair of of deformed steel is symmetrically fixed on vertical reinforcement (4) upper end and watertight rubber item (2) are set;In deformed steel plastic plate arranged below (3), casting concrete forms notch anchorage zone (10) to pouring hole (6) in the middle part of horizontal steel plate (14) downwards, after notch anchorage zone (10) reach design strength, flexible material (9) are filled in horizontal steel plate (14) above notched areas.Novel bridge telescopic device of the invention is suitable for the update of existing bridge extension joint, can also the construction and installation simultaneously in newly building bridge, structure is simple, and practicability is wide, good economy performance, is worthy to be popularized.

Description

The novel bridge telescopic device and its installation method that can quickly repair
[technical field]
The invention belongs to the rail traffics technical field of buildings such as high-speed railway, subway, light rail, and in particular to one kind is suitable for The telescopic device and its installation method of highway or road and bridge and application.
[background technique]
Bridge extension joint is bridge floor system important component, major function be adapt to bridge temperature load, The deformation generated under concrete shrinkage and creep and Vehicle Load, to guarantee vehicle pass-through on bridge structure stress safety and bridge Safety and comfortable.Meanwhile bridge extension joint also has water-proof function.
Maurer expansion installation is widely used in Bridges in Our Country structure.Factual survey discovery, anchorage zone concrete cracking are broken Broken is one of Maurer expansion installation Common Diseases, and such disease is mainly closely bound up with expansion joint site operation installation quality, directly Connecing influences travel safety and main beam stress.When concrete cracking broken disease in anchorage zone is slight, often takes to cut to crack and break The measure poured again after damage concrete is repaired;And the expansion joint more serious for disease, it often needs to abolish anchorage zone New expansion joint is re-replaced after concrete, this measure is larger to the existing traffic impact of bridge floor, certainly will also increase maintenance cost Investment.
For telescopic device is installed or repairs replacement, exist centainly on newly building bridge and servicing bridges construction method Difference, specific as follows:
1, newly building bridge telescopic device is installed
The installation of newly building bridge telescopic device is generally used " anti-fluting " construction method at present, which is by road surface, bridge Surfacing is unified at face, expansion joint as a whole, and to guarantee flatness, then the road surface of making is dug in expansion joint position It opens, performs expansion joint according still further to design drawing, expansion joint top surface absolute altitude need to be flushed with the road surface or bridge floor holding that two sides have been completed.
Although the method simplifies the process of construction to a certain extent, it is ensured that road surface is connected and smooth with the absolute altitude of bridge floor It spends and crosses, but there is also some drawbacks:
(1) stretching, there are problems for slot area bonding interface.It needs that backfill is expected and paved when expansion joint notch excavates Ground surface material digs up, then pours anchorage zone concrete material.Some materials are bonded in pocket bottom and are difficult to clearly when practice of construction Reason is clean, and so as to cause expansion joint anchorage zone the old and new's material bonding interface, there are quality problems.
(2) beam-ends rubbish blocks.In practice of construction, it is easy when excavating paver in the notch of expansion joint so that part material Expect the beam-ends that falls, if unit in charge of construction does not do timely cleaning, easily causes beam-ends to block rubbish, normally become to limit girder Shape displacement, produces bigger effect abutment parados, girder beam-ends and Bearing Seat Force safety and normal use.
(3) bar planting and installation quality are difficult to ensure." anti-fluting " method installation expansion joint is often that bridge construction is last together Process, in order to strive for open to traffic as early as possible, generally require compression the construction time, when expansion joint being caused to construct bar planting depth not enough, Welding quality is not good enough, spacer bar installation position is inaccurate, and expansion joint installation quality is caused to be unable to satisfy design requirement.
2, servicing bridges telescopic device maintenance replacement
The maintenance replacement of servicing bridges telescopic device usually requires to carry out traffic control first, then mixed according to anchorage zone is cut Solidifying soil, cleaning rubbish, implantation or welding anchor connection reinforcing bar lay anticracking distribution bar, pour anchorage zone concrete material Sequence is constructed, can open to traffic after after anchorage zone, concrete strength meets design requirement.
Above scheme is the common method of servicing bridges telescopic device maintenance replacement, but similarly has the disadvantage that:
(1) traffic control is leading, and maintenance time is limited.Highway biggish for vehicle flowrate, local road and city For road, the replacement construction operation at expansion joint need to be usually carried out when night, vehicle flowrate was smaller, and expansion joint notch concrete Cut, bar planting, anchorage zone concrete pour and health time-consuming longest in the whole process, in the current pressure of traffic and actually have It imitates under conditions of the working time is limited in pairs, pursuing speed simply frequently can lead to construction quality and be difficult to ensure, cause expansion joint The shortening of service life.When bridge width is larger, telescopic device replacement also needs to carry out stage by stage, therefore the expansion joint of stitching portion Anchoring, fashioned iron welding quality requirement are higher, and difficulty of construction is also synchronous to be increased.
(2) maintenance replacement heavy workload, waste are obvious.As previously mentioned, expansion joint anchorage zone concrete cracking breakage disease It is very common, if without punishing in time, under the comprehensive function of a variety of unfavorable factors such as vehicular load and the infiltration of sleet water, disease Accelerated development is influenced travel safety until anchorage zone is failed by evil.For the relatively serious bridge of anchorage zone cracking failure disease Beam telescopic device, re-replacing after being removed is way more general at present.Still clearly for notch lower anchor performance And good telescopic device, the Faville repair replacement heavy workload, artificial mechanism investment is more, some are wasted unavoidably.
In conclusion in order to evade institute in above-mentioned newly building bridge and the installation of servicing bridges telescopic device or maintenance replacement process There are the drawbacks of or disadvantage, ensure the construction quality, improve construction convenience, accelerate speed of application under the premise of, invent one kind Have the advantages that the demand for the novel bridge telescopic device quickly repaired is very urgent.
[summary of the invention]
The purpose of the present invention is overcoming existing conventional maurer expansion seal defect, existing bridge or peace can be installed in by providing one kind The novel bridge telescopic device of loaded on newly building bridge, easy installation and maintenance, easy construction.
To achieve the goals above, the present invention provides a kind of novel bridge telescopic device that can quickly repair, described flexible Device includes deformed steel, watertight rubber item, vertical reinforcement, transverse steel, genesis analysis reinforcing bar and plastic foamboard;
Vertical reinforcement 4 is set in the notch of expansion joint anchorage zone, is erected at transverse steel between vertical reinforcement 4, in transverse direction Multiple rows of genesis analysis reinforcing bar is laid on reinforcing bar 5;
The deformed steel includes horizontal steel plate 14 and the special-shaped lug boss 1 that 14 side of horizontal steel plate is arranged in, the abnormal shape Lug boss 1 includes vertical portion 21 and the upper turn of bilge 22 being connected, and has at the middle part of vertical portion 21, with the ipsilateral one side wall of upper turn of bilge 22 There is convex edge 23, convex edge 23 and upper turn of bilge 22 collectively form special-shaped steel type chamber 24;A pair of of deformed steel is symmetrically fixed on vertical reinforcement 4 Upper end, and 1 direction of lug boss is opposite, watertight rubber item 2 are arranged between the deformed steel chamber 24 to deformed steel;
Plastic plate 3 is set in deformed steel position below, supports plastic plate 3 and the end of the genesis analysis reinforcing bar It connects, by 14 clamping of horizontal steel plate;
Notch anchorage zone 10 is formed from the downward casting concrete of pouring hole 6 at 14 middle part of horizontal steel plate, to notch anchorage zone After 10 reach design strength, flexible material 9 is filled in 14 or more horizontal steel plate.
In the present invention, non-limiting for ease of description, will be known as along spanning direction or direction of traffic vertical bridge to or it is vertical To by direction normal thereto as direction across bridge or transverse direction.
In the present invention, the bridge extension joint is suitable for the expansion joint between the beam-ends of bridge two sides, is also applied for beam-ends Expansion joint between parados, therefore, expansion joint anchorage zone notch be located between the beam-ends of bridge two sides or beam-ends and parados it Between.
According to a kind of preferred embodiment, location hole 12 is set, silk is arranged in 4 upper end of vertical reinforcement on horizontal steel plate 14 Tooth makes vertical reinforcement 4 pass through location hole 12 and the deformed steel of realization and the connection of vertical reinforcement 4 is secured with nuts.
In the present invention, the nut for fixing vertical reinforcement 4 and the deformed steel includes upper layer nut 7 and lower layer's nut 8 (can further comprise rubber pad).Wherein, lower layer's nut 8 plays installation positioning and support, and upper layer nut 7 then will be horizontal Steel plate 14 and vertical reinforcement 4 are connected to form entirety, realize preferable power transmission anchoring property.
Preferably, the location hole 12 is lateral elongate holes.The effect of its strip location hole is to solve practice of construction When pre-buried or implantation vertical reinforcement position and actual apertures groove location the problem of can not exactly matching, grown by being arranged along direction across bridge Strip-shaped hole can carry out the real-time deviation correcting of lateral position, improve applicability.
Pouring hole 6 is preferably provided at four strip location holes, the 12 diagonal line center position of horizontal steel plate 14, for circle Shape hole is equipped with port lid.Screw thread is made in Kong Zhoutong, is poured convenient for matched port lid by screw thread installation is fixed in due course closing Hole.Adjustment 8 elevation of lower layer's nut and the handle hole of positioning when pouring hole is used as expansion joint to install on the one hand;On the other hand it is used as slot The pouring construction hole of mouth anchorage zone 10.
According to a kind of preferred embodiment, plastic plate 3 is polyethylene foams plate.Plastic plate 3 is embedded in horizontal steel Between 14 or less plate, girder and parados end or between girder and girder, side wall is abutted with genesis analysis reinforcing bar, and top is borrowed Horizontal steel plate clamping is helped, to prevent concreting shift.Plastic plate 3 functions as notch anchorage zone concreting side Mould prevents concrete spillage in casting concrete.
When installation, according to the obtained installed height mark setting out data of measurement, the mounting height of first successive step lower layer nut 8, to After telescopic device lifting of the invention is in place, so that vertical reinforcement 4 is passed through location hole 12, horizontal steel plate is located in lower layer's nut 8 More than, then by the pouring hole 6 on 14 surface of horizontal steel plate, lower layer's spiral shell is adjusted by tools such as torque spanneres by operator The final height of mother 8, keeps horizontal steel plate accurately in place, then installs upper layer nut 7.
Preferably, horizontal steel plate 14 and settable rubber pad at the link position of lower layer nut 8 are rigid to solve local location The phenomenon or problem of degree mutation and lateral stressed unevenness.
The maintenance replacement construction of later period expansion joint notch top flexible material may cause upper layer nut 7 in order to prevent Damage, when 14 thickness of horizontal steel plate is enough, upper layer nut 7 is embedded in horizontal steel plate 14;When horizontal steel plate 14 thickness not When being enough embedding nut, includes protectiveness material layer outside upper layer nut 7, carried out in advance for example, by using epoxy resin material Perfusion package is to protect upper layer nut 7.
In the present invention, the following are notch anchorage zone 10, the concrete for constructing notch anchorage zone 10 should be selected horizontal steel plate Steel fiber reinforced concrete, to improve itself cracking resistance.
In the present invention, fill the flexible material in 14 or more horizontal steel plate can be selected from elastic concrete, bituminous concrete, ECC high-tenacity fiber enhances cement-base composite material etc..
In the present invention, in order to ensure effective connection of flexible material and horizontal steel plate, to the table of the horizontal steel plate 14 Hair pulling treatment is made in face and the side of expansion joint lug boss 1.Or further, before filling flexible material, notch side above Face and bottom surface brushing sticking layer oil.
Novel bridge telescopic device, the present invention also provides installation method, the installation method can be quickly repaired based on above-mentioned The following steps are included:
A, special-shaped lug boss 1 is welded with horizontal steel plate 14 by twin fillet wolt, make integrally obtain it is described different Fashioned iron;
B, more vertical reinforcements 4 are installed on bridge main beam two sides or girder and parados, make silk tooth at the top of vertical reinforcement;
C, transverse steel 5 is laid on vertical reinforcement 4;Genesis analysis reinforcing bar is laid on transverse steel 5;
D, plastic plate 3 is set in deformed steel position below, makes the end of plastic plate 3 Yu the genesis analysis reinforcing bar It abuts, by 14 clamping of horizontal steel plate;
E, installed height mark setting out data is measured, lower layer's nut 8 is installed, the upper end of vertical reinforcement 4 is made to pass through horizontal steel plate 14 Location hole 12, then 3 upper end of plastic plate adjusts the final mounting height of lower layer's nut 8 by 14 clamping of horizontal steel plate, then install Upper layer nut 7;
F, notch anchorage zone 10 is formed by the downward casting concrete of pouring hole 6 on horizontal steel plate 14, until pouring hole 6 Pulp, to 10 health of notch anchorage zone to design strength;
G, flexible material is filled on 14 top of horizontal steel plate to form flexible material layer 9, the upper table of the flexible material layer 9 Face height is concordant with the special-shaped overhead height of lug boss 1;
H, between deformed steel chamber 24 install watertight rubber item 2, then can site clearing, open to traffic.
In above-mentioned installation method, since bridge extension joint is arranged along bridge expanssion joint length direction, preferably Adjustable mounting height makes described device have unidirectional horizontal slope.Therefore when implementation steps F, each pouring on contracting seam length direction Building hole 6, there is also differences in height, should pour by lower region at this time, after lower 6 pulp of pouring hole, install mating Port lid, then successively carry out upper zone again pours process, gradually constructs, until completing whole notch area's concretings.
[beneficial effect]
The notch of telescopic device is divided into upper and lower two solely by horizontal steel plate by novel bridge telescopic device of the present invention Vertical part, horizontal steel plate fill flexible material the above are upper notch region directly to bear Vehicle Load, horizontal steel plate The following are lower part notch anchorage zone, steel fiber reinforced concrete is poured to establish preferable anchoring system.It is soft when upper notch region Property material when there is crack, damaged disease, if lower part notch anchorage zone working performance is good, without to entire telescopic device into Row replacement, only need to cut upper notch regional flexibility material, fill again compacting after can open to traffic, to existing bridge deck traffic Interference time is short, realizes the purpose of quickly reparation, greatly improves the maintenance speed of bridge extension joint.Meanwhile it also avoiding It cuts and is poured after the concrete of anchorage zone again, replaces unnecessary waste caused by expansion joint, saved project cost and support Protect cost.
Novel bridge telescopic device of the present invention can guarantee construction quality.For newly building bridge, the present invention changes It has been apt to the sequence of construction of telescopic device.The mode that original telescopic device generallys use " anti-fluting " is constructed, so that flexible Device usually becomes last procedure of bridge construction, due to the limitation of duration and the urgency of open to traffic, construction quality It often not can guarantee, and in " anti-fluting " construction, the material for backfilling preformed groove is difficult to clean out and become beam-ends rubbish, to master Beam, parados and Bearing Seat Force and normal use bring adverse effect.Bridge extension joint of the present invention, can be in construction Other working procedures carry out in parallel, can largely ensure the construction quality;For servicing bridges, if top flexible material Badly broken cuts time that flexible material pours again considerably less than expansion joint is reinstalled, to avoid because of matter of time Blindly promote the decline of construction quality caused by speed.
Telescoping apparatus of the present invention has preferable economy.When in particular for maintenance or replacement, without more Entire telescopic device is changed, when horizontal steel plate anchorage zone working performance below is good, only needs to change top flexible material layer i.e. Can, telescopic device maintenance cost is greatly reduced, can utmostly reduce influence of the telescopic device maintenance for traffic.In addition, The floorings displacement due to temperature and traffic loading effect generation can be absorbed in flexible material, guarantees that surface layer is not in cracking damage It is bad, extend the telescopic device service life.
[Detailed description of the invention]
Fig. 1 is that novel bridge telescopic device of the invention installs cross-sectional configuration figure;
Fig. 2 is the abnormally-structured figure in expansion joint;
Fig. 3 is novel bridge telescopic device position of opening schematic diagram of the invention;
[specific embodiment]
Following embodiment for explaining technical solution of the present invention without limitation.
Embodiment 1 is to existing exchanging bridge telescopic device
Certain 3 × 20m prestressed concrete freely-supported hollow slab bridge, the original expansion joint position telescopic device cracking failure of abutment are tight Weight, need to be replaced.Plan former Maurer expansion installation and is changed to novel bridge telescopic device of the invention.
(1) processing and manufacturing of expansion joint main body
Horizontal steel plate 14 and special-shaped lug boss 1 as illustrated in fig. 1 and 2, by twin fillet wolt by horizontal steel plate 14 and abnormity Lug boss 1 is welded as a whole, and becomes expansion joint deformed steel.
In order to adapt to install, pouring hole 6 and location hole 12 (as shown in Figure 3) are opened on horizontal steel plate 14.Wherein, it pours Hole 6 is round hole, and for screw thread installation and concrete pouring operation, hole wall is processed screw thread, can be used cooperatively with mating port lid.It is fixed Position hole 12 is lateral elongate holes.
In order to ensure horizontal steel plate 14 and special-shaped lug boss 1 connect with cast-in-place concrete layer 15 and the effective of flexible material layer 16 It connects, makees hair pulling treatment in the upper and lower surface of horizontal steel plate 14 and special-shaped 1 side wall of lug boss.
(2) expansion joint in-site installation
After closing lane, ensuring construction safety, freely-supported hollow slab bridge disease expansion joint is removed, avoids damaging in demolishing process Hurt cored slab top plate and parados, while retaining available former vertical reinforcement as far as possible.
Vertical reinforcement 4 is installed at two sides beam-ends 13 (or beam-ends and parados) using bar planting mode.
Transverse steel 5 is set between vertical reinforcement 4 by way of welding or binding, then lays genesis analysis on it Reinforcing bar.Wherein, installation of the production silk tooth in 4 upper end of vertical reinforcement to cooperate lower layer's nut 8.
Between two sides beam-ends 13, the height below of horizontal steel plate 14 setting polyethylene foams plate 3.Polyethylene Side form when plastic plate is as the concreting of notch anchorage zone, therefore one end of genesis analysis reinforcing bar can be made to abut foam plastic Flitch deforms displacement when pouring to prevent it, and the position for adjusting plastic plate ensures that spillage does not occur when casting concrete.
Installed height mark setting out data is measured, primarily determines the installation mark of lower layer's nut 8 on each vertical reinforcement 4 Height is installed lower layer's nut 8 (containing rubber pad), and then lifting deformed steel keeps it in place, and vertical reinforcement 4 passes through horizontal steel plate 14, 3 upper end of plastic plate and 14 clamping of horizontal steel plate.
After deformed steel lifting is in place, each lower layer is adjusted using torque spanner by 14 surface pouring hole 6 of horizontal steel plate The final mounting height of nut 8;Then upper layer nut 7 is fastened, deformed steel and vertical reinforcement 4 are connected as entirety, form collaboration The anchor connection system of stress.
Wherein, 14 thickness of horizontal steel plate is not enough to embedded upper layer nut 7, uses to exposed upper layer nut and pours asphalt mixtures modified by epoxy resin The mode of rouge protects it.
By pouring hole 6 to 14 or less casting concrete of horizontal steel plate to form notch anchorage zone 10, until concrete from Pouring hole 6 overflows, and mating port lid is in time installed on pouring hole 6.Due to the presence of deck transverse slope, there is height in telescopic device Difference pours the progress of process sectional, pours since lower region and close pouring hole 6, successively carries out to higher region, directly It is finished to pouring, then covers health.
It is viscous to the wall brushing of 14 upper surface of horizontal steel plate and expansion joint lug boss 1 after concrete curing to design strength Layer oil, pours flexible material then to form flexible material layer 9.
Finally, installing watertight rubber item 2, subsequent site clearing, open to traffic between deformed steel.
Since the notch of telescopic device is divided into upper and lower two by horizontal steel plate by novel bridge telescopic device of the invention Independent sector, when crack, damaged disease occurs in the flexible material layer in the upper notch region more than horizontal steel plate, if horizontal steel The cast-in-place concrete layer working performance of plate lower part notch below anchorage zone is good, then without carrying out more to entire telescopic device It changes, need to only fill flexible material layer again can be realized quick reparation, reduce maintenance consuming and maintenance cost.
Novel bridge telescopic device of the invention is suitable for the update of existing bridge extension joint, can also be in newly building bridge Construction and installation simultaneously, practicability is wide, good economy performance, is worthy to be popularized.

Claims (10)

1. the novel bridge telescopic device that can quickly repair, it is characterised in that the telescopic device includes deformed steel, watertight rubber Item, vertical reinforcement, transverse steel, genesis analysis reinforcing bar and plastic foamboard;
Vertical reinforcement (4) are set in the notch of expansion joint anchorage zone, are erected at transverse steel between vertical reinforcement (4), in transverse direction Multiple rows of genesis analysis reinforcing bar is laid on reinforcing bar (5);
The deformed steel includes the special-shaped lug boss (1) of horizontal steel plate (14) and setting in horizontal steel plate (14) side, described different Type lug boss (1) include vertical portion (21) with the upper turn of bilge (22) that is connected, at the middle part of vertical portion (21), same with upper turn of bilge (22) The one side wall of side has convex edge (23), and convex edge (23) and upper turn of bilge (22) collectively form special-shaped steel type chamber (24);It will be a pair of special-shaped Steel is symmetrically fixed on vertical reinforcement (4) upper end, and lug boss (1) direction is opposite, and watertight rubber item (2) is arranged at this to deformed steel Deformed steel chamber (24) between;
In deformed steel position setting plastic plate (3) below, support plastic plate (3) and the end of the genesis analysis reinforcing bar It connects, by horizontal steel plate (14) clamping;
Casting concrete forms notch anchorage zone (10) to pouring hole (6) in the middle part of horizontal steel plate (14) downwards, anchors to notch After area (10) reaches design strength, flexible material (9) are filled in horizontal steel plate (14) above notched areas.
2. novel bridge telescopic device according to claim 1, it is characterised in that location hole is arranged on (14) in horizontal steel plate (12), silk tooth is arranged in vertical reinforcement (4) upper end, so that vertical reinforcement (4) is passed through location hole (12) and the institute of realization is secured with nuts State the connection of deformed steel Yu vertical reinforcement (4).
3. novel bridge telescopic device according to claim 1, it is characterised in that the location hole (12) is lateral strip Shape hole.
4. novel bridge telescopic device according to claim 1, it is characterised in that plastic plate (3) is polyethylene foams Plate.
5. novel bridge telescopic device according to claim 2, it is characterised in that the nut include upper layer nut (7) and Lower layer's nut (8).
6. novel bridge telescopic device according to claim 5, it is characterised in that when horizontal steel plate (14) thickness is enough, Upper layer nut (7) is embedded in horizontal steel plate (14);When the thickness of horizontal steel plate (14) is not enough to embedding nut, in upper layer spiral shell It include protectiveness material layer outside female (7).
7. novel bridge telescopic device according to claim 1, it is characterised in that the flexible material is selected from elastic coagulation Soil, bituminous concrete, ECC high-tenacity fiber enhance cement-base composite material.
8. novel bridge telescopic device according to claim 1, it is characterised in that the surface of the horizontal steel plate (14) Make hair pulling treatment with the side of special-shaped lug boss (1).
9. expansion joint anchorage zone notch is located between the beam-ends of bridge two sides or between beam-ends and parados.
10. the installation method of novel bridge telescopic device described in any one of -9 claims according to claim 1, the side Method the following steps are included:
A, special-shaped lug boss (1) and horizontal steel plate (14) are welded by twin fillet wolt, make integrally obtain it is described different Fashioned iron;
B, more vertical reinforcements (4) are installed on bridge main beam two sides or girder and parados, make silk tooth at the top of vertical reinforcement;
C, transverse steel (5) are laid on vertical reinforcement (4);Genesis analysis reinforcing bar is laid on transverse steel (5);
D, in deformed steel position setting plastic plate (3) below, make the end of plastic plate (3) Yu the genesis analysis reinforcing bar It abuts, by horizontal steel plate (14) clamping;
E, installed height mark setting out data is measured, is installed lower layer's nut (8), the upper end of vertical reinforcement (4) is made to pass through horizontal steel plate (14) then location hole (12), plastic plate (3) upper end adjust the final peace of lower layer's nut (8) by horizontal steel plate (14) clamping Dress height, then upper layer nut (7) are installed;
F, by the pouring hole (6) on horizontal steel plate (14), casting concrete forms notch anchorage zone (10) downwards, until pouring Hole (6) pulp, to notch anchorage zone (10) health to design strength;
G, fill flexible material on horizontal steel plate (14) top to be formed flexible material layer (9), the flexible material layer (9) it is upper Apparent height is concordant with the overhead height of the special-shaped lug boss (1);
H, watertight rubber item (2) are installed between deformed steel chamber (24), installation is completed in site clearing.
CN201910360179.4A 2019-04-30 2019-04-30 The novel bridge telescopic device and its installation method that can quickly repair Pending CN110029574A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910360179.4A CN110029574A (en) 2019-04-30 2019-04-30 The novel bridge telescopic device and its installation method that can quickly repair

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910360179.4A CN110029574A (en) 2019-04-30 2019-04-30 The novel bridge telescopic device and its installation method that can quickly repair

Publications (1)

Publication Number Publication Date
CN110029574A true CN110029574A (en) 2019-07-19

Family

ID=67240973

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910360179.4A Pending CN110029574A (en) 2019-04-30 2019-04-30 The novel bridge telescopic device and its installation method that can quickly repair

Country Status (1)

Country Link
CN (1) CN110029574A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021088394A1 (en) * 2019-11-04 2021-05-14 南京毛勒工程材料有限公司 Pouring method for filler in anchorage zone of expansion joint

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200280748Y1 (en) * 2002-03-27 2002-07-13 윤미진 The fabricated expansion joint and installation method without concrete-breaking
CN102787556A (en) * 2012-08-31 2012-11-21 中铁二院工程集团有限责任公司 Changeable retractor device for railroad bridge
CN202865737U (en) * 2012-08-31 2013-04-10 中铁二院工程集团有限责任公司 Replaceable retractor device for roadway bridge
CN204509987U (en) * 2015-01-20 2015-07-29 中铁武汉勘察设计研究院有限公司 The special stretching device of bridge widening
CN204589800U (en) * 2015-04-22 2015-08-26 浙江嘉桥交通建设有限公司 A kind of dual fail-safe bridge expansion joint structure
CN204608598U (en) * 2015-05-08 2015-09-02 山西省交通科学研究院 A kind of seamless bridge joint structure
CN206396629U (en) * 2016-12-26 2017-08-11 河北省交通规划设计院 A kind of Fast Installation fishback retractor device
CN107974935A (en) * 2017-12-11 2018-05-01 中国水利水电第十工程局有限公司 A kind of SF combs flute profile telescopic device and its construction method of installation
CN109024260A (en) * 2018-09-10 2018-12-18 郑州航空工业管理学院 Buffer-type bridge extension joint
CN210134336U (en) * 2019-04-30 2020-03-10 南京博瑞吉工程技术有限公司 Novel bridge expansion device capable of being quickly repaired

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200280748Y1 (en) * 2002-03-27 2002-07-13 윤미진 The fabricated expansion joint and installation method without concrete-breaking
CN102787556A (en) * 2012-08-31 2012-11-21 中铁二院工程集团有限责任公司 Changeable retractor device for railroad bridge
CN202865737U (en) * 2012-08-31 2013-04-10 中铁二院工程集团有限责任公司 Replaceable retractor device for roadway bridge
CN204509987U (en) * 2015-01-20 2015-07-29 中铁武汉勘察设计研究院有限公司 The special stretching device of bridge widening
CN204589800U (en) * 2015-04-22 2015-08-26 浙江嘉桥交通建设有限公司 A kind of dual fail-safe bridge expansion joint structure
CN204608598U (en) * 2015-05-08 2015-09-02 山西省交通科学研究院 A kind of seamless bridge joint structure
CN206396629U (en) * 2016-12-26 2017-08-11 河北省交通规划设计院 A kind of Fast Installation fishback retractor device
CN107974935A (en) * 2017-12-11 2018-05-01 中国水利水电第十工程局有限公司 A kind of SF combs flute profile telescopic device and its construction method of installation
CN109024260A (en) * 2018-09-10 2018-12-18 郑州航空工业管理学院 Buffer-type bridge extension joint
CN210134336U (en) * 2019-04-30 2020-03-10 南京博瑞吉工程技术有限公司 Novel bridge expansion device capable of being quickly repaired

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021088394A1 (en) * 2019-11-04 2021-05-14 南京毛勒工程材料有限公司 Pouring method for filler in anchorage zone of expansion joint

Similar Documents

Publication Publication Date Title
CN109137762B (en) Method for reinforcing wave-shaped arch plate double-curved arch bridge
JP5266291B2 (en) Construction method of bridge deck and joint structure of precast deck
CN108286210B (en) A kind of rapid constructing method of embedded railway points system
CN108642988B (en) Comprehensive treatment and repair structure for embankment base layer diseases and construction method
CN110219667B (en) Tunnel inverted arch and inverted arch filling layer substituted steel-concrete combined structure and construction process
CN107083730A (en) A kind of prefabricated PC construction refuse regenerated aggregate road and its construction method
KR100788275B1 (en) Bridge deck with stay-in-place precast concrete panel
CN103741597B (en) A kind of without transition section concrete bridge expansion joint installation and mounting method thereof
CN206887664U (en) Widened structure is spliced based on assembled template new and old roadbed light soil
CN112144342A (en) Damaged pavement repairing plate structure and repairing method
CN210134336U (en) Novel bridge expansion device capable of being quickly repaired
CN110029574A (en) The novel bridge telescopic device and its installation method that can quickly repair
CN203559345U (en) Non-concrete bridge expansion joint device
CN203768800U (en) Non-transition-section concrete bridge expansion joint device
CN112176813B (en) Asphalt concrete pavement maintenance structure and method thereof
CN202194081U (en) Hinge joint disease treatment structure of hollow slab bridge
CN112281663B (en) Construction method for widening connection of upper structures of new and old bridges
CN109797666A (en) A kind of full assembled quick-changing technology method of bridge expanssion joint under guarantor's gating condition
CN103510468A (en) Non-concrete type bridge expansion joint device
CN212270661U (en) Easy-to-replace rotary shaft type bridge expansion joint device
CN110306398B (en) Sectional beam-setting pretensioning staggered symmetrical tensioning prestressed tendon superposed assembly road and construction method thereof
CN113605930A (en) Assembly type tunnel bottom structure replacing inverted arch filling layer and construction method
JPH09273116A (en) Expansion joint bearing body for steel highway bridge, construction of expansion joint-mounting section of the bridge, and execution method of expansion joint in the bridge
CN219195529U (en) Assembled road surface basic unit connecting element
KR102181535B1 (en) Easily replaceable extension joint device and how to replace expansion joints

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination