CN110019505A CN201710834283.3A CN201710834283A CN110019505A CN 110019505 A CN110019505 A CN 110019505A CN 201710834283 A CN201710834283 A CN 201710834283A CN 110019505 A CN110019505 A CN 110019505A
Authority
CN
China
Prior art keywords
disaster tolerance
business
database
test
cluster
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710834283.3A
Other languages
Chinese (zh)
Inventor
史培培
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201710834283.3A priority Critical patent/CN110019505A/en
Publication of CN110019505A publication Critical patent/CN110019505A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/14Error detection or correction of the data by redundancy in operation
    • G06F11/1402Saving, restoring, recovering or retrying
    • G06F11/1446Point-in-time backing up or restoration of persistent data
    • G06F11/1458Management of the backup or restore process
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/27Replication, distribution or synchronisation of data between databases or within a distributed database system; Distributed database system architectures therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Databases & Information Systems (AREA)
  • Quality & Reliability (AREA)
  • Computing Systems (AREA)
  • Data Mining & Analysis (AREA)
  • Debugging And Monitoring (AREA)

Abstract

The invention discloses a kind of data center's DR test method, apparatus, equipment and storage mediums, are related to disaster tolerance field, which comprises configure to business and database, and the business and the database are received pipe to disaster tolerance cluster;The disaster tolerance of the business and/or the database to the disaster tolerance cluster switches process and carries out layout;When needing to carry out DR test to the business and/or the database, process is switched according to the business of layout and/or the disaster tolerance of the database, carries out DR test.Realization of the embodiment of the present invention carries out DR test before data center's disaster is not arrived, improves O&M and the efficiency of management, improves the reliability and security of whole system.

Description

A kind of data center's DR test method, apparatus, equipment and storage medium
Technical field
The present invention relates to disaster tolerance field, in particular to a kind of data center's DR test method, apparatus, equipment and storage are situated between Matter.
Background technique
In bank securities finance unit, government unit, branch, large-scale enterprises and institutions, garden and colleges and universities etc., a side Face information technology (Informat ion Technology, IT) system type is more, strongly professional, updates fast, many units Staff's task is heavy, take into account a variety of work, and no energy is also safeguarded without professional skill, and specially employs IT engineer's cost It is excessively high, how to be compatible with reuse be also very big problem;On the other hand, IT system is pretty troublesome, out of joint to need remote maintenance, but ties up Shield cannot leak Company Confidential, full safety that can monitor.
At the past 10 years, these industries had occurred deep variation under the driving of market and technology, mobile Internet, big The fast development of data technique and utilization, have pushed Continuous Innovation, traditional industries are gradually to flexible, elastic, Fast Persistence Business deliver transformation.
Data safety and business continuance are vital factors during information construction, in order to ensure data safety, It prevents data center's disaster from causing huge loss to enterprise or tissue, and plays the service ability of data center to greatest extent, Lness ratio of plant is reduced, a kind of convenient and reliable Disaster Tolerant Scheme is needed, faces data center's disaster, can guarantee that business is not interrupted, And DR test is also critically important a part among these.
Summary of the invention
A kind of data center's DR test method, apparatus, equipment and storage medium provided in an embodiment of the present invention solve to hold The problem of implementation of calamity rehearsal.
A kind of data center's DR test method provided according to embodiments of the present invention, comprising:
Business and database are configured, and the business and the database are received into pipe to disaster tolerance cluster;
The disaster tolerance of the business and/or the database to the disaster tolerance cluster switches process and carries out layout;
When needing to carry out DR test to the business and/or the database, according to layout the business and/ Or the disaster tolerance of the database switches process, carries out DR test.
Preferably, described that business and database are configured, and the business and the database are received into pipe to disaster tolerance Cluster includes:
According to the master/slave data library configuration information of input, the database is configured;
Using the service application configuration information of input, the business is configured;
Determine the disaster tolerance cluster of the configured business and database ownership.
Preferably, described that process progress is switched to the business of the disaster tolerance cluster and/or the disaster tolerance of the database Layout includes:
The disaster tolerance of the business and/or the database of establishing the disaster tolerance cluster switches template;
It is switched in template in the disaster tolerance, the disaster tolerance of business and/or the database to the disaster tolerance cluster switches stream Cheng Jinhang layout;
The disaster tolerance that the disaster tolerance cluster and disaster tolerance described in layout switch process is switched template to bind.
Preferably, described that process progress is switched to the business of the disaster tolerance cluster and/or the disaster tolerance of the database Layout, further includes:
It is switched in process in the disaster tolerance of the business and/or the database, insertion has perform script and respective host Third party's process of list.
Preferably, it is described to the business of the disaster tolerance cluster and/or the disaster tolerance of the database switch process into After row layout, further includes:
The state of the business and/or the database is inquired, and is shown in the topology of the disaster tolerance cluster The state of the business and/or the database that are inquired.
Preferably, described when needing to carry out DR test to the business and/or the database, according to layout The disaster tolerance of the business and/or the database switches process, carries out DR test and includes:
When carrying out DR test to the business and/or the database, find and the business and/or the data The corresponding disaster tolerance of the disaster tolerance cluster of library ownership switches template;
Process is switched according to the disaster tolerance that the disaster tolerance switches template instruction, carries out DR test.
Preferably, process is switched according to the business of layout and/or the disaster tolerance of the database described, is held During calamity is drilled, further includes:
During carrying out DR test, monitors the disaster tolerance and switch each step successively executed in process, and determine institute The progress and log information that disaster tolerance is switched are stated, to show the progress and log information that the disaster tolerance is switched.
A kind of data center's DR test device provided according to embodiments of the present invention, comprising:
It receives tube module, receives pipe to holding for configuring to business and database, and by the business and the database Calamity cluster;
Orchestration module, the disaster tolerance for the business and/or the database to the disaster tolerance cluster switch process into Row layout;
Module is drilled, is used for when needing to carry out DR test to the business and/or the database, according to layout The business and/or the disaster tolerance of the database switch process, carry out DR test.
A kind of data center's DR test equipment provided according to embodiments of the present invention, comprising: processor, and with it is described The memory of processor coupling;The data center's DR test journey that can be run on the processor is stored on the memory Sequence, the step of data center's DR test program data center's DR test method above-mentioned when being executed by the processor Suddenly.
A kind of storage medium provided according to embodiments of the present invention is stored thereon with data center's DR test program, institute State the step of above-mentioned data center's DR test method is realized when data center's DR test program is executed by processor.
Technical solution provided in an embodiment of the present invention has the following beneficial effects:
1. the embodiment of the present invention realizes automation to the process of switching manually carried out originally, compared to complicated before and Relatively high to implementation personnel requirement switches implementation, can more easily be operated, and reduce the difficulty of O&M;
2. the DR test process of the embodiment of the present invention can carry out visualization layout, and give the layout process of default, The layout of DR test process can be flexibly carried out to actual business scenario.
Detailed description of the invention
Fig. 1 is data center's DR test method flow diagram provided in an embodiment of the present invention;
Fig. 2 is data center's DR test device block diagram provided in an embodiment of the present invention;
Fig. 3 is DR test overall flow schematic diagram provided in an embodiment of the present invention;
Fig. 4 is that disaster tolerance business provided in an embodiment of the present invention switches flow diagram;
Fig. 5 is that disaster recovery database provided in an embodiment of the present invention switches flow diagram;
Fig. 6 is that disaster tolerance provided in an embodiment of the present invention integrally switches flow diagram;
Fig. 7 be it is provided in an embodiment of the present invention can layout DR test scheme schematic diagram.
Specific embodiment
Below in conjunction with attached drawing to a preferred embodiment of the present invention will be described in detail, it should be understood that described below is excellent Select embodiment only for the purpose of illustrating and explaining the present invention and is not intended to limit the present invention.
Fig. 1 is data center's DR test method flow diagram provided in an embodiment of the present invention, as shown in Figure 1, step includes:
Step 100: business and database being configured, and the business and the database are received into pipe to disaster tolerance collection Group.
Step 100 includes:
According to the master/slave data library configuration information of input, the database is configured, especially to master/slave data library It is configured;
Using the service application configuration information of input, the business is configured;
Determine the configured business and database ownership disaster tolerance cluster (i.e. the business of disaster tolerance cluster management and Database).
Step 200: the disaster tolerance of the business and/or the database to the disaster tolerance cluster is switched process and is compiled Row.
Step 200 includes:
The disaster tolerance of the business and/or the database of establishing the disaster tolerance cluster switches template;
It is switched in template in the disaster tolerance, the disaster tolerance of business and/or the database to the disaster tolerance cluster switches stream Cheng Jinhang layout;
The disaster tolerance that the disaster tolerance cluster and disaster tolerance described in layout switch process is switched template to bind.
Step 200 further include:
It is switched in process in the disaster tolerance of the business and/or the database, insertion has perform script and respective host Third party's process of list.
Step 300: when needing to carry out DR test to the business and/or the database, according to the institute of layout The disaster tolerance for stating business and/or the database switches process, carries out DR test.
Step 300 includes:
When carrying out DR test to the business and/or the database, find and the business and/or the data The corresponding disaster tolerance of the disaster tolerance cluster of library ownership switches template;
Process is switched according to the disaster tolerance that the disaster tolerance switches template instruction, carries out DR test.
For example, finding disaster tolerance corresponding with the disaster tolerance cluster of the business ownership when carrying out DR test to the business Template is switched, and switches process according to the disaster tolerance that the disaster tolerance switches template instruction, DR test is carried out, to default process For, the basic environment inspection of progress network, equipment, database etc. first will be to be visited then by change domain name mapping Business is switched to another region from a region of cluster.
During executing step 300, monitors the disaster tolerance and switch each step successively executed in process, and described in determination The progress and log information that disaster tolerance is switched, to show the progress and log information that the disaster tolerance is switched.
Further, after step 200, the state of the business and/or the database can also be inquired (timing inquiry, random challenge, periodic queries etc.), preservation inquire the state of the business and/or the database, and The state of the business and/or the database that are inquired is shown in the topology of the disaster tolerance cluster.
It will appreciated by the skilled person that implement the method for the above embodiments be can be with Relevant hardware is instructed to complete by program, the program can store in computer-readable storage medium.Into One step says that the present invention can also provide a kind of storage medium, is stored thereon with data center's DR test program, in the data The step of heart DR test program data center's DR test method above-mentioned when being executed by processor.Wherein, the storage Medium may include ROM/RAM, magnetic disk, CD, USB flash disk.
Fig. 2 is data center's DR test device block diagram provided in an embodiment of the present invention, as shown in Figure 2, comprising:
It receives tube module, receives pipe to holding for configuring to business and database, and by the business and the database Calamity cluster, specifically, receiving tube module realizes Fig. 1 embodiment step 100;
Orchestration module, the disaster tolerance for the business and/or the database to the disaster tolerance cluster switch process into Row layout, specifically, orchestration module realizes Fig. 1 embodiment step 200;
Module is drilled, is used for when needing to carry out DR test to the business and/or the database, according to layout The business and/or the disaster tolerance of the database switch process, DR test is carried out, specifically, rehearsal module realizes Fig. 1 Embodiment step 300.
Further, the orchestration module is also used to switch in process in the disaster tolerance of the business and/or the database, It is inserted into third party's process with perform script and respective host list.
Described device further include:
Enquiry module, for switching process in the disaster tolerance of the business and/or the database to the disaster tolerance cluster Carry out layout after, the state of the business and/or the database is inquired, and save inquire the business and/ Or the state of the database.
Visualization model, for showing the business that is inquired and/or described in the topology of the disaster tolerance cluster The state of database, the progress and log information for being also used to switch the disaster tolerance are shown.
The present embodiment provides a kind of data center's DR test equipment, comprising: processor, and coupled with the processor Memory;The data center's DR test program that can be run on the processor, the number are stored on the memory The step of realizing above-mentioned data center's DR test method when being executed according to center disaster recovery rehearsal program by the processor.
Fig. 3 is DR test overall flow schematic diagram provided in an embodiment of the present invention, as shown in figure 3, the embodiment of the present invention Can the DR test scheme of layout include:
Step 101: cluster configuration receives pipe.
Step 102: disaster tolerance switches process layout;
Step 103: disaster tolerance cluster topology exhibits;
Step 104: DR test.
In the step 101, cluster configuration receives pipe, i.e., the business and database in configuration cluster, by business and database Pipe is received into cluster, which specifically includes that
Step 201: the configuration of master/slave data library;
Step 202: disaster tolerance application configuration;
Step 203: disaster tolerance cluster configuration.
Wherein, in step 202, disaster tolerance application configuration, the step main flow is as follows:
Step 301: the region of configuration disaster tolerance application;
Step 302: configuration disaster tolerance applies corresponding virtual machine, physical machine and master/slave data library;
Step 303: the monitoring model of configuration disaster tolerance application.
Wherein, in step 203, disaster tolerance cluster is configured, and the step main flow is as follows:
401: configuring main region and the preparation area domain of disaster tolerance cluster;
402: configuring each application of disaster tolerance cluster;
403: configuring the corresponding GSLB configuration of each service application.
Step 102 disaster tolerance is switched in process layout step, is switched process for disaster tolerance, is mainly divided three classes, be respectively as follows: Business switches process, database switches process, entirety switches process, and the step main flow is as follows:
Step 501: newly-increased/editor's disaster tolerance switches template;
Step 502: visualization layout process, the editor of dragging and attribute including component and the layout of process sequence;
Step 503: disaster tolerance cluster is bound with template is switched.
Wherein, the disaster tolerance in step 502 switch visualization layout in, component include: basic environment inspection, stop GSLB, Switch it is preceding check, database switch, switch after check, change domain name mapping, open GSLB, third party's component.
In the 103 disaster tolerance topology exhibits step, it can show the topology in each region, be divided into three parts in each region, The respectively area GSLB, the area APP and the area DB can show real-time state in every part, when for malfunction, can show failure The reason of, topological diagram can really reflect the state of current cluster, and positioning is facilitated to go wrong.
It, can be to cluster when the state of cluster meets the condition of DR test in the step 104 DR test step DR test is switched and is divided into three classes, be respectively as follows: that business is switched, database is switched and it is whole switch, the default stream of each classification Journey is as follows:
Fig. 4 is that disaster tolerance business provided in an embodiment of the present invention switches flow diagram, as shown in figure 4, business switches process Include:
Step 601: basic environment inspection;
Step 602: change domain name mapping;
Step 603: executing third party's step.
Fig. 5 is that disaster recovery database provided in an embodiment of the present invention switches flow diagram, as shown in figure 5, database is switched Process includes:
Step 701: basic environment inspection.
Step 702: stopping GSLB.
Step 703: switching preceding inspection.
Step 704: database is switched.
Step 705: being checked after switching.
Step 706: opening GSLB.
Fig. 6 is that disaster tolerance provided in an embodiment of the present invention integrally switches flow diagram, as shown in fig. 6, whole switch process Include:
Step 801: basic environment inspection
Step 802: stopping GSLB
Step 803: switching preceding inspection
Step 804: database is switched
Step 805: being checked after switching
Step 806: change domain name mapping
Step 807: opening GSLB.
For specific practical business scene, it can be inserted into third party's process, such as Fig. 4 step 603, third on stream It needs to provide perform script (including script packet and script configuration file) in Fang Liucheng and needs to be implemented the Host List of script.
During rehearsal, the implementation progress and state of each step in process can be monitored in real time, each step is in execution In the process all can real-time exhibition execute log, the process entirely drilled be automatically, if a certain step has failed, can execute Rollback operation can also be executed and be continued to execute or skip operations, until process terminates.
Fig. 7 be it is provided in an embodiment of the present invention can layout DR test scheme schematic diagram, as shown in fig. 7, being related to nine Module, database module, GSLB interactive module, database interactive module, master/slave data database management module, disaster tolerance application module, Disaster tolerance process orchestration module, disaster tolerance cluster topography module, display module (web services, user interface), DR test module.It can The DR test process of layout includes:
Step 901: user enters web page, the typing cluster relevant configuration on the page.
Step 902:web service receives the logging data at interface, backstage is transmitted to, specifically, being to be transmitted to active and standby number According to database management module;
Step 903: master/slave data library module receives the master/slave data library configuration information of web services transmitting, storage to number According to library;
Step 904: after the completion of the processing of master/slave data library module, turning to the configuration that disaster tolerance application module carries out disaster tolerance application;
Step 905: the configuration that disaster tolerance application module is applied, virtual machine, physical machine, active and standby number including configuration application According to library and monitoring model etc., storage arrives database;
Step 906: disaster tolerance application module configures into rear, steering disaster tolerance process orchestration module to application;
Step 907: disaster tolerance process orchestration module carries out layout to the process of switching of disaster tolerance cluster, and the every of process is switched in layout The step of one step, and the step storage database after process is parsed;
Step 908: after disaster tolerance process orchestration module layout, turning to disaster tolerance cluster topography module;
Step 909: disaster tolerance cluster topography module timing inquiry business and the state in master/slave data library are mainly handed over GSLB Mutual module and database interactive module interact, and obtain the state of the state and master/slave data library that service in GSLB, obtain Database is put in storage after getting state;
Step 910: disaster tolerance cluster topography module rear steering DR test module;
Step 911: DR test module can switch disaster tolerance and drill, when switching to business, with GSLB Interactive module interacts, and when switching to master/slave data library progress database, interacts, switches with database interactive module When process progress is put in storage database, and record the log of reversed process to file;
The result received is passed to user interface by step 912, step 913:web service.Knot of the User Page to acquisition Cluster topology and rehearsal progress are shown that specific display form can be shown with pie chart by fruit.
In conclusion the embodiment of the present invention has following technical effect that
Realization of the embodiment of the present invention carries out DR test before data center's disaster is not arrived, improves O&M and management effect Rate improves the reliability and security of whole system.
Although describing the invention in detail above, but the invention is not restricted to this, those skilled in the art of the present technique It can be carry out various modifications with principle according to the present invention.Therefore, all to be modified according to made by the principle of the invention, all it should be understood as Fall into protection scope of the present invention.

Claims (10)

1. a kind of data center's DR test method, comprising:
Business and database are configured, and the business and the database are received into pipe to disaster tolerance cluster;
The disaster tolerance of the business and/or the database to the disaster tolerance cluster switches process and carries out layout;
When needing to carry out DR test to the business and/or the database, the business and/or institute according to layout The disaster tolerance for stating database switches process, carries out DR test.
2. according to the method described in claim 1, described configure business and database, and by the business and the number Receiving pipe according to library to disaster tolerance cluster includes:
According to the master/slave data library configuration information of input, the database is configured;
Using the service application configuration information of input, the business is configured;
Determine the disaster tolerance cluster of the configured business and database ownership.
3. according to the method described in claim 2, described to the business of the disaster tolerance cluster and/or the appearance of the database Calamity switches process progress layout
The disaster tolerance of the business and/or the database of establishing the disaster tolerance cluster switches template;
Switched in template in the disaster tolerance, the disaster tolerance of business and/or the database to the disaster tolerance cluster switch process into Row layout;
The disaster tolerance that the disaster tolerance cluster and disaster tolerance described in layout switch process is switched template to bind.
4. according to the method described in claim 3, described to the business of the disaster tolerance cluster and/or the appearance of the database Calamity switches process and carries out layout, further includes:
It is switched in process in the disaster tolerance of the business and/or the database, insertion has perform script and respective host list Third party's process.
5. according to the method described in claim 4, in the business to the disaster tolerance cluster and/or the database Disaster tolerance is switched after process progress layout, further includes:
The state of the business and/or the database is inquired, and shows and is looked into the topology of the disaster tolerance cluster The state of the business and/or the database ask.
6. according to method described in claim 3-5 any one, it is described when need to the business and/or the database into When row DR test, process is switched according to the business of layout and/or the disaster tolerance of the database, carries out DR test packet It includes:
When carrying out DR test to the business and/or the database, finds and return with the business and/or the database The corresponding disaster tolerance of the disaster tolerance cluster belonged to switches template;
Process is switched according to the disaster tolerance that the disaster tolerance switches template instruction, carries out DR test.
7. according to the method described in claim 6, in the business according to layout and/or the disaster tolerance of the database Process is switched, during carrying out DR test, further includes:
During carrying out DR test, monitors the disaster tolerance and switch each step successively executed in process, and determine the appearance The progress and log information that calamity is switched, to show the progress and log information that the disaster tolerance is switched.
8. a kind of DR test device of data center, comprising:
It receives tube module, receives pipe to disaster tolerance collection for configuring to business and database, and by the business and the database Group;
Orchestration module, the disaster tolerance for the business and/or the database to the disaster tolerance cluster are switched process and are compiled Row;
Module is drilled, is used for when needing to carry out DR test to the business and/or the database, according to the institute of layout The disaster tolerance for stating business and/or the database switches process, carries out DR test.
9. a kind of DR test equipment of data center, comprising: processor, and the memory with processor coupling;Institute State the DR test program that the data center that can be run on the processor is stored on memory, the appearance of the data center Calamity rehearsal program realizes that the disaster tolerance of the data center as described in any one of claims 1 to 7 is drilled when being executed by the processor The step of practicing method.
10. a kind of storage medium is stored thereon with the DR test program of data center, the DR test journey of the data center The step of DR test method of the data center as described in any one of claims 1 to 7 is realized when sequence is executed by processor.
CN201710834283.3A 2017-09-15 2017-09-15 A kind of data center's DR test method, apparatus, equipment and storage medium Pending CN110019505A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710834283.3A CN110019505A (en) 2017-09-15 2017-09-15 A kind of data center's DR test method, apparatus, equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710834283.3A CN110019505A (en) 2017-09-15 2017-09-15 A kind of data center's DR test method, apparatus, equipment and storage medium

Publications (1)

Publication Number Publication Date
CN110019505A true CN110019505A (en) 2019-07-16

Family

ID=67186316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710834283.3A Pending CN110019505A (en) 2017-09-15 2017-09-15 A kind of data center's DR test method, apparatus, equipment and storage medium

Country Status (1)

Country Link
CN (1) CN110019505A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101426306A (en) * 2008-10-24 2009-05-06 中国移动通信集团山东有限公司 A disaster tolerance switching method, system and apparatus
WO2009127160A1 (en) * 2008-04-17 2009-10-22 华为技术有限公司 Disaster-tolerant testing method, apparatus and server
CN103984309A (en) * 2014-05-09 2014-08-13 浙江中烟工业有限责任公司 Cigarette production system with disaster tolerance function and disaster tolerance exercise method thereof
CN104660386A (en) * 2015-03-03 2015-05-27 浪潮电子信息产业股份有限公司 Method for improving DB2 disaster recovery high availability based on Itanium platform
CN106095614A (en) * 2016-05-27 2016-11-09 上海新炬网络信息技术有限公司 A kind of data base's DR test managing and control system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009127160A1 (en) * 2008-04-17 2009-10-22 华为技术有限公司 Disaster-tolerant testing method, apparatus and server
CN101426306A (en) * 2008-10-24 2009-05-06 中国移动通信集团山东有限公司 A disaster tolerance switching method, system and apparatus
CN103984309A (en) * 2014-05-09 2014-08-13 浙江中烟工业有限责任公司 Cigarette production system with disaster tolerance function and disaster tolerance exercise method thereof
CN104660386A (en) * 2015-03-03 2015-05-27 浪潮电子信息产业股份有限公司 Method for improving DB2 disaster recovery high availability based on Itanium platform
CN106095614A (en) * 2016-05-27 2016-11-09 上海新炬网络信息技术有限公司 A kind of data base's DR test managing and control system

Similar Documents

Publication Publication Date Title
CN108459939A (en) A kind of log collecting method, device, terminal device and storage medium
JP5102901B2 (en) Method and system for maintaining data integrity between multiple data servers across a data center
CN103699599B (en) A kind of message reliable treatments support method based on Storm real-time streams Computational frame
CN103812699A (en) Monitoring management system based on cloud computing
US20130067067A1 (en) Cross-Machine Event Log Correlation
CN107479514B (en) A kind of industry big data process control data acquisition and Transmission system and implementation method
EP1410281A2 (en) System and method of enterprise systems and business impact management
CN104461747A (en) Distributed type task scheduling system
CN102929769B (en) Virtual machine internal-data acquisition method based on agency service
CN103885854A (en) Data backup method, data backup device and data backup system
CN104731566A (en) Testing device, method and system for IDE (Integrated Development Environment)
CN105653401A (en) Method and device for scheduling disaster recovery, operation and maintenance, monitoring and emergency start-stop of application systems
CN104598341A (en) Approach and system for determining a location of failure between interconnects/controller
Gan et al. Runtime monitoring of web service conversations
CN110018935A (en) Store apparatus testing method, system, device and computer readable storage medium
CN109726066A (en) Method and apparatus for identifying the problems in storage system component
US20140250332A1 (en) Log file reduction according to problem-space network topology
CN106126427A (en) A kind of method and system of fast quick-recovery test
CN101763294A (en) Method for looking up and backing up system operation log according to time slots
CN105450754B (en) A kind of method of physical machine and the mutually shared cloud disk of virtual machine
CN110019505A (en) A kind of data center's DR test method, apparatus, equipment and storage medium
CN104123217A (en) Capture method and system of execution instruction of service server
CN108173711A (en) Enterprises system data exchange monitoring method
CN110413438A (en) The treating method and apparatus to report an error for backup
CN105630635B (en) Data disaster tolerance system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190716

WD01 Invention patent application deemed withdrawn after publication