CN110016931A - A kind of novel pre-stressed anchor bolt blower foundation and method - Google Patents

A kind of novel pre-stressed anchor bolt blower foundation and method Download PDF

Info

Publication number
CN110016931A
CN110016931A CN201910400852.2A CN201910400852A CN110016931A CN 110016931 A CN110016931 A CN 110016931A CN 201910400852 A CN201910400852 A CN 201910400852A CN 110016931 A CN110016931 A CN 110016931A
Authority
CN
China
Prior art keywords
anchor
component
bolt
blower foundation
suppor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910400852.2A
Other languages
Chinese (zh)
Inventor
刘莉媛
刘金全
李红有
王兆新
岳俊红
迟洪明
曹恩志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longyuan Beijing Wind Power Engineering Design and Consultation Co Ltd
Original Assignee
Longyuan Beijing Wind Power Engineering Design and Consultation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longyuan Beijing Wind Power Engineering Design and Consultation Co Ltd filed Critical Longyuan Beijing Wind Power Engineering Design and Consultation Co Ltd
Priority to CN201910400852.2A priority Critical patent/CN110016931A/en
Publication of CN110016931A publication Critical patent/CN110016931A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • E02D27/425Foundations for poles, masts or chimneys specially adapted for wind motors masts
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/20Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
    • F03D13/22Foundations specially adapted for wind motors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0046Production methods using prestressing techniques
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a kind of novel pre-stressed anchor bolt blower foundation and method, blower foundation includes anchor component, lower suppor component;Lower suppor component is connected by connector with the anchor component above it;The construction method of above-mentioned blower foundation, including Site Design, assembling lower suppor component, embedded embedded board, assembling anchor component, installation anchor component and lower suppor component, level and multiple steps such as pour.The present invention adds lower suppor component by the lower end in prestressed bolt, the difficulty of processing of longer anchor bolt raw material can not only be greatly reduced, and raw material dosage is saved as far as possible, to reduce construction cost, but also have the advantages that not having to pre- digging heavy platform and cable trench, work progress is easy easily to be realized, can reduce the costs such as prestressed bolt material, transport and blower foundation construction on the whole.

Description

A kind of novel pre-stressed anchor bolt blower foundation and method
Technical field
The present invention relates to a kind of blower foundation and method more particularly to a kind of novel pre-stressed anchor bolt blower foundation and sides Method.
Background technique
Blower fan tower barrel is all that the foundation ring used connects with connection type a very long time of blower foundation.For tradition The blower foundation of basic loop type, the part in foundation ring Transducers Embedded in Concrete is a rigid structure, and exposed portion and whole A tower body is a flexible body again, in foundation ring and concrete foundation contact portion, is formed a stress concentration portion position, such as Fruit blower foundation is excessive in the stress that this part material is defective or bears, it is easy to cause fatigue rupture at this position. The appearance of prestressed bolt in recent years then avoids blower foundation and the possibility of the above problem occurs.
Prestressed bolt is made of the vertical anchor bolt of upper anchor slab, lower anchor slab and centre, and anchor bolt is poured in progress concrete It is isolated with concrete when building by PVC pillar, when such anchor bolt under tension, entire anchor bolt is exactly an elastomer, not bullet Property part and rigid element interface, so as to avoid concrete foundation stress concentration and destroy.But this is also to the material of anchor bolt Matter and stress condition propose requirements at the higher level.
In practical application, due to the difference of blower single-machine capacity, length of blade, hub height etc., prestressed bolt embedment The projected depth on basis is often not consistent with the design height of blower foundation, or even has larger difference.Traditional method is direct Prestressed bolt is run through into blower foundation up and down, that is, the height of prestressed bolt is made into it is consistent with blower foundation, in this way Although keeping foundation structure relatively simple, the waste of the higher anchor bolt material of great amount of cost is also resulted in simultaneously, and is significantly increased The difficulty of processing and installation difficulty of material are added, because anchor bolt length is longer, difficulty of processing is bigger, and there are initial imperfections for material Probability is also bigger.It is provided with circular lower anchor slab further, since enclosing under prestressed bolt, and cable tube generally can not be from anchor bolt Between be pierced by, existing mounting means usually requires in prestressed bolt embedded part position to dig heavy platform in advance in advance and under blower foundation Embedded cable trench, to guarantee the smooth installation of prestressed bolt and cable pipe laying.
Summary of the invention
In order to solve shortcoming present in above-mentioned technology, the present invention provides a kind of novel pre-stressed anchor bolt blower bases Plinth and method.
In order to solve the above technical problems, the technical solution adopted by the present invention is that: a kind of novel pre-stressed anchor bolt blower base Plinth, including anchor component further include lower suppor component;Lower suppor component passes through connector and the anchor component phase above it Connection;Anchor component includes upper anchor slab, lower anchor slab, anchor bolt;Anchor bolt is more, and more anchor bolts are uniformly arranged on anchor slab and cast anchor Between plate;
Lower suppor component includes support column, top plate, embedded board;Top plate, embedded board are fixedly installed on support column respectively Upper end, lower end;
Connector includes connecting plate, lag bolt, stay bolt;Connecting plate is set to the bottom surface of lower anchor slab by lag bolt fastening On;One end of stay bolt is fixedly installed among the lower end of connecting plate, and the other end is screwed by adjusting nut and is set on top plate.
Further, lower suppor component is multiple, and multiple lower suppor components are uniformly distributed in the lower end of lower anchor slab.
Further, support column is steel pipe or I-steel.
Further, the centre of top plate offers the through-hole to match with stay bolt outer diameter, stay bolt pass through after through-hole with Adjusting nut is tightened.
Further, matching is provided with adjusting nut on lag bolt, and lag bolt passes through after sequentially passing through connecting plate, lower anchor slab Adjusting nut is tightened.
A kind of construction method of novel pre-stressed anchor bolt blower foundation, detailed process are as follows:
A, blower foundation height and anchor component height are designed according to field working conditions, and then determines lower suppor component Height;
B, then top plate is welded in the upper end of support column, is assembled into lower part by support column vertical welding on embedded board Supporting member;
C, it pours and buries embedded board in design requirement position after blower foundation bed course;Make cable pipe laying between embedded board It is passed through in gap and carries out cabling, without embedded cable trench;
D, it fits together upper anchor slab, lower anchor slab, anchor bolt to form anchor component, and completes the binding of blower foundation reinforcing bar;
E, it will tighten on the top plate of the stay bolt insertion lower suppor component in connector and by adjusting nut, then lead to It crosses lag bolt the lower anchor slab of anchor component is fixed on connecting plate, anchor component is made to be mounted on the top of lower suppor component;
F, part concreting first is carried out to blower foundation, makes to pour the level height that height is lower than top plate;Pass through tune Section nut levels the anchor component of upper end, to be achieved to require to continue casting concrete after levelness until completing;
G, after the concrete in blower foundation reaches design requirement intensity, fan bottom section tower is installed, and to anchor bolt group Part carries out tensioning subsequent construction.
The present invention adds lower suppor component by the lower end in prestressed bolt, and longer anchor bolt can not only be greatly reduced The difficulty of processing of raw material, and raw material dosage is saved as far as possible, to reduce construction cost, but also has and do not have to pre- digging heavy platform and electricity The advantages of cable groove, work progress is easy easily to be realized, can reduce prestressed bolt material, transport and blower base on the whole The costs such as plinth construction.
Detailed description of the invention
Fig. 1 is overall structure diagram of the invention.
Fig. 2 is the structural schematic diagram of anchor component.
Fig. 3 is the structural schematic diagram of connector and lower suppor component.
Fig. 4 is the schematic diagram of the section structure of Fig. 3.
Fig. 5 is the schematic diagram of the section structure for pouring rear fan basis.
In figure: 1, anchor component;2, lower suppor component;3, upper anchor slab;4, lower anchor slab;5, anchor bolt;6, connecting plate;7, short Bolt;8, stay bolt;9, adjusting nut;10, top plate;11, support column;12, embedded board.
Specific embodiment
The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
Fig. 1, a kind of novel pre-stressed anchor bolt blower foundation shown in Fig. 2, including anchor component 1, further include lower support Component 2;Lower suppor component 2 is connected by connector with the anchor component 1 above it;Lower suppor component 2 be it is multiple, it is more A lower suppor component is uniformly distributed in the lower end of lower anchor slab 4.Anchor component 1 includes upper anchor slab 3, lower anchor slab 4, anchor bolt 5;Anchor bolt 5 be more, and more anchor bolts are uniformly arranged between anchor slab 3 and lower anchor slab 4;
As shown in Figure 3, Figure 4, lower suppor component 2 includes support column 11, top plate 10, embedded board 12;Top plate 10, embedded board 12 are fixedly installed on the upper end of support column 11, lower end respectively;Support column 11 is steel pipe or I-steel.
Connector includes connecting plate 6, lag bolt 7, stay bolt 8;Connecting plate 6 is set to lower anchor slab 4 by the fastening of lag bolt 7 Bottom surface on;One end of stay bolt 8 is fixedly installed among the lower end of connecting plate 6, and the other end screws setting by adjusting nut 9 In on top plate 10.
The centre of top plate 10 offers the through-hole to match with 8 outer diameter of stay bolt, stay bolt 8 pass through after through-hole with adjust spiral shell Mother 9 is tightened.
Matching is provided with adjusting nut on lag bolt 7, and lag bolt 7 passes through adjusting after sequentially passing through connecting plate 6, lower anchor slab 4 Nut tightening is fixed.
Since blower foundation and the projected depth of prestressed bolt buried foundation are often different, the present invention passes through in prestressing force Lower suppor component is added in the lower end of anchor bolt, can make the sum of lower suppor component, height of prestressed bolt and blower foundation Height it is equal, thus under the requirement for height for meeting original prestressed bolt, saving anchor bolt raw material as far as possible, and reduce original The difficulty of processing of material.For example, the long anchor bolt length of traditional 3-4 rice to be reduced to 1-2 meters of design requirement.
A kind of construction method of novel pre-stressed anchor bolt blower foundation, detailed process are as follows:
A, blower foundation height is designed according to actual conditions such as live blower single-machine capacity, length of blade, hub heights And anchor component height, and then determine the height of lower suppor component;
B, then top plate 10 is welded in the upper end of support column 11, group on embedded board 12 by 11 vertical welding of support column Dress up lower suppor component;
C, it pours and buries embedded board 12 in design requirement position after blower foundation bed course;Make cable pipe laying between embedded board Gap in pass through and carry out cabling, without embedded cable trench;
D, it fits together upper anchor slab 3, lower anchor slab 4, anchor bolt 5 to form anchor component, and completes blower foundation reinforcing bar and tie up It pricks;
E, the stay bolt 8 in connector is inserted on the top plate 10 of lower suppor component and is tightened by adjusting nut, so The lower anchor slab 4 of anchor component is fixed on connecting plate 6 by lag bolt 7 afterwards, anchor component is made to be mounted on lower suppor component Top;
F, part concreting first is carried out to blower foundation, makes to pour the level height that height is lower than top plate 10;Pass through Adjusting nut levels the anchor component of upper end, to be achieved to require to continue casting concrete after levelness until completing;It pours The cross-section structure of blower foundation is as shown in Figure 5 after the completion of building;
G, after the concrete in blower foundation reaches design requirement intensity, fan bottom section tower is installed, and to anchor bolt group Part carries out tensioning subsequent construction.
It can be seen that the present invention in prestressed anchor bolt without pre- digging heavy platform by above-mentioned form of construction work, need to only mention The embedded board of preceding embedded compact, therefore construction efficiency can be greatly improved, save construction period;Further, since multiple There is very spacious gap, cable pipe laying is also not required to bury cable trench under blower foundation, directly between lower suppor component It connects and is embedded in concrete foundation from being pierced by between lower suppor component.Therefore, work progress of the present invention is easy easily realizes, whole The costs such as prestressed bolt material, transport and blower foundation construction are reduced on body.
Above embodiment is not limitation of the present invention, and the present invention is also not limited to the example above, this technology neck The variations, modifications, additions or substitutions that the technical staff in domain is made within the scope of technical solution of the present invention, also belong to this hair Bright protection scope.

Claims (6)

1. a kind of novel pre-stressed anchor bolt blower foundation, including anchor component (1), it is characterised in that: further include lower support structure Part (2);The lower suppor component (2) is connected by connector with the anchor component (1) above it;The anchor component It (1) include upper anchor slab (3), lower anchor slab (4), anchor bolt (5);The anchor bolt (5) is more, and more anchor bolts are uniformly arranged on anchor slab (3) between lower anchor slab (4);
The lower suppor component (2) includes support column (11), top plate (10), embedded board (12);The top plate (10), embedded board (12) it is fixedly installed on upper end, the lower end of support column (11) respectively;
The connector includes connecting plate (6), lag bolt (7), stay bolt (8);The connecting plate (6) is tight by lag bolt (7) On the fixed bottom surface for being placed in lower anchor slab (4);One end of the stay bolt (8) is fixedly installed among the lower end of connecting plate (6), separately One end is screwed by adjusting nut (9) and is set on top plate (10).
2. novel pre-stressed anchor bolt blower foundation according to claim 1, it is characterised in that: the lower suppor component (2) to be multiple, multiple lower suppor components are uniformly distributed in the lower end of lower anchor slab (4).
3. novel pre-stressed anchor bolt blower foundation according to claim 2, it is characterised in that: the support column (11) is steel Pipe or I-steel.
4. novel pre-stressed anchor bolt blower foundation according to claim 3, it is characterised in that: the centre of the top plate (10) The through-hole to match with stay bolt (8) outer diameter is offered, stay bolt (8) is tightened after passing through through-hole with adjusting nut (9).
5. novel pre-stressed anchor bolt blower foundation according to claim 4, it is characterised in that: the lag bolt (7) on With adjusting nut is provided with, lag bolt (7) sequentially passes through connecting plate (6), lower anchor slab (4) is tightened by adjusting nut afterwards.
6. a kind of construction method of novel pre-stressed anchor bolt blower foundation as claimed in claim 5, it is characterised in that: the side The detailed process of method are as follows:
A, blower foundation height and anchor component height are designed according to field working conditions, and then determines the height of lower suppor component Degree;
B, top plate (10) is then welded in the upper of support column (11) on embedded board (12) by support column (11) vertical welding End, is assembled into lower suppor component;
C, it pours and buries embedded board (12) in design requirement position after blower foundation bed course;Make cable pipe laying between embedded board It is passed through in gap and carries out cabling, without embedded cable trench;
D, upper anchor slab (3), lower anchor slab (4), anchor bolt (5) are fitted together and forms anchor component, and complete blower foundation reinforcing bar Binding;
E, it will be tightened on the top plate (10) of stay bolt (8) the insertion lower suppor component in connector and by adjusting nut, so The lower anchor slab (4) of anchor component is fixed on connecting plate (6) by lag bolt (7) afterwards, anchor component is made to be mounted on lower part branch Support the top of component;
F, part concreting first is carried out to blower foundation, makes to pour the level height that height is lower than top plate (10);Pass through tune Section nut levels the anchor component of upper end, to be achieved to require to continue casting concrete after levelness until completing;
G, after the concrete in blower foundation reaches design requirement intensity, install fan bottom section tower, and to anchor component into Row tensioning subsequent construction.
CN201910400852.2A 2019-05-15 2019-05-15 A kind of novel pre-stressed anchor bolt blower foundation and method Pending CN110016931A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910400852.2A CN110016931A (en) 2019-05-15 2019-05-15 A kind of novel pre-stressed anchor bolt blower foundation and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910400852.2A CN110016931A (en) 2019-05-15 2019-05-15 A kind of novel pre-stressed anchor bolt blower foundation and method

Publications (1)

Publication Number Publication Date
CN110016931A true CN110016931A (en) 2019-07-16

Family

ID=67193672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910400852.2A Pending CN110016931A (en) 2019-05-15 2019-05-15 A kind of novel pre-stressed anchor bolt blower foundation and method

Country Status (1)

Country Link
CN (1) CN110016931A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111155546A (en) * 2019-12-25 2020-05-15 湖北瑞宏新能源设备有限公司 Prestressed anchor bolt fan foundation reinforcing device
CN111155548A (en) * 2019-12-25 2020-05-15 湖北瑞宏新能源设备有限公司 Prestressed anchor bolt foundation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202658620U (en) * 2012-07-25 2013-01-09 中国二十二冶集团有限公司 Mounting leveling device for fan foundation ring
CN203846843U (en) * 2014-05-14 2014-09-24 闵怡红 Pre-stress anchor bolt cage of wind power generation tower
CN104532871A (en) * 2014-12-04 2015-04-22 瑞风能源(武汉)工程技术有限公司 Fan foundation and pre-stress component for same
CN210658418U (en) * 2019-05-15 2020-06-02 龙源(北京)风电工程设计咨询有限公司 Novel prestressed anchor bolt fan foundation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202658620U (en) * 2012-07-25 2013-01-09 中国二十二冶集团有限公司 Mounting leveling device for fan foundation ring
CN203846843U (en) * 2014-05-14 2014-09-24 闵怡红 Pre-stress anchor bolt cage of wind power generation tower
CN104532871A (en) * 2014-12-04 2015-04-22 瑞风能源(武汉)工程技术有限公司 Fan foundation and pre-stress component for same
CN210658418U (en) * 2019-05-15 2020-06-02 龙源(北京)风电工程设计咨询有限公司 Novel prestressed anchor bolt fan foundation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111155546A (en) * 2019-12-25 2020-05-15 湖北瑞宏新能源设备有限公司 Prestressed anchor bolt fan foundation reinforcing device
CN111155548A (en) * 2019-12-25 2020-05-15 湖北瑞宏新能源设备有限公司 Prestressed anchor bolt foundation

Similar Documents

Publication Publication Date Title
US5586417A (en) Tensionless pier foundation
CN100510280C (en) Method for the earthwork of a foundation sunk for a wind energy facility
CN106661855B (en) The installation method of the ground based system of the ground based system and tower of tower
US20120167499A1 (en) Foundation for a Wind Turbine Tower
CN101813069A (en) Foundation for enabling anchoring of a wind turbine tower thereto by means of replaceable through-bolts
CN113136890B (en) Tower foundation and construction method thereof
CN110016931A (en) A kind of novel pre-stressed anchor bolt blower foundation and method
KR101242395B1 (en) Construction method for rhamen bridge
CN110468727B (en) Temporary prestress tensioning pedestal and lifting point integrated structure of segmental beam and construction method
KR102197107B1 (en) Slab unit implanted with means for pressing pile and the method for carrying out the construction of the reinforced concrete column using it
CN112195957B (en) Reinforced connecting structure of fan tower and foundation and construction method
KR102197106B1 (en) Slab unit implanted with means for pressing pile and the method for carrying out the construction of the steel column using it
KR100655654B1 (en) Device for standing in line pc steel wire and pre-stressing method of psc box girder bridge using the same
TWM510942U (en) Precasted concrete foundation for upright shape steel post
CN210658418U (en) Novel prestressed anchor bolt fan foundation
CN209654738U (en) A kind of aerial protection structure for large span pipeline
SU763545A1 (en) Platform-type joint between columns and girders of frame buildings
CN219344154U (en) Cantilever component supporting and reinforcing device
CN219690490U (en) Reinforced precast concrete square pile
CN211974014U (en) Prefabricated component connected node structure
CN217399718U (en) Prefabricated corrugated steel arch culvert foundation
KR102197109B1 (en) Slab unit implanted with means for pressing pile and the method for carrying out the construction of the retaining wall using it
CN210827543U (en) Column foot structure of spoke type beam string structure roof
CN209053445U (en) Prefabricated bench mounting bracket system
KR200143184Y1 (en) Support for wall forms

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Country or region after: China

Address after: 100032 9th floor, 6 Fuchengmen North Street, Xicheng District, Beijing

Applicant after: Longyuan (Beijing) New Energy Engineering Design and Research Institute Co.,Ltd.

Address before: 100032 9th floor, 6 Fuchengmen North Street, Xicheng District, Beijing

Applicant before: LONGYUAN (BEIJING) WIND POWER ENGINEERING & CONSULTING CO.,LTD.

Country or region before: China

CB02 Change of applicant information