CN110016626A - A kind of production method improving low Grade Pipeline Steel surface quality - Google Patents
A kind of production method improving low Grade Pipeline Steel surface quality Download PDFInfo
- Publication number
- CN110016626A CN110016626A CN201910374229.4A CN201910374229A CN110016626A CN 110016626 A CN110016626 A CN 110016626A CN 201910374229 A CN201910374229 A CN 201910374229A CN 110016626 A CN110016626 A CN 110016626A
- Authority
- CN
- China
- Prior art keywords
- dephosphorization
- temperature
- furnace
- carry out
- heating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B45/00—Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
- B21B45/04—Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for de-scaling, e.g. by brushing
- B21B45/08—Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for de-scaling, e.g. by brushing hydraulically
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21C—PROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
- C21C7/00—Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
- C21C7/04—Removing impurities by adding a treating agent
- C21C7/064—Dephosphorising; Desulfurising
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21C—PROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
- C21C7/00—Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
- C21C7/10—Handling in a vacuum
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D8/00—Modifying the physical properties by deformation combined with, or followed by, heat treatment
- C21D8/02—Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips
- C21D8/0205—Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips of ferrous alloys
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D8/00—Modifying the physical properties by deformation combined with, or followed by, heat treatment
- C21D8/02—Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips
- C21D8/0221—Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips characterised by the working steps
- C21D8/0226—Hot rolling
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/001—Ferrous alloys, e.g. steel alloys containing N
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/002—Ferrous alloys, e.g. steel alloys containing In, Mg, or other elements not provided for in one single group C22C38/001 - C22C38/60
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/02—Ferrous alloys, e.g. steel alloys containing silicon
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/04—Ferrous alloys, e.g. steel alloys containing manganese
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/06—Ferrous alloys, e.g. steel alloys containing aluminium
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/18—Ferrous alloys, e.g. steel alloys containing chromium
- C22C38/40—Ferrous alloys, e.g. steel alloys containing chromium with nickel
- C22C38/44—Ferrous alloys, e.g. steel alloys containing chromium with nickel with molybdenum or tungsten
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/18—Ferrous alloys, e.g. steel alloys containing chromium
- C22C38/40—Ferrous alloys, e.g. steel alloys containing chromium with nickel
- C22C38/48—Ferrous alloys, e.g. steel alloys containing chromium with nickel with niobium or tantalum
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/18—Ferrous alloys, e.g. steel alloys containing chromium
- C22C38/40—Ferrous alloys, e.g. steel alloys containing chromium with nickel
- C22C38/50—Ferrous alloys, e.g. steel alloys containing chromium with nickel with titanium or zirconium
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/18—Ferrous alloys, e.g. steel alloys containing chromium
- C22C38/40—Ferrous alloys, e.g. steel alloys containing chromium with nickel
- C22C38/58—Ferrous alloys, e.g. steel alloys containing chromium with nickel with more than 1.5% by weight of manganese
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Crystallography & Structural Chemistry (AREA)
- Treatment Of Steel In Its Molten State (AREA)
- Heat Treatment Of Steel (AREA)
Abstract
The invention discloses a kind of production method for improving low Grade Pipeline Steel surface quality, chemical component and mass percent are as follows: C:0.040%~0.080%, Si:0.10%~0.30%, Mn:1.20%~1.60%, P≤0.015%, S≤0.0030%, Ni≤0.20%, Nb≤0.070%, Cr≤0.30%, Mo≤0.15%, Ti:0.005%~0.02%, N≤0.0050%, Ca:0.001%~0.003%, Al:0.010%~0.050%, surplus are Fe and inevitable impurity.Cc billet surface quality is improved by smelting process optimization, adjustment rolling and forming technology improves steel surface iron oxide scale integrity degree, obtains the Pipeline Steel Plate of surface quality highly corrosion resistant, improve product quality.
Description
Technical field
The present invention relates to iron and steel smelting technology fields, more particularly to a kind of life for improving low Grade Pipeline Steel surface quality
Production method.
Background technique
As demand of the world to the energy increases, petroleum pipeline conveying is increasingly pursued by countries in the world, external
The steel plate of the market demand mainly uses cruise to transport, the haul-cycle time generally at 1~2 month, ocean surface bad environments, steel plate often by
To rainwater even sea water intrusion, steel plate arrives at a station rear surface deterioration, and some possibility influence to use.Currently, pipe line steel uses
TMCP rolling mill practice, in order to enhance product performance, zerolling technology is used widely, and rolling reduction results in greatly steel plate
Surface deformation is big, and iron scale is often damaged different on the steel plate, and structural transformation is quick in cooling procedure, and internal stress is uneven,
Surface of steel plate Stress non-homogeneity is caused, the iron scale that surface of steel plate obtains after temperature correction is imperfect, the ground that iron scale falls off
Side is easy to produce corrosion source, so as to cause plate surface quality deterioration.
Summary of the invention
In order to solve the above technical problems, the present invention provides a kind of producer for improving low Grade Pipeline Steel surface quality
Method,
S1, its chemical component and mass percent are as follows: C:0.040%~0.080%, Si:0.10%~0.30%, Mn:1.20%~
1.60%, P≤0.015%, S≤0.0030%, Ni≤0.20%, Nb≤0.070%, Cr≤0.30%, Mo≤0.15%, Ti:0.005%
~0.02%, N≤0.0050%, Ca:0.001%~0.003%, Al:0.010%~0.050%, surplus be Fe and inevitably it is miscellaneous
Matter;
S2, desulfurization station carry out compound desulfurization using lime and magnesium powder, skim clean after desulfurization, enter S≤0.0020% in furnace molten iron,
S≤0.010% after converter;
S3, steel-making use BOF → LF furnace refining → RH refining → continuous casting process route, Tapping Temperature of Bof 1640~1680
DEG C, tapping carries out slag making using pro-molten refining slag+active lime;
S4, molten steel carry out heating slugging after reaching LF furnace, and ingredient meets requirement described in step S1;
S5, RH meet vacuum degree≤3mbar, and vacuum cycle 15min carries out Calcium treatment after vacuum processing, and Calcium treatment terminates
It is quiet afterwards to stir 15~20min;
S6, CCM casting are poured using full guard, and the middle packet degree of superheat meets 15~25 DEG C, are adjusted by pulling rate, and Dynamic Light pressure is shortened
Lower pressure range guarantees that dynamic soft-reduction is depressed at 8 sections to 10 sections, it is ensured that covering slag liquefaction effect guarantees covering slag not
Dross, conticaster do not carry out secondary chamfering using 34 ° of big chamfer crystallizers to slag, it is ensured that slab quality of edges;
Use stepped heating stove heating after the cold table inspection of S7, blank heap, 1100~1110 DEG C of heating temperature, heating time 10~
12min/cm, soaking time >=50min;
S8, slab go out heating furnace and send by the speed of 3m/s to milling train, dephosphorization at the beginning of carrying out in dephosphorization case, dephosphorization pressure >=22MPa, slightly
1050~1080 DEG C of start rolling temperature are rolled, roughing guarantees that 2~3 passage of dephosphorization, dephosphorization pressure >=22MPa roll work using the two-stage
Skill, 800~920 DEG C of finish rolling start rolling temperature, two passage dephosphorization before finish rolling, dephosphorization pressure >=22MPa, finish rolling end reduction in pass≤
6mm, enters 750~800 DEG C of coolant-temperature gage, 550~650 DEG C of red temperature by 800~860 DEG C of finishing temperature;
It is straight that S9, steel plate carry out temperature correction after cold bed is cooled to 300 DEG C or less, is put in storage after cutting, mark, flaw detection, table inspection.
Technical effect: the present invention breaches prior art constraint, and deterioration surface quality is effectively controlled by smelting process
Constituent content has obtained the few high-quality slab of surface purging reconditioning ratio, has reduced iron scale using low temperature austenitizing technique
Thickness, rolling cooling technique parameter adjustment change the phenomenon of scale on surface breakage easy to fall off, pass through this method steel plate table
Face quality is obviously improved.
The technical solution that the present invention further limits is:
A kind of preceding production method for improving low Grade Pipeline Steel surface quality, grade of steel are 5LB~X65 grades;Blank uses
(220~320) mm* (1600~2800) mm section blank, product specification (15~35) mm* (1600~4800) mm.
A kind of preceding production method for improving low Grade Pipeline Steel surface quality, grade of steel are 5LB grades, and blank uses
260mm*2070mm section blank, product specification 15mm*3830mm;
S1, its chemical component and mass percent are as follows: C:0.060%~0.080%, Si:0.20%~0.30%, Mn:1.20%~
1.40%, P≤0.015%, S≤0.0030%, Ni≤0.20%, Nb≤0.070%, Cr≤0.30%, Mo≤0.15%, Ti:0.005%
~0.02%, N≤0.0050%, Ca:0.001%~0.003%, Al:0.010%~0.050%, surplus be Fe and inevitably it is miscellaneous
Matter;
S2, desulfurization station carry out compound desulfurization using lime and magnesium powder, skim clean after desulfurization, enter S:0.0020% in furnace molten iron, turn
S:0.008% after furnace;
S3, steel-making use BOF → LF furnace refining → RH refining → continuous casting process route, 1668 DEG C of Tapping Temperature of Bof, tap
Slag making is carried out using pro-molten refining slag+active lime;
S4, molten steel carry out heating slugging after reaching LF furnace, and ingredient meets requirement described in step S1;
S5, RH meet vacuum degree 2mbar, vacuum cycle 15min, carry out Calcium treatment after vacuum processing, after Calcium treatment
It is quiet to stir 22min;
S6, CCM casting are poured using full guard, and 23 DEG C of the middle packet degree of superheat is adjusted by pulling rate, are shortened dynamic soft-reduction and are depressed area
Between, guarantee that dynamic soft-reduction is depressed at 9 sections, it is ensured that covering slag liquefaction effect guarantees covering slag not slag not dross, continuous casting
Machine uses 34 ° of big chamfer crystallizers, while carrying out secondary chamfering, it is ensured that slab quality of edges;
Use stepped heating stove heating after the cold table inspection of S7, blank heap, 1106 DEG C of heating temperature, heating time 11min/cm,
Hot time 55min;
S8, slab go out heating furnace and send by the speed of 3m/s to milling train, carry out just dephosphorization, dephosphorization pressure 23MPa, roughing in dephosphorization case
1058 DEG C of start rolling temperature, roughing guarantees 3 passage of dephosphorization, dephosphorization pressure 22MPa, using two-stage rolling mill practice, finish rolling open rolling temperature
918 DEG C of degree, two passage dephosphorization before finish rolling, dephosphorization pressure 22MPa, finish rolling end reduction in pass 5.6mm, enter by 858 DEG C of finishing temperature
798 DEG C of coolant-temperature gage, 650 DEG C of red temperature;
It is straight that S9, steel plate carry out temperature correction after cold bed is cooled to 300 DEG C or less, is put in storage after cutting, mark, flaw detection, table inspection.
A kind of preceding production method for improving low Grade Pipeline Steel surface quality, grade of steel are X60M grades, and blank uses
220mm*2070mm section blank, product specification 23.83mm*3890mm;
S1, its chemical component and mass percent are as follows: C:0.040%~0.060%, Si:0.10%~0.30%, Mn:1.30%~
1.50%, P≤0.015%, S≤0.0030%, Ni≤0.20%, Nb:0.040%~0.070%, Cr≤0.15%, Mo≤0.15%,
Ti:0.005%~0.02%, N≤0.0050%, Ca:0.001%~0.003%, Al:0.010%~0.050%, surplus is for Fe and not
Evitable impurity;
S2, desulfurization station carry out compound desulfurization using lime and magnesium powder, skim clean after desulfurization, enter S:0.0020% in furnace molten iron, turn
S:0.006% after furnace;
S3, steel-making use BOF → LF furnace refining → RH refining → continuous casting process route, 1653 DEG C of Tapping Temperature of Bof, tap
Slag making is carried out using pro-molten refining slag+active lime;
S4, molten steel carry out heating slugging after reaching LF furnace, and ingredient meets requirement described in step S1;
S5, RH meet vacuum degree 2mbar, vacuum cycle 15min, carry out Calcium treatment after vacuum processing, after Calcium treatment
It is quiet to stir 18min;
S6, CCM casting are poured using full guard, and 18 DEG C of the middle packet degree of superheat is adjusted by pulling rate, are shortened dynamic soft-reduction and are depressed area
Between, guarantee that dynamic soft-reduction is depressed at 9 sections, it is ensured that covering slag liquefaction effect guarantees covering slag not slag not dross, continuous casting
Machine uses 34 ° of big chamfer crystallizers, while carrying out secondary chamfering, it is ensured that slab quality of edges;
Use stepped heating stove heating after the cold table inspection of S7, blank heap, 1101 DEG C of heating temperature, heating time 12min/cm,
Hot time 53min;
S8, slab go out heating furnace and send by the speed of 3m/s to milling train, carry out just dephosphorization, dephosphorization pressure 23MPa, roughing in dephosphorization case
1068 DEG C of start rolling temperature, roughing guarantees 3 passage of dephosphorization, dephosphorization pressure 22MPa, using two-stage rolling mill practice, finish rolling open rolling temperature
830 DEG C of degree, two passage dephosphorization before finish rolling, dephosphorization pressure 22MPa, finish rolling end reduction in pass 5.3mm, enter by 820 DEG C of finishing temperature
765 DEG C of coolant-temperature gage, 601 DEG C of red temperature;
It is straight that S9, steel plate carry out temperature correction after cold bed is cooled to 300 DEG C or less, is put in storage after cutting, mark, flaw detection, table inspection.
A kind of preceding production method for improving low Grade Pipeline Steel surface quality, grade of steel are X65M grades, and blank uses
320mm*2570mm section blank, product specification 27.2mm*3110mm;
S1, its chemical component and mass percent are as follows: C:0.050%~0.070%, Si:0.15%~0.25%, Mn:1.40%~
1.60%, P≤0.015%, S≤0.0030%, Ni≤0.20%, Nb:0.030%~0.070%, Cr:0.15%~0.30%, Mo≤
0.15%, Ti:0.005%~0.02%, N≤0.0050%, Ca:0.001%~0.003%, Al:0.010%~0.050%, surplus are
Fe and inevitable impurity;
S2, desulfurization station carry out compound desulfurization using lime and magnesium powder, skim clean after desulfurization, enter S:0.0020% in furnace molten iron, turn
S:0.008% after furnace;
S3, steel-making use BOF → LF furnace refining → RH refining → continuous casting process route, 1669 DEG C of Tapping Temperature of Bof, tap
Slag making is carried out using pro-molten refining slag+active lime;
S4, molten steel carry out heating slugging after reaching LF furnace, and ingredient meets requirement described in step S1;
S5, RH meet vacuum degree 2mbar, vacuum cycle 15min, carry out Calcium treatment after vacuum processing, after Calcium treatment
It is quiet to stir 17min;
S6, CCM casting are poured using full guard, and 21 DEG C of the middle packet degree of superheat is adjusted by pulling rate, are shortened dynamic soft-reduction and are depressed area
Between, guarantee that dynamic soft-reduction is depressed at 9 sections, it is ensured that covering slag liquefaction effect guarantees covering slag not slag not dross, continuous casting
Machine uses 34 ° of big chamfer crystallizers, while carrying out secondary chamfering, it is ensured that slab quality of edges;
Use stepped heating stove heating after the cold table inspection of S7, blank heap, 1107 DEG C of heating temperature, heating time 12.3min/cm,
Soaking time 57min;
S8, slab go out heating furnace and send by the speed of 3m/s to milling train, carry out just dephosphorization, dephosphorization pressure 22MPa, roughing in dephosphorization case
1056 DEG C of start rolling temperature, roughing guarantees 2 passage of dephosphorization, dephosphorization pressure 22MPa, using two-stage rolling mill practice, finish rolling open rolling temperature
801 DEG C of degree, two passage dephosphorization before finish rolling, dephosphorization pressure 22MPa, finish rolling end reduction in pass 4.7mm, enter by 803 DEG C of finishing temperature
753 DEG C of coolant-temperature gage, 560 DEG C of red temperature;
It is straight that S9, steel plate carry out temperature correction after cold bed is cooled to 300 DEG C or less, is put in storage after cutting, mark, flaw detection, table inspection.
The beneficial effects of the present invention are:
(1) Rational Composition design Surface Quality is most important in the present invention, the higher Surface Quality of Si constituent content influence compared with
Greatly, Si element mass fraction is lighter, is easy to be enriched with to casting billet surface, and oxidation reaction can occur for Fe atom in 2 Mo Steel Slab during Heating Process,
It is enriched in the Si on surface and iron oxide reacts and easily forms 2FeOSiO2(fayalite), fayalite is in conjunction with steel matrix
Preferably, Si≤0.30% is required in the design of Pipeline Steel Plate ingredient;Effectively control N content, addition Ti carry out effective fixed nitrogen, prevent nitrogen
In conjunction with Nb element, fragmentation line is generated;The Nb element usage amount upper limit is controlled;The low temperature that Ni element can improve steel grade is tough
Property, but excessive addition will increase the viscosity of molten steel, will cause covering slag slag during continuous casting, to cause surface
Deterioration;S content is controlled, the influence of manganese sulfide inclusion Surface Quality is avoided;
(2) present invention in by tapping temperature, refining treatment, vacuum measure restriction, effectively increase Cleanliness of Molten Steel, drop
The harm of the elements such as low pernicious gas nitrogen, hydrogen, oxygen has achieved the purpose that improve plate surface quality;
(3) stabilization of surface quality is improved, the specification degree of superheat ensure that continuous casting by the improvement of continuous casting working procedure in the present invention
Covering slag stabilization of the thickness of molten slag layer and molten condition in casting process, using chamfer crystallizer and carries out at secondary chamfering
Reason, avoids the generation of wide and thick slab edge chink, has decreased or even eliminated slab reconditioning and purge, regular shape has good
The slab of good oscillation mark provides good basis to form the uniform steel surface iron oxide scale of constant thickness;
(4) for slab in Furnace Production Process, surface can generate rapidly iron scale in the present invention, by reducing heating temperature
Degree, effectively reduces and rolls plate iron scale thickness;It reduces by two and opens temperature, effectively reduce steel plate secondary oxidation during the rolling process
Degree effectively improves plate surface quality by being used cooperatively dephosphorization means;
(5) using high red temperature, to plate is rolled, cooling back plate shape is advantageous out in the present invention, while avoiding fierce phase transformation and causing
Steel plate stress release is not concentrated, and selective oxidation iron sheet is caused to fall off, and destroys scale on surface integrity degree, and steel billet temperature is down to
300 DEG C or less progress temperature corrections are straight, ensure that the flatness of steel plate, improve surface quality stability;
(6) by smelting and the cooperation of rolling process in the present invention, it ensure that the iron scale of production process was generated and removed
Uniformity reduces steel surface iron oxide scale thickness, steel surface iron oxide scale integrity degree is improved, to improve product table
Face quality meets the requirement of client.
Detailed description of the invention
Fig. 1 is 1 steel surface iron oxide scale thickness chart of embodiment;
Fig. 2 is that embodiment 1 produces plate surface quality figure.
Specific embodiment
Embodiment 1
A kind of production method improving low Grade Pipeline Steel surface quality provided in this embodiment, grade of steel are 5LB grades, and blank uses
260mm*2070mm section blank, product specification 15mm*3830mm.Specifically:
S1, its chemical component and mass percent are as follows: C:0.060%~0.080%, Si:0.20%~0.30%, Mn:1.20%~
1.40%, P≤0.015%, S≤0.0030%, Ni≤0.20%, Nb≤0.070%, Cr≤0.30%, Mo≤0.15%, Ti:0.005%
~0.02%, N≤0.0050%, Ca:0.001%~0.003%, Al:0.010%~0.050%, surplus be Fe and inevitably it is miscellaneous
Matter;
S2, desulfurization station carry out compound desulfurization using lime and magnesium powder, skim clean after desulfurization, enter S:0.0020% in furnace molten iron, turn
S:0.008% after furnace;
S3, steel-making use BOF → LF furnace refining → RH refining → continuous casting process route, 1668 DEG C of Tapping Temperature of Bof, tap
Slag making is carried out using pro-molten refining slag+active lime;
S4, molten steel carry out heating slugging after reaching LF furnace, and ingredient meets requirement described in step S1;
S5, RH meet vacuum degree 2mbar, vacuum cycle 15min, it is ensured that and degassing completely, reduces the content of steel water oxygen, nitrogen, hydrogen,
Carry out Calcium treatment after vacuum processing, it is quiet after Calcium treatment to stir 22min;
S6, CCM casting are poured using full guard, and 23 DEG C of the middle packet degree of superheat is adjusted by pulling rate, are shortened dynamic soft-reduction and are depressed area
Between, guarantee that dynamic soft-reduction is depressed at 9 sections, it is ensured that covering slag liquefaction effect guarantees covering slag not slag not dross, continuous casting
Machine uses 34 ° of big chamfer crystallizers, while carrying out secondary chamfering, it is ensured that slab quality of edges;
Use stepped heating stove heating after the cold table inspection of S7, blank heap, 1106 DEG C of heating temperature, heating time 11min/cm,
Hot time 55min;
S8, slab go out heating furnace and send by the speed of 3m/s to milling train, carry out just dephosphorization, dephosphorization pressure 23MPa, roughing in dephosphorization case
1058 DEG C of start rolling temperature, roughing guarantees 3 passage of dephosphorization, dephosphorization pressure 22MPa, using two-stage rolling mill practice, finish rolling open rolling temperature
918 DEG C of degree, two passage dephosphorization before finish rolling, dephosphorization pressure 22MPa, finish rolling end reduction in pass 5.6mm, enter by 858 DEG C of finishing temperature
798 DEG C of coolant-temperature gage, 650 DEG C of red temperature;
It is straight that S9, steel plate carry out temperature correction after cold bed is cooled to 300 DEG C or less, is put in storage after cutting, mark, flaw detection, table inspection.
Embodiment 2
A kind of production method improving low Grade Pipeline Steel surface quality provided in this embodiment, grade of steel are X60M grades, and blank is adopted
With 220mm*2070mm section blank, product specification 23.83mm*3890mm.Specifically:
S1, its chemical component and mass percent are as follows: C:0.040%~0.060%, Si:0.10%~0.30%, Mn:1.30%~
1.50%, P≤0.015%, S≤0.0030%, Ni≤0.20%, Nb:0.040%~0.070%, Cr≤0.15%, Mo≤0.15%,
Ti:0.005%~0.02%, N≤0.0050%, Ca:0.001%~0.003%, Al:0.010%~0.050%, surplus is for Fe and not
Evitable impurity;
S2, desulfurization station carry out compound desulfurization using lime and magnesium powder, skim clean after desulfurization, enter S:0.0020% in furnace molten iron, turn
S:0.006% after furnace;
S3, steel-making use BOF → LF furnace refining → RH refining → continuous casting process route, 1653 DEG C of Tapping Temperature of Bof, tap
Slag making is carried out using pro-molten refining slag+active lime;
S4, molten steel carry out heating slugging after reaching LF furnace, and ingredient meets requirement described in step S1;
S5, RH meet vacuum degree 2mbar, vacuum cycle 15min, it is ensured that and degassing completely, reduces the content of steel water oxygen, nitrogen, hydrogen,
Carry out Calcium treatment after vacuum processing, it is quiet after Calcium treatment to stir 18min;
S6, CCM casting are poured using full guard, and 18 DEG C of the middle packet degree of superheat is adjusted by pulling rate, are shortened dynamic soft-reduction and are depressed area
Between, guarantee that dynamic soft-reduction is depressed at 9 sections, it is ensured that covering slag liquefaction effect guarantees covering slag not slag not dross, continuous casting
Machine uses 34 ° of big chamfer crystallizers, while carrying out secondary chamfering, it is ensured that slab quality of edges;
Use stepped heating stove heating after the cold table inspection of S7, blank heap, 1101 DEG C of heating temperature, heating time 12min/cm,
Hot time 53min;
S8, slab go out heating furnace and send by the speed of 3m/s to milling train, carry out just dephosphorization, dephosphorization pressure 23MPa, roughing in dephosphorization case
1068 DEG C of start rolling temperature, roughing guarantees 3 passage of dephosphorization, dephosphorization pressure 22MPa, using two-stage rolling mill practice, finish rolling open rolling temperature
830 DEG C of degree, two passage dephosphorization before finish rolling, dephosphorization pressure 22MPa, finish rolling end reduction in pass 5.3mm, enter by 820 DEG C of finishing temperature
765 DEG C of coolant-temperature gage, 601 DEG C of red temperature;
It is straight that S9, steel plate carry out temperature correction after cold bed is cooled to 300 DEG C or less, is put in storage after cutting, mark, flaw detection, table inspection.
Embodiment 3
A kind of production method improving low Grade Pipeline Steel surface quality provided in this embodiment, grade of steel are X65M grades, and blank is adopted
With 320mm*2570mm section blank, product specification 27.2mm*3110mm.Specifically:
S1, its chemical component and mass percent are as follows: C:0.050%~0.070%, Si:0.15%~0.25%, Mn:1.40%~
1.60%, P≤0.015%, S≤0.0030%, Ni≤0.20%, Nb:0.030%~0.070%, Cr:0.15%~0.30%, Mo≤
0.15%, Ti:0.005%~0.02%, N≤0.0050%, Ca:0.001%~0.003%, Al:0.010%~0.050%, surplus are
Fe and inevitable impurity;
S2, desulfurization station carry out compound desulfurization using lime and magnesium powder, skim clean after desulfurization, enter S:0.0020% in furnace molten iron, turn
S:0.008% after furnace;
S3, steel-making use BOF → LF furnace refining → RH refining → continuous casting process route, 1669 DEG C of Tapping Temperature of Bof, tap
Slag making is carried out using pro-molten refining slag+active lime;
S4, molten steel carry out heating slugging after reaching LF furnace, and ingredient meets requirement described in step S1;
S5, RH meet vacuum degree 2mbar, vacuum cycle 15min, it is ensured that and degassing completely, reduces the content of steel water oxygen, nitrogen, hydrogen,
Carry out Calcium treatment after vacuum processing, it is quiet after Calcium treatment to stir 17min;
S6, CCM casting are poured using full guard, and 21 DEG C of the middle packet degree of superheat is adjusted by pulling rate, are shortened dynamic soft-reduction and are depressed area
Between, guarantee that dynamic soft-reduction is depressed at 9 sections, it is ensured that covering slag liquefaction effect guarantees covering slag not slag not dross, continuous casting
Machine uses 34 ° of big chamfer crystallizers, while carrying out secondary chamfering, it is ensured that slab quality of edges;
Use stepped heating stove heating after the cold table inspection of S7, blank heap, 1107 DEG C of heating temperature, heating time 12.3min/cm,
Soaking time 57min;
S8, slab go out heating furnace and send by the speed of 3m/s to milling train, carry out just dephosphorization, dephosphorization pressure 22MPa, roughing in dephosphorization case
1056 DEG C of start rolling temperature, roughing guarantees 2 passage of dephosphorization, dephosphorization pressure 22MPa, using two-stage rolling mill practice, finish rolling open rolling temperature
801 DEG C of degree, two passage dephosphorization before finish rolling, dephosphorization pressure 22MPa, finish rolling end reduction in pass 4.7mm, enter by 803 DEG C of finishing temperature
753 DEG C of coolant-temperature gage, 560 DEG C of red temperature;
It is straight that S9, steel plate carry out temperature correction after cold bed is cooled to 300 DEG C or less, is put in storage after cutting, mark, flaw detection, table inspection.
As shown in Figs. 1-2, the present invention promotes cc billet surface quality by smelting process optimization, adjusts rolling and forming technology
To improve steel surface iron oxide scale integrity degree, surface quality height, corrosion resistant Pipeline Steel Plate have been obtained.Annual low level pipeline
The unqualified incidence of steel surface is reduced to 0.11% by 0.32%, and surface quality is promoted obviously, and it is significant to drop this gain effect.
In addition to the implementation, the present invention can also have other embodiments.It is all to use equivalent substitution or equivalent transformation shape
At technical solution, fall within the scope of protection required by the present invention.
Claims (5)
1. a kind of production method for improving low Grade Pipeline Steel surface quality, it is characterised in that:
S1, its chemical component and mass percent are as follows: C:0.040%~0.080%, Si:0.10%~0.30%, Mn:1.20%~
1.60%, P≤0.015%, S≤0.0030%, Ni≤0.20%, Nb≤0.070%, Cr≤0.30%, Mo≤0.15%, Ti:0.005%
~0.02%, N≤0.0050%, Ca:0.001%~0.003%, Al:0.010%~0.050%, surplus be Fe and inevitably it is miscellaneous
Matter;
S2, desulfurization station carry out compound desulfurization using lime and magnesium powder, skim clean after desulfurization, enter S≤0.0020% in furnace molten iron,
S≤0.010% after converter;
S3, steel-making use BOF → LF furnace refining → RH refining → continuous casting process route, Tapping Temperature of Bof 1640~1680
DEG C, tapping carries out slag making using pro-molten refining slag+active lime;
S4, molten steel carry out heating slugging after reaching LF furnace, and ingredient meets requirement described in step S1;
S5, RH meet vacuum degree≤3mbar, and vacuum cycle 15min carries out Calcium treatment after vacuum processing, and Calcium treatment terminates
It is quiet afterwards to stir 15~20min;
S6, CCM casting are poured using full guard, and the middle packet degree of superheat meets 15~25 DEG C, are adjusted by pulling rate, and Dynamic Light pressure is shortened
Lower pressure range guarantees that dynamic soft-reduction is depressed at 8 sections to 10 sections, it is ensured that covering slag liquefaction effect guarantees covering slag not
Dross, conticaster do not carry out secondary chamfering using 34 ° of big chamfer crystallizers to slag, it is ensured that slab quality of edges;
Use stepped heating stove heating after the cold table inspection of S7, blank heap, 1100~1110 DEG C of heating temperature, heating time 10~
12min/cm, soaking time >=50min;
S8, slab go out heating furnace and send by the speed of 3m/s to milling train, dephosphorization at the beginning of carrying out in dephosphorization case, dephosphorization pressure >=22MPa, slightly
1050~1080 DEG C of start rolling temperature are rolled, roughing guarantees that 2~3 passage of dephosphorization, dephosphorization pressure >=22MPa roll work using the two-stage
Skill, 800~920 DEG C of finish rolling start rolling temperature, two passage dephosphorization before finish rolling, dephosphorization pressure >=22MPa, finish rolling end reduction in pass≤
6mm, enters 750~800 DEG C of coolant-temperature gage, 550~650 DEG C of red temperature by 800~860 DEG C of finishing temperature;
It is straight that S9, steel plate carry out temperature correction after cold bed is cooled to 300 DEG C or less, is put in storage after cutting, mark, flaw detection, table inspection.
2. a kind of production method for improving low Grade Pipeline Steel surface quality according to claim 1, it is characterised in that: steel
Grade is 5LB~X65 grades;Blank uses (220~320) mm* (1600~2800) mm section blank, product specification (15~35)
Mm* (1600~4800) mm.
3. a kind of production method for improving low Grade Pipeline Steel surface quality according to claim 2, it is characterised in that: steel
Grade is 5LB grades, and blank uses 260mm*2070mm section blank, product specification 15mm*3830mm;
S1, its chemical component and mass percent are as follows: C:0.060%~0.080%, Si:0.20%~0.30%, Mn:1.20%~
1.40%, P≤0.015%, S≤0.0030%, Ni≤0.20%, Nb≤0.070%, Cr≤0.30%, Mo≤0.15%, Ti:0.005%
~0.02%, N≤0.0050%, Ca:0.001%~0.003%, Al:0.010%~0.050%, surplus be Fe and inevitably it is miscellaneous
Matter;
S2, desulfurization station carry out compound desulfurization using lime and magnesium powder, skim clean after desulfurization, enter S:0.0020% in furnace molten iron, turn
S:0.008% after furnace;
S3, steel-making use BOF → LF furnace refining → RH refining → continuous casting process route, 1668 DEG C of Tapping Temperature of Bof, tap
Slag making is carried out using pro-molten refining slag+active lime;
S4, molten steel carry out heating slugging after reaching LF furnace, and ingredient meets requirement described in step S1;
S5, RH meet vacuum degree 2mbar, vacuum cycle 15min, carry out Calcium treatment after vacuum processing, after Calcium treatment
It is quiet to stir 22min;
S6, CCM casting are poured using full guard, and 23 DEG C of the middle packet degree of superheat is adjusted by pulling rate, are shortened dynamic soft-reduction and are depressed area
Between, guarantee that dynamic soft-reduction is depressed at 9 sections, it is ensured that covering slag liquefaction effect guarantees covering slag not slag not dross, continuous casting
Machine uses 34 ° of big chamfer crystallizers, while carrying out secondary chamfering, it is ensured that slab quality of edges;
Use stepped heating stove heating after the cold table inspection of S7, blank heap, 1106 DEG C of heating temperature, heating time 11min/cm,
Hot time 55min;
S8, slab go out heating furnace and send by the speed of 3m/s to milling train, carry out just dephosphorization, dephosphorization pressure 23MPa, roughing in dephosphorization case
1058 DEG C of start rolling temperature, roughing guarantees 3 passage of dephosphorization, dephosphorization pressure 22MPa, using two-stage rolling mill practice, finish rolling open rolling temperature
918 DEG C of degree, two passage dephosphorization before finish rolling, dephosphorization pressure 22MPa, finish rolling end reduction in pass 5.6mm, enter by 858 DEG C of finishing temperature
798 DEG C of coolant-temperature gage, 650 DEG C of red temperature;
It is straight that S9, steel plate carry out temperature correction after cold bed is cooled to 300 DEG C or less, is put in storage after cutting, mark, flaw detection, table inspection.
4. a kind of production method for improving low Grade Pipeline Steel surface quality according to claim 2, it is characterised in that: steel
Grade is X60M grades, and blank uses 220mm*2070mm section blank, product specification 23.83mm*3890mm;
S1, its chemical component and mass percent are as follows: C:0.040%~0.060%, Si:0.10%~0.30%, Mn:1.30%~
1.50%, P≤0.015%, S≤0.0030%, Ni≤0.20%, Nb:0.040%~0.070%, Cr≤0.15%, Mo≤0.15%,
Ti:0.005%~0.02%, N≤0.0050%, Ca:0.001%~0.003%, Al:0.010%~0.050%, surplus is for Fe and not
Evitable impurity;
S2, desulfurization station carry out compound desulfurization using lime and magnesium powder, skim clean after desulfurization, enter S:0.0020% in furnace molten iron, turn
S:0.006% after furnace;
S3, steel-making use BOF → LF furnace refining → RH refining → continuous casting process route, 1653 DEG C of Tapping Temperature of Bof, tap
Slag making is carried out using pro-molten refining slag+active lime;
S4, molten steel carry out heating slugging after reaching LF furnace, and ingredient meets requirement described in step S1;
S5, RH meet vacuum degree 2mbar, vacuum cycle 15min, carry out Calcium treatment after vacuum processing, after Calcium treatment
It is quiet to stir 18min;
S6, CCM casting are poured using full guard, and 18 DEG C of the middle packet degree of superheat is adjusted by pulling rate, are shortened dynamic soft-reduction and are depressed area
Between, guarantee that dynamic soft-reduction is depressed at 9 sections, it is ensured that covering slag liquefaction effect guarantees covering slag not slag not dross, continuous casting
Machine uses 34 ° of big chamfer crystallizers, while carrying out secondary chamfering, it is ensured that slab quality of edges;
Use stepped heating stove heating after the cold table inspection of S7, blank heap, 1101 DEG C of heating temperature, heating time 12min/cm,
Hot time 53min;
S8, slab go out heating furnace and send by the speed of 3m/s to milling train, carry out just dephosphorization, dephosphorization pressure 23MPa, roughing in dephosphorization case
1068 DEG C of start rolling temperature, roughing guarantees 3 passage of dephosphorization, dephosphorization pressure 22MPa, using two-stage rolling mill practice, finish rolling open rolling temperature
830 DEG C of degree, two passage dephosphorization before finish rolling, dephosphorization pressure 22MPa, finish rolling end reduction in pass 5.3mm, enter by 820 DEG C of finishing temperature
765 DEG C of coolant-temperature gage, 601 DEG C of red temperature;
It is straight that S9, steel plate carry out temperature correction after cold bed is cooled to 300 DEG C or less, is put in storage after cutting, mark, flaw detection, table inspection.
5. a kind of production method for improving low Grade Pipeline Steel surface quality according to claim 2, it is characterised in that: steel
Grade is X65M grades, and blank uses 320mm*2570mm section blank, product specification 27.2mm*3110mm;
S1, its chemical component and mass percent are as follows: C:0.050%~0.070%, Si:0.15%~0.25%, Mn:1.40%~
1.60%, P≤0.015%, S≤0.0030%, Ni≤0.20%, Nb:0.030%~0.070%, Cr:0.15%~0.30%, Mo≤
0.15%, Ti:0.005%~0.02%, N≤0.0050%, Ca:0.001%~0.003%, Al:0.010%~0.050%, surplus are
Fe and inevitable impurity;
S2, desulfurization station carry out compound desulfurization using lime and magnesium powder, skim clean after desulfurization, enter S:0.0020% in furnace molten iron, turn
S:0.008% after furnace;
S3, steel-making use BOF → LF furnace refining → RH refining → continuous casting process route, 1669 DEG C of Tapping Temperature of Bof, tap
Slag making is carried out using pro-molten refining slag+active lime;
S4, molten steel carry out heating slugging after reaching LF furnace, and ingredient meets requirement described in step S1;
S5, RH meet vacuum degree 2mbar, vacuum cycle 15min, carry out Calcium treatment after vacuum processing, after Calcium treatment
It is quiet to stir 17min;
S6, CCM casting are poured using full guard, and 21 DEG C of the middle packet degree of superheat is adjusted by pulling rate, are shortened dynamic soft-reduction and are depressed area
Between, guarantee that dynamic soft-reduction is depressed at 9 sections, it is ensured that covering slag liquefaction effect guarantees covering slag not slag not dross, continuous casting
Machine uses 34 ° of big chamfer crystallizers, while carrying out secondary chamfering, it is ensured that slab quality of edges;
Use stepped heating stove heating after the cold table inspection of S7, blank heap, 1107 DEG C of heating temperature, heating time 12.3min/cm,
Soaking time 57min;
S8, slab go out heating furnace and send by the speed of 3m/s to milling train, carry out just dephosphorization, dephosphorization pressure 22MPa, roughing in dephosphorization case
1056 DEG C of start rolling temperature, roughing guarantees 2 passage of dephosphorization, dephosphorization pressure 22MPa, using two-stage rolling mill practice, finish rolling open rolling temperature
801 DEG C of degree, two passage dephosphorization before finish rolling, dephosphorization pressure 22MPa, finish rolling end reduction in pass 4.7mm, enter by 803 DEG C of finishing temperature
753 DEG C of coolant-temperature gage, 560 DEG C of red temperature;
It is straight that S9, steel plate carry out temperature correction after cold bed is cooled to 300 DEG C or less, is put in storage after cutting, mark, flaw detection, table inspection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910374229.4A CN110016626B (en) | 2019-05-07 | 2019-05-07 | Production method for improving surface quality of low-steel-grade pipeline steel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910374229.4A CN110016626B (en) | 2019-05-07 | 2019-05-07 | Production method for improving surface quality of low-steel-grade pipeline steel |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110016626A true CN110016626A (en) | 2019-07-16 |
CN110016626B CN110016626B (en) | 2020-12-18 |
Family
ID=67193220
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910374229.4A Active CN110016626B (en) | 2019-05-07 | 2019-05-07 | Production method for improving surface quality of low-steel-grade pipeline steel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110016626B (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110616377A (en) * | 2019-11-06 | 2019-12-27 | 湖南华菱湘潭钢铁有限公司 | Production method of low-yield-ratio high-toughness Q460GJ |
CN110735079A (en) * | 2019-10-10 | 2020-01-31 | 南京钢铁股份有限公司 | Production method of multi-grade steel high-strength steel blank |
CN111235489A (en) * | 2020-02-17 | 2020-06-05 | 柳州钢铁股份有限公司 | Method for manufacturing X65MS acid-resistant pipeline steel |
CN111254352A (en) * | 2020-02-17 | 2020-06-09 | 柳州钢铁股份有限公司 | X65MS acid-resistant pipeline steel |
CN111304426A (en) * | 2020-03-31 | 2020-06-19 | 湖南华菱湘潭钢铁有限公司 | Production method of high-strength steel sheet |
CN111455277A (en) * | 2020-05-14 | 2020-07-28 | 南京钢铁股份有限公司 | Production method of extra-low-cost PS L1 thick outlet pipeline steel |
CN111519083A (en) * | 2020-05-14 | 2020-08-11 | 南京钢铁股份有限公司 | Production method of extremely-low-cost manganese-containing thick-specification outlet pipeline steel |
CN111530949A (en) * | 2020-04-29 | 2020-08-14 | 南京钢铁股份有限公司 | Control method for surface quality of steel for railway bogie |
CN111719084A (en) * | 2020-06-15 | 2020-09-29 | 南京钢铁股份有限公司 | Production method of titanium-containing thick outlet alloy steel with extremely low cost |
CN111793768A (en) * | 2020-05-15 | 2020-10-20 | 南京钢铁股份有限公司 | Production method of extremely-low-cost chromium-containing thick outlet pipeline steel |
CN111842546A (en) * | 2020-07-10 | 2020-10-30 | 首钢集团有限公司 | Equipment and method for improving TMCP wide and thick plate secondary plate shape |
CN113462981A (en) * | 2021-07-05 | 2021-10-01 | 攀钢集团攀枝花钢铁研究院有限公司 | Continuous annealing low alloy steel HC500LA and smelting method thereof |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104928595A (en) * | 2015-07-07 | 2015-09-23 | 南京钢铁股份有限公司 | Band steel with good cold forming performance and for automobile structure and production process thereof |
CN106513611A (en) * | 2016-10-17 | 2017-03-22 | 江阴兴澄特种钢铁有限公司 | Continuous casting process for producing 450mm extremely-thick plate blank on straight arc-shaped continuous casting machine |
-
2019
- 2019-05-07 CN CN201910374229.4A patent/CN110016626B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104928595A (en) * | 2015-07-07 | 2015-09-23 | 南京钢铁股份有限公司 | Band steel with good cold forming performance and for automobile structure and production process thereof |
CN106513611A (en) * | 2016-10-17 | 2017-03-22 | 江阴兴澄特种钢铁有限公司 | Continuous casting process for producing 450mm extremely-thick plate blank on straight arc-shaped continuous casting machine |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110735079A (en) * | 2019-10-10 | 2020-01-31 | 南京钢铁股份有限公司 | Production method of multi-grade steel high-strength steel blank |
CN110616377A (en) * | 2019-11-06 | 2019-12-27 | 湖南华菱湘潭钢铁有限公司 | Production method of low-yield-ratio high-toughness Q460GJ |
CN111235489A (en) * | 2020-02-17 | 2020-06-05 | 柳州钢铁股份有限公司 | Method for manufacturing X65MS acid-resistant pipeline steel |
CN111254352A (en) * | 2020-02-17 | 2020-06-09 | 柳州钢铁股份有限公司 | X65MS acid-resistant pipeline steel |
CN111304426A (en) * | 2020-03-31 | 2020-06-19 | 湖南华菱湘潭钢铁有限公司 | Production method of high-strength steel sheet |
CN111530949A (en) * | 2020-04-29 | 2020-08-14 | 南京钢铁股份有限公司 | Control method for surface quality of steel for railway bogie |
CN111455277A (en) * | 2020-05-14 | 2020-07-28 | 南京钢铁股份有限公司 | Production method of extra-low-cost PS L1 thick outlet pipeline steel |
CN111519083A (en) * | 2020-05-14 | 2020-08-11 | 南京钢铁股份有限公司 | Production method of extremely-low-cost manganese-containing thick-specification outlet pipeline steel |
CN111793768A (en) * | 2020-05-15 | 2020-10-20 | 南京钢铁股份有限公司 | Production method of extremely-low-cost chromium-containing thick outlet pipeline steel |
CN111719084A (en) * | 2020-06-15 | 2020-09-29 | 南京钢铁股份有限公司 | Production method of titanium-containing thick outlet alloy steel with extremely low cost |
CN111842546A (en) * | 2020-07-10 | 2020-10-30 | 首钢集团有限公司 | Equipment and method for improving TMCP wide and thick plate secondary plate shape |
CN113462981A (en) * | 2021-07-05 | 2021-10-01 | 攀钢集团攀枝花钢铁研究院有限公司 | Continuous annealing low alloy steel HC500LA and smelting method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN110016626B (en) | 2020-12-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110016626A (en) | A kind of production method improving low Grade Pipeline Steel surface quality | |
CN110066965A (en) | A kind of production method improving thin gauge pipeline steel surface quality | |
CN110157978A (en) | A kind of production method improving Hi-grade steel pipeline steel surface quality | |
CN102416404B (en) | Method for producing cold-rolled steel strips | |
JP5939797B2 (en) | Method for producing grain-oriented silicon steel by single cold rolling method | |
CN109852891B (en) | Corner crack control method for low-carbon boron-containing steel continuous casting slab | |
CN100411758C (en) | Method for producing semi-process cold-rolled silicon steel by sheet billet continuous casting and rolling process | |
CN102051530B (en) | 48MnV nitrogenous steel and nitrogen adding process thereof | |
CN110029287A (en) | A kind of production method improving Wide and Heavy Plates surface quality | |
CN103160734B (en) | A kind of pressurized vessel P460NL1 (L2) super-thick steel plate and production method thereof | |
CN109487165B (en) | Method for improving production efficiency of Q345B hot-rolled narrow strip steel | |
CN102002635A (en) | Steel for pressure container in thick specification and preparation method thereof | |
CN101993987B (en) | Method for producing extra-thick low-alloy high-strength steel plate by adopting continuous casting slab | |
CN102345050A (en) | Method for producing flaw detection and performance guaranteed Q235B steel plate with 80-100mm in argon station | |
CN103710620A (en) | Large-thickness steel plate for low-temperature pressure container and production process thereof | |
CN113846260A (en) | Production method of high-strength steel plate for engineering machinery | |
CN109881081A (en) | A kind of 700MPa grades of hot rolling container steel and its low cost production thereof | |
CN112962025A (en) | Production method of low-cost flaw-detection-guaranteed low-alloy structural steel medium plate | |
KR20240013141A (en) | High-toughness hot-rolled H-beam steel for construction and manufacturing method thereof | |
CN111378893A (en) | Hot-rolled steel plate for longitudinal welded pipe with yield strength of 290MPa | |
CN113604747B (en) | High-performance corrosion-resistant refractory steel with excellent-80 ℃ low-temperature toughness and production method thereof | |
CN111996443A (en) | Rare earth wear-resistant NM 360-shaped steel and production process thereof | |
CN107557534A (en) | The production method of extremely low phosphoretic steel | |
EP1342798B1 (en) | Process for producing high-nitrogen ultralow-carbon steel | |
CN110042309A (en) | A kind of production method improving wide surface of thin steel sheet quality |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |