CN110005128A - Company's Cable Structure and prestressed cable installation method for prestressing force beam string structure strut - Google Patents

Company's Cable Structure and prestressed cable installation method for prestressing force beam string structure strut Download PDF

Info

Publication number
CN110005128A
CN110005128A CN201910352596.4A CN201910352596A CN110005128A CN 110005128 A CN110005128 A CN 110005128A CN 201910352596 A CN201910352596 A CN 201910352596A CN 110005128 A CN110005128 A CN 110005128A
Authority
CN
China
Prior art keywords
cord clip
strut
card slot
prestressing force
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910352596.4A
Other languages
Chinese (zh)
Inventor
赵鹏飞
魏广忠
姜体标
朱银国
姚辉
刘英生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201910352596.4A priority Critical patent/CN110005128A/en
Publication of CN110005128A publication Critical patent/CN110005128A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C3/10Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal prestressed
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C3/11Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal with non-parallel upper and lower edges, e.g. roof trusses

Abstract

The present invention provides a kind of company's Cable Structures and prestressed cable installation method for prestressing force beam string structure strut, which includes: the cord clip for clamping prestressed cable;And the limiter for connecting strut, the surface of the limiter is equipped with the card slot of both ends perforation, the cord clip is removably mounted in the card slot and the both ends of the cord clip are corresponded in the both ends of the card slot, and the portion of revealing all the details of the card slot is formed with the activity space moved along its length for the cord clip.It is complicated for operation that the present invention solves the problems, such as that the connecting node of traditional drag-line and strut is installed.

Description

Company's Cable Structure and prestressed cable installation method for prestressing force beam string structure strut
Technical field
The present invention relates to technical field of building construction, and in particular to a kind of company's Cable Structure for prestressing force beam string structure strut And prestressed cable installation method.
Background technique
In modern building design, prestressing force beam string structure structure is widely used as a kind of common structure type In each Large-sized Communication hinge and stadiums, especially in wide span house cap and dome structure, the quality of steel construction The characteristics of light various shapes, breaches traditional reinforced concrete structure, this also allow modern architecture moulding can be bigger performance its Creativeness, the following complicated structure type also bring very big challenge to construction, wherein for large span The connecting node of the design of string beam, prestressed stretch-draw drag-line and strut is very crucial, if the tie point of drag-line and strut is inadequate It is firm, when the complete stress of steel construction is in service stage, very big security risk is had, on the other hand traditional connecting node Installation operation is excessively complicated in the construction process, increases security risk when construction worker's high altitude operation, reduces construction effect Rate, and operating its more complicated drag-line also can be bigger with strut position and installation error.
Summary of the invention
To overcome the defects of present in the prior art, now provide a kind of company's Cable Structure for prestressing force beam string structure strut and Prestressed cable installation method, to solve the problems, such as that it is complicated for operation that the connecting node of traditional drag-line and strut is installed.
To achieve the above object, a kind of company's Cable Structure for prestressing force beam string structure strut is provided, comprising:
For clamping the cord clip of prestressed cable;And
For connecting the limiter of strut, the surface of the limiter is equipped with the card slot of both ends perforation, and the cord clip is removable Unload be installed in the card slot and the both ends of the cord clip correspond in the both ends of the card slot, portion's shape of revealing all the details of the card slot At the activity space for thering is the confession cord clip to move along its length.
Further, the broadening section that the card slot has two necking segments and is connected between two necking segments, the rope Folder is removably installed in the broadening section, and the activity space is formed in the portion of revealing all the details of the broadening section, the cord clip Both ends are corresponded in the necking segment.
Further, the cord clip includes two fixture blocks with fore shaft, and two fixture blocks are detachably connected by locking member And the fore shaft is opposite upon connection surrounds the lockhole to be formed for prestressed cable clamping.
Further, the fixture block is hemispherical.
Further, the inner wall of the card slot has arcwall face compatible with the radian of the outer wall of the cord clip.
Further, the socket joint slot plugged for the strut is formed on the outer wall of the limiter.
Further, the quantity of the socket joint slot is two, two angled settings of socket joint slot.
The present invention provides a kind of prestressed cable installation method, comprising the following steps:
Limiter is provided, the surface of the limiter is equipped with the card slot of both ends perforation, the limiter is installed on pre- answer On the strut of power beam string;
Cord clip is provided, the cord clip is held on the junction that the prestressed cable is connect with the strut;
The cord clip for being held on the junction is placed in the card slot, so that the both ends one of the cord clip are a pair of The both ends of card slot described in Ying Yu;
The prestressed cable at the both ends of the holding position is placed in correspondingly in the both ends of the card slot;
After the cord clip is placed in the both ends that the card slot and the prestressed cable are placed in the card slot, to institute It states prestressed cable and applies prestressing force.
The beneficial effects of the present invention are company's Cable Structures for prestressing force beam string structure strut of the invention, according to strut With the position of the connecting node of prestressed cable, cord clip is pre-installed in the corresponding position of prestressed cable, finally by rope Folder is placed in the card slot in the limiter being mounted on strut, is limited using card slot to cord clip, so as to prestressing force After drag-line applies prestressing force, the cord clip being clamped on prestressed cable can adjust to suitability on the length direction along card slot Position avoids position of the secondary adjustment cord clip on prestressed cable to adapt to corresponding prestressing force.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of company's Cable Structure for prestressing force beam string structure strut of the embodiment of the present invention.
Fig. 2 is the main view of company's Cable Structure for prestressing force beam string structure strut in Fig. 1 embodiment.
Fig. 3 is the side view of company's Cable Structure for prestressing force beam string structure strut in Fig. 1 embodiment.
Fig. 4 is the bottom view of company's Cable Structure for prestressing force beam string structure strut in Fig. 1 embodiment.
Fig. 5 is the structural schematic diagram of the cord clip of the embodiment of the present invention.
Fig. 6 is the side view of the cord clip of the embodiment of the present invention.
Fig. 7 is the state of company's Cable Structure prestressed drag-line for prestressing force beam string structure strut of the embodiment of the present invention Schematic diagram.
Specific embodiment
Illustrate embodiments of the present invention below by way of specific specific example, those skilled in the art can be by this specification Other advantages and efficacy of the present invention can be easily understood for disclosed content.The present invention can also pass through in addition different specific realities The mode of applying is embodied or practiced, the various details in this specification can also based on different viewpoints and application, without departing from Various modifications or alterations are carried out under spirit of the invention.
Fig. 1 is that structural schematic diagram, Fig. 2 of company's Cable Structure for prestressing force beam string structure strut of the embodiment of the present invention are figure Main view, Fig. 3 of company's Cable Structure for prestressing force beam string structure strut in 1 embodiment are in Fig. 1 embodiment for answering in advance Side view, Fig. 4 of company's Cable Structure of power beam string strut are company's hitch for prestressing force beam string structure strut in Fig. 1 embodiment Bottom view, Fig. 5 of structure are the side view of the structural schematic diagram of the cord clip of the embodiment of the present invention, the cord clip that Fig. 6 is the embodiment of the present invention The state signal of figure, company's Cable Structure prestressed drag-line for prestressing force beam string structure strut that Fig. 7 is the embodiment of the present invention Figure.
Shown in referring to Figure 1 to Figure 7, the present invention provides a kind of company's Cable Structures for prestressing force beam string structure strut, comprising: Cord clip 1 and limiter 2.
Specifically, cord clip 1 is for clamping prestressed cable.Cord clip 1 has the lockhole 110 worn for prestressed cable 3. Limiter 2 is used to connect the strut of prestressing force beam string structure.The surface of limiter is equipped with the card slot of both ends perforation.Cord clip 1 is detachable It is installed in card slot, and the both ends of cord clip 1 are corresponded in the both ends of card slot.The portion of revealing all the details of card slot is formed with for cord clip along length The mobile activity space in direction.
Company's Cable Structure for prestressing force beam string structure strut of the invention, according to the connecting node of strut and prestressed cable Position, cord clip is pre-installed in the corresponding position of prestressed cable, finally cord clip is placed in and is mounted on strut In card slot in limiter, cord clip is limited using card slot, so that being clamped in after applying prestressing force to prestressed cable Cord clip on prestressed cable can adjust position to suitability on the length direction along card slot to adapt to corresponding prestressing force, Avoid position of the secondary adjustment cord clip on prestressed cable.
Card slot includes the broadening section for accommodating two necking segments 21 of prestressed cable 3 and being connected between two necking segments 21 22.Cord clip 1 is removably placed in broadening section 22.The activity space be formed in broadening section 22 portion of revealing all the details, the two of cord clip 1 End is corresponded in necking segment 21.
Specifically, cord clip 1 includes two fixture blocks 11 with fore shaft.Two pieces of fixture blocks 11 are involutory and are fixedly connected.Two pieces of folders Block 11 is detachably connected by locking member, and upon connection, and the fore shaft of two pieces of fixture blocks 11 is opposite to surround to be formed for prestressing force drawing The lockhole 110 that cord clip is held.
As a kind of preferable embodiment, in order to reduce the frictional resistance between cord clip and card slot inner wall to reduce pre- answer The loss of prestress of power drag-line, fixture block 11 are hemispherical.
In the present embodiment, fixture block is high strength alloy steel hemisphere, and fore shaft is arranged in the middle part at the position that fixture block is involutory.It is high The radius of strength alloys steel hemisphere and the size of fore shaft, can be arranged according to design requirement, and two fixture blocks 11 are (high by 4 locking members 12 Strength bolt) it is fixed.The fixation of two fixture blocks 11 can be spliced into a spherical cord clip after tightening by high-strength bolt.Prestressed cable The diameter of diameter and lockhole matches.
In the present embodiment, in order to further lower frictional force, the inner wall of broadening section 22 has the arc with the outer wall of cord clip 1 Spend compatible arcwall face.It is rounded to widen section 22.
In the present embodiment, it widens on the inner wall of section coated with lubricant layer.Further, lubricant layer is the lubrication of coating Oil.
In the present embodiment, limiter is made of high strength alloy steel.
The socket joint slot 23 plugged for strut is formed on the outer wall of limiter 2.The end of prestressing force beam string structure strut plugs It in socket joint slot, then welds firm, weld seam detection work is carried out after the completion of welding, preservative treatment is done in the outside of limiter 2.
In some embodiments, the quantity of socket joint slot 23 is two, two angled settings of socket joint slot 23.
Limiter is made to be seated firmly on " triangle " that two form between strut and beam string by two struts Corner position.
The present invention provides a kind of prestressed cable installation method of company's Cable Structure for prestressing force beam string structure strut, including Following steps:
S1: providing limiter 2, and the surface of the limiter 2 is equipped with both ends perforation, the limiter 2 is installed on pre- On the strut of stress beam string.
In the present embodiment, socket joint slot 23 is formed on the outer wall of limiter 2.The quantity of socket joint slot 23 is two.Pacifying Fill limiter when, the end of prestressing force beam string structure strut is inserted in socket joint slot, then weld it is firm, welding after the completion of welded Seam detection work, preservative treatment is done in the outside of limiter 2.
As a kind of preferable embodiment, in one of lubricating oil of inner wall brush of the broadening section of limiter.
In the present embodiment, the quantity of limiter is multiple.
S2: cord clip 1 is provided, cord clip 1 is held on the junction that prestressed cable 3 is connect with strut.
According to the installation site of limiter 2, in identifying junction corresponding with installation site on prestressed cable 3.
Cord clip 1 has a lockhole 110, the prestressed cable 3 is arranged in the lockhole 110, so that the cord clip 1 It is attached to the junction.In the present embodiment, the quantity of junction is many places.Correspondingly, the quantity and limiter of cord clip Quantity is identical.
Specifically, cord clip 1 includes two fixture blocks 11.Two pieces of fixture blocks 11 are involutory and are fixedly connected by locking member.Fixture block The fore shaft of perforation is offered on 11, the fore shaft of two pieces of fixture blocks 11 is combined to form lockhole 110.Two pieces of fixture blocks are installed on prestressing force to draw Two pieces of fixture blocks 11 are involutory and are fixedly connected using locking member, so that cord clip is attached to pre- answer by the junction of rope identified On power drag-line.
S3: the cord clip 1 for being held on junction is placed in card slot, so that the both ends of cord clip are corresponded in the two of card slot End.
Card slot includes two necking segments 21 and the broadening section 22 that is connected between two necking segments 21.The width of necking segment 21 is less than The width of cord clip.The width of necking segment 21 is greater than the diameter of prestressed cable.
Lifting is clamped with the prestressed cable 3 of cord clip 1, and the cord clip for being held on prestressed cable is placed in broadening section 22 In, cord clip is arranged along the length direction of broadening section, so that the both ends of cord clip are corresponded in the necking segment 21 at broadening 22 both ends of section.
S4: the prestressed cable at the both ends of holding position is placed in correspondingly in the both ends of card slot.
The prestressed cable at the both ends of holding position is placed in correspondingly in the necking segment 21 at broadening 22 both ends of section.Rope The activity space moved along the length direction of broadening section is formed between folder 1 and the inner wall for widening section 22.
Construction personnel reaches the installation site of limiter by high altitude vehicle, lifts by crane prestressed cable by lifting machine, and It is hung to below strut, then corresponding cord clip is placed in the broadening section of limiter.Due to the cord clip on prestressed cable at this time It is not completely fixed in the card slot of limiter, so whole cord clips on prestressed cable are put into before broadening section, Cord clip is temporarily fixed at limit together with prestressed cable using wirerope improving bud grafting by the cord clip for having been placed in broadening section together On the device of position.
S5: after cord clip is placed in the both ends that card slot and prestressed cable are placed in card slot, prestressed cable is applied Prestressing force.
When all cord clips are all put into the broadening Duan Zhonghou of limiter, the slightly prestressing force on prestressed cable makes pre- Stress drag-line reaches tight state, takes high altitude vehicle by construction personnel and all takes the wirerope of interim cord clip.Later, to pre- The classification of stress drag-line applies prestressing force until reaching design prestress value.
At this point, there are certain pressure between cord clip and limiter, and pressure is applied to strut.
It should be noted that this specification structure depicted in this specification institute accompanying drawings, ratio, size etc., only to cooperate The bright revealed content of book is not intended to limit the invention enforceable limit so that those skilled in the art understands and reads Fixed condition, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, not It influences still fall in disclosed technology contents under the effect of present invention can be generated and the purpose that can reach and obtain In the range of capable of covering.Meanwhile it is cited such as "upper", "lower", "left", "right", " centre " and " one " in this specification Term is merely convenient to being illustrated for narration, rather than to limit the scope of the invention, the change of relativeness or tune It is whole, under the content of no substantial changes in technology, when being also considered as the enforceable scope of the present invention.
The present invention has been described in detail with reference to the accompanying drawings, those skilled in the art can be according to upper It states and bright many variations example is made to the present invention.Thus, certain details in embodiment should not constitute limitation of the invention, this Invention will be using the range that the appended claims define as protection scope.

Claims (8)

1. a kind of company's Cable Structure for prestressing force beam string structure strut characterized by comprising
For clamping the cord clip of prestressed cable;And
For connecting the limiter of strut, the surface of the limiter is equipped with the card slot of both ends perforation, and the cord clip is detachably pacified It corresponds loaded in the card slot and both ends of the cord clip in the both ends of the card slot, the portion of revealing all the details of the card slot is formed with The activity space moved along its length for the cord clip.
2. company's Cable Structure according to claim 1 for prestressing force beam string structure strut, which is characterized in that the card slot tool The broadening section for having two necking segments and being connected between two necking segments, the cord clip are removably installed in the broadening section In, the activity space is formed in the portion of revealing all the details of the broadening section, and the both ends of the cord clip are corresponded in the necking segment.
3. company's Cable Structure according to claim 1 for prestressing force beam string structure strut, which is characterized in that the cord clip packet Two fixture blocks with fore shaft are included, two fixture blocks are detachably connected by locking member and the fore shaft is opposite upon connection surrounds Form the lockhole clamped for prestressed cable.
4. company's Cable Structure according to claim 1 for prestressing force beam string structure strut, which is characterized in that the fixture block is in It is hemispherical.
5. company's Cable Structure according to claim 4 for prestressing force beam string structure strut, which is characterized in that the card slot Inner wall has arcwall face compatible with the radian of the outer wall of the cord clip.
6. company's Cable Structure according to claim 1 for prestressing force beam string structure strut, which is characterized in that the limiter Outer wall on be formed with the socket joint slot plugged for the strut.
7. company's Cable Structure according to claim 6 for prestressing force beam string structure strut, which is characterized in that the socket joint slot Quantity be two, two angled settings of socket joint slot.
8. a kind of prestressed cable installation method, which comprises the following steps:
Limiter is provided, the surface of the limiter is equipped with the card slot of both ends perforation, the limiter is installed on prestressing force On the strut of string beam;
Cord clip is provided, the cord clip is held on the junction that the prestressed cable is connect with the strut;
The cord clip for being held on the junction is placed in the card slot so that the cord clip both ends correspond in The both ends of the card slot;
The prestressed cable at the both ends of the holding position is placed in correspondingly in the both ends of the card slot;
After the cord clip is placed in the both ends that the card slot and the prestressed cable are placed in the card slot, to described pre- Stress drag-line applies prestressing force.
CN201910352596.4A 2019-04-29 2019-04-29 Company's Cable Structure and prestressed cable installation method for prestressing force beam string structure strut Pending CN110005128A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910352596.4A CN110005128A (en) 2019-04-29 2019-04-29 Company's Cable Structure and prestressed cable installation method for prestressing force beam string structure strut

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910352596.4A CN110005128A (en) 2019-04-29 2019-04-29 Company's Cable Structure and prestressed cable installation method for prestressing force beam string structure strut

Publications (1)

Publication Number Publication Date
CN110005128A true CN110005128A (en) 2019-07-12

Family

ID=67174923

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910352596.4A Pending CN110005128A (en) 2019-04-29 2019-04-29 Company's Cable Structure and prestressed cable installation method for prestressing force beam string structure strut

Country Status (1)

Country Link
CN (1) CN110005128A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002348956A (en) * 2001-05-25 2002-12-04 Nippon Steel Corp High strength bolt-connection structure between steel column and steel beam, and its construction method
CN1789636A (en) * 2005-12-22 2006-06-21 高维成 Pulley type truss-string arc-scaffolding combined structural system
CN201288394Y (en) * 2008-10-23 2009-08-12 浙江东南网架股份有限公司 Device for fastening lower camber node of astaddle chord beam or astaddle chord girder
CN204059587U (en) * 2014-08-18 2014-12-31 中机中联工程有限公司 A kind of Space Beam-strut-drag-line steel structures coating
CN204081271U (en) * 2014-09-02 2015-01-07 巨力索具股份有限公司 A kind of beam string ground tackle and stayed structure
CN105089163A (en) * 2015-06-24 2015-11-25 浙江东南网架股份有限公司 Lower-chord panel point fastening device of crossed truss string structure and fastening tensioning method
CN210032328U (en) * 2019-04-29 2020-02-07 中国建筑第八工程局有限公司 Pressure-bearing structure of prestressed beam string stay bar

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002348956A (en) * 2001-05-25 2002-12-04 Nippon Steel Corp High strength bolt-connection structure between steel column and steel beam, and its construction method
CN1789636A (en) * 2005-12-22 2006-06-21 高维成 Pulley type truss-string arc-scaffolding combined structural system
CN201288394Y (en) * 2008-10-23 2009-08-12 浙江东南网架股份有限公司 Device for fastening lower camber node of astaddle chord beam or astaddle chord girder
CN204059587U (en) * 2014-08-18 2014-12-31 中机中联工程有限公司 A kind of Space Beam-strut-drag-line steel structures coating
CN204081271U (en) * 2014-09-02 2015-01-07 巨力索具股份有限公司 A kind of beam string ground tackle and stayed structure
CN105089163A (en) * 2015-06-24 2015-11-25 浙江东南网架股份有限公司 Lower-chord panel point fastening device of crossed truss string structure and fastening tensioning method
CN210032328U (en) * 2019-04-29 2020-02-07 中国建筑第八工程局有限公司 Pressure-bearing structure of prestressed beam string stay bar

Similar Documents

Publication Publication Date Title
EP0087463B1 (en) Spreader bar assembly
CN204920414U (en) Segment to peg graft concurrent and insertion rod section thereof
CN104261246A (en) Hoisting tool of rectangular pipe-jacking section and use method of hoisting tool
CN104209734B (en) Spring ring assembly fixture and spring ring installation equipment using same
US20160152449A1 (en) Triangular lift frame with load blocks
CN110005128A (en) Company's Cable Structure and prestressed cable installation method for prestressing force beam string structure strut
CN102767139A (en) Combined clip of double main cables of suspension bridge
CN205985954U (en) Transformer substation's " V type " suspends strain insulator string hoisting support in midair
CN210032328U (en) Pressure-bearing structure of prestressed beam string stay bar
CN104233888A (en) Novel steel wire rope weaving and connecting method
CN207293932U (en) A kind of crane hook for handling steel pipe
KR101485101B1 (en) method of constructing truss structure
EP3444219A1 (en) Coupling unit for a lattice structure constituting a work machine
CN212480442U (en) Hydraulic engineering protector
KR101590383B1 (en) Manufacturing method for wire rope sling
CN109612364B (en) Inspection device and inspection method for support frame fork
CN212174223U (en) Net rack ball hoisting device
CN207760731U (en) A kind of steel pipe arch bridge knotted rope hookup
CN115703178A (en) Pipeline welding defect protection tool
CN208182462U (en) A kind of steel column lifting anchor ear
CN216583950U (en) Mounting transmission structure of lifting height limiter
CN206720559U (en) A kind of flat-type work piece hoisting instrument
CN204458799U (en) Axle sleeve and articulated mechanism
CN220201125U (en) Beam lifting device
CN107313349B (en) Pin-connected cable clamp for double-side sling arranging and forming

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination