CN109995646A - Link switch-over method, device and equipment - Google Patents
Link switch-over method, device and equipment Download PDFInfo
- Publication number
- CN109995646A CN109995646A CN201711483774.4A CN201711483774A CN109995646A CN 109995646 A CN109995646 A CN 109995646A CN 201711483774 A CN201711483774 A CN 201711483774A CN 109995646 A CN109995646 A CN 109995646A
- Authority
- CN
- China
- Prior art keywords
- physical
- virtual machine
- virtual
- link
- group
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/06—Management of faults, events, alarms or notifications
- H04L41/0654—Management of faults, events, alarms or notifications using network fault recovery
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L45/00—Routing or path finding of packets in data switching networks
- H04L45/28—Routing or path finding of packets in data switching networks using route fault recovery
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
A kind of link switch-over method, device and equipment.This method comprises: passing through the first service link transmission services between the first virtual machine and the second virtual machine;When detecting business transmission abnormality, the first virtual machine, which passes through, establishes the second service link between the second virtual network port and the second virtual machine, the odd even characteristic of the network address of the first virtual network port and the second virtual network port is different;Business is switched on the second service link from the first service link and is transmitted by the first virtual machine.In the embodiment of the present application, the different network address of odd even characteristic is configured by two virtual network ports to virtual machine, after detecting business transmission abnormality and being switched to another virtual network port and establish new service link, new service link must not be identical with physical link corresponding to original service link, to avoid physical link switching is unsuccessful from happening, and then avoid business impaired.
Description
Technical field
The invention relates to technical field of virtualization, in particular to a kind of link switch-over method, device and equipment.
Background technique
Currently, usually by service link and being held when providing related service by virtual machine (Virtual Machine, VM)
The physical link collaboration for carrying the service link is completed.When the physical link of bearer service link is in communication sub-health state,
For example, then needing to switch physical link when packet loss, Cuo Bao, network delay are larger.
In the related technology, the physical link of bearer service link is that each physical equipment is adjusted using source-destination address hash
Spend what algorithm determined.Source-destination address hash dispatching algorithm is also referred to as the Kazakhstan Internet protocol (Internet Protocol, IP)
Uncommon (HASH) algorithm.Specifically, physical equipment carries out the source IP address of service link and the end number of purpose IP address different
Or operation, the corresponding Hash hashed value of the service link is obtained, which is used to indicate the object for transmitting the service link
Manage network interface.When service link switches, each physical equipment can recalculate the corresponding Hash of service link after switching
Hashed value determines corresponding physical internet ports according to the corresponding Hash hashed value of service link after switching later.
Since the source IP address and purpose IP address of service link are randomly assigned, it is thus possible to deposit before the handover
The corresponding Hash hashed value of the service link situation identical as the corresponding Hash hashed value of service link after switching generates, at this time
Physical link switching is unsuccessful.
Summary of the invention
The embodiment of the present application provides a kind of link switch-over method, device and equipment, can be used for solving in the related technology because
Caused by physical link switching is unsuccessful the problem of traffic lost.
On the one hand, the embodiment of the present application provides a kind of link switch-over method, in the method, the first virtual machine and the second void
Pass through the first service link transmission services between quasi- machine, wherein the first service link is the first virtual network port of the first virtual machine
The service link established between the second virtual machine, there are 2n-1 group intermediate physical sections between the first virtual machine and the second virtual machine
Point, n are positive integer, and each group of intermediate physical node includes mutual cascade 2 physical nodes, the physics where the first virtual machine
Two physical internet ports of equipment have physical link, the second virtual machine with 2 physical nodes of the 1st group of intermediate physical node respectively
Two physical internet ports of the physical equipment at place have physics chain with 2 physical nodes of 2n-1 group intermediate physical node respectively
Road has parallel physical link and intersection as n > 1 between i-th group of intermediate physical node and i+1 group intermediate physical node
Physical link, wherein the Physical Network slogan that parallel physics link pair is answered is 0, intersects the corresponding Physical Network slogan of physical link and is
1, i is positive integer;When detecting business transmission abnormality, the first virtual machine passes through between the second virtual network port and the second virtual machine
Establish the second service link;Wherein, the odd even characteristic of the network address of the first virtual network port and the second virtual network port is different;First
Business is switched on the second service link from the first service link and is transmitted by virtual machine.
It is different to configure odd even characteristic by two virtual network ports to virtual machine for technical solution provided by the embodiments of the present application
Network address, it is new after detecting business transmission abnormality and being switched to another virtual network port and establish new service link
Service link must not be identical with physical link corresponding to original service link, to avoid physical link switching unsuccessful
It happens, and then avoids business impaired.
In a possible design, the network address of above-mentioned first virtual network port is the net of even number and the second virtual network port
Network address is odd number;Alternatively, the network address that the network address of the first virtual network port is odd number and the second virtual network port is even number.
In a possible design, above-mentioned second virtual machine includes third virtual network port and the 4th virtual network port, and
The odd even characteristic of the network address of three virtual network ports and the 4th virtual network port is different.
In a possible design, operation has virtual switch in the physical equipment where the first virtual machine, virtual to hand over
It changes planes using Source Hashing Scheduling algorithms selection physical link.
In a possible design, above-mentioned physical node selects physics chain using source-destination address hash dispatching algorithm
Road.
In a possible design, as n=1, there are 1 group of intermediate physicals between the first virtual machine and the second virtual machine
Node, intermediate physical node include mutual cascade 2 power boards;Alternatively, as n=2, the first virtual machine and the second virtual machine
Between there are 3 groups of intermediate physical nodes, wherein the 1st group of intermediate physical node includes mutual cascade 2 the first power boards, the 2nd
Group intermediate physical node includes mutual cascade 2 TOR (Top of Rank) interchanger, and the 3rd group of intermediate physical node includes mutual
Mutually cascade 2 the second power boards;Alternatively, there are 5 groups of intermediate physicals between the first virtual machine and the second virtual machine as n=3
Node, wherein the 1st group of intermediate physical node includes mutual cascade 2 the first power boards, and the 2nd group of intermediate physical node includes
Mutual cascade 2 the first TOR interchangers, the 3rd group of intermediate physical node include mutual cascade 2 EOR (End of Rank)
Interchanger, the 4th group of intermediate physical node include mutual cascade 2 the 2nd TOR interchangers, and the 5th group of intermediate physical node includes
Mutual cascade 2 the second power boards.
On the other hand, the embodiment of the present application provides a kind of link switching device, which, which has, realizes above method example
In function.The function can also execute corresponding software realization by hardware realization by hardware.The hardware or
Software includes one or more modules corresponding with above-mentioned function or unit.
It include processor and communication interface in the structure of device in a possible design, the processor is configured
To support device to execute the function in the above method.The communication interface is used to support the communication between device and other equipment.
Further, device can also include memory, and the memory with processor for coupling, the necessary program of save set
Instruction and data.
In another aspect, the embodiment of the present application provides a kind of computer storage medium, for being stored as used in above-mentioned apparatus
Computer program, it includes for executing program designed by above-mentioned aspect.
Another aspect, the embodiment of the present application provide a kind of computer program product, when the computer program product is performed
When, it is used to execute link switch-over method provided by the various possible designs of above-mentioned first aspect and first aspect.
Detailed description of the invention
Fig. 1 is the unsuccessful schematic diagram of link switching that the relevant technologies provide;
Fig. 2A is the schematic diagram of the application scenarios shown in one exemplary embodiment of the application;
Fig. 2 B is the schematic diagram of data center's scene shown in one exemplary embodiment of the application;
Fig. 2 C is the schematic diagram of data center's scene shown in another exemplary embodiment of the application;
Fig. 2 D is the schematic diagram of data center's scene shown in another exemplary embodiment of the application;
Fig. 3 is the flow chart of the link switch-over method shown in one exemplary embodiment of the application;
Fig. 4 A is the schematic diagram of the link switching shown in one exemplary embodiment of the application;
Fig. 4 B is the schematic diagram of the link switching shown in one exemplary embodiment of the application;
Fig. 5 A is the structural block diagram of the link switching device shown in one exemplary embodiment of the application;
Fig. 5 B is the structural block diagram of the physical equipment shown in one exemplary embodiment of the application.
Specific embodiment
To keep the purposes, technical schemes and advantages of the application clearer, below in conjunction with attached drawing, to the embodiment of the present application
In technical solution be described.
The network architecture and business scenario of the embodiment of the present application description are to clearly illustrate that the application is implemented
The technical solution of example, does not constitute the restriction to technical solution provided by the embodiments of the present application, those of ordinary skill in the art can
Know, with the differentiation of the network architecture and the appearance of new business scene, technical solution provided by the embodiments of the present application is for similar
Technical problem, it is equally applicable.
In conjunction with reference Fig. 1, it illustrates the unsuccessful schematic diagrames of link switching that the relevant technologies provide.Wherein, the first industry
The source address of business link 101 is 172.10.0.10 (the corresponding network address of 0 plane of the first virtual machine 11), and destination address is
172.20.0.11 (the corresponding network address of 0 plane of the second virtual machine 13), carries the physics chain of first service link 101
Road is as follows: No. 1 physics of No. 1 physical internet ports → TOR interchanger 2 of No. 0 physical internet ports → power board 1 of the first physical equipment 12
No. 0 physical internet ports of No. 1 physical internet ports of network interface → power board 3 → second physical equipment 14.
When first service link 101 is switched to the second service link 102, the source address of the second service link 102 is
172.10.0.12 (the corresponding network address of 1 plane of the first virtual machine 11), destination address are that (second is virtual by 172.20.0.13
The corresponding network address of 1 plane of machine 13), the physical link for carrying second service link 102 is still as follows: the first physics is set
The 1 of No. 1 physical internet ports → power board 3 of No. 1 physical internet ports → TOR interchanger 2 of standby 12 No. 0 physical internet ports → power board 1
Number No. 0 physical internet ports of physical internet ports → second physical equipment 14.
After switching to the second service link 102 due to the first service link 101, physical link is simultaneously had not been changed, therefore object
Reason link does not switch successfully.
Before technical solution provided by the embodiments of the present application is introduced, first to the invention relates to phase
Noun is closed to be introduced.
Virtual machine: by software simulate with complete hardware system function, operate in a completely isolated environment
Complete computer.Virtual machine generally includes 2 virtual planes, and virtual network port corresponding with this 2 virtual planes.
Illustratively, virtual machine includes 0 plane and 1 plane, corresponding No. 0 virtual network port of 0 plane, corresponding No. 1 virtual network port of 1 plane.
Service link: a kind of logical links is used for transmission business datum and control signaling etc..
Physical link: the link of the physical circuit composition between each physical node and each physical node.Physical cord
Road can be cable, optical fiber etc..
In conjunction with reference Fig. 2A, it illustrates the schematic diagrames of the application scenarios shown in the application one embodiment.The applied field
Scape includes the first virtual machine 10, the second virtual machine 20 and 2n-1 group intermediate physical node, and n is positive integer.
First virtual machine 10 includes two virtual network ports, respectively No. 0 virtual network port and No. 1 virtual network port, No. 0 virtual net
Mouth is the corresponding virtual network port of 0 plane of the first virtual machine 10, and No. 1 virtual network port is that 1 plane of the first virtual machine 10 is corresponding
Virtual network port, and No. 0 virtual network port respectively corresponds different network address from No. 1 virtual network port.First virtual machine 10 is run on
In first physical equipment 40, the first physical equipment 40 includes No. 0 physical internet ports and No. 1 physical internet ports.Optionally, the first physics is set
Operation has the first virtual switch 41 in standby 40.First physical equipment 40 can be veneer, be also possible to host, such as server.
Second virtual machine 20 includes two virtual network ports, respectively No. 0 virtual network port and No. 1 virtual network port, No. 0 virtual net
Mouth is the corresponding virtual network port of 0 plane of the second virtual machine 20, and No. 1 virtual network port is that 1 plane of the second virtual machine 20 is corresponding
Virtual network port, and No. 0 virtual network port respectively corresponds different network address from No. 1 virtual network port.Second virtual machine 20 is run on
In second physical equipment 50, the second physical equipment 50 includes No. 0 physical internet ports and No. 1 physical internet ports.Optionally, the second physics is set
Operation has the second virtual switch 51 in standby 50.Second physical equipment 50 can be veneer, be also possible to host, such as server.
Intermediate physical node is between the first physical equipment 10 and the second physical equipment 50, each group of intermediate physical node
Including mutual cascade 2 physical nodes 30.In addition, No. 0 physical internet ports of the first physical equipment 40 and No. 1 physical internet ports difference
There are physical link, No. 0 physical internet ports of the second physical equipment 50 and 1 with 2 physical nodes 30 of the 1st group of intermediate physical node
Number physical internet ports have physical link with 2 physical nodes 30 of 2n-1 group intermediate physical node respectively.In addition, working as n > 1
When, there is parallel physical link between i-th group of intermediate physical node and i+1 group intermediate physical node and intersect physical link.
Wherein, the Physical Network slogan that parallel physics link pair is answered is 0, and the corresponding Physical Network slogan of intersection physical link is positive whole for 1, i
Number.
There is at least two service link, service link between first virtual machine 10 and the second virtual machine 20 can be used for transmitting
Business datum, control signaling etc..Above-mentioned two service link can be used for transmitting identical business, and it is different to can be used for transmission
Business.There is also at least two physical links between first physical equipment 40 and the second physical equipment 50,
When the application scenarios are data center's scene, physical node 30 included by every group of intermediate physical node can be
Power board, TOR interchanger, EOR interchanger etc..
In conjunction with reference Fig. 2 B, it illustrates the signals of data center's scene shown in one exemplary embodiment of the application
Figure.The scene is properly termed as straddle scene in frame.As n=1, there are 1 group between the first virtual machine 10 and the second virtual machine 20
Intermediate physical node, this group of intermediate physical node include mutual cascade 2 power boards, are shown in figure with power board 1 and power board 2
Out.Two physical internet ports of two physical internet ports of the first physical equipment 40 and the second physical equipment 50 with power board 1,
The foundation of power board 2 has physical link.
In conjunction with reference Fig. 2 C, it illustrates the signals of data center's scene shown in another exemplary embodiment of the application
Figure.The scene is properly termed as across frame scene in TOR.As n=2, there are 3 groups between the first virtual machine 10 and the second virtual machine 20
Intermediate physical node, wherein the 1st group of intermediate physical node includes mutual cascade 2 the first power boards, with power board 1 in figure
It is shown with power board 2, the 2nd group of intermediate physical node includes mutual cascade 2 TOR interchangers, with TOR 1 and TOR 2 in figure
It shows, the 3rd group of intermediate physical node includes mutual cascade 2 the second power boards, is shown in figure with power board 3 and power board 4.
Two physical internet ports of the first physical equipment 40 have physical link, the second physical equipment 50 with 2 the first power board foundation respectively
Two physical internet ports have physical link with the foundation of 2 the second power boards respectively.In addition, every two groups adjacent intermediate physical nodes
Between have parallel physical link and intersect physical link.
In conjunction with reference Fig. 2 D, it illustrates the signals of data center's scene shown in another exemplary embodiment of the application
Figure.The scene is properly termed as across TOR through EOR interaction scenarios.As n=3, deposited between the first virtual machine 10 and the second virtual machine 20
In 5 groups of intermediate physical nodes, wherein the 1st group of intermediate physical node 30 includes mutual cascade 2 the first power boards, in figure with
Power board 1 and power board 2 are shown, and the 2nd group of intermediate physical node includes mutual cascade 2 the first TOR interchangers, in figure with
TOR 1 and TOR 2 are shown, and the 3rd group of intermediate physical node includes mutual cascade 2 EOR interchangers, with EOR 1 and EOR in figure
2 show, and the 4th group of intermediate physical node includes mutual cascade 2 the 2nd TOR interchangers, are shown in figure with TOR 3 and TOR 4,
5th group of intermediate physical node includes mutual cascade 2 the second power boards, is shown in figure with power board 3 and power board 4.First
Two physical internet ports of physical equipment 40 are established with two the first power boards respectively physical link, and the two of the second physical equipment 50
A physical internet ports have physical link with two the second power board foundation respectively.In addition, every two groups adjacent intermediate physical nodes it
Between have parallel physical link and intersect physical link.
It should be noted that each physical equipment (such as first physical equipment, the second physical equipment, physical node) is wrapped
Physical internet ports are included, the quantity of physical internet ports can be 2,4 or other quantity.Each physical internet ports are corresponding with physical internet ports
Number, Physical Network slogan can be indicated using 0 or 1.For ease of description, the physical internet ports that Physical Network slogan is 0 are claimed below
For No. 0 physical internet ports, the physical internet ports that Physical Network slogan is 1 are known as No. 1 physical internet ports.
When the corresponding Physical Network slogan of physical internet ports is set, can according to physical equipment put sequence, number, slot number,
Priority etc. is set in advance.For example, the corresponding Physical Network of small physical internet ports can will be numbered for the first physical equipment
Slogan is set as 0, numbers the corresponding Physical Network slogan of big physical internet ports and is set as 1.For another example can be incited somebody to action for power board
The corresponding Physical Network slogan of the small physical internet ports of slot number is set as 0, the corresponding Physical Network slogan setting of the big physical internet ports of slot number
It is 1.For another example the corresponding Physical Network slogan of the higher physical internet ports of priority can be set as 0, preferentially for interchanger
The corresponding Physical Network slogan of the lower physical internet ports of grade is set as 1.
In addition, the concatenate rule of the physical link between each physical equipment is as follows: the first physical equipment, the second physics
The physical internet ports of equipment can have physical link between any one physical internet ports (such as power board) of physical node.Object
When connection obtains physical link between reason node and physical node, there are the Physical Network slogans of two physical internet ports of physical link
It should be identical.For example, having physical link between No. 0 physical internet ports of power board and No. 0 physical internet ports of TOR interchanger, hand over
Changing has physical link between No. 1 physical internet ports of plate and No. 1 physical internet ports of TOR interchanger.Further, No. 0 Physical Network
Between mouthful physical link is parallel to each other namely Fig. 2 C or Fig. 2 D shown in parallel physical link;Between No. 1 physical internet ports
Physical link cross one another namely Fig. 2 C or Fig. 2 D shown in intersect physical link.
It is different to configure odd even characteristic by two virtual network ports to virtual machine for technical solution provided by the embodiments of the present application
Network address, it is new after detecting business transmission abnormality and being switched to another virtual network port and establish new service link
Service link must not be identical with physical link corresponding to original service link, to avoid physical link switching unsuccessful
It happens, and then avoids business impaired.
In conjunction with reference Fig. 3, it illustrates the schematic diagrames for the link switch-over method that the application one embodiment provides.This method
It can be applied in any application scenarios described above, this method may include the following steps.
Step 201, pass through the first service link transmission services between the first virtual machine and the second virtual machine.
First service link is the service link established between the first virtual network port of the first virtual machine and the second virtual machine.
Optionally, the first virtual machine include the first virtual network port and the second virtual network port, the second virtual machine include third virtual network port and
4th virtual network port.First service link is the first virtual network port of the first virtual machine and the third virtual network port of the second virtual machine
Between the service link established.Virtual network port is that the logic communicated between virtual machine and other entities (such as virtual switch) connects
Mouthful.
Two virtual network ports of the first virtual machine can be distinguished using different network interfaces number, such as the first virtual network port
Network interface number is 0, and the network interface number of the second virtual network port is 1;Alternatively, the network interface number of the first virtual network port is 1, the second virtual network port
Network interface number is 0.Similarly, two virtual network ports of the second virtual machine can also be distinguished using different network interfaces number, example
If the network interface number of third virtual network port is 0, the network interface number of the 4th virtual network port is 1;Alternatively, the network interface number of third virtual network port is
1, the network interface number of the 4th virtual network port is 0.
The odd even characteristic of the network address of first virtual network port and the second virtual network port is different.Third virtual network port and the 4th
The odd even characteristic of the network address of virtual network port is different.The odd even characteristic of network address is used to indicate last position of network address
Number is odd number or even number.Network address can be IP address.Illustratively, IP address 172.20.00.13, the then net
The odd even characteristic of network address is odd number.For another example IP address is 172.20.00.16, then the odd even characteristic of the network address is even
Number.In one example, it is odd number that the network address of the first virtual network port, which is the network address of even number and the second virtual network port,;?
In another example, the network address of the first virtual network port is that the network address of odd number and the second virtual network port is even number.One
In a example, the network address of third virtual network port is that the network address of even number and the 4th virtual network port is odd number;At another
In example, the network address of third virtual network port is that the network address of odd number and the 4th virtual network port is even number.
There are 2n-1 group intermediate physical node between first virtual machine and the second virtual machine, n is positive integer.Intermediate physical section
Point can be power board, is also possible to TOR interchanger, can also be EOR interchanger.TOR interchanger refers in data center
The interchanger of the top of server cabinet or unit installation.EOR interchanger refers to the server cabinet or unit in data center
End installation interchanger.
As n=1, there are 1 group of intermediate physical node, this group of intermediate physical sections between the first virtual machine and the second virtual machine
Point includes mutual cascade 2 power boards.As n=2, there are 3 groups of intermediate physicals between the first virtual machine and the second virtual machine
Node, wherein the 1st group of intermediate physical node includes mutual cascade 2 the first power boards, and the 2nd group of intermediate physical node includes
Mutual cascade 2 TOR interchangers, the 3rd group of intermediate physical node include mutual cascade 2 the second power boards.As n=3,
There are 5 groups of intermediate physical nodes between first virtual machine and the second virtual machine, wherein the 1st group of intermediate physical node includes mutual
Cascade 2 the first power boards, the 2nd group of intermediate physical node include mutual cascade 2 the first TOR interchangers, among the 3rd group
Physical node includes mutual cascade 2 EOR interchangers, and the 4th group of intermediate physical node includes mutual cascade 2 the 2nd TOR
Interchanger, the 5th group of intermediate physical node include mutual cascade 2 the second power boards.
Each group of intermediate physical node includes between mutual cascade 2 physical nodes namely above-mentioned two physical node
It interconnects.Above-mentioned two physical node can be cascaded by ordinary user port, can also using special cascade port into
Row cascade.If when between two physical nodes using the cascade of ordinary user port, the cable between port can use cross cable;
If when between two physical nodes using the cascade of special cascade port, the cable between port can use straight-through cable.
Two physical internet ports of the physical equipment where the first virtual machine, 2 objects with the 1st group of intermediate physical node respectively
Manage node have physical link, two physical internet ports of the physical equipment where the second virtual machine respectively with 2n-1 group intermediary
2 physical nodes for managing node have physical link.That is, two physical internet ports of the physical equipment where the first virtual machine point
It is not connect between 2 physical nodes of the 1st group of intermediate physical node by wired mode, the physics where the second virtual machine is set
Two standby physical internet ports are connect with 2 physical nodes of 2n-1 group intermediate physical node by wired mode respectively.It is above-mentioned
Wired mode can be cable connection.
As n > 1, between i-th group of intermediate physical node and i+1 group intermediate physical node have parallel physical link and
Intersect physical link, i is positive integer.Optionally, the Physical Network slogan that parallel physics link pair is answered is 0, intersects physical link pair
The Physical Network slogan answered is 1.
When passing through the first service link transmission services, the physical link of the first service link is carried as where virtual machine
Physical equipment and physical node codetermine.
Optionally, operation has virtual switch in the physical equipment where the first virtual machine, and virtual switch is using source
Location hashes dispatching algorithm (SRC-IP algorithm) and selects physical link.Source Hashing Scheduling algorithm makees the source address of transmission services
Corresponding physical internet ports are found out from the hash table of static allocation for hashed key (Hash Key).In one example, if source address
Last one-bit digital be odd number, then by No. 1 physical internet ports transmission services of the physical equipment where virtual machine, if source address
Last one-bit digital be even number, then pass through No. 0 physical internet ports transmission services of the physical equipment where virtual machine.For example, source
Address is 172.18.00.07, then passes through No. 1 physical internet ports transmission services of the physical equipment where virtual machine.
Optionally, physical node selects physics chain using source-destination address hash dispatching algorithm (SRC-DST-IP algorithm)
Road.Specifically, the last one-bit digital of the source address of the first service link and destination address is carried out XOR operation by physical node,
If exclusive or result is 0, No. 0 physical internet ports transmission services of the physical node are selected, if exclusive or result is 1, select the object
Manage No. 1 physical internet ports transmission services of node.When the last one-bit digital of source address is odd number, the last one digit number of destination address
Word is odd number, alternatively, the last one-bit digital of source address is even number, the last one-bit digital of destination address is even number, exclusive or knot
Fruit perseverance is 0, selects No. 0 physical internet ports transmission services of the physical node at this time.When source address last one-bit digital be odd number,
The last one-bit digital of destination address be even number, alternatively, the last one-bit digital of source address be even number, destination address last
Bit digital is odd number, and exclusive or result perseverance is 1, selects No. 1 physical internet ports transmission services of the physical node at this time.
Step 302, when detecting business transmission abnormality, the first virtual machine passes through the second virtual network port and the second virtual machine
Between establish the second service link.
Business transmission abnormality may include at least one of following several situations: packet loss, Cuo Bao, network delay and network
Shake.Optionally, when the first service link is the service link established between the first virtual network port and third virtual network port, the
One virtual machine is by establishing the second service link between the second virtual network port and the 4th virtual network port of the second virtual machine.
In the embodiment of the present application, when detecting business transmission abnormality, entrained mesh when virtual machine is by transmission services
Address be modified with source address, to establish the second service link.For example, by source address by the first virtual of the first virtual machine
The network address of network interface is revised as the network address of the second virtual network port, by destination address by the third virtual net of the second virtual machine
The network address of mouth is revised as the network address of the 4th virtual network port.
Step 303, business is switched on the second service link from the first service link and is transmitted by the first virtual machine.
After the second service link is successfully established, passed between the first virtual machine and the second virtual machine by the second service link
Defeated business.
It should be noted that virtual machine reselects object based on the source address after change when service link switches
Manage link, physical node based on after change source address and destination address reselect physical link, due to the first virtual machine packet
The odd even characteristic of the network address of the first virtual network port and the second virtual network port that include is not identical, the third that the second virtual machine includes
The odd even characteristic of the network address of virtual network port and the 4th virtual network port is not also identical, therefore determined based on the second service link
Physical link and the physical link determined based on the first service link be not centainly identical, that is, after service link switching, each object
Equipment (such as the physical equipment where the first virtual machine, the physical equipment where the second virtual machine, physical node) is managed according to new
Physical link come carry switching after the second service link.
In conclusion technical solution provided by the embodiments of the present application, is configured odd by two virtual network ports to virtual machine
The different network address of even characteristic establishes new service link when detecting business transmission abnormality and being switched to another virtual network port
Later, new service link must not be identical with physical link corresponding to original service link, so that physical link be avoided to cut
Change it is unsuccessful happen, and then avoid business impaired.
It is explained so that link switch-over method shown in Fig. 3 is applied to data center's scene shown in Fig. 2 D as an example.
First virtual machine include No. 0 virtual network port and No. 1 virtual network port, and network address be respectively 172.20.0.10 and
172.30.0.11.Second virtual machine also includes No. 0 virtual network port and No. 1 virtual network port, and network address is respectively
And 172.30.0.12 172.20.0.11.
In conjunction with reference Fig. 4 A, parallel plane is formed between the first virtual machine 10 and the second virtual machine 20.Parallel plane refers to
There are service link, 1 planes of the first virtual machine 10 between 0 plane of the first virtual machine 10 and 0 plane of the second virtual machine 20
There are service link between 1 plane of the second virtual machine 20.
The source address of first service link 401 is 172.20.0.10, destination address 172.20.0.11, the first business chain
The corresponding physical link in road is as follows: No. 1 physical internet ports → TOR 2 of No. 0 physical internet ports → power board 1 of the first physical equipment 40
No. 1 physical internet ports → EOR 1 No. 1 physical internet ports → TOR 4 No. 1 physical internet ports → power board 3 No. 1 physical internet ports →
No. 0 physical internet ports of the second physical equipment 50.When the first service link 401 switches to the second service link 402, the second business
The source address of link 402 is 172.30.0.11, destination address 172.30.0.12.The corresponding physics of second service link 402
Link is as follows: No. 1 Physical Network of No. 1 physical internet ports → TOR 1 of No. 1 physical internet ports → power board 2 of the first physical equipment 40
No. 1 physical internet ports → second physics of No. 1 physical internet ports → power board 4 of No. 1 physical internet ports → TOR 3 of mouth → EOR 2 is set
Standby 50 No. 1 physical internet ports.
In conjunction with reference Fig. 4 B, crossing plane is formed between the first virtual machine 10 and the second virtual machine 20.Crossing plane refers to
There are service link, 1 planes of the first virtual machine 10 between 0 plane of the first virtual machine 10 and 1 plane of the second virtual machine 20
There are service link between 0 plane of the second virtual machine 20.
The source address of third service link 403 is 172.20.0.10, destination address 172.30.0.12.Third business chain
The corresponding physical link in road 403 is as follows: No. 0 physical internet ports of No. 0 physical internet ports → power board 1 of the first physical equipment 40 →
No. 0 physics of No. 0 physical internet ports → power board 3 of No. 0 physical internet ports → TOR 3 of No. 0 physical internet ports → EOR 1 of TOR 1
No. 0 physical internet ports of network interface → second physical equipment 50.When third service link 403 switches to four service link 404, the
The source address of four service link 404 is 172.30.0.11, destination address 172.20.0.11.4th service link 404 is corresponding
Physical link it is as follows: No. 0 of No. 0 physical internet ports → TOR 2 of No. 1 physical internet ports → power board 2 of the first physical equipment 40
No. 0 physical internet ports → the second of No. 0 physical internet ports → power board 4 of No. 0 physical internet ports → TOR 4 of physical internet ports → EOR 2
No. 1 physical internet ports of physical equipment 50.
In above method embodiment, from the angle of link switching device (namely physical equipment) to technology provided by the present application
Explanation is introduced in scheme.It is understood that link switching device is in order to realize the above functions, it comprises execute each function
It can corresponding hardware configuration and/or software module (or unit).Each example described in conjunction with embodiment disclosed herein
Unit and algorithm steps, the embodiment of the present application can realize with the combining form of hardware or hardware and computer software.Certain
A function is executed in a manner of hardware or computer software driving hardware actually, depending on technical solution specific application and
Design constraint.Those skilled in the art can realize each specific application using different methods described
Function, but this realization is it is not considered that exceed the range of the technical solution of the embodiment of the present application.
The embodiment of the present application can carry out the division of functional unit, example according to above method example to link switching device
Such as, each functional unit of each function division can be corresponded to, two or more functions can also be integrated at one
It manages in unit.Above-mentioned integrated unit both can take the form of hardware realization, can also be in the form of software functional units
It realizes.It should be noted that being schematical, only a kind of logic function stroke to the division of unit in the embodiment of the present application
Point, there may be another division manner in actual implementation.
Fig. 5 A shows the structural block diagram of the link switching device of the application one embodiment offer.The device includes: logical
Believe unit 501 and processing unit 502.
Communication unit 501 is for realizing step 301 in above method embodiment and the corresponding function of step 303, Yi Jiqi
The communication steps that it expresses or implies.
Processing unit 502 is for realizing the corresponding function of step 302 in above method embodiment and other expresses or hidden
The processing step contained.
Fig. 5 B shows the structural block diagram of the physical equipment 510 of the application one embodiment offer, which can
To be to run veneer, the host etc. that have virtual machine.The physical equipment 510 includes: processor 512 and memory 511.Optionally,
Physical equipment 510 can also include bus 513.Wherein, processor 512 and memory 511 can be interconnected by 513 phase of bus
It connects;It is total that bus 513 can be Peripheral Component Interconnect standard (Peripheral Component Interconnect, abbreviation PCI)
Line or expanding the industrial standard structure (Extended Industry Standard Architecture, abbreviation EISA) bus etc..
The bus 513 can be divided into address bus, data/address bus, control bus etc..For convenient for indicating, only with a thick line in Fig. 5 B
It indicates, it is not intended that an only bus or a type of bus.It in the embodiment of the present application, can be in memory 511
It is stored with computer program, processor 512 forms virtual machine, the virtual machine by the computer program in run memory 511
For executing each step in above method example.
The step of method in conjunction with described in the embodiment of the present application disclosure or algorithm, can be come real in a manner of hardware
It is existing, it is also possible to execute the mode of software instruction by processor to realize.Software instruction can be (or single by corresponding software module
Member) composition, software module (or unit) can be stored on random access memory (Random Access Memory, RAM),
Flash memory, read-only memory (Read Only Memory, ROM), Erasable Programmable Read Only Memory EPROM (Erasable
Programmable ROM, EPROM), Electrically Erasable Programmable Read-Only Memory (Electrically EPROM, EEPROM), post
Storage, hard disk, mobile hard disk, CD-ROM (CD-ROM) or any other form well known in the art storage medium in.
A kind of illustrative storage medium is coupled to processor, to enable a processor to from the read information, and can be to
Information is written in the storage medium.Certainly, storage medium is also possible to the component part of processor.Pocessor and storage media can be with
In ASIC.In addition, the ASIC can be located in physical equipment.Certainly, pocessor and storage media can also be used as discrete
Component is present in physical equipment.
Those skilled in the art it will be appreciated that in said one or multiple examples, retouched by the embodiment of the present application
The function of stating can be realized with hardware, software, firmware or their any combination.The embodiment of the present application also provides computers
Program product, when the computer program product is performed, for realizing function provided by above method example.In addition,
Above-mentioned computer program can be stored in computer-readable medium or as one or more on computer-readable medium
A instruction or code are transmitted.Computer-readable medium includes computer storage media and communication media, wherein communication media
Including convenient for from a place to any medium of another place transmission computer program.Storage medium can be general or special
Any usable medium enough accessed with computer capacity.
It should be understood that referenced herein " multiple " refer to two or more."and/or", description association
The incidence relation of object indicates may exist three kinds of relationships, for example, A and/or B, can indicate: individualism A exists simultaneously A
And B, individualism B these three situations.Character "/" typicallys represent the relationship that forward-backward correlation object is a kind of "or".Make herein
" first ", " second " and similar word are not offered as any sequence, quantity or importance, and are used only to distinguish
Different objects.
Above-described specific embodiment carries out the purpose of the embodiment of the present application, technical scheme and beneficial effects
It is further described, it should be understood that the foregoing is merely the specific embodiments of the embodiment of the present application, and does not have to
In limit the embodiment of the present application protection scope, it is all on the basis of the technical solution of the embodiment of the present application, done it is any
Modification, equivalent replacement, improvement etc. should all include within the protection scope of the embodiment of the present application.
Claims (14)
1. a kind of link switch-over method, which is characterized in that the described method includes:
Pass through the first service link transmission services between first virtual machine and the second virtual machine, wherein first service link
It is the service link established between the first virtual network port of first virtual machine and second virtual machine, described first is virtual
There are 2n-1 group intermediate physical node between machine and second virtual machine, the n is positive integer, each group of intermediate physical node
Including mutual cascade 2 physical nodes, two physical internet ports of the physical equipment where first virtual machine are respectively with the 1st
2 physical nodes of group intermediate physical node have physical link, two objects of the physical equipment where second virtual machine
Managing network interface has physical link with 2 physical nodes of 2n-1 group intermediate physical node respectively, as n > 1, among i-th group
There is parallel physical link between physical node and i+1 group intermediate physical node and intersect physical link, wherein is described parallel
The corresponding Physical Network slogan of physical link is 0, and the corresponding Physical Network slogan of the intersections physical link is 1, and the i is positive whole
Number;
When detecting the business transmission abnormality, first virtual machine passes through the second virtual network port and second virtual machine
Between establish the second service link;Wherein, the odd even of the network address of first virtual network port and second virtual network port
Characteristic is different;
The business is switched on second service link from first service link and is transmitted by first virtual machine.
2. the method according to claim 1, wherein
The network address of first virtual network port is that the network address of even number and second virtual network port is odd number;
Alternatively,
The network address of first virtual network port is that the network address of odd number and second virtual network port is even number.
3. the method according to claim 1, wherein second virtual machine includes third virtual network port and the 4th
Virtual network port, and the third virtual network port is different with the odd even characteristic of the network address of the 4th virtual network port.
4. the method according to claim 1, wherein running in physical equipment where first virtual machine has
Virtual switch, the virtual switch use Source Hashing Scheduling algorithms selection physical link.
5. the method according to claim 1, wherein the physical node is using source-destination address hash scheduling
Algorithms selection physical link.
6. the method according to claim 1, wherein
As n=1, there are 1 group of intermediate physical node, the intermediaries between first virtual machine and second virtual machine
Managing node includes mutual cascade 2 power boards;
Alternatively,
As n=2, there are 3 groups of intermediate physical nodes between first virtual machine and second virtual machine, wherein the 1st group
Intermediate physical node includes mutual cascade 2 the first power boards, and the 2nd group of intermediate physical node includes mutual cascade 2 cabinets
TOR interchanger is pushed up, the 3rd group of intermediate physical node includes mutual cascade 2 the second power boards;
Alternatively,
As n=3, there are 5 groups of intermediate physical nodes between first virtual machine and second virtual machine, wherein the 1st group
Intermediate physical node includes mutual cascade 2 the first power boards, and the 2nd group of intermediate physical node includes cascade 2 the mutually
One TOR interchanger, the 3rd group of intermediate physical node include mutual cascade 2 column end EOR interchanger, the 4th group of intermediate physical node
Including mutual cascade 2 the 2nd TOR interchangers, the 5th group of intermediate physical node includes mutual cascade 2 the second power boards.
7. a kind of link switching device, which is characterized in that described device includes:
Communication unit, for passing through the first service link transmission services between the second virtual machine, wherein first business chain
Road is the service link established between the first virtual network port of first virtual machine and second virtual machine, and described first is empty
There are 2n-1 group intermediate physical node between quasi- machine and second virtual machine, the n is positive integer, each group of intermediate physical section
Point includes mutual cascade 2 physical nodes, two physical internet ports of the physical equipment where first virtual machine respectively with
2 physical nodes of the 1st group of intermediate physical node have physical link, two of the physical equipment where second virtual machine
Physical internet ports have physical link with 2 physical nodes of 2n-1 group intermediate physical node respectively, as n > 1, in i-th group
Between there is parallel physical link between physical node and i+1 group intermediate physical node and intersect physical link, wherein it is described flat
The corresponding Physical Network slogan of row physical link is 0, and the corresponding Physical Network slogan of the intersections physical link is 1, and the i is positive whole
Number;
Processing unit, for when detecting the business transmission abnormality, first virtual machine by the second virtual network port with
The second service link is established between second virtual machine;Wherein, first virtual network port and second virtual network port
The odd even characteristic of network address is different;
The communication unit is also used to the business switching to the second service link upload from first service link
It is defeated.
8. device according to claim 7, which is characterized in that
The network address of first virtual network port is that the network address of even number and second virtual network port is odd number;
Alternatively,
The network address of first virtual network port is that the network address of odd number and second virtual network port is even number.
9. device according to claim 7, which is characterized in that second virtual machine includes third virtual network port and the 4th
Virtual network port, and the third virtual network port is different with the odd even characteristic of the network address of the 4th virtual network port.
10. device according to claim 7, which is characterized in that run in the physical equipment where first virtual machine
There is virtual switch, the virtual switch uses Source Hashing Scheduling algorithms selection physical link.
11. device according to claim 7, which is characterized in that the physical node is using source-destination address hash scheduling
Algorithms selection physical link.
12. device according to claim 7, which is characterized in that
As n=1, there are 1 group of intermediate physical node, the intermediaries between first virtual machine and second virtual machine
Managing node includes mutual cascade 2 power boards;
Alternatively,
As n=2, there are 3 groups of intermediate physical nodes between first virtual machine and second virtual machine, wherein the 1st group
Intermediate physical node includes mutual cascade 2 the first power boards, and the 2nd group of intermediate physical node includes mutual cascade 2 cabinets
TOR interchanger is pushed up, the 3rd group of intermediate physical node includes mutual cascade 2 the second power boards;
Alternatively,
As n=3, there are 5 groups of intermediate physical nodes between first virtual machine and second virtual machine, wherein the 1st group
Intermediate physical node includes mutual cascade 2 the first power boards, and the 2nd group of intermediate physical node includes cascade 2 the mutually
One TOR interchanger, the 3rd group of intermediate physical node include mutual cascade 2 column end EOR interchanger, the 4th group of intermediate physical node
Including mutual cascade 2 the 2nd TOR interchangers, the 5th group of intermediate physical node includes mutual cascade 2 the second power boards.
13. a kind of physical equipment, which is characterized in that the physical equipment includes processor and memory, wherein
Computer program is stored in the memory;
The processor forms virtual machine by the computer program run in the memory, and the virtual machine is for executing such as
The described in any item methods of the claims 1 to 6.
14. a kind of computer storage medium, which is characterized in that be stored with computer program, institute in the computer storage medium
It states computer program and is performed realization such as method as claimed in any one of claims 1 to 6.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711483774.4A CN109995646B (en) | 2017-12-29 | 2017-12-29 | Link switching method, device and equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711483774.4A CN109995646B (en) | 2017-12-29 | 2017-12-29 | Link switching method, device and equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109995646A true CN109995646A (en) | 2019-07-09 |
CN109995646B CN109995646B (en) | 2021-10-01 |
Family
ID=67110029
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711483774.4A Active CN109995646B (en) | 2017-12-29 | 2017-12-29 | Link switching method, device and equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109995646B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI766631B (en) * | 2021-03-29 | 2022-06-01 | 中華電信股份有限公司 | Service function chain path switching method and computer-readable medium thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100039937A1 (en) * | 2007-10-31 | 2010-02-18 | Architecture Technology Corporation | Reliable transport protocol providing receiver-based congestion control |
CN101783770A (en) * | 2010-03-12 | 2010-07-21 | 成都市华为赛门铁克科技有限公司 | Method and system for processing message, service processing board and circuit processing board |
CN102868631A (en) * | 2012-09-28 | 2013-01-09 | 华为技术有限公司 | Load sharing method and device |
CN103401781A (en) * | 2013-07-18 | 2013-11-20 | 杭州华三通信技术有限公司 | Access method and access device applied to TRILL (Transparent Interconnection of Lots of Links) network |
US20140254352A1 (en) * | 2013-03-11 | 2014-09-11 | Dell Products L.P. | System and method for rapid vlt connection failure handling |
CN104753707A (en) * | 2013-12-29 | 2015-07-01 | 中国移动通信集团公司 | System maintenance method and network switching equipment |
-
2017
- 2017-12-29 CN CN201711483774.4A patent/CN109995646B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100039937A1 (en) * | 2007-10-31 | 2010-02-18 | Architecture Technology Corporation | Reliable transport protocol providing receiver-based congestion control |
CN101783770A (en) * | 2010-03-12 | 2010-07-21 | 成都市华为赛门铁克科技有限公司 | Method and system for processing message, service processing board and circuit processing board |
CN102868631A (en) * | 2012-09-28 | 2013-01-09 | 华为技术有限公司 | Load sharing method and device |
US20140254352A1 (en) * | 2013-03-11 | 2014-09-11 | Dell Products L.P. | System and method for rapid vlt connection failure handling |
CN103401781A (en) * | 2013-07-18 | 2013-11-20 | 杭州华三通信技术有限公司 | Access method and access device applied to TRILL (Transparent Interconnection of Lots of Links) network |
CN104753707A (en) * | 2013-12-29 | 2015-07-01 | 中国移动通信集团公司 | System maintenance method and network switching equipment |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI766631B (en) * | 2021-03-29 | 2022-06-01 | 中華電信股份有限公司 | Service function chain path switching method and computer-readable medium thereof |
Also Published As
Publication number | Publication date |
---|---|
CN109995646B (en) | 2021-10-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101485156B (en) | System and method for switching traffic through a network | |
US9600440B2 (en) | Network topology of hierarchical ring with recursive shortcuts | |
CN101094185A (en) | Method and device for forwarding message based on multilink | |
La et al. | Optimal routing control: Game theoretic approach | |
CN108111410B (en) | Method and device for constructing deadlock-free route in network with Cartesian topology | |
Li et al. | On the design and analysis of data center network architectures for interconnecting dual-port servers | |
Wang et al. | Designing efficient high performance server-centric data center network architecture | |
CN107634905A (en) | Data forwarding method and device in pile system | |
CN104639437A (en) | Forwarding method and apparatus of broadcast messages in stack system | |
CN113630347A (en) | Data transmission method, system, storage medium and equipment | |
CN103873367B (en) | Route data grouping, method and device for determining route and fat tree network | |
CN102932250B (en) | Non-deadlock self-adaptation routing method based on fault-tolerant computer network structure | |
CN109936505B (en) | Method and apparatus in data-centric software-defined networks | |
CN1825832A (en) | Ring rapid spanning tree protocol | |
Bogdanski | Optimized routing for fat-tree topologies | |
CN109995646A (en) | Link switch-over method, device and equipment | |
CN104954439A (en) | Cloud server, node interconnection method thereof and cloud server system | |
Vignéras et al. | The bxi routing architecture for exascale supercomputer | |
WO2008040063A1 (en) | Multi-path switching networks | |
CN102647424B (en) | Data transmission method and data transmission device | |
CN103179034A (en) | Deadlock-free adaptive routing method | |
CN111817958B (en) | Message forwarding method and network equipment | |
CN1738286A (en) | Method for realizing heavy route in IP network | |
CN1729661A (en) | Return path derivation in packet-switched networks | |
Manfred | Circuit switching versus packet switching |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |