CN109993639B - 一种虚拟电厂参与日前电力市场的优化投标策略 - Google Patents

一种虚拟电厂参与日前电力市场的优化投标策略 Download PDF

Info

Publication number
CN109993639B
CN109993639B CN201811544351.3A CN201811544351A CN109993639B CN 109993639 B CN109993639 B CN 109993639B CN 201811544351 A CN201811544351 A CN 201811544351A CN 109993639 B CN109993639 B CN 109993639B
Authority
CN
China
Prior art keywords
power plant
virtual power
cost
bidding
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811544351.3A
Other languages
English (en)
Other versions
CN109993639A (zh
Inventor
韩帅
高立克
吴宛潞
郭小璇
杨艺云
秦丽娟
林溪桥
金庆忍
肖静
姚知洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of Guangxi Power Grid Co Ltd
Original Assignee
Electric Power Research Institute of Guangxi Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Guangxi Power Grid Co Ltd filed Critical Electric Power Research Institute of Guangxi Power Grid Co Ltd
Priority to CN201811544351.3A priority Critical patent/CN109993639B/zh
Publication of CN109993639A publication Critical patent/CN109993639A/zh
Application granted granted Critical
Publication of CN109993639B publication Critical patent/CN109993639B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/08Auctions
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S50/00Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
    • Y04S50/10Energy trading, including energy flowing from end-user application to grid

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Human Resources & Organizations (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Development Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • Finance (AREA)
  • Accounting & Taxation (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明涉及电力系统及其自动化技术领域,具体涉及一种虚拟电厂参与日前电力市场的优化投标策略。本发明针对虚拟电厂参与日前电力市场投标研究,建立了优化投标模型,提出了优化投标策略,为今后虚拟电厂参与日前电力市场提供了科学理论支持。所建立的成本容量模型,充分考虑了虚拟电厂内部多类型不同需求侧资源出力特性,生成的优化投标策略计及了投标主体内部不同需求侧资源在日前市场投标电量和投标电价,体现了投标策略的优越性。

Description

一种虚拟电厂参与日前电力市场的优化投标策略
技术领域
本发明涉及电力系统及其自动化技术领域,具体涉及一种虚拟电厂参与日前电力市场的优化投标策略。
背景技术
近年来,风电、太阳能等间歇性能源发展迅猛,随着大规模可再生能源接入,其随机性和间歇性特点使得电力系统安全稳定运行带来一定挑战。燃气轮机、电动汽车、柔性负荷等需求侧资源因其灵活、经济、可靠、环保特点,能有效解决上述问题,因此得到迅速发展。但需求侧资源一般容量较小,且多以分散形式存在,在电力市场上不具有竞争力,亟需协调多类型需求侧资源管理技术出现。
虚拟电厂能有效聚合分散的不同容量等级需求侧资源,通过协调优化控制,能够提高系统整体的稳定性,减轻调度负担,同时作为整体参与电力市场,具有更强的市场竞争力,为用户带来可观收益,有利于调动电力用户参与系统运行的积极性实现资源的高效利用。在需求响应项目中,虚拟电厂聚合的广义需求侧资源主要包括分布式发电(distributed generation,DG)资源、储能资源和负荷资源。其中,DG资源包括2类:一类式是诸如风能、太阳能等间歇式可再生能源,另一类是可控DG资源,如燃料电池、微型燃气轮机、柴油发电机等。储能资源包括静态储能和电动汽车。负荷资源包括不可平移负荷、可平移负荷和可削减负荷等。现在研究关于虚拟电厂参与日前电力市场投标优化,缺少对协调多类型不同需求侧资源出力特性的刻画,没有充分考虑投标主体内部不同需求侧资源在日前市场投标电量和投标电价的获取,没有实现合理协调需求侧资源出力,达到利益最大化。
发明内容
为了解决上述问题,本发明提供了一种虚拟电厂参与日前电力市场的优化投标策略,具体技术方案如下:
一种虚拟电厂参与日前电力市场的优化投标策略包括以下步骤:
S1:在各虚拟电厂提交其需求侧资源的投标电量和电价后,以最小成本为优化目标构建调度中心市场出清模型,获取市场出清价格和出清电量;
S2:根据步骤S1得到的市场出清价格,结合虚拟电厂内部需求侧资源的变动运行成本和投标电量,获得该虚拟电厂净收益函数;
S3:以虚拟电厂最大净收益为优化目标,结合其内部各需求侧资源最大容量约束,建立虚拟电厂的投标优化模型;
S4:根据步骤S1获得的市场出清模型的最优性条件,将其作为虚拟电厂投标优化的部分约束条件,从而将步骤S3建立的投标优化模型转化成具有平衡约束的数学规划模型;
S5:采用二进制扩充方法处理步骤S4中的具有平衡约束的数学规划模型中的非线性项,即连续变量乘积,形成混合整数规划模型;
S6:结合虚拟电厂内部需求侧资源的出力特性,确定虚拟电厂参与日前市场的优化投标模型;
S7:采用Yamip/Gurobi软件计算虚拟电厂参与日前电力市场的最大收益投标模型,获取投标电量和投标电价。
优选地,所述步骤S1中的构建调度中心市场出清模型的具体步骤如下:
S11:在各虚拟电厂提交其需求侧资源i的投标电量Pi和投标电价λi后,调度中心进行经济调度获取出清电价πd和出清电量gi,假设出清电量gi≥0,其目标函数如下:
Figure RE-GDA0001990845560000021
式中,I表示所有需求侧资源集合;
S12:负荷供需平衡约束:
Figure RE-GDA0001990845560000022
式中,d为负荷;πd是对偶变量,表示现货价格,即增加单位负荷的边际成本;
S13:出清电量受到投标电量约束如下:
gi≤Pi,i∈Iπgi (3);
式中,πgi是对偶变量,表示需求侧资源i增加单位投标电量的边际效益。
优选地,所述步骤S2中的获得该虚拟电厂净收益函数的计算方式为:设该虚拟电厂为虚拟电厂A,虚拟电厂A的总收入减去运行成本即得净收益R,具体如下:
Figure RE-GDA0001990845560000023
式中,ci表示需求侧资源i的变动运行成本;i∈A表示属于虚拟电厂A的需求侧资源集合;πd是对偶变量,表示现货价格,即增加单位负荷的边际成本;gi为出清电量。
优选地,所述步骤S3中建立虚拟电厂的投标优化模型的步骤具体如下:
S31:设该细腻电厂为虚拟电厂A,虚拟电厂A投标优化目标是其净收益最大化,具体如下:
Figure RE-GDA0001990845560000024
式中,ci表示虚拟电厂A的需求侧资源i的变动运行成本;i∈A表示属于虚拟电厂A的需求侧资源集合;πd是对偶变量,表示现货价格,即增加单位负荷的边际成本;gi为出清电量。
S32:虚拟电厂A的需求侧资源i投标电量具有出力约束,具体如下:
Pi≤Pi max i∈A (6);
式中,Pi为虚拟电厂A的需求侧资源i的投标电量,Pi max表示虚拟电厂A的需求侧资源i 的最大容量。
优选地,所述步骤S4中的将步骤S3建立的投标优化模型转化成平衡约束的数学规划模型的步骤具体如下:
S41:根据对偶理论,获取市场出清模型的最优性条件,具体如式(7)-(16),将其加入到步骤S3建立的虚拟电厂A的投标优化模型的约束条件中,得到虚拟电厂A具有平衡约束的数学规划模型;
Figure RE-GDA0001990845560000031
gi-Pi≤0,i∈A (8);
Figure RE-GDA0001990845560000032
πdgii≤0,i∈A (10);
Figure RE-GDA0001990845560000033
πgi≤0,i∈I (12);
dgii)gi=0,i∈A (13);
Figure RE-GDA0001990845560000034
(Pi-gigi=0,i∈A (15);
Figure RE-GDA0001990845560000035
其中,式(7)-(9)是步骤S1的构建的调度中心市场出清模型的约束条件,式(10)-(12)是对偶问题的约束条件,式(13)-(16)是互补条件;
式中,
Figure RE-GDA0001990845560000036
为虚拟电厂A的预测市场负荷;
Figure RE-GDA0001990845560000037
表示虚拟电厂A预测其余需求侧资源的投标电量-电价;Pi为虚拟电厂A的需求侧资源i的投标电量,gi为出清电量;λi为投标电价;πd是对偶变量,表示现货价格,即增加单位负荷的边际成本;πgi是对偶变量,表示需求侧资源 i增加单位投标电量的边际效益;
Figure RE-GDA0001990845560000038
表示市场其余需求侧资源集合;
S42:根据gi≥0,i∈I,对公式(10)和(11)进行变形,得到:
dgii)gi≤0,i∈A (17);
Figure RE-GDA0001990845560000041
S43:根据公式(12),对公式(8)和(9)进行变形,得到:
(gi-Pigi≤0,i∈A (19);
Figure RE-GDA0001990845560000042
S44:根据公式(17)-(20)的非正性,得到互补条件(13)-(16)的等效公式:
Figure RE-GDA0001990845560000043
S45:使用公式(7):重新安排公式(21)各项,得到等效公式(22),即原对偶等式条件为:
Figure RE-GDA0001990845560000044
S46:至此,生成步骤S3建立的虚拟电厂A的投标优化模型的目标函数及其约束条件,步骤S3建立的虚拟电厂A的投标优化模型的目标函数如式(5)所示,其约束条件为式(6)-(12)和式(22)。
优选地,所述步骤S5中采用二进制扩充方法处理步骤S4中的具有平衡约束的数学规划模型中的非线性项的具体步骤如下:
S51:应用式(13)和(15)的互补条件,用λigi和πgiPi重写目标函数(5)中的非线性项πdgi
πdgi=λigigiPi (23);
S52:采用二进制扩充方法处理约束条件(22)中的非线性项λigi
首先,通过一组离散值{λim,m=0,1,...,M1}近似连续决策变量λi,其近似表达式为:
Figure RE-GDA0001990845560000045
这里,
Figure RE-GDA0001990845560000049
λi的取值区间为
Figure RE-GDA0001990845560000046
xki为二进制变量;然后,将gi乘以等式(24)两侧,得到新变量zki=xkigi,从而得到:
Figure RE-GDA0001990845560000047
同时,引入相应约束:
0≤gi-zki≤G1(1-xki) (26);
0≤zki≤G1xki (27);
式中,G1是一个常数,通常
Figure RE-GDA0001990845560000048
S53:采用二进制扩充方法,处理约束条件(22)中的非线性项πgiPi
首先,通过一组离散值{Pim,m=0,1,...,M2}近似连续决策变量Pi,其近似表达式为
Figure RE-GDA0001990845560000051
这里,
Figure RE-GDA0001990845560000052
Pi的取值区间为(Pi min,Pi max),ΔPi=(Pi max-Pi min)/M2,yki为二进制变量;然后,将πgi乘以等式(28)两侧,得到新变量wki=πgiyki,从而得到:
Figure RE-GDA0001990845560000053
同时,引入相应约束
0≤wkigi≤G2(1-yki) (30);
0≤-wki≤G2yki (31);
式中,G2是一个常数,通常
Figure RE-GDA0001990845560000054
S54:在目标函数(5),约束条件(6)-(12)和(22)应用上述步骤S51-S53的线性转化形式,得到混合整数规划模型:
Figure RE-GDA0001990845560000055
Figure RE-GDA0001990845560000056
Figure RE-GDA0001990845560000057
Figure RE-GDA0001990845560000058
Figure RE-GDA0001990845560000059
Figure RE-GDA00019908455600000510
Figure RE-GDA00019908455600000511
Figure RE-GDA00019908455600000512
πgi≤0,i∈I (40);
Figure RE-GDA00019908455600000513
0≤gi-zki≤G1(1-xki),i∈A (42);
0≤zki≤G1xki,i∈A (43);
0≤wkigi≤G2(1-yki),i∈A (44);
0≤-wki≤G2yki,i∈A (45);
xki,yki∈{0,1},i∈A (46)。
优选地,所述步骤S6中确定虚拟电厂参与日前市场的优化投标模型的具体步骤如下:
S61:确定虚拟电厂A所参与日前市场的时间间隔为Δt,时段数
Figure RE-GDA0001990845560000061
S62:根据虚拟电厂A和其他虚拟电厂内部需求侧资源组成情况,确定市场中所有需求侧资源种类、数目以及所属虚拟电厂;
S63:根据历史信息和市场信息,虚拟电厂A预测得到市场负荷
Figure RE-GDA0001990845560000062
和其余需求侧资源投标电量和电价;
S64:根据虚拟电厂A内部需求侧资源特性,构建其在t时段容量成本模型CA,t
S65:根据成本容量模型及相关约束,结合预测信息,构建虚拟电厂A参加日前电力市场优化投标模型。
优选地,所述Δt设置为1h,则时段数=24/1=24时段。
本发明的有益效果为:本发明针对虚拟电厂参与日前电力市场投标研究,建立了优化投标模型,提出了优化投标策略,为今后虚拟电厂参与日前电力市场提供了科学理论支持。所建立的成本容量模型,充分考虑了虚拟电厂内部多类型不同需求侧资源出力特性,生成的优化投标策略计及了投标主体内部不同需求侧资源在日前市场投标电量和投标电价,体现了投标策略的优越性。
具体实施方式
为了更好的理解本发明,下面具体实施例对本发明作进一步说明:
一种虚拟电厂参与日前电力市场的优化投标策略包括以下步骤:
S1:在各虚拟电厂提交其需求侧资源的投标电量和电价后,以最小成本为优化目标构建调度中心市场出清模型,获取市场出清价格和出清电量;构建调度中心市场出清模型的具体步骤如下:
S11:在各虚拟电厂提交其需求侧资源i的投标电量Pi和投标电价λi后,调度中心进行经济调度获取出清电价πd和出清电量gi,假设出清电量gi≥0,其目标函数如下:
Figure RE-GDA0001990845560000063
式中,I表示所有需求侧资源集合;
S12:负荷供需平衡约束:
Figure RE-GDA0001990845560000071
式中,d为负荷;πd是对偶变量,表示现货价格,即增加单位负荷的边际成本;
S13:出清电量受到投标电量约束如下:
gi≤Pi,i∈Iπgi (3);
式中,πgi是对偶变量,表示需求侧资源i增加单位投标电量的边际效益。
S2:根据步骤S1得到的市场出清价格,结合虚拟电厂内部需求侧资源的变动运行成本和投标电量,获得该虚拟电厂净收益函数;获得该虚拟电厂净收益函数的计算方式为:设该虚拟电厂为虚拟电厂A,虚拟电厂A的总收入减去运行成本即得净收益R,具体如下:
Figure RE-GDA0001990845560000072
式中,ci表示需求侧资源i的变动运行成本;i∈A表示属于虚拟电厂A的需求侧资源集合;πd是对偶变量,表示现货价格,即增加单位负荷的边际成本;gi为出清电量。
S3:以虚拟电厂最大净收益为优化目标,结合其内部各需求侧资源最大容量约束,建立虚拟电厂的投标优化模型;建立虚拟电厂的投标优化模型的步骤具体如下:
S31:设该细腻电厂为虚拟电厂A,虚拟电厂A投标优化目标是其净收益最大化,具体如下:
Figure RE-GDA0001990845560000073
式中,ci表示虚拟电厂A的需求侧资源i的变动运行成本;i∈A表示属于虚拟电厂A的需求侧资源集合;πd是对偶变量,表示现货价格,即增加单位负荷的边际成本;gi为出清电量。 S32:虚拟电厂A的需求侧资源i投标电量具有出力约束,具体如下:
Pi≤Pi max i∈A (6);
式中,Pi为虚拟电厂A的需求侧资源i的投标电量,Pi max表示虚拟电厂A的需求侧资源i 的最大容量。
S4:根据步骤S1获得的市场出清模型的最优性条件,将其作为虚拟电厂投标优化的部分约束条件,从而将步骤S3建立的投标优化模型转化成具有平衡约束的数学规划模型;具体如下:
S41:根据对偶理论,获取市场出清模型的最优性条件,具体如式(7)-(16),将其加入到步骤S3建立的虚拟电厂A的投标优化模型的约束条件中,得到虚拟电厂A具有平衡约束的数学规划模型;
Figure RE-GDA0001990845560000081
gi-Pi≤0,i∈A (8);
Figure RE-GDA0001990845560000082
πdgii≤0,i∈A (10);
Figure RE-GDA0001990845560000083
πgi≤0,i∈I (12);
dgii)gi=0,i∈A (13);
Figure RE-GDA0001990845560000084
(Pi-gigi=0,i∈A (15);
Figure RE-GDA0001990845560000085
其中,式(7)-(9)是步骤S1的构建的调度中心市场出清模型的约束条件,式(10)-(12)是对偶问题的约束条件,式(13)-(16)是互补条件;
式中,
Figure RE-GDA0001990845560000086
为虚拟电厂A的预测市场负荷;
Figure RE-GDA0001990845560000087
表示虚拟电厂A预测其余需求侧资源的投标电量-电价;Pi为虚拟电厂A的需求侧资源i的投标电量,gi为出清电量;λi为投标电价;πd是对偶变量,表示现货价格,即增加单位负荷的边际成本;πgi是对偶变量,表示需求侧资源 i增加单位投标电量的边际效益;
Figure RE-GDA00019908455600000812
表示市场其余需求侧资源集合;
S42:根据gi≥0,i∈I,对公式(10)和(11)进行变形,得到:
dgii)gi≤0,i∈A (17);
Figure RE-GDA0001990845560000088
S43:根据公式(12),对公式(8)和(9)进行变形,得到:
(gi-Pigi≤0,i∈A (19);
Figure RE-GDA0001990845560000089
S44:根据公式(17)-(20)的非正性,得到互补条件(13)-(16)的等效公式:
Figure RE-GDA00019908455600000810
S45:使用公式(7):重新安排公式(21)各项,得到等效公式(22),即原对偶等式条件为:
Figure RE-GDA00019908455600000811
S46:至此,生成步骤S3建立的虚拟电厂A的投标优化模型的目标函数及其约束条件,步骤S3建立的虚拟电厂A的投标优化模型的目标函数如式(5)所示,其约束条件为式(6)-(12)和式(22)。
S5:采用二进制扩充方法(a binary expansion approach)处理步骤S4中的具有平衡约束的数学规划模型中的非线性项,即连续变量乘积,形成混合整数规划模型;具体步骤如下:
S51:应用式(13)和(15)的互补条件,用λigi和πgiPi重写目标函数(5)中的非线性项πdgi
πdgi=λigigiPi (23);
S52:采用二进制扩充方法处理约束条件(22)中的非线性项λigi
首先,通过一组离散值{λim,m=0,1,...,M1}近似连续决策变量λi,其近似表达式为:
Figure RE-GDA0001990845560000091
这里,
Figure RE-GDA0001990845560000092
λi的取值区间为
Figure RE-GDA0001990845560000098
xki为二进制变量;然后,将gi乘以等式(24)两侧,得到新变量zki=xkigi,从而得到:
Figure RE-GDA0001990845560000093
同时,引入相应约束:
0≤gi-zki≤G1(1-xki) (26);
0≤zki≤G1xki (27);
式中,G1是一个常数,通常
Figure RE-GDA0001990845560000094
S53:采用二进制扩充方法,处理约束条件(22)中的非线性项πgiPi
首先,通过一组离散值{Pim,m=0,1,...,M2}近似连续决策变量Pi,其近似表达式为
Figure RE-GDA0001990845560000095
这里,
Figure RE-GDA0001990845560000096
Pi的取值区间为(Pi min,Pi max),ΔPi=(Pi max-Pi min)/M2,yki为二进制变量;然后,将πgi乘以等式(28)两侧,得到新变量wki=πgiyki,从而得到:
Figure RE-GDA0001990845560000097
同时,引入相应约束
0≤wkigi≤G2(1-yki) (30);
0≤-wki≤G2yki (31);
式中,G2是一个常数,通常
Figure RE-GDA0001990845560000101
S54:在目标函数(5),约束条件(6)-(12)和(22)应用上述步骤S51-S53的线性转化形式,得到混合整数规划模型:
Figure RE-GDA0001990845560000102
Figure RE-GDA0001990845560000103
Figure RE-GDA0001990845560000104
Figure RE-GDA0001990845560000105
Figure RE-GDA0001990845560000106
Figure RE-GDA0001990845560000107
Figure RE-GDA0001990845560000108
Figure RE-GDA0001990845560000109
πgi≤0,i∈I (40);
Figure RE-GDA00019908455600001010
0≤gi-zki≤G1(1-xki),i∈A (42);
0≤zki≤G1xki,i∈A (43);
0≤wkigi≤G2(1-yki),i∈A (44);
0≤-wki≤G2yki,i∈A (45);
xki,yki∈{0,1},i∈A (46)。
S6:结合虚拟电厂内部需求侧资源的出力特性,确定虚拟电厂参与日前市场的优化投标模型;具体步骤如下:
S61:确定虚拟电厂A所参与日前市场的时间间隔为Δt,时段数
Figure RE-GDA00019908455600001011
本实施例中Δt设置为1h,则时段数=24/1=24时段。
S62:根据虚拟电厂A和其他虚拟电厂内部需求侧资源组成情况,确定市场中所有需求侧资源种类、数目以及所属虚拟电厂。以虚拟电厂A、B和C参加区域日前市场投标为例进行介绍。虚拟电厂A由4类需求侧资源组成,包括风电机组(wind turbine,PT)、燃气轮机(gas turbine,GT)、电动汽车(electric vehicle,EV)和柔性负荷(price-sensitivedemand response,PSDR)。虚拟电厂B由GT和PSDR组成。虚拟电厂C由GT和EV组成。此处PSDR是指基于激励的需求响应负荷。
S63:根据历史信息和市场信息,虚拟电厂A预测得到市场负荷
Figure RE-GDA0001990845560000111
和其余需求侧资源投标电量和电价。包括虚拟电厂B的投标信息
Figure RE-GDA0001990845560000112
Figure RE-GDA0001990845560000113
和虚拟电厂C的投标信息
Figure RE-GDA0001990845560000114
此处PSDR+表示增加需求响应负荷,而PSDR-表示减少需求响应负荷。
S64:根据虚拟电厂A内部需求侧资源特性,构建其在t时段容量成本模型CA,t
S641:虚拟电厂A在t时段容量成本模型CA,t具体包括WT成本CA,WT,t、GT成本CA,GT,t、PSDR成本CA,PSDR,t和EV成本CA,EV,t,即:
CA,t=CA,WT,t+CA,GT,t+CA,PSDR,t+CA,EV,t; (47)
①WT成本
由于WT发电成本为零,这里WT成本主要是弃风成本:
CA,WT,t=cWTPA,WT,t (48);
Figure RE-GDA0001990845560000115
式中,cWT表示弃风电惩罚费用;PA,WT,t表示在t时刻弃风电;
Figure RE-GDA0001990845560000116
表示虚拟电厂A预测风电机组在时刻t发电功率。
②GT成本
GT成本由燃料费用、启停成本和碳排放惩罚成本组成,即:
Figure RE-GDA0001990845560000117
其中:
ηA,GT,t=aA,GT(PA,GT,t)2+bA,GTPA,GT,t+cA,GT (51);
Figure RE-GDA0001990845560000118
Figure RE-GDA0001990845560000119
式中,FA,GT,t为GT燃气耗量;LHV为低位热值;ηA,GT,t分别为GT发电效率;
Figure RE-GDA00019908455600001110
分别为GT启停成本;DK、YK、VK分别为第k类污染气体的排放量及单位排放量对应的罚款和环境价值;PA,GT,t为GT发电功率;aA,GT、bA,GT、cA,GT为GT效率系数;
Figure RE-GDA0001990845560000121
分别为 GT每次开机、停机费用;uA,GT,t为二进制变量,分别为GT机组在时段t工作状态。
GT的相关约束条件为:
Figure RE-GDA0001990845560000122
式中,
Figure RE-GDA0001990845560000123
表示GT在时刻t的最大出力。
③PSDR成本
PSDR成本是需求响应负荷削减或增加产生的费用,即:
CA,PSDR,t=aA,PSDR(PA,PSDR,t)2+bA,PSDRPA,PSDR,t+cA,PSDR,t (55);
式中,PA,PSDR,t表示PSDR在时刻t负荷削减量或增加量;aA,PSDR、bA,PSDR、cA,PSDR,t表示与价格弹性系数及电价折扣率有关系数。
PSDR的相关约束条件如下:
Figure RE-GDA0001990845560000124
Figure RE-GDA0001990845560000125
Figure RE-GDA0001990845560000126
Figure RE-GDA0001990845560000127
Figure RE-GDA0001990845560000128
式中:
Figure RE-GDA0001990845560000129
表示PSDR在时刻t最大削减或增加负荷;
Figure RE-GDA00019908455600001210
Figure RE-GDA00019908455600001211
分别表示PSDR 在时刻t削减负荷和增加负荷;
Figure RE-GDA00019908455600001212
Figure RE-GDA00019908455600001213
分别表示PSDR在时刻t是否处于削减负荷状态和增加负荷状态。
④EV成本
EV成本是电池损耗成本,即:
Figure RE-GDA00019908455600001214
式中:nA,EV表示EV数量;cA,EV,i、EA,EV,i、NA,EV,i、DODA,EV,i分别表示第i辆EV的电池购买成本、电池容量、电池可用循环次数及电池可用放电限度;
Figure RE-GDA00019908455600001215
为EV的放电效率;LA,EV,i,t为第i辆EV在时刻t的行驶距离;SA,EV,i表示第i辆EV能量需求;
Figure RE-GDA0001990845560000131
为决策变量,表示 EV的放电功率。
EV的相关约束条件具体如下:
Figure RE-GDA0001990845560000132
Figure RE-GDA0001990845560000133
Figure RE-GDA0001990845560000134
Figure RE-GDA0001990845560000135
Figure RE-GDA0001990845560000136
Figure RE-GDA0001990845560000137
Figure RE-GDA0001990845560000138
式中,EA,EV,i,t表示第i辆EV在时刻t的蓄电量;
Figure RE-GDA0001990845560000139
分别表示第i辆EV蓄电量上、下限;
Figure RE-GDA00019908455600001310
表示第i辆EV在时刻t的充电功率;
Figure RE-GDA00019908455600001311
分别表示第i辆EV充放功率上限;
Figure RE-GDA00019908455600001312
分别表示第i辆EV在时刻t是否处于充放状态;
Figure RE-GDA00019908455600001313
表示第i辆 EV在时刻t是否处于接入电网状态;
Figure RE-GDA00019908455600001314
分别表示第i辆EV始、末时刻蓄电量;
Figure RE-GDA00019908455600001315
分别表示第i辆EV充电效率。
S642:应用分段线性化方法,处理GT容量成本模型及约束条件。具体是将GT在t时刻燃料费用
Figure RE-GDA00019908455600001316
与出力函数分成nGT段,每一段引入一个状态变量τi,GT,t和一个连续变量pi,GT,t,其燃料费用的线性化表达式如下:
Figure RE-GDA00019908455600001317
相关约束条件为:
Figure RE-GDA00019908455600001318
Figure RE-GDA00019908455600001319
pi,GTτi,t≤pi,GT,t≤pi+1,GTτi,GT,t (72);
Figure RE-GDA00019908455600001320
Figure RE-GDA0001990845560000141
对于GT启停成本模型,可以重写为线性形式:
Figure RE-GDA0001990845560000142
Figure RE-GDA0001990845560000143
Figure RE-GDA0001990845560000144
Figure RE-GDA0001990845560000145
S643:应用分段线性化方法,处理PSDR成本容量模型及相关约束条件。具体是将PSDR 在t时刻增加负荷费用
Figure RE-GDA0001990845560000146
与出力函数分成
Figure RE-GDA0001990845560000147
段,每一段引入一个状态变量
Figure RE-GDA0001990845560000148
和一个连续变量
Figure RE-GDA0001990845560000149
其增加负荷费用的线性化表达式如下:
Figure RE-GDA00019908455600001410
相关约束条件为:
Figure RE-GDA00019908455600001411
Figure RE-GDA00019908455600001412
Figure RE-GDA00019908455600001413
Figure RE-GDA00019908455600001414
Figure RE-GDA00019908455600001415
将PSDR在t时刻削减负荷费用
Figure RE-GDA00019908455600001416
与出力函数分成
Figure RE-GDA00019908455600001417
段,每一段引入一个状态变量
Figure RE-GDA00019908455600001418
和一个连续变量
Figure RE-GDA00019908455600001419
其削减负荷费用的线性化表达式如下:。
Figure RE-GDA00019908455600001420
相关约束条件为:
Figure RE-GDA00019908455600001421
Figure RE-GDA00019908455600001422
Figure RE-GDA00019908455600001423
Figure RE-GDA0001990845560000151
Figure RE-GDA0001990845560000152
S65:根据成本容量模型及相关约束,结合预测信息,构建虚拟电厂A参加日前电力市场优化投标模型。虚拟电厂A出清电量包括弃风电gA,WT,t、GT出力gA,GT,t、需求响应增加负荷
Figure RE-GDA0001990845560000153
需求响应减少负荷
Figure RE-GDA0001990845560000154
EV充电功率
Figure RE-GDA0001990845560000155
和EV放电功率
Figure RE-GDA0001990845560000156
市场所有需求侧资源用集合I表示。虚拟电厂A在时段t总出清电量可表示为:
Figure RE-GDA0001990845560000157
虚拟电厂B总出清电量可表示为:
Figure RE-GDA0001990845560000158
虚拟电厂C总出清电量表示为:
Figure RE-GDA0001990845560000159
构建的虚拟电厂A参加日前电力市场优化投标模型为:
Figure RE-GDA00019908455600001510
Figure RE-GDA00019908455600001511
Figure RE-GDA00019908455600001512
Figure RE-GDA00019908455600001513
Figure RE-GDA00019908455600001514
Figure RE-GDA00019908455600001515
Figure RE-GDA00019908455600001516
Figure RE-GDA00019908455600001517
πgi,t≤0,i∈I; (102)
Figure RE-GDA00019908455600001518
Figure RE-GDA0001990845560000161
0≤gi,t-zki,t≤G1(1-xki,t),i∈A; (104)
0≤zki,t≤G1xki,t,i∈A; (105)
0≤wki,tgi,t≤G2(1-yki,t),i∈A; (106)
0≤-wki,t≤G2yki,t,i∈A; (107)
ui,t,xki,t,yki,t∈{0,1},i∈A; (108)
式中,系数δi,t取+1或-1,即公式(93)gi,t系数为正数时取+1,系数为负数时取-1。此外,虚拟电厂A出清电量满足GT有关约束(70-78),PSDR相关约束(56-60)、(80-84)、 (86-90),EV有关约束(62-68)。
S7:采用Yamip/Gurobi软件计算虚拟电厂参与日前电力市场的最大收益投标模型,获取投标电量和投标电价,具体步骤如下:
S71:应用蒙特卡罗方法对虚拟电厂A的每辆电动汽车行驶距离和并网时间进行模拟,生成nEV辆电动汽车单一时刻驶入和驶离的电动汽车数量及行驶距离输入数据,并采用K-means聚类算法抽取NEV类典型电动汽车,得到每类电动汽车具有相近并网时间和行驶距离。
S72:根据NEV类典型电动汽车并网时间、行驶距离和数量,累加得到每类EV充、放电功率上限、并网容量和行驶距离,用NEV类典型EV参数更新投标优化模型中涉及EV模型参数。
S73:采用Yamip/Gurobi商用软件计算虚拟电厂参加日前市场的优化投标模型,获取虚拟电厂 A内部各类需求侧资源投标电量和电价。
本发明不局限于以上所述的具体实施方式,以上所述仅为本发明的较佳实施案例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。

Claims (2)

1.一种虚拟电厂参与日前电力市场的优化投标方法,其特征在于:包括以下步骤:
S1:在各虚拟电厂提交其需求侧资源的投标电量和电价后,以最小成本为优化目标构建调度中心市场出清模型,获取市场出清价格和出清电量;所述步骤S1中的构建调度中心市场出清模型的具体步骤如下:
S11:在各虚拟电厂提交其需求侧资源i的投标电量Pi和投标电价λi后,调度中心进行经济调度获取出清电价πd和出清电量gi,假设出清电量gi≥0,其目标函数如下:
Figure FDA0002616771690000011
式中,I表示所有需求侧资源集合;
S12:负荷供需平衡约束:
Figure FDA0002616771690000012
式中,d为负荷;πd是对偶变量,表示现货价格,即增加单位负荷的边际成本;
S13:出清电量受到投标电量约束如下:
gi≤Pi,i∈I πgi (3);
式中,πgi是对偶变量,表示需求侧资源i增加单位投标电量的边际效益;
S2:根据步骤S1得到的市场出清价格,结合虚拟电厂内部需求侧资源的变动运行成本和投标电量,获得该虚拟电厂净收益函数;获得该虚拟电厂净收益函数的计算方式为:设该虚拟电厂为虚拟电厂A,虚拟电厂A的总收入减去运行成本即得净收益R,具体如下:
Figure FDA0002616771690000013
式中,ci表示需求侧资源i的变动运行成本;i∈A表示属于虚拟电厂A的需求侧资源集合;πd是对偶变量,表示现货价格,即增加单位负荷的边际成本;gi为出清电量;
S3:以虚拟电厂最大净收益为优化目标,结合其内部各需求侧资源最大容量约束,建立虚拟电厂的投标优化模型;建立虚拟电厂的投标优化模型的步骤具体如下:
S31:设该虚拟电厂为虚拟电厂A,虚拟电厂A投标优化目标是其净收益最大化,具体如下:
Figure FDA0002616771690000014
式中,ci表示虚拟电厂A的需求侧资源i的变动运行成本;i∈A表示属于虚拟电厂A的需求侧资源集合;πd是对偶变量,表示现货价格,即增加单位负荷的边际成本;gi为出清电量;
S32:虚拟电厂A的需求侧资源i投标电量具有出力约束,具体如下:
Pi≤Pi max i∈A (6);
式中,Pi为虚拟电厂A的需求侧资源i的投标电量,Pi max表示虚拟电厂A的需求侧资源i的最大容量;
S4:根据步骤S1获得的市场出清模型的最优性条件,将其作为虚拟电厂投标优化的部分约束条件,从而将步骤S3建立的投标优化模型转化成具有平衡约束的数学规划模型;所述步骤S4中的将步骤S3建立的投标优化模型转化成平衡约束的数学规划模型的步骤具体如下:
S41:根据对偶理论,获取市场出清模型的最优性条件,具体如式(7)-(16),将其加入到步骤S3建立的虚拟电厂A的投标优化模型的约束条件中,得到虚拟电厂A具有平衡约束的数学规划模型;
Figure FDA0002616771690000021
gi-Pi≤0,i∈A (8);
Figure FDA0002616771690000022
πdgii≤0,i∈A (10);
Figure FDA0002616771690000023
πgi≤0,i∈I (12);
dgii)gi=0,i∈A (13);
Figure FDA0002616771690000024
(Pi-gigi=0,i∈A (15);
Figure FDA0002616771690000025
其中,式(7)-(9)是步骤S1的构建的调度中心市场出清模型的约束条件,式(10)-(12)是对偶问题的约束条件,式(13)-(16)是互补条件;
式中,
Figure FDA0002616771690000026
为虚拟电厂A的预测市场负荷;
Figure FDA0002616771690000027
表示虚拟电厂A预测其余需求侧资源的投标电量-电价;Pi为虚拟电厂A的需求侧资源i的投标电量,gi为出清电量;λi为投标电价;πd是对偶变量,表示现货价格,即增加单位负荷的边际成本;πgi是对偶变量,表示需求侧资源i增加单位投标电量的边际效益;
Figure FDA0002616771690000028
表示市场其余需求侧资源集合;
S42:根据gi≥0,i∈I,对公式(10)和(11)进行变形,得到:
dgii)gi≤0,i∈A (17);
Figure FDA0002616771690000031
S43:根据公式(12),对公式(8)和(9)进行变形,得到:
(gi-Pigi≤0,i∈A (19);
Figure FDA0002616771690000032
S44:根据公式(17)-(20)的非正性,得到互补条件(13)-(16)的等效公式:
Figure FDA0002616771690000033
S45:使用公式(7):重新安排公式(21)各项,得到等效公式(22),即原对偶等式条件为:
Figure FDA0002616771690000034
S46:至此,生成步骤S3建立的虚拟电厂A的投标优化模型的目标函数及其约束条件,步骤S3建立的虚拟电厂A的投标优化模型的目标函数如式(5)所示,其约束条件为式(6)-(12)和式(22);
S5:采用二进制扩充方法处理步骤S4中的具有平衡约束的数学规划模型中的非线性项,即连续变量乘积,形成混合整数规划模型;所述步骤S5中采用二进制扩充方法处理步骤S4中的具有平衡约束的数学规划模型中的非线性项的具体步骤如下:
S51:应用式(13)和(15)的互补条件,用λigi和πgiPi重写目标函数(5)中的非线性项πdgi
πdgi=λigigiPi (23);
S52:采用二进制扩充方法处理约束条件(22)中的非线性项λigi
首先,通过一组离散值{λim,m=0,1,...,M1}近似连续决策变量λi,其近似表达式为:
Figure FDA0002616771690000035
这里,
Figure FDA0002616771690000036
λi的取值区间为(λi mini max),Δλi=(λi maxi min)/M1,xki为二进制变量;然后,将gi乘以等式(24)两侧,得到新变量zki=xkigi,从而得到:
Figure FDA0002616771690000037
同时,引入相应约束:
0≤gi-zki≤G1(1-xki) (26);
0≤zki≤G1xki (27);
式中,G1是一个常数,
Figure FDA0002616771690000038
S53:采用二进制扩充方法,处理约束条件(22)中的非线性项πgiPi
首先,通过一组离散值{Pim,m=0,1,...,M2}近似连续决策变量Pi,其近似表达式为
Figure FDA0002616771690000041
这里,
Figure FDA0002616771690000042
Pi的取值区间为(Pi min,Pi max),ΔPi=(Pi max-Pi min)/M2,yki为二进制变量;然后,将πgi乘以等式(28)两侧,得到新变量wki=πgiyki,从而得到:
Figure FDA0002616771690000043
同时,引入相应约束
0≤wkigi≤G2(1-yki) (30);
0≤-wki≤G2yki (31);
式中,G2是一个常数,
Figure FDA0002616771690000044
S54:在目标函数(5),约束条件(6)-(12)和(22)应用上述步骤S51-S53的线性转化形式,得到混合整数规划模型:
Figure FDA0002616771690000045
Figure FDA0002616771690000046
Figure FDA0002616771690000047
Figure FDA0002616771690000048
Figure FDA00026167716900000413
Figure FDA0002616771690000049
Figure FDA00026167716900000410
Figure FDA00026167716900000411
πgi≤0,i∈I (40);
Figure FDA00026167716900000412
0≤gi-zki≤G1(1-xki),i∈A (42);
0≤zki≤G1xki,i∈A (43);
0≤wkigi≤G2(1-yki),i∈A (44);
0≤-wki≤G2yki,i∈A (45);
xki,yki∈{0,1},i∈A (46);
S6:结合虚拟电厂内部需求侧资源的出力特性,确定虚拟电厂参与日前市场的优化投标模型;
具体步骤如下:
S61:确定虚拟电厂A所参与日前市场的时间间隔为Δt,时段数
Figure FDA0002616771690000051
S62:根据虚拟电厂A和其他虚拟电厂内部需求侧资源组成情况,确定市场中所有需求侧资源种类、数目以及所属虚拟电厂;虚拟电厂A的需求侧资源包括风电机组、燃气轮机、电动汽车和柔性负荷;
S63:根据历史信息和市场信息,虚拟电厂A预测得到市场负荷
Figure FDA0002616771690000052
和其余需求侧资源投标电量和电价;
S64:根据虚拟电厂A内部需求侧资源特性,构建其在t时段容量成本模型CA,t
S641:虚拟电厂A在t时段容量成本模型CA,t具体包括风电机组WT成本CA,WT,t、燃气轮机GT成本CA,GT,t、柔性负荷PSDR成本CA,PSDR,t和电动汽车EV成本CA,EV,t,即:
CA,t=CA,WT,t+CA,GT,t+CA,PSDR,t+CA,EV,t; (47)
①风电机组成本
由于风电机组发电成本为零,这里风电机组成本主要是弃风成本:
CA,WT,t=cWTPA,WT,t (48);
Figure FDA0002616771690000053
式中,cWT表示弃风电惩罚费用;PA,WT,t表示在t时刻弃风电;
Figure FDA0002616771690000054
表示虚拟电厂A预测风电机组在时刻t发电功率;
②燃气轮机成本
燃气轮机成本由燃料费用、启停成本和碳排放惩罚成本组成,即:
Figure FDA0002616771690000055
其中:
ηA,GT,t=aA,GT(PA,GT,t)2+bA,GTPA,GT,t+cA,GT (51);
Figure FDA0002616771690000061
Figure FDA0002616771690000062
式中,FA,GT,t为GT燃气耗量;LHV为低位热值;ηA,GT,t分别为GT发电效率;
Figure FDA0002616771690000063
分别为GT启停成本;DK、YK、VK分别为第k类污染气体的排放量及单位排放量对应的罚款和环境价值;PA,GT,t为GT发电功率;aA,GT、bA,GT、cA,GT为GT效率系数;
Figure FDA0002616771690000064
分别为GT每次开机、停机费用;uA,GT,t为二进制变量,分别为GT机组在时段t工作状态;
GT的相关约束条件为:
Figure FDA0002616771690000065
式中,
Figure FDA0002616771690000066
表示GT在时刻t的最大出力;
③柔性负荷成本
柔性负荷成本是需求响应负荷削减或增加产生的费用,即:
CA,PSDR,t=aA,PSDR(PA,PSDR,t)2+bA,PSDRPA,PSDR,t+cA,PSDR,t (55);
式中,PA,PSDR,t表示PSDR在时刻t负荷削减量或增加量;aA,PSDR、bA,PSDR、cA,PSDR,t表示与价格弹性系数及电价折扣率有关系数;
PSDR的相关约束条件如下:
Figure FDA0002616771690000067
Figure FDA0002616771690000068
Figure FDA0002616771690000069
Figure FDA00026167716900000610
Figure FDA00026167716900000611
式中:
Figure FDA00026167716900000612
表示PSDR在时刻t最大削减或增加负荷;
Figure FDA00026167716900000613
Figure FDA00026167716900000614
分别表示PSDR在时刻t削减负荷和增加负荷;
Figure FDA00026167716900000615
Figure FDA00026167716900000616
分别表示PSDR在时刻t是否处于削减负荷状态和增加负荷状态;
④电动汽车成本
电动汽车成本是电池损耗成本,即:
Figure FDA0002616771690000071
式中:nA,EV表示EV数量;cA,EV,i、EA,EV,i、NA,EV,i、DODA,EV,i分别表示第i辆EV的电池购买成本、电池容量、电池可用循环次数及电池可用放电限度;
Figure FDA0002616771690000072
为EV的放电效率;LA,EV,i,t为第i辆EV在时刻t的行驶距离;SA,EV,i表示第i辆EV能量需求;
Figure FDA0002616771690000073
为决策变量,表示EV的放电功率;
EV的相关约束条件具体如下:
Figure FDA0002616771690000074
Figure FDA0002616771690000075
Figure FDA0002616771690000076
Figure FDA0002616771690000077
Figure FDA0002616771690000078
Figure FDA0002616771690000079
Figure FDA00026167716900000710
式中,EA,EV,i,t表示第i辆EV在时刻t的蓄电量;
Figure FDA00026167716900000711
分别表示第i辆EV蓄电量上、下限;
Figure FDA00026167716900000712
表示第i辆EV在时刻t的充电功率;
Figure FDA00026167716900000713
分别表示第i辆EV充放功率上限;
Figure FDA00026167716900000714
分别表示第i辆EV在时刻t是否处于充放状态;
Figure FDA00026167716900000715
表示第i辆EV在时刻t是否处于接入电网状态;
Figure FDA00026167716900000716
分别表示第i辆EV始、末时刻蓄电量;
Figure FDA00026167716900000717
分别表示第i辆EV充电效率;
S642:应用分段线性化方法,处理GT容量成本模型及约束条件;具体是将GT在t时刻燃料费用
Figure FDA00026167716900000718
与出力函数分成nGT段,每一段引入一个状态变量τi,GT,t和一个连续变量pi,GT,t,其燃料费用的线性化表达式如下:
Figure FDA00026167716900000719
相关约束条件为:
Figure FDA0002616771690000081
Figure FDA0002616771690000082
pi,GTτi,t≤pi,GT,t≤pi+1,GTτi,GT,t (72);
Figure FDA0002616771690000083
Figure FDA0002616771690000084
对于GT启停成本模型,可以重写为线性形式:
Figure FDA0002616771690000085
Figure FDA0002616771690000086
Figure FDA0002616771690000087
Figure FDA0002616771690000088
S643:应用分段线性化方法,处理PSDR成本容量模型及相关约束条件;具体是将PSDR在t时刻增加负荷费用
Figure FDA0002616771690000089
与出力函数分成
Figure FDA00026167716900000810
段,每一段引入一个状态变量
Figure FDA00026167716900000811
和一个连续变量
Figure FDA00026167716900000812
其增加负荷费用的线性化表达式如下:
Figure FDA00026167716900000813
相关约束条件为:
Figure FDA00026167716900000814
Figure FDA00026167716900000815
Figure FDA00026167716900000816
Figure FDA00026167716900000817
Figure FDA00026167716900000818
将PSDR在t时刻削减负荷费用
Figure FDA00026167716900000819
与出力函数分成
Figure FDA00026167716900000820
段,每一段引入一个状态变量
Figure FDA00026167716900000821
和一个连续变量
Figure FDA00026167716900000822
其削减负荷费用的线性化表达式如下:
Figure FDA0002616771690000091
相关约束条件为:
Figure FDA0002616771690000092
Figure FDA0002616771690000093
Figure FDA0002616771690000094
Figure FDA0002616771690000095
Figure FDA0002616771690000096
S65:根据成本容量模型及相关约束,结合预测信息,构建虚拟电厂A参加日前电力市场优化投标模型;
S7:采用Yamip/Gurobi软件计算虚拟电厂参与日前电力市场的最大收益投标模型,获取投标电量和投标电价。
2.根据权利要求1所述的一种虚拟电厂参与日前电力市场的优化投标方法,其特征在于:所述Δt设置为1h,则时段数=24/1=24时段。
CN201811544351.3A 2018-12-17 2018-12-17 一种虚拟电厂参与日前电力市场的优化投标策略 Active CN109993639B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811544351.3A CN109993639B (zh) 2018-12-17 2018-12-17 一种虚拟电厂参与日前电力市场的优化投标策略

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811544351.3A CN109993639B (zh) 2018-12-17 2018-12-17 一种虚拟电厂参与日前电力市场的优化投标策略

Publications (2)

Publication Number Publication Date
CN109993639A CN109993639A (zh) 2019-07-09
CN109993639B true CN109993639B (zh) 2020-11-24

Family

ID=67129042

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811544351.3A Active CN109993639B (zh) 2018-12-17 2018-12-17 一种虚拟电厂参与日前电力市场的优化投标策略

Country Status (1)

Country Link
CN (1) CN109993639B (zh)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110750759B (zh) * 2019-09-11 2023-04-21 广东工业大学 一种基于虚拟储能并带有误差调制的需求侧管理方法
CN111563617B (zh) * 2020-04-22 2023-09-19 国网上海市电力公司 一种虚拟电厂中长期备用交易的市场出清优化方法及系统
CN112102047A (zh) * 2020-08-11 2020-12-18 国网冀北电力有限公司 虚拟电厂优化组合竞价方法、装置、设备和存储介质
CN112215641B (zh) * 2020-10-10 2024-06-07 国网上海市电力公司 智能楼宇型虚拟电厂参与能量调频的控制方法及系统
CN112580987A (zh) * 2020-12-22 2021-03-30 深圳供电局有限公司 一种考虑虚拟电厂可调资源可用性的负荷聚合方法及装置
CN113538066B (zh) * 2021-07-30 2024-02-27 国网上海市电力公司 虚拟电厂参与电力市场的控制方法、系统、设备及介质
CN117154736A (zh) * 2023-09-01 2023-12-01 华能罗源发电有限责任公司 一种混合储能系统参与火电机组深度调峰优化方法及系统

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108711890A (zh) * 2018-06-27 2018-10-26 广东电网有限责任公司 日前市场出清方法、系统、装置及计算机可读存储介质
CN108960510A (zh) * 2018-07-04 2018-12-07 四川大学 一种基于两阶段随机规划的虚拟电厂优化交易策略模型

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10509374B2 (en) * 2015-10-07 2019-12-17 University Of Utah Research Foundation Systems and methods for managing power generation and storage resources

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108711890A (zh) * 2018-06-27 2018-10-26 广东电网有限责任公司 日前市场出清方法、系统、装置及计算机可读存储介质
CN108960510A (zh) * 2018-07-04 2018-12-07 四川大学 一种基于两阶段随机规划的虚拟电厂优化交易策略模型

Also Published As

Publication number Publication date
CN109993639A (zh) 2019-07-09

Similar Documents

Publication Publication Date Title
CN109993639B (zh) 一种虚拟电厂参与日前电力市场的优化投标策略
Elsied et al. Optimal economic and environment operation of micro-grid power systems
Saber et al. Efficient utilization of renewable energy sources by gridable vehicles in cyber-physical energy systems
Jaramillo et al. Optimal microgrid scheduling with peak load reduction involving an electrolyzer and flexible loads
Saber et al. Plug-in vehicles and renewable energy sources for cost and emission reductions
Arslan et al. Cost and emission impacts of virtual power plant formation in plug-in hybrid electric vehicle penetrated networks
Gabash et al. Flexible optimal operation of battery storage systems for energy supply networks
US8718850B2 (en) Systems and methods for using electric vehicles as mobile energy storage
CN107979111A (zh) 一种基于两阶段鲁棒优化的微电网能量管理方法
CN103217900A (zh) 基于实时电价的中压微网混沌pso最优潮流实现方法
CN114243694B (zh) 考虑阶梯碳交易和需求响应的并网型微电网优化配置方法
Feng et al. Performance analysis of hybrid energy storage integrated with distributed renewable energy
Hu et al. Minimizing energy cost for green data center by exploring heterogeneous energy resource
Huang et al. A decision-making tool for determination of storage capacity in grid-connected PV systems
Gherairi Design and implementation of an intelligent energy management system for smart home utilizing a multi-agent system
Michael et al. Economic scheduling of virtual power plant in day-ahead and real-time markets considering uncertainties in electrical parameters
CN113742944A (zh) 一种考虑电制氢系统的虚拟电厂建模方法
Ghasemi Olanlari et al. Coordinated multi‐objective scheduling of a multi‐energy virtual power plant considering storages and demand response
Tian et al. Coordinated control strategy assessment of a virtual power plant based on electric public transportation
Hayati et al. A two-stage stochastic optimization scheduling approach for integrating renewable energy sources and deferrable demand in the spinning reserve market
Zahboune et al. Modified electric system cascade analysis for optimal sizing of an autonomous hybrid energy system
Henni et al. Bottom-up system modeling of battery storage requirements for integrated renewable energy systems
Rizvi et al. Optimal scheduling of virtual power plants utilizing wind power and electric vehicles
Chandio et al. Gridpeaks: Employing distributed energy storage for grid peak reduction
CN112260274A (zh) 一种基于全景理论的虚拟电厂组建方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant