CN109989717A - It is a kind of to can be achieved from the drill pipe storage for moving bar - Google Patents

It is a kind of to can be achieved from the drill pipe storage for moving bar Download PDF

Info

Publication number
CN109989717A
CN109989717A CN201910305530.XA CN201910305530A CN109989717A CN 109989717 A CN109989717 A CN 109989717A CN 201910305530 A CN201910305530 A CN 201910305530A CN 109989717 A CN109989717 A CN 109989717A
Authority
CN
China
Prior art keywords
spring
arc groove
drilling rod
chuck
drill pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910305530.XA
Other languages
Chinese (zh)
Other versions
CN109989717B (en
Inventor
李波
孟宪钊
张振东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Geosciences
Original Assignee
China University of Geosciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Geosciences filed Critical China University of Geosciences
Priority to CN201910305530.XA priority Critical patent/CN109989717B/en
Publication of CN109989717A publication Critical patent/CN109989717A/en
Application granted granted Critical
Publication of CN109989717B publication Critical patent/CN109989717B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/10Slips; Spiders ; Catching devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/14Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
    • E21B19/143Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole specially adapted for underwater drilling

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Drilling And Boring (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention provides a kind of can be achieved from the drill pipe storage for moving bar, if including cantilever beam, rotational fuel tank, center-pole, several chucks and dry pipe, the cantilever beam is arranged between rack rail, the rotational fuel tank setting is on a cantilever beam, it is connect with center-pole, the chuck is setting up and down, and is connected on center-pole;The chuck is semicircular structure, the first arc groove and the second arc groove are opened up on the chuck, first arc groove and the second arc groove are used to place drilling rod, the first spring card is arranged in the front end of first arc groove, and first spring card constrains drilling rod along the first arc groove direction;Spring top clamping device is set at second arc groove, and drilling rod is limited in the second arc groove by the spring top clamping device.Drill pipe storage of the invention is compact-sized, and functional reliability is high, and a dive can repeatedly be sampled in different work point, be improved work efficiency, and provides technical support for the exploitation of deep sea mineral resources.

Description

It is a kind of to can be achieved from the drill pipe storage for moving bar
Technical field
The present invention relates to deep-sea Exploration Domains more particularly to one kind to be mounted in Deep Unmanned Submersibles (Remote Operated Vehicle, ROV) on vibration sampler drill dedicated can be achieved from moving the drill pipe storage of bar.
Background technique
As China's economy develops rapidly, resources requirement is significantly increased, land can production of resources it is fewer and fewer, therefore I State advocates Development of Marine economy energetically, improves marine resources development ability.In this context, the deep-sea of vibration sampler drill is carried Remote-controlled vehicle comes into being, and in order to improve the quality and quantity of dive sampling, urgent need designs a kind of deep earth sampling brill Machine is dedicated to be can be achieved to move the drill pipe storage of bar function certainly to meet scientific research needs.
Summary of the invention
In view of this, the present invention provides one kind to be mounted in Deep Unmanned Submersibles (Remote Operated Vehicle, ROV) on vibration sampler drill dedicated can be achieved from moving the drill pipe storage of bar.
The present invention provide it is a kind of can be achieved from moving the drill pipe storage of bar, including it is cantilever beam, rotational fuel tank, center-pole, several If chuck and dry pipe, the cantilever beam is arranged between rack rail, and the rotational fuel tank is arranged on a cantilever beam, with center Bar connection, the chuck is setting up and down, and is connected on center-pole;The chuck is semicircular structure, is opened up on the chuck First arc groove and the second arc groove, first arc groove and the second arc groove are used to place drilling rod, first arc groove Front end the first spring card is set, first spring card constrains drilling rod along the first arc groove direction;Described Spring top clamping device is set at two arc grooves, and drilling rod is limited in the second arc groove by the spring top clamping device;Using described When drill pipe storage Recycling of drill rod, rotational fuel tank rotation drive chuck rotate clockwise 90 degree of power heads to drilling machine just under Side, drilling rod and first the first spring card of spring card contact squeeze on the power head, first spring card Stress after-contraction, the drilling rod on the power head stick into the first arc groove;When sending bar using the drill pipe storage, the rotation oil Cylinder rotation drives chuck to rotate counterclockwise 90 degree of underfaces to power head, the outermost drilling rod folder in second arc groove After on power head, the rotational fuel tank drives center-pole to rotate clockwise drilling rod along the direction of the second arc groove from chuck Separation.
Further, the spring top clamping device includes second spring card, the first spring track support, second spring rail Road support, the first spring track, second spring track, the first spring, second spring and spring thin slice, the second spring card The front end of second arc groove is set, and the second spring card holds out against the outermost drilling rod in the second arc groove and applies to it Inside thrust;The first spring track support is connected to the left upper end of the second arc groove, the first spring track connection In the upper end of the first spring track support, first spring is set on the first spring track, and the head end of the first spring is solid It is scheduled on the rear end of the first spring track;The second spring track support is connected to the upper right side of the second arc groove, and described second Spring track is connected to the upper end of second spring track support, and the second spring is set on second spring track, and second The head end of spring is fixed on the rear end of second spring track, and the spring thin slice is between the first spring and second spring, institute The one end for stating spring thin slice is hinged on the tail end of the first spring, and the other end of the spring thin slice is hinged on the tail of second spring End, first spring and second spring are in compressive state, first spring and second spring and apply to spring thin slice Elastic force, so that spring thin slice holds out against the innermost drilling rod in the second arc groove and applies outside thrust to it.
Further, aperture is opened up on the chuck, the center-pole passes through aperture and is fixedly connected with chuck.
Further, the bottom end of the center-pole connects pedestal, and the lower end in contact of the pedestal and drilling rod is bored for limiting The movement of bar in the vertical direction.
Further, first arc groove and the width of the second arc groove and the diameter of drilling rod are adapted.
Further, four drilling rods can be placed in first arc groove and the second arc groove.
Further, the quantity of the chuck is 2.
Compared with prior art, present invention has an advantage that
1, the drilling rod in drill pipe storage provided by the invention is limited in card by spring top clamping device and the first spring card In disk, structure is simple, and functional reliability is high;
2, the chuck of drill pipe storage provided by the invention is semicircular structure, opens up the first arc groove and the second arc groove, when When rotational fuel tank drives chuck to rotate 90 degree, the first arc groove and the second arc groove are just gone to immediately below power head, are facilitated back Receive and replace drilling rod;
3, drill pipe storage of the invention can accommodate four drilling rods, and dive of drilling machine can repeatedly be sampled in different work point, can By property height, work efficiency is high, has innovation and practicality.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram that can be achieved from the drill pipe storage for moving bar of the present invention.
Fig. 2 is a kind of initial position top view that can be achieved from the drill pipe storage for moving bar of the present invention.
Fig. 3 is a kind of equal shaft side figures that can be achieved from the initial position for the drill pipe storage for moving bar of the present invention.
Fig. 4 is a kind of partial enlarged view for the front end that the first arc groove from the drill pipe storage for moving bar can be achieved of the present invention.
Fig. 5 is a kind of partial enlarged view for the front end that the second arc groove from the drill pipe storage for moving bar can be achieved of the present invention.
Fig. 6 is a kind of rearview that can be achieved from the drill pipe storage for moving bar of the present invention.
Fig. 7, which is that the present invention is a kind of, can be achieved to complete once to change the top view after bar from the drill pipe storage for moving bar.
Fig. 8 is a kind of equal shaft side figures that can be achieved to complete once to change from the drill pipe storage for moving bar after bar of the present invention.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with attached drawing to embodiment party of the present invention Formula is further described.
Referring to FIG. 1, the embodiment provides a kind of drill pipe storage that can be achieved to move bar certainly, including center-pole 1, If cantilever beam 2,3, two chucks 4 of rotational fuel tank, dry pipe 5 and pedestal 6, cantilever beam 2 are fixed between rack rail 7, Positioned at the top of power head 8, rotational fuel tank 3 is fixed, and rotational fuel tank 3 is connect with center-pole 1 by internal screw thread on the cantilever beam 2, Rotational fuel tank 3 is used to that center-pole 1 is driven to rotate, and two chucks 4, pedestal 6 be connected on center-pole 1, during pedestal 6 is connected to The bottom end of core bar 1, the lower end in contact with drilling rod 5, for limiting the movement of drilling rod 5 in the vertical direction.
Referring to figs. 2 and 3, chuck 4 be semicircular structure, two chucks 4 be on center-pole 1 it is setting up and down, on chuck 4 Aperture 41, the first arc groove 42 and the second arc groove 43 are opened up, the first arc groove 42 is located at the left side of chuck 4, the second arc groove 43 are located at the right side of chuck 4, and the width of the first arc groove 42 and the second arc groove 43 is adapted with the diameter of drilling rod 5, the first arc Shape slot 42 and the second arc groove 43 can place four drilling rods 5, and center-pole 1 passes through aperture 41 and is fixedly connected with chuck 4, and first The front end of arc groove 42 is bolted the first spring card 421 of setting, and the first spring card 421 is matched with the first arc groove 42 It closes, the first spring card 421 constrains drilling rod 5 along 42 direction of the first arc groove, prevents the brill in the first arc groove 42 Bar 5 is fallen, and the partial enlargement diagram of the front end of the first arc groove 42 is shown in Fig. 4;Spring top clamping is arranged at second arc groove 43 to fill 431 are set, spring top clamping device 431 includes second spring card 4311, the first spring track support 4312, second spring track branch Seat the 4313, first spring track 4314, second spring track 4315, the first spring 4316, second spring 4317, spring thin slice 4318。
Second spring card 4311 is bolted the front end that the second arc groove 43 is arranged in, second spring card 4311 Cooperate with the second arc groove 43, second spring card 4311 holds out against the outermost drilling rod 5 in the second arc groove 43, prevent its from It is fallen in second arc groove 43, the partial enlargement diagram of the front end of the second arc groove 43 is shown in Fig. 5;First spring track support 4312 are bolted to connection the left upper end in the second arc groove 43, and the first spring track 4314 is bolted to connection The upper end of first spring track support 4312, the first spring 4316 is set on the first spring track 4314, and the first spring 4316 head end is fixed on the rear end of the first spring track 4314;Second spring track support 4313 is bolted to connection The upper right side of second arc groove 43, second spring track 4315 are bolted to connection in second spring track support 4313 Upper end, second spring 4317 are set on second spring track 4315, and the head end of second spring 4317 is fixed on second spring The rear end of track 4315, spring thin slice 4318 between the first spring 4316 and second spring 4317, spring thin slice 4318 One end is hinged on the tail end of the first spring 4316, and the other end of spring thin slice 4318 is hinged on the tail end of second spring 4317, the One spring 4316 and second spring 4317 are in compressive state, since the first spring 4316 and second spring 4317 are in pressure Contracting state, and the first spring 4316 and the head end of second spring 4317 are fixed, therefore the first spring 4316 and second spring 4317 tail end can to spring thin slice 4318 apply elastic force, and then spring thin slice 4318 can hold out against it is most interior in the second arc groove 43 The drilling rod 5 of side applies outside thrust to it, while the outermost drilling rod 5 in the second arc groove 43 is by second spring card 4311 hold out against, and by inside thrust, under the action of outside thrust and inside thrust, drilling rod 5 is limited in the second arc In shape slot 43.
With reference to Fig. 6, the embodiment of the present invention will can be mounted on a vibrodrill from the drill pipe storage for moving bar, vibrodrill Power head 8 be bolted to connection on the side plate 9 between rack rail 7, side plate 9 by pulley 91 in rack rail 7 Hydraulic motor 92 is arranged on side plate 9 for middle up and down motion, and hydraulic motor 92 is connect with pulley 91, for controlling the sliding of pulley 91, Clamping cylinder 81 is arranged in the lower section of power head 8, and the front of clamping cylinder 81 is bolted to connection gripping block 82;Utilize drilling rod The process of library replacement drilling rod 5 are as follows:
(1) drilling rod 5 is put into two chucks 4;
(2) since before dive, the lower end of power head 8 has installed a drilling rod 5, vibrodrill is put into predetermined take Sample place starts to replace drilling rod 5 after boring under primary;
It (3) is the center of circle with center-pole 1, the rotation of rotational fuel tank 3 drives two chucks 4 to rotate clockwise 90 degree to power head 8 Underface, 421 the first spring card of contact squeeze 421 of drilling rod 5 and the first spring card on power head 8, the first Spring Card 421 stress after-contraction of piece, the drilling rod 5 on power head 8 stick into the first arc groove 42, and clamping cylinder 81 starts to act at this time, folder The telescopic rod of locking oil cylinder 81 extend out to initial position, and drilling rod 5 is unloaded from power head 8,92 driving pulley 91 of rear hydraulic motor It is moved up in rack rail 7, power head 8 is driven to rise a distance, then rotational fuel tank 3 drives center-pole 1 counterclockwise 90 degree of rotation, makes two chucks 4 return to initial position, so far completes the drilling rod 5 on recycling power head 8;
(4) after the completion of recycling, rotational fuel tank 3 drives center-pole 1 to rotate counterclockwise 90 degree, and center-pole 1 drives two after rotating A chuck 4 rotates counterclockwise 90 degree of underfaces to power head 8, and hydraulic motor 92 is downward along rack rail 7 with movable pulley 91 Movement drives power head 8 to drop to its fixture mushroom head bottom surface and is overlapped with drilling rod mushroom head top surface, and clamping cylinder 81 starts at this time Movement, the piston rod of clamping cylinder 81 starts to shrink until gripping block 82 clamps the outermost brill in the second arc groove 43 completely Drilling rod mushroom head on bar 5, rotational fuel tank 3 drive center-pole 1 to rotate clockwise, since the rotating torque of center-pole 1 is greater than most Moment of friction between the drilling rod 5 and second spring card 4311 in outside, therefore rotating clockwise with center-pole 1, are located at Outermost drilling rod 5 squeezes second spring card 4311, separates from chuck 4 then along the direction of the second arc groove 43, this When under the action of the first spring 4316 and the elastic force of second spring 4317, spring thin slice 4318 pushes remaining three drilling rods 5 It is held out against to outermost drilling rod 5 with second spring card 4311, when center-pole 1 rotates clockwise 90 degree, two chucks 4 are returned to Initial position is so far completed to send bar;By the above process, drill pipe storage, which realizes, completes once to move bar certainly;Drill pipe storage once changes Position after the completion of bar is referring to figs. 7 and 8.
Drill pipe storage of the invention is compact-sized, and functional reliability is high, and a dive can repeatedly be sampled in different work point, be mentioned High working efficiency, provides technical support for the exploitation of deep sea mineral resources.
Herein, the nouns of locality such as related front, rear, top, and bottom are to be located in figure with components in attached drawing and zero Part mutual position defines, only for the purpose of expressing the technical solution clearly and conveniently.It should be appreciated that the noun of locality Use should not limit the claimed range of the application.
In the absence of conflict, the feature in embodiment and embodiment herein-above set forth can be combined with each other.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (7)

1. a kind of can be achieved from the drill pipe storage for moving bar, which is characterized in that including cantilever beam, rotational fuel tank, center-pole, several cards If disk and dry pipe, the cantilever beam is arranged between rack rail, and the rotational fuel tank is arranged on a cantilever beam, with center-pole Connection, the chuck is setting up and down, and is connected on center-pole;The chuck is semicircular structure, and the is opened up on the chuck One arc groove and the second arc groove, first arc groove and the second arc groove are used to place drilling rod, first arc groove The first spring card is arranged in front end, and first spring card constrains drilling rod along the first arc groove direction;Described second Spring top clamping device is set at arc groove, and drilling rod is limited in the second arc groove by the spring top clamping device;Utilize the brill When the Recycling of drill rod of bar library, the rotational fuel tank rotation drive chuck rotates clockwise the underface of 90 degree of power heads to drilling machine, Drilling rod and first the first spring card of spring card contact squeeze on the power head, the first spring card stress After-contraction, the drilling rod on the power head stick into the first arc groove;When sending bar using the drill pipe storage, the rotational fuel tank turns Dynamic that chuck is driven to rotate counterclockwise 90 degree of underfaces to power head, the outermost drilling rod in second arc groove is clipped in dynamic After on power head, the rotational fuel tank drive center-pole is rotated clockwise divides drilling rod along the direction of the second arc groove from chuck From.
2. according to claim 1 can be achieved from the drill pipe storage for moving bar, which is characterized in that the spring top clamping device packet Include second spring card, the first spring track support, second spring track support, the first spring track, second spring track, The front end of the second arc groove, the second spring is arranged in one spring, second spring and spring thin slice, the second spring card Card holds out against the outermost drilling rod in the second arc groove and applies inside thrust to it;The first spring track support connection In the left upper end of the second arc groove, the first spring track is connected to the upper end of the first spring track support, first bullet Spring is set on the first spring track, and the head end of the first spring is fixed on the rear end of the first spring track;The second spring Track support is connected to the upper right side of the second arc groove, and the second spring track is connected to the upper of second spring track support End, the second spring is set on second spring track, and the head end of second spring is fixed on the rear end of second spring track, For the spring thin slice between the first spring and second spring, one end of the spring thin slice is hinged on the tail of the first spring End, the other end of the spring thin slice are hinged on the tail end of second spring, and first spring and second spring are in compression State, first spring and second spring apply elastic force to spring thin slice, so that spring thin slice is held out against in the second arc groove Innermost drilling rod applies outside thrust to it.
3. according to claim 1 can be achieved from the drill pipe storage for moving bar, which is characterized in that opened up on the chuck small Hole, the center-pole pass through aperture and are fixedly connected with chuck.
4. according to claim 1 can be achieved from the drill pipe storage for moving bar, which is characterized in that the bottom end of the center-pole connects Connect pedestal, the lower end in contact of the pedestal and drilling rod, for limiting the movement of drilling rod in the vertical direction.
5. according to claim 1 can be achieved from moving the drill pipe storage of bar, which is characterized in that first arc groove and the The width of two arc grooves is adapted with the diameter of drilling rod.
6. according to claim 1 can be achieved from moving the drill pipe storage of bar, which is characterized in that first arc groove and the Four drilling rods can be placed in two arc grooves.
7. according to claim 1 can be achieved from the drill pipe storage for moving bar, which is characterized in that the quantity of the chuck is 2 It is a.
CN201910305530.XA 2019-04-16 2019-04-16 Drill rod warehouse capable of realizing automatic rod replacement Active CN109989717B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910305530.XA CN109989717B (en) 2019-04-16 2019-04-16 Drill rod warehouse capable of realizing automatic rod replacement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910305530.XA CN109989717B (en) 2019-04-16 2019-04-16 Drill rod warehouse capable of realizing automatic rod replacement

Publications (2)

Publication Number Publication Date
CN109989717A true CN109989717A (en) 2019-07-09
CN109989717B CN109989717B (en) 2023-12-08

Family

ID=67133903

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910305530.XA Active CN109989717B (en) 2019-04-16 2019-04-16 Drill rod warehouse capable of realizing automatic rod replacement

Country Status (1)

Country Link
CN (1) CN109989717B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306941A (en) * 2019-08-05 2019-10-08 湖南科技大学 The seabed drilling machine drilling pipe library arcuate rotation supporting mechanism stored in a manner of couching
CN111425153A (en) * 2020-04-02 2020-07-17 张红宾 Automatic rod feeding device of jumbolter for coal mine
CN115853447A (en) * 2023-02-28 2023-03-28 南京中荷寰宇环境科技有限公司 Rod replacing device and rod replacing method for drilling machine

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2886060Y (en) * 2006-05-19 2007-04-04 中南大学 Multi-rod drilling rod library
KR20100078330A (en) * 2008-12-30 2010-07-08 주식회사수산중공업 Drill rod changer
CN204921774U (en) * 2015-08-24 2015-12-30 马鞍山唐拓凿岩机械有限公司 Drilling machine drilling rod storehouse pivoted arrestment mechanism
CN105863541A (en) * 2016-06-20 2016-08-17 中国地质大学(武汉) Small deep-sea multi-tube coring drilling rig
KR101665433B1 (en) * 2015-06-22 2016-10-12 주식회사 화인테크놀로지 Rod Breakaway Preventing Device for Rock Drill
CN106194175A (en) * 2016-09-26 2016-12-07 湖南文理学院 Many bars of connecting become born of the same parents' drill carriage linkage coarse filtration slag-draining device
CN106437571A (en) * 2016-09-26 2017-02-22 湖南文理学院 Drill carriage rough filtering linkage deslagging device adopting multi-rod metamorphic mechanism
US20170175462A1 (en) * 2015-12-18 2017-06-22 Sandvik Mining And Construction Oy Drill rod changer, rock drilling unit and method of changing drill rods
US20180128061A1 (en) * 2015-04-29 2018-05-10 Itrec B.V. Tubular product clamp
CN108194024A (en) * 2018-02-05 2018-06-22 中央民族大学 A kind of deep sea drill and method for being equipped with reducing core sampling drilling rod power head
US20180258716A1 (en) * 2015-08-31 2018-09-13 Ihc Marine And Mineral Projects (Proprietary) Limited Tooling rack for drill pipes
CN210068012U (en) * 2019-04-16 2020-02-14 中国地质大学(武汉) Drill rod warehouse capable of realizing automatic rod replacement

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2886060Y (en) * 2006-05-19 2007-04-04 中南大学 Multi-rod drilling rod library
KR20100078330A (en) * 2008-12-30 2010-07-08 주식회사수산중공업 Drill rod changer
US20180128061A1 (en) * 2015-04-29 2018-05-10 Itrec B.V. Tubular product clamp
KR101665433B1 (en) * 2015-06-22 2016-10-12 주식회사 화인테크놀로지 Rod Breakaway Preventing Device for Rock Drill
CN204921774U (en) * 2015-08-24 2015-12-30 马鞍山唐拓凿岩机械有限公司 Drilling machine drilling rod storehouse pivoted arrestment mechanism
US20180258716A1 (en) * 2015-08-31 2018-09-13 Ihc Marine And Mineral Projects (Proprietary) Limited Tooling rack for drill pipes
US20170175462A1 (en) * 2015-12-18 2017-06-22 Sandvik Mining And Construction Oy Drill rod changer, rock drilling unit and method of changing drill rods
CN105863541A (en) * 2016-06-20 2016-08-17 中国地质大学(武汉) Small deep-sea multi-tube coring drilling rig
CN106194175A (en) * 2016-09-26 2016-12-07 湖南文理学院 Many bars of connecting become born of the same parents' drill carriage linkage coarse filtration slag-draining device
CN106437571A (en) * 2016-09-26 2017-02-22 湖南文理学院 Drill carriage rough filtering linkage deslagging device adopting multi-rod metamorphic mechanism
CN108194024A (en) * 2018-02-05 2018-06-22 中央民族大学 A kind of deep sea drill and method for being equipped with reducing core sampling drilling rod power head
CN210068012U (en) * 2019-04-16 2020-02-14 中国地质大学(武汉) Drill rod warehouse capable of realizing automatic rod replacement

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306941A (en) * 2019-08-05 2019-10-08 湖南科技大学 The seabed drilling machine drilling pipe library arcuate rotation supporting mechanism stored in a manner of couching
CN110306941B (en) * 2019-08-05 2020-10-23 湖南科技大学 Arc-shaped rotating supporting mechanism for submarine drilling rig drill pipe warehouse stored in horizontal lying mode
CN111425153A (en) * 2020-04-02 2020-07-17 张红宾 Automatic rod feeding device of jumbolter for coal mine
CN115853447A (en) * 2023-02-28 2023-03-28 南京中荷寰宇环境科技有限公司 Rod replacing device and rod replacing method for drilling machine

Also Published As

Publication number Publication date
CN109989717B (en) 2023-12-08

Similar Documents

Publication Publication Date Title
CN109989717A (en) It is a kind of to can be achieved from the drill pipe storage for moving bar
CN110567757B (en) Sampling structure and sampling method for marine exploration
CN110398389A (en) A kind of geotechnical engineering investigation ground sampler
AU712046B2 (en) Articulated bit-selector coring tool
CN107448145B (en) Seabed deep hole drilling machine and operation method
CN111058771B (en) Submarine multi-point impact drilling core-taking micro-drilling machine with submersible vehicle
CN109470507B (en) Spiral auxiliary submerging vibration injection type lunar soil coring device
CN211230328U (en) Miniature drilling machine for taking rock core from seabed clamped by manipulator
CN102606074B (en) Novel submarine deep hole pressure maintaining and core drilling rig
CN105239940A (en) Drill rod unloading device suitable for submarine drilling rig
CN106323683A (en) Deep sea bed bucket sampler based on ROV (remotely operated vehicle) platform
CN112962562B (en) Double-penetration-mode submarine static sounding equipment
CN111794678A (en) Drilling rig for engineering investigation
CN1036081A (en) Improved device for generating acoustic waves of seismic prospecting
CN208252070U (en) A kind of seabed drilling machine gas hydrates active pressure maintaining core bit
CN110132658A (en) A kind of coastal ocean water and sediment sampler
CN110641658B (en) Deep sea sampling series-parallel robot
CN102644439A (en) Rotating drilling rig enabling soil-discharging push plate to be automatically reset and construction method thereof
CN210068012U (en) Drill rod warehouse capable of realizing automatic rod replacement
CN206114337U (en) Deep sea seabed grab sample ware based on ROV platform
CN117108276A (en) Drilling device for hydraulic loop geological survey
CN207620787U (en) A kind of comprehensive underwater short distance drilling machine sampler based on ROV
CN218293531U (en) Drill rod clamping device for coal mine drilling machine
CN107380142B (en) Position fixing device in engineering vehicle construction process
CN205117249U (en) Be applied to engineering driller's set ware of holding up

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant