CN109986025A - Stainless steel water pump vane wheel full form casting process - Google Patents

Stainless steel water pump vane wheel full form casting process Download PDF

Info

Publication number
CN109986025A
CN109986025A CN201711480525.XA CN201711480525A CN109986025A CN 109986025 A CN109986025 A CN 109986025A CN 201711480525 A CN201711480525 A CN 201711480525A CN 109986025 A CN109986025 A CN 109986025A
Authority
CN
China
Prior art keywords
impeller
water pump
cured
stainless steel
pump vane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711480525.XA
Other languages
Chinese (zh)
Inventor
朱国荣
李武建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Xinxiang Stainless Steel Product Co Ltd
Original Assignee
Ningbo Xinxiang Stainless Steel Product Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Xinxiang Stainless Steel Product Co Ltd filed Critical Ningbo Xinxiang Stainless Steel Product Co Ltd
Priority to CN201711480525.XA priority Critical patent/CN109986025A/en
Publication of CN109986025A publication Critical patent/CN109986025A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/02Sand moulds or like moulds for shaped castings
    • B22C9/04Use of lost patterns
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/22Moulds for peculiarly-shaped castings
    • B22C9/28Moulds for peculiarly-shaped castings for wheels, rolls, or rollers

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The present invention relates to water pump vane production fields, disclose a kind of stainless steel water pump vane wheel full form casting process, its key points of the technical solution are that: including cere molding, shell molding and impeller casting molding process.It forms wax-pattern quality height, forms shell hardness and good permeability, mould casting ratio of defects are low;Roughing can ensure that impeller outlet position dimension precision reaches defined requirement, keep exit width uniform, and error is small, guarantees in the drawing margin of tolerance;A large amount of stress is generated inside impeller casting after roughing and finishing;After stress-removal is heat-treated, low temperature stress-removal, stable dimensions, it is ensured that the dimensional accuracy after processing are carried out.The stainless steel water pump vane wheel that the present invention is processed, ratio of defects is low, and size distortion is small, and Impeller Machining dimensional accuracy is good, and surface smoothness is high, and impeller service life is high.

Description

Stainless steel water pump vane wheel full form casting process
Technical field
The present invention relates to impeller production field, in particular to a kind of stainless steel water pump vane wheel full form casting process.
Background technique
Full form casting process is that molten metal is poured into casting mold, and obtaining after solidification has certain shapes, size and performance The forming method of metal blank.
The process flow of model casting is: wax-pattern compacting → wax-pattern assembling → hanging sand → dewaxing → Baking → casting, Wherein wax-pattern packaging technology and shell cooling condition have important influence to casting quality.
Traditional charging pump uses pig iron material to be made mostly, but the corrosion resistance of the pig iron, durability are nothing like stainless steel Material;And the impeller ratio of defects of melt film casting and forming is high.Therefore, it is necessary to design a kind of utilization stainless steel material manufacture water pump leaf The production technology of wheel improves Impeller Mass.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide a kind of stainless steel that Impeller Shaping quality is high Water pump vane full form casting process.
Above-mentioned technical purpose of the invention has the technical scheme that a kind of stainless steel water pump vane wheel is molten Die cast technique, including cere molding, shell molding and impeller cast molding, wherein steps are as follows for shaping investment pattern:
Configured cured piece of pulverizing heating is melt into liquid to 80 DEG C ~ 95 DEG C, is subsequently poured into agitator by A1, keeps being in liquid Shape La Shui;
A2, side stir cured waterside and cured powder are added, and keeping temperature is 45 DEG C ~ 65 DEG C, stir into paste, and when stirring goes up and down blender leaf Wheel, convenient for beating paste;
A3 pours into paste cured material in injection molding machine, and injection molding machine is kept the temperature in advance at 45 DEG C ~ 65 DEG C;
The cured material of paste is injected into mold by A4, is infused cured air pressure and is maintained at 2.5 ~ 3.5 atmospheric pressure, fills 3 ~ 10 points of rear pressure maintaining Clock, room temperature cooling 30 ~ 60 minutes, demoulding obtained cured type;
A5 carries out deburring to obtained cured type, scrapes off edge grinding;
Wax pattern is adhered on the cured stick of cast gate got ready with 150 DEG C of boiling hot knife and is fixed by A6;
Wherein, shell forming step is as follows:
The cured type fixed in above-mentioned A6 step is gently immersed in slurry, and rotates and move up and down repeatedly by B1, and slurry is applied It smears uniformly, encounters aperture and dead angle and do not soak at slurry, mended and brushed with writing brush;
B2 rotates cured type, and the sand material that constantly winnows, and sand material is made to coat cured type completely, is placed in 20 DEG C ~ 25 DEG C environment and carries out It is dry, slurry in above-mentioned steps B1 is repeated after cured type is dry and is coated, then step is dried, 5 times or more repeatedly;
Electric heating dewaxing kettle is heated to 150 DEG C using steam dewaxing by B3, and pressure is set as 0.7MPa, carries out dewaxing operation, is taken off The wax time is 5min, from La Bangchu by cured blend-out formation shell chamber;
Shell chamber is placed in roaster and roasts by B4, and furnace temperature, which first rises, sets 250 DEG C, keeps the temperature 1 hour;Then it is rapidly heated to most It is 880 DEG C high ~ 1000 DEG C, keep the temperature 1 hour;Finally, it is cooling stand-by to take out shell chamber when furnace temperature is cooled to 100 DEG C;
Wherein, steps are as follows for impeller cast molding:
C1 matches molten steel and 1600 DEG C of meltings, refining agent refining is added, and after square standing, alterant, slagging-off is added;
C2 pours fracture test check fracture, and adjusts the temperature of molten steel, carries out cast molding after fracture is qualified;
Cast is placed in shake sand machine and carries out shake sand by C3;
C4 cuts cap mouth, forms blank and clears up cap mouth and polishes;
Impeller merging shot-blasting machine is carried out smooth surface processing, shakeout by C5;
C6 carries out ingredient inspection, mechanical performance test to impeller, and will carry out radiographic inspection at impeller root after the assay was approved;
C7 polishes to qualified impeller flow-passing surface, removes workpiece surface burr;
C8 carries out roughing to the maximum outer circle of the impeller after above-mentioned polishing, choma, hub shaft hole;
C9, carries out the finishing of entrance side to the impeller after roughing, examines entrance cincture profile with formed template;
C10 carries out stress-removal heat treatment, and the impeller after roughing and finishing keeps the temperature 30-36 by 300 ± 10 DEG C of tempering heating Hour, carry out low temperature stress-removal;
Impeller is immersed in pickling solution and carries out pickling by C11, removes surface contaminants and oxide skin;
C12 carries out smart polishing, finishing to impeller, and cleans impeller with washing oil, completes finished product.
Through the above technical solutions, wax powder is added in liquid wax material in shaping investment pattern step, convenient for paste wax material It is formed, reduces mould material particle, improve the quality of paste wax material, be convenient for shaping investment pattern;Make to form by control above-mentioned steps simultaneously Wax-pattern quality it is high;
It in shell forming step, is moved repeatedly when smearing slurry, can avoid slurry accumulation and part lacks and applies, while being conducive to gas Body discharge;Sand material moisture content is needed lower than 0.3% during stucco, and herein, moisture content excessively easily causes shell to be layered;Water Point content is too low is also easy to produce dust, and slurry is caused to be coated with difficulty;Be conducive to improve investment shell intensity using 0.3% moisture content, have Effect prevents shell is dry from cracking when shrinking;By strictly regulating and controlling shell slurry applying step and drying temperature, it is conducive to be formed The high shell of intensity;The impeller type of any surface finish, hardness and good air permeability is formed by control steam dewaxing and roasting technique Chamber;
In impeller cast molding step, by control molten steel configuration, casting process, casting flaw detection and coarse-fine processing, Gao Pin is obtained Matter impeller;
To sum up, by control shaping investment pattern, shell molding and three links of cast molding each technological parameter, obtain it is corrosion-resistant, Durable stainless steel water pump vane wheel, ratio of defects is low, and quality is high.
Preferably, in the cere forming step A6, a cured stick of cast gate can be bonded several ceres.
Through the above technical solutions, being conducive to improve production efficiency.
Preferably, in the shell forming step in B2, sand material uses resistance to takasago, and sand material coats 5 layers altogether, every layer it is dry when Between be set as 24 hours.
Through the above technical solutions, sufficient drying time is conducive to improve the intensity of shell when shell is dry.
Preferably, in the shell forming step B2, cured type is aweather blown when dry using each side simultaneously, wind speed setting In 3 ~ 8m/s.
Through the above technical solutions, wind speed is faster, shell drying is faster, but wind speed is excessive can also dispel shell, using this Wind speed, it is relatively reasonable;The wind of all directions blows certifiable shell uniform drying simultaneously simultaneously.
Preferably, the sand material coated outside cured type is gradually thicker to the granularity of outer layer sand material from internal layer.
Through the above technical solutions, being conducive to increase the discharge of internal gas when molten steel is cast, casting Forming Quality is improved.
Preferably, in the shell forming step B1, slurry is configured using silica solution and refractory material, in slurry bucket It is inside put into quantitative silica solution, refractory material is added while stirring, stands 16 hours after the completion of slurry stirring for quick start blender More than.
Through the above technical solutions, manufactured pulp quality is high, it is made conducive to the shell with some strength and gas permeability.
Preferably, in the impeller cast molding step C1, refining agent dosage is the 0.3% of molten steel gross mass, refining temperature It is 750 DEG C, and is put into refining agent in three times, each refining time is 3 minutes, and total time controls the horizontal time in 15 minutes It is 10 minutes.
Through the above technical solutions, being conducive to the removal of steel impurities in water.
Preferably, in the impeller cast molding step C1, alterant is slowly uniformly sprinkling upon on liquid steel level, is kept 10min ~ 12min, then pressure modifier agent slowly makes it invade alloy liquid level or less 100mm ~ 150mm, gentle uniformly mobile 3min~5min;Aluminium alloy surface slag is removed, gentle agitation liquid 1min ~ 2min removes the gred after standing 3min ~ 4min.
Through the above technical solutions, the removal of steel impurities in water is clean, casting product quality is high when molten steel is cast.
Preferably, in the impeller cast molding step C7, by the defect of defect detecting test, defect cleaning, PT flaw detection are carried out It checks, aperture carries out repair welding by argon arc welding after qualification, and postwelding carries out rough grinding;Defect detecting test, counterweight are re-started to fault location Big defect carries out solutionizing processing after carrying out electric welding repair welding.
Through the above technical solutions, being checked, being repaired to impeller defective products, production efficiency is greatly improved, reduces cost, Control high yield quality.
Preferably, in the impeller cast molding step C9, impeller maximum outer circle, axis hole and choma outer circle single side are reserved 2mm, and opening width line is drawn in maximum outer circle, width of blade is modified by line.
Through the above technical solutions, roughing can ensure that impeller outlet position dimension precision reaches defined requirement, use Mouth even width, error is small, guarantees in the drawing margin of tolerance, and a large amount of stress is generated inside the impeller casting after finishing and is passed through again After crossing stress-removal heat treatment, low temperature stress-removal, stable dimensions, it is ensured that the dimensional accuracy after processing are carried out.
Advantages of the present invention effect is as follows:
1, stainless steel impeller corrosion resistance is strong, long service life;
2, molding wax-pattern quality is high, forms shell hardness and good permeability, mould casting ratio of defects are low;
3, roughing can ensure that impeller outlet position dimension precision reaches defined requirement, keep exit width uniform, and error is small, protect Card is in the drawing margin of tolerance;
4, a large amount of stress is generated inside the impeller casting after roughing and finishing;After stress-removal is heat-treated, low temperature is carried out Stress-removal, stable dimensions, it is ensured that the dimensional accuracy after processing;
Summary, the stainless steel water pump vane wheel that the present invention is processed, ratio of defects is low, and size distortion is small, and Impeller Machining dimensional accuracy is good, Surface smoothness is high, and impeller service life is high.
Specific embodiment
Invention is further described in detail below.
A kind of stainless steel water pump vane wheel full form casting process, including cere molding, shell molding and impeller cast molding, In, steps are as follows for shaping investment pattern:
A1 is ground into configured cured piece the irregular fritter of (20 ~ 40mm) × (20 ~ 40mm) and is heated to 80 DEG C ~ 95 DEG C and melts Melt into liquid, be subsequently poured into agitator, keeps being in liquid La Shui.
A2, side stir cured waterside and cured powder are added, and keeping temperature is 45 DEG C ~ 65 DEG C, stir into paste, lifting stirring when stirring Machine impeller, convenient for beating paste.Herein, wax powder is added in liquid wax material, convenient for the formation of paste wax material;The movement of impeller is conducive to The mould material particle in paste wax material is reduced, the quality of paste wax material is improved.
A3 pours into paste cured material in injection molding machine, and injection molding machine is kept the temperature in advance at 45 DEG C ~ 65 DEG C.
A4 first checks mold before casting, and one layer of thin release agent is brushed on mold cavity, assembles mold, will paste The cured material of shape is injected into mold, is infused cured air pressure and is maintained at 2.5 ~ 3.5 atmospheric pressure, fills rear pressure maintaining 3 ~ 10 minutes, room temperature cooling 30 ~ 60 minutes, demoulding obtained cured type.
A5 carries out deburring to obtained cured type, scrapes off edge grinding.
Wax pattern is adhered on the cured stick of cast gate got ready with 150 DEG C of boiling hot knife and is fixed by A6;Herein, a cast gate is cured Stick can be bonded several ceres.Cast gate rod wax is in cross in the present embodiment, and each end bonds a wax-pattern, a cast gate Rod wax bonds 4 wax-patterns.
Wherein, shell forming step is as follows:
The cured type fixed in above-mentioned A6 step is gently immersed in slurry, and rotates and move up and down repeatedly by B1, and slurry is applied It smears uniformly, encounters aperture and dead angle and do not soak at slurry, mended and brushed with writing brush.Slurry using silica solution and refractory material configuration and At.Refractory material is the basis for making shell, directly and melt contacts, zircon English, electro-corundum, vitreous silica, silicon can be selected Sand etc. selects vitreous silica herein.
When making slurry, quantitative silica solution is put into slurry bucket, tekite is added in quick start blender while stirring English, stand 16 hours after the completion of slurry stirring or more, slurry specific gravity is 2.1 ~ 2.3g/cm3 herein.It is adopted after the completion of slurry stirring Slurry preservation is carried out with seal approach, prevents moisture from evaporating so that slurry is rotten.
B2 rotates cured type, and the sand material that constantly winnows, and sand material is made to coat cured type completely, is placed in 20 DEG C ~ 25 DEG C environment It is dried.Sand material use high temperature resistant sand, sand material to be evenly coated after using each side aweather while the form blown, wind speed for 3 ~ It is dried in the environment of 8m/s, drying time is set as 24 hours.It repeats the above steps after primary drying and applies slurry again, spreads Sand, drying carry out 5 times altogether, coat 5 layers.Herein, the sand material of coating is gradually thicker to the granularity of outer layer sand material from internal layer.
Herein, stucco is the intensity in order to improve shell, prevents shell from cracking in dry shrink.And sand used Moisture content and dust require to control, contained dust and moisture content are required lower than 0.3%.
Electric heating dewaxing kettle is heated to 150 DEG C using steam dewaxing by B3, and pressure is set as 0.7MPa, carries out dewaxing work Industry, the dewaxing time is 5min, from La Bangchu by cured blend-out formation shell chamber.
Shell chamber is placed in roaster and roasts by B4, and furnace temperature, which first rises, sets 250 DEG C, 1 hour is kept the temperature, to decompose shell The wax of middle remnants;400 DEG C then are to slowly warm up to, continues heat preservation 1 hour;It is rapidly heated afterwards again to 880 DEG C ~ 1000 DEG C of highest, Heat preservation 1 hour;Finally, it is cooling stand-by to take out shell chamber when furnace temperature is cooled to 100 DEG C.Shell any surface finish, hardness after roasting and Gas permeability is good, flawless.
Wherein, steps are as follows for impeller cast molding:
C1 matches molten steel and 1600 DEG C of meltings, refining agent refining is added, after square standing.Herein, refining agent selects hexachloroethanc Alkane, refining agent dosage are the 0.3% of molten steel gross mass, and refining temperature is 750 DEG C, and is put into refining agent in three times, every time when refining Between be 3 minutes, total time control in 15 minutes, the horizontal time be 10 minutes.
After standing, alterant is slowly uniformly sprinkling upon on liquid steel level, keeps 10min ~ 12min, then pressure slowly Alterant makes it invade alloy liquid level or less 100mm ~ 150mm, gentle uniformly mobile 3min ~ 5min;It is molten to remove aluminium alloy surface Slag, gentle agitation liquid 1min ~ 2min remove the gred after standing 3min ~ 4min.
C2 pours fracture test check fracture, and adjusts the temperature of molten steel, carries out cast molding after fracture is qualified.
Cast is placed in shake sand machine and carries out shake sand, sand is made to be detached from cast surface by C3.
C4 cuts cap mouth, forms blank and clears up cap mouth and polishes.
Impeller merging shot-blasting machine is carried out smooth surface processing, using the shot of 0.5mm ~ 0.6mm granularity, carried out altogether twice by C5 Ball blast, half an hour is primary, sand remaining on impeller is removed clean.
C6 carries out ingredient inspection, mechanical performance test to impeller, and will be visited at impeller root after the assay was approved with RT ray Wound;Remaining surface liquid penetrant inspection.
C7 polishes to qualified impeller flow-passing surface, removes workpiece surface burr.By the defect of defect detecting test, carry out scarce Fall into cleaning, PT defect detecting test, it is qualified after aperture by argon arc welding carry out repair welding, postwelding carries out rough grinding;Fault location is re-started Defect detecting test carries out solutionizing processing after carrying out electric welding repair welding to significant deficiency.
C8 carries out roughing to the maximum outer circle of the impeller after above-mentioned polishing, choma, hub shaft hole.
C9 carries out the finishing of entrance side to the impeller after roughing, and impeller maximum outer circle, axis hole and choma outer circle single side are reserved 2mm, and opening width line is drawn in maximum outer circle, width of blade is modified by line, examines entrance cincture profile with formed template.
C10 carries out stress-removal heat treatment, and the impeller after roughing and finishing is by 300 ± 10 DEG C of tempering heating, heat preservation 30-36 hours, carry out low temperature stress-removal.
Impeller is immersed in pickling solution and carries out pickling by C11, removes surface contaminants and oxide skin.
C12 carries out smart polishing, finishing to impeller, and cleans impeller with washing oil, completes finished product.
The defects of product completed the process is clear-cut, surface quality is good, no shrinkage cavity and porosity.Impeller high yield rate uses Service life is long.
The above embodiments are merely illustrative of the technical solutions of the present invention, rather than limits the protection scope of invention.To the greatest extent Invention is explained in detail referring to above-described embodiment for pipe, and those of ordinary skill in the art can not still make creation Property labour modify to technical solution illustrated in the above embodiments, thus obtain it is different, essence without departing from of the invention The other technologies scheme of design, these technical solutions similarly belong to invention which is intended to be protected.

Claims (10)

1. a kind of stainless steel water pump vane wheel full form casting process, including cere molding, shell molding and impeller cast molding, special Sign is: steps are as follows for shaping investment pattern:
Configured cured piece of pulverizing heating is melt into liquid to 80 DEG C ~ 95 DEG C, is subsequently poured into agitator by A1, keeps being in liquid Shape La Shui;
A2, side stir cured waterside and cured powder are added, and keeping temperature is 45 DEG C ~ 65 DEG C, stir into paste, and when stirring goes up and down blender leaf Wheel, convenient for beating paste;
A3 pours into paste cured material in injection molding machine, and injection molding machine is kept the temperature in advance at 45 DEG C ~ 65 DEG C;
The cured material of paste is injected into mold by A4, is infused cured air pressure and is maintained at 2.5 ~ 3.5 atmospheric pressure, fills 3 ~ 10 points of rear pressure maintaining Clock, room temperature cooling 30 ~ 60 minutes, demoulding obtained cured type;
A5 carries out deburring to obtained cured type, scrapes off edge grinding;
Wax pattern is adhered on the cured stick of cast gate got ready with 150 DEG C of boiling hot knife and is fixed by A6;
Shell forming step is as follows:
The cured type fixed in above-mentioned A6 step is gently immersed in slurry, and rotates and move up and down repeatedly by B1, and slurry is applied It smears uniformly, encounters aperture and dead angle and do not soak at slurry, mended and brushed with writing brush;
B2 rotates cured type, and the sand material that constantly winnows, and sand material is made to coat cured type completely, is placed in 20 DEG C ~ 25 DEG C environment and carries out It is dry, slurry in above-mentioned steps B1 is repeated after cured type is dry and is coated, then step is dried, 5 times or more repeatedly;
Electric heating dewaxing kettle is heated to 150 DEG C using steam dewaxing by B3, and pressure is set as 0.7MPa, carries out dewaxing operation, is taken off The wax time is 5min, from La Bangchu by cured blend-out formation shell chamber;
Shell chamber is placed in roaster and roasts by B4, and furnace temperature, which first rises, sets 250 DEG C, keeps the temperature 1 hour;Then it is rapidly heated to most It is 880 DEG C high ~ 1000 DEG C, keep the temperature 1 hour;Finally, it is cooling stand-by to take out shell chamber when furnace temperature is cooled to 100 DEG C;
Steps are as follows for impeller cast molding:
C1 matches molten steel and 1600 DEG C of meltings, refining agent refining is added, and after square standing, alterant, slagging-off is added;
C2 pours fracture test check fracture, and adjusts the temperature of molten steel, carries out cast molding after fracture is qualified;
Cast is placed in shake sand machine and carries out shake sand by C3;
C4 cuts cap mouth, forms blank and clears up cap mouth and polishes;
Impeller merging shot-blasting machine is carried out smooth surface processing, shakeout by C5;
C6 carries out ingredient inspection, mechanical performance test to impeller, and will carry out radiographic inspection at impeller root after the assay was approved;
C7 polishes to qualified impeller flow-passing surface, removes workpiece surface burr;
C8 carries out roughing to the maximum outer circle of the impeller after above-mentioned polishing, choma, hub shaft hole;
C9, carries out the finishing of entrance side to the impeller after roughing, examines entrance cincture profile with formed template;
Impeller is immersed in pickling solution and carries out pickling by C10, removes surface contaminants and oxide skin;
C11 carries out smart polishing, finishing to impeller, and cleans impeller with washing oil, completes finished product.
2. stainless steel water pump vane wheel full form casting process according to claim 1, it is characterized in that: the cere forming step In A6, a cured stick of cast gate can be bonded several ceres.
3. stainless steel water pump vane wheel full form casting process according to claim 1, it is characterized in that: the shell forming step In middle B2, sand material uses resistance to takasago, and sand material coats 5 layers altogether, and every layer of drying time is set as 24 hours.
4. stainless steel water pump vane wheel full form casting process according to claim 1, it is characterized in that: the shell forming step In B2, cured type is aweather blown when dry using each side simultaneously, and wind speed is arranged in 3 ~ 8m/s.
5. stainless steel water pump vane wheel full form casting process according to claim 3, it is characterized in that: the sand material coated outside cured type Granularity from internal layer to outer layer sand material is gradually thicker.
6. stainless steel water pump vane wheel full form casting process according to claim 1, it is characterized in that: the shell forming step In B1, slurry is configured using silica solution and refractory material, and quantitative silica solution, quick start stirring are put into slurry bucket Refractory material is added in machine while stirring, stand 16 hours after the completion of slurry stirring or more.
7. stainless steel water pump vane wheel full form casting process according to claim 1, it is characterized in that: the impeller cast molding In step C1, refining agent dosage is the 0.3% of molten steel gross mass, and refining temperature is 750 DEG C, and is put into refining agent in three times, every time Refining time is 3 minutes, and total time controlled in 15 minutes, and the horizontal time is 10 minutes.
8. stainless steel water pump vane wheel full form casting process according to claim 1, it is characterized in that: the impeller cast molding In step C1, alterant is slowly uniformly sprinkling upon on liquid steel level, keeps 10min ~ 12min, then pressure modifier agent slowly makes It invades alloy liquid level or less 100mm ~ 150mm, gentle uniformly mobile 3min ~ 5min;Aluminium alloy surface slag is removed, is slightly stirred Liquid 1min ~ 2min is mixed, is removed the gred after standing 3min ~ 4min.
9. stainless steel water pump vane wheel full form casting process according to claim 1, it is characterized in that: the impeller cast molding In step C7, by the defect of defect detecting test, carry out defect cleaning, PT defect detecting test, it is qualified after aperture by argon arc welding carry out repair welding, Postwelding carries out rough grinding;Defect detecting test is re-started to fault location, is carried out at solutionizing after carrying out electric welding repair welding to significant deficiency Reason.
10. stainless steel water pump vane wheel full form casting process according to claim 1, it is characterized in that: the impeller is cast into In type step C9, impeller maximum outer circle, axis hole and choma outer circle single side reserve 2mm, and draw opening width line in maximum outer circle, press Line modifies width of blade.
CN201711480525.XA 2017-12-29 2017-12-29 Stainless steel water pump vane wheel full form casting process Pending CN109986025A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711480525.XA CN109986025A (en) 2017-12-29 2017-12-29 Stainless steel water pump vane wheel full form casting process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711480525.XA CN109986025A (en) 2017-12-29 2017-12-29 Stainless steel water pump vane wheel full form casting process

Publications (1)

Publication Number Publication Date
CN109986025A true CN109986025A (en) 2019-07-09

Family

ID=67109867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711480525.XA Pending CN109986025A (en) 2017-12-29 2017-12-29 Stainless steel water pump vane wheel full form casting process

Country Status (1)

Country Link
CN (1) CN109986025A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110523924A (en) * 2019-09-17 2019-12-03 潍坊盛龙精密铸件有限公司 The method of manufacturing technology and impeller of impeller
CN110614347A (en) * 2019-11-06 2019-12-27 晋江渠成机械有限公司 Investment casting process of fan-shaped impeller
CN110722326A (en) * 2019-10-25 2020-01-24 浙江上风高科专风实业有限公司 Production method based on closed centrifugal fan simulation test
CN111975303A (en) * 2020-08-27 2020-11-24 西藏大学 Method for manufacturing supporting seat for separating effective ingredients of plant medicines
CN112207510A (en) * 2020-09-14 2021-01-12 襄阳顺特阳光科技有限公司 Method for machining stainless steel intercooling air inlet pipe
CN113399624A (en) * 2021-06-21 2021-09-17 贵阳一舟航科机械设备制造有限公司 Machining method for aviation parts
CN113996761A (en) * 2021-11-29 2022-02-01 江门市联益金属制品有限公司 Manufacturing process of mixing core of static mixer

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101798660A (en) * 2010-01-11 2010-08-11 段岳君 Method for refining, metamorphosing and casting cold roll steel by casting instead of forging
CN103182470A (en) * 2013-03-22 2013-07-03 伟成金属制品有限公司 Mold manufacturing process in investment casting
CN103418991A (en) * 2013-06-18 2013-12-04 沈阳三科水力机械制造有限公司 Machining process of large duplex stainless steel impeller
CN203476790U (en) * 2013-08-29 2014-03-12 上海东方泵业(集团)有限公司 Stainless steel single-suction centrifugal pump impeller made by medium-temperature lost wax casting
CN104152806A (en) * 2014-08-19 2014-11-19 常州凯达重工科技有限公司 Casting production process of large mold steel roughing roll

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101798660A (en) * 2010-01-11 2010-08-11 段岳君 Method for refining, metamorphosing and casting cold roll steel by casting instead of forging
CN103182470A (en) * 2013-03-22 2013-07-03 伟成金属制品有限公司 Mold manufacturing process in investment casting
CN103418991A (en) * 2013-06-18 2013-12-04 沈阳三科水力机械制造有限公司 Machining process of large duplex stainless steel impeller
CN203476790U (en) * 2013-08-29 2014-03-12 上海东方泵业(集团)有限公司 Stainless steel single-suction centrifugal pump impeller made by medium-temperature lost wax casting
CN104152806A (en) * 2014-08-19 2014-11-19 常州凯达重工科技有限公司 Casting production process of large mold steel roughing roll

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110523924A (en) * 2019-09-17 2019-12-03 潍坊盛龙精密铸件有限公司 The method of manufacturing technology and impeller of impeller
CN110722326A (en) * 2019-10-25 2020-01-24 浙江上风高科专风实业有限公司 Production method based on closed centrifugal fan simulation test
CN110614347A (en) * 2019-11-06 2019-12-27 晋江渠成机械有限公司 Investment casting process of fan-shaped impeller
CN110614347B (en) * 2019-11-06 2020-11-20 晋江渠成机械有限公司 Investment casting process of fan-shaped impeller
CN111975303A (en) * 2020-08-27 2020-11-24 西藏大学 Method for manufacturing supporting seat for separating effective ingredients of plant medicines
CN112207510A (en) * 2020-09-14 2021-01-12 襄阳顺特阳光科技有限公司 Method for machining stainless steel intercooling air inlet pipe
CN113399624A (en) * 2021-06-21 2021-09-17 贵阳一舟航科机械设备制造有限公司 Machining method for aviation parts
CN113996761A (en) * 2021-11-29 2022-02-01 江门市联益金属制品有限公司 Manufacturing process of mixing core of static mixer

Similar Documents

Publication Publication Date Title
CN109986025A (en) Stainless steel water pump vane wheel full form casting process
CN102228956B (en) Precision fire mould casting process of series sliding bed bedplates for turnouts of high-speed railway lines for passenger transport and special die
CN102091757B (en) Integral precision casting method for large thin-wall casing part
CN109773122A (en) A kind of production technology and valve castings of the model casting of valve castings
CN102836963B (en) Support casting process
CN104014748B (en) The method utilizing the overall shell mould of formwork roasting apperance gasification, and combustion preparation
CN105665626A (en) Wax mold manufacturing technique
CN110180994A (en) A kind of preparation method of the elongated blind hole investment-casting shell of band
CN106694853A (en) Method for casting motorcycle parts by use of low-pressure casting process
CN107790631A (en) A kind of titanium tea set production method
CN109108221A (en) The production technology of fast opening and closing power station exhaust check valve casting
CN105945227A (en) Precise casting technology for fusion mold
CN110340279A (en) Heavy castings casting method
CN111097875B (en) Casting process of inner chill for accelerated solidification and cooling of thick and large investment castings
CN110014265A (en) A kind of heat is mutually modified the manufacture craft of two-wheeled wheel hub
CN109986029A (en) Pump body full form casting process
CN111203514A (en) Precision casting method for high-temperature alloy complex thin-wall casting
CN107398531A (en) The casting technique of high-precision stainless steel body
CN108927493A (en) A kind of aluminium alloy electric automobile inner-cooled machine shell cast shaping process
CN110976843A (en) Casting production process flow of turbine blade of gas turbine
CN103506267A (en) Nanometer treatment technology of surface of aluminum alloy hub
CN206747540U (en) Ti alloy casting sizing dewaxing device
CN110052583A (en) Precise casting process of hollow guide blade
CN110722101A (en) Production method of selection valve cylinder
CN105618701B (en) A kind of casting method of wear-resisting steel part

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190709

RJ01 Rejection of invention patent application after publication