CN109985717A - A kind of safety system of high-efficiency pulverized coal preparation process - Google Patents

A kind of safety system of high-efficiency pulverized coal preparation process Download PDF

Info

Publication number
CN109985717A
CN109985717A CN201711500829.8A CN201711500829A CN109985717A CN 109985717 A CN109985717 A CN 109985717A CN 201711500829 A CN201711500829 A CN 201711500829A CN 109985717 A CN109985717 A CN 109985717A
Authority
CN
China
Prior art keywords
dilution
coal
grinding machine
inert gas
explosion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711500829.8A
Other languages
Chinese (zh)
Inventor
邢现刚
王敬军
张夏琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Lanya Energy Technology Co Ltd
Original Assignee
Beijing Lanya Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Lanya Energy Technology Co Ltd filed Critical Beijing Lanya Energy Technology Co Ltd
Priority to CN201711500829.8A priority Critical patent/CN109985717A/en
Publication of CN109985717A publication Critical patent/CN109985717A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C23/00Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C23/00Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
    • B02C23/04Safety devices

Abstract

The present invention provides the safety system of high-efficiency pulverized coal preparation process a kind of, and including active protective system, passive protection system, coal mill deduster, inert gas extinguishment by dilution system and temperature point inductor: the active protective system includes the CO-O positioned at coal dust preparation system2On-line gas analysis system and CO2Automatic dilution fire extinguishing system carries out real-time monitoring to grinding machine outlet and inlet mouth, dust collector box body and ash bucket;The passive protection system includes the inert gas access port being designed on the explosion-proof valve and grinding machine being equipped at the top of the shell, grinding machine of flour mill host machine part, at powder concentrator shell and air inlet duct, is connected with inert gas extinguishment by dilution system.Actively protection carries out real-time monitoring to each system to the present invention, and carries out the starting of automatic safety device;Passive protection mainly carries out special protection to each equipment, has reached the safe operation of equipment;The system monitor set and dilution, cooling, flame failure protection interlock, and ensure that the safe operation of coal dust preparation system.

Description

A kind of safety system of high-efficiency pulverized coal preparation process
Technical field
The invention belongs to coal industry fields, and in particular to a kind of safeguard protection system of high-efficiency pulverized coal preparation process System.
Background technique
The method that the safeguard protection of existing powder-making technique mainly uses has the setting of explosion proof door, monitoring temperature, nitrogen device, Temperature reaches set temperature and needs to stop production, and seriously affects the production efficiency of pulverized coal preparation system.
Summary of the invention
Aiming at the deficiencies in the prior art, the present invention provides the safeguard protection system of high-efficiency pulverized coal preparation process a kind of System.
For above-mentioned purpose, technical solution of the present invention is as follows:
A kind of safety system of high-efficiency pulverized coal preparation process, including active protective system, passive protection system, coal mill Deduster, inert gas extinguishment by dilution system and temperature point inductor:
The active protective system includes the CO-O positioned at coal dust preparation system2On-line gas analysis system and CO2It is automatic dilute Fire extinguishing system is released, real-time monitoring is carried out to grinding machine outlet and inlet mouth, dust collector box body and ash bucket;
The passive protection system includes the explosion-proof valve and grinding machine being equipped at the top of the shell, grinding machine of flour mill host machine part The inert gas access port being designed at upper, powder concentrator shell and air inlet duct, is connected with inert gas extinguishment by dilution system.
Further, the coal mill deduster grinds dedicated explosion-proof type high concentration bag dust collector using coal, and goes out in grinding machine A set of explosion-proof valve is respectively mounted at air port and deduster air intake vent, to release the pressure generated when combustion explosion in time.
Further, the inert gas extinguishment by dilution system: nitrogen is used.
The utility model has the advantages that the present invention is provided with actively protection and two parts of passive protection;Actively protection to each system into Row real-time monitoring, and carry out the starting of automatic safety device;Passive protection mainly carries out special protection to each equipment, has reached To the safe operation of equipment;To achieve the purpose that improve production efficiency, the system monitor set and dilution, cooling, flame failure protection Interlocking, ensure that the safe operation of coal dust preparation system.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention.
Specific embodiment
The present invention is described below with reference to specific embodiments.It will be appreciated by those skilled in the art that these embodiments are only For illustrating the present invention, do not limit the scope of the invention in any way.
A kind of safety system of high-efficiency pulverized coal preparation process, including active protective system, passive protection system, coal mill Deduster, inert gas extinguishment by dilution system and temperature point inductor:
Active protective system includes the CO-O positioned at coal dust preparation system2On-line gas analysis system and CO2Automatic dilution goes out Fiery system carries out real-time monitoring to grinding machine outlet and inlet mouth, dust collector box body and ash bucket;
Passive protection system includes on the explosion-proof valve and grinding machine being equipped at the top of the shell, grinding machine of flour mill host machine part, The inert gas access port being designed at powder concentrator shell and air inlet duct is connected with inert gas extinguishment by dilution system.
The coal mill deduster grinds dedicated explosion-proof type high concentration bag dust collector using coal, and in grinding machine air outlet and dedusting A set of explosion-proof valve is mounted at device air intake vent, respectively to release the pressure generated when combustion explosion in time.
As shown in Figure 1,2- run coal bin;3- discharger;4- coal conveyer belt;5- weighing belt;6- bucket elevator;7- precomminution Pulverized coal bin;8- grinding batcher;9- vertical spindle coal pulveriser;10- fine coal collector;11- air-introduced machine;12- powder cabin;13- pressure gauge; 17- carbon-dioxide protecting;21- nitrogen distributor;
Temperature point inductor be mounted on run coal bin 02, bucket elevator 06, precomminution pulverized coal bin 07, work as local temperature Meeting automatic start up system when occurring excessively high takes every cooling fire extinguishing predetermined set.
Vertical spindle coal pulveriser 09, fine coal collector 10 are respectively arranged with nitrogen protection device in powder cabin 12, take nitrogen filled protection.
The working principle of the invention:
Once CO, O in system2Content and temperature exceeding standard, CO2Extinguishment by dilution system starts dilution, cooling automatically.If being When smoldering or burn in system, CO2Fire extinguishing system starts sprinkling fire extinguishing, dilution cooling automatically.
On grinding machine, inert gas access port is equipped at powder concentrator shell and air inlet duct, when system monitoring device issues dangerous letter Number when, inert gas extinguishment by dilution system makes a response in time, is diluted cooling to Dangerous Place blowing inert gas or goes out.
This system is used the dedicated explosion-proof type high concentration bag dust collector of coal mill and is removed due to the inflammable and explosive characteristic of coal dust In dirt device and grinding machine when combustion explosion occurs, in order to avoid the pressure that explosion time generates causes secondary hazards to equipment, A set of explosion-proof valve is respectively mounted at grinding machine air outlet and deduster air intake vent, to release the pressure generated when combustion explosion in time. While there has been shown and described that technical solution of the present invention, for the ordinary skill in the art, it is possible to understand that A variety of change, modification, replacement and modification can be carried out to these embodiments in the case where not departing from the principle and spirit of the invention, The scope of the present invention is defined by the appended.

Claims (3)

1. a kind of safety system of high-efficiency pulverized coal preparation process, it is characterised in that: including active protective system, passive protection System, coal mill deduster, inert gas extinguishment by dilution system and temperature point inductor;
The active protective system includes the CO-O positioned at coal dust preparation system2On-line gas analysis system and CO2Automatic dilution goes out Fiery system carries out real-time monitoring to grinding machine outlet and inlet mouth, dust collector box body and ash bucket;
The passive protection system includes on the explosion-proof valve and grinding machine being equipped at the top of the shell, grinding machine of flour mill host machine part, The inert gas access port being designed at powder concentrator shell and air inlet duct is connected with inert gas extinguishment by dilution system.
2. the safety system of high-efficiency pulverized coal preparation process described in accordance with the claim 1, it is characterised in that: the coal abrades Dirt device grinds dedicated explosion-proof type high concentration bag dust collector using coal, and is respectively mounted at grinding machine air outlet and deduster air intake vent A set of explosion-proof valve, to release the pressure generated when combustion explosion in time.
3. the safety system of high-efficiency pulverized coal preparation process described in accordance with the claim 1, it is characterised in that: the indifferent gas Body extinguishment by dilution system: nitrogen is used.
CN201711500829.8A 2017-12-31 2017-12-31 A kind of safety system of high-efficiency pulverized coal preparation process Pending CN109985717A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711500829.8A CN109985717A (en) 2017-12-31 2017-12-31 A kind of safety system of high-efficiency pulverized coal preparation process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711500829.8A CN109985717A (en) 2017-12-31 2017-12-31 A kind of safety system of high-efficiency pulverized coal preparation process

Publications (1)

Publication Number Publication Date
CN109985717A true CN109985717A (en) 2019-07-09

Family

ID=67110276

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711500829.8A Pending CN109985717A (en) 2017-12-31 2017-12-31 A kind of safety system of high-efficiency pulverized coal preparation process

Country Status (1)

Country Link
CN (1) CN109985717A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0086260A2 (en) * 1982-02-15 1983-08-24 Deutsche Babcock Aktiengesellschaft Device for introducing coal in an heating chamber under high pressure
JPH0623296A (en) * 1992-07-10 1994-02-01 Ishikawajima Harima Heavy Ind Co Ltd Method and apparatus for production of pulverized coal
CN101570808A (en) * 2009-05-31 2009-11-04 中冶京诚工程技术有限公司 Dry converter coal gas dust-removal system and explosion protection device thereof
CN201631961U (en) * 2010-04-10 2010-11-17 徐州中矿奥特麦科技有限公司 Coal storage silo safety protection device
CN106439885A (en) * 2016-09-28 2017-02-22 江苏省冶金设计院有限公司 Raw coal direct blowing type pulverizing device
CN107131758A (en) * 2017-05-05 2017-09-05 淮北矿业(集团)有限责任公司 A kind of rotary kiln coal mill system
CN208865775U (en) * 2017-12-31 2019-05-17 北京蓝亚能源科技有限公司 A kind of safety system of high-efficiency pulverized coal preparation process

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0086260A2 (en) * 1982-02-15 1983-08-24 Deutsche Babcock Aktiengesellschaft Device for introducing coal in an heating chamber under high pressure
JPH0623296A (en) * 1992-07-10 1994-02-01 Ishikawajima Harima Heavy Ind Co Ltd Method and apparatus for production of pulverized coal
CN101570808A (en) * 2009-05-31 2009-11-04 中冶京诚工程技术有限公司 Dry converter coal gas dust-removal system and explosion protection device thereof
CN201631961U (en) * 2010-04-10 2010-11-17 徐州中矿奥特麦科技有限公司 Coal storage silo safety protection device
CN106439885A (en) * 2016-09-28 2017-02-22 江苏省冶金设计院有限公司 Raw coal direct blowing type pulverizing device
CN107131758A (en) * 2017-05-05 2017-09-05 淮北矿业(集团)有限责任公司 A kind of rotary kiln coal mill system
CN208865775U (en) * 2017-12-31 2019-05-17 北京蓝亚能源科技有限公司 A kind of safety system of high-efficiency pulverized coal preparation process

Similar Documents

Publication Publication Date Title
CN206809942U (en) A kind of dust arrester for dust explosion place
CN203347832U (en) Automatic water spraying dust settling device for mine
CN204802584U (en) Coal transporting trestle dust suppression device
CN104180383B (en) The coal dust preparation system of a kind of safety and environmental protection and preparation method
CN102527487B (en) Blasting control process for dry-method superfine smashing process for carbon-contained material
WO2018099261A1 (en) Stoping method for oxygen-free working surface of highly gaseous mine
CN106439885A (en) Raw coal direct blowing type pulverizing device
CN208865775U (en) A kind of safety system of high-efficiency pulverized coal preparation process
CN110404650B (en) Coal grinding system and method for safely and efficiently preparing lignite
CN105692541A (en) Wharf oil and gas recycling security device and method
CN104326688B (en) A kind of a large amount of, system and method for safe utilization brown coal calcination of cement clinker
CN109985717A (en) A kind of safety system of high-efficiency pulverized coal preparation process
CN204591331U (en) The mine development end dash system of adjoint high-concentration hydrogen sulfide and gas
CN105170290A (en) Ore crushing machine unit
CN205497235U (en) Throw ball sand blasting equipment dust exposion prevention protection system
CN105170296B (en) A kind of pulverized coal preparation system fine explosion protection system of complete period inerting
CN105507941B (en) Underground coal mine working face automates safety system
CN204224470U (en) A kind of system of a large amount of, safe utilization brown coal calcination of cement clinker
CN110081455A (en) A kind of quick-fried integrated protection system of pulverized coal preparation control
CN206729192U (en) Tobacco productive corporation dust pelletizing system with safeguard function
CN106437822B (en) A kind of mining tunnel pneumatic dedusting device
CN204543828U (en) A kind of pulse dust collector
CN204532414U (en) Underground coal mine work plane automation safety system
CN204353178U (en) A kind of bagged cement packaging system being conducive to unordered airborne dust collection process
CN107051658A (en) A kind of explosion-proof quick grinding production Technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
DD01 Delivery of document by public notice

Addressee: Wu Deqing

Document name: Notification of eligibility

DD01 Delivery of document by public notice