CN109978486A - Method, apparatus, system and medium for Row control - Google Patents
Method, apparatus, system and medium for Row control Download PDFInfo
- Publication number
- CN109978486A CN109978486A CN201711471043.8A CN201711471043A CN109978486A CN 109978486 A CN109978486 A CN 109978486A CN 201711471043 A CN201711471043 A CN 201711471043A CN 109978486 A CN109978486 A CN 109978486A
- Authority
- CN
- China
- Prior art keywords
- control flow
- level
- node
- business
- control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Abstract
Present disclose provides a kind of methods for Row control.The method includes obtaining hierarchical information of the promoter of business in organization, the control flow of level where obtaining the promoter, and the business is controlled according to the control flow of level where the described promoter.Wherein, the control flow of level is to be configured and obtained according to parameter of the hierarchical information to each node in total business control flow where the described promoter, wherein the parameter of each node includes whether to skip the node.The disclosure additionally provides a kind of for the device of Row control, system and medium.
Description
Technical field
This disclosure relates to Internet technical field, more particularly, to a kind of method, apparatus for Row control, it is
System and medium.
Background technique
For organization, each usual business (for example, buying, human recruitment etc.) has its specific workflow
Journey.Activiti currently is widely used to realize the planning of workflow.It, can be by being based on for each single item business
Activiti draws complete job flow chart, and the auditor based on each node in activiti configuration work flow chart, and
And activiti interface circulation work flow diagram is called to control the progress of workflow.
During realizing present inventive concept, at least there are the following problems in the prior art for inventor's discovery: being based on
This workflow of activiti only realizes simple workflow, cannot dynamically specify the circulation path of process.Example
Such as, when business is more complicated, perhaps the structure of organization is more complicated in the organization each business or
Each level (such as each subsidiary, branch company or department etc.) needs to separately design the corresponding Service control of each level
Process, then each level is carried out the work according to its corresponding Service control process.In this way, for one in the organization
Business, it is necessary to design is largely directed to the Service control process of each department, and when business tine changes (such as
Encounter some emergencies) it can not also change Service control process, lead to not meet quick in some in emergency circumstances business
Requirement or the requirement of security control of processing etc..
Summary of the invention
It can be with the side for Row control of dynamic configuration Service control process in view of this, present disclose provides one kind
Method, device, system and medium.
An aspect of this disclosure provides a kind of method for Row control.The method includes obtaining the hair of business
Hierarchical information of the person in organization is played, the control flow of level where obtaining the promoter, and according to the described initiation
The control flow of level controls the business where person.Wherein, the control flow of level is according to institute where the described promoter
It states hierarchical information to configure the parameter of each node in total business control flow and obtain, wherein each node
Parameter include whether to skip the node.
In accordance with an embodiment of the present disclosure, the method also includes designing the total business of the organization to control stream
Journey.Wherein, the Service control process includes multiple nodes, and the parameter of each node is to be determined.
In accordance with an embodiment of the present disclosure, the method also includes configuring institute for each level in the organization
The parameter of each node in total business control flow is stated to generate the control flow of the level.
In accordance with an embodiment of the present disclosure, it for the control flow of level where the promoter, controls and flows in the total business
The parameter of any one node in journey is configured as in the case where skipping the node, the control of level where the described promoter
Process includes skipping the node to be directly entered next node.
In accordance with an embodiment of the present disclosure, it for the control flow of level where the promoter, controls and flows in the total business
The parameter of any one node in journey is configured as in the case where not skipping the node, the control of level where the described promoter
Process processed includes that must just can enter next node after the control of the node passes through.
In accordance with an embodiment of the present disclosure, the method also includes the control flows when any one level to be reconfigured
Afterwards, using the control flow that reconfigures as the control flow of the current level.
Another aspect of the disclosure provides a kind of device for Row control, including hierarchical information obtain module,
Level control flow obtains module and message control module.
Hierarchical information obtains module and is used to obtain hierarchical information of the promoter of business in organization.Level control stream
Journey obtains the control flow of level where module is used to obtain the promoter, wherein the control stream of level where the described promoter
Journey is to be configured and obtained according to parameter of the hierarchical information to each node in total business control flow, wherein institute
The parameter for stating each node includes whether to skip the node.Message control module is used for according to level where the described promoter
Control flow controls the business.
In accordance with an embodiment of the present disclosure, described device further includes master control process design module.Master control process design mould
Block is used to design the total business control flow of the organization, wherein and the Service control process includes multiple nodes,
And the parameter of each node is to be determined.
In accordance with an embodiment of the present disclosure, described device further includes level control flow generation module.Level control flow is raw
It is used to configure the parameter of each node in the total business control flow for each level in the organization at module
To generate the control flow of the level.
In accordance with an embodiment of the present disclosure, it for the control flow of level where the promoter, controls and flows in the total business
The parameter of any one node in journey is configured as in the case where skipping the node, the control of level where the described promoter
Process includes skipping the node to be directly entered next node.
In accordance with an embodiment of the present disclosure, it for the control flow of level where the promoter, controls and flows in the total business
The parameter of any one node in journey is configured as in the case where not skipping the node, the control of level where the described promoter
Process processed includes that must just can enter next node after the control of the node passes through.
In accordance with an embodiment of the present disclosure, the level control flow generation module is also used to the control when any one level
After process is reconfigured, using the control flow that reconfigures as the control flow of the current level.
The third aspect of the disclosure provides a kind of system for Row control, including one or more processors, with
And memory.Memory is for storing one or more programs, wherein when one or more of programs are by one or more
When a processor executes, so that one or more of processors are realized according to the method for being used for Row control as described above.
The fourth aspect of the disclosure provides a kind of computer-readable medium, is stored thereon with executable instruction, the instruction
Processor is set to realize the method for being used for Row control as described above when being executed by processor.
Another aspect of the present disclosure provides a kind of computer program, and the computer program, which includes that computer is executable, to be referred to
It enables, described instruction is when executed for realizing the method as described above for being used for Row control.
In accordance with an embodiment of the present disclosure, can at least be partially solved Service control process in the prior art can not dynamic
Allocation problem, and therefore may be implemented according to hierarchical information dynamic configuration total business control flow where the promoter of business,
The technical effect of the control flow of level where promoter to dynamically obtain the business.
By this method, it can be controlled and be flowed by the flexible configuration total business when the business tine of organization changes
Journey and the control flow dynamic change for making corresponding level, thus realize the diversity requirement for flexibly, efficiently coping with business development,
Realize the mobilism of Service control process.
Detailed description of the invention
By referring to the drawings to the description of the embodiment of the present disclosure, the above-mentioned and other purposes of the disclosure, feature and
Advantage will be apparent from, in the accompanying drawings:
Fig. 1 diagrammatically illustrates the exemplary system of the method and apparatus for Row control according to the embodiment of the present disclosure
Framework;
Fig. 2 diagrammatically illustrates the flow chart of the method for Row control according to the embodiment of the present disclosure;
Fig. 3 diagrammatically illustrates the flow chart of the method for Row control according to another embodiment of the disclosure;
Fig. 4 diagrammatically illustrates the flow chart of the method for Row control according to disclosure another embodiment;
Fig. 5 diagrammatically illustrates the realization scene schematic diagram according to the method for Row control of the embodiment of the present disclosure;
Fig. 6 diagrammatically illustrates the block diagram of the device for Row control according to the embodiment of the present disclosure;And
Fig. 7 diagrammatically illustrates the block diagram of the computer system for Row control according to the embodiment of the present disclosure.
Specific embodiment
Hereinafter, will be described with reference to the accompanying drawings embodiment of the disclosure.However, it should be understood that these descriptions are only exemplary
, and it is not intended to limit the scope of the present disclosure.In addition, in the following description, descriptions of well-known structures and technologies are omitted, with
Avoid unnecessarily obscuring the concept of the disclosure.
Term as used herein is not intended to limit the disclosure just for the sake of description specific embodiment.It uses herein
The terms "include", "comprise" etc. show the presence of the feature, step, operation and/or component, but it is not excluded that in the presence of
Or add other one or more features, step, operation or component.
There are all terms (including technical and scientific term) as used herein those skilled in the art to be generally understood
Meaning, unless otherwise defined.It should be noted that term used herein should be interpreted that with consistent with the context of this specification
Meaning, without that should be explained with idealization or excessively mechanical mode.
It, in general should be according to this using statement as " at least one in A, B and C etc. " is similar to
Field technical staff is generally understood the meaning of the statement to make an explanation (for example, " system at least one in A, B and C "
Should include but is not limited to individually with A, individually with B, individually with C, with A and B, with A and C, have B and C, and/or
System etc. with A, B, C).Using statement as " at least one in A, B or C etc. " is similar to, generally come
Saying be generally understood the meaning of the statement according to those skilled in the art to make an explanation (for example, " having in A, B or C at least
One system " should include but is not limited to individually with A, individually with B, individually with C, with A and B, have A and C, have
B and C, and/or the system with A, B, C etc.).It should also be understood by those skilled in the art that substantially arbitrarily indicating two or more
The adversative conjunction and/or phrase of optional project shall be construed as either in specification, claims or attached drawing
A possibility that giving including one of these projects, either one or two projects of these projects.For example, phrase " A or B " should
A possibility that being understood to include " A " or " B " or " A and B ".
Embodiment of the disclosure provides a kind of method, apparatus, system and medium for Row control.This method includes
Hierarchical information of the promoter of acquisition business in organization, the control flow of level where obtaining the promoter, and press
The business is controlled according to the control flow of level where the promoter.Wherein, the control flow of level where the promoter is basis
The hierarchical information configures the parameter of each node in total business control flow and is obtained, wherein each node
Parameter includes whether to skip the node.
In accordance with an embodiment of the present disclosure, can at least be partially solved Service control process in the prior art can not dynamic
Allocation problem, and the promoter place hierarchical information dynamic configuration total business control flow according to business therefore may be implemented, from
And the technical effect of the control flow of level where dynamically obtaining the promoter of the business.
By this method, it can be controlled and be flowed by the flexible configuration total business when the business tine of organization changes
Journey and the control flow dynamic change for making corresponding level.For example, when in organization level setting change when or industry
When business demand changes, it can be met by the relevant parameter in the dynamic configuration total business control flow and be corresponded to newly
The Service control process of level or new business demand.
In this way, method, apparatus according to an embodiment of the present disclosure, system and medium, can flexibly, efficiently
The diversity demand for control for coping with business development, realizes the mobilism of Service control process.
Fig. 1 diagrammatically illustrates the exemplary system of the method and apparatus for Row control according to the embodiment of the present disclosure
Framework 100.It should be noted that being only the example that can apply the system architecture of the embodiment of the present disclosure shown in Fig. 1, to help this
Field technical staff understands the technology contents of the disclosure, but be not meant to the embodiment of the present disclosure may not be usable for other equipment,
System, environment or scene.
As shown in Figure 1, system architecture 100 may include terminal device 101,102,103, network according to this embodiment
104 and server 105.Network 104 between terminal device 101,102,103 and server 105 to provide communication link
Medium.Network 104 may include various connection types, such as wired, wireless communication link or fiber optic cables etc..
User can be used terminal device 101,102,103 and be interacted by network 104 with server 105, to receive or send out
Send message etc..Client application etc. for Service control process can be installed on terminal device 101,102,103.
Terminal device 101,102,103 can be the various electronic equipments with display screen and supported web page browsing, packet
Include but be not limited to smart phone, tablet computer, pocket computer on knee and desktop computer etc..
Server 105 can be to provide the server of various services, such as utilize terminal device 101,102,103 to user
The information (such as user logs in, requests to initiate each node audit of a certain business, business etc.) inputted provides the backstage supported
Management server (merely illustrative).Back-stage management server analyze to data such as the user's requests received etc.
Reason, and by processing result (such as according to user's request or the total business control flow and total business control flow of generation
In parameter configuration, the control of each node passes through situation or other data etc. in Service control process) feed back to terminal device.
It should be noted that the method provided by the embodiment of the present disclosure for Row control generally can be by server
105 execute.Correspondingly, the device provided by the embodiment of the present disclosure for Row control generally can be set in server 105
In.It can also be by being different from server 105 and can be with terminal for the method for Row control provided by the embodiment of the present disclosure
The server or server cluster that equipment 101,102,103 and/or server 105 communicate execute.Correspondingly, the embodiment of the present disclosure
The provided device for Row control also can be set in be different from server 105 and can with terminal device 101,102,
103 and/or server 105 communicate server or server cluster in.
It should be understood that the number of terminal device, network and server in Fig. 1 is only schematical.According to realization need
It wants, can have any number of terminal device, network and server.
Fig. 2 diagrammatically illustrates the flow chart of the method according to an embodiment of the present disclosure for Row control.
As shown in Fig. 2, this method includes operation S201~operation S203.
In operation S201, hierarchical information of the promoter of business in organization is obtained.
The hierarchical information for example can be the corresponding acquisition such as the login account according to promoter's login system, login name
Identification information.
For example, the promoter of the business is in a group loom when the promoter of the business is the research and development department employee of branch company
Hierarchical information in structure for example may is that parent company-branch company-research and development department.
Then, in operation S202, the control flow of level where obtaining the promoter.Wherein level where the promoter
Control flow is to be configured and obtained according to parameter of the hierarchical information to each node in total business control flow,
In, the parameter of each node includes whether to skip the node.
The total business control flow can be the unified architectural process designed in the institutional framework for the business,
At least part parameter in each of which node can be to be determined.Specific to the institutional framework different levels when, by this
The design parameter of each node, which carries out configuration, in total business control flow can be obtained by the control flow of corresponding level.
For the promoter of a business, the control according to level where the promoter of the business is needed when handling the business
Process processed carries out.In hierarchical information of the promoter for getting the business in organization, so that it may be believed according to the level
Cease the control stream for the parameter of each node in total business control flow being configured and being obtained business promoter place level
Journey.
It specifically, can according to the process that parameter of the hierarchical information to each node in total business control flow is configured
With there are many implementations;Such as it can be each node in pre-stored total business control flow corresponding with the level
Parameter value assign total business control flow each node;Such as it is also possible to each level in advance by total business control
The corresponding configuration of process processed is good and stores, and then calls the corresponding control of the level according to the hierarchical information of business promoter is corresponding
Process.
In operation S203, the business is controlled according to the control flow of level where the promoter.
It in accordance with an embodiment of the present disclosure, can be according to hierarchical information dynamic configuration total business control where the promoter of business
Process processed, thus the technical effect of the control flow of level where dynamically obtaining the promoter of the business.In this way, when group loom
The business tine of structure or the hierarchical structure of organization can be by the flexible configuration total business control flows when changing
And make the control flow dynamic change of corresponding level, thus realize the diversity requirement for flexibly, efficiently coping with business development, it is real
The mobilism of existing Service control process.
In accordance with an embodiment of the present disclosure, for the control flow of level where the promoter, in the total business control flow
In the parameter of any one node be configured as in the case where skipping the node, the control flow packet of level where the promoter
It includes and skips the node and be directly entered next node.
In this way, some emergencies are being encountered, such as is encountering the business tine for needing quickly to handle, Ke Yitong
The audit for skipping some or certain nodes is crossed to control quickly propelling for the operation flow.
In accordance with an embodiment of the present disclosure, for the control flow of level where the promoter, in the total business control flow
In the parameter of any one node be configured as in the case where not skipping the node, the control flow of level where the promoter
Including must just can enter next node after the control of the node passes through.
In this way, tight for having to when encountering some the case where needing to reinforce security control, stringent control
Some nodes of lattice control are configured to not skip the node.It can reinforce strictly auditing in this way, improve the safety of Service control.
Fig. 3 diagrammatically illustrates the flow chart of the method for Row control according to another embodiment of the disclosure.
As shown in figure 3, according to another embodiment of the disclosure, this method further includes in addition to operating S201~operation S203
Operate S301.
In operation S301, the total business control flow of the organization is designed, wherein the Service control process includes more
A node, and the parameter of each node is to be determined.
Specifically, the parameter of each node includes whether to skip the node.In some embodiments, the parameter of each node
It can also include that node audit passes through parameter informations such as the priority assignation of personnel etc..
In accordance with an embodiment of the present disclosure, for a business of organization, one or limited multiple total can be designed
Service control process.When specific business executes, according to the hierarchical information where the promoter of the business to the total business control
Process processed is configured.By this method, the design objective of Service control process is simplified.
Also, when the level setting in organization changes or when business demand changes, it can pass through
The relevant parameter in total business control flow is reconfigured to meet the business corresponding to new level or new business demand
Control flow.
As shown in figure 3, in some embodiments, this method can further include operation S302.
Each node in the total business control flow is configured for each level in the organization in operation S302
Parameter to generate the control flow of the level.
It in accordance with an embodiment of the present disclosure, can be pre- by total business control flow for each level in the organization
First configure.The control flow of pre-configured each level can also be stored in advance in some embodiments.In this way,
It can be according to the corresponding control flow of the hierarchical information quick calling of the business promoter level in operation S202.To not
It needs to configure the total business control flow in real time when each user of the level uses the control flow every time, helps to mention
Height realizes the speed of service of operation S202.
Fig. 4 diagrammatically illustrates the flow chart of the method for Row control according to disclosure another embodiment.
As shown in figure 4, this method can also wrap after operation S301 and operation S302 according to another embodiment of the disclosure
Include operation S403.
It should be noted that also including operation S201~operation S203 in method shown in Fig. 4.Operate S403 and operation
S201~operation S203 execution does not define or necessary successive logical order, therefore is not shown in the method example of Fig. 4
Operate S201~operation S203.
In operation S403, after the control flow of any one level is reconfigured, with the control flow reconfigured
Control flow as the current level.
Below in conjunction with Fig. 5 exemplary embodiment to according to the method for Row control of each embodiment of the disclosure into
Row explanation.
Fig. 5 diagrammatically illustrates the realization scene schematic diagram according to the method for Row control of the embodiment of the present disclosure;
Specifically, Fig. 5 illustrates the total business control flow 510 of the procurement business of organization 500.
As shown in figure 5, the total business control flow 500 includes department's evaluation 511, general manager office's evaluation 512, total warp
Reason 513 3 nodes of audit.Wherein the parameter of each node is undetermined, as in figure " skip1=?, skip2=? and skip3
=? ", indicate whether to skip corresponding node.
The table when the value of skip (including any one or more in skipl, skip2 and skip3) is configured as " True "
Show and can skip the control that the node is directly entered next node.
Alternatively, the value when skip (including any one or more in skip1, skip2 and skip3) is configured as
It must include the control of the node in expression Service control process when " False ", and can only be after the node control passes through
It can enter the control of next node.
For example, the employee of research and development one, which initiates one, adopts structure business.In accordance with an embodiment of the present disclosure, it in operation S201, obtains
Hierarchical information of the employee of research and development one in organization 500 is taken, e.g.: general manager-general manager office-research and development department-
Research and development one.
Then in operation S202, according to " general manager-general manager office-research and development department-research and development one " this hierarchical information
Total business control flow 510 is configured.
For example, its corresponding procurement process can be for " general manager-general manager office-research and development department-research and development one "
Whole parameters of skipl, skip2 and skip3 are False, that is, research and develop one employee initiate procurement business need by
Department's evaluation 511, general manager office's evaluation 512, general manager audit the control one by one of 513 3 nodes and pass through, could be final
Pass through.
So, operation S203 in for research and development one employee initiate adopt structure business need by department evaluate 511,
General manager office's evaluation 512 and general manager audit the control one by one of 513 3 nodes.
Or it can be with for " general manager-general manager office-research and development department-research and development one " its corresponding procurement process
It is skip1, skip2 parameter is false, and skip3 is True.To, in operation S203 for research and development one
The structure business of adopting of employee's initiation needs to evaluate 512 two node controls by i.e. by department's evaluation 511 and general manager office
It can.
It in some embodiments, can be to the level corresponding to research and development department of all departments of research and development department subordinate application unification
Control flow.To require the procurement process of research and development one, research and development two, the employee's initiation for researching and developing three through identical
Control flow.
In further embodiments, for example, initial is configured to unified pair of all departments application to research and development department subordinate
Should in research and development department control flow (for example, correspond to research and development department control flow be skip1, skip2 parameter be false, and
Skip3 is True), then to three this levels of research and development, (i.e. hierarchical information is " general manager-general manager office-research and development department-
Research and development three ") reconfigured according to operation S403 (such as three business of research and development change, for example assume responsibility for more
The research and development task of load is aggravated, whole parameters that purchasing control process is redeployed as skip1, skip2 and skip3 are
false).So, for research and development one and research and development two, the control flow of procurement business is still department's evaluation 511 and total
Manager office evaluates 512 two nodes and audits step by step.And for research and development three, the control flow of procurement business is then
Control flow after reconfiguring needs to evaluate 511, general manager office evaluation 512 and general manager's audit by department
The control one by one of 513 3 nodes.In this way, after the control flow to some level is reconfigured, with what is reconfigured
Control flow of the control flow as the current level, so that Service control process dynamic change, rapidly adapts to diversity business
Demand.
Fig. 6 diagrammatically illustrates the block diagram of the device for Row control according to the embodiment of the present disclosure.
As shown in fig. 6, in accordance with an embodiment of the present disclosure, which be can be used to implement with reference to Fig. 2~shown in fig. 5
Method for Row control.
The device 600 includes that hierarchical information obtains module 610, level control flow obtains module 620 and Service control
Module 630.
Hierarchical information obtains module 610 and is used to obtain hierarchical information of the promoter of business in organization;
Level control flow obtains the control flow of level where module 620 is used to obtain the promoter, the wherein initiation
The control flow of level is configured according to parameter of the hierarchical information to each node in total business control flow where person
And obtain, wherein the parameter of each node includes whether to skip the node.
Message control module 630 is used to control the business according to the control flow of level where the promoter.
In accordance with an embodiment of the present disclosure, for the control flow of level where the promoter, in the total business control flow
In the parameter of any one node be configured as in the case where skipping the node, the control flow packet of level where the promoter
It includes and skips the node and be directly entered next node.
In accordance with an embodiment of the present disclosure, for the control flow of level where the promoter, in the total business control flow
In the parameter of any one node be configured as in the case where not skipping the node, the control flow of level where the promoter
Including must just can enter next node after the control of the node passes through.
In accordance with an embodiment of the present disclosure, which further includes master control process design module 640.
Master control process design module 640 is used to design the total business control flow of the organization, wherein the business
Control flow includes multiple nodes, and the parameter of each node is to be determined.
In accordance with an embodiment of the present disclosure, which further includes level control flow generation module 650.
Level control flow generation module 650 is used to configure the total business control for each level in the organization
The parameter of each node is in process processed to generate the control flow of the level.
In accordance with an embodiment of the present disclosure, which is also used to the control when any one level
After process processed is reconfigured, using the control flow that reconfigures as the control flow of the current level.
It is understood that hierarchical information obtains module 610, level control flow obtains module 620, message control module
630, master control process design module 640 and level control flow generation module 650, which may be incorporated in a module, realizes,
Or any one module therein can be split into multiple modules.Alternatively, one or more modules in these modules
At least partly function can be combined at least partly function of other modules, and be realized in a module.According to the present invention
Embodiment, hierarchical information obtain module 610, level control flow obtain module 620, message control module 630, master control stream
Journey design at least one of module 640 and level control flow generation module 650 can be at least implemented partly as firmly
Part circuit, for example, field programmable gate array (FPGA), programmable logic array (PLA), system on chip, the system on substrate,
System, specific integrated circuit (ASIC) in encapsulation, or can be any other reasonable integrate or encapsulate to circuit
The hardware such as mode or firmware realize, or is realized with software, the appropriately combined of three kinds of implementations of hardware and firmware.Or
Person, hierarchical information obtains module 610, level control flow obtains module 620, message control module 630, master control process design
At least one of module 640 and level control flow generation module 650 can at least be implemented partly as computer journey
Sequence module can execute the function of corresponding module when the program is run by computer.
Fig. 7 diagrammatically illustrates the block diagram of the computer system for Row control according to the embodiment of the present disclosure.Fig. 7
The computer system shown is only an example, should not function to the embodiment of the present disclosure and use scope bring any limit
System.
As shown in fig. 7, include processor 701 according to the computer system 700 of the embodiment of the present disclosure, it can be according to storage
It is loaded into random access storage device (RAM) 703 in the program in read-only memory (ROM) 702 or from storage section 708
Program and execute various movements appropriate and processing.Processor 701 for example may include general purpose microprocessor (such as CPU), refer to
Enable set processor and/or related chip group and/or special microprocessor (for example, specific integrated circuit (ASIC)), etc..Processing
Device 701 can also include the onboard storage device for caching purposes.Processor 701 may include for executing with reference to Fig. 2~Fig. 5
Single treatment unit either multiple processing units of the different movements of the method flow according to the embodiment of the present disclosure of description.
In RAM 703, it is stored with system 700 and operates required various programs and data.Processor 701, ROM 702 with
And RAM 703 is connected with each other by bus 704.Processor 701 is held by executing the program in ROM 702 and/or RAM 703
Various operations of the row above with reference to Fig. 2~Fig. 5 method for Row control described.It is noted that the program can also deposit
Storage is in one or more memories in addition to ROM 702 and RAM 703.Processor 701 can also be stored in by executing
Program in the one or more memory is executed above with reference to each of Fig. 2~Fig. 5 method for Row control described
Kind operation.
In accordance with an embodiment of the present disclosure, system 700 can also include input/output (I/O) interface 705, input/output
(I/O) interface 705 is also connected to bus 704.System 700 can also include be connected to I/O interface 705 with one in lower component
Item is multinomial: the importation 706 including keyboard, mouse etc.;Including such as cathode-ray tube (CRT), liquid crystal display (LCD)
Deng and loudspeaker etc. output par, c 707;Storage section 708 including hard disk etc.;And including such as LAN card, modulatedemodulate
Adjust the communications portion 709 of the network interface card of device etc..Communications portion 709 executes communication process via the network of such as internet.
Driver 710 is also connected to I/O interface 705 as needed.Detachable media 711, such as disk, CD, magneto-optic disk, semiconductor
Memory etc. is mounted on as needed on driver 710, in order to be pacified as needed from the computer program read thereon
It is packed into storage section 708.
In accordance with an embodiment of the present disclosure, it may be implemented as computer software journey above with reference to the method for flow chart description
Sequence.For example, embodiment of the disclosure includes a kind of computer program product comprising carry meter on a computer-readable medium
Calculation machine program, the computer program include the program code for method shown in execution flow chart.In such embodiments,
The computer program can be downloaded and installed from network by communications portion 709, and/or be pacified from detachable media 711
Dress.When the computer program is executed by processor 701, the above-mentioned function of limiting in the system of the embodiment of the present disclosure is executed.Root
According to embodiment of the disclosure, system as described above, unit, module, unit etc. can by computer program module come
It realizes.
It should be noted that computer-readable medium shown in the disclosure can be computer-readable signal media or meter
Calculation machine readable storage medium storing program for executing either the two any combination.Computer readable storage medium for example can be --- but not
Be limited to --- electricity, magnetic, optical, electromagnetic, infrared ray or semiconductor system, device or device, or any above combination.Meter
The more specific example of calculation machine readable storage medium storing program for executing can include but is not limited to: have the electrical connection, just of one or more conducting wires
Taking formula computer disk, hard disk, random access storage device (RAM), read-only memory (ROM), erasable type may be programmed read-only storage
Device (EPROM or flash memory), optical fiber, portable compact disc read-only memory (CD-ROM), light storage device, magnetic memory device,
Or above-mentioned any appropriate combination.In the disclosure, computer readable storage medium can be it is any include or storage journey
The tangible medium of sequence, the program can be commanded execution system, device or device use or in connection.And at this
In open, computer-readable signal media may include in a base band or as the data-signal that carrier wave a part is propagated,
Wherein carry computer-readable program code.The data-signal of this propagation can take various forms, including but unlimited
In electromagnetic signal, optical signal or above-mentioned any appropriate combination.Computer-readable signal media can also be that computer can
Any computer-readable medium other than storage medium is read, which can send, propagates or transmit and be used for
By the use of instruction execution system, device or device or program in connection.Include on computer-readable medium
Program code can transmit with any suitable medium, including but not limited to: wireless, electric wire, optical cable, RF etc. are above-mentioned
Any appropriate combination.In accordance with an embodiment of the present disclosure, computer-readable medium may include above-described ROM 702
And/or one or more memories other than RAM 703 and/or ROM 702 and RAM 703.
Flow chart and block diagram in attached drawing are illustrated according to the system of the various embodiments of the disclosure, method and computer journey
The architecture, function and operation in the cards of sequence product.In this regard, each box in flowchart or block diagram can generation
A part of one module, program segment or code of table, a part of above-mentioned module, program segment or code include one or more
Executable instruction for implementing the specified logical function.It should also be noted that in some implementations as replacements, institute in box
The function of mark can also occur in a different order than that indicated in the drawings.For example, two boxes succeedingly indicated are practical
On can be basically executed in parallel, they can also be executed in the opposite order sometimes, and this depends on the function involved.Also it wants
It is noted that the combination of each box in block diagram or flow chart and the box in block diagram or flow chart, can use and execute rule
The dedicated hardware based systems of fixed functions or operations is realized, or can use the group of specialized hardware and computer instruction
It closes to realize.
As on the other hand, the disclosure additionally provides a kind of computer-readable medium, which can be
Included in equipment described in above-described embodiment;It is also possible to individualism, and without in the supplying equipment.Above-mentioned calculating
Machine readable medium carries one or more program, when said one or multiple programs are executed by the equipment, makes
Equipment execution is obtained according to the method for Row control of the embodiment of the present disclosure.
This method includes hierarchical information of the promoter of acquisition business in organization, obtains level where the promoter
Control flow, and control the business according to the control flow of level where the promoter.Wherein, level where the promoter
Control flow be to be configured and obtained according to parameter of the hierarchical information to each node in total business control flow,
In, the parameter of each node includes whether to skip the node.
In accordance with an embodiment of the present disclosure, this method further includes designing the total business control flow of the organization.Wherein,
The Service control process includes multiple nodes, and the parameter of each node is to be determined.
In accordance with an embodiment of the present disclosure, this method further includes configuring total industry for each level in the organization
The parameter of each node is in business control flow to generate the control flow of the level.
In accordance with an embodiment of the present disclosure, for the control flow of level where the promoter, in the total business control flow
In the parameter of any one node be configured as in the case where skipping the node, the control flow packet of level where the promoter
It includes and skips the node and be directly entered next node.
In accordance with an embodiment of the present disclosure, for the control flow of level where the promoter, in the total business control flow
In the parameter of any one node be configured as in the case where not skipping the node, the control flow of level where the promoter
Including must just can enter next node after the control of the node passes through.
In accordance with an embodiment of the present disclosure, this method further include after the control flow of any one level is reconfigured,
Using the control flow that reconfigures as the control flow of the current level.
Embodiment of the disclosure is described above.But the purpose that these embodiments are merely to illustrate that, and
It is not intended to limit the scope of the present disclosure.Although respectively describing each embodiment above, but it is not intended that each reality
Use cannot be advantageously combined by applying the measure in example.The scope of the present disclosure is defined by the appended claims and the equivalents thereof.It does not take off
From the scope of the present disclosure, those skilled in the art can make a variety of alternatives and modifications, these alternatives and modifications should all fall in this
Within scope of disclosure.
Claims (14)
1. a kind of method for Row control, comprising:
Hierarchical information of the promoter of acquisition business in organization;
The control flow of level where obtaining the promoter, wherein the control flow of level is according to institute where the described promoter
It states hierarchical information to configure the parameter of each node in total business control flow and obtain, wherein each node
Parameter include whether to skip the node;And
The business is controlled according to the control flow of level where the described promoter.
2. according to the method described in claim 1, further include:
Designing the total business control flow of the organization, wherein the Service control process includes multiple nodes, and
And the parameter of each node is to be determined.
3. according to the method described in claim 2, further include:
For each level in the organization, the parameter of each node in the total business control flow is configured to generate
The control flow of the level.
4. according to the method described in claim 1, wherein, for the control flow of level where the promoter, in total industry
The parameter of any one node in business control flow is configured as in the case where skipping the node:
The control flow of level where the described promoter includes skipping the node to be directly entered next node.
5. according to the method described in claim 1, wherein, for the control flow of level where the promoter, in total industry
The parameter of any one node in business control flow is configured as in the case where not skipping the node:
The control flow of level includes that must just can enter next section after the control of the node passes through where the described promoter
Point.
6. according to the method described in claim 3, further include:
After the control flow of any one level is reconfigured, using the control flow that reconfigures as the current level
Control flow.
7. a kind of device for Row control, comprising:
Hierarchical information obtains module, for obtaining hierarchical information of the promoter of business in organization;
Level control flow obtains module, for the control flow of level where obtaining the promoter, wherein the described promoter
The control flow of place level is configured according to parameter of the hierarchical information to each node in total business control flow
And obtain, wherein the parameter of each node includes whether to skip the node;And
Message control module, for controlling the business according to the control flow of level where the described promoter.
8. device according to claim 7, further includes:
Master control process design module, for designing the total business control flow of the organization, wherein the business
Control flow includes multiple nodes, and the parameter of each node is to be determined.
9. device according to claim 8, further includes:
Level control flow generation module, for configuring the total business control for each level in the organization
The parameter of each node is in process to generate the control flow of the level.
10. device according to claim 7, wherein for the control flow of level where the promoter, in total industry
The parameter of any one node in business control flow is configured as in the case where skipping the node:
The control flow of level where the described promoter includes skipping the node to be directly entered next node.
11. device according to claim 7, wherein for the control flow of level where the promoter, in total industry
The parameter of any one node in business control flow is configured as in the case where not skipping the node:
The control flow of level includes that must just can enter next section after the control of the node passes through where the described promoter
Point.
12. device according to claim 9, in which:
The level control flow generation module is also used to after the control flow of any one level is reconfigured, with again
Control flow of the control flow of configuration as the current level.
13. a kind of system for Row control, comprising:
One or more processors;
Memory, for storing one or more programs,
Wherein, when one or more of programs are executed by one or more of processors, so that one or more of
Processor realizes method described in any one according to claim 1~6.
14. a kind of computer-readable medium, is stored thereon with executable instruction, which makes processor real when being executed by processor
Now method described in any one according to claim 1~6.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711471043.8A CN109978486A (en) | 2017-12-28 | 2017-12-28 | Method, apparatus, system and medium for Row control |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711471043.8A CN109978486A (en) | 2017-12-28 | 2017-12-28 | Method, apparatus, system and medium for Row control |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109978486A true CN109978486A (en) | 2019-07-05 |
Family
ID=67075616
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711471043.8A Pending CN109978486A (en) | 2017-12-28 | 2017-12-28 | Method, apparatus, system and medium for Row control |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109978486A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112799684A (en) * | 2019-11-14 | 2021-05-14 | 中盈优创资讯科技有限公司 | Service packet obtaining and loading method and device |
CN115293655A (en) * | 2022-09-30 | 2022-11-04 | 神州数码融信云技术服务有限公司 | Flow control method and device, computer equipment and computer readable storage medium |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101000667A (en) * | 2006-01-12 | 2007-07-18 | 鸿富锦精密工业(深圳)有限公司 | System and method of dynamic examining procedure |
CN102254246A (en) * | 2011-06-17 | 2011-11-23 | 中国建设银行股份有限公司 | Workflow managing method and system |
CN102810070A (en) * | 2012-07-16 | 2012-12-05 | 福建富士通信息软件有限公司 | High-performance professional ability packaging process engine and process control method thereof |
WO2014164336A1 (en) * | 2013-03-12 | 2014-10-09 | Illinois Tool Works Inc. | Mass flow controller with near field communication and/or usb interface |
CN106327143A (en) * | 2016-08-05 | 2017-01-11 | 东软集团股份有限公司 | Method and apparatus for node in flow |
-
2017
- 2017-12-28 CN CN201711471043.8A patent/CN109978486A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101000667A (en) * | 2006-01-12 | 2007-07-18 | 鸿富锦精密工业(深圳)有限公司 | System and method of dynamic examining procedure |
CN102254246A (en) * | 2011-06-17 | 2011-11-23 | 中国建设银行股份有限公司 | Workflow managing method and system |
CN102810070A (en) * | 2012-07-16 | 2012-12-05 | 福建富士通信息软件有限公司 | High-performance professional ability packaging process engine and process control method thereof |
WO2014164336A1 (en) * | 2013-03-12 | 2014-10-09 | Illinois Tool Works Inc. | Mass flow controller with near field communication and/or usb interface |
CN106327143A (en) * | 2016-08-05 | 2017-01-11 | 东软集团股份有限公司 | Method and apparatus for node in flow |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112799684A (en) * | 2019-11-14 | 2021-05-14 | 中盈优创资讯科技有限公司 | Service packet obtaining and loading method and device |
CN112799684B (en) * | 2019-11-14 | 2023-09-29 | 中盈优创资讯科技有限公司 | Service package acquisition and loading method and device |
CN115293655A (en) * | 2022-09-30 | 2022-11-04 | 神州数码融信云技术服务有限公司 | Flow control method and device, computer equipment and computer readable storage medium |
CN115293655B (en) * | 2022-09-30 | 2023-01-20 | 神州数码融信云技术服务有限公司 | Flow control method and device, computer equipment and computer readable storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109308214A (en) | Data task processing method and system | |
CN107590186B (en) | Method for managing and executing data processing policy and policy engine system | |
CN108920222A (en) | A kind of method and device for business processing of rule-based engine | |
CN110310034A (en) | A kind of service orchestration applied to SaaS, business flow processing method and apparatus | |
CN112633691A (en) | Method and device for generating custom approval process | |
US10540703B2 (en) | Visualizations for aiding in co-locating products based upon associations | |
CN108173919A (en) | Big data platform builds system, method, equipment and computer-readable medium | |
CN107479882A (en) | Insure generation method, generating means, medium and the electronic equipment of the page | |
CN108021450A (en) | Job analysis method and apparatus based on YARN | |
CN109063190A (en) | Method and apparatus for handling data sequence | |
CN111552550A (en) | Task scheduling method, device and medium based on GPU (graphics processing Unit) resources | |
CN106293661A (en) | The generation of pictorial statement, generation processing method and processing device | |
CN110427304A (en) | O&M method, apparatus, electronic equipment and medium for banking system | |
US20180316777A1 (en) | Invoking enhanced plug-ins and creating workflows having a series of enhanced plug-ins | |
CN109978486A (en) | Method, apparatus, system and medium for Row control | |
CN110515741A (en) | A kind of degradation processing method and device based on local task queue | |
CN109144729A (en) | The data processing method and distributed system of distributed system | |
CN112817562A (en) | Service processing method and device | |
CN109428926A (en) | A kind of method and apparatus of scheduler task node | |
CN112333672A (en) | Method and device for opening UPF network element of 5G core network | |
CN109271238A (en) | Support the task scheduling apparatus and method of a variety of programming languages | |
CN113535220A (en) | Code packet management method and device | |
CN110309462A (en) | Method for exhibiting data and system | |
US20170180197A1 (en) | Dynamic Planning and Configuration Based on Inconsistent Supply | |
CN110324194A (en) | Method, apparatus, system and medium for load balancing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190705 |