CN109978486A - Method, apparatus, system and medium for Row control - Google Patents

Method, apparatus, system and medium for Row control Download PDF

Info

Publication number
CN109978486A
CN109978486A CN201711471043.8A CN201711471043A CN109978486A CN 109978486 A CN109978486 A CN 109978486A CN 201711471043 A CN201711471043 A CN 201711471043A CN 109978486 A CN109978486 A CN 109978486A
Authority
CN
China
Prior art keywords
control flow
level
node
business
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711471043.8A
Other languages
Chinese (zh)
Inventor
宋小兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jingdong Century Trading Co Ltd
Beijing Jingdong Shangke Information Technology Co Ltd
Original Assignee
Beijing Jingdong Century Trading Co Ltd
Beijing Jingdong Shangke Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jingdong Century Trading Co Ltd, Beijing Jingdong Shangke Information Technology Co Ltd filed Critical Beijing Jingdong Century Trading Co Ltd
Priority to CN201711471043.8A priority Critical patent/CN109978486A/en
Publication of CN109978486A publication Critical patent/CN109978486A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Abstract

Present disclose provides a kind of methods for Row control.The method includes obtaining hierarchical information of the promoter of business in organization, the control flow of level where obtaining the promoter, and the business is controlled according to the control flow of level where the described promoter.Wherein, the control flow of level is to be configured and obtained according to parameter of the hierarchical information to each node in total business control flow where the described promoter, wherein the parameter of each node includes whether to skip the node.The disclosure additionally provides a kind of for the device of Row control, system and medium.

Description

Method, apparatus, system and medium for Row control
Technical field
This disclosure relates to Internet technical field, more particularly, to a kind of method, apparatus for Row control, it is System and medium.
Background technique
For organization, each usual business (for example, buying, human recruitment etc.) has its specific workflow Journey.Activiti currently is widely used to realize the planning of workflow.It, can be by being based on for each single item business Activiti draws complete job flow chart, and the auditor based on each node in activiti configuration work flow chart, and And activiti interface circulation work flow diagram is called to control the progress of workflow.
During realizing present inventive concept, at least there are the following problems in the prior art for inventor's discovery: being based on This workflow of activiti only realizes simple workflow, cannot dynamically specify the circulation path of process.Example Such as, when business is more complicated, perhaps the structure of organization is more complicated in the organization each business or Each level (such as each subsidiary, branch company or department etc.) needs to separately design the corresponding Service control of each level Process, then each level is carried out the work according to its corresponding Service control process.In this way, for one in the organization Business, it is necessary to design is largely directed to the Service control process of each department, and when business tine changes (such as Encounter some emergencies) it can not also change Service control process, lead to not meet quick in some in emergency circumstances business Requirement or the requirement of security control of processing etc..
Summary of the invention
It can be with the side for Row control of dynamic configuration Service control process in view of this, present disclose provides one kind Method, device, system and medium.
An aspect of this disclosure provides a kind of method for Row control.The method includes obtaining the hair of business Hierarchical information of the person in organization is played, the control flow of level where obtaining the promoter, and according to the described initiation The control flow of level controls the business where person.Wherein, the control flow of level is according to institute where the described promoter It states hierarchical information to configure the parameter of each node in total business control flow and obtain, wherein each node Parameter include whether to skip the node.
In accordance with an embodiment of the present disclosure, the method also includes designing the total business of the organization to control stream Journey.Wherein, the Service control process includes multiple nodes, and the parameter of each node is to be determined.
In accordance with an embodiment of the present disclosure, the method also includes configuring institute for each level in the organization The parameter of each node in total business control flow is stated to generate the control flow of the level.
In accordance with an embodiment of the present disclosure, it for the control flow of level where the promoter, controls and flows in the total business The parameter of any one node in journey is configured as in the case where skipping the node, the control of level where the described promoter Process includes skipping the node to be directly entered next node.
In accordance with an embodiment of the present disclosure, it for the control flow of level where the promoter, controls and flows in the total business The parameter of any one node in journey is configured as in the case where not skipping the node, the control of level where the described promoter Process processed includes that must just can enter next node after the control of the node passes through.
In accordance with an embodiment of the present disclosure, the method also includes the control flows when any one level to be reconfigured Afterwards, using the control flow that reconfigures as the control flow of the current level.
Another aspect of the disclosure provides a kind of device for Row control, including hierarchical information obtain module, Level control flow obtains module and message control module.
Hierarchical information obtains module and is used to obtain hierarchical information of the promoter of business in organization.Level control stream Journey obtains the control flow of level where module is used to obtain the promoter, wherein the control stream of level where the described promoter Journey is to be configured and obtained according to parameter of the hierarchical information to each node in total business control flow, wherein institute The parameter for stating each node includes whether to skip the node.Message control module is used for according to level where the described promoter Control flow controls the business.
In accordance with an embodiment of the present disclosure, described device further includes master control process design module.Master control process design mould Block is used to design the total business control flow of the organization, wherein and the Service control process includes multiple nodes, And the parameter of each node is to be determined.
In accordance with an embodiment of the present disclosure, described device further includes level control flow generation module.Level control flow is raw It is used to configure the parameter of each node in the total business control flow for each level in the organization at module To generate the control flow of the level.
In accordance with an embodiment of the present disclosure, it for the control flow of level where the promoter, controls and flows in the total business The parameter of any one node in journey is configured as in the case where skipping the node, the control of level where the described promoter Process includes skipping the node to be directly entered next node.
In accordance with an embodiment of the present disclosure, it for the control flow of level where the promoter, controls and flows in the total business The parameter of any one node in journey is configured as in the case where not skipping the node, the control of level where the described promoter Process processed includes that must just can enter next node after the control of the node passes through.
In accordance with an embodiment of the present disclosure, the level control flow generation module is also used to the control when any one level After process is reconfigured, using the control flow that reconfigures as the control flow of the current level.
The third aspect of the disclosure provides a kind of system for Row control, including one or more processors, with And memory.Memory is for storing one or more programs, wherein when one or more of programs are by one or more When a processor executes, so that one or more of processors are realized according to the method for being used for Row control as described above.
The fourth aspect of the disclosure provides a kind of computer-readable medium, is stored thereon with executable instruction, the instruction Processor is set to realize the method for being used for Row control as described above when being executed by processor.
Another aspect of the present disclosure provides a kind of computer program, and the computer program, which includes that computer is executable, to be referred to It enables, described instruction is when executed for realizing the method as described above for being used for Row control.
In accordance with an embodiment of the present disclosure, can at least be partially solved Service control process in the prior art can not dynamic Allocation problem, and therefore may be implemented according to hierarchical information dynamic configuration total business control flow where the promoter of business, The technical effect of the control flow of level where promoter to dynamically obtain the business.
By this method, it can be controlled and be flowed by the flexible configuration total business when the business tine of organization changes Journey and the control flow dynamic change for making corresponding level, thus realize the diversity requirement for flexibly, efficiently coping with business development, Realize the mobilism of Service control process.
Detailed description of the invention
By referring to the drawings to the description of the embodiment of the present disclosure, the above-mentioned and other purposes of the disclosure, feature and Advantage will be apparent from, in the accompanying drawings:
Fig. 1 diagrammatically illustrates the exemplary system of the method and apparatus for Row control according to the embodiment of the present disclosure Framework;
Fig. 2 diagrammatically illustrates the flow chart of the method for Row control according to the embodiment of the present disclosure;
Fig. 3 diagrammatically illustrates the flow chart of the method for Row control according to another embodiment of the disclosure;
Fig. 4 diagrammatically illustrates the flow chart of the method for Row control according to disclosure another embodiment;
Fig. 5 diagrammatically illustrates the realization scene schematic diagram according to the method for Row control of the embodiment of the present disclosure;
Fig. 6 diagrammatically illustrates the block diagram of the device for Row control according to the embodiment of the present disclosure;And
Fig. 7 diagrammatically illustrates the block diagram of the computer system for Row control according to the embodiment of the present disclosure.
Specific embodiment
Hereinafter, will be described with reference to the accompanying drawings embodiment of the disclosure.However, it should be understood that these descriptions are only exemplary , and it is not intended to limit the scope of the present disclosure.In addition, in the following description, descriptions of well-known structures and technologies are omitted, with Avoid unnecessarily obscuring the concept of the disclosure.
Term as used herein is not intended to limit the disclosure just for the sake of description specific embodiment.It uses herein The terms "include", "comprise" etc. show the presence of the feature, step, operation and/or component, but it is not excluded that in the presence of Or add other one or more features, step, operation or component.
There are all terms (including technical and scientific term) as used herein those skilled in the art to be generally understood Meaning, unless otherwise defined.It should be noted that term used herein should be interpreted that with consistent with the context of this specification Meaning, without that should be explained with idealization or excessively mechanical mode.
It, in general should be according to this using statement as " at least one in A, B and C etc. " is similar to Field technical staff is generally understood the meaning of the statement to make an explanation (for example, " system at least one in A, B and C " Should include but is not limited to individually with A, individually with B, individually with C, with A and B, with A and C, have B and C, and/or System etc. with A, B, C).Using statement as " at least one in A, B or C etc. " is similar to, generally come Saying be generally understood the meaning of the statement according to those skilled in the art to make an explanation (for example, " having in A, B or C at least One system " should include but is not limited to individually with A, individually with B, individually with C, with A and B, have A and C, have B and C, and/or the system with A, B, C etc.).It should also be understood by those skilled in the art that substantially arbitrarily indicating two or more The adversative conjunction and/or phrase of optional project shall be construed as either in specification, claims or attached drawing A possibility that giving including one of these projects, either one or two projects of these projects.For example, phrase " A or B " should A possibility that being understood to include " A " or " B " or " A and B ".
Embodiment of the disclosure provides a kind of method, apparatus, system and medium for Row control.This method includes Hierarchical information of the promoter of acquisition business in organization, the control flow of level where obtaining the promoter, and press The business is controlled according to the control flow of level where the promoter.Wherein, the control flow of level where the promoter is basis The hierarchical information configures the parameter of each node in total business control flow and is obtained, wherein each node Parameter includes whether to skip the node.
In accordance with an embodiment of the present disclosure, can at least be partially solved Service control process in the prior art can not dynamic Allocation problem, and the promoter place hierarchical information dynamic configuration total business control flow according to business therefore may be implemented, from And the technical effect of the control flow of level where dynamically obtaining the promoter of the business.
By this method, it can be controlled and be flowed by the flexible configuration total business when the business tine of organization changes Journey and the control flow dynamic change for making corresponding level.For example, when in organization level setting change when or industry When business demand changes, it can be met by the relevant parameter in the dynamic configuration total business control flow and be corresponded to newly The Service control process of level or new business demand.
In this way, method, apparatus according to an embodiment of the present disclosure, system and medium, can flexibly, efficiently The diversity demand for control for coping with business development, realizes the mobilism of Service control process.
Fig. 1 diagrammatically illustrates the exemplary system of the method and apparatus for Row control according to the embodiment of the present disclosure Framework 100.It should be noted that being only the example that can apply the system architecture of the embodiment of the present disclosure shown in Fig. 1, to help this Field technical staff understands the technology contents of the disclosure, but be not meant to the embodiment of the present disclosure may not be usable for other equipment, System, environment or scene.
As shown in Figure 1, system architecture 100 may include terminal device 101,102,103, network according to this embodiment 104 and server 105.Network 104 between terminal device 101,102,103 and server 105 to provide communication link Medium.Network 104 may include various connection types, such as wired, wireless communication link or fiber optic cables etc..
User can be used terminal device 101,102,103 and be interacted by network 104 with server 105, to receive or send out Send message etc..Client application etc. for Service control process can be installed on terminal device 101,102,103.
Terminal device 101,102,103 can be the various electronic equipments with display screen and supported web page browsing, packet Include but be not limited to smart phone, tablet computer, pocket computer on knee and desktop computer etc..
Server 105 can be to provide the server of various services, such as utilize terminal device 101,102,103 to user The information (such as user logs in, requests to initiate each node audit of a certain business, business etc.) inputted provides the backstage supported Management server (merely illustrative).Back-stage management server analyze to data such as the user's requests received etc. Reason, and by processing result (such as according to user's request or the total business control flow and total business control flow of generation In parameter configuration, the control of each node passes through situation or other data etc. in Service control process) feed back to terminal device.
It should be noted that the method provided by the embodiment of the present disclosure for Row control generally can be by server 105 execute.Correspondingly, the device provided by the embodiment of the present disclosure for Row control generally can be set in server 105 In.It can also be by being different from server 105 and can be with terminal for the method for Row control provided by the embodiment of the present disclosure The server or server cluster that equipment 101,102,103 and/or server 105 communicate execute.Correspondingly, the embodiment of the present disclosure The provided device for Row control also can be set in be different from server 105 and can with terminal device 101,102, 103 and/or server 105 communicate server or server cluster in.
It should be understood that the number of terminal device, network and server in Fig. 1 is only schematical.According to realization need It wants, can have any number of terminal device, network and server.
Fig. 2 diagrammatically illustrates the flow chart of the method according to an embodiment of the present disclosure for Row control.
As shown in Fig. 2, this method includes operation S201~operation S203.
In operation S201, hierarchical information of the promoter of business in organization is obtained.
The hierarchical information for example can be the corresponding acquisition such as the login account according to promoter's login system, login name Identification information.
For example, the promoter of the business is in a group loom when the promoter of the business is the research and development department employee of branch company Hierarchical information in structure for example may is that parent company-branch company-research and development department.
Then, in operation S202, the control flow of level where obtaining the promoter.Wherein level where the promoter Control flow is to be configured and obtained according to parameter of the hierarchical information to each node in total business control flow, In, the parameter of each node includes whether to skip the node.
The total business control flow can be the unified architectural process designed in the institutional framework for the business, At least part parameter in each of which node can be to be determined.Specific to the institutional framework different levels when, by this The design parameter of each node, which carries out configuration, in total business control flow can be obtained by the control flow of corresponding level.
For the promoter of a business, the control according to level where the promoter of the business is needed when handling the business Process processed carries out.In hierarchical information of the promoter for getting the business in organization, so that it may be believed according to the level Cease the control stream for the parameter of each node in total business control flow being configured and being obtained business promoter place level Journey.
It specifically, can according to the process that parameter of the hierarchical information to each node in total business control flow is configured With there are many implementations;Such as it can be each node in pre-stored total business control flow corresponding with the level Parameter value assign total business control flow each node;Such as it is also possible to each level in advance by total business control The corresponding configuration of process processed is good and stores, and then calls the corresponding control of the level according to the hierarchical information of business promoter is corresponding Process.
In operation S203, the business is controlled according to the control flow of level where the promoter.
It in accordance with an embodiment of the present disclosure, can be according to hierarchical information dynamic configuration total business control where the promoter of business Process processed, thus the technical effect of the control flow of level where dynamically obtaining the promoter of the business.In this way, when group loom The business tine of structure or the hierarchical structure of organization can be by the flexible configuration total business control flows when changing And make the control flow dynamic change of corresponding level, thus realize the diversity requirement for flexibly, efficiently coping with business development, it is real The mobilism of existing Service control process.
In accordance with an embodiment of the present disclosure, for the control flow of level where the promoter, in the total business control flow In the parameter of any one node be configured as in the case where skipping the node, the control flow packet of level where the promoter It includes and skips the node and be directly entered next node.
In this way, some emergencies are being encountered, such as is encountering the business tine for needing quickly to handle, Ke Yitong The audit for skipping some or certain nodes is crossed to control quickly propelling for the operation flow.
In accordance with an embodiment of the present disclosure, for the control flow of level where the promoter, in the total business control flow In the parameter of any one node be configured as in the case where not skipping the node, the control flow of level where the promoter Including must just can enter next node after the control of the node passes through.
In this way, tight for having to when encountering some the case where needing to reinforce security control, stringent control Some nodes of lattice control are configured to not skip the node.It can reinforce strictly auditing in this way, improve the safety of Service control.
Fig. 3 diagrammatically illustrates the flow chart of the method for Row control according to another embodiment of the disclosure.
As shown in figure 3, according to another embodiment of the disclosure, this method further includes in addition to operating S201~operation S203 Operate S301.
In operation S301, the total business control flow of the organization is designed, wherein the Service control process includes more A node, and the parameter of each node is to be determined.
Specifically, the parameter of each node includes whether to skip the node.In some embodiments, the parameter of each node It can also include that node audit passes through parameter informations such as the priority assignation of personnel etc..
In accordance with an embodiment of the present disclosure, for a business of organization, one or limited multiple total can be designed Service control process.When specific business executes, according to the hierarchical information where the promoter of the business to the total business control Process processed is configured.By this method, the design objective of Service control process is simplified.
Also, when the level setting in organization changes or when business demand changes, it can pass through The relevant parameter in total business control flow is reconfigured to meet the business corresponding to new level or new business demand Control flow.
As shown in figure 3, in some embodiments, this method can further include operation S302.
Each node in the total business control flow is configured for each level in the organization in operation S302 Parameter to generate the control flow of the level.
It in accordance with an embodiment of the present disclosure, can be pre- by total business control flow for each level in the organization First configure.The control flow of pre-configured each level can also be stored in advance in some embodiments.In this way, It can be according to the corresponding control flow of the hierarchical information quick calling of the business promoter level in operation S202.To not It needs to configure the total business control flow in real time when each user of the level uses the control flow every time, helps to mention Height realizes the speed of service of operation S202.
Fig. 4 diagrammatically illustrates the flow chart of the method for Row control according to disclosure another embodiment.
As shown in figure 4, this method can also wrap after operation S301 and operation S302 according to another embodiment of the disclosure Include operation S403.
It should be noted that also including operation S201~operation S203 in method shown in Fig. 4.Operate S403 and operation S201~operation S203 execution does not define or necessary successive logical order, therefore is not shown in the method example of Fig. 4 Operate S201~operation S203.
In operation S403, after the control flow of any one level is reconfigured, with the control flow reconfigured Control flow as the current level.
Below in conjunction with Fig. 5 exemplary embodiment to according to the method for Row control of each embodiment of the disclosure into Row explanation.
Fig. 5 diagrammatically illustrates the realization scene schematic diagram according to the method for Row control of the embodiment of the present disclosure;
Specifically, Fig. 5 illustrates the total business control flow 510 of the procurement business of organization 500.
As shown in figure 5, the total business control flow 500 includes department's evaluation 511, general manager office's evaluation 512, total warp Reason 513 3 nodes of audit.Wherein the parameter of each node is undetermined, as in figure " skip1=?, skip2=? and skip3 =? ", indicate whether to skip corresponding node.
The table when the value of skip (including any one or more in skipl, skip2 and skip3) is configured as " True " Show and can skip the control that the node is directly entered next node.
Alternatively, the value when skip (including any one or more in skip1, skip2 and skip3) is configured as It must include the control of the node in expression Service control process when " False ", and can only be after the node control passes through It can enter the control of next node.
For example, the employee of research and development one, which initiates one, adopts structure business.In accordance with an embodiment of the present disclosure, it in operation S201, obtains Hierarchical information of the employee of research and development one in organization 500 is taken, e.g.: general manager-general manager office-research and development department- Research and development one.
Then in operation S202, according to " general manager-general manager office-research and development department-research and development one " this hierarchical information Total business control flow 510 is configured.
For example, its corresponding procurement process can be for " general manager-general manager office-research and development department-research and development one " Whole parameters of skipl, skip2 and skip3 are False, that is, research and develop one employee initiate procurement business need by Department's evaluation 511, general manager office's evaluation 512, general manager audit the control one by one of 513 3 nodes and pass through, could be final Pass through.
So, operation S203 in for research and development one employee initiate adopt structure business need by department evaluate 511, General manager office's evaluation 512 and general manager audit the control one by one of 513 3 nodes.
Or it can be with for " general manager-general manager office-research and development department-research and development one " its corresponding procurement process It is skip1, skip2 parameter is false, and skip3 is True.To, in operation S203 for research and development one The structure business of adopting of employee's initiation needs to evaluate 512 two node controls by i.e. by department's evaluation 511 and general manager office It can.
It in some embodiments, can be to the level corresponding to research and development department of all departments of research and development department subordinate application unification Control flow.To require the procurement process of research and development one, research and development two, the employee's initiation for researching and developing three through identical Control flow.
In further embodiments, for example, initial is configured to unified pair of all departments application to research and development department subordinate Should in research and development department control flow (for example, correspond to research and development department control flow be skip1, skip2 parameter be false, and Skip3 is True), then to three this levels of research and development, (i.e. hierarchical information is " general manager-general manager office-research and development department- Research and development three ") reconfigured according to operation S403 (such as three business of research and development change, for example assume responsibility for more The research and development task of load is aggravated, whole parameters that purchasing control process is redeployed as skip1, skip2 and skip3 are false).So, for research and development one and research and development two, the control flow of procurement business is still department's evaluation 511 and total Manager office evaluates 512 two nodes and audits step by step.And for research and development three, the control flow of procurement business is then Control flow after reconfiguring needs to evaluate 511, general manager office evaluation 512 and general manager's audit by department The control one by one of 513 3 nodes.In this way, after the control flow to some level is reconfigured, with what is reconfigured Control flow of the control flow as the current level, so that Service control process dynamic change, rapidly adapts to diversity business Demand.
Fig. 6 diagrammatically illustrates the block diagram of the device for Row control according to the embodiment of the present disclosure.
As shown in fig. 6, in accordance with an embodiment of the present disclosure, which be can be used to implement with reference to Fig. 2~shown in fig. 5 Method for Row control.
The device 600 includes that hierarchical information obtains module 610, level control flow obtains module 620 and Service control Module 630.
Hierarchical information obtains module 610 and is used to obtain hierarchical information of the promoter of business in organization;
Level control flow obtains the control flow of level where module 620 is used to obtain the promoter, the wherein initiation The control flow of level is configured according to parameter of the hierarchical information to each node in total business control flow where person And obtain, wherein the parameter of each node includes whether to skip the node.
Message control module 630 is used to control the business according to the control flow of level where the promoter.
In accordance with an embodiment of the present disclosure, for the control flow of level where the promoter, in the total business control flow In the parameter of any one node be configured as in the case where skipping the node, the control flow packet of level where the promoter It includes and skips the node and be directly entered next node.
In accordance with an embodiment of the present disclosure, for the control flow of level where the promoter, in the total business control flow In the parameter of any one node be configured as in the case where not skipping the node, the control flow of level where the promoter Including must just can enter next node after the control of the node passes through.
In accordance with an embodiment of the present disclosure, which further includes master control process design module 640.
Master control process design module 640 is used to design the total business control flow of the organization, wherein the business Control flow includes multiple nodes, and the parameter of each node is to be determined.
In accordance with an embodiment of the present disclosure, which further includes level control flow generation module 650.
Level control flow generation module 650 is used to configure the total business control for each level in the organization The parameter of each node is in process processed to generate the control flow of the level.
In accordance with an embodiment of the present disclosure, which is also used to the control when any one level After process processed is reconfigured, using the control flow that reconfigures as the control flow of the current level.
It is understood that hierarchical information obtains module 610, level control flow obtains module 620, message control module 630, master control process design module 640 and level control flow generation module 650, which may be incorporated in a module, realizes, Or any one module therein can be split into multiple modules.Alternatively, one or more modules in these modules At least partly function can be combined at least partly function of other modules, and be realized in a module.According to the present invention Embodiment, hierarchical information obtain module 610, level control flow obtain module 620, message control module 630, master control stream Journey design at least one of module 640 and level control flow generation module 650 can be at least implemented partly as firmly Part circuit, for example, field programmable gate array (FPGA), programmable logic array (PLA), system on chip, the system on substrate, System, specific integrated circuit (ASIC) in encapsulation, or can be any other reasonable integrate or encapsulate to circuit The hardware such as mode or firmware realize, or is realized with software, the appropriately combined of three kinds of implementations of hardware and firmware.Or Person, hierarchical information obtains module 610, level control flow obtains module 620, message control module 630, master control process design At least one of module 640 and level control flow generation module 650 can at least be implemented partly as computer journey Sequence module can execute the function of corresponding module when the program is run by computer.
Fig. 7 diagrammatically illustrates the block diagram of the computer system for Row control according to the embodiment of the present disclosure.Fig. 7 The computer system shown is only an example, should not function to the embodiment of the present disclosure and use scope bring any limit System.
As shown in fig. 7, include processor 701 according to the computer system 700 of the embodiment of the present disclosure, it can be according to storage It is loaded into random access storage device (RAM) 703 in the program in read-only memory (ROM) 702 or from storage section 708 Program and execute various movements appropriate and processing.Processor 701 for example may include general purpose microprocessor (such as CPU), refer to Enable set processor and/or related chip group and/or special microprocessor (for example, specific integrated circuit (ASIC)), etc..Processing Device 701 can also include the onboard storage device for caching purposes.Processor 701 may include for executing with reference to Fig. 2~Fig. 5 Single treatment unit either multiple processing units of the different movements of the method flow according to the embodiment of the present disclosure of description.
In RAM 703, it is stored with system 700 and operates required various programs and data.Processor 701, ROM 702 with And RAM 703 is connected with each other by bus 704.Processor 701 is held by executing the program in ROM 702 and/or RAM 703 Various operations of the row above with reference to Fig. 2~Fig. 5 method for Row control described.It is noted that the program can also deposit Storage is in one or more memories in addition to ROM 702 and RAM 703.Processor 701 can also be stored in by executing Program in the one or more memory is executed above with reference to each of Fig. 2~Fig. 5 method for Row control described Kind operation.
In accordance with an embodiment of the present disclosure, system 700 can also include input/output (I/O) interface 705, input/output (I/O) interface 705 is also connected to bus 704.System 700 can also include be connected to I/O interface 705 with one in lower component Item is multinomial: the importation 706 including keyboard, mouse etc.;Including such as cathode-ray tube (CRT), liquid crystal display (LCD) Deng and loudspeaker etc. output par, c 707;Storage section 708 including hard disk etc.;And including such as LAN card, modulatedemodulate Adjust the communications portion 709 of the network interface card of device etc..Communications portion 709 executes communication process via the network of such as internet. Driver 710 is also connected to I/O interface 705 as needed.Detachable media 711, such as disk, CD, magneto-optic disk, semiconductor Memory etc. is mounted on as needed on driver 710, in order to be pacified as needed from the computer program read thereon It is packed into storage section 708.
In accordance with an embodiment of the present disclosure, it may be implemented as computer software journey above with reference to the method for flow chart description Sequence.For example, embodiment of the disclosure includes a kind of computer program product comprising carry meter on a computer-readable medium Calculation machine program, the computer program include the program code for method shown in execution flow chart.In such embodiments, The computer program can be downloaded and installed from network by communications portion 709, and/or be pacified from detachable media 711 Dress.When the computer program is executed by processor 701, the above-mentioned function of limiting in the system of the embodiment of the present disclosure is executed.Root According to embodiment of the disclosure, system as described above, unit, module, unit etc. can by computer program module come It realizes.
It should be noted that computer-readable medium shown in the disclosure can be computer-readable signal media or meter Calculation machine readable storage medium storing program for executing either the two any combination.Computer readable storage medium for example can be --- but not Be limited to --- electricity, magnetic, optical, electromagnetic, infrared ray or semiconductor system, device or device, or any above combination.Meter The more specific example of calculation machine readable storage medium storing program for executing can include but is not limited to: have the electrical connection, just of one or more conducting wires Taking formula computer disk, hard disk, random access storage device (RAM), read-only memory (ROM), erasable type may be programmed read-only storage Device (EPROM or flash memory), optical fiber, portable compact disc read-only memory (CD-ROM), light storage device, magnetic memory device, Or above-mentioned any appropriate combination.In the disclosure, computer readable storage medium can be it is any include or storage journey The tangible medium of sequence, the program can be commanded execution system, device or device use or in connection.And at this In open, computer-readable signal media may include in a base band or as the data-signal that carrier wave a part is propagated, Wherein carry computer-readable program code.The data-signal of this propagation can take various forms, including but unlimited In electromagnetic signal, optical signal or above-mentioned any appropriate combination.Computer-readable signal media can also be that computer can Any computer-readable medium other than storage medium is read, which can send, propagates or transmit and be used for By the use of instruction execution system, device or device or program in connection.Include on computer-readable medium Program code can transmit with any suitable medium, including but not limited to: wireless, electric wire, optical cable, RF etc. are above-mentioned Any appropriate combination.In accordance with an embodiment of the present disclosure, computer-readable medium may include above-described ROM 702 And/or one or more memories other than RAM 703 and/or ROM 702 and RAM 703.
Flow chart and block diagram in attached drawing are illustrated according to the system of the various embodiments of the disclosure, method and computer journey The architecture, function and operation in the cards of sequence product.In this regard, each box in flowchart or block diagram can generation A part of one module, program segment or code of table, a part of above-mentioned module, program segment or code include one or more Executable instruction for implementing the specified logical function.It should also be noted that in some implementations as replacements, institute in box The function of mark can also occur in a different order than that indicated in the drawings.For example, two boxes succeedingly indicated are practical On can be basically executed in parallel, they can also be executed in the opposite order sometimes, and this depends on the function involved.Also it wants It is noted that the combination of each box in block diagram or flow chart and the box in block diagram or flow chart, can use and execute rule The dedicated hardware based systems of fixed functions or operations is realized, or can use the group of specialized hardware and computer instruction It closes to realize.
As on the other hand, the disclosure additionally provides a kind of computer-readable medium, which can be Included in equipment described in above-described embodiment;It is also possible to individualism, and without in the supplying equipment.Above-mentioned calculating Machine readable medium carries one or more program, when said one or multiple programs are executed by the equipment, makes Equipment execution is obtained according to the method for Row control of the embodiment of the present disclosure.
This method includes hierarchical information of the promoter of acquisition business in organization, obtains level where the promoter Control flow, and control the business according to the control flow of level where the promoter.Wherein, level where the promoter Control flow be to be configured and obtained according to parameter of the hierarchical information to each node in total business control flow, In, the parameter of each node includes whether to skip the node.
In accordance with an embodiment of the present disclosure, this method further includes designing the total business control flow of the organization.Wherein, The Service control process includes multiple nodes, and the parameter of each node is to be determined.
In accordance with an embodiment of the present disclosure, this method further includes configuring total industry for each level in the organization The parameter of each node is in business control flow to generate the control flow of the level.
In accordance with an embodiment of the present disclosure, for the control flow of level where the promoter, in the total business control flow In the parameter of any one node be configured as in the case where skipping the node, the control flow packet of level where the promoter It includes and skips the node and be directly entered next node.
In accordance with an embodiment of the present disclosure, for the control flow of level where the promoter, in the total business control flow In the parameter of any one node be configured as in the case where not skipping the node, the control flow of level where the promoter Including must just can enter next node after the control of the node passes through.
In accordance with an embodiment of the present disclosure, this method further include after the control flow of any one level is reconfigured, Using the control flow that reconfigures as the control flow of the current level.
Embodiment of the disclosure is described above.But the purpose that these embodiments are merely to illustrate that, and It is not intended to limit the scope of the present disclosure.Although respectively describing each embodiment above, but it is not intended that each reality Use cannot be advantageously combined by applying the measure in example.The scope of the present disclosure is defined by the appended claims and the equivalents thereof.It does not take off From the scope of the present disclosure, those skilled in the art can make a variety of alternatives and modifications, these alternatives and modifications should all fall in this Within scope of disclosure.

Claims (14)

1. a kind of method for Row control, comprising:
Hierarchical information of the promoter of acquisition business in organization;
The control flow of level where obtaining the promoter, wherein the control flow of level is according to institute where the described promoter It states hierarchical information to configure the parameter of each node in total business control flow and obtain, wherein each node Parameter include whether to skip the node;And
The business is controlled according to the control flow of level where the described promoter.
2. according to the method described in claim 1, further include:
Designing the total business control flow of the organization, wherein the Service control process includes multiple nodes, and And the parameter of each node is to be determined.
3. according to the method described in claim 2, further include:
For each level in the organization, the parameter of each node in the total business control flow is configured to generate The control flow of the level.
4. according to the method described in claim 1, wherein, for the control flow of level where the promoter, in total industry The parameter of any one node in business control flow is configured as in the case where skipping the node:
The control flow of level where the described promoter includes skipping the node to be directly entered next node.
5. according to the method described in claim 1, wherein, for the control flow of level where the promoter, in total industry The parameter of any one node in business control flow is configured as in the case where not skipping the node:
The control flow of level includes that must just can enter next section after the control of the node passes through where the described promoter Point.
6. according to the method described in claim 3, further include:
After the control flow of any one level is reconfigured, using the control flow that reconfigures as the current level Control flow.
7. a kind of device for Row control, comprising:
Hierarchical information obtains module, for obtaining hierarchical information of the promoter of business in organization;
Level control flow obtains module, for the control flow of level where obtaining the promoter, wherein the described promoter The control flow of place level is configured according to parameter of the hierarchical information to each node in total business control flow And obtain, wherein the parameter of each node includes whether to skip the node;And
Message control module, for controlling the business according to the control flow of level where the described promoter.
8. device according to claim 7, further includes:
Master control process design module, for designing the total business control flow of the organization, wherein the business Control flow includes multiple nodes, and the parameter of each node is to be determined.
9. device according to claim 8, further includes:
Level control flow generation module, for configuring the total business control for each level in the organization The parameter of each node is in process to generate the control flow of the level.
10. device according to claim 7, wherein for the control flow of level where the promoter, in total industry The parameter of any one node in business control flow is configured as in the case where skipping the node:
The control flow of level where the described promoter includes skipping the node to be directly entered next node.
11. device according to claim 7, wherein for the control flow of level where the promoter, in total industry The parameter of any one node in business control flow is configured as in the case where not skipping the node:
The control flow of level includes that must just can enter next section after the control of the node passes through where the described promoter Point.
12. device according to claim 9, in which:
The level control flow generation module is also used to after the control flow of any one level is reconfigured, with again Control flow of the control flow of configuration as the current level.
13. a kind of system for Row control, comprising:
One or more processors;
Memory, for storing one or more programs,
Wherein, when one or more of programs are executed by one or more of processors, so that one or more of Processor realizes method described in any one according to claim 1~6.
14. a kind of computer-readable medium, is stored thereon with executable instruction, which makes processor real when being executed by processor Now method described in any one according to claim 1~6.
CN201711471043.8A 2017-12-28 2017-12-28 Method, apparatus, system and medium for Row control Pending CN109978486A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711471043.8A CN109978486A (en) 2017-12-28 2017-12-28 Method, apparatus, system and medium for Row control

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711471043.8A CN109978486A (en) 2017-12-28 2017-12-28 Method, apparatus, system and medium for Row control

Publications (1)

Publication Number Publication Date
CN109978486A true CN109978486A (en) 2019-07-05

Family

ID=67075616

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711471043.8A Pending CN109978486A (en) 2017-12-28 2017-12-28 Method, apparatus, system and medium for Row control

Country Status (1)

Country Link
CN (1) CN109978486A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112799684A (en) * 2019-11-14 2021-05-14 中盈优创资讯科技有限公司 Service packet obtaining and loading method and device
CN115293655A (en) * 2022-09-30 2022-11-04 神州数码融信云技术服务有限公司 Flow control method and device, computer equipment and computer readable storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101000667A (en) * 2006-01-12 2007-07-18 鸿富锦精密工业(深圳)有限公司 System and method of dynamic examining procedure
CN102254246A (en) * 2011-06-17 2011-11-23 中国建设银行股份有限公司 Workflow managing method and system
CN102810070A (en) * 2012-07-16 2012-12-05 福建富士通信息软件有限公司 High-performance professional ability packaging process engine and process control method thereof
WO2014164336A1 (en) * 2013-03-12 2014-10-09 Illinois Tool Works Inc. Mass flow controller with near field communication and/or usb interface
CN106327143A (en) * 2016-08-05 2017-01-11 东软集团股份有限公司 Method and apparatus for node in flow

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101000667A (en) * 2006-01-12 2007-07-18 鸿富锦精密工业(深圳)有限公司 System and method of dynamic examining procedure
CN102254246A (en) * 2011-06-17 2011-11-23 中国建设银行股份有限公司 Workflow managing method and system
CN102810070A (en) * 2012-07-16 2012-12-05 福建富士通信息软件有限公司 High-performance professional ability packaging process engine and process control method thereof
WO2014164336A1 (en) * 2013-03-12 2014-10-09 Illinois Tool Works Inc. Mass flow controller with near field communication and/or usb interface
CN106327143A (en) * 2016-08-05 2017-01-11 东软集团股份有限公司 Method and apparatus for node in flow

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112799684A (en) * 2019-11-14 2021-05-14 中盈优创资讯科技有限公司 Service packet obtaining and loading method and device
CN112799684B (en) * 2019-11-14 2023-09-29 中盈优创资讯科技有限公司 Service package acquisition and loading method and device
CN115293655A (en) * 2022-09-30 2022-11-04 神州数码融信云技术服务有限公司 Flow control method and device, computer equipment and computer readable storage medium
CN115293655B (en) * 2022-09-30 2023-01-20 神州数码融信云技术服务有限公司 Flow control method and device, computer equipment and computer readable storage medium

Similar Documents

Publication Publication Date Title
CN109308214A (en) Data task processing method and system
CN107590186B (en) Method for managing and executing data processing policy and policy engine system
CN108920222A (en) A kind of method and device for business processing of rule-based engine
CN110310034A (en) A kind of service orchestration applied to SaaS, business flow processing method and apparatus
CN112633691A (en) Method and device for generating custom approval process
US10540703B2 (en) Visualizations for aiding in co-locating products based upon associations
CN108173919A (en) Big data platform builds system, method, equipment and computer-readable medium
CN107479882A (en) Insure generation method, generating means, medium and the electronic equipment of the page
CN108021450A (en) Job analysis method and apparatus based on YARN
CN109063190A (en) Method and apparatus for handling data sequence
CN111552550A (en) Task scheduling method, device and medium based on GPU (graphics processing Unit) resources
CN106293661A (en) The generation of pictorial statement, generation processing method and processing device
CN110427304A (en) O&M method, apparatus, electronic equipment and medium for banking system
US20180316777A1 (en) Invoking enhanced plug-ins and creating workflows having a series of enhanced plug-ins
CN109978486A (en) Method, apparatus, system and medium for Row control
CN110515741A (en) A kind of degradation processing method and device based on local task queue
CN109144729A (en) The data processing method and distributed system of distributed system
CN112817562A (en) Service processing method and device
CN109428926A (en) A kind of method and apparatus of scheduler task node
CN112333672A (en) Method and device for opening UPF network element of 5G core network
CN109271238A (en) Support the task scheduling apparatus and method of a variety of programming languages
CN113535220A (en) Code packet management method and device
CN110309462A (en) Method for exhibiting data and system
US20170180197A1 (en) Dynamic Planning and Configuration Based on Inconsistent Supply
CN110324194A (en) Method, apparatus, system and medium for load balancing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190705