CN109978296A - A kind of power distribution network aid decision-making system - Google Patents
A kind of power distribution network aid decision-making system Download PDFInfo
- Publication number
- CN109978296A CN109978296A CN201711451918.8A CN201711451918A CN109978296A CN 109978296 A CN109978296 A CN 109978296A CN 201711451918 A CN201711451918 A CN 201711451918A CN 109978296 A CN109978296 A CN 109978296A
- Authority
- CN
- China
- Prior art keywords
- decision
- distribution network
- aid decision
- power distribution
- analysis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012544 monitoring process Methods 0.000 claims abstract description 8
- 238000003012 network analysis Methods 0.000 claims abstract description 6
- 238000012545 processing Methods 0.000 claims abstract description 6
- 238000004458 analytical method Methods 0.000 claims description 19
- 238000012502 risk assessment Methods 0.000 claims description 10
- 238000012546 transfer Methods 0.000 claims description 6
- 230000008859 change Effects 0.000 claims description 3
- 230000005611 electricity Effects 0.000 claims 1
- 238000013024 troubleshooting Methods 0.000 abstract description 2
- 238000007726 management method Methods 0.000 description 5
- 238000007363 ring formation reaction Methods 0.000 description 4
- 238000011161 development Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 230000007246 mechanism Effects 0.000 description 2
- 241000196324 Embryophyta Species 0.000 description 1
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 1
- 240000002853 Nelumbo nucifera Species 0.000 description 1
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 1
- 230000002159 abnormal effect Effects 0.000 description 1
- 230000003466 anti-cipated effect Effects 0.000 description 1
- 238000012550 audit Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000007257 malfunction Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 230000011664 signaling Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Quality & Reliability (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Educational Administration (AREA)
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Power Engineering (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The present invention relates to a kind of aid decision-making systems of power distribution network.The present invention provides a kind of aid decision-making systems of power distribution network, it is characterised in that;Including support platform, the support platform for monitoring in real time, being monitored online and network analysis, the support platform to power distribution network operate analyze in the case where to accident treatment decision, to being operated after handling out decision scheme.Power distribution network aid decision-making system provided by the invention, on the basis of the softwares such as network analysis, auxiliary rhymed formula plan is carried out in the case of the running operational risk of dispatching of power netwoks and troubleshooting, it is quickly analyzed and is calculated, improve dispatcher to the assurance of system mode and the ability of processing system accident.
Description
Technical field
The present invention relates to a kind of aid decision-making systems of power distribution network.
Background technique
The fast development of domestic economy is while the high speed development for having driven electric utility, also to the reliable of power supply
More stringent requirements are proposed for property, power quality and economy.But face now the biggest problems are that lack science point
The decision of analysis and lean.Failure above electric power happens occasionally, until occur after, just start to look for reason, be more pass through through
It tests, keeps the time for solving failure elongated, the time having a power failure is caused to extend.Many failures are all it is anticipated that if can do
To lean decision, cash can gone out not yet, can solve in advance, can at least reduce the time of power failure.
Summary of the invention
1, technical problem to be solved:
Existing power supply lacks scientific analysis and lean decision.
2, technical solution:
In order to solve the above problem, the present invention provides a kind of aid decision-making systems of power distribution network, it is characterised in that;It is flat including supporting
Platform, for the support platform for monitoring in real time, being monitored online and network analysis, the support platform analyzes power distribution network in running
In the case where to accident treatment decision, to being operated after handling out decision scheme.
Operating analysis mainly include power supply risk analysis, scheduling Intelligent switching order, closed loop operation risk analysis, draw ration the power supply it is auxiliary
Help decision.
Accident treatment decision failure decision includes that processing mainly turns including resultant fault analysis, scope of power outage analysis, load
Road is drawn for aid decision, single-phase earthing.
The power supply risk analysis carries out relevant analytical judgment by network topology and real time data, according to some normal
The feature and risk trigger condition and requirement for seeing risk and customized risk, are comprehensively screened, are judged, analyzed and are returned
Class provides the risk being likely to occur and carries out accurate, comprehensive prompt;The scheduling Intelligent switching order is to meet dispatcher's reality
Work requirements improve the automatization level of operation order management conscientiously, ensure the operational safety of power grid;The closed loop operation risk point
The risk for analysing involutive ring operation carries out comprehensive assessment, provides the Loop Closing Operation possible more limit information and security risk, right
Whether Loop Closing Operation provides safely conclusive information;The drawing rations the power supply aid decision to draw Lu Xu according to the accident made
Position table rations the power supply and draws road tagmeme table, is calculated in accident or ration the power supply in the case where according to real time data automatically and cuts off load number of targets
The optimal set of the involved drawing road object of value, provides and draws dataway operation table, and be able to carry out remote control operation.
5. the aid decision-making system of power distribution network as claimed in claim 3, it is characterised in that;The resultant fault analysis
Main task is when the grid collapses, to utilize all possible various fault messages obtained;The scope of power outage is analyzed
Power failure equipments and range, including plant stand, transformer, route, line sectionalizing and responsible consumer are found according to Network Topology Discovery, and
Statistics loss load condition;The load transfer aid decision, which analyzes it according to target device, influences load, and will be impacted negative
Lotus goes to safely new power point, proposes including turning for path, turning for the load transfer operation scheme including capacity;It is described single-phase
The ground connection road La Luduila sequence switch is remotely controlled and monitors the busbar voltage situation of change after movement, to judge single-phase
Earth fault line.
Drawing rations the power supply aid decision as remote control.
The single-phase earthing draws road remote control.
3, the utility model has the advantages that
Power distribution network aid decision-making system provided by the invention, on the basis of the softwares such as network analysis, in dispatching of power netwoks operation
Operational risk and troubleshooting in the case of carry out auxiliary rhymed formula plan, quickly analyzed and calculated, improve dispatcher couple
The assurance of system mode and the ability of processing system accident.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
Specific embodiment
Below by attached drawing, the present invention is described in detail.
As shown in Figure 1, the present invention provides a kind of aid decision-making systems of power distribution network, it is characterised in that;It is flat including supporting
Platform, for the support platform for monitoring in real time, being monitored online and network analysis, the support platform analyzes power distribution network in running
In the case where to accident treatment decision, to being operated after handling out decision scheme.
Operating analysis mainly include power supply risk analysis, scheduling Intelligent switching order, closed loop operation risk analysis, draw ration the power supply it is auxiliary
Help decision.
Management and running personnel can carry out traffic control decision based on power supply risk analysis, realize safety and economic coordination.
Operation ticket system use with the consistent model of real-time monitoring system, figure and real time information, avoid the repetition of data
Maintenance, mitigates the workload of maintenance personnel and the error rate of data.Aptitude Operation Order Sheet System is to operation order life cycle using complete
Row control.System, which uses, makes out an invoice in figure, executes in ticket, stringent safe related function mechanism and perfect rights management mechanism
Realize operation order intend ticket, audit, send out in advance, issue an order, execute, guarding it is man-machine combine check on, thus to greatest extent go up guarantee
The safe and stable operation of power grid.
In order to realize that the Universal and scalability of system, Aptitude Operation Order Sheet System use operation order list pattern and process
Permission is customed.System provides flexible scheduling operation flow and flexible form customizes, and what user can construct different-style is
System, realizes the flexible redundant robot framework of system.
The closed loop operation risk that the closed loop operation risk analysis will carry out system is analyzed comprehensively, it is in base
On the basis of state section, pairing ring apparatus carries out loop topology verification first, and after loop checking passes through, it successively carries out cyclization punching
Hit that the N-1 analysis after electric current, cyclization after steady-state load flow, cyclization, rupturing capacity scanning etc. calculates after Loop Closing Operation, finally, comprehensive
Above each calculated result is closed, the risk of involutive ring operation carries out comprehensive assessment, provides the possible out-of-limit letter of the Loop Closing Operation
Breath and security risk, whether safety provides conclusive information for involutive ring operation.By the function management and running, personnel can be comprehensive
Get information about the feelings such as rupturing capacity of the steady-state load flow of power grid, impact trend and breaker after closing the ring operates
Condition, involutive ring operation whether can carry out and cyclization after grid condition have one accurately hold.
The drawing road tagmeme table for drawing aid decision of rationing the power supply to read predefined automatically, draws in road tagmeme table and sets comprising La Lu
Standby title and corresponding operation switch, and the reasonability for defining content is examined automatically;When On-line Control, according to distant in real time
Measured data, it is automatic to calculate the minimal set that road object is drawn involved in excision load target value in conjunction with various target strategies;Really
After recognizing, Operation switch therein is all generated in combination remote control operation sequence, after reaffirming, into real time monitoring and intelligence
The mass-produced remote control operation that can be monitored.Each operational circumstances for drawing road or recovery are recorded in by data record and statistical function automatically
In historical data base, and is arranged, counted as required.
It is described that aid decision of rationing the power supply is drawn to improve the response speed drawn road and restore load control system when drawing is rationed the power supply
With safety and precise, the equilibrium of supply and demand of power grid can be fast implemented, has preferably ensured the stable operation of power grid, while also reducing
The probability of artificial maloperation.
Accident treatment decision failure decision includes that processing mainly turns including resultant fault analysis, scope of power outage analysis, load
Road is drawn for aid decision, single-phase earthing.
The method that the resultant fault analysis is combined using logic judgment with electrical quantity analytical algorithm, is accurately diagnosed to be
Fault element and nature of trouble in power grid identify protection and the breaker of malfunction and misaction, improve management and running personnel
The ability that catastrophic failure in power grid is handled.
The scope of power outage analysis is after power grid accident generation, and within the short time, dispatcher may be will receive largely
Abnormal accident is reported, and occurs a large amount of remote signalling displacement information in real-time monitoring system and stablize to get over limit information, weight in the short time
The information wanted can be fallen into oblivion by the mass data of presentation.In electric network composition complexity, it is difficult to the power failure model that discovery failure influences in time
It encloses.Scope of power outage is analyzed after receiving fault message, using local rapid topology, is analyzed network structure, is found out impacted stop
Electric range, while express statistic goes out facility information, is scheduled for operations staff's reference.
The analysis of load transfer aid decision combination resultant fault analysis as a result, provide the urgent plan of load restoration in time
Slightly, can it is significantly more efficient processing power grid accident development, shorten power system restoration operate normally time, reduce power grid accident
Bring loss.
Single-phase earthing draws road to be directed to distribution outlet singlephase earth fault, guarantee important load minimum according to loss load
Etc. principles, provide and road sequence drawn to suggest, and can be associated with remote control and carry out drawing dataway operation, voltage condition after monitoring operation judges
Whether single-phase earthing is eliminated, to analyze the route for determining single-phase earthing.
Embodiment more than original text is merely illustrative of the invention's technical idea, and protection model of the invention cannot be limited with this
Enclose, it is all according to the technical idea provided by the invention, any changes made on the basis of the technical scheme each falls within guarantor of the present invention
Within the scope of shield.The technology that the present invention is not directed to can be realized by existing technology.
Claims (7)
1. a kind of aid decision-making system of power distribution network, it is characterised in that;Including support platform, the support platform for supervising in real time
Control, on-line monitoring and network analysis, the support platform to power distribution network operate analyze in the case where to accident treatment decision, give
It is operated after handling out decision scheme.
2. the aid decision-making system of power distribution network as described in claim 1, it is characterised in that;Operating analysis mainly includes for electric wind
Danger analysis, closed loop operation risk analysis, draws aid decision of rationing the power supply at scheduling Intelligent switching order.
3. the aid decision-making system of power distribution network as described in claim 1, it is characterised in that;Accident treatment decision failure decision package
Including processing mainly includes resultant fault analysis, scope of power outage analysis, load transfer aid decision, single-phase earthing drawing road.
4. the aid decision-making system of power distribution network as claimed in claim 2, it is characterised in that;The power supply risk analysis passes through net
Network topology and real time data carry out relevant analytical judgment, according to the feature of some common risks and customized risk, Yi Jifeng
Dangerous trigger condition and requirement are comprehensively screened, are judged, analyzed and are sorted out, provide the risk being likely to occur and carry out it is accurate,
Comprehensive prompt;The scheduling Intelligent switching order improves the automatic of operation order management to meet dispatcher's real work demand conscientiously
Change level, ensures the operational safety of power grid;The risk of the closed loop operation risk analysis involutive ring operation carries out comprehensive assessment, gives
The Loop Closing Operation possible more limit information and security risk out, whether safety provides conclusive information for involutive ring operation;Institute
Stating and drawing aid decision of rationing the power supply is to draw tagmeme table in road according to the accident made or ration the power supply to draw road tagmeme table, in accident or limit
It calculates the optimal set for drawing road object involved by excision load target value in the case where electricity automatically according to real time data, mentions
For drawing dataway operation table, and it is able to carry out remote control operation.
5. the aid decision-making system of power distribution network as claimed in claim 3, it is characterised in that;The resultant fault is analyzed main
Task is when the grid collapses, to utilize all possible various fault messages obtained;According to the scope of power outage analysis
Network Topology Discovery finds power failure equipments and range, including plant stand, transformer, route, line sectionalizing and responsible consumer, and counts
Lose load condition;The load transfer aid decision, which analyzes it according to target device, influences load, and impacted load is pacified
New power point is gone to entirely, is proposed including turning for path, turning for the load transfer operation scheme including capacity;The single-phase earthing
The sequence switch of the road La Luduila is remotely controlled and monitors the busbar voltage situation of change after movement, to judge single-phase earthing
Faulty line.
6. the aid decision-making system of power distribution network as claimed in claim 2 or 4, it is characterised in that;Drawing ration the power supply aid decision be it is distant
Control control.
7. the aid decision-making system of power distribution network as claimed in claim 3 or 5, it is characterised in that;The single-phase earthing draws Lu Yao
Control control.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711451918.8A CN109978296A (en) | 2017-12-28 | 2017-12-28 | A kind of power distribution network aid decision-making system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711451918.8A CN109978296A (en) | 2017-12-28 | 2017-12-28 | A kind of power distribution network aid decision-making system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109978296A true CN109978296A (en) | 2019-07-05 |
Family
ID=67071993
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711451918.8A Pending CN109978296A (en) | 2017-12-28 | 2017-12-28 | A kind of power distribution network aid decision-making system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109978296A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111509703A (en) * | 2020-04-22 | 2020-08-07 | 云南电网有限责任公司电力科学研究院 | Power distribution network loop closing and power adjusting operation decision method and system |
CN112381363A (en) * | 2020-10-28 | 2021-02-19 | 广西电网有限责任公司贺州供电局 | Intelligent navigation method and system for power grid accident handling |
CN115622248A (en) * | 2022-10-27 | 2023-01-17 | 国网山东省电力公司淄博供电公司 | Load accurate control method based on distribution network automation system |
CN116739550A (en) * | 2023-02-06 | 2023-09-12 | 广州辰创科技发展有限公司 | Intelligent auxiliary decision-making method and system for rush repair |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104517239A (en) * | 2013-09-27 | 2015-04-15 | 国家电网公司 | Power distribution network planning analysis and auxiliary decision-making system |
CN104700167A (en) * | 2015-04-03 | 2015-06-10 | 上海银都节能服务有限公司 | User power distribution and energy saving decision making system based on intelligent monitoring platform |
CN105678467A (en) * | 2016-01-15 | 2016-06-15 | 国家电网公司 | Regulation and control integrated data analysis and aid decision making system and method under ultrahigh-voltage alternating current and direct current networking |
CN107093928A (en) * | 2017-03-31 | 2017-08-25 | 贵州电网有限责任公司凯里供电局 | Power distribution network scheduling aid decision and trouble analysis system |
-
2017
- 2017-12-28 CN CN201711451918.8A patent/CN109978296A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104517239A (en) * | 2013-09-27 | 2015-04-15 | 国家电网公司 | Power distribution network planning analysis and auxiliary decision-making system |
CN104700167A (en) * | 2015-04-03 | 2015-06-10 | 上海银都节能服务有限公司 | User power distribution and energy saving decision making system based on intelligent monitoring platform |
CN105678467A (en) * | 2016-01-15 | 2016-06-15 | 国家电网公司 | Regulation and control integrated data analysis and aid decision making system and method under ultrahigh-voltage alternating current and direct current networking |
CN107093928A (en) * | 2017-03-31 | 2017-08-25 | 贵州电网有限责任公司凯里供电局 | Power distribution network scheduling aid decision and trouble analysis system |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111509703A (en) * | 2020-04-22 | 2020-08-07 | 云南电网有限责任公司电力科学研究院 | Power distribution network loop closing and power adjusting operation decision method and system |
CN112381363A (en) * | 2020-10-28 | 2021-02-19 | 广西电网有限责任公司贺州供电局 | Intelligent navigation method and system for power grid accident handling |
CN115622248A (en) * | 2022-10-27 | 2023-01-17 | 国网山东省电力公司淄博供电公司 | Load accurate control method based on distribution network automation system |
CN116739550A (en) * | 2023-02-06 | 2023-09-12 | 广州辰创科技发展有限公司 | Intelligent auxiliary decision-making method and system for rush repair |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109978296A (en) | A kind of power distribution network aid decision-making system | |
CN202230153U (en) | Abnormal power utilization real-time monitoring system for rural power grid distribution station | |
CN105245185A (en) | Regional distributed photovoltaic fault diagnosis system and method for access power distribution network | |
CN109459664A (en) | A kind of detection of distribution network failure and positioning analysis system | |
CN209282929U (en) | A kind of electric power box intelligent monitoring protection management system | |
US20080103631A1 (en) | Method and system for collecting data from intelligent electronic devices in an electrical power substation | |
CN103065268A (en) | System for optimization, integration and intelligent analysis of operating data of converting station | |
CN106124935A (en) | Middle and low voltage network Fault Locating Method | |
CN103607042B (en) | The distribution network failure processing method of long fault indicator for overhead lines towards outskirts of a town | |
CN103424670B (en) | A kind of thunderbolt auto-check system of transmission line of electricity trip accident | |
CN109639477A (en) | A kind of secondary device in-service monitoring and analysis system and method | |
CN102737287B (en) | Regional power grid on-line power supply risk assessment system | |
CN104331042A (en) | State evaluation method of hydropower plant computer monitoring system | |
CN209232119U (en) | A kind of box-type substation monitoring and alarming system based on cloud service platform | |
CN103970098A (en) | Intelligent substation auxiliary system integrated monitoring platform | |
CN107069966A (en) | A kind of transformer station's remote online monitoring and status assessing system | |
CN106383286A (en) | Electric power line fault alarm device | |
CN106208372A (en) | Based on visualization and the switch remote operation method of anti-error topological analysis comprehensively | |
Baranovic et al. | Experiences from intelligent alarm processing and decision support tools in smart grid transmission control centers | |
CN106093636A (en) | The analog quantity check method of the secondary device of intelligent grid and device | |
CN103208089B (en) | Electric network intelligent scheduling system and method based on mode identification technology | |
CN105337314A (en) | Multisource coordination control fault treatment method based on distributed power supply black start technology | |
Kawano et al. | Intelligent protection relay system for smart grid | |
CN106451760B (en) | A kind of 500kV substation centralized control system telemetry intelligence (TELINT) method for real-time monitoring | |
CN104795804A (en) | Auxiliary relay protection monitoring processing system and processing method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190705 |
|
RJ01 | Rejection of invention patent application after publication |