CN109978289A - 一种月度市场交易前安全校核的电力转换电量方法 - Google Patents
一种月度市场交易前安全校核的电力转换电量方法 Download PDFInfo
- Publication number
- CN109978289A CN109978289A CN201711445532.6A CN201711445532A CN109978289A CN 109978289 A CN109978289 A CN 109978289A CN 201711445532 A CN201711445532 A CN 201711445532A CN 109978289 A CN109978289 A CN 109978289A
- Authority
- CN
- China
- Prior art keywords
- peak
- unit
- electricity
- lower limit
- electrical power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000005611 electricity Effects 0.000 title claims abstract description 43
- 238000000034 method Methods 0.000 title claims abstract description 22
- 238000006243 chemical reaction Methods 0.000 title claims abstract description 14
- 238000005516 engineering process Methods 0.000 claims description 3
- 238000012423 maintenance Methods 0.000 claims description 3
- 238000004458 analytical method Methods 0.000 description 6
- PEDCQBHIVMGVHV-UHFFFAOYSA-N Glycerine Chemical compound OCC(O)CO PEDCQBHIVMGVHV-UHFFFAOYSA-N 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000010977 unit operation Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Educational Administration (AREA)
- Marketing (AREA)
- Development Economics (AREA)
- Health & Medical Sciences (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Public Health (AREA)
- Primary Health Care (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明提供一种月度市场交易前安全校核的电力转换电量方法,该方法可根据月度典型时刻的机组电力上下限约束转化得到机组月度的电量上、下限约束。该方法的主要特点,一是可通过高峰、低谷小时数等关键参数的选取和调整,实现对月度典型时刻选取个数差异的适应性,二是其关键参数选取的有效性和准确性,可通过历史月份数据的拟合进行验证。
Description
技术领域
本发明涉及电力市场电量计算方法领域,更具体地,涉及一种月度市场交易前安全校核的电力转换电量方法。
背景技术
广东试行以月度竞价为终端市场、以月度电量为交易标的的电力市场。按照该市场机制,调度机构考虑电网安全稳定和电力可靠供应的需要,在月度市场交易前对各参与市场的电厂提出月度电量的上、下限约束,交易机构在竞价出清时考虑电厂的电量上、下限约束后撮合成交。
传统的电力系统安全稳定分析都是对某一时刻(例如年最高负荷时刻或最大丰水时刻)的电网状态进行分析,得到该时刻为确保电网安全稳定而对电厂的出力要求。若要对一个时间段的电量给出上下限,理论上就需要对该时间段内逐个时刻分别进行分析,根据每个时刻对电厂的出力要求逐点积分得到该时段的电量需求。
然而,在月前进行次月逐个时刻的电力校核分析,面临诸多问题:一是分析量庞大,即便是按照每日24点的要求,月度分析的工作量也是一次传统分析的720倍;二是月前对次月逐个时刻负荷需求、地方来水等边界条件的预测难度很大且准确度低,因此逐个时刻分析的结论也就失去了意义。
发明内容
本发明提供一种一种月度市场交易前安全校核的电力转换电量方法,该方法可推出电厂全月的电量上、下限约束,解决月度市场交易前月度电量安全校核的难题。
为了达到上述技术效果,本发明的技术方案如下:
一种月度市场交易前安全校核的电力转换电量方法,包括以下步骤:
S1:对于顶峰机组,根据开机台数、出力下限换算出电量下限;
S2:对于受限机组,根据受限电力值换算出电量上限。
进一步地,所述步骤S1的过程是:
其中,Q下限为顶峰机组当月全电量下限,T全月为全月天数, 分别为第i天高峰、低谷段网络要求的机组出力下限,分别为第i天机组装机和检修容量,P最低出力为机组最低技术出力,为第i天网络要求的开机台数,H高峰、H低谷分别为机组高峰、低谷出力对应的小时数。
进一步地,所述步骤S2的过程是:
其中,Q上限为受限机组当月全电量上限,分别为第i天高峰、低谷段网络允许的机组出力上限。
进一步地,H高峰、H低谷的取值根据历史月份相应典型时刻的最高、最低出力要求,以及全月电量数据进行拟合;同类型必开机组H高峰、H低谷的小时数取统一数值。
与现有技术相比,本发明技术方案的有益效果是:
本发明方法根据典型时刻的机组电力校核结论转化至机组电量上、下限的思路,该方法能够通过调整高峰、低谷小时数等关键参数,实现对典型时刻点选取个数差异的适应性;根据历史月份相应典型时刻的最高、最低出力要求,以及全月电量数据进行拟合,实现对高峰、低谷小时数等关键参数的选取方式,进而实现推出电厂全月的电量上、下限约束,解决月度市场交易前月度电量安全校核的难题。
附图说明
图1为本发明方法流程图。
具体实施方式
附图仅用于示例性说明,不能理解为对本专利的限制;
为了更好说明本实施例,附图某些部件会有省略、放大或缩小,并不代表实际产品的尺寸;
对于本领域技术人员来说,附图中某些公知结构及其说明可能省略是可以理解的。
下面结合附图和实施例对本发明的技术方案做进一步的说明。
实施例1
如图1所示,月度市场交易前,对系统中存在输电阻塞的网络,按照对机组的要求可分为受限断面与顶峰断面。对于受限断面内的机组(群),其出力上限由断面内高峰负荷与断面送出极限确定;对于顶峰断面内的机组(群),其出力下限由断面内高峰负荷减去断面受入极限确定。
由上确定的相关阻塞断面内的受限、顶峰机组的电力上、下限按照如下方法转换得到月度电量上、下限:
1、对于顶峰机组(群),按如下公式根据开机台数、出力下限换算出电量下限:
其中,Q下限为顶峰机组(群)当月全电量下限,T全月为全月天数, 分别为第i天高峰、低谷段网络要求的机组(群)出力下限,分别为第i天机组(群)装机和检修容量,P最低出力为机组最低技术出力,为第i天网络要求的开机台数,H高峰、H低谷分别为机组(群)高峰、低谷出力对应的小时数(同类型必开机组高峰、低谷小时数取统一数值;高峰、低谷小时数的取值随预计次月电力平衡的情况适度调整)。
2、对于受限机组(群),按如下公式根据受限电力值换算出电量上限:
其中,Q上限为受限机组(群)当月全电量上限,分别为第i天高峰、低谷段网络允许的机组(群)出力上限,其余参数同上。当受限断面内机组群可选开机方式不唯一时,综合考虑全省电力平衡、机组运行特性,选取典型开机方式折算全电量上限。
按照上述公式,可根据受限或顶峰机组(群)次月每日最高、最低出力要求,换算得到次月电量上、下限。当技术系统尚不具备时,亦可根据实际情况,对次月仅选取几个典型时刻,例如每旬选取一个时刻,根据典型时刻的最高、最低出力要求进行换算,相应地调整公式中有关参数以提升换算的准确性。
上述公式中的关键参数——高峰、低谷小时数数值的选取,直接影响到换算结果。该参数根据历史月份相应典型时刻的最高、最低出力要求,以及全月电量数据进行拟合,以提升上述转换公式的准确性。
相同或相似的标号对应相同或相似的部件;
附图中描述位置关系的用于仅用于示例性说明,不能理解为对本专利的限制;
显然,本发明的上述实施例仅仅是为清楚地说明本发明所作的举例,而并非是对本发明的实施方式的限定。对于所属领域的普通技术人员来说,在上述说明的基础上还可以做出其它不同形式的变化或变动。这里无需也无法对所有的实施方式予以穷举。凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明权利要求的保护范围之内。
Claims (5)
1.一种月度市场交易前安全校核的电力转换电量方法,其特征在于,包括以下步骤:
S1:对于顶峰机组,根据开机台数、出力下限换算出电量下限;
S2:对于受限机组,根据受限电力值换算出电量上限。
2.根据权利要求1所述的月度市场交易前安全校核的电力转换电量方法,其特征在于,所述步骤S1的过程是:
其中,Q下限为顶峰机组当月全电量下限,T全月为全月天数, 分别为第i天高峰、低谷段网络要求的机组出力下限,分别为第i天机组装机和检修容量,P最低出力为机组最低技术出力,为第i天网络要求的开机台数,H高峰、H低谷分别为机组高峰、低谷出力对应的小时数。
3.根据权利要求2所述的月度市场交易前安全校核的电力转换电量方法,其特征在于,所述步骤S2的过程是:
其中,Q上限为受限机组当月全电量上限,分别为第i天高峰、低谷段网络允许的机组出力上限。
4.根据权利要求2-3任一项所述的月度市场交易前安全校核的电力转换电量方法,其特征在于,H高峰、H低谷的取值根据历史月份相应典型时刻的最高、最低出力要求,以及全月电量数据进行拟合。
5.根据权利要求4所述的月度市场交易前安全校核的电力转换电量方法,其特征在于,同类型必开机组H高峰、H低谷的小时数取统一数值。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711445532.6A CN109978289B (zh) | 2017-12-27 | 2017-12-27 | 一种月度市场交易前安全校核的电力转换电量方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711445532.6A CN109978289B (zh) | 2017-12-27 | 2017-12-27 | 一种月度市场交易前安全校核的电力转换电量方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109978289A true CN109978289A (zh) | 2019-07-05 |
CN109978289B CN109978289B (zh) | 2022-11-29 |
Family
ID=67071630
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711445532.6A Active CN109978289B (zh) | 2017-12-27 | 2017-12-27 | 一种月度市场交易前安全校核的电力转换电量方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109978289B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110570020A (zh) * | 2019-08-15 | 2019-12-13 | 中国南方电网有限责任公司 | 适应区域交直流混联电网的中长期交易电量安全校核方法 |
CN113177692A (zh) * | 2021-04-06 | 2021-07-27 | 长沙理工大学 | 一种国家指令性电量的年计划完成风险评估方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103324848A (zh) * | 2013-06-17 | 2013-09-25 | 清华大学 | 基于诱导目标函数的含电量约束月度机组组合优化方法 |
CN105608633A (zh) * | 2015-10-28 | 2016-05-25 | 国家电网公司西北分部 | 多时间尺度的大用户直接交易电力市场模拟仿真方法 |
CN105678394A (zh) * | 2014-11-07 | 2016-06-15 | 国家电网公司 | 一种多源多周期发电计划制定方法 |
CN106651224A (zh) * | 2017-01-24 | 2017-05-10 | 国网福建省电力有限公司 | 一种优化峰谷电价下省际新能源购电量的方法 |
CN106786790A (zh) * | 2016-11-19 | 2017-05-31 | 国网浙江省电力公司 | 一种含水气煤核电的省级电网长期多电源协调调度方法 |
CN107220868A (zh) * | 2017-04-20 | 2017-09-29 | 国网上海市电力公司 | 一种抽水电量集中竞价交易出清电价的计算方法 |
CN107276065A (zh) * | 2016-04-07 | 2017-10-20 | 中国电力科学研究院 | 基于负荷特征时段的月度发电计划优化与安全校核方法 |
-
2017
- 2017-12-27 CN CN201711445532.6A patent/CN109978289B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103324848A (zh) * | 2013-06-17 | 2013-09-25 | 清华大学 | 基于诱导目标函数的含电量约束月度机组组合优化方法 |
CN105678394A (zh) * | 2014-11-07 | 2016-06-15 | 国家电网公司 | 一种多源多周期发电计划制定方法 |
CN105608633A (zh) * | 2015-10-28 | 2016-05-25 | 国家电网公司西北分部 | 多时间尺度的大用户直接交易电力市场模拟仿真方法 |
CN107276065A (zh) * | 2016-04-07 | 2017-10-20 | 中国电力科学研究院 | 基于负荷特征时段的月度发电计划优化与安全校核方法 |
CN106786790A (zh) * | 2016-11-19 | 2017-05-31 | 国网浙江省电力公司 | 一种含水气煤核电的省级电网长期多电源协调调度方法 |
CN106651224A (zh) * | 2017-01-24 | 2017-05-10 | 国网福建省电力有限公司 | 一种优化峰谷电价下省际新能源购电量的方法 |
CN107220868A (zh) * | 2017-04-20 | 2017-09-29 | 国网上海市电力公司 | 一种抽水电量集中竞价交易出清电价的计算方法 |
Non-Patent Citations (1)
Title |
---|
吕泉: "《制定电力市场中机组合同交易电量日出力计划的一种经济策略》", 《电网技术》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110570020A (zh) * | 2019-08-15 | 2019-12-13 | 中国南方电网有限责任公司 | 适应区域交直流混联电网的中长期交易电量安全校核方法 |
CN110570020B (zh) * | 2019-08-15 | 2023-04-07 | 中国南方电网有限责任公司 | 适应区域交直流混联电网的中长期交易电量安全校核方法 |
CN113177692A (zh) * | 2021-04-06 | 2021-07-27 | 长沙理工大学 | 一种国家指令性电量的年计划完成风险评估方法 |
CN113177692B (zh) * | 2021-04-06 | 2024-05-10 | 长沙理工大学 | 一种国家指令性电量的年计划完成风险评估方法 |
Also Published As
Publication number | Publication date |
---|---|
CN109978289B (zh) | 2022-11-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Wang et al. | Risk-based distributionally robust optimal gas-power flow with wasserstein distance | |
Hedayati-Mehdiabadi et al. | Wind power dispatch margin for flexible energy and reserve scheduling with increased wind generation | |
Yu et al. | Solar photovoltaic energy policy and globalization: a multiperspective approach with case studies of Germany, Japan, and China | |
Huang et al. | Market mechanisms for cooperative operation of price-maker energy storage in a power network | |
Izadian et al. | Renewable energy policies: A brief review of the latest US and EU policies | |
Fouquet | Policy instruments for renewable energy–From a European perspective | |
Riesz et al. | Designing electricity markets for a high penetration of variable renewables | |
Weitemeyer et al. | A European perspective: potential of grid and storage for balancing renewable power systems | |
Barelli et al. | How hybridization of energy storage technologies can provide additional flexibility and competitiveness to microgrids in the context of developing countries | |
Huang et al. | Strategic storage operation in wholesale electricity markets: A networked cournot game analysis | |
CN109978289A (zh) | 一种月度市场交易前安全校核的电力转换电量方法 | |
Balaban et al. | Analysing renewable energy source impacts on power system national network code | |
Pavić et al. | Defining and evaluating use cases for battery energy storage investments: Case study in Croatia | |
Hadley et al. | Electric grid expansion planning with high levels of variable generation | |
Chen et al. | Method of carbon obligation allocation between generation side and demand side in power system | |
CN102904248B (zh) | 基于风电出力不确定性集合的电力系统调度方法 | |
Kryszk et al. | Barriers and prospects for the development of renewable energy sources in Poland during the energy crisis | |
Budin et al. | A quadratically constrained optimization problem for determining the optimal nominal power of a pv system in net-metering model: A case study for Croatia | |
Shetwan et al. | Using analytical hierarchy process to select the best power generation technology in Libya | |
Zangs et al. | Distributed energy storage control for dynamic load impact mitigation | |
Felling et al. | Flow-based market coupling revised-Part II: Assessing improved price zones in Central Western Europe | |
Reka et al. | A smart survey on demand response potential in global energy market | |
Mégel et al. | Reducing the computational effort of stochastic multi-period dc optimal power flow with storage | |
Roach | Community power and fleet microgrids: meeting climate goals, enhancing system resilience, and stimulating local economic development | |
Lie et al. | Validation study of an approximate 2014 European power‐flow model using PowerGAMA |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |