CN109977545A - A kind of Electric Power Network Planning figure methods of exhibiting and system - Google Patents

A kind of Electric Power Network Planning figure methods of exhibiting and system Download PDF

Info

Publication number
CN109977545A
CN109977545A CN201910234601.1A CN201910234601A CN109977545A CN 109977545 A CN109977545 A CN 109977545A CN 201910234601 A CN201910234601 A CN 201910234601A CN 109977545 A CN109977545 A CN 109977545A
Authority
CN
China
Prior art keywords
power network
electric power
network planning
grid
exhibiting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910234601.1A
Other languages
Chinese (zh)
Inventor
傅光辉
张艺涵
李科
郭勇
刘猛
全少理
于昊正
罗潘
马杰
杨卓
孙义豪
丁岩
关朝杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Economic and Technological Research Institute of State Grid Henan Electric Power Co Ltd
Shandong Luneng Software Technology Co Ltd
Original Assignee
Economic and Technological Research Institute of State Grid Henan Electric Power Co Ltd
Shandong Luneng Software Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Economic and Technological Research Institute of State Grid Henan Electric Power Co Ltd, Shandong Luneng Software Technology Co Ltd filed Critical Economic and Technological Research Institute of State Grid Henan Electric Power Co Ltd
Priority to CN201910234601.1A priority Critical patent/CN109977545A/en
Publication of CN109977545A publication Critical patent/CN109977545A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/18Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

Present disclose provides a kind of Electric Power Network Planning figure methods of exhibiting and systems.Wherein, a kind of Electric Power Network Planning figure methods of exhibiting, comprising: according to the power grid spatial data of the corresponding demand of Electric Power Network Planning business automatic screening;Preset requirement is paid close attention to according to Electric Power Network Planning, the corresponding grid graph of power grid spatial data of screening is vacuated, different grid equipment information is shown under different scale bars.Which raises grid graphs to show efficiency, meets the needs of Electric Power Network Planning business, provides the data supporting of strength for the planning graphic data analysis service application of next step.

Description

A kind of Electric Power Network Planning figure methods of exhibiting and system
Technical field
The disclosure belongs to Electric Power Network Planning figure and shows field more particularly to a kind of Electric Power Network Planning figure methods of exhibiting and system.
Background technique
Only there is provided background technical informations relevant to the disclosure for the statement of this part, it is not necessary to so constitute first skill Art.
With the gradually deep propulsion of Electric Power Network Planning business, electric network information data need to visualize on GIS figure, Equipment retrospect, positioning, spatial analysis, provide decision support for Electric Power Network Planning.Electric Power Network Planning figure is with image map or vector bottom Figure is displaying grid equipment spatial data such as power plant, substation, transmission line of electricity, distribution transforming station and line etc. on the basis of background, Show the grid structure of power grid, the programme of each project, system access situation, substation location, route geography along cloth The functions such as situation, the comparative situation of status power grid and the following power grid, play the role of crucial touch to Electric Power Network Planning work, to mention Rise the lean management level of Electric Power Network Planning work.
Traditional grid graph solve the problems, such as CAD can not multizone it is seamless spliced it is region-wide one figure, with information The Electric Power Network Planning for turning to carrier is promoted to a new step.Inventors have found that current Electric Power Network Planning figure is shown mostly Multistage loadings are shown by the way of the spatial data of reading service device, because vector base map and image map data volume are huge, ground Figure tile, which is read, needs to consume a large amount of Internet resources and computer memory with loading procedure, takes a long time, working efficiency is low Under;Furthermore there is the grid equipment of great quantities of spare not play a role in Electric Power Network Planning in status power grid GIS figure, such as Shaft tower figure layer on content layer, data volume is big, and the reading shaft tower figure layer in route loading procedure step by step renders bar step by step Tower figure layer consumes resource, wastes time.It significantly reduces figure and shows speed;It is advised although there are also many grid equipments in power grid It is indispensable in the business of drawing, but some grid equipments call on demand, if load will affect grid graph simultaneously Displaying speed and efficiency.
Summary of the invention
To solve the above-mentioned problems, the first aspect of the disclosure provides a kind of Electric Power Network Planning figure methods of exhibiting, can It improves grid graph and shows efficiency, meet the needs of Electric Power Network Planning business, answered for the planning graphic data analysis business of next step With providing the data supporting of strength.
To achieve the goals above, the disclosure adopts the following technical scheme that
A kind of Electric Power Network Planning figure methods of exhibiting, comprising:
According to the power grid spatial data of the corresponding demand of Electric Power Network Planning business automatic screening;
Preset requirement is paid close attention to according to Electric Power Network Planning, the corresponding grid graph of power grid spatial data of screening is vacuated, Different grid equipment information is shown under different scale bars.
To solve the above-mentioned problems, the second aspect of the disclosure provides a kind of Electric Power Network Planning figure display systems, can It improves grid graph and shows efficiency, meet the needs of Electric Power Network Planning business, answered for the planning graphic data analysis business of next step With providing the data supporting of strength.
To achieve the goals above, the disclosure adopts the following technical scheme that
A kind of Electric Power Network Planning figure display systems, including memory, processor, display and storage are on a memory and can be The computer program run on processor, the processor realize that Electric Power Network Planning figure described above is shown when executing described program Step in method.
To solve the above-mentioned problems, a kind of computer readable storage medium is provided in terms of the third of the disclosure, it can It improves grid graph and shows efficiency, meet the needs of Electric Power Network Planning business, answered for the planning graphic data analysis business of next step With providing the data supporting of strength.
To achieve the goals above, the disclosure adopts the following technical scheme that
A kind of computer readable storage medium, is stored thereon with computer program, realization when which is executed by processor Step in Electric Power Network Planning figure methods of exhibiting described above.
The beneficial effect of the disclosure is:
The disclosure is according to the power grid spatial data of the corresponding demand of Electric Power Network Planning business automatic screening;It is paid close attention to according to Electric Power Network Planning Preset requirement vacuates the corresponding grid graph of power grid spatial data of screening, shows under different scale bars different Grid equipment information improves the displaying efficiency of grid graph display systems, saves hardware resource and Internet resources, and the whole province is each Planning examination, the evaluation of district planning assistant director has obtained technical support, browsing, positioning, tracking, the plan item of grid graph The work such as mesh evaluation have obtained great promotion, and Electric Power Network Planning works to obtain sound assurance.
Detailed description of the invention
The Figure of description for constituting a part of this disclosure is used to provide further understanding of the disclosure, and the disclosure is shown Meaning property embodiment and its explanation do not constitute the improper restriction to the disclosure for explaining the disclosure.
Fig. 1 is a kind of Electric Power Network Planning figure methods of exhibiting flow chart that the embodiment of the present disclosure provides.
Fig. 2 is the Electric Power Network Planning business demand that the embodiment of the present disclosure provides and the element vacuated.
Fig. 3 is that the power network line that the embodiment of the present disclosure provides shows process.
Fig. 4 is the base map tile storing process that the embodiment of the present disclosure provides.
Specific embodiment
The disclosure is described further with embodiment with reference to the accompanying drawing.
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the disclosure.Unless another It indicates, all technical and scientific terms used herein has usual with disclosure person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root According to the illustrative embodiments of the disclosure.As used herein, unless the context clearly indicates otherwise, otherwise singular Also it is intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet Include " when, indicate existing characteristics, step, operation, device, component and/or their combination.
Term is explained:
Power grid GIS figure can be divided into tri- layers of basemap, region, content.Basemap refers to mountains and rivers, river, railway, public affairs Road, social unit etc., region refers to that the block of each region, content refer to the power grids such as the route of various voltage class, substation Device space data, grid equipment data are divided into point, line, surface three types spatial data.Wherein each layer includes multiple figure layers, Electric Power Network Planning figure is the summation of All Layers.
As shown in Figure 1, a kind of Electric Power Network Planning figure methods of exhibiting of the present embodiment, comprising:
S101: according to the power grid spatial data of the corresponding demand of Electric Power Network Planning business automatic screening.
Such as: Electric Power Network Planning business includes but is not limited to grid equipment planning, voltage class planning, regional planning and department Planning.
S102: preset requirement is paid close attention to according to Electric Power Network Planning, the corresponding grid graph of the power grid spatial data of screening is carried out It vacuates, different grid equipment information is shown under different scale bars.
In specific implementation, the process corresponding grid graph of power grid spatial data of screening vacuated are as follows:
S1021: according to Electric Power Network Planning business demand, the element for needing to vacuate is found out, is respectively: grid equipment classification, ratio The classification of example ruler, voltage class classification, territorial classification, department's classification, equipment render this 6 class of classifying and vacuate element type;Such as Fig. 2 institute Show.
S1022: being numbered by the business of service database, setting difference vacuate the displaying ranks of element and show order with And bandwagon effect;
Such as:
Business number Business demand title Show rank Show order Bandwagon effect
1 Grid equipment classification Level V 5 Grid equipment
2 Scale bar classification The first order 1 Scale bar
3 Voltage class classification The fourth stage 4 Voltage class
4 Territorial classification The second level 2 Region
5 Department's classification The third level 3 Department
6 Equipment rendering classification 6th grade 6 Equipment rendering
It should be understood that in other examples, being numbered by the business of service database, difference vacuates its of element The displaying rank and displaying order of his default settings and bandwagon effect, those skilled in the art can voluntarily set according to specific operating condition It sets, is not described in detail here.
S1023: grid graph information is shown according to the number that vacuates set.
During grid graph is shown, many grid equipments are not to require to show under any circumstance, than As major network planning only need to pay close attention to 35kV or more grid equipment can and distribution network planning needs to pay close attention to 35kV grid equipment below The especially grid equipment of 10kV.According to the power grid spatial data of Electric Power Network Planning business automatic screening different demands, different Required displaying grid equipment pays close attention to the particular/special requirement in face according to Electric Power Network Planning, to electrical network figure without identical under scale bar Shape is vacuated, and different grid equipment information is shown under different scale bars.
Specifically, in a step 102, the grid graph includes grid equipment, shows process are as follows:
The spatial information for reading corresponding grid equipment in power grid GIS spatial database, calculates in each face of grid equipment Heart space of points coordinate renders corresponding grid equipment symbol, shows the grid equipment of rendering and the central point space coordinate in each face.
There is a large amount of spatial data in power grid GIS spatial database, grid equipment is such as in previous work Power plant, substation, box-type substation, change, distribution transforming room etc. are stored in spatial database in the form of face on column, and face is There are four coordinate points to form, and needs to recycle during grid graph is shown and reads the information of four coordinate points and show, this reality Apply example in the form of face existing for grid equipment convert the central point in taking-up face respectively and replace original face structure, during displaying The central point spatial coordinated information for showing this equipment, rendering corresponding grid equipment symbol arrived previous bandwagon effect, accelerate Data loading improves figure and shows efficiency, preferably solves the need that Current Situation meets Electric Power Network Planning business simultaneously It wants.
Such as: the spatial information of equipment is read, respectively maximum X-coordinate, minimum X-coordinate, maximum Y-coordinate, minimum Y are sat Mark;
The central point of the maximin of equipment X is calculated separately, the central point of the maximin of equipment Y is formed with this X, the spatial information of the vertex type centered on Y;
The spatial information of vertex type is rendered corresponding grid equipment symbol and Show Styles, transparency, angle, ratio The information such as ruler.
The present embodiment is according to the power grid spatial data of the corresponding demand of Electric Power Network Planning business automatic screening;It is closed according to Electric Power Network Planning Preset requirement is infused, the corresponding grid graph of power grid spatial data of screening is vacuated, is shown under different scale bars different Grid equipment information, improve the displaying efficiency of grid graph display systems, save hardware resource and Internet resources, the whole province Planning examination, the evaluation of each district planning assistant director has obtained technical support, the browsing of grid graph, positioning, tracking, planning The work such as project appraisal have obtained great promotion, and Electric Power Network Planning works to obtain sound assurance.
Specifically, in a step 102, the grid graph further includes power network line, as shown in figure 3, it shows process are as follows:
Read the power network line information in power grid GIS spatial database between each grid equipment, by greedy algorithm by Point in secondary filtering straightway or class straightway is shown after reducing weight to power network line.
Specifically, it crosses greedy algorithm and gradually filters the mistake that the point in straightway or class straightway reduces weight to power network line Journey are as follows:
Original power network line is resolved into conducting wire, cable and connecting line;
Thought according to greedy algorithm takes out preceding 3 coordinate points of route, the 2nd o'clock to the 1st point and the 3rd point first The vertical range of composed straightway deletes the spatial information of intermediate point if vertical range is 0, and so on, it is intermediate O'clock to straightway composed by the 1st point and the 3rd point vertical range be less than or equal to preset threshold (such as: 0.0001) spatial information for, deleting intermediate point, until route does not change nyctitropic state;
The line topological for filtering out extra point is replaced original power network line at a complete route.
Wherein: greedy algorithm (also known as greedy algorithm) refers to, when to problem solving, always makes and appearing to be most currently Good selection.That is, not taking in from total optimization, what it was made is local optimum in some sense Solution.
In power grid GIS spatial database, route is made of multiple points, and line is the set of point.Because of Electric Power Network Planning business Demand is not very strict to the accuracy of power network line.It is much put on route on same straightway or close to straightway On, the spatial information data amount of these points is quite huge, passes through greedy algorithm filtering out in straightway or class straightway gradually Point reduce weight to power network line, improve the precision of Electric Power Network Planning.
In another embodiment, as shown in figure 4, the Electric Power Network Planning figure methods of exhibiting, further includes:
Local base map tile information is read, shows grid graph.
If local incomplete without base map tile or base map tile, access server and read base map slice service, lead to simultaneously Agent data mode is crossed base map tile storage to local.
Wherein, power grid base map slice address of service is accessed by way of agent data, according to opening up under different scale Show different base maps, and the base map tile under the correspondence scale bar of access is stored in local.
During grid graph is shown, service is sliced by the base map in connection GIS spatial server, reads slice clothes Base map tile of each of the business below scale bar, the base map watt of the server shown under the different scale bar in the same region The piece number is different, citing: assuming that the base map in mono- province 1:100000 can averagely be divided into i.e. 4 rows 4 of 16 tiles to arrange, that The base map in one province can averagely be divided into i.e. 40 rows 40 of 1600 tiles to arrange when scale bar is amplified to 1:100.Not on year-on-year basis Base map tile under example ruler is stored in different files in the following, with regard to many cages similar to different levels, in each grid Store corresponding base map tile.These base map tiles are to recycle each layer step by step by system, are inquired below each layer Row, recycles the column of every a line, gradually loads the following tile of each column.
Need to expend a large amount of Internet resources, hardware resource in the tile loading procedure of each base map, grid graph is shown Effect is excessively poor, flexibility is excessively poor.The power grid base map local cache process of the present embodiment are as follows:
Power grid base map address of service is accessed by way of agent data first, according to what is shown under different scale Different base maps, the base map tile accessed under corresponding scale bar are stored in local, first correspond to from local read when base map is shown again Base map tile under figure layer connects GIS spatial server base map if the base map tile being locally not present under corresponding scale bar Slice service is read base map tile and is shown in grid graph simultaneously to local.
In the present embodiment, Electric Power Network Planning graph data disposes three-level application model using second level, and province-city-county three cascades Dynamic, zone isolation, real-time synchronization ensure that safety, confidentiality and the integrality of Electric Power Network Planning GIS graph data, accelerate number According to loading velocity, figure displaying efficiency is improved, the needs that Current Situation meets Electric Power Network Planning business simultaneously are preferably solved, under The planning graphic data analysis service application of one step provides the data supporting of strength.
The present embodiment improves the displaying efficiency of grid graph display systems, saves hardware resource and Internet resources.Entirely Planning examination, the evaluation for saving each district planning assistant director have obtained technical support.The browsing of grid graph, positioning, tracking, rule It draws the work such as project appraisal and has obtained great promotion, Electric Power Network Planning works to obtain sound assurance.
The present embodiment grid graph shows that efficiency raising can support more people to simultaneously participate in drawing for Electric Power Network Planning figure Work processed, can support more people to submit Electric Power Network Planning spatial data simultaneously, and working efficiency greatly improves.The more people in subregion are simultaneously It draws, promotes working efficiency.
The present embodiment Electric Power Network Planning GIS graph data improves Electric Power Network Planning by a series of filtering, weight reducing, refinement Precision, Electric Power Network Planning graph data using second level dispose (province, city's two levels server) three-level application model, figure show system System end is mounted on planning assistant director PC at different levels, and Electric Power Network Planning GIS graphical information takes province-city-county's three-level to link, zone isolation, Real-time synchronization ensure that safety, confidentiality and the integrality of Electric Power Network Planning GIS graph data, be the planning figure of next step Data analysis service application provides the data supporting of strength;The mode of real-time synchronization has ensured power grid spatial data loading velocity And efficiency.
The present embodiment is converted original grid graph spatial data by device type, is converted into a little by face, power grid is set Standby information space information saves 75%, is filtered by greedy algorithm and reduces great quantities of spare point information data on route, using vacuating Technology divides the displaying grid equipment spatial information of difference, and base map uses data generation to load local tile as major way The mode of reason stores the base map of server-side to local.
In another embodiment, a kind of Electric Power Network Planning figure display systems, including memory, processor, display are additionally provided On a memory and the computer program that can run on a processor, when processor execution described program, is realized for device and storage Step shown in Fig. 1 or in Electric Power Network Planning figure methods of exhibiting described in any of the above-described embodiment.
The present embodiment according to planning business, working efficiency, power network resources needs, be woven into the sky that a multi-angle screens out Between data funnel, reduce weight to spatial data, change original data load logic, cache available base map tile, with Face present grid equipment be converted into show a spatial data, not only can solve space data quantity is big, data volume is miscellaneous, plus Carry that speed is slow, the problems such as bandwagon effect is poor, and realize than traditional power grid figure show it is more flexible, more practical, closer to business Electric Power Network Planning figure display systems, for Electric Power Network Planning development escort.
In another embodiment, a kind of computer readable storage medium is additionally provided, computer program is stored thereon with, it should The step shown in Fig. 1 or in Electric Power Network Planning figure methods of exhibiting described in any of the above-described embodiment is realized when program is executed by processor Suddenly.
It should be understood by those skilled in the art that, embodiment of the disclosure can provide as method, system or computer program Product.Therefore, the shape of hardware embodiment, software implementation or embodiment combining software and hardware aspects can be used in the disclosure Formula.Moreover, the disclosure, which can be used, can use storage in the computer that one or more wherein includes computer usable program code The form for the computer program product implemented on medium (including but not limited to magnetic disk storage and optical memory etc.).
The disclosure is referring to method, the process of equipment (system) and computer program product according to the embodiment of the present disclosure Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
Those of ordinary skill in the art will appreciate that realizing all or part of the process in above-described embodiment method, being can be with Relevant hardware is instructed to complete by computer program, the program can be stored in a computer-readable storage medium In, the program is when being executed, it may include such as the process of the embodiment of above-mentioned each method.Wherein, the storage medium can be magnetic Dish, CD, read-only memory (Read-Only Memory, ROM) or random access memory (Random AccessMemory, RAM) etc..
The foregoing is merely preferred embodiment of the present disclosure, are not limited to the disclosure, for the skill of this field For art personnel, the disclosure can have various modifications and variations.It is all within the spirit and principle of the disclosure, it is made any to repair Change, equivalent replacement, improvement etc., should be included within the protection scope of the disclosure.

Claims (10)

1. a kind of Electric Power Network Planning figure methods of exhibiting characterized by comprising
According to the power grid spatial data of the corresponding demand of Electric Power Network Planning business automatic screening;
Preset requirement is paid close attention to according to Electric Power Network Planning, the corresponding grid graph of power grid spatial data of screening is vacuated, it is different Scale bar under show different grid equipment information.
2. a kind of Electric Power Network Planning figure methods of exhibiting as described in claim 1, which is characterized in that the grid graph includes power grid Equipment shows process are as follows:
The spatial information for reading corresponding grid equipment in power grid GIS spatial database, calculates the central point in each face of grid equipment Space coordinate renders corresponding grid equipment symbol, shows the grid equipment of rendering and the central point space coordinate in each face.
3. a kind of Electric Power Network Planning figure methods of exhibiting as claimed in claim 2, which is characterized in that the grid graph further includes electricity Cable road shows process are as follows:
The power network line information in power grid GIS spatial database between each grid equipment is read, greedy algorithm gradually mistake is passed through Point in filter straightway or class straightway is shown after reducing weight to power network line.
4. a kind of Electric Power Network Planning figure methods of exhibiting as claimed in claim 3, which is characterized in that cross greedy algorithm and gradually filter directly The process that point in line segment or class straightway reduces weight to power network line are as follows:
Original power network line is resolved into conducting wire, cable and connecting line;
Thought according to greedy algorithm takes out preceding 3 coordinate points of route, the 2nd o'clock to the 1st point and the 3rd point institute group first At straightway vertical range, if vertical range be 0, delete the spatial information of intermediate point, and so on, intermediate point arrives The vertical range of straightway composed by 1st point and the 3rd point is to delete the space of intermediate point less than or equal to preset threshold Information, until route does not change nyctitropic state;
The line topological for filtering out extra point is replaced original power network line at a complete route.
5. a kind of Electric Power Network Planning figure methods of exhibiting as described in claim 1, which is characterized in that the power grid spatial data of screening The process that corresponding grid graph is vacuated are as follows:
According to Electric Power Network Planning business demand, the element for needing to vacuate is found out, is respectively: grid equipment classification, scale bar classification, electricity Pressure grade separation, territorial classification, department's classification, equipment render this 6 class of classifying and vacuate element type;
It is numbered by the business of service database, setting difference vacuates the displaying rank of element and shows order and show effect Fruit;
Grid graph information is shown according to the number that vacuates set.
6. a kind of Electric Power Network Planning figure methods of exhibiting as described in claim 1, which is characterized in that Electric Power Network Planning figure displaying side Method, further includes:
Local base map tile information is read, shows grid graph.
7. a kind of Electric Power Network Planning figure methods of exhibiting as claimed in claim 6, which is characterized in that if it is local without base map tile or Base map tile is not complete, then accesses server and read base map slice service, while base map tile is stored by agent data mode To local.
8. a kind of Electric Power Network Planning figure methods of exhibiting as claimed in claim 7, which is characterized in that visited by way of agent data Power grid base map slice address of service is asked, according to showing different base maps under different scale, and will be under the correspondence scale bar of access Base map tile be stored in local.
9. a kind of Electric Power Network Planning figure display systems, including memory, processor, display and storage on a memory and can located The computer program run on reason device, which is characterized in that the processor is realized when executing described program as in claim 1-8 Step in described in any item Electric Power Network Planning figure methods of exhibiting.
10. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the program is by processor It realizes when execution such as the step in Electric Power Network Planning figure methods of exhibiting of any of claims 1-8.
CN201910234601.1A 2019-03-26 2019-03-26 A kind of Electric Power Network Planning figure methods of exhibiting and system Pending CN109977545A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910234601.1A CN109977545A (en) 2019-03-26 2019-03-26 A kind of Electric Power Network Planning figure methods of exhibiting and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910234601.1A CN109977545A (en) 2019-03-26 2019-03-26 A kind of Electric Power Network Planning figure methods of exhibiting and system

Publications (1)

Publication Number Publication Date
CN109977545A true CN109977545A (en) 2019-07-05

Family

ID=67080840

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910234601.1A Pending CN109977545A (en) 2019-03-26 2019-03-26 A kind of Electric Power Network Planning figure methods of exhibiting and system

Country Status (1)

Country Link
CN (1) CN109977545A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112580970A (en) * 2020-12-15 2021-03-30 西安华海众和电力科技有限公司 Energy mapping platform based on GIS and power grid holographic sensing
CN112862248A (en) * 2021-01-06 2021-05-28 山东旗帜信息有限公司 Road section rarefying method, equipment and medium
CN113010570A (en) * 2021-03-11 2021-06-22 南方电网数字电网研究院有限公司 Power grid equipment vector data query method and device, computer equipment and medium
CN113124895A (en) * 2021-04-19 2021-07-16 武汉齐物科技有限公司 Code table navigation route generation method and code table
CN113590997A (en) * 2020-12-30 2021-11-02 绿盟科技集团股份有限公司 Data display method and device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040051266A (en) * 2002-12-12 2004-06-18 한국전자통신연구원 Geographic information system for client/server-system and the method
CN103093024A (en) * 2012-11-22 2013-05-08 中国电力科学研究院 Web geographic information system (WEBGIS)-based visualized showing method for planning power grid
CN106056349A (en) * 2016-05-18 2016-10-26 国网山东省电力公司经济技术研究院 Province-city-county three-level power grid programming GIS drawing system and method
CN106682001A (en) * 2015-11-05 2017-05-17 新华通讯社 Multi-scale mass data space rendering method based on grid
CN106777136A (en) * 2016-12-19 2017-05-31 上海找钢网信息科技股份有限公司 A kind of steel trade price index information map interactive exhibition system and method
CN107133272A (en) * 2017-04-07 2017-09-05 南京南瑞集团公司 A kind of Web ends magnanimity power network resources GIS data dynamic dispatching and rendering intent
CN108897909A (en) * 2018-05-29 2018-11-27 广西电网有限责任公司 A kind of distribution network planning panoramic view Dynamic Display method based on GIS data

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040051266A (en) * 2002-12-12 2004-06-18 한국전자통신연구원 Geographic information system for client/server-system and the method
CN103093024A (en) * 2012-11-22 2013-05-08 中国电力科学研究院 Web geographic information system (WEBGIS)-based visualized showing method for planning power grid
CN106682001A (en) * 2015-11-05 2017-05-17 新华通讯社 Multi-scale mass data space rendering method based on grid
CN106056349A (en) * 2016-05-18 2016-10-26 国网山东省电力公司经济技术研究院 Province-city-county three-level power grid programming GIS drawing system and method
CN106777136A (en) * 2016-12-19 2017-05-31 上海找钢网信息科技股份有限公司 A kind of steel trade price index information map interactive exhibition system and method
CN107133272A (en) * 2017-04-07 2017-09-05 南京南瑞集团公司 A kind of Web ends magnanimity power network resources GIS data dynamic dispatching and rendering intent
CN108897909A (en) * 2018-05-29 2018-11-27 广西电网有限责任公司 A kind of distribution network planning panoramic view Dynamic Display method based on GIS data

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
姜春莹等: "移动GIS建设规划的研究分析", 《电子测试》 *
邢亚虹等: "基于贪婪算法的配电网网格负荷预测与规划方法", 《计算机工程》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112580970A (en) * 2020-12-15 2021-03-30 西安华海众和电力科技有限公司 Energy mapping platform based on GIS and power grid holographic sensing
CN113590997A (en) * 2020-12-30 2021-11-02 绿盟科技集团股份有限公司 Data display method and device
CN112862248A (en) * 2021-01-06 2021-05-28 山东旗帜信息有限公司 Road section rarefying method, equipment and medium
CN113010570A (en) * 2021-03-11 2021-06-22 南方电网数字电网研究院有限公司 Power grid equipment vector data query method and device, computer equipment and medium
CN113010570B (en) * 2021-03-11 2023-01-20 南方电网数字电网研究院有限公司 Power grid equipment vector data query method and device, computer equipment and medium
CN113124895A (en) * 2021-04-19 2021-07-16 武汉齐物科技有限公司 Code table navigation route generation method and code table

Similar Documents

Publication Publication Date Title
CN109977545A (en) A kind of Electric Power Network Planning figure methods of exhibiting and system
CN104616207B (en) Power network topology visualization system and method
Amado et al. Solar urban planning: a parametric approach
CN104318402B (en) Integrated planning and designing information system based on power network GIS platform
CN102411764B (en) The data management system of grid equipment and management method
CN108763669B (en) Power grid tide layered and partitioned three-dimensional visual display method
CN105975619A (en) Power grid graph drawing method based on mobile GIS platform
CN103150600A (en) Safety analyzing system of power network
CN104462314A (en) Power grid data processing method and device
CN103810753A (en) Method for visually showing power grid dispatching businesses
CN104835018B (en) The reliability estimation method and device of medium voltage distribution network rack
CN111275275B (en) Power distribution network load space-time characteristic visualization analysis method
CN103955566A (en) Electric transmission line three-dimensional design method based on Google Earth and electric transmission line three-dimensional design system based on Google Earth
CN107291539B (en) Cluster program scheduler method based on resource significance level
CN108595613A (en) GIS local maps edit methods and device
CN102708520A (en) Section gradient interpolation technology for water quality multi-index dynamic simulation
CN104299056A (en) Distribution network planning basic technology supporting platform
CN110689187A (en) Multi-condition constraint-based automatic site selection method for transformer substation
CN105701271A (en) Creating and deleting method for device in electric power system graph/model hybrid simulation modeling
CN103049640B (en) Power grid multi-state multi-dimensional display control based on GIS-Geographic Information System
CN106951453A (en) A kind of geographical entity coding method of quick renewal and data sharing
CN115329667A (en) Method, device and equipment for determining point location of fan and storage medium
CN105677680B (en) A kind of geographical wiring diagram networking is synchronous and conversion method
Zhang et al. Application of multi-agent models to urban expansion in medium and small cities: A case study in Fuyang City, Zhejiang Province, China
CN112541617A (en) Constant volume and site selection method for transformer substation and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190705

RJ01 Rejection of invention patent application after publication